HomeMy Public PortalAbout09-0164 Wilson 1i
6-r >
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03-25-2009 PERMIT#: 090164
WORK DESCRIPTION ADD REAR STEPS
WORK LOCATION 8 TAYLOR
OWNER NAME ANNE ELIZABETH WILSON
ADDRESS PO BOX 564
CITY,ST,ZIP TYBEE ISLAND GA 31328-0564
PHONE NUMBER
CONTRACTOR NAME CONSOLIDATED SERVICES
ADDRESS PO BOX 60593
CITY STATE ZIP SAVANNAH GA 31420
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 42.50
PROPERTY IDENTIFICATION#
PROJECT VALUATION $2,500.00
TOTAL BALANCE DUE: $ 42.50
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
. ,
•
Inspection Report
City of Tybee Island
403 Butler Ave.
P.O. Box 2749
Tybee Island, GA 31328
Phone: (912) 786-4573 ext. 114
Fax: (912) 786-9539
Permit No. O 0/Zil Date Requested /
-4i3/0q•Owner's Name IALL:2aLi Date Needed - km /
Gen. Contractor C(AS SiZt). Subcontractor
Contact Number (0 K) ,„ 12 7Z 3r-,
Location ?",
:6"") --
t •
Inspector '") Date of Inspection
Type of Inspection 17;LbC., P1 134-i rr"
g, 094-01)pa_
Fail
CITY OF TYBEE ISLAND, GEO 'IA 0 c( - b 1
APPLICATION FOR BUILDING PLrtMMIT
pn00
Location: $ 7 -y/o2 vifife..531, PIN #
NAME ADDRESS TELEPHONE
9/2-
Owner Gvli.s®,i/ -F3 act/vr s 3 - 08.7/
Architect
or Engineer
Building Ga,rxa/. l PD. '3o4- 4, ?J 3 qy Cvs",r-
Contractor s g 4. 4-1.4-Ai i✓' t 6+9 3/S�Zt� 231
(Check all that apply)
(1 Repair n Residential 1 Footprint Changes
n Renovation in Single Family n Discovery
[i Minor Addition n Duplex n Demolition
Substantial Addition n Multi-Family
I1 'Other ADD /2E14.< n Commercial
SrePs
Details of Project: -r-z) -ice• ,ec k 647
z ,4 floor. C G,-si- Giv,'
,Lelesil r,t - w,•' ' a: s
Estimated Cost of Construction: $ 2S2D. 0°
Construction Type -- (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood &Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use: ,. Cce.sJ Give 42-QE,g_ FQo.n 12,e42 c�r4�nl.
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan: A17,4—
#Units #Bedrooms #Bathrooms
Lot Area Living space(total sq. ft.)
# Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway _ (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through Ow si
On-site waste and debris containers will be provided by Cotir-,p,4c._-rb r /oe
Construction debris will be disposed by(o#0-trazte - by Bans of -7) Ries, o✓
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
o
Date: 3l Z3/2 0 4 Signature of Applicant:Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size _
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
OEM OF .EE. fit;
/MURAL
GEORGIA '`
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition,Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned Date
Printed Name
Office Use Only:
Project Address:
Permit Number:
NOTES:
1) ANYTHING SHOWN OUTSIDE THE DEFINED BOUNDARY IS FOR
DESCRIPTIVE PURPOSES ONLY.
2) THE PUBLIC RECORDS REFERENCED WERE USED FOR THE
ESTABLISHMENT OF THE BOUNDARY OF THIS PROPERTY
THEY APE NOT AND DO NOT CONS71TU7E A TITLE SEARCH.
3) THIS PLAT WAS MADE AS AN AGREEMENT BETWEEN THE
SURVEYOR AND THE CLIENT. NO THIRD PARTY USE EXCEPT
AS AUTHORIZED.
4) ALL WZ.7LANDS ARE UNDER THE AUTHORITY OF THE U.S, ARMY'
CORPS .'F ENGINEERING AND/OR GEORGIA DEPARTMENT OF
NATURAL RESOURCES. NO DISTURBANCE TO THESE AREAS
ALLOWED EXCEPT AS PERMITTED.
5) NO ENVIRONMENTAL OR SUBSURFACE INVESTIGATION TO INDICATE
AREA!' OF WE7LANDS OR OTHER CONCERNS PERFORMED.
6) PROPE,J'TY SHOWN HEREON IS SUBJECT TO ANY/ALL APPLICABLE
MUNICIPAL SETBACKS OR NEIGHBORHOOD COVENANTS.
W~
LOT5 LOT4 LOT3 �a
W
CITY LANE N
8956'00" E
60.00' 10' R/ W lac3,„ - ,
Q 0,o 20 B.S.L.
NOTE: RESIDENCE & PORCHES pc,
ARE ELEVATED SINGLE-STORY 1 LOT r 1O I ��
FRAME WITH ALUMINUM SIDING. t- `?l,�L--:HT,t_H '',I,a"-G
LOT 9 1 K, ��6 ,� LOT ,1.1 ( 4
N
U r
x x—f7 w,PORCH
0 10.0' B 0
CI
CON E1E to i �,
cn Q 1 r' N
y �' w — o
0 N 20' B.S.I. 0
S 8957'22" W h'' O S t80.0CT',"
125.58' -
;, 1" PIPE FOUND�- ' 60.00' . -- S 89'56'00°, W — 1/2" F':;�'L FOUND
�
TAYLOR STREET 40' . R/W
0 1/2" REBAR IOUP,'D UNLESS NOTED)REF�'IZ-�N .r 'S:, LI 4" X 4" WOOD ! _ .I F 0037
„ ':' DEED F-JOK 243 &;', PAGE 754 -�X- W� ENcE
"' 08DI V1�I{�N MAP BOW 'A', PAGE G' ---0- CHAIN FENCE
PLAT REFERLNCt BOOK 6 'P', PAGE 67 B.S.L. BUILDING SF tdAC\ LINE
ADDRESS: TAYLOR S T( -E 7 ,
"I HEREBY CERTIFY THAT PURSUANT TO O C"C A. 15-8--i57„ PROPERTY lU EN7717C; 174\I vli'td&L/7": 06'00-10-010
THIS PLAT DEPICTS AN EXISTING TRACT or',RECORD, DOES • EQUIPMENT USED: TOPCO GPT vD5A TOTAL STATION
NOT CREATE' ANY PUBLIC AREAS, STREET% OR RIGHTS U1` TOTAL AREA: 8,300.0 SGI.F1 0.145 ACRES ,
WAY, AND THEREPORE DOES NOT REQUIRE APPROVAL or PRECISION PLAT: 1/100 0{'O+
ANY LOCAL GOVERNING,AUTHORITY PRIOR TO RECORD/NCB° PRECISION FIELD: 1/35,600'
' 7 FURTHER CERTIFY THAT THIS SURVEY WAS PRECISION ANGLES; 05",PER 4NL4 c ('DINT i'
MADE UUNDEER,MY SUPERVISION AND THAT IT ADJUSTMENT ME77(00: LEAST SQUARES '
IS A TRUE REPRESENTATION OF THE LAND FIELD WORK COMPLETED' ;/22/09
AND TT-AT IT CONFORMS WITH THE MINIMUM '4
STANDARDS REQUIRED BY LAW. FLOOD NOTE:
THIS IS TO CERTIFY 17/A AC,CORL)ING 70
FEMA FLOOD INSTJRANCE RATE MAP: 135164
GISTE�p COMMUNITY PANEL NU14(E R: 0213 77
4� f.
AND DA TEG: r%26/SUd T'IA 7" THIS F IN?I"r::F'I.'
/ * / 1 * IS LOCATED 'Ti ZONE: 'r', 14171I r .?.SSE
No Jc 5 FLOOD ELEVATION OF 12.0
r M.SL. 'h'AVD 1988" DA!,JM
h C'�I'�'�p''' / 3O' 15' 0 JO' 60'
CARL R. JACKSO GA. R.L.S. NO. 2555 P SCALE r id'
k PREPAItEV F R: ANNE tt�LS0 V
,y CARL R JACKSON A SUE VEY PLAT OF LCD,'. 0. BLOCK 35,
LAND SURVEYOR, INC. FORD S cR' N WARD, 6,th G.M. DisPincTi
411 PINE STREET PM'S ISLli D, ClIATHAIV ' 0 Wirt GEOR A
BLOOMINGDALE, GA 31302 DRAWN BY: C.R.J. CIHECK&i' BY C.R.J. � �. ,
(�12) 988-3355 (912) 596-2189 SCALE 1" 3II;� DA 7F 1/. ✓0 �: ;
FAX (912) 988-3 ---
FILE: 09009 SHEETS ,