HomeMy Public PortalAbout09-0406 Tybee Historical Society CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 09 -16 -2009 PERMIT #: 090406
WORK DESCRIPTION SHINGLES & REPAIR WATER DAMAGE
WORK LOCATION 30 MEDDIN DRIVE
OWNER NAME TYBEE HISTORICAL SOCIETY
ADDRESS P 0 BOX 366
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME SAVANNAH RESTORATION INC
ADDRESS PO BOX 9351
CITY STATE ZIP SAVANNAH GA 314129351
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 63.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $6,000.00
TOTAL BALANCE DUE: $ 63.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
1
tI
Iksm.to eti
City of Tybee Island • Community Development Dept. 6
Inspection Report
403 Butler Ave. • P.O. Box 2749 Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No ( ) I - C)+ L.) C-1 Date Requested 1
Owner's Nam +3 r c, e . Date Needed
e 11 ' a
Gen. Contractor b 3 u � . Subcontractor
Contact Info rm at io n l o r. derio
Project Address /Y1 .4:)
Scope of Work 7 7Zta-r 1/4 ? baCkkr CI (
Inspector '26) .
Date of Inspection yr/ / 7 Z.-"-( (}1
cyr
Inspection (2 Pass Fai Fee
r
Inspection Pass 0 Fail Fee
Inspection Pass Fail 0 Fee
2-
inspecto/ ,f Pass Fail Fee
,)L
CITY OF TYBEE ISLAND
APPLICATION FOR NEW CONSTRUCTION BUILDING PERMIT
_ 2 sets of building plans
1 copy ofsurve-r showing
ground elevations & flood gone
09 .- c 4 j _ $250 plan deposit
Location: // ` L-4 c PIN #
�??�� ��,, l�
NAME ADDRESS /I 1 _ TELEPHONE
Owner i' 444 M� ^f .. 50 j 4 a+ � 7c 6 ,�Q /
Architect
or Engineer 4`4
Building ��
Contractor �p � q3 ,/ „(' l % . / D 1 15,2
(Check all that apply) ❑ New Construction ❑ Residential
❑ Other ❑ Single Family
❑ Duplex
12 Multi- Family
❑ Commercial
Details of Project: �
Estimated Cost of Construction: $ 67,40/2
Construction Type 2_ (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units c # Bedrooms f) # Bathrooms
Lot Area Living space (total sq. ft.)
# Off-street parking spaces Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories / Height Vertical distance measured from the average adjacent grade of
the building to the extreme high point of the building, exclusive of chimneys, heating units,
ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be pro'' d - . by •
Construction debris will be disposed by , , by means of
I understand that I must comply with zoning, flood damage control, building. fire. shore protections
and wetlands ordinances. FEMA regulations and all applicable codes and regulations. I understand
that the lot must be staked out and that the stakes will be inspected to ensure that the setback
requirements are met. I understand also that a certified plot plan showing elevation must be attached
to this application and that an as-built elevation certification is due as soon as the habitable floor level
is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that
surrounding property is in no way adversely affected. I accept responsibility for any corrective action
that may be necessary to restore drainage impaired by this permii ed • % truction.
Daterr / ‘ / Signature of Applicant: r
Note: A permit normally takes 7 to 10 business days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections
Water /Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager CC Recovery
TOTAL (. _
PUT. OF
NANA.1. mounts �.r.cDFE L
Dpi
Kg
GEORGIA
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Proiects Involving Demolition. Wrecking. or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
1) I if
4 0 / — 7fi.s.)?
Undersigned Date
'ct) p A- y0 s r\-
Printed Name
Office Use Only:
Project Address:
Permit Number: