Loading...
HomeMy Public PortalAboutResolution 2021-23, A Resolution Amending the Agreement Between the City of Riverdale and MSA for Construction Review of Woods Development Phase II for an Addditional $2,900Resolution 2021-23 A RESOLUTION TO AMENDING THE AGREEMENT BETWEEN THE CITY OF RIVERDALE AND MSA FOR CONSTRUCTION REVIEW OF WOODS DEVELOPMENT PHASE II FOR AN ADDITIONAL $2,900 WHEREAS, the City of Riverdale, Iowa is a Municipal Corporation, organized and operating under the laws of the State of Iowa: WHEREAS, upon review and consideration of correspondence from City Engineer, MSA Professional Services, their Project Engineer, Christian Cooper, P.E., CPESC phase II I of the Woods Development shown as Attachment A; WHEREAS, the Developer intends to complete the Development from three phases not six as originally proposed; WHEREAS, the City Council has already approved Resolution 2021-19 which allowed for the $4,500; and WHEREAS, in a considered effort to track development expenses the City has asked for MSA to draft Engineering Services Agreement and any necessary Amendments to original agreements; and WHEREAS, the amount of engineering review required for this type of review of this type project is almost entirely driven by the developer/design engineer. That is, their design and their ready adaption /acceptance to review comments is driving the review engineer's effort and; WHEREAS, the City may or may not require the Developer to reimburse the City for costs associated the review; WHEREAS, the City may seek reimbursement of associated costs through the Development Agreement; NOW THERE FOR IT BE RESOLVED, by the City of the City of Riverdale, Iowa that; Section 1. Authorizes the Mayor to execute orders, contracts and other documents required by the City Engineer and other contractors on this Woods Development Phase II and Plan and Plat review at an additional cost not to exceed the $2,900 or the previously approved amount authorized by this resolution without further advice and consent of the City Council. Section 2. The City Engineer is hereby ordered to update the City Council at future meetings regarding the status of the Woods Development City of Riverdale, Iowa 110 Manor Drive, Riverdale, Iowa 52722 1 (563) 355-2511 1 www.riverdaleiowa.com fto assed this 25'" day of May 2021. Attest: ichael Baw2a'en, Mayor Katie J. Enloe City of Riverdale, Iowa 110 Manor Drive, Riverdale, Iowa 52722 I (563) 355-2511 I www.riverdaleiowa.com r� MSA Amendment No. 1 To: City of Riverdale Date of Issuance: May 19, 2021 Micahel Bawden 110 Manor Drive MSA Project No.: 10876077 Riverdale, Iowa 52722 This is an amendment to the Agreement dated January 26, 2021 and does acknowledge that MSA Professional Services, Inc. (MSA) is authorized to begin work on the following project amendment: Project Name: Woods Estates - Addition 2 The project scope has changed due to: Construction Issues The scope of the work authorized is: Complete original scope of work The schedule to perform the work is: Approximate Start Date: May 19, 2021 Approximate Completion Date: June 15, 2021 The estimated fee for the work: $2,900.00 Authorization for the work described above shall amend the Agreement between MSA and OWNER. Any attachments or exhibits referenced in this Amendment are made part of the Agreement. Payment for these services will be on a time and materials basis. Approval: MSA shall commence work on this project in accordance with your written authorization. This authorization is acknowledged by signature of the authorized representatives of the parties to this Amendment. A copy of this Amendment signed by the authorized representatives shall be returned for our files. If a signed copy of this Authorization is not received by MSA within seven days from the date of issuance, MSA may stop work on the project. ITY OF RIVERDALE// Michael Bawden City Mayor •— Date: c Kent Royster City Clerk Date: C' ,//2-7202. 110 110 Manor Drive Riverdale, Iowa 52722 Phone: (563) 355-2511 MSA PROFESSIONAL SERVICES, INC. Kevin Bailey, P.E. Team Leader Date: 4fi y Zo Z/ 2117 State Street, Suite 200 Bettendorf, Iowa 52722 Phone: (563) 424-3696 Page 1 of 1 G'\10\10876\ 108760771Contract\10876077 210519 Amendment 1 docx ATTACHMENT A: RATE SCHEDULE CLASSIFICATION LABOR RATE Architects $115 — $175/hr. Clerical $ 80 — $125/hr. CAD Technician $ 95 — $150/hr. Geographic Information Systems (GIS) $ 75 — $146/hr. Housing Administration $ 82 — $125/hr. Hydrogeologists $127 — $160/hr. Planners $ 90 — $180/hr. Principals $175 — $369/hr. Professional Engineers $ 92 — $2001hr. Project Manager $ 150 — $242/hr. Professional Land Surveyors $ 87 — $180/hr. Staff Engineers $ 80 — $150/hr. Technicians $ 70 — $132/hr. Wastewater Treatment Plant Operator $ 80 — $ 100/hr. REIMBURSABLE EXPENSES Copies/Prints Specs/Reports Copies Plots Flash Drive GPS Equipment Laser Level Mailing/UPS Mileage — Reimbursement (currently $o.56/mile) Mileage — MSA Vehicle Nuclear Density Testing Organic Vapor Field Meter PC/CADD Machine Robotic Survey Equipment Stakes/Lath/Rods Travel Expenses, Lodging, & Meals Traffic Counting Equipment & Data Processing Geodimeter Rate based on volume $10 $0.20/page $0.15/sq.in. $10 $28/hour $10/per day At cost Rate set by Fed. Gov. $35 + $0.30 mile $25.00/day + $10/test $100/day Included in labor rates $37/hour At cost At cost At cost $30/hour Labor rates represent an average or range for a particular job classification. These rates are in effect until December 25, 2021. Page 1 of 1 (Attachment A: MSA Standard Rate Schedule) 3 f O',108761108760771Contract\' 0876077 210519 Amendment 1 docx CONTRACT FEE SUMMARY: Original Agree Not To Exceed $7,500.00 Amendment Number 1 $2,900.00 Adjusted Agree Not to Exceed $10,400.00 Page 1 of 1 (Attachment A: MSA Standard Rate Schedule) G:\10\10876\108760771Contract\10876077 210519 Amendment 1 docx