DATE ISSUED: 05/06/2010 PERMIT#: 090408
WORK DESCRIPTION COVER REAR DECK W/OVERHANG
WORK LOCATION 1005 LOVELL AVE f
OWNER NAME DONNA BOWLING
ADDRESS 699 CHEROKEE AVE SE ' (J,
CITY,ST,ZIP ATLANTA GA 30315-1457 �'
PHONE NUMBER 404-581-1991
CONTRACTOR NAME HARRISON CONSTRUCTION& DESIGN - '`
ADDRESS PO BOX 2386
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE , \'
BUILDING VALUATION
dais SQUARE FOOTAGE I a
OCCUPANCY TYPE P 14 0
TOTAL FEES CHARGED $ 68.00 /
PROPERTY IDENTIFICATION#
PROJECT VALUATION $1,500.00
7 ,„,,A -1 ‘
REINSPECTION FEE - FRAMING TOTAL BALANCE DUE: $ 30.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
cl ...)
- ( 2- lam
H .r E' ;5 ' t'-` (-:°('S `' P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
D 9 ( I ww IN.cihroftybee.org
JNi■ o, tier r . Sa-, C- at,5'i
_Z4'-ii (e-C4 Vet
�°`. y City of bee Island • Community Develo ent Dept. ��`
( Inspection Report ����
\ i I 403 Butler Ave. • P.O. Box 2749 • Tybee Island GA 31328 == �INTERZONL
n%
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
// MEMBER
a a
Permit No. ( / / , , ) Date Requested 9,/22-4
,
Owner's Name t:0i,41/,,ck-c Date Needed /4;/I+
dd //4 1
Gen. Contractor d-CU/J Subcontractor
i
Contact Information ,/ q/2 U 2i.-
Project Address /L`?() U//.:d
Scope of Work . i/..-f t/ / i<_ '-AZ J�'
Inspector Date of Inspection - '%t,ss
,r
Inspection i /rr, %'--- .... Pass Is Fail a�Fee
Qe.s
/
Inspection r 7" /- Jr, ; Pass ® Fail 0 Fee
Inspection Pass ❑ Fail [J Fee
Inspection Pass ❑ Fail ❑ Fee
i
,
City a Tybee Island • Community Development Dept. WA;
.';;;;*•', ..31' •
EMMA 1-t,
4 Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA :11328
Phone 912.786.4573 ext. 114 Fax 912.786.9539 ftr, i la
'..1'.V+•,:;....
:.•0:4:.:Sces7.1
1,- -
Permit No. 04:i -LA-II/3(9 Date Requested
-'2 - j ,.\\7
Owner's Name 1
_-0C..2L - Date Needed
LL
Gen.
, \
Gen. Contractor Ti/ L/!- /1,4\,..) Subcontractor __
Lt
/1–, , b,
Contact Information at/_,__L-_ _t_LL- 193
Project Address LO_LL-..;2__ L ijirjj_
Scope of Work
/
Inspector_ ,2/(`/1 ____
_
Date of Inspection .- -/i /
,Lt..221„_/
..........,
vo -0
Inspection
I--- 4-41..,1' 1 =..
I /'
— _ Pass 0 Fail,, i F
/\)6) /4-6'nf-, ,-5 –
46,
bfrt.)
Fee
,..1
Inspection __ Pass Fail Fee
Inspection Pass Fail Fee
,...
(
mr?
City of Tybee island • Community Development Dept
inspection Report ixtic
T.4v12,;a7A
403 Butler.Ave. I: POD. Box 2749 • Tybee Island, GA 3132B
Phone 412.786..4573 ext. 114 Fax 912.780.9539
Permit No. no-, 4 (,)' ` Date Requested
Owner's Name Date Needed 4 - 2 rf? iro
Gen. Contractor 0, c c. ar r s n Subcontractor
Contact Information
Project Address
Scope of Work n
Inspector ')/ 11/ Date of Inspection (//17z'-/--)
Inspection_ 9 Pass 0 Fail 'Ix
Inspection Pass Fail Ei Fee j\. ,(„)
–
."`
30 HLL_ fitk
-1--
3410/#36-, 14e-aze/L-1,,,Atc
Inspection jJ PPs* - -
Inspection Pass Fail Fee
_ — —
' to
City of Tybee Island • Community Development Dept-
Inspection Report z
••
40:3 Butler Ave. • P.O. Bo x 2749 • Tybee Island, GA 3132x
.t.. Phone 912.786.4573 ext. 114 • Fax 912.786.9539
mit No. CMO
Date Requ.P.O.Pd
flea's Name -7,I72.-r)" J.) e Date Needed ac( 9
:n. Contractor (-- rc 4,
Subcontractor --
.;ontact Information t„1, 0. 7c -3
Project Address 1(,)p 5
Scope of Work
A•4. s..
Inspector 7Jg Date of Inspection ,dallit4 ?Val
Inspection C C Pass Fail Fee
. v
Inspection Pass Fail 0 Fee
Inspection Pass Fail o Fee
•.
. ,
•
Inspection Pass Fail Fee
_ .
0.05PF 4544
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 09-18-2009 PERMIT#: 090408
WORK DESCRIPTION COVER REAR DECK W/OVERHANG
WORK LOCATION 1005 LOVELL AVE
OWNER NAME DONNA BOWLING
ADDRESS 699 CHEROKEE AVE SE
CITY,ST,ZIP ATLANTA GA 30315-1457
PHONE NUMBER 404-581-1991
CONTRACTOR NAME HARRISON CONSTRUCTION&DESIGN
ADDRESS PO BOX 2386
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 38.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $1,500.00
TOTAL BALANCE DUE: $ 38.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
litj "al
Signature of Building Inspector or Authorized Agent: ...... ......_41.11I -
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGE.
APPLICATION FOR BUILDING PERMIT
(7) ma VO,a3:. ,••
Location: / OO5 j ye/ ./' )V-e°, PIN #
NAME ADDRESS TELEPHONE
Owner /1��� ,gave/� ��//�vuy.i7
Architect
or Engineer
Building /� Cr•Jv Ca9 _% ,/// S C ///4-42- 9/2.y/2-97?j
Contractor , ��
(Check all that apply)
❑ Repair ®Residential ❑ Footprint Changes
❑fixnovation ❑ Single Family ❑ Discovery
Minor Addition ❑ Duplex ❑ Demolition
❑ Substantial Addition ❑ Multi-Family
❑ Other ❑ Commercial
Details of Project: e-9 r" 9.77 621/r c/"„,25'
Estimated Cost of Construction: $ /5-42°- a_
Construction Type / (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood &Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units #Bedrooms #Bathrooms
Lot Area Living space (total sq. ft.)
#Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through r'
On-site waste and debris containers will be rovided by C_'wi7`rad,,
Construction debris will be disposed by . 75--act 1 by means of 7F ' .
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: g Signature of A pp licant: e-��.
�-�
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: igna . e Date FEES
Zoning Administrator 4 A o'\ Permit Z3-
Code Enforcement Officer %rr�' `.!!!r /inspections /5
Water/Sewer � Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL 3g-
DEFL
RRFfOUPCU
(Ff� s4k GEORGIA `�,�,,!
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
Page 1 of 1
LOT 38-B
N 22°00'15"E 60.00'
1.0'
CMFI !l���'' ���.� ;,�RBS
�..
1 STORY FRAME
I RESIDENCE
Ir;ai
10.7' 91' r-
LOT 37-A r f 4 LOT 39-A
t`
CONC. CONC. P m q m KO
5" - ra
m �
v A m
z , i III 1 °'
LOT 38--A " �
N
N 22°00'15"E
58.8E3' Me _ _ 15/111"RHS it,
OCMF
9 S 22°00'15"W 60.00'
LOVELL AVENUE 60' R/W !
PLAT OF LOT 38-A, WARD NO- 3, TYBEE
ISLAND, CHATHAM COUNTY, GEORGIA
STREET ADDRESS: 1005 LOVELL AVENUE ` Z,-t3-0 L
FOR: TIM FULT.FR
ACCORDING TO THE F.I.R.M. DATED
5/17/88 THIS LOT IS WITHIN FLOOD EQUIPMENT:
ZONE A-8, BFE 12. T(}PCON AP-LIA
ERROR OF CLOSURE:
G-t,ORG44 LINEAR: 1/10800
GTER ANG: 17"/ANGLE
ry A'd * BALANCED BY:L. S.
J. WI.FY REYNOLDS 4* 4 PLAT: 1/INFINITY
LAND SURVEYOR O. 22 • ra 0 20
636 STEPHENSON AVENUE i o`r 4 F I I
SUITE C e , /jam SCALE: 1" -20' .
SAVANNAH, GEORGIA 31405 _ RV Q' , _ij%DATE: JUNE 12, 2003 SURVEY
http://sz0028.wc.mail.comcast.net/service/home/-'/08-survey jpg?auth=co&loc=en US&id=32421&part=2 9/4/2009
REVIEW FOR CODE COMPLIANCE ROOF FRAMING °'
Every effort has been made to identify IRC SECT. 802 AND SSTD 10-99 SECT. 102 AND 307
code violations, ne oversight by the
"An Approved Set of Plans bust
Y ALLOWED ROOF SLOPES ARE 2/1 -7112 FOR WOOD Qs �
reviewer shall be construed as authority Remain on Job Site at All Times"
WALL�,
r, L , ST Olv I RUCTION.ALL HOLE IN HOLD DOWNS
to violate, cancel, alter or set aside TO SE FILLED USING MANUFACT RER'S NAILS, ,
any applicable codes or ordinances.The
review and permit should not be construed �'o
as a warranty or gg�u�arantee. /� SIMPSON 112 o d . o
Reviewed ay `' L Oi ote_ 1 u� RAFTER TIES . . . / a
%2' GALV. BOLTS ' b 6 ° e t 6 6 6 V 6 Ra w t tr -moo
C�.�rri�.:�rze .� a;�s o
Required on eacl ralUIr d „ n
ALL CONSTRUCTION MUST COMPLY WITH THE NEW 6x6 POSTS p p o -
fi TD 10 -C161 AND THE IRC ONE AND TWO II it
�'� SIMPSON ABU66 EXISTING DECK
A M1L'y L;WEs LING CODE ZOb6 EDITION POST BASE v� Li
=D STATE OF GEORGIA AMENDMENTS
NEW 2'x 2'x 20" THICK -�'
POST FOOTINGS co
U
g
•o
d
Sect. R-311.5.6 HANDRAILS & R-312 GUARDRAILS °
Stairs more than 30"in height require
34"138" handrails.
Porches,balconies, ramp & decks more
EXISTING DECK than 30"above gr;,,:e require 36"guardrails.
(a o° Largest opening permitted Is 4"
s. o m o
1 L ■
NEW 2'x 2'x 20' THICK
POST FOOTINGS
PROPOSED REAR DECK OVERHANG
N.T,S.
t. A
, ..,
i * 1 • ' ''jc‘'i"i C.',\. .,, .
•
. , -..- • '''
A : . •
• ,-.
-- - ,
"111 ''''. * ' • , .
1,',•.. 1 .,,!:'"„ \ . . . . __........4.-----
. _
N.
,...„
• ".".. '''''r'..C...5.4;,. . ..
1 '
'''...
...
. •
-.
..i.. .
11, _ , 1
i
. ,
. _
. -
_,...__. k ,
,
-
' i t \ \\ , l
,
•
„TIO
I,,
I. /
:'-/ LOT 38-B
IA
N 22°00'15"E 60.00'
1.0 x
P_ _-
CMF - Q 5/8” RBS
/8.B'
1 STORY FRAME
RESIDENCE
6
in ..)
N 10.7' 9.1' N
LOT 37-A -EH-1 w LOT 39-A
Z•- w Z--
CONC. CONC.
CO
CO Q — in
o °
— N
co) z 1 co
z 0 4 A VI
L
b LOT 38—A ici
N 22°00'15"E
�CMF
59.86' CMF� m 15/8" RBS■
V S 22°00'15"W 60.00'
LOVELL AVENUE 60' R/W
PLAT OF LOT 38—A, WARD NO. 3, TYBEE
ISLAND, CHATHAM COUNTY, GEORGIA
STREET ADDRESS: 1005 LOVELL AVENUE
FOR: TIM FULLER
ACCORDING TO THE F.I.R.M. DATED
6/17/86 THIS LOT IS WITHIN FLOOD EQUIPMENT:
ZONE A-8, BFE 12. TOPCON AP-L1A
ERROR OF CLOSURE:
;VR GIA LINEAR: 1/10,600
ANG: 17"/ANGLE
�ZSTER�, 4 BALANCED BY: L. S.
J. WHITLEY REYNOLDS * � 4 * PLAT: 1/INFINITY
tn
LAND SURVEYOR t' e. f, • Q 0 20
636 STEPHENSON AVENUE 0
0 a I I I
SUITE C i �� SCALE: 1" = 20'
SAVANNAH, GEORGIA 31405 suRV �'� `` tiJ DATE: JUNE 12, 2003 SURVEY
ITLEI g I° DATE: JUNE 13, 2003 PLAT
TELEPHONE: 912-352-0464 �� FILE NO. 03-104