HomeMy Public PortalAbout09-0427 Green jtJv S
CITY OF TYBEE ISLAND
P
BUILDING PERMIT
DATE ISSUED: 09-30-2009 PERMIT#: 090427
WORK DESCRIPTION R&R SIDING,W/MISC.REPAIRS
WORK LOCATION 1308 SEVENTH AVE
OWNER NAME ROBERT GREEN
ADDRESS PO BOX 2558
CITY,ST,ZIP TYBEE ISLAND GA 31328-2558
PHONE NUMBER
CONTRACTOR NAME ROBERT GREEN
ADDRESS PO BOX 2558
CITY STATE ZIP TYBEE ISLAND GA 31328-2558
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $274.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $32,425.00
TOTAL BALANCE DUE: $274.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized -
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
°; �1� City of bee Island • Community Develc ent Dept. 11`
(-4 Inspection Report imit
M1` ) 403 Butler Ave. • P.O. Box 2749 • Tybee Island GA 31328
=�,
INTERNATIONAL
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
MEMBER
Permit No. 1- Date Requested 4),/..)
zi
Owner's Name .. =,,aai Date Needed P/VLD
Gen. Contractor Subcontractor
f
Contact Information �,� ,4
!/ f3(),
Project Address P :,. .) P, _LI/py" 4 ,11-i- .
i
Scope of Work . ji i ; f)1i , • 21' /
Inspector rr ;E' Date of Inspection P7 r.!'
F
fokss
/1 !
Inspection ":` �` °'! Pass Ei Fa'1 F Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass 0 Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
City of Tybee Island - Community Development D .
','.".*•• ••"' TrOspection Report
403 Butler Ave. • P.o. Box 2749 • Tybee island, GA 31328 v.v27irs° r
-',,,•.!...a;;:i.•
Phone 912.786.4573 ext. 114 - Fax 912.786.9539
•,,,IF.f.1 r.i.,--.!':e.
Permit No. 0 9 - LA-__L22._ Date Requested 4 _ 1 Li ._ 1 0
Owner's Name L1_2_9-1 r't Date Needed L-I - ( C- I 0
Gen. Contractor Subcontractor _
Contact information ,....\ a vy\..Q_S
Project Address 0 <i:.‘
:0 e Lie ir k A
k V e- •
4-:
Scope of Work
I / , ,,--1. —7--
Inspector ecto r 1-/- --- , .
Date of Inspection : I'' ,f 0
if .
Inspection \____ .2.144f Yr% I, 4 :_c_, cki) pass -..,,, in Fee
1
I •
Inspection Pass 0 Fail 0 Fee .
----Pass-Catail 0 Fee
/
1 ,.._: - ,:.2::1131:7(4.• ,
,,..., ... .....----•-----"--
N,..
Inspection Pass E3 Fail 0 Fee
[ •• -- - --- — — _ __ _____
. ..
v•---- * .
.,.
iEt6:t t CA
City of Tybee Island • Community Development Dept. 3Tinct":
"...,. " .,,•
• Inspection Report
lit
.. ...,. :
i403 Butler Ave.. • P.O. Box 2749 • Tybee Island, GA 31328 '
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 tat a a GS;
n (1 r) q ----.)e-- --7
Permit No. ____iL_,__ . f Date Requested 2 ( C?- ( 0
r- . •
1 Owner's Name k--zJ e...(2.-0 Date Needed 2_ - 1 Q(
, r
Gen. Contractor Subcontractor .._
Contact Information ‘ 0 vv./ S \ - q 1 --.) - ' <--r; - 1 39
2 .,4; 4
--
Project Address t_. 0 . ,
____
• , ...- ,
, -.-
Scope of Work ,., i (.3 , iTh 4- V-1/1 , s c . V- (2 3 .......<..L4S:S
e*-7 i 01
Inspector f r Date of Inspectio '::' ' /V
ef... _
Inspection 0, (-.,1 ri.1.>(:,,4--Le)--n Pass c Fee
Inspection _ Pass 0 Fail 0 Fee _.
. .
1
Inspection Pass 0 Fail,0 Fee
..,
Inspection Pass 0 Fail 0 Fee
. .
.. t
City of Tybee Island - Community Development Dtept. git #M
Inspection Report i:::,
:: .:::, :
4
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 v..6.r s I iiii.i
:•;YX.rAvon
'''' Phone 912480.4573 ext. 114 = Fax 912.7815.9539 ..........._....
4171 ,,—.. ,,,i, ,—..,
1 Permit No, 6. ,/- (.24., 1 Date Requested d ...f.; ...._.
i
Owner's Name -7,....-_41--
--- . :3..-- Date Needed ///77 .,),/,-.)c ....
Gen, Contractor 1 Subcontractor
Contact Information krai—, 4ei),S - ‘,.
„ i
Project Address 1306 --t.:\jz. )44- Aiiff,,--
, -1 .
I Scope of Work ::.5 I 1)( i\)‘:= -': k1,71 5Z. . TZrE,1-'1)--(77.:5 •
Inspector '17116i Date of Inspection ... j& )'I
1'---"sc\ /i
Inspection 1\1(1-/ i '41+7-el'” \
1 ? .---i., - Pass Fail 0 Fee
, .
•.
Inspection Pass 0 Fail 0 Fee
Inspection_ Pass Fail E3 Fee
_
—
. Inspection _ Pass 0 Fail Fee
1 .
i
. . • ,A
I `---f
. .
PA e
:;.;,,#0•,. 0
".•.:;.'..4'.::i;:. City of Tybee Island • Community Development Dept. ••-,- I I
'UM -
Inspection Report
t..:::: ..:.:.:
4 403 Butler Ave. - P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 —•..-...
*,:xx.:7,-:3•:.-..1
..........
Permit No. 6.7-1 - 4‘1,-,.7-7 Date Requested
••-.... i --Ir.-. / • .
Owner's Name eLit4: Date Needed /0 V/ c/71
_
Gen. Contractor Subcontractor
Contact Information \IA/4 1- ...;:; i'L SS. I :5' c'il
Project Address 130
r
Scope of Work --71-•;1 Di (34.; e, t MI (..4. 12-rc,:r7,4--fTZG;
Inspector --I/i Date of Inspectional 0 2 if/12/ -
Inspection 1\•)P I 1(P.. ,(-,•r4r,r= 17.4.) -- Pass 9 .-Wil 0 Fee
',,,4 T-1 .77, LI
1 I
Inspection .
.• Pass 0 Fail 0 Fee
.-.
Inspection Pass 0 Fail 0 Fee
Inspection Pass o Fail Fee
l
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
9 -oc'Z'7
_F
2
Location: /36k 7/11-) U / y PIN# - as /i - oy
NAME ADDRESS TELEPHONE
Owner R?b-e G 2E1<-) .264 1A(S N19//r NAw�v FMAiL (�)O A(.
/3 -D e ROBErT•Gft"f'A) ,t)itl7,A i AgLC.
Architeet \/A w TA( , 076'000 E rfa r —Ha,k.z, rvEr
or ShAeJC/D,04 PR. CA /,uA- ARor,c,,e A,eE, e_tk,L,,4)K. roe7'
Wig OW,J ee S _ OA ZAi ve tA/A-Y-6
Contester i'erg(-)s -tiu-C. /013 /1w v cPd -4,5S- 31.„
/ybee 14 3/3.7E
(Check all that apply)
❑ Repair " Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex ❑ Demolition
❑ Substantial Addition ❑ Multi-Family
[r Other T-C/9LO Cr ❑ Commercial
Details of Project: ,fir 774
/1'ep!AC�Kz°L,
Estimated Cost of Gen,stftiotien: $ 3 a) 31a ii. 7 c2
Construction Type a (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood&Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use: �S/
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan: kV/9
#Units #Bedrooms #Bathrooms
Lot Area Living space(total sq. ft.)
#Off-street parking spaces
Trees located &listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides(L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units,ventilation ducts, air conditioning units, elevators,and similar appurtances.
ichic:ticet During
On-site restroom facilities will be provided through A -S/0-e, A p J
On-site waste and debris containers will be provided by
Construction debris will be disposed by b iiv 13/4 by means of pl ckv io e Lick To
_:1-Al u8-1,i Y f}/-o C v"-f p
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances,FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 5b—p 1 °V 0306 Signature of Applicant:( 1 ►A,
Le) e( S 67,kl
Note:A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number:New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator ,,r Permit /7/
Code Enforcement Officer `_ ,'' % 3p 0 i Inspections ql
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL 274,t-
DiFt Of "Cal
IRK
RRI CU ES (e7.f. 1
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition,Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
3 82e0 ?
l er• gned Date i
ft/m014– P- rre-rst w4—(-eD
Printed Name
Office Use Only:
Project Address:
Permit Number:
Labor and Materials Estimate for Siding Removal and Replacement
Home of Robert and Anne Green— 1308 7th Avenue,Tybee Island, GA
Prepared by Linda Inveninato
Description of Procedures:
A.) Prep
1. Set-up 16'x 45'Scaffolding(safety rails, metal decks, stairs) -$511.55+35.81 GA sales
tax/month Grist Equipment Company, Garden City.ALL OSHA safety equipment included.
($2046.20+ 143.24 GA Sales Tax=$2189.44 Entire Project Cost)
2. Trim Palms South Side of house
3. Licensed Electrician repositioning of electrical service, phone, cable, and HVAC service south
wall
B.) Removal—reinstall OSB (remove per day only what can be completed thru reinstallation of OSB
so as to eliminate possibility of weather damage
4. Remove and dispose of non-usable cedar, Including dormer
Remove and dispose of Foam Insulation board
-Save damage to lawn and cost of dumpster by removing debris to dump daily
5. Repair framing wood rot-?? (suspect some rat damage in kitchen wall area)
6. Remove and Replace damaged fiberglass insulation-R13-4" 15"x 32' @$ 9.98??
7. Fetch, measure,trim, install OSB-20 sheets for South wall (60 sheets @ 6.64=398.40+t = EPC
- Entire Project Cost)It is assumed that all house corners were sheathed with 4 x 8 plywood as
was code at the time the house was built.OSB count reflects that assumption.
C.) Flashing, House Wrap,Corner Boards, Cedar Siding,Caulking
8. Fetch, measure,trim, install flashing at all windows, dormers, cedar to masonary connection
- Step Flashing(1 dormer 2@5.98-Ft) 4 dormers—8 @$5.98=$47.84+t= (EPC)
- Drip Edge—windows, cedar to masonary(6 @2.98+t) -30 @ 2.98=$89.40+t= (EPC)
9. Install House Wrap—Easy Guard House Wrap (9'x 150') =$ 94.00 x 2=$188.00+t=(EPC)
- House wrap nails-??We were told that Code requires a rubber washered nail.
10. Dormer—Raise scaffolding one level, perform all R&R procedures including coatings,tear down
additional section of scaffolding
11. Fetch, measure, cut, install corner boards and window trim—456 ft(1 x 4, and 1 x 3) @ .81=
$369.36+t=(EPC)
12. Measure, cut, install 5/4 x 8 rabbetted Bevel Cedar,STK, all sides pre-primed
- Galvanized ring Shank nails 2000ct= 50.89 x 3= 152.67+t=(EPC)
13. Caulking—OSI Quad Caulk @ 62.88/case x 3=$188.64+t=(EPC)
D.)Paint/Stain
14. 100% latex paint— Or 100%latex stain BEHR
-supplies: plastic, buckets, brushes,tape, razor blades=$280.00+t=(EPC)
E.)Finish and move on
15. Tear down Scaffolding, move to East wall.
16. Licensed Electrician reattaches Electrical service, phone, cable and HVAC services to original
positions
Labor estimate South Side Wall
- 12 Days(192 labor hours @ $30.00/labor hour,Jim and Linda Inveninato)=$5760.00
****Porch siding in good condition with the exception of exposed 5 ft sections (140 square ft). We will
R&R only those sections. For best match retain some original siding to repair porch wall.
- • -
el /j
1,4r . 444L -= 2,3 020ZU
Authorization to begin project - Robert Green Date
'IM1111r- gr c ,73