Loading...
HomeMy Public PortalAbout09-0442 Shearouse CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 10 -12 -2009 PERMIT #: 090442 WORK DESCRIPTION REPAIR/REPLACE ROOF; ADD CORNICES WORK LOCATION 1212 LOVELL AVE OWNER NAME HUGH SHEAROUSE ADDRESS 920 PRICE DR CITY, ST, ZIP LOCUST GROVE GA 30248 -2914 PHONE NUMBER CONTRACTOR NAME HUGH SHEAROUSE ADDRESS 920 PRICE DR CITY STATE ZIP LOCUST GROVE GA 30248 -2914 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 40.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $2,000.00 TOTAL BALANCE DUE: $ 40.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: : /' P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 10/12/2009 13:46 FAX 7709579009 SHEAROUSE I1001 CITY OF TYI3EE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT fi.. :,, ,',L - ,� / is a- Q i y C ire ilk ,ti: �,;; El V 6 2_4 -4 6 4 7 y Location: , . a Lo V eJ 1 AV e, • PIN # NAME ADDRESS A TELEPHONE Owner . ,� J t 2 L-t V ,MVtt (, . l. S r zv � _g: Z't► u ,us AA 61-6 Architect or Engineer /A Building MA Contractor Check all that apply) Repair Residential ❑Footprint Changes Renovation Single Family ❑ Discovery 0- Minor Addition ] Duplex ❑ Demolition Substantial Addition D Multi - Family ❑ Other J Commercial Details of Project: LC - /A (A -C=E err i 2Of 121 J 'MC 134Ci4 OF iita::1 o USE A 7Vc ,4 t{ , A cia(AnciEs, Estimated Cost of Construction: $_ d Oa. 0 0 Construction Type J (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry . ,. ____ (3) Brick Veneer Proposed use: Remarks: ATTACH. A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: 4 Units _ # Bedrooms # Bathrooms Lot Area Living space (total sq, ft.) ._. . 4 Off - street parking spaces Trees located & listed on site plan Access: Driveway (II,) With culvert? ._ With swale? • Setbacks: Front _ Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. 10/12/2009 13:46 FAX 7709579009 SHEAROLTSE Zen During construction: l On -site restroom facilities will be provided through , ', - _ On -site waste and debris containers will be provided by Pk/ Construction debris will be disposed by „�4/ by means of 1.l4c.g. I understand that 1 must comply with zoning. flood dam =e control. buildiniz. fire, shore protections and wetlands ordinances. FEMA re zulations, and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met, 1 understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is establisha Drainage: 1 realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. 1 accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction, Date: toll 2/O' l Oe7 Signature of Applicant: /Pbt./..."4441(..44-e— Note: A permit normally tales 7 to 10 days to nrocess. The Allowing is to he completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site _ Water meter size Storm drainage . Approvals: Signature Date FEES Zoning Administrator _ _ Permit z Code Enforcement Officer Inspections Water /Sewer Water Tap Stonn/Drainage Sewer Stub Inspections Aid to Const, City Manager TOTAL Ye) 10/12/2009 13:46 FAX 7709579009 SHEAROUSE U003 tr $ I \ T GEORGIA w Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Proiects Involving Demolition. Wrecking. or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification or Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules, The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition, Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPA regulations that could affect the project. 11/127/1"-M491W (CY/ 2/0 1 Undersigned Date ki e ,/e- 5 40440 611 Eg Printed Name 0,91c, Use Only Profect Address; ; Permit Number.: