Loading...
HomeMy Public PortalAbout09-0428 City of Tybee if gr CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 10 -2 -2009 PERMIT #: 090428 WORK DESCRIPTION ELEC - JOCKEY BOX TO 2 TEMP PANELS WORK LOCATION 202 FIFTH ST OWNER NAME CITY OF TYBEE GYM 6110 ADDRESS PO BOX 2749 CITY, ST, ZIP TYBEE ISLAND GA 31328 -2749 PHONE NUMBER CONTRACTOR NAME WADE ELECTRIC ADDRESS PO BOX 1995 CITY STATE ZIP TYBEE ISLAND GA 313281995 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 25.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $ 1.00 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. _CI ' Signature of Building Inspector or Authorized Agent: l MtA".C_) P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 72.7.74:77i City of Tybee Island Community Development Depi. M i l a r r A f. ; Inspection Report 4-03 Butler Ave. P.D. Box 2749 - Tybee Islacid, GA 3:132S rim i • Phone 912.786.45;7'2. ext. 114 - Fax („ Permit No.0 ,5 9 4 - - Date Requested 1( ) k Owner's Name r'r•-1 \o ec2--- Date Needed 0 - J - Gen. Contractor WO, co rctor Contact Information 4< a ITh 2(3 2 Project Address L- I S , i Scope of Work A40 1 c.) VIPN ' CA"C )4. - 3 A r7 ) piny-01 Izispecto r Date of Ins, pecbon 77 ,7 Inspection -4 . P p < . Pass Li Faa 0 Fee • Inspection Pass Fail Fee Inspection Pass Ej Fail Fee Inspection Pass 0 Fail Fee • • Dianne Otto From: Jonathan Lynn [jonathanhlynn @yahoo.com] Sent: Friday, October 02, 2009 12:54 PM To: Dianne Otto Subject: Re: permit fees Dianne 1) I would not double the fee but I will say to go ahead and charge them $25 for working without the permit. 2) Due to the amount of work that the City is having to put in to this project, I will say to move forward with the charging of this permit. I don't even think that the $303 will cover amount of work we have put in to this point much less later on. 3) Yes, please proceed and provide me recommended changes and we can discuss when you two are ready as I agree that there are certain areas that we need to address. Thanks Jonathan - -- On Fri, 10/2/09, Dianne Otto <D otto@cityoftybee.org> wrote: From: Dianne Otto <Dotto @cityoftybee.org> Subject: permit fees To: "Jonathan Lynn" <jlynn @cityoftybee.org> Date: Friday, October 2, 2009, 12:08 PM Jonathan, I have 3 pennit fee questions: 1. Unpermitted electrical work was done by Wade Electric in the gym for the Tybee Arts Association play this weekend. Ray is inspecting it this afternoon. An electrical permit fee is $25. Should it be waived or should it be doubled? 2. The Historical Society has applied for a permit for the relocation and foundation for the church. The project cost is $36,000. Should the $303 building permit fee be waived? 3. Ray and I have been pondering the fee schedule. For example, a fence permit is $25. An electrical permit is $25. The fence is not inspected but the electrical is. Would you like us to work toward documenting the changes that we would propose? Thanks, 1 Dianne Otto, CFM Zoning Specialist City of Tybee Island 912.786.4573 ext. 136 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e -mail. Please notify the sender immediately by e -mail if you have received this e -mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.Q. Box 2749 Tybee Island, GA 31328 Do You Yahoo!? Tired of spam? Yahoo! Mail has the best spam protection around http: / /mail.yahoo.com 2 C CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT t P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT - Date f() New Work Replacement Location of wor (stre t address . C---V/14 Contractor ) ` Telephone A � � a T p v..e- JILJ7 v Address of Contractor IOX 1 O 1. ,0 40 Property Owner `/ % � _ � - A_KKO Telephone Date work will be rea y for inspection, if known AO 1 Permit Number Estimated cost of construction OD- 00 © i.aNzs A/C Unit and Heat Pump Range Hood_ commercial Attic Ventilation Fan Service: ( / '2() amps ALL WIRING, Bell Transmitter — low voltage Sign Circuit- wattage Border /Outline Lighting Smoke Detector — low voltage SERVICE Building Saw Spa or Tub — grounding INCLUDED, Exit Lights — life safety Special Outlet Heat Pump Swimming Pool — grounding MUST BE Meter Box Water Heater Motor(s): hp Welder — 220 volts circuit COPPER. NO Outlets —110 volts circuit Well Pump — grounding ALUMINUM Parking Lot Lights X -ray Pool Lights — grounding Other ALLOWED. Range — commercial APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issu by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby ea responsible for any violations of this policy. A violation of this por+ may result in disconnectio the electrical service until all violations and deficiencies are corrected. Owner /Contractor Signore' bate r vs-- j —cLel bay -4 ce :r p 4 Owner /Contractor Printed Name a'^.c 1 .C o ar-. • 1A (l - te.wy rw • APPROVAL Fee Code Enforcement Date