HomeMy Public PortalAbout06-22-1999 Application for listing on Bridge Inventory System.tifVILLAGE OF KEY BISCAYNE
Village Council
Joe 1. Rasco, Mayor
Gregory C. Han, Vice Mayor
Scott Bass
Martha Fdez-Leon Broucek
Alan H. Fein
Mortimer Fried
Robert Oldakowski
Village Manager
C. Samuel Kissinger
Florida Department of Transportation
1000 N.W. 111th Avenue
Miami, FL 33172
Office of the Village Manager
June 22, 1999
Attention: Gabriel Romanach, P.E.
District Structures and Facilities Engineer
Reference: West Mashta Drive Bridge
Application for listing on Bridge Inventory System
Dear Mr. Romanach:
The Village of Key Biscayne is requesting a bridge number for the recently constructed West Mashta
Drive Bridge so that it can be listed on the Bridge Inventory System. The bridge is located on West
Mashta Drive between Hurricane Harbor and Smuggler's Cove in Key Biscayne, Florida. A location
map is included on the attached plans. I have attached the following information for your use in
obtaining the bridge number:
•
•
a set of 11"x 17" plans for the project
a bridge information sheet identifying key characteristics of the bridge
a company business card from C3TS (the project engineer)
If you require additional information on this matter, please feel free to contact me at (305) 365-5514.
Thank you.
y your ,
uel Ki roger
- Village Man ger
CSKIadv
85 West McIntyre Street • Key Biscayne, Florida 33149 • (305) 365-5511 • Fax (305) 365-8936
MISSION STATEMENT: "TO PROVIDE A SAFE, QUALITY COMMUNITY ENVIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT"
C3TS
CORZO
CASTELLA
CARBALLO
THOMPSON
SALMAN
Engineers
Architects
Planners
EB0005022
AAC0021 42
WEST MASHTA DRIVE BRIDGE
GENERAL INFORMATION
Bridge Superstructure Description:
The length of the W. Mashta Drive Bridge is 44'-4" and the it is 48'-0" wide. The
bridge superstructure consists of a roadway bed composed of select fill, an 8"
limerock base and traffic bearing brick pavers supported by Pre -cast Concrete
Conspan units. Each Conspan unit is 8'-0" wide and has a clear span of 42'-0".
There are concrete headwalls on each end of the bridge to support the
compacted fill material.
The bridge section consists of 2-11'-0" lanes, modified Type F curb and gutter (9"
high) and 2-10'-0" sidewalks. Aluminum railings were built at each headwall.
Bridge Substructure Description:
The abutments were made with a Class IV FDOT concrete mix and are 49'-0"
long and 3'-10" wide. There are 14 — 14" square prestressed concrete piles at
each abutment spaced 4'-0" on center.
If additional information is required please contact either Ramon Castella, P.E. or
myself at 305-445-2900.
Walfrido J. Pevida, Jr., P.E.