Loading...
HomeMy Public PortalAbout09-0427 Green jtJv S CITY OF TYBEE ISLAND P BUILDING PERMIT DATE ISSUED: 09-30-2009 PERMIT#: 090427 WORK DESCRIPTION R&R SIDING,W/MISC.REPAIRS WORK LOCATION 1308 SEVENTH AVE OWNER NAME ROBERT GREEN ADDRESS PO BOX 2558 CITY,ST,ZIP TYBEE ISLAND GA 31328-2558 PHONE NUMBER CONTRACTOR NAME ROBERT GREEN ADDRESS PO BOX 2558 CITY STATE ZIP TYBEE ISLAND GA 31328-2558 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $274.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $32,425.00 TOTAL BALANCE DUE: $274.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire, soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized - P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org °; �1� City of bee Island • Community Develc ent Dept. 11` (-4 Inspection Report imit M1` ) 403 Butler Ave. • P.O. Box 2749 • Tybee Island GA 31328 =�, INTERNATIONAL Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL MEMBER Permit No. 1- Date Requested 4),/..) zi Owner's Name .. =,,aai Date Needed P/VLD Gen. Contractor Subcontractor f Contact Information �,� ,4 !/ f3(), Project Address P :,. .) P, _LI/py" 4 ,11-i- . i Scope of Work . ji i ; f)1i , • 21' / Inspector rr ;E' Date of Inspection P7 r.!' F fokss /1 ! Inspection ":` �` °'! Pass Ei Fa'1 F Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass 0 Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee City of Tybee Island - Community Development D . ','.".*•• ••"' TrOspection Report 403 Butler Ave. • P.o. Box 2749 • Tybee island, GA 31328 v.v27irs° r -',,,•.!...a;;:i.• Phone 912.786.4573 ext. 114 - Fax 912.786.9539 •,,,IF.f.1 r.i.,--.!':e. Permit No. 0 9 - LA-__L22._ Date Requested 4 _ 1 Li ._ 1 0 Owner's Name L1_2_9-1 r't Date Needed L-I - ( C- I 0 Gen. Contractor Subcontractor _ Contact information ,....\ a vy\..Q_S Project Address 0 <i:.‘ :0 e Lie ir k A k V e- • 4-: Scope of Work I / , ,,--1. —7-- Inspector ecto r 1-/- --- , . Date of Inspection : I'' ,f 0 if . Inspection \____ .2.144f Yr% I, 4 :_c_, cki) pass -..,,, in Fee 1 I • Inspection Pass 0 Fail 0 Fee . ----Pass-Catail 0 Fee / 1 ,.._: - ,:.2::1131:7(4.• , ,,..., ... .....----•-----"-- N,.. Inspection Pass E3 Fail 0 Fee [ •• -- - --- — — _ __ _____ . .. v•---- * . .,. iEt6:t t CA City of Tybee Island • Community Development Dept. 3Tinct": "...,. " .,,• • Inspection Report lit .. ...,. : i403 Butler Ave.. • P.O. Box 2749 • Tybee Island, GA 31328 ' Phone 912.786.4573 ext. 114 • Fax 912.786.9539 tat a a GS; n (1 r) q ----.)e-- --7 Permit No. ____iL_,__ . f Date Requested 2 ( C?- ( 0 r- . • 1 Owner's Name k--zJ e...(2.-0 Date Needed 2_ - 1 Q( , r Gen. Contractor Subcontractor .._ Contact Information ‘ 0 vv./ S \ - q 1 --.) - ' <--r; - 1 39 2 .,4; 4 -- Project Address t_. 0 . , ____ • , ...- , , -.- Scope of Work ,., i (.3 , iTh 4- V-1/1 , s c . V- (2 3 .......<..L4S:S e*-7 i 01 Inspector f r Date of Inspectio '::' ' /V ef... _ Inspection 0, (-.,1 ri.1.>(:,,4--Le)--n Pass c Fee Inspection _ Pass 0 Fail 0 Fee _. . . 1 Inspection Pass 0 Fail,0 Fee .., Inspection Pass 0 Fail 0 Fee . . .. t City of Tybee Island - Community Development Dtept. git #M Inspection Report i:::, :: .:::, : 4 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 v..6.r s I iiii.i :•;YX.rAvon '''' Phone 912480.4573 ext. 114 = Fax 912.7815.9539 ..........._.... 4171 ,,—.. ,,,i, ,—.., 1 Permit No, 6. ,/- (.24., 1 Date Requested d ...f.; ...._. i Owner's Name -7,....-_41-- --- . :3..-- Date Needed ///77 .,),/,-.)c .... Gen, Contractor 1 Subcontractor Contact Information krai—, 4ei),S - ‘,. „ i Project Address 1306 --t.:\jz. )44- Aiiff,,-- , -1 . I Scope of Work ::.5 I 1)( i\)‘:= -': k1,71 5Z. . TZrE,1-'1)--(77.:5 • Inspector '17116i Date of Inspection ... j& )'I 1'---"sc\ /i Inspection 1\1(1-/ i '41+7-el'” \ 1 ? .---i., - Pass Fail 0 Fee , . •. Inspection Pass 0 Fail 0 Fee Inspection_ Pass Fail E3 Fee _ — . Inspection _ Pass 0 Fail Fee 1 . i . . • ,A I `---f . . PA e :;.;,,#0•,. 0 ".•.:;.'..4'.::i;:. City of Tybee Island • Community Development Dept. ••-,- I I 'UM - Inspection Report t..:::: ..:.:.: 4 403 Butler Ave. - P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 —•..-... *,:xx.:7,-:3•:.-..1 .......... Permit No. 6.7-1 - 4‘1,-,.7-7 Date Requested ••-.... i --Ir.-. / • . Owner's Name eLit4: Date Needed /0 V/ c/71 _ Gen. Contractor Subcontractor Contact Information \IA/4 1- ...;:; i'L SS. I :5' c'il Project Address 130 r Scope of Work --71-•;1 Di (34.; e, t MI (..4. 12-rc,:r7,4--fTZG; Inspector --I/i Date of Inspectional 0 2 if/12/ - Inspection 1\•)P I 1(P.. ,(-,•r4r,r= 17.4.) -- Pass 9 .-Wil 0 Fee ',,,4 T-1 .77, LI 1 I Inspection . .• Pass 0 Fail 0 Fee .-. Inspection Pass 0 Fail 0 Fee Inspection Pass o Fail Fee l CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT 9 -oc'Z'7 _F 2 Location: /36k 7/11-) U / y PIN# - as /i - oy NAME ADDRESS TELEPHONE Owner R?b-e G 2E1<-) .264 1A(S N19//r NAw�v FMAiL (�)O A(. /3 -D e ROBErT•Gft"f'A) ,t)itl7,A i AgLC. Architeet \/A w TA( , 076'000 E rfa r —Ha,k.z, rvEr or ShAeJC/D,04 PR. CA /,uA- ARor,c,,e A,eE, e_tk,L,,4)K. roe7' Wig OW,J ee S _ OA ZAi ve tA/A-Y-6 Contester i'erg(-)s -tiu-C. /013 /1w v cPd -4,5S- 31.„ /ybee 14 3/3.7E (Check all that apply) ❑ Repair " Residential ❑ Footprint Changes ❑ Renovation ❑ Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition ❑ Multi-Family [r Other T-C/9LO Cr ❑ Commercial Details of Project: ,fir 774 /1'ep!AC�Kz°L, Estimated Cost of Gen,stftiotien: $ 3 a) 31a ii. 7 c2 Construction Type a (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other(please specify) (2) Wood&Masonry (5) Steel &Masonry (3) Brick Veneer Proposed use: �S/ Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: kV/9 #Units #Bedrooms #Bathrooms Lot Area Living space(total sq. ft.) #Off-street parking spaces Trees located &listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides(L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units,ventilation ducts, air conditioning units, elevators,and similar appurtances. ichic:ticet During On-site restroom facilities will be provided through A -S/0-e, A p J On-site waste and debris containers will be provided by Construction debris will be disposed by b iiv 13/4 by means of pl ckv io e Lick To _:1-Al u8-1,i Y f}/-o C v"-f p I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances,FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 5b—p 1 °V 0306 Signature of Applicant:( 1 ►A, Le) e( S 67,kl Note:A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number:New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator ,,r Permit /7/ Code Enforcement Officer `_ ,'' % 3p 0 i Inspections ql Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL 274,t- DiFt Of "Cal IRK RRI CU ES (e7.f. 1 GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition,Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. 3 82e0 ? l er• gned Date i ft/m014– P- rre-rst w4—(-eD Printed Name Office Use Only: Project Address: Permit Number: Labor and Materials Estimate for Siding Removal and Replacement Home of Robert and Anne Green— 1308 7th Avenue,Tybee Island, GA Prepared by Linda Inveninato Description of Procedures: A.) Prep 1. Set-up 16'x 45'Scaffolding(safety rails, metal decks, stairs) -$511.55+35.81 GA sales tax/month Grist Equipment Company, Garden City.ALL OSHA safety equipment included. ($2046.20+ 143.24 GA Sales Tax=$2189.44 Entire Project Cost) 2. Trim Palms South Side of house 3. Licensed Electrician repositioning of electrical service, phone, cable, and HVAC service south wall B.) Removal—reinstall OSB (remove per day only what can be completed thru reinstallation of OSB so as to eliminate possibility of weather damage 4. Remove and dispose of non-usable cedar, Including dormer Remove and dispose of Foam Insulation board -Save damage to lawn and cost of dumpster by removing debris to dump daily 5. Repair framing wood rot-?? (suspect some rat damage in kitchen wall area) 6. Remove and Replace damaged fiberglass insulation-R13-4" 15"x 32' @$ 9.98?? 7. Fetch, measure,trim, install OSB-20 sheets for South wall (60 sheets @ 6.64=398.40+t = EPC - Entire Project Cost)It is assumed that all house corners were sheathed with 4 x 8 plywood as was code at the time the house was built.OSB count reflects that assumption. C.) Flashing, House Wrap,Corner Boards, Cedar Siding,Caulking 8. Fetch, measure,trim, install flashing at all windows, dormers, cedar to masonary connection - Step Flashing(1 dormer 2@5.98-Ft) 4 dormers—8 @$5.98=$47.84+t= (EPC) - Drip Edge—windows, cedar to masonary(6 @2.98+t) -30 @ 2.98=$89.40+t= (EPC) 9. Install House Wrap—Easy Guard House Wrap (9'x 150') =$ 94.00 x 2=$188.00+t=(EPC) - House wrap nails-??We were told that Code requires a rubber washered nail. 10. Dormer—Raise scaffolding one level, perform all R&R procedures including coatings,tear down additional section of scaffolding 11. Fetch, measure, cut, install corner boards and window trim—456 ft(1 x 4, and 1 x 3) @ .81= $369.36+t=(EPC) 12. Measure, cut, install 5/4 x 8 rabbetted Bevel Cedar,STK, all sides pre-primed - Galvanized ring Shank nails 2000ct= 50.89 x 3= 152.67+t=(EPC) 13. Caulking—OSI Quad Caulk @ 62.88/case x 3=$188.64+t=(EPC) D.)Paint/Stain 14. 100% latex paint— Or 100%latex stain BEHR -supplies: plastic, buckets, brushes,tape, razor blades=$280.00+t=(EPC) E.)Finish and move on 15. Tear down Scaffolding, move to East wall. 16. Licensed Electrician reattaches Electrical service, phone, cable and HVAC services to original positions Labor estimate South Side Wall - 12 Days(192 labor hours @ $30.00/labor hour,Jim and Linda Inveninato)=$5760.00 ****Porch siding in good condition with the exception of exposed 5 ft sections (140 square ft). We will R&R only those sections. For best match retain some original siding to repair porch wall. - • - el /j 1,4r . 444L -= 2,3 020ZU Authorization to begin project - Robert Green Date 'IM1111r- gr c ,73