CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03-18-2009 PERMIT#: 090155
WORK DESCRIPTION R&R DAMAGED BEAMS&PORCH FLR
WORK LOCATION 1201 BUTLER AVENUE
OWNER NAME HUGH MAHANY
ADDRESS 302 PARKERSBURG RD
CITY,ST,ZIP SAVANNAH GA 31406-6429
PHONE NUMBER
CONTRACTOR NAME HUGH MAHANY
ADDRESS 302 PARKERSBURG RD
CITY STATE ZIP SAVANNAH GA 31406-6429
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 95.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $10,000.00
TOTAL BALANCE DUE: $ 95.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:_4, �%,��
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
Inspection Report
City of Tybee Island
403 Butler Ave.
P.O. Box 2749
Tybee Island, GA 31328
Phone: (912) 786-4573 ext. 114
fax: (912) 786-9539
---
', )'--■ - n i 5< '- ‘, , -7 --,( )
1 Ff-rmii. No. ----' . ,.- „ ...) Date Requested (._) —I
-----
I ,
()boiler's Name ,/Y\ (") Ir\O v-1 vi Date Needed
I
Contractor Subcontractor
1 \
; Co,Iltai...I. N umber __ L_A 3
i
, ! -2 o 1 -2.-) , i j I_‘, 6
Loci.or _ J 7 P r
1 -
7.„ ,,V,, ,/
Inspeci7 _ __:2
or_ / _ Date of Inspection ,--- (-,/ - /
Type c inspection -Vr
r)
Pass
1 \ \ .-A r......,
S-i--
V.-ail 1
6,-
..!.c.....\3-11-.
o4- 1".- ./\-7 ;..11
I'
I
I
-- --
During construction:
On-site restroom facilities will be provided through
waste and debris containers will be provided byg
Construction debris will be disposed by v..,lvc by means of
understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: -!3 . 7 9 Signature of Applicant: --j ,..e.(z., ,
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not,has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
DM CV
EE•
•RISOINCES
O
GEORGIA ;,44,�so",i
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition,Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
ndersi ed
� � Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
ALL CONSTRUCTION MUST COMPLY WITH THE
SSTD J �q9 AND THE IRC ONE AND TWO
FAMILY DWELLING CODE Zote.-- EDITION �r O.3‹ �r
AIID STATE OF GEORGIA AMENDMENTS ��`G fv� � v
REVIE a _,+ - CODE COMPLIANCE l J
Every effort ..,,;en made to identity
cede violations,'"''-`Z. oversight by the
reviewer shall be c. rued as authority
to violate, cancel, alt r or set aside
any applicable codes or ordinances.The
review and permit should not be construed - �^
as a warranty or guarantee. .}
Reviewed By. _TM%.-.\ _pate 3(r 8104 x
__ 1/
' xr571 / `7-Ck
r
�x}s-n or., --7-7A', ' + 1
-7:7 'A 7 5 O T
St-Font "Fo [ g-f
1
z ,
‹ ( // ///// 77,'!// / // �/ !`,/ 7
%�' E-)c, 1 lcc-,S
, .. ,,,,, ,,,_,L _ _
„ .._. ..
elliv,., _ : . v,
, . ,-...-. / ./
P10 510N - ,,,,
42, Oft
924 t-el
/J, T 5,
(k xi -r-ii•-r4 &XL,--P0 :1---
t-t-e-t^i 'S f l'(11= o/-( --.1. --?-7 AJ., ,,_
//,//
-E x I s-r n_ii 57:4--'•'--7;7L-=c_ /
.,
.. ,- .
/;
1.1J. .
. ;
. ,
- ,
F . 1/7 /7 / /7 77 / ' / 7. /7
11 E-4E-1. 1
\A
----'--
1 •, ,/ — T--
L-..,, ,
...ORO . - -,-.., >c-t f1 /k1 x ...-
• 4 • /;A I -
. co044
,==-)L0 FV1 hi,
• '.2 i MU,
i •-ii-°6 i,,k-1--5