Loading...
HomeMy Public PortalAbout09-0447 City of Tybee a CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 10-13-2009 PERMIT#: 090447 WORK DESCRIPTION CROSSOVERS-7TH,6TH,9TH, 10TH WORK LOCATION VARIOUS OWNER NAME CITY OF TYBEE ADDRESS PO BOX 2749 CITY,ST,ZIP TYBEE ISLAND GA 31328-2749 PHONE NUMBER CONTRACTOR NAME CITY OF TYBEE ADDRESS PO BOX 2749 CITY STATE ZIP TYBEE ISLAND GA 31328-2749 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 0.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $45,000.00 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire, soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: � _ / It A. P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 wNw.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT .EF Lys 09-o LI 47 Location: ? �� �� 1 704—PIN# NAME ADDRESS TELEPHONE Owner ( 17 -Architect eT#* er Ai k Building Contractor � "f G,�7 �rk(e i (Check all that apply) ❑ Residential Footprint Changes Renovation ❑ Single Family l Discovery I I Minor Addition I Duplex [y Demolition ❑ Substantial Addition ❑ Multi-Family // n Other ❑ Commercial Details of Project: A.:e p ( ¢ q— /1-0e_ (c!C k 7 L-1.-/-2 iG C(J Si/ , 5 Estimated Cost of Construction: $ 11,S / l)U' Construction Type 1 (Enter appropriate number) (I) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel &Masonry (3) Brick Veneer �f Proposed use: 1 c 8 e ce cl 4 cL es 5 Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: #Units #Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off-street parking spaces Trees located &listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On-site restroom facilities will be provided through `!1/7 On-site waste and debris containers will be provided by • Construction debris will be disposed by C./ by mean ofi� / I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: /C //2169 G Signature of Applicant: '� �/.17 Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES .0 Zoning Administrator Permit Code Enforcement Officer Inspections Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager 10, TOTAL NAM./ .O V 60 H w REICURCEE 0 GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. / '.-2-7. Una-rsigned Date ,-,j G)--e--- k4-)/ 75,a--- Printed Name Office Use Only: Project Address: Permit Number: a, w d a_ Section i-A -Landside Section I-S - Deck Section I-C - Seaside . ° LTtris Dimension Varies Depending ar This Dimension Varies This Dimension Varies ° l2r opolf Behind Dune Depending on Width Depending on Dropoff in T of Dune Front of-Dune Crest TN 6 O co z r_. --'� N .,f'efer to H cn 5 ,. r •�- xR 1+ Steps Detail 71 H • � •-:='-� Handrail • rw. r111•�ISY111i��1 /MOM ' s Id r► D a 0 W s '~ `� .. L1 '. D, 0 aI O C451 i �'";' Z D°I 1� c Tom-``o •• 3G'irn%nirnw'�n — 1 Q . Hall ;; I � t 1 L3 r' _Wi. .W.. A1!-----.id._ k�l �- iforypical tu , H fg , . IA. - " � f 11 Refer to./ �4, Beach • u rd I' _. ° "Ram Detail" c I :i ', P 7. � \ rr .40 N f •1 M.w m ,a_On T r— f " 6'- e" • ,i l i to t TYPica L to T ical to Typical ii, ti co m TYPICAL .SECTION No. I MS N n I I SQQ e I = 5 '� t -� �, o o m CO No t e : Place steps on beach side /°'` Beach Storm Profile 4 ° 1u kvel of moirnxum beach �.: m r r,►ee ssion during a severe (Maximum E'�pecled Recesslar� s/or'n or tropical hurricane . m GEC} } ,A• DEPARTMENT OF NATURAL RESOURCES COASTAL RESOURCES DIVISION September 24, 2009 Mr. Joe Wilson City of Tybee Island Box 2749 403 Butler Avenue Tybee Island, Georgia 31328 RE: Letter of Acknowledgment, Shore Protection Act Permit#169, General Permit for Public Beach Access Crossovers, Request for Maintenance of 6th, 9th and 10th Street Crossovers,q-7 City of Tybee Island, Chatham County, Georgia Dear Mr. Wilson: This Letter of Acknowledgement(LOA) is in response to your recent request to maintain and elevate three public crosswalks located at the ends of 6th, 9th and 10th Street, Tybee Island, Chatham County, Georgia. Shore Protection Committee Permit#169 authorized the construction and maintenance of public crosswalks currently existing along the Tybee Island Beach at Public Street ends. The proposed work includes replacement of the decking and support piles as needed. The new crosswalk will be built essentially in the same foot print as the existing structure with some alteration needed at the seaward landing of the crosswalk to extend the crosswalk beyond the dune field and onto the dry sand beach just seaward of the toe of the most seaward dune. The crosswalk will be elevated a minimum of three feet above the existing sand dunes. The proposed work will be done from the crosswalk using hand tools only and no stock piling of materials is proposed in the dunes. The City of Tybee Public Works plans to trim the vegetation in the area of construction to allow for the proposed work. No motorized vehicles are proposed on the crosswalk structure, except for motorized wheelchairs for handicapped persons. Staff has conducted an onsite inspection of the crosswalks. The dunes have increased in height over time and the crosswalks, although serviceable, are no longer elevated above the dunes or dune vegetation. The crosswalk will provide access for all citizens to enjoy the public trust resources of the state while protecting the dynamic dune field. The Department authorizes the proposed maintenance and repairs to the crosswalks located at the seaward street ends of 6th, 9th and 10th Streets as depicted by the attached drawings and description. The Department authorizes the elevation and extension and considers this construction necessary for normal maintenance in full compliance with Shore Protection Committee Permit#169. ONE CONSERVATION WAY ° BRUNSWICK, GEORGIA 31520 (912) 264-7218 ° FAX: (912) 262-3143 ° CoastalGaDNR.org