HomeMy Public PortalAbout09-0394 Yarborough CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 09-3-2009 PERMIT#: 090394
WORK DESCRIPTION DUCT FOR HOOD
WORK LOCATION 1605 STRAND
OWNER NAME JOHN A YARBOROUGH
ADDRESS 518 RIDGE DR
CITY,ST,ZIP NAPLES FL 34108-2674
PHONE NUMBER
CONTRACTOR NAME DELTA METALS INC
ADDRESS PO BOX 1706
CITY STATE ZIP SAVANNAH GA 314021706
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 49.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $4,500.00
TOTAL BALANCE DUE: $ 49.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: 41a./t/ -1414--e....)
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
1
':lt`.`' City of Tybee .eland . Community Development ._.dpt. -, ,0 ci
: , . Inspecti Report rirrr: . ,
�t ,•
.: • 403 Butter Ave. - P.O. Box 2749 . Tybee Island, GA 31328 r�9 ;; 4
,, ;`f Phone 912.786.4573 ext. 114 . Fax 912.786.9539 `_',;.,..;a
J t
Permit No. e '�I Date Requested 1O '
Owner's Name t ' )7 ,ar Date Needed 42//kr
Gen. Contractor �Subc€>'ntractor
Contact Information
r 1
Project Address ' j +-� +t-•-1 / j / (J'4 3
Scope of Work ��U ... ° ° .-, i
Inspector `�71 r I T Date of Inspe " I at 0
Inspection _ (N,.) I Pass Fail El Fee
9
I
Inspection Pass Fail 0 Fee
Inspection Pass Fail 0 Fee
Inspection _ Pass Fail 0 Fee
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
4,,OClO�
Location: /a0 S A,ti PIN #
NAME ADDRESS TELEPHONE
Owner Liifilro z1& l66( S v cD 7X--- 41-Y77
Architect
or Engineer le/ti--14 /k - (Y t 27(i' - � 1
Building t ;
Contractor
(Check all that apply)
H Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family [ Discovery
n Minor Addition ❑ Duplex ❑ Demolition
n Substantial Addition ❑ Multi-Family
'K Other El Commercial C . r-
Details of Project: ' 0441 . 0 6
Estimated Cost of Construction: $ � -- `6
Construction Type (Enter appropriate number)
(1) *ood Frame (4) Masonry (6) Other (please specify)
(2) Wood &Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed se:
Remarks:
ATTACH A ' ' 'Y OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following in . ation based on the construction drawings and site plan:
#Units #Bedrooms #Bathrooms
Lot Are. Living space (total sq. ft.)
#Off- eet parking 'aces
Trees ocated & listed .n site plan
Acc'ss:
D eway (ft.) With culvert? With swale?
S
tbacks: Front Rear Sides (L) (R)
Stories Height Vertical distance measured from the average adjacent
grade of the building to the extre - high point of the building, exclusive of chimneys, heating _
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
°e /44(7 CV �G�- 4 /iaz�nliL
During construction:
On-site restroom facilities will be provided through
On-site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
i J
Date: "7/ o Signature of Applic. • __ �
Note: A permit normally takes 7 to 10 days to proce
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Dat FEES
Zoning Administrator Permit
Code Enforcement Officer [ Inspections /
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL 1'f
DEFT.Of .EE•I�
NATURAL ,F
RUM= . � �'
a
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition,Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
L. I.. .
,
i" " '. //'?(riD,T' Da'PtalliT OF nil-LONG SAFri'mz'
61 REGULA-roRv.stimvirms.
-- APpk\-ntEr)
t4cMicNnAK,CA r5i4,12411E1 DATE,,...,..2z5-__L-4‹;
D1SAPPROVr.7, trii..Zild.47.,.
`. ..
You ere horelw nctitteci that ti iF.if.an Clicie.E atiar of tire County Fire UE,',!-shilt,StrrAinpthaticts ..N.4 tr;er.it to the heferencrel stn.ratire,tend turihe7
re,Vros
that you,at.;owner,a,gerk,or MrSnrt ir,'..rrrargo or tiale atructuFe r3brI1 itexce"36 ciLy8 to orrolsTr:srocified repair::OF irnproverne Ws,
BUSHES.S 7g6"-e-/ci 2 ) Ot.NNER. gz, ...,./;,,,,,,,,,,.....6..cfr, (.9CcUPAr0
PlIONII: LOst 13
/
4'
Rtzt.Iii V. ,jte.:0 ...:, p / c.......,4.2.14 .-.,.* <,..;„„ ,,,,..... ,,, .,...
....,
4US'eft Ess (---A-7-ZSErt4R),:Y -) STORAGE EDUCATi014 OM-c.ARC: fkr.71'iRcAkiTC.0
-'..---------'
E,ERSOtiAl. r'ARL:110i4E FACTORY RESIDENT/AI HA.-ZARDOUS
,,,e2
T. Nith.kBER 07 EXET r.)-iatIKs op: El Locg.ED 1174 BLOCKED r-
i._ iqFPA i Di
1. EMT SIGNS ::!70C.TD 2-' UNSATISFACTORY D NIA D NH-4,1Di
34, EMERGENCY Lin= .:::1:1:r.,`)L% Et uNe ATISFACTORY CI N/A. in NFPA 1 Di
4_.......0
d.. !,zANo:-.: HARM/ARE GOCO 0 Uki•ISA`i-i4S.FACTORY f 1 ■14i/A Li 14FPA.10 i
_
E. t,ELF.M.0„SARE LIEOCEi7, c.oc,t,, F-i Litir.s...nsr,ACTCAY D NIA r 1
1.......J NiFP,A i D1
Er Pilr.:.E AL.A.Ril' "it-S 0 kCik n iWA F] rEETED ______„ i4FPA 72
7. WOKE/HEAT DETEcioRtri.,. YES fl No Fi will, El F - 1050AL i)11 gq NFPA 72
E, 1.i:PRIWKLER SYST014 YES W.,,,-" to D WI' ■.----1 .-EA4-En Ple) b
t ,,j t ,E ,t,
S, ME E),ITINGUCS4E PNCTER TYPE: Fik E 114SPECTED/Cf IARGELt?:'ir:4-e:r flirt P4F--Pk. lit3
L-,.... 6,...,..:
i 0... Ft XF.0 11COD SY-2•TER yEr.,p NC3 D PIA nt. CLE.AK:L] ig
„ ....-.7.
DATE:Or LAST SERVoc,"E .,:ir:..,,.. .' 1 (REOL.WilEID SEMI-ANLIALLY)
. . %
I'D, FLECIAtC-Cal 0,00u 0 FAF.R 71 uusfraisPACTORY I. 1 Ne.,,pi,ird
avERLOADED OUTLETS 1::3 kiiSSiNG ELECINCIAti C-OVERS [J
V:, EXC,1:1:SE.,T17,*TOig.ASE OF COME4.3:-sTiatLE;f: ,E, al IFC, i'l7M 1
gi •1.- -:gAtt.,S,;.: ,,:, ,--
..., f---1... ., .)// '(27,:i cl-l'
-' ?
/
. 4: -.: A-e'6 .4.( 0 - 1: 1,--J 7
–
-- /4) Li- , . s- /
,..., 41,‘,j,.‹. , .r. 1:2'.‹. 9- 0/ ,,,-.--I, f,...,/C.,
t. r
'' ‘3'- '; .- -- - -I .-- —,-,
14e-t/ ) . -i . el, (. ...% ,,_, , 7 7 6(:,'.,-. ir
r 6"
...: 7.-, i,„-e e .,;_, ? /41.4: :1')
'--- i ,-, ;(17 Cz.) ,...`.1 , r- s- , ,
• .. ,.
I-
/ • )• -) , ce ,,,. z , ,I,ej ),Y r- A.)1 I
.7...' ' -- z,,4.: -I. •-• -2,, /.... c1-.•-c r- - • (
6:3,-- I t
12 .r e_i,...),:-;:- ,:f 0,,,i;,- 6`,,,
./r'''
71-iE&I:NATURE. UF,bvkliqtiS, i:i.:CUPAN:!:;-11;..1-ENT, Sr.,I.N.i7ES f•NSIT.CTION WAS 1144404.a...
,, ..,---1
i' , . , --c.-=-1;''''%'------------
6..-“, - / rr .-,..,----1,
5.FgAt:C:4K'),"firk7------- :727:5MC't'1-1i111.T--:'IR•ii01/1-(P755-27512MIF-
.
• ...
08/27/2009 12:02 9127865012 SPANKYS BEACH PAGE 01
To: Ray Horde
From : John Yarbrough /Spanky's Beachside
Here is sketch of what Ronnie Lewis at Delta
Metals has come up with .1 will be sending Eric
a copy of this as well and hopefully this will
work. I will try and reach you at the office to
see if any other changes are necessary or if we
are good to go.
Thank You,
John Yarbrough
Cell #:912-844-0670
Office #:912-786-4477
Fax #:912-786-5012
"
. -
Q U O T A T I O N
S p a n k y '