Committee on Public Works
Mark S.Sideris, Meeting: December 18, 2018
Council President Report: January 8, 2019
Vincent J.Piccirilli,Jr., The Public Works Committee convened at 7:00m on Tuesday December 18, 2018 in the
Vice President& p �'
District C Councilor Richard E. Mastrangelo Council Chambers. Present were members Vincent Piccirilli, chair;
Anthony Palomba,vice chair; and Kenneth Woodland, secretary. Staff present were DPW
Caroline Bays Councilor At Large Superintendent Gerald Mee, Town Engineer Matthew Shuman, and DPW Director of
Administration and Finance Dennis Sheehan. Also present were Councilors Anthony
Anthony J.Donato, Donato, Caroline Bays, and Lisa Feltner; Chairman of the Stormwater Advisory Committee
Councilor At Large David Stokes; and Watertown News.
Susan G.Falkoff,
Councilor At Large The purpose of the meeting was to review the 2019 local road construction program and
make a recommendation to the full Town Council. Mr. Shuman made a presentation to the
Anthony Palomba, Committee concerning the various methods of road reconstruction and the specific roads for
Councilor At Large
consideration(see Attachment).
Angeline B.Kounelis,
District A Councilor Highlights from the presentation included a review of the road program goals and reviewing
Lisa J.Feltner, the various elements of road reconstruction such as planning,notifications, curbs, sidewalks,
District B Councilor and accessibility. The presentation also included updates on the 2018 road program.
Kenneth M.woodland, The proposed list of streets for 2019 consideration included: Bellevue Rd(Channing Rd to
District D Councilor Common St),Avon Rd, Chandler St, Burnham St, Bridgham Ave, Nichols Ave (Dexter
Ave to Boylston St), and Bartlett St along with the unfinished portion of Everett Ave.
4 ACTION ITEM: Councilor Woodland made a motion, seconded by Councilor Palomba, that the full
Town Council approves proceeding with the 2019 Road Program as presented. Voted 3-0.
Next, Councilor Piccirilli asked for additional discussion on the bullet point in the summary about funding
collector roads and longer streets. The consensus was that this was a worthy idea, similar to what we did on
the Common St project.
ACTION ITEM: Councilor Palomba made a motion, seconded by Councilor Woodland,that the full
Town Council recommend that the Administration add additional funding in the annual Capital
Improvement Program for"collector roads and longer streets"in addition to the annual $2.5M road
program appropriation. Voted 3-0.
Finally, Councilor Piccirilli related requests raised by residents at the School Building Committee meetings,
regarding fixing roads around the three elementary schools to improve traffic, and asked to consider if the
2020 local road program should prioritize these roads. There was concern about diverting funds from roads
already under consideration for next year, and that there needs to be more discussion with the DPW and
SBC on how to proceed with this.
The meeting adjourned at 8:40 pm
Report prepared by Kenneth Woodland
Attachment: 2019 Road Program Presentation
111
Public Works Subcommittee Presentation
December 18, 2018
Road Program Goals *01 amw
Elements of Road Reconstruction ** mile
2018 Road Reconstruction Update v mama
to now
2019 Road Reconstruction List
Capital Projects and Planning
Complete Streets Policy Update
Summary
Road Program Goals
Key Facts & Considerations
2018 Construction Season
2,700 feet of water main replacement
1,360 feet of sewer main replacement
' 125 feet of drain replacement
800 feet of gas main replacement (National Grid)
Work stoppage impacts
' 4,320 feet of road reconstruction
72 centerline miles of Town roads
' 55 miles of residential roads
Average width of residential roads is 25 feet
Town -Wide Pavement Condition Index: 65 (2012 — 59)
dw
Total Work Backlog: $88 million (2012 - $92 million)
Road Program Goals
Road Reconstruction Progress
Road Program Goals
Program Activities
' Maintenance and Repair
' Mill and overlay repairs
' Full depth patch CQx �x�FA
' Crack sealing �
' Sidewalk reconstruction
Road Reconstruction)
Road reclamation Today's Discussion
' Mill and overlay
Road Program Goals
Maintenance, Repair & Reconstruction
Provide a variety of maintenance treatments to
prolong the useful life of less deteriorated
roadways
Coordinate road reconstruction activities with
capital planning and utility work
Seek long term planning and alternative funding for
large-scale projects
Improve accessibility and safety for all users by
using "Complete Streets" principles
Road Program Goals
Typical Elements of Road Reconstruction
Road reclamation and paving
Drainage repairs
Cur • • f i
• -
• I
x
Concrete • -.
Handicap . •
4D Grass a
borders • street trees
idMi umur_
E�95L phi
F746P.
SIDE'a'Al� PpJOP h4'DnIT _
*41F7�E 1EF74lH�FA/i�C3E0 9X ��'. 4i�@-T7PE v�-� WNk 9AFl[E
E1V'f S�HIk}�k7if{�.} i' L4MY k s
�'lGw#5Ef0
�atBflG4i+f1 �}'.�.•�rrr
Fl1LL �7l1 PAv�1iEtl7 RECLxA1r.T14M
HOT Tb sc,+LE �'T#�AYtX C4 i4M4+4'
'COHST�4G114�+ TL4ER+.wCE f4,S7C
Elements of R
ReclamationPP
.y
IL
Roadements of
GradingCompactionand
IL J
ilk-
17
Ili � •�- -
.�.
Elements of R
Binder Paving
F
5 �
r�
Roadements of
Curb Installation
Am
rr.
it _ _V
Roadements of
Sidewalk, Driveway and Accessible Ramps
"s
f4W. u!.'.. .
lip-
■ u� La ■+ -
i
OOP.-
M
9 -
Roadements of
Sidewalk, Driveway and Accessible Ramps
Woe t r fl
. ti
IL
Road ements of
Transition Repairs
Vlk
-fir.:�i�' i V•*± .1r` ' � �I.Y� �r{.=.
ILI
lff�-2w'I
s �
Elements of Road Reconstruction
Planning and Notifications
' Winter — Develop Plans and Specifications
' Review streets with tree warden
' Review driveways with Zoning Enforcement Officer
Develop conceptual plans for geometric changes
' Review green infrastructure opportunities
' Review sewer and drain infrastructure if needed
Elements of Road Reconstruction
Planning and Notifications
' Late Winter — Notify residents of planned work
Is Provide scope of work and notification procedure
' Remind residents of future moratorium
Encourage residents to request street trees
' Notify residents of driveway impacts
Construction Notifications
' Before work begins
Is At significant milestones during the project
2018 Road Update
Arden Road
'}P
2018 Road Update
Priest Road
If
NOMI
wit
Before After
2018 Road Update
Malden Street
Before After
Spring 2019—Transition repairs to be finalized in 2019
2018 Road Update
Everett Avenue ( Palfrey Street to Bartlett Street)
Af
Before
er
` f
Spring 2019—Transition repairs to be tinaiizea in zuly
2018 Road Update
Edgecliff Road
J
Before Atter
w
Spring 2019—To course paving & - f
p g p p g �
2018 Road Reconstruction Update
Edgecliff Road Green Infrastructure
Two tree trenches installed
under sidewalk
Provide stormwater treatment � e
and infiltration prior to entering
drainage system
Protect the Charles River and
helps meet EPA permit �
requirements �.
2018 Road Update
Westland Road
k'.
Before After
Spring 2019—Top course paving & landscaping
2018 Road Update
Woodleigh Road
-Oilf ' ,
VL
r - -i--• .'I.. �Tt ti. .
Before After
Spring 2019—Top course paving & landscaping
2018 Road Update
Hosmer Safe Routes to School
- 0 .
Ld
e or Afte
•� } _ - i _ !qP f l
i. i
�Wdpkw Aftr
1•
Spring 2019—Top course paving & landscaping
2018 Road Update
Common Street
Shut down for winter
Curb and sidewalk work between Common Street and Columbia
Street completed
Next phase will be from Columbia Street through
roundabout
' Orchard Street Extension & Katherine Road
,i4 tilt X.,
. ��
111k.
Aml III
201q Road Reconstruction List
Developing a "Universe of Projects"
2012 & 2016 Pavement Management Inventory
IV Windshield surveys
IV Maintenance records
Capital projects ( proposed and completed )
Resident input
201q Road Reconstruction List
Developing the List
' Prepare detailed cost estimates of high priority
streets
0 Develop a program that fits within funding
constraints
0 Prioritize streets in greatest state of disrepair
0 Continue ongoing preventative maintenance
0 Consider alternative funding sources
0 Consider geographic equity
201q Road Reconstruction
Utility Coordination & Capital Planning
' Water main replacement program
' Hunt Street
' Wheeler Lane
Phillips Street
Sewer and drain repairs
' Maplewood Street (School St. to Commonwealth Road)
' Copeland Street
National Grid work stoppage
201q Road Reconstruction List
Proposed Streets
' Bellevue Road (Channing Road to Common
Street)
Avon Road
Chandler Street
Burnham Street
Bridgham Avenue
Nichols Avenue ( Dexter Avenue to Boylston
Street)
Bartlett Street ( including Everett Ave . )
_
201q Road List
Bellevue Road (Channing Road to Common St.)
NO
4
t�AFL j--�,�•� - �Y� r',�:.- �.:-
Bellevue RoadGas main replaced in 2015
Water main replaced in 2017
Multiple trenches pavement failure
Variety of •
Non-compliant accessible ramps
1,000 feet long — 24 feet wide
201q Road Reconstruction List
Avon Road
4.11
Vp, r
Win
�4.
Avon Road • Gas main replaced in 2015
feet long — 24 feet wide
• Trench repairs, alligator � ��
cracking, cracking at joints . � � � �� � �'�
• Berm, concrete sidewalks
rrrr,w4-
201q Road List
Chandler Street
Chandler0 Gas main replaced in 2015
Street0 Water main replaced in 2016
sidewalk •
Multiple • and mainline trenches
550 feet long — 24 feet wide
201q Road List
Burnham Street
.14
L •��
Burnham0 Gas main replaced in 2015
Street0 Water main replaced in 2016
0 Various sidewalk and curb materials
0 Multiple cross & mainline trenches
550 feet long — 24 feet wide
w■ -
_ Y Y
20lq Road Reconstruction List
Bridgham Ave.
3 -
Bridgham Ave. • Gas main replaced in 2016
• Water main replaced in 2017
• Granite curb, various sidewalks in disrepair
• Multiple cross and mainline trenches
• 24 + 11i
�'T +wwtx rrrr,w4-
• Is Ave. • Gas main replaced in 2016
• Open cut and trenchless sewer repairs
• Multiple cross and mainline trenches
650 feet long— 24 feet wide
�'T +wwtx rrrr,w4-
Iist
201q oa econstruction
Bartlett Street (including Everett Ave.)
46
VJ
I Bartlett Street * Gas main replaced in 2015
0 Alligator cracking
. . course unraveling
Limited space for sidewalk
700 feet long— 24 feet wide ' i '
ProjectMount Auburn Street tA;R Watertown Square
A Complete Streets
' www. mountauburnstreet.com
www.watertownsquareimprovements.com
MassDOT design and funding for Galen
Street/Nonantum Road/Watertown Street intersection
Arsenal Street corridor developer mitigation
City of Cambridge Belmont Street "facelift" from
Brimmer Street to Mount Auburn Street (2019)
Community Path Extension ( Irving to Taylor) DCDP
Complete Streets Policy
Update
Policy adopted by Town Council on May 9, 2017
Complete Streets Prioritization Plan completed
Applied to be a Tier 3 community
Is Raised crosswalk on Whites Ave.
' Widen path through Saltonstall Park
' Raised crosswalk on Warren Street at Cuniff School
' Crosswalk improvements on Watertown Street at
Theurer Park
Received $280,000 grant funding for 2019
construction
Summary
Challenges
Limited number of vendors bidding on work
' Reflected in bid prices
' Affects schedule
Weather
' Severe weather conditions can lead to higher
than expected levels of deterioration on
streets
0 Planned and unplanned utility work
' Reduces road PCI and increases maintenance or
reconstruction needs
It Funding collector roads and longer streets
Summate
2019 Road Reconstruction List
0 Bellevue Road (Channing Road to Common Street)
Avon Road
Chandler Street
Burnham Street
Bridgham Avenue
Nichols Avenue ( Dexter Avenue to Boylston Street)
Bartlett Street ( including Everett Ave. )