Loading...
HomeMy Public PortalAbout12-22-1997 Change orders No.tifPROJECT: WestMashta Drive Bridge Projed No.: 3011B OWNER: Village of Key Biscayne OWNERS CONSULTANT: CAP. Engineering Consultants, Inc. DESIGN I BUILD FIRM: Cone Constructors, Inc. NOTICE TO PROCE$ DATE: December 22, 1997 You are directed to make the following changes in the Contrat Documents. DESCRIPTION: Adjust Contract time per the summary below PURPOSE OF CHANGE ORDER: To review the Contract Time to reflect the time required to accomplish all the permitting requirements of Dade County DERM and the Army Corps of Engineers. Additional time is required to: 1) Obtain approval of Miami Dade County Commission at the earliest available hearing, scheduled for April 21, 1996. 2) Obtain approval of Army Corps of Engineers required for dredging work associated with construction of temporary roadway. CHANGE IN CONTRACT TIME: Original Contract time: 3' !days Additional Contract tiny Total Contract time with approved Change Order 360 days RECOMMEND: APPROVED By: By: By: Owners Consultant Owner Date: FAOATAMACAFRIO11\chgord1.wPd A PROJECT: West Mashta Drive Bridge Project No.: 30116 Village of Key Biscayne OWNER: OWNERS CONSULTANT: DESIGN ! BUILD FIRM: C.A.P. Engineering Consultants, Inc. Cone Constructors, Inc. NOTICE TO PROCEED DATE: December 22, 1997 You are directed to make the fdllowing changes in the Contract Documents. DESCRIPTION: Adjust Contract Price and Contract Time per the summary below PURPOSE OF CHANGE ORDER: To revise the Contract Price and Contract lime to reflect additional geotechnical cost and additional time for Florida Power and Light to re-route power lines out of work area. CHANGE IN CONTRACT PRICE: Original Contract Price $801.300.40 Previous Change Orders No.1 $0.00 Contract Price prior to this C.O. $801.300.00 Net increase this C.O. Contract Price with all approved C.O. $804.95125 RECOMMEND: By: Owners Consultant L CHANGE IN CONTRACT TIME: Original Contact Time 300 days Net Change from Previous C.O. 60 days Contract Time prior to this C.O. 360 days Net increase this C.O. 14 days Contract Time with approved C.O. 374 days APPROVED By: Owner Date: F:IDATACL APi30t FFdigord3 Wpd IttfiB CORZO CASTELLA CARBALLO THOMPSON SALMAN Engineers Architects Planners EB0005022 AAC002142 MID a November 25, 1997 Village of Key Biscayne Office of the Village Manager 85 West McIntyre Street Key Biscayne, Florida 33149 Attention: Mr. Sam Kissinger City Manager Reference: West Mashta Drive Bridge Project No.: 3011-B Dear Mr. Kissinger. At the pre -proposal conference for this project, held on 7116197, it was stated that the existing Geotechnical information may be Inadequate, and that the Village will pay direct cost for any additional geotechnical investigation that is related to the design of the bridge, pending approval of the cost by the Village. We have reviewed the available geotechnical information, and based on our preliminary pile length calculations, have determined that additional testing is required. We need a minimum of one SPT'on either side of the bridge to a depth of 50 feet in order to properly design the piles. We have obtained a proposal from Keith & Schnars for this additional testing -- which is • attached, for your review and approval: If you have any questions or comments regarding the above, please do not hesitate to contact us. Sincerely, Corzo Castella Carballo Thompson Salman, P.A. Ramon Casteila, P. RC/er cc: Steve Kasper, Cone Constructions . Richard Bunnell, Bunnell Foundations Clprotedslpmposal1p97 i 95-3 901 Ponce de Leon Blvd.. Suite 900 Corot Gables. Florida 33134 305.445.2900 1.800.448.0227 Facsirrule 305.445.3366 Equal Opportunity Employer r• A. J. 4u/ 1 77 • .13: 33 954 7630077 KEITH&SCHNARS--GEOT PAGE 02 F Mr. Ramon Castello C3TS Keith and Schnars P.A. Proposal No. P97 A33.MK November 26. 1997 - ' age 2. • t. CQSTAND TERma Presented on the attach s Exhibit 1 is our costs for performing these services. We will not exceed our budget unless the ft Id conditions are significantly different than those anticipated or the she is not accessible to our t ck mounted drill rig. In either event, you will be notified prior to any increase in costs. If yo wish us to proceed, please have the party responsible for payment sign the appropriate space o the Request for Professional Service Agreement Form and return one • copy to use for our • If you should have any working with you on Respectflnlly submitted, uestions concerning this information, please call. We look forward to s project. KEITH and SCHNARP.A. En ineers Planner -Su ors Hugo boleda Laboratory Manager, technical Division Attachment HAlrt • ��•.' = KEITH and SCH ARS, P.A. !ter ISINL•GHS -P1.w Wl`ft. $./ n V r 7 It t. PROJECT: West Mashta Drive Bridge Project No.: 30118 Village of Key Biscayne C.A.P. Engineering Consultants. Inc. Cone Constructors, Inc. OWNER: OWNERS CONSULTANT: DESIGN I BUILD FIRM: NOTICE TO PROCEED DATE; December 22. 1997 You are directed to make the following changes in the Contract Documents. DESCRIPTION: Adjust Contract Price PURPOSE OF CHANGE ORDER: To revise the Contract Price to reflect: additional cost to furnish and install four (4) 6" diameter PVC conduits as per FPSL requirements. CHANGE IN CONTRACT PRICE: Original Contract Price 8101.300.00 Previous Change Orders No. 1 - No.2 83.65125 Contract Price prior to this C.Q. . secot,g5i,gs Net increase this C.O. Contract Price with ail approved C.O. 5808.964.75 RECOMMEND: By: Owners Consultant CHANGE IN CONTRACT TIME: Original Contract Time ;00 days Net Change from Previous C.O. �4d=ys Contract Time prior to this C.O. 374 days Net increase this C.O. 0 days Contract Time with approved C.O. 374 den APPROVED APPROVED By: By: Owner Design I Build Firm Date: F ADATACIACnPW)1 ild+goed4.wpd VOd - T4b ans -z� sun 64.1 F321uLBSA "11 •.a •ti--i WC" • / (-1 o or - c A. C.A.P. Engineering Consultants, Inc. 4( yr. September 17, 1998 Mr. Stephen D. Kasper Vice President of Special Operations Cone Constructors. Inc. 6735 South Lois Avenue Tampa, Florida 33616 Re: West Mashta Dtive Bridge Relocation of FP&L Overhead lines underground C.A.P. Project No.: 3011b Dear Mr. Kasper. We received you correspondence of September 11, 1998, concerning the cost breakdown for the work tO be performed in conjunction with FP&L to relocate the overhead lines underground. The cost for furnishing and installing four (4) 6" diameter PVC conduits (complete) as per FP&L requirements is approved except for the 5% mark up. We will prepare a change order for a lump sum of The FP&L portion of the cost breakdown is still being reviewed by the Village. If you have any questions, please contact me at your earliest convenience. Very truly yours, C.A.P. Engineering Consultants, Inc. Andrew Pierce. P.E. Project Manager c: C. Sam Kissinger - Village of Key Biscayne 100 Wade Mrlf {:i05) 461-S484 • • Suite 300 www c:apeflg.cnrnl • w fADATAGIACAM301t1CpM.sdk.wpd Coral Gables, Florida 33134 }-ax: (305) 4(i1-5494 C C A•• wr•wI ly/Ag,r-., d'w. Arann 1 •,tigny+•• ZO'd bfib9-19b 5OE 6ui..caaut6ua 'd'v VEV:LO 86--8t-daS FeunoaT I On, Inc. Cone Constructors, Inc. 6735 South Lois Avenue Tampa, Florida 33616 Attn.: Steve Kasper (813) 837-2991 Office (813) 839-8921 Fax phone (305) 594-99t September 11, 1998 Re: West Mashta Drive Bridge Project Project H -3011B Subj.: CHANGE ORDER REQUEST Relocation of Permanent FP&L Power Lines Per your request, please find the following Change Order Proposal breakdown for the work to be performed in conjunction with FP&L to place all permanent power lines under the road bed of the bridge structure, instead of existing overhead service. 1. Furnish and install four 6" diameter PVC conduits $ 2,400.00 as per FP&L requirements, a total of 400 feet at $6.00 per foot. 2. Furnish and install 6" PVC couplings and radius $ 640.00 bends as necessary. 3, Provide excavation and backfilling as required to $ 450.00 accommodate FP&L conduit up to new pole locations as necessary. Total .$ 3,490.00 Mark-up (15%) $ 523,50 Total Change Order Request $ 4,013.50 Please forward this Request for Change Order to the Village for processing. Sincere! flu c ¶rd President 7801 n.w. 66th street 1 miami, ftorida 33166 foundation piling • seawalls • cofferdams • marinas • bridges drilled shaft construction • cast in situ retaining walls • injection grouting marine engineering contractors in south ftorida since 1911 6735 SOUTH LOIS AVENUE • TAMPA, FLORIDA 33616 P. O. BOX 22869, TAMPA, FL 33622-2869 PHONE (813) 837-2991 - FAX (813) 839-8921 Village of Key Biscayne Office of the Village Manager 85 West McIntyre Street Key Biscayne, Florida 33149 Attn: Mr. C. Samuel Kissinger Village Manager (305) 365-5507 Office (305) 365-8936 Fax September 11, 1998 Re: West Mashta Drive Bridge Project No,: 3011-B Subj.: REQUEST FOR CHANGE ORDER # Relocation of Permanent FP&L Power Lines Per your request following is a cost breakdown for the placement of permanent electric lines under the road bed of the bridge structure as provided by our subcontractor, Bunnell Foundation, Inc. (See Attached). a ion $ 1,030.15 -1- 291.50 T 2. Total FP&L costs $ 20,000.00 7.01 Om too TOTAL RCO # 5 -Sr24;243-t65— FP&L is requiring a $ 2,000.00 deposit prior to implementing any work on this Change Order. Dr eve . ua Please issue a Change Order in the Anxount of $ 2;23Th5 Sincerely, CON t ON . ' U TORS, INC. Per resident of Sp cc: Dick Bunnell Walfrido Pevida rations