Loading...
HomeMy Public PortalAbout09-0164 Wilson 1i 6-r > CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 03-25-2009 PERMIT#: 090164 WORK DESCRIPTION ADD REAR STEPS WORK LOCATION 8 TAYLOR OWNER NAME ANNE ELIZABETH WILSON ADDRESS PO BOX 564 CITY,ST,ZIP TYBEE ISLAND GA 31328-0564 PHONE NUMBER CONTRACTOR NAME CONSOLIDATED SERVICES ADDRESS PO BOX 60593 CITY STATE ZIP SAVANNAH GA 31420 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 42.50 PROPERTY IDENTIFICATION# PROJECT VALUATION $2,500.00 TOTAL BALANCE DUE: $ 42.50 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire, soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org . , • Inspection Report City of Tybee Island 403 Butler Ave. P.O. Box 2749 Tybee Island, GA 31328 Phone: (912) 786-4573 ext. 114 Fax: (912) 786-9539 Permit No. O 0/Zil Date Requested / -4i3/0q•Owner's Name IALL:2aLi Date Needed - km / Gen. Contractor C(AS SiZt). Subcontractor Contact Number (0 K) ,„ 12 7Z 3r-, Location ?", :6"") -- t • Inspector '") Date of Inspection Type of Inspection 17;LbC., P1 134-i rr" g, 094-01)pa_ Fail CITY OF TYBEE ISLAND, GEO 'IA 0 c( - b 1 APPLICATION FOR BUILDING PLrtMMIT pn00 Location: $ 7 -y/o2 vifife..531, PIN # NAME ADDRESS TELEPHONE 9/2- Owner Gvli.s®,i/ -F3 act/vr s 3 - 08.7/ Architect or Engineer Building Ga,rxa/. l PD. '3o4- 4, ?J 3 qy Cvs",r- Contractor s g 4. 4-1.4-Ai i✓' t 6+9 3/S�Zt� 231 (Check all that apply) (1 Repair n Residential 1 Footprint Changes n Renovation in Single Family n Discovery [i Minor Addition n Duplex n Demolition Substantial Addition n Multi-Family I1 'Other ADD /2E14.< n Commercial SrePs Details of Project: -r-z) -ice• ,ec k 647 z ,4 floor. C G,-si- Giv,' ,Lelesil r,t - w,•' ' a: s Estimated Cost of Construction: $ 2S2D. 0° Construction Type -- (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other(please specify) (2) Wood &Masonry (5) Steel &Masonry (3) Brick Veneer Proposed use: ,. Cce.sJ Give 42-QE,g_ FQo.n 12,e42 c�r4�nl. Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: A17,4— #Units #Bedrooms #Bathrooms Lot Area Living space(total sq. ft.) # Off-street parking spaces Trees located & listed on site plan Access: Driveway _ (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On-site restroom facilities will be provided through Ow si On-site waste and debris containers will be provided by Cotir-,p,4c._-rb r /oe Construction debris will be disposed by(o#0-trazte - by Bans of -7) Ries, o✓ I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. o Date: 3l Z3/2 0 4 Signature of Applicant:Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size _ Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit Code Enforcement Officer Inspections Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL OEM OF .EE. fit; /MURAL GEORGIA '` Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition,Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned Date Printed Name Office Use Only: Project Address: Permit Number: NOTES: 1) ANYTHING SHOWN OUTSIDE THE DEFINED BOUNDARY IS FOR DESCRIPTIVE PURPOSES ONLY. 2) THE PUBLIC RECORDS REFERENCED WERE USED FOR THE ESTABLISHMENT OF THE BOUNDARY OF THIS PROPERTY THEY APE NOT AND DO NOT CONS71TU7E A TITLE SEARCH. 3) THIS PLAT WAS MADE AS AN AGREEMENT BETWEEN THE SURVEYOR AND THE CLIENT. NO THIRD PARTY USE EXCEPT AS AUTHORIZED. 4) ALL WZ.7LANDS ARE UNDER THE AUTHORITY OF THE U.S, ARMY' CORPS .'F ENGINEERING AND/OR GEORGIA DEPARTMENT OF NATURAL RESOURCES. NO DISTURBANCE TO THESE AREAS ALLOWED EXCEPT AS PERMITTED. 5) NO ENVIRONMENTAL OR SUBSURFACE INVESTIGATION TO INDICATE AREA!' OF WE7LANDS OR OTHER CONCERNS PERFORMED. 6) PROPE,J'TY SHOWN HEREON IS SUBJECT TO ANY/ALL APPLICABLE MUNICIPAL SETBACKS OR NEIGHBORHOOD COVENANTS. W~ LOT5 LOT4 LOT3 �a W CITY LANE N 8956'00" E 60.00' 10' R/ W lac3,„ - , Q 0,o 20 B.S.L. NOTE: RESIDENCE & PORCHES pc, ARE ELEVATED SINGLE-STORY 1 LOT r 1O I �� FRAME WITH ALUMINUM SIDING. t- `?l,�L--:HT,t_H '',I,a"-G LOT 9 1 K, ��6 ,� LOT ,1.1 ( 4 N U r x x—f7 w,PORCH 0 10.0' B 0 CI CON E1E to i �, cn Q 1 r' N y �' w — o 0 N 20' B.S.I. 0 S 8957'22" W h'' O S t80.0CT'," 125.58' - ;, 1" PIPE FOUND�- ' 60.00' . -- S 89'56'00°, W — 1/2" F':;�'L FOUND � TAYLOR STREET 40' . R/W 0 1/2" REBAR IOUP,'D UNLESS NOTED)REF�'IZ-�N .r 'S:, LI 4" X 4" WOOD ! _ .I F 0037 „ ':' DEED F-JOK 243 &;', PAGE 754 -�X- W� ENcE "' 08DI V1�I{�N MAP BOW 'A', PAGE G' ---0- CHAIN FENCE PLAT REFERLNCt BOOK 6 'P', PAGE 67 B.S.L. BUILDING SF tdAC\ LINE ADDRESS: TAYLOR S T( -E 7 , "I HEREBY CERTIFY THAT PURSUANT TO O C"C A. 15-8--i57„ PROPERTY lU EN7717C; 174\I vli'td&L/7": 06'00-10-010 THIS PLAT DEPICTS AN EXISTING TRACT or',RECORD, DOES • EQUIPMENT USED: TOPCO GPT vD5A TOTAL STATION NOT CREATE' ANY PUBLIC AREAS, STREET% OR RIGHTS U1` TOTAL AREA: 8,300.0 SGI.F1 0.145 ACRES , WAY, AND THEREPORE DOES NOT REQUIRE APPROVAL or PRECISION PLAT: 1/100 0{'O+ ANY LOCAL GOVERNING,AUTHORITY PRIOR TO RECORD/NCB° PRECISION FIELD: 1/35,600' ' 7 FURTHER CERTIFY THAT THIS SURVEY WAS PRECISION ANGLES; 05",PER 4NL4 c ('DINT i' MADE UUNDEER,MY SUPERVISION AND THAT IT ADJUSTMENT ME77(00: LEAST SQUARES ' IS A TRUE REPRESENTATION OF THE LAND FIELD WORK COMPLETED' ;/22/09 AND TT-AT IT CONFORMS WITH THE MINIMUM '4 STANDARDS REQUIRED BY LAW. FLOOD NOTE: THIS IS TO CERTIFY 17/A AC,CORL)ING 70 FEMA FLOOD INSTJRANCE RATE MAP: 135164 GISTE�p COMMUNITY PANEL NU14(E R: 0213 77 4� f. AND DA TEG: r%26/SUd T'IA 7" THIS F IN?I"r::F'I.' / * / 1 * IS LOCATED 'Ti ZONE: 'r', 14171I r .?.SSE No Jc 5 FLOOD ELEVATION OF 12.0 r M.SL. 'h'AVD 1988" DA!,JM h C'�I'�'�p''' / 3O' 15' 0 JO' 60' CARL R. JACKSO GA. R.L.S. NO. 2555 P SCALE r id' k PREPAItEV F R: ANNE tt�LS0 V ,y CARL R JACKSON A SUE VEY PLAT OF LCD,'. 0. BLOCK 35, LAND SURVEYOR, INC. FORD S cR' N WARD, 6,th G.M. DisPincTi 411 PINE STREET PM'S ISLli D, ClIATHAIV ' 0 Wirt GEOR A BLOOMINGDALE, GA 31302 DRAWN BY: C.R.J. CIHECK&i' BY C.R.J. � �. , (�12) 988-3355 (912) 596-2189 SCALE 1" 3II;� DA 7F 1/. ✓0 �: ; FAX (912) 988-3 --- FILE: 09009 SHEETS ,