HomeMy Public PortalAbout10-25-1999 Letter from CAP Engiineering Consultants re Final Payment.tif- C.A.P. Engineering Consultants, Inc.
MEMORANDUM
TO: C. Samuel Kissinger - Village Manager, Village of Key Biscayne
FROM: Andrew Pierce, P.E.»Project Manager
DATE: October 25, 1999
RE:
West Mashta Drive Bridge
Final Payment - Project Close Out
C.A.P. Project No. 3011B
Please find enclosed the following:
1. Water and sewer as-builts approved by Miami -Dade Water and Sewer
Department (MDWASD) and job completion memorandums.
2. Letter of release from the Florida Department of Health (HRS).
The remaining punch list items for the above mentioned project have been completed.
Kindly prepare the final payment (joint checks) as per the payment request by Bunnell
Foundation on 8/16/99.
If you have any questions, please contact me at your earliest convenience.
F \DATACL\CAP\3011 \3011B wMashta Br Final Pmt wpd
r Milt,
1 ',1H I
';n0 • C/Jr,1I Cables, Floric1 33134
• Hcix (305)101-51,M
NEE
a
,.F-orunoRTian, int.
Village of Key Biscayne
Office of the Village Manager
85 West McIntyre Street
Key Biscayne, Florida 33149
Attn: Mr. C. Samuel Kissinger
Village Manager
(305) 365-5507 Office
(305) 365-8936 Fax
phone (305) 594-9900
August 16, 1999
Re West Mashta Drive Bridge
Project No.: 3011-B
Subj.: Final Requisition and Payment
Request for Joint Checks
The placement of the four aluminum flag poles on the West Mashta Bridge has been completed, and
constitutes the balance of the work to be finished on the project. All other punch list items have been
completed as well
Attached you will find a copy of the final requisition on this project, identified as Requisition # I I,
in a final amount $ 59,360.94.
Bunnell Foundation, Inc. Is requesting that the Village of Key Biscayne issue joint checks on the final
payments on this Contract. The following is a list of the requested joint checks for vendors and
subcontractors. Of course, each vendor or subcontractor will furnish the Village with a Final Release
of Lien upon payment of these final amounts.
1 Total Amount of Requisition # 11 $' 59,360.94
2 Cone / Bunnell Foundation, Inc. $ 41,596.20
3. Cone / Giralt Enterprises $ 2,235.00
4. Cone / America's Best Products $ 3,700.00
5. Cone / Ace Asphalt $ 2,000.00
6. Cone / ABC Barricades $ 2,064.36
7. Cone / C3TS $ 2.117,50
Balance to Cone Constructors, Inc. $ 5,647.88
We will appreciate the Village of Key Biscayne accommodating our request to process final payment
in this manner. Please contact us if you have any questions or comments.
Sincerely,
BUN O ON, INC. - -
Richard . nell
President
7801 n w 66th street / miaini, florida 331 66
foundation piling • seawalls • cofferdams • marinas • bridges
drilled shaft construction • cast in situ retaining walls - Injection grouting
marine engineering contractors in south florida since 1 91 1
Vitiate Gr nr,(
Joe I. Reece. Mr).r
Gregory C. Han. Vier Me7.r
Scott Bess
Mucha Fdea-Leen Broucek
Alan H. Fan
Mortimer Fried
Rg$,e,r O1d,kr...vicI
Vigez . Mew igrr
C Samuel Kissinger
VILLAGE OF KEY BISCAYNE
Office of the Village Manager
July 29, 1999
David Wolpin, Esquire
Weiss, Serota, Helfman, Pastoriza & Gucdes, P.A.
2665 So. Bayshore Drive
Miami, Florida 33133
Dear David:
San
O f k, \✓-e a f l' --°A"
wig s f ieerc-e /r
u
�'7/s /99
Enclosed please find a copy of the Final Payment Request from Andrew C. Pierce of
C.A.P. Engineering, dated July 19, 1999, addressed to C. Samuel Kissinger. As noted in the
memorandum, Mr. Pierce has requested that you review the documents.
We would appreciate it if you would examine the enclosed material and notify me and
Mr. Pierce of your recommendations.
Thank you.
Sine
C. ' amuel Kissinger
Village Manager
CSK\cpg
enclosure
. 85 West McIntyre Street • Key Biscayne, Florida 33149 • (305) 365-5500 • Fax (305) 365-8936
MISSION STATTUENT:'T0 raov1oEA LIFE QUALITY COMMUNITY ENVIRONMENT FOR AI I ISLANDERS TIIROUCH RrSPONsme COVIRNMINt —
A6 C.A.P. Engineering Consultants, Inc.
Nir
/'s t- 1 'c'
FAX TRANSMITTAL
it
Date: Id Mil
Project No: ifUtiir MAS tr1 got�r
1
To: ' � +9 Wi Z { 11Ni From: CWPtWi-J fir C�?°- e
Company:, h) fiSs 4o .P Number of Pages: 6
ORClud+no cover sheet]
Fax No.: ( 34)S } 8s - z32
REMARKS:
y_J✓1.9,
l iG
Uf1r,f Is PAD 4fi 5t411- fir
flPe
Ep_l 11* f * c-ur /c)41. 1 $tJ F) (I r», c.T6ry Ct/a/=..b
-roe �iGi, r1 7P /55v,`" 50/ ' Cl fc tc.s gips tap d r1! r
4.i
ilJ 7 v1� -1)4f" f- c. -trC co v t, 6 t7 T14 Ccvvv
v6
ltr u ;c -vv i e Cv t eJ P 1 VD r✓ t isW
ckaJm o , 71114. len-v t-- moo rfI etj 1'440 .
fk1
If traosmi ted material Is not received as noted. please Inform us immediately.
100 Miracle Mile • Suite 300 • Coral Gables, Florida 33134 • (305) 451-5484 • Fa (3O5)351-549•=
t0'd t,6t9-I917 5o£ "�Lsu' 6ui.,iaaui6u3 "d-b' V/30: II 66-SZ-iaO
I UNPAluitavMTAil
'U
7.1 V 7•• --. 0.100 . PC
lee 8ush
Governer
ectidve AdmGtdetraro
Engineering Section
1725 N. W. 167th Street
Miami. Florida 33056
September 2, 1999
W do J. Pevida, PE
Co o Castello Crballo Thompson Salmon
90 Ponce de Leon Blvd, Suite 900
Co al Gables, Florida 33134
Project Name: West Mashta Drive Bridge
Address' Key Btscyane
Permit" 125469-399-DSGP
Issued: 08/11/98
r Mr. Pevida.
Robert 0. Stooks M.U.
ScaersrL
Th s will serve to acknowledge receipt of request for a Letter of Release to place water Supply system
�n aervicc.
B d on the FAgirteer's Certification and satisfactory pressure test and bacteriological results, we are
rel acing these facilities for service.
In a.se of a Partial Release it will be the En ,lneer's responsibility to secure complete clearance of the
eet project prior toplaccing the entire system in service. Failure to comply with this requirement
wil constitute a cause for Enforcement Action.
Yojr continued cooperation in our water supply program is very much appreciated.
Julia
olc, P_E.
5wit Elrnir. M 3 . P.! . anvueenientd Adm;nt i,te
M,3mi.Dadt COunty flurry t ep4Lnr+URavi►enn.eeal ,0%
Iris N.W. tor• Elm, won.. Rasp 31016
TEL (301) 623-1500 • FAX (305) 623.3302
Bmeit, 3tinic a1.nlr�da�.WNt A.ec
WebvKi wwvr4.IthesIN Ora
TOTAL p' .etc'
10/22'90 FRI (3:01 FAX 305 6887737 INSPECTION UNIT
0 00 2
MEMORANDUM
G? , w• w.,
TO:
FROM:
Jose Soto DATE G'GI-. 1 I , 19 9 9
System Records & Permits Supervisor
E.T. Parada Jr.
Chief Inspector
Field Operations Section
SUBJECT:
Job Completion
E.R. Numberb S9 So1 1
F.B. Number —
The Sewer Collection System for E Sr I-1 Ft S N T A w E R 1 p C E located at
• HT A & 4 }-ivkgl C. tie. 1-k1644 IZ been completed.
Contractor ,,,1 L o t S` - •
Enclosed: Mylars I , Blue -lines_ 1 , and Field Iiociks.
Recorded Plat Enclosed. (One Copy to Plans Review, one copy to New Business.)
NON-Recorde(1 Plat Enclosed; Signed by
Miami -Dade Public Works Plat Unit
Design Engineer(s) Eotiz6, CA sue` A_yCa2SNALt- -t'yQ‘kpSo&JI SAl,w A r-) A-•
As-BuiltEnginccr(s) 4RtIli 6EAtt.) LA aD St J .j oAS, mac ,
cc: Tomas Goicouria, Utilities Development, New Business Manager
Elio Calvo,Fixed Assets Supervisor
Jerry Gomez, Hydrant Shop, Medley
' Marla Santa Cruz, Wholesale Billing
File
MEMORANDUM
1o,.., I7,. w.
S 0 Jose Soto
System Records & Permits Supervisor
FROM:
E.T. Parads Jr.
Chief Inspector
Field Operations Section
LATE. DST
SUBJECT:
I ci ci 9
Job Completion
B.R. Number 609 8 I oa
F . Number
The Water Distribution System for Ik\E ST l -t A j J DR., 0E. j3ft r._e located at
� J . t-4 A, trrA 1, + Ht/ dAOE 44 -8. Q„ been completed.
CAntraCtDr C4, 4l E C. ►J cs'r -
Enclosed: Mylars I , Blue -lines_ , and -G Field Books
Recorded Plat Enclosed. (One Copy to Plans Review, one copy to New Business.)
NON -Recorded Plat Enclosed; Signed by
Miami -Dade Public Works Plat Uric
Design Engineer(s)C404,,zo,C_Agi- , Ck&JA i tiomPsoN{9ALMAY, PA
As -Built Engi iccr(s) C A Kt 8 E. A'' LAND S v RJ "-1.04S-
cc:
Tomas (}oieouria, Utilities Development, New Business Manager
Elio Calvo,Fixed Assets Supervisor
Jerry Gomez, Hydrant Shop, Medley
Maria Santa Cruz, Wholesale Billing
File