BUDGET SUPPLEMENT FOR FISCAL YEAR 2022
PREFACE
This annual Budget Supplement provides information about the Metropolitan St. Louis Sewer
District's intended Capital Improvement and Replacement Program during Fiscal Year 2022 (July 1, 2021 to
June 30, 2022). This document is divided into the following sections:
•Program Summary (includes a glossary of terms used in the Budget Supplement)
•Wastewater Engineering Projects
•Wastewater Construction Projects
•Wastewater Continued Projects
•Wastewater Contingency Projects
•Wastewater Program
•Stormwater Engineering Projects
•Stormwater Construction Projects
•Stormwater Continued Projects
•Stormwater Contingency Projects
•Stormwater Program
•Appendix
The Wastewater Construction Projects and Stormwater Construction Projects sections list projects
that have scheduled construction starts during Fiscal Year 2022. The Wastewater Engineering Projects and
Stormwater Engineering Projects sections list projects that have scheduled engineering starts during Fiscal
Year 2022 (which includes design, planning, and data collection/system investigation services). Due to the
magnitude and complexity of these projects and the requirements for permitting and easement acquisition,
their construction is scheduled in future years. The Contingency Projects sections detail projects that are
currently scheduled for Fiscal Year 2023, but may be expedited to begin construction during Fiscal Year
2022, if revenue becomes available and project schedules allow. The Wastewater and Stormwater Program
sections summarize the capital program by fund.
For each new project identified for funding in Fiscal Year 2022, this document provides information
regarding the approximate project scope and estimated cost. For projects continued from previous fiscal
years, only the estimated construction cost and reason for continuance are provided. Specific information
regarding Continued Projects was included in previous Budget Supplement documents in the fiscal years in
which the projects were initially identified. Lastly, a listing of all Fiscal Year 2022 projects sorted by
municipality is provided in the Appendix.
On the Cover: MSD Project Clear (MSDPC) is two utilities in one - responsible for 9,000+ miles of public
wastewater and stormwater sewer systems in the St. Louis region. MSDPC is investing billions of dollars over a
generation to improve water quality and minimize wastewater and stormwater issues by maintaining regulatory
compliance, planning, designing, and building community rainscaping & system improvements, and an ambitious
program of maintenance and repair. Pictured is the Lower Meramec Wastewater Treatment Plant, which will be
undergoing expansion beginning in Fiscal Year 2022.
")
")
")
")
")
")
")
")")
")")
")")
")
")")
")
")
")
")
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(!(
!(
!(
!(
!(
!(
M
S
D
B
o
u
n
d
a
r
y
St
.
L
o
u
i
s
C
o
u
n
t
y
B
o
u
n
d
a
r
y
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 44
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦ 55
§¨¦170
§¨¦255
163
128
127
132
130
134
137
166165
131129
135 138
140
136
126
141
164
125
167
5
4 1
2
8
7
82
81
87
94 4544
78
54
58
80
92
42
83
16
84
19
49
93
20
68
66
18
90
85
64
7473
70
7675
17
46
56
65
59
12
14
48
47
77
86
61
40
50
69
72
10
51
57
9941
91
43
89
38
11
39
154153
148
151
117
152
150
155
159
103
104
121
105
122
111
110
109
124120
123
147
144
162
114
102
119
143
101
107
112
118
115 116
113
146
149
133
79
106
160
108
161
Map produced by MSD GIS Mapping, January 27, 2021
The Metropolitan St. Louis Sewer DistrictCapital Improvement and Replacement ProgramFiscal Year 2022
Legend
FISCAL YEAR 2022
!(Wastewater
!(Stormwater
FISCAL YEAR 2023
")Wastewater
")Stormwater
Combined Sewer Area
PAGE NO.3691315212223242526272829303132333435363752535560626367718895969798100139142145156157
MSD DISTRICT WIDE PROJECTS
SYSTEMFISCAL YEAR 2022
6 April 2021
Page 1 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY22
PAGE NUMBER PROJECT NAME
1 ARV ELLEN SANITARY RELIEF (TESSON CREEK ESTATES DR TO MADAFORD
LN)
2 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
3 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
4 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
5 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
6 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
7 BURNING TREE INFRASTRUCTURE REPAIR (N. WATERFORD DR TO FOX RUN
DR)
8 CAULKS CREEK PUMP STATION B (P-751) RELOCATION
9 CCTV INSPECTION AND PHYSICAL INSPECTION OF SEWERS (2020)
10 CLARK AVE SANITARY RELIEF (LACLEDE STA RD TO YEATMAN AVE)
11 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP
TUNNEL FACILITIES
12 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER
CREEK TUNNELS
13 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP
STATION FACILITIES
14 CONWAY ROAD SANITARY RELIEF (CONWAY LN TO DWYER AVE)
15 CRITICAL INFRASTRUCTURE ASSESSMENT AND ASSET INVESTIGATION (2020)
16 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE II
17 CSO - SHREWSBURY AVE CSO INTERCEPTOR (I-293)/OUTFALL (L-166) SEWER
SEPARATION
18 DANIEL BOONE - LAWNVIEW CREEK I/I REDUCTION
19 ELTORA WET WEATHER STORAGE FACILITY
20 FILLMORE PUMP STATION (P-308) REHABILITATION
6 April 2021
Page 2 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY22
PAGE NUMBER PROJECT NAME
21 FLOW METERING AND MONITORING (2022)
22 GENERAL SERVICES AGREEMENT - CONSTRUCTION MANAGEMENT (2022)
23 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2018)
CONTRACT B
24 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2022)
CONTRACT A
25 GENERAL SERVICES AGREEMENT - FACILITY & SEWER DESIGN (2022)
CONTRACT B
26 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2022) CONTRACT A
27 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2022) CONTRACT B
28 GENERAL SERVICES AGREEMENT - GEOTECHNICAL (2022) CONTRACT C
29 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT
A
30 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT B
31 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT C
32 GENERAL SERVICES AGREEMENT - PROPERTY APPRAISAL (2021) CONTRACT
D
33 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT A
34 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT B
35 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT C
36 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT D
37 GENERAL SERVICES AGREEMENT - SURVEY SERVICES (2022) CONTRACT E
38 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR)
PHASE I
39 HARLEM - BADEN RELIEF PHASE IV (HEBERT) BUILDING DEMOLITION AND
DESIGN
40 HAWTHORNE ESTATES SANITARY RELIEF (RANCH LN TO CLAYTON HILLS
LN)
41 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
42 L51 PUMP STATION FORCEMAIN IMPROVEMENTS
6 April 2021
Page 3 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY22
PAGE NUMBER PROJECT NAME
43 LINDBERGH SANITARY RELIEF (MEADOWSIDE DR TO N LINDBERGH BLVD)
44 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
45 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS
(WATERSHED CONSULTANT)
46 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
47 LOWER MERAMEC WWTF EXPANSION PHASE II
48 LOWER MERAMEC WWTF EXPANSION PHASE II
49 MCCUTCHEON RD AND THORNDELL SANITARY RELIEF
50 MULBERRY CREEK SANITARY RELIEF (HARWICH DR TO S LINDBERGH BLVD)
51 NORMANDIE SANITARY RELIEF (PAGE AVE TO SAINT CHARLES ROCK ROAD)
52 PUMP STATION REPLACEMENT PROJECTS (PHASE I)
53 RADAR RAINFALL DATA (2020)
54 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC
SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT)
55 SCADA SYSTEM UPGRADE
56 SMITH CREEK LADUE ROAD SANITARY RELIEF (ROYAL MANOR DR TO
HEWLETT CT)
57 SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-736 TO P-750)
58 SPOEDE ROAD SANITARY SEWER IMPROVEMENTS
59 ST. JOACHIM'S SANITARY RELIEF (ST. GENEVIEVE LN TO LYNROS DR)
60 ST. LOUIS COMBINED SEWER OVERFLOWS PROGRAM - CORPS OF ENGINEERS
- PHASE II
61 ST. MATTHIAS SANITARY RELIEF (ST. SHAWN LN TO STONEHARD DR)
62 STREAM FLOW GAUGE OPERATION AND MAINTENANCE (USGS)
63 STREAM FLOW WATER QUALITY SAMPLING (2020)
64 UPPER FISHPOT EAST SANITARY RELIEF (FIELD AVE TO WOLFF LN)
65 WATKINS-SPANISH SANITARY RELIEF (MALAGA ST TO TRAMPE AVE)
6 April 2021
Page 4 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY22
PAGE NUMBER PROJECT NAME
66 WESTWOOD COUNTRY CLUB SANITARY RELIEF (DEER CREEK TO WESTWOOD
CT)
67 WET WEATHER OPTIMIZATION STUDY
68 WOODSON SANITARY RELIEF (FLORA AVE TO LACKLAND RD)
69 BADEN CITYSHED MITIGATION BASINS (CALVARY, FREDERIK, PARTRIDGE
AND TILLIE) - SEPARATION SEWERS
70 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
71 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
72 BISSELL POINT WWTF TRICKLING FILTER MEDIA REPLACEMENT
73 CANTERBURY AND ROLAND SANITARY RELIEF (NELSON DR TO ROLAND
BLVD)
74 CANTERBURY AND ROLAND SANITARY RELIEF (NELSON DR TO ROLAND
BLVD)
75 CAREY CT 1664 SANITARY AND STORM SEWER REPLACEMENT
76 CAREY CT 1664 SANITARY AND STORM SEWER REPLACEMENT
77 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
78 CLAYTON MERAMEC ELEMENTARY PRIVATE I/I REMOVAL (S. MERAMEC AVE
AT WALINCA TER)
79 CLAYTON RD 9925 SANITARY SEWER REPLACEMENT
80 COLDWATER SANITARY RELIEF SECTION B, C & D - SECTION B
REHABILITATION
81 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
82 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE - RIVER DES PERES
83 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
84 DEER CREEK SANITARY TUNNEL (CLAYTON RD TO RDP) - PUMP STATION
85 DOLAN PLACE AND GRANDVIEW PLACE COMBINED SEWER RELIEF
86 EARTH CITY EXPRESSWAY PUMP STATION (P-708) REPLACEMENT
87 EARTH CITY UPS PUMP STATION (P-702) REPLACEMENT PHASE II
6 April 2021
Page 5 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY22
PAGE NUMBER PROJECT NAME
88 EASEMENT ACQUISITION FOR WASTEWATER PROJECTS (2022)
89 FENTON CREEK PUMP STATION (P-425) IMPROVEMENTS
90 FF-07 FEE FEE CREEK SANITARY RELIEF (MEADOWSIDE DR TO WILLOW
BROOK DR)
91 FISHPOT TRUNK WEST AND ED LOU LANE I/I REDUCTION (SMITH DR AND
VLASIS DR)
92 GEYER SANITARY RELIEF AND WINDSOR SPRINGS P-521 STORAGE (BIG BEND
BLVD TO WINDSOR SPRINGS DR)
93 GRAND GLAIZE TRUNK SANITARY RELIEF (BALLWIN GOLF CLUB TO
CLAYMONT COVE CT)
94 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR)
PHASE IB
95 INFRASTRUCTURE REPAIRS (FACILITIES) (2022)
96 INFRASTRUCTURE REPAIRS (REHABILITATION) (2022) CONTRACT A
97 INFRASTRUCTURE REPAIRS (REHABILITATION) (2022) CONTRACT B
98 INFRASTRUCTURE REPAIRS (WASTEWATER) (2022)
99 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS)
100 LEMAY PUBLIC I/I REDUCTION AND REHABILITATION (2022) CONTRACT A
101 LOUISVILLE AVENUE AND OAKLAND AVENUE COMBINED SEWER RELIEF
102 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
103 LOWER MERAMEC WWTF - ADMINISTRATION BUILDING FACILITY
IMPROVEMENTS
104 LOWER MERAMEC WWTF - INFLUENT PUMP STATION IMPROVEMENTS
105 LOWER MERAMEC WWTF - SOLIDS HANDLING EQUIPMENT REPLACEMENT
106 LOWER MERAMEC WWTF CORROSION AND HUMIDITY CONTROL
IMPROVEMENTS PHASE II
107 LOWER MERAMEC WWTF EXPANSION PHASE II
108 LOWER MERAMEC WWTF FITTING REPLACEMENT
109 MC-02 WATSON TO EDGAR RD SANITARY RELIEF (SKME-580A)
6 April 2021
Page 6 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY22
PAGE NUMBER PROJECT NAME
110 MC-02 WATSON TO EDGAR RD SANITARY RELIEF (SKME-580A)
111 MISSOURI RIVER WWTF DIGESTER GAS STORAGE COVER REPLACEMENT
112 OAKWOOD FARMS PUMP STATION (P-470) ELIMINATION
113 PRICE TO PIONEER SANITARY RELIEF
114 SCHUETZ ROAD SANITARY RELIEF (FOREST BROOK LN TO SUNNY WOOD CT)
115 SHREWSBURY SANITARY RELIEF SEWER AND I/I REDUCTION (WEIL AVE AND
I-44)
116 SOUTH BROADWAY AT MERAMEC COMBINED SEWER REPLACEMENT
117 ST. GEORGE CREEK SANITARY RELIEF (DAISY LN TO GRAVOIS RD TO NEW
HAMPSHIRE AVE)
118 ST. JACQUES SANITARY RELIEF (ST. JACQUES ST TO N LAFAYETTE ST)
119 SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAM CT TO COVE LN)
120 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TO JENNER LN)
121 TREVILLIAN 20 AND 50 SANITARY SEWER REPLACEMENT
122 WASHINGTON TERRACE 14 SEWER REPLACEMENT
123 WATKINS CREEK PUMP STATION (P-101) FORCEMAIN REPLACEMENT (COAL
BANK RD TO SPRING GARDEN DR)
124 WATKINS CREEK PUMP STATION (P-101) REPLACEMENT
142 GENERAL SERVICES AGREEMENT - WATER QUALITY SUPPORT SERVICES
(2021)
143 GRAVOIS CREEK OMCI STORMWATER DESIGN (CONTRACT F)
144 HALL STREET STORM SEWERS
145 STORMWATER ASSET INVESTIGATIONS (2022)
146 BROADHEAD #921 STORM SEWER
147 COLDWATER CREEK OMCI REIMBURSEMENTS PROGRAM
148
149
DEER CREEK OMCI REIMBURSEMENTS PROGRAM
DEKAMAY DRIVE STORM SEWER (MGJB-130)
6 April 2021
Page 7 of 7
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX - FY22
PAGE NUMBER PROJECT NAME
150 EASEMENT ACQUISITION FOR DEER CREEK OMCI PROJECTS (2021)
151 EASEMENT ACQUISITION FOR MALINE OMCI PROJECTS (2021)
152 EASEMENT ACQUISITION FOR UNIVERSITY CITY OMCI PROJECTS (2021)
153 ORCHARD AND WINDSOR LANE STORM SEWER
154 RECO AVENUE BANK STABILIZATION
155 SEMINARY OMCI REIMBURSEMENTS PROGRAM
156 STORMWATER INFRASTRUCTURE REPAIRS (2022)
157 STORMWATER INFRASTRUCTURE REPAIRS (REHABILITATION) (2022)
158 STORMWATER QUALITY GREEN INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
159 SUGAR CREEK OMCI REIMBURSEMENTS PROGRAM
160 UNIVERSITY CITY OMCI REIMBURSEMENTS PROGRAM
161 WC-33 LA PADERA - EL CAMARA STORM IMPROVEMENT
162 WC-33 LA PADERA - EL CAMARA STORM IMPROVEMENT
6 April 2021
Page 1 of 1
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
MAP INDEX CONTINGENCY PROJECTS - FY23
PAGE NUMBER PROJECT NAME
125 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS
126 CAULKS CREEK A PUMP STATION (P-750) IMPROVEMENTS
127 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE
128 CSO VOLUME REDUCTION GREEN INFRASTRUCTURE - RIVER DES PERES
129 HARLEM BADEN RELIEF PHASE IV (HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
130 HARLEM BADEN RELIEF PHASE IV (HEBERT) - SEWER REHABILITATION
131 HARLEM CITYSHED MITIGATION BASINS (ASHLAND AND ESSEX)
132 LEMAY 1 PUMP STATION (P-301) COOLING TOWER REPLACEMENT
133 LINDWORTH STORM SEWER SEPARATION
134 LINDWORTH STORM SEWER SEPARATION
135 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
136 LOWER MERAMEC WWTF EXPANSION PHASE II
137 MC-02 WATSON TO EDGAR RD SANITARY RELIEF (SKME-580A)
138 NEW ENGLAND TOWN CLIFF CAVE PUMP STATION (P-323) IMPROVEMENTS
139 PUMP STATION MANLIFT REPLACEMENT
140 STONINGTON PLACE SANITARY RELIEF (CLAYTON RD TO GEORGIAN ACRES
ST)
141 VALLEY VIEW PUMP STATION (P-734) REPLACEMENT
163 CLAYTON CITY HALL STORM SEWER
164 EVERMAN AVE 9518 STORM SEWER
165 HALL STREET STORM SEWERS
166 HALL STREET STORM SEWERS
167 REASOR DRIVE STORM SEWER
6 April 2021
Page 1 of 1
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY - FY22
TYPE OF PROJECT NUMBER OF
PROJECTS
PROJECT COST
Wastewater Engineering 67 $47,253,000
Wastewater Construction 53 $281,979,000
Stormwater Engineering 4 $1,430,000
Stormwater Construction 16 $14,529,522
TOTAL:140 $345,191,522
Wastewater Continued 2 $7,300,000
Stormwater Continued 2 $449,000
TOTAL:4 $7,749,000
GRAND TOTAL:144 $352,940,522
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
1 of 7
The identification and prioritization of projects to be included in the Capital Improvement
and Replacement Program is a multi-step process, requiring monitoring and updating to ensure
that the highest priority problems within the District are addressed in a timely manner, given
funding limitations. These stages include: project identification, conceptual solution,
preliminary study, final design, and construction.
At each step in the process, the project scope is reevaluated to verify that it continues to
meet regulatory requirements and customers’ needs. The project cost is updated based on
available information, and the project’s priority is assessed with the goal that the highest priority
projects are funded first.
Project cost estimates used in the budget preparation process and shown in the Budget
Supplement are usually based on the preliminary study stage of the process. At this stage there is
typically a minimal amount of detailed information available regarding geotechnical conditions,
utility relocation requirements, easement requirements, and other site-specific issues that have
the potential to significantly affect the project’s construction cost. Preliminary study cost
estimates are intended to be within thirty percent of the design engineer’s final estimates.
Individual projects may vary to a greater degree than the average, due to unanticipated site-
specific conditions that impact the project cost.
New projects are identified on an ongoing basis to ensure that the District is in
compliance with the regulatory requirements of the United States Environmental Protection
Agency and Missouri Department of Natural Resources, to address customer stormwater or
wastewater problems, remedy deficiencies identified through planning studies and hydraulic
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
2 of 7
analysis of the system, and implement required collection system and wastewater treatment plant
repairs and upgrades.
Upon the initial identification of regulatory issues, localized problems, or system
deficiencies, a conceptual solution is developed, which includes a project scope, cost estimate,
and priority ranking of the project relative to similar projects. This solution and associated cost
estimate are general, based on a single site visit and a “table-top” analysis of the problem. The
project may then be incorporated into the Capital Improvement and Replacement Program in a
specific fiscal year, based on the availability of funds and priority of the project.
Before the year in which funding of the project is anticipated, a preliminary study is
performed. In this study, scope is reevaluated in greater detail to ensure that the conceptual
solution is still viable, given current conditions, regulatory requirements, and updated project
cost estimate and priority ranking. In performing this preliminary study, the District may make
multiple site visits to inspect the problem area and estimate alignment of the sewer or channel to
be constructed. Preliminary survey information may be obtained and a more detailed hydraulic
analysis performed than was done at the conceptual solution level. Preliminary studies are
typically performed by the Engineering Department. However, the District may use engineering
consultants to perform preliminary studies during periods of heavy workload, or for large,
complex projects such as new treatment plants, upgrades to existing treatment plants, tunnel
projects, or major sewer upgrades.
Upon completion of a preliminary study, the project’s priority ranking is reevaluated
relative to other, similar projects. A project may be rescheduled to a later fiscal year within the
Capital Improvement and Replacement Program, should its priority ranking be reduced due to
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
3 of 7
increased project cost estimate or modification of its scope.
The final design of a project is performed by either the District’s Engineering Department
staff or via engineering consultant services. As part of the final design process, topographic and
geotechnical information is collected, utility conflicts are identified, construction plans and
specifications are prepared, easement plats are drafted, and easements are obtained.
In FY 2022, 24 engineering budget items have been procured using the Watershed
Consultant approach, retaining firms for multi-year efforts on a related suite of projects, in order
to increase efficiency, expedite the program and meet Consent Decree requirements and
schedule. Following is a listing of the Watershed Consultant related engineering projects and
associated professional service firms:
Project
Number
Project Name Page
Number
Budget
Watershed Program Consultant - 11151 - Construction Management Services -
Tank/Treatment/Pump Station Facilities. Consultant: KAI 360 Construction
Services, LLC
11151 CONSTRUCTION MANAGEMENT SERVICES - TANK/TREATMENT/PUMP STATION FACILITIES 13 7,000,000
Watershed Program Consultant - 11152 - Construction Management Services -
Lower and Middle RDP Tunnel Facilities. Consultant: Shannon & Wilson, Inc.
11152 CONSTRUCTION MANAGEMENT SERVICES - LOWER AND MIDDLE RDP TUNNEL FACILITIES 11 2,700,000
Watershed Program Consultant - 11826 - Construction Management Services -
Lower Meramec and Deer Creek Tunnels. Consultant: Black & Veatch Corporation
11826 CONSTRUCTION MANAGEMENT SERVICES - LOWER MERAMEC AND DEER CREEK TUNNELS 12 4,800,000
Watershed Program Design Consultant - 11109 - Lower & Middle RDP CSO
Controls System Improvements. Consultant: Jacobs Engineering Group, Inc.
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TO MARTIGNEY PS) 41 400,000 11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 44 150,000
11109 LOWER & MIDDLE RDP CSO CONTROLS SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 45 270,000
Watershed Program Design Consultant - 11144 - Bissell - Coldwater - Missouri -
Meramec Sanitary System Improvements. Consultant: Wood Environment &
Infrastructure Solutions, Inc.
12079 ARV ELLEN SANITARY RELIEF (TESSON CREEK ESTATES DR TO MADAFORD LN) 1 95,000 13033 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023) CONTRACT C 3 48,000
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
4 of 7
12586 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023) CONTRACT D 4 58,000
12587 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023) CONTRACT E 5 87,000
13124 BISSELL - COLDWATER - MISSOURI - MERAMEC PUBLIC I/I REDUCTION (2023) CONTRACT F 6 52,000
12326 DANIEL BOONE - LAWNVIEW CREEK I/I REDUCTION 18 161,000 11943 LINDBERGH SANITARY RELIEF (MEADOWSIDE DR TO N LINDBERGH BLVD) 43 401,000 12202 SMITH CREEK LADUE ROAD SANITARY RELIEF (ROYAL MANOR DR TO HEWLETT CT) 56 518,000
12217 ST. MATTHIAS SANITARY RELIEF (ST. SHAWN LN TO STONEHARD DR) 61 306,000 12242 UPPER FISHPOT EAST SANITARY RELIEF (FIELD AVE TO WOLFF LN) 64 404,000
Watershed Program Design Consultant - 11145 - Lemay Sanitary System
Improvements. Consultant: Burns & McDonnell Engineering Co., Inc.
12355 MULBERRY CREEK SANITARY RELIEF (HARWICH DR TO S LINDBERGH BLVD) 50 531,000 13623 SPOEDE ROAD SANITARY SEWER IMPROVEMENTS 58 120,000 12300 WOODSON SANITARY RELIEF (FLORA AVE TO LACKLAND RD) 68 391,000
Watershed Program Design Consultant - 11153 - RDP Tributaries (Deer Creek)
Controls System Improvements. Consultant: HDR Engineering, Inc.
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER CSO INTERCEPTOR (I-132)/OUTFALL (L-106) ELIMINATION PHASE II 16 150,000
12141 CSO - SHREWSBURY AVE CSO INTERCEPTOR (I-293)/OUTFALL (L-166) SEWER SEPARATION 17 450,000
12334 HAMPTON CREEK SANITARY RELIEF (DEER CREEK TRUNK TO OXFORD DR) PHASE I 38 200,000
11746 LOWER MERAMEC RIVER SYSTEM IMPROVEMENTS - BAUMGARTNER TO FENTON WWTF TUNNEL 46 650,000
11153 RDP TRIBUTARIES & UPPER RDP CSO CONTROLS & LOWER MERAMEC SYSTEM IMPROVEMENTS (WATERSHED CONSULTANT) 54 600,000
For projects of significant scope and impact, coordination with property owners who will
benefit or who will be affected by the construction of the project is achieved at neighborhood
meetings hosted by the District. For smaller projects, property owners are individually contacted
during the design of the project.
Many projects require that new easements be acquired to enable the project to be
constructed. The time required to acquire these easements is lengthy and may result in delays in
the planned construction schedule. When necessary, the District may utilize its eminent domain
powers to condemn for easements in order to ensure that a project is constructed. Any required
condemnation proceedings are performed in full compliance with state and federal law. Some
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
5 of 7
projects may additionally require specific permitting from other government agencies, such as
the Missouri Department of Natural Resources or US Army Corps of Engineers, prior to bidding.
A project is advertised for public bidding a minimum of 30 days, followed by a formal
bid opening. Bids are evaluated to determine the lowest responsive, responsible bidder.
Appropriation and contract ordinances are submitted to the Board of Trustees for their approval.
Upon final approval, contracts are executed and notices to proceed are issued.
In addition to wastewater and stormwater projects, the District may construct sanitary
sewer sub-district projects at the request of property owners currently served by private systems
or individual septic tank systems. These sub-districts are financed by the benefiting property
owners, using special benefit assessments. The affected property owners initiate the projects by
submitting a petition to the District, which provides design and construction management
assistance. Because of the uncertainty of the viability and/or schedule of sub-district projects,
they are not always listed in the Budget Supplement.
Wastewater projects are funded via revenue from the wastewater user charge paid by
ratepayers. The user charge also supports the sale of revenue bonds to fund the wastewater
program. Generally, Fund 6660, the Sanitary Replacement Fund, is used to pay for capital
wastewater work, while Fund 1101, the General Fund, is used to pay for non-capital wastewater
related work. The allocation of a given project’s costs between these two funds is an accounting
function necessary to facilitate capitalization of District assets (adding the value of work
completed to the overall value of all physical assets owned by the District). Wastewater projects
may also be funded by various Operation, Maintenance, Construction and Improvement (OMCI)
funds, Construction Funds, Special Funds, or the Improvement Fund.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
6 of 7
Stormwater projects may be funded via the Districtwide Stormwater Fund, the
Stormwater Regulatory Fund, the Improvement Fund, or from various Operation, Maintenance,
Construction, and Improvement (OMCI) funds. These OMCI funds are established in certain
areas of the District, are supported by property tax collection, and must be spent only within their
specific areas of tax collection.
The sections included in this Budget Supplement document are:
•Program Summary – summary of budget, and number and type of projects. Includes
general description of the capital program and budgeting process, and a glossary of often
used terms.
•Wastewater Engineering Projects – summary and details on wastewater engineering
consulting services and other professional services necessary to implement the
wastewater program.
•Wastewater Construction Projects – summary and details on wastewater construction
projects and other expenses such as property rights acquisition necessary to implement
the wastewater program.
•Wastewater Continued Projects – summary of wastewater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
•Wastewater Contingency Projects – summary and details on wastewater projects
currently budgeted in the next fiscal year, but having the chance to be expedited into the
current fiscal year, if scheduling or budget allow.
•Wastewater Program – annual alphabetical listing of wastewater projects by fund,
including the type of service (task) budgeted.
•Stormwater Engineering Projects - summary and details on stormwater engineering
consulting services and other professional services necessary to implement the
stormwater program.
•Stormwater Construction Projects - summary and details on stormwater construction
projects and other expenses such as property rights acquisition necessary to implement
the stormwater program.
CAPITAL IMPROVEMENT AND REPLACEMENT PROGRAM
SUMMARY
7 of 7
•Stormwater Continued Projects - summary of stormwater projects continued from
previous fiscal years, due to difficulties in easement acquisition, permitting process or
coordination with other agencies, design revisions or status, or other special issues.
•Stormwater Contingency Projects - summary and details on stormwater projects currently
budgeted in the next fiscal year, but having the chance to be expedited into the current
fiscal year, if scheduling or budget allow.
•Stormwater Program - annual alphabetical listing of stormwater projects by fund,
including the type of service (task) budgeted.
•Appendix – list of projects by municipality.
Please note that the detail sheets for each project in this document include locations and
quantities of work to be performed. These maps and quantities are approximate only, and final
location and extent of work may vary depending on final design and/or field conditions during
construction.
GLOSSARY
BIORETENTION A concave landscape feature which stores, filters, and infiltrates
stormwater runoff.
BIOSTABILIZATION A method of repairing eroding streams by utilizing the structural
properties of live plants to rebuild eroded streambanks and incised
channels.
BIOSWALE A sloped open drainage channel with landscape elements designed to
store, filter, and infiltrate stormwater runoff.
CD The Federal Consent Decree, entered on April 27, 2012 and all
appendices and all modifications or amendments thereto, between
MSD, United States of America, and the Missouri Coalition for the
Environment Foundation designed to eliminate or reduce overflows
from the Combined and Separate Sewer Systems in order to improve
water quality and protect human health and the environment.
CIPP Cured in Place Pipe, a construction method to rehabilitate a sewer pipe
by lining it with a new pipe. This work does not require excavating the
pipe and replacing it in total.
CIRP Capital Improvement and Replacement Program, the ongoing system
improvement efforts by MSD.
CMOM Capacity, Management, Operations, and Maintenance program.
COE United States Army Corps of Engineers.
COMBINED SEWER The portion of MSD's sewer system designed to convey municipal
sewage (i.e. domestic, commercial and industrial wastewaters) and
stormwater runoff through a single-pipe system to a wastewater
treatment facility and/or to a CSO outfall.
CONSENT DECREE See “CD”.
CSO Combined Sewer Overflow, any discharge from the combined sewer
system at a point prior to the headworks of a wastewater treatment
facility.
FORCE MAIN A pressurized sewer pipe that can carry wastewater. Sewer force mains
are necessary when topography, or other system characteristics, do not
allow wastewater to move through the line by the influence of gravity
alone. Force mains are the pipes that convey wastewater under pressure
through the work of pumps located in pump stations or lift stations.
GI Green Infrastructure, environmentally friendly and sustainable
stormwater management practices that reduce runoff by using
infiltration, such as bioretention and bioswales.
GRADE CONTROL
STRUCTURE
A structure constructed in a creek or stream to control erosion. The
structure allows water to pass to a lower elevation while directing the
energy and velocity of the water in a manner that minimizes erosion
that would otherwise change the shape of the stream.
GLOSSARY
I/I Inflow and Infiltration; inflow refers to direct connections of rainwater
sources to the sanitary sewer system; infiltration refers to groundwater
sources of flows into sewer pipes. Inflow sources can include roof
downspouts, yard and area drains, foundation drains, manhole covers,
cross connections from storm sewers, or inlets. Infiltration sources can
include defective building laterals, sewer pipes, pipe joints,
connections, or manhole walls.
INFILTRATION Infiltration refers to groundwater sources of flows into sewer pipes.
Infiltration sources can include defective building laterals, sewer pipes,
pipe joints, connections, or manhole walls.
INFLOW Inflow refers to direct connections of rainwater sources to the sanitary
sewer system. Inflow sources can include roof downspouts, yard and
area drains, foundation drains, manhole covers, cross connections from
storm sewers, or inlets.
LATERAL A sewer connecting a building with the publicly owned sanitary sewer
main.
LIFT STATION Lift stations are used for pumping wastewater or stormwater from a
point of lower elevation to a point of higher elevation. Lift stations
utilize pumps to lift the wastewater from the lower elevation to the
higher elevation. Wastewater then flows by gravity to the next location
in the system.
LMRDP Lower and Middle River Des Peres, generally the river from University
City south to the Mississippi River.
LTCP Long Term Control Plan, a long duration plan to manage/improve the
combined sewer system and abate combined sewer overflows, through
the identification of a capital improvement plan tailored to receiving
stream water quality and the community's financial capability.
MAIN A smaller public sewer collecting flows from buildings via lateral
connections.
MGD Million Gallons per Day, a measure of flow over time. 1 MGD is
equivalent to 700 gallons per minute of flow.
MSD Metropolitan St. Louis Sewer District, district formed in 1954 via vote
of the people, with responsibility for wastewater and stormwater
services in St. Louis City and most of St. Louis County.
OMCI Operation Maintenance Construction Improvement district, funds
generated by tax payments in certain districts can be used for capital
improvements in those districts. Funds can be used for capital projects
or maintenance.
OUTFALL The point of discharge to the environment from a constructed SSO or
CSO.
PRIVATE I/I REDUCTION Reduction of inflow and infiltration sources on private property, from
private sources, such as downspout and driveway drain connections to
the sanitary sewer system (inflow) or deteriorated service laterals or
broken connections (infiltration).
PUBLIC I/I REDUCTION Reduction of public inflow and infiltration sources such as cracked and
broken sewer pipes or deteriorated manholes.
GLOSSARY
PUMP STATION Pump stations are facilities which include pumps and ancillary
equipment, for pumping fluids from one place to another. A pump is a
mechanical device that converts mechanical energy to pressure, in order
to convey wastewater or stormwater. Pumping results in pressurized
sewer pipes that are called force mains.
RAIN GARDEN A landscaped shallow swale or depression that temporarily holds water
and reduces stormwater runoff as the water infiltrates into the soil. The
water is absorbed by plants and is filtered as it percolates through the
soil.
RAINSCAPING Any combination of plantings, water features, catch basins, permeable
pavement and other activities that manage stormwater as close as
possible to where it falls, rather than moving it someplace else.
RDP River Des Peres, a river in the central and south portions of the
metropolitan area, which was enlarged in the early 1900s to provide
conveyance to the Mississippi River of stormwater runoff in order to
reduce surface flooding.
RFP Request for Proposals.
RFQ Request for Qualifications.
SANITARY SEWER SYSTEM The portion of the sewer system designed to convey only sewage, and
not stormwater, from residences, commercial buildings, industrial
plants and institutions for treatment at a wastewater treatment facility
SKME Sverdrup Kwame Metcalf Eddy - a planning team that identified system
needs in the early 2000s.
SSO Sanitary Sewer Overflow, any overflow, spill, diversion, or release of
wastewater from or caused by MSD's sanitary sewer system. This CD
term shall include: (i) discharges to surface waters of the State or
United States from MSD's sanitary sewer system and (ii) any release of
wastewater from MSD's sanitary sewer system to public or private
property that does not reach waters of the United States or the State.
SSO MP Sanitary Sewer Overflow Control Master Plan, a capital improvement
plan which describes the results of system evaluations and the specific
measures that will result in the Elimination of all Constructed SSOs
Outfalls, all known SSOs, and Building Backups, and/or that are
necessary to ensure that there is adequate capacity in the Sanitary Sewer
System to collect, convey, and treat anticipated peak wet weather flows
under current and projected future conditions as defined in Paragraphs
21(e) and (g) of the CD.
SUBTRUNK A sewer that serves a smaller or sub-watershed area, which brings flow
to a trunk sewer.
TRUNK SEWER A major sewer which serves a large area. A trunk sewer typically is
centrally located within a watershed to which subtrunks and other
sewers are tributary.
USGS United States Geological Survey.
GLOSSARY
WASTEWATER Wastewater, also written as waste water, is any water that has been
adversely affected in quality by human influence. Wastewater can
originate from a combination of domestic, industrial, commercial or
agricultural activities, and from sewer inflow or infiltration.
WATERSHED An area of land which drains to a specific creek, river, or other body of
water.
WATERSHED CONSULTANT A consulting firm retained for a multi-year design effort on a related
suite of projects in a specific watershed.
WWTF Wastewater Treatment Facility, any facility, method or process which
removes, reduces or renders less obnoxious pollutants or water
contaminants released from any source.
WWTP Wastewater Treatment Plant, a municipal facility that removes, reduces
or renders less obnoxious pollutants or water contaminants from
wastewater before releasing it to the environment.
6 April 2021
Page 1 of 5
WASTEWATER ENGINEERING PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12079 ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
$95,000 1
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$2,050,000 2
13033 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
$48,000 3
12586 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
$58,000 4
12587 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
$87,000 5
13124 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
$52,000 6
12108 BURNING TREE INFRASTRUCTURE REPAIR (N.
WATERFORD DR TO FOX RUN DR)
$103,000 7
12114 CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
$1,035,000 8
12000 CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
$2,500,000 9
12122 CLARK AVE SANITARY RELIEF (LACLEDE STA
RD TO YEATMAN AVE)
$323,000 10
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
$2,700,000 11
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
$4,800,000 12
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
$7,000,000 13
12130 CONWAY ROAD SANITARY RELIEF (CONWAY
LN TO DWYER AVE)
$108,000 14
12907 CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
$1,700,000 15
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II
$150,000 16
12141 CSO - SHREWSBURY AVE CSO INTERCEPTOR
(I-293)/OUTFALL (L-166) SEWER SEPARATION
$450,000 17
6 April 2021
Page 2 of 5
WASTEWATER ENGINEERING PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12326 DANIEL BOONE - LAWNVIEW CREEK I/I
REDUCTION
$161,000 18
11737 ELTORA WET WEATHER STORAGE FACILITY $100,000 19
13046 FILLMORE PUMP STATION (P-308)
REHABILITATION
$300,000 20
12801 FLOW METERING AND MONITORING (2022)$2,500,000 21
12387 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
$2,000,000 22
12894 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2018) CONTRACT B
$50,000 23
13098 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2022) CONTRACT A
$475,000 24
13099 GENERAL SERVICES AGREEMENT - FACILITY
& SEWER DESIGN (2022) CONTRACT B
$250,000 25
13102 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
$85,000 26
13103 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
$85,000 27
13104 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
$85,000 28
13087 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT A
$75,000 29
13088 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT B
$75,000 30
13089 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT C
$75,000 31
13090 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT D
$75,000 32
13108 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
$50,000 33
13109 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
$50,000 34
6 April 2021
Page 3 of 5
WASTEWATER ENGINEERING PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13110 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
$50,000 35
13111 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
$50,000 36
13112 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
$50,000 37
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
$200,000 38
10641 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
BUILDING DEMOLITION AND DESIGN
$600,000 39
12299 HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
$319,000 40
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$400,000 41
13227 L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
$1,161,000 42
11943 LINDBERGH SANITARY RELIEF (MEADOWSIDE
DR TO N LINDBERGH BLVD)
$401,000 43
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$150,000 44
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
$270,000 45
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$650,000 46
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$1,000,000 47
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$2,000,000 48
12346 MCCUTCHEON RD AND THORNDELL
SANITARY RELIEF
$405,000 49
12355 MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
$531,000 50
12360 NORMANDIE SANITARY RELIEF (PAGE AVE TO
SAINT CHARLES ROCK ROAD)
$1,661,000 51
6 April 2021
Page 4 of 5
WASTEWATER ENGINEERING PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
$150,000 52
12006 RADAR RAINFALL DATA (2020)$150,000 53
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
$600,000 54
13467 SCADA SYSTEM UPGRADE $1,000,000 55
12202 SMITH CREEK LADUE ROAD SANITARY RELIEF
(ROYAL MANOR DR TO HEWLETT CT)
$518,000 56
12628 SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-736
TO P-750)
$220,000 57
13623 SPOEDE ROAD SANITARY SEWER
IMPROVEMENTS
$120,000 58
12214 ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
$550,000 59
13608 ST. LOUIS COMBINED SEWER OVERFLOWS
PROGRAM - CORPS OF ENGINEERS - PHASE II
$10,000 60
12217 ST. MATTHIAS SANITARY RELIEF (ST. SHAWN
LN TO STONEHARD DR)
$306,000 61
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
$540,000 62
12004 STREAM FLOW WATER QUALITY SAMPLING
(2020)
$270,000 63
12242 UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
$404,000 64
12271 WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
$363,000 65
12132 WESTWOOD COUNTRY CLUB SANITARY
RELIEF (DEER CREEK TO WESTWOOD CT)
$513,000 66
13436 WET WEATHER OPTIMIZATION STUDY $1,500,000 67
12300 WOODSON SANITARY RELIEF (FLORA AVE TO
LACKLAND RD)
$391,000 68
6 April 2021
Page 5 of 5
WASTEWATER ENGINEERING PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
TOTAL:$47,253,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ARV ELLEN SANITARY RELIEF (TESSON CREEKESTATES DR TO MADAFORD LN)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 700 FEET OF 15-INCH SANITARY SEWER AND 40 FEET OFBANK STABILIZATION.
G R A N T M EADOW
WHITCOM
B
LINDHAL
L
BARLOW
AP
L
E
Y
MA
D
A
F
O
R
D
BO
N
B
Y
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
CROSTON
CASA ROSA
TESSONCREEKEST
A
T
E
S
AFFT
O
N
V
I
E
W
AEROVISTA
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12079
Wastewater
11
$95,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
1Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENTFACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL ANDLEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDEREDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS HANDLINGSYSTEM IMPROVEMENTS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTIONBUDGET IS $515,000,000.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
11
$2,050,000
Various
Various
Various
Capital
2Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT C
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE THE PUBLIC SEWER SYSTEM USING THE CURED INPLACE PIPE METHOD.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12143 AND 12343.
MU
L
L
A
N
P
H
Y
EST
E
S
AS
P
E
N
LIN
D
S
A
Y
HU
M
E
S
FLI
C
K
E
R
SW
A
L
L
O
W
BO
U
L
D
E
R
LIL
A
C
LOV
E
L
A
N
D
BL
U
E
B
I
R
D
MAN
O
R
TYS
O
N
VE
R
L
E
N
E
MA
D
I
S
O
N
MERCURY
MA
R
K
T
W
A
I
N
FLA
M
I
N
G
O
BA
B
L
E
R
FER
N
B
R
O
O
K
RON
D
A
VIOL
E
T
GRA
N
T
S
IRIS
COR
T
E
Z
HAM
M
E
S
DANIELBOONE
VES
P
E
R
CHA
R
L
O
T
T
E
CR
O
W
D
E
R
FLORISOTA
GAR
D
E
N
I
A
ANG
E
L
U
S
SAL
L
Y
RU
T
H
SAN
M
A
T
E
O
MAR
Y
A
N
N
CUR
T
I
S
DON
D
O
N
N
A
LOV
E
FENMORE
MO
N
T
E
R
E
Y
MUL
I
A
N
GRE
E
L
E
Y
SHIRLENE
LA SIERRA
FL O RISSA NTPARK
OLV
E
R
A
ASP
E
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13033
Wastewater
11
$48,000
Various
Various
Various
Capital
3Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT D
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED INPLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12088, 12094, 12169,12338, 12274, AND 12307.
§¨¦44
§¨¦270
§¨¦270
S
MO141
HWY
M A N C H E S T E R R D
E M O 3 0 H W Y
S
K
I
R
K
W
O
O
D
R
D
WATSON RD
S
LINDBERGH
BLVD
MANCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12586
Wastewater
11
$58,000
Various
Various
Various
Capital
4Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT E
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED INPLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECT 12350, 12167, 12258,AND 12277.
§¨¦44
§¨¦64
§¨¦270
§¨¦255
§¨¦170
§¨¦255
§¨¦270 §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12587
Wastewater
11
$87,000
Various
Various
Various
Capital
5Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2023) CONTRACT F
Design Services
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATION OF THE PUBLIC SEWER SYSTEM USING THE CURED INPLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12326 AND 12330.
§¨¦44
§¨¦64
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦70
§¨¦270
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13124
Wastewater
11
$52,000
Various
Various
Various
Capital
6Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BURNING TREE INFRASTRUCTURE REPAIR (N.WATERFORD DR TO FOX RUN DR)
Design Services
6660 - SanitaryReplacement Fund
DEFICIENT SEWER CAUSING OVERCHARGING.
CONSTRUCT 230 FEET OF 15-INCH SANITARY SEWER ANDREHABILITATE 180 FEET OF 15-INCH SANITARY SEWER.
WATERFORD
PAD
D
O
C
K
FOX RUN
TU
R
F
PALOMIN
O
NAS
H
U
A
BLUEFIELD
ARL
I
N
G
T
O
N
BU
R
N
I
N
G
T
R
E
E
S
A
D
D
L
E
S
P
U
R
PEP P E R H I L L
WILLOWBROOK
BL
U
E
F
I
E
L
D
LINDB
E
R
G
H
LIN D B E R G H
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12108
Wastewater
11
$103,000
Florissant
Coldwater
Coldwater Creek
Capital
7Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK PUMP STATION B (P-751)RELOCATION
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
PUMP STATION AT MAXIMUM CAPACITY, ACCESS IMPACTED BYFLOODING, UTILITY COMPLICATIONS, AND NO ROOM ON SITE FORNEEDED EMERGENCY STORAGE.
RECONSTRUCT PUMP STATION AT NEW LOCATION.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLMENTAL APPROPRIATIONIN FY 25. TOTAL CONSTRUCTION BUDGET IS $8,200,000.
§¨¦64
§¨¦64CENTRALMIDLAND
ALR
I
C
K
DORESAY
OLDCHESTERFIELD
BIG
E
L
O
W
GRI
M
S
T
O
N
E
GILE
A
D
CENTRAL MIDLAN D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12114
Wastewater
11
$1,035,000
Chesterfield
Missouri
Caulks Creek
Capital
8Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CCTV INSPECTION AND PHYSICAL INSPECTION OFSEWERS (2020)
Vendor Services
1101 - General Fund
FIELD INVESTIGATION OF SEWERS IS NEEDED TO IDENTIFY PROBLEMSAND QUANTIFY REQUIRED REPAIRS/IMPROVEMENTS AND CLEANING.
PERFORM CCTV OR PHYSICAL INSPECTION AND CLEANING OFSELECTED SEWERS. SERVICES MAY BE RENEWED THROUGH FY2022BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12000
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
9Page
2022
FISCAL YEAR:
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLARK AVE SANITARY RELIEF (LACLEDE STA RDTO YEATMAN AVE)
Design Services
6660 - SanitaryReplacement Fund
Description of Problem/Issue
EXCESSIVE I/I, BUILDING BACKUPS, AND SEWER STRUCTURAL
PROBLEMS.
CONSTRUCT 1,270 FEET OF 18-INCH SANITARY SEWER.
MARSHALL
TUXEDO
YE
A
T
M
A
N
CLARK
LACLEDE
STATION
ATALANTA
OXFORD
BR
O
O
K
S
I
D
E
KUHLMAN
TWINING
CA
R
O
L
I
N
E
RO
B
I
N
S
O
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12122
Wastewater
11
$323,000
Webster Groves
Lemay/RDP
Deer Creek
Capital
10Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER AND MIDDLE RDP TUNNEL FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE LMRDP CSO STORAGE TUNNEL (BROADWAY TO RDP TUBES),AND THE JEFFERSON BARRACKS TUNNEL (LEMAY WWTP TOMARTIGNEY PS).
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦64
§¨¦270
§¨¦44
§¨¦255
§¨¦70
§¨¦170
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11152
Wastewater
16
$2,700,000
Various
Lemay/RDP
Various
Asset Management
11Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -LOWER MERAMEC AND DEER CREEK TUNNELS
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATUNNEL CONSTRUCTION.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR THE DEER CREEK TUNNEL & TRUNK SEWER, MALINE CREEKSTORAGE FACILITY, RDP TRIBUTARIES CSO TUNNEL, UPPER RDP CSOSTORAGE TUNNEL, AND THE LOWER MERAMEC SYSTEMBAUMGARTNER TO FENTON WWTF TUNNEL.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70§¨¦170
§¨¦255
§¨¦70
§¨¦270
§¨¦55
§¨¦170
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11826
Wastewater
16
$4,800,000
Various
Various
Various
Asset Management
12Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONSTRUCTION MANAGEMENT SERVICES -TANK/TREATMENT/PUMP STATION FACILITIES
Professional Services
6660 - SanitaryReplacement Fund
SYSTEM DEFICIENCIES REQUIRING CORRECTION OR MITIGATION VIATHE CONSTRUCTION OF STORAGE TANKS AND PUMP STATIONS, ANDTREATMENT FACILITY IMPROVEMENTS.
PROVIDE CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESFOR TANK, TREATMENT, AND PUMP STATION PROJECTS THROUGHOUTTHE DISTRICT.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11151
Wastewater
16
$7,000,000
Various
Various
Various
Asset Management
13Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CONWAY ROAD SANITARY RELIEF (CONWAY LNTO DWYER AVE)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 880 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
DW
Y
E
R
DA
R
Y
L
CO
N
W
A
Y
GERMAN
ARTHUR
CABLE
ANZEIGER
GARIBALDI
LYLEWO
O
D
SAVANNAH
FI
E
L
D
S
T
O
N
E
CAPITOL
LE
E
L
A
W
I
N
W
O
O
D
GOLD DUST
B
E
N
N
I
N
G
T
O
N
I
N
G
LESIDE
THORNW
O
O
D
MARYVIEW
PR
E
S
I
D
E
N
T
FERRA N D W O O D S
F
A
I
R
L
Y
N
N
OL
D
F
R
O
N
T
E
N
C
DW
Y
E
R
LE
E
L
A
S
L
I
N
D
B
E
R
G
H
B
L
V
D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12130
Wastewater
11
$108,000
Ladue
Lemay/RDP
Deer Creek
Capital
14Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CRITICAL INFRASTRUCTURE ASSESSMENT ANDASSET INVESTIGATION (2020)
Vendor Services
1101 - General Fund
INVESTIGATION NEEDED TO DETERMINE SEWER CONDITIONS ANDSYSTEM DEFECTS TO PROVIDE THE BASIS FOR PREVENTATIVEMAINTENANCE AND REHABILITATION ACTIVITIES.
PERFORM SERVICES SUCH AS FIELD RECONNAISSANCE ANDINSPECTION, MAP UPDATES, WORK ORDER MANAGEMENT,FLOODWALL GATE INSPECTIONS, SSO MONITORING EQUIPMENTMAINTENANCE, AND CCTV VIDEO REVIEW. SERVICES MAY BERENEWED THROUGH FY2022 BASED ON PERFORMANCE.
THIS PROJECT WILL PROVIDE SUPPORT FOR THE OPERATIONSDEPARTMENT, DESIGN AND PLANNING ACTIVITIES, AND UPDATES TOASSET INFORMATION PROGRAMS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12907
Wastewater
16
$1,700,000
Various
Various
Various
Asset Management
15Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO - MARY AVENUE SOUTH OF MANCHESTERCSO INTERCEPTOR (I-132)/OUTFALL (L-106)ELIMINATION PHASE II
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
REMOVAL OF I-132 AND L-106 REQUIRED BY THE LONG TERM CONTROLPLAN.
CONSTRUCT 10,500 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, AND3,600 FEET OF 12-INCH TO 36-INCH STORM SEWER. PERFORM PUBLICAND PRIVATE I/I REDUCTION TO FACILITATE COMBINED SEWERSEPARATION. REMOVE INTERCEPTOR I-132 AND CSO OUTFALL L-106.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS$26,500,000.
PINE
MC
K
N
I
G
H
T
WHITE
LAWN
BR
E
N
T
W
O
O
D
SWAN
EULALIE
ROSALIE
D
O
R
O
T
H
Y
HIGH
SCHOOL
MADGE
SA
L
E
M
ST
C
L
A
I
R
URBAN
Y O R K
CE
C
E
L
I
A
ROSE
R
OCK
F
O
R
D
MAR
Y
PA
R
K
R
I
D
G
E
FLORENCE
BR
E
M
E
R
T
O
N
MORITZ
WRENWOOD
LOUIS
SONORA
PENDLETON
AN
N
A
L
E
E
HARRISON
EVANS
RE
M
I
N
G
T
O
N
RU
T
H
STRASSNER
MERRITT
HI
L
L
JOSEPH
LITZSINGER
PO
C
A
H
O
N
T
A
S
POWELL
KENTLAND
MA
N
D
E
R
L
Y
CO
L
L
I
E
R
BERRY
HE
L
E
N
WHITEHALL
SUTTON
RARITAN
HENRIETTA
B R I D G E P O R T
HILLDALE
GOLDEN GATE
CAN
A
R
Y
KENILWORTH
BOMPART
PA
T
T
O
N
R E DBIRD
YORKH I L L S
UNIONPACIFIC
GENEVIEVE
WHITE
L I T Z SINGER
MARY
LITZSINGER
SWAN
MARY
MORITZ
LAWN
BRIDGEPORT
M A N C H ES TE R RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12140
Wastewater
11
$150,000
Brentwood
Lemay/RDP
Deer Creek
Capital
16Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO - SHREWSBURY AVE CSO INTERCEPTOR(I-293)/OUTFALL (L-166) SEWER SEPARATION
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,130 FEET OF 8-INCH TO 21-INCH SANITARY AND 290 FEETOF 12-INCH STORM SEWER, AND PERFORM PRIVATE I/I REDUCTION AT37 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12590.
TUXEDO
SHREWSBURY
SUTHERLAND
LACLEDE
STATION
YE
A
T
M
A
N
GREELEY
DEVONSHIRE
SP
R
I
N
G
LANSDOWNE
ARLINGT
O
N
MARSHALLOXFORD
CLARK METROLINK
B U R L I N G T O N N O R T H E R N
S
A N T A F ESUFF
O
L
K
NEWPORT
DA
L
E
CA
R
O
L
I
N
E
S
U
S
S
E
X
KUHLMAN
ATALANTA
EX
E
T
E
R
LE
N
O
X
ST
M
I
C
H
A
E
L
AMELIA
PROVIDENCE
O
A
K
W
O
O
D
MELBOURNE
PAGE
MURDOCH
BROO K S I D E
ELMWOOD
KEY W
E
S
T
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12141
Wastewater
11
$450,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
17Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DANIEL BOONE - LAWNVIEW CREEK I/IREDUCTION
Design Services
6660 - SanitaryReplacement Fund
EXCESSIVE I/I CAUSING OVERCHARGED SANITARY SEWERS.
CONSTRUCT 520 FEET OF 12-INCH TO 15-INCH SANITARY SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT 14 PROPERTIES.
PROJECTS INCORPORATED INTO THIS PROJECT INCLUDE 12118CENTRAL, 12343 MARK TWAIN, AND 12143 DANIEL BOONE.
HU
M
E
S
CE
N
T
R
A
L
LIN
D
S
A
Y
N
E
W
H
A
L
L
S
F
E
R
R
Y
MU
L
L
A
N
P
H
Y
5TH
KINGSFORD
JENKEE EST
E
S
WIE
T
H
A
U
P
T
V A I LE
CH
A
R
B
O
N
I
E
R
FLA
M
I
N
G
O
WR
E
N
PRI
V
A
T
E
PAU
L
LOV
E
L
A
N
D
ASP
E
N
AVO N
MOULE
OLDHALLSFERRY
DO
V
E
BAL
T
I
C
G
R
EENWAYCHASE
LILA
C
SU
N
S
E
T
P
A
R
K
LOV
E
95T
H
DE W A YNE
KEEVEN
NIG
H
T
W E D G W OO D
CARLA
D E L L AGO
SHACKELFORD
LEE
S
BLUEHERON
JANA
KIL
M
O
R
Y
PATTERSON
PALM
RYA
N
PATI
E
N
C
E
LANGHOLM
TYSON
HAR
K
E
E
FLI
G
H
T
HEATHERTON
DRESDEN
D
O
V
E
R
RA
V
E
N
B
A
R
K
W
O
O
D
ORIOLE
F O X T AI L
CED
A
R
BLU
F
F
EN
S
E
N
A
D
A
BO
R
D
E
N
HER
B
S
T
M
E
R
C
Y
E
D
I
S
T
O
HUMES
PRI
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12326
Wastewater
11
$161,000
Unincorporated
Coldwater
Coldwater Creek
Capital
18Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ELTORA WET WEATHER STORAGE FACILITY
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS. CONSTRUCTED SSOOUTFALLS REQUIRE REMOVAL.
CONSTRUCT A 2 MILLION GALLON SANITARY STORAGE FACILITY,PUMP STATION, AND COLLECTION SEWERS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS$10,447,000.
PAGE
TERMINAL
CANTON
PE
N
N
S
Y
L
V
A
N
I
A
VE
R
L
IO
N
A
PA
R
T
R
I
D
G
E
MI
L
F
O
R
D
ROBBINS
CO
L
B
Y
GR
I
E
F
I
E
L
D
N O R F O L K S O U T HERN
PURCELL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11737
Wastewater
11
$100,000
Pagedale
Lemay/RDP
University City Branch
Capital
19Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FILLMORE PUMP STATION (P-308)REHABILITATION
Design Services
6660 - SanitaryReplacement Fund
AGING PUMP STATION IN NEED OF ASSET RENEWAL.
REHABILITATE THE MECHANICAL AND ELECTRICAL SYSTEMS, ANDTHE BUILDING ENVELOPE.
EL
W
O
O
D
FIL
L
M
O
R
E
PENN
S
Y
L
V
A
N
I
A
UNIO
N
P
A
C
I
F
I
C
IRO
N
MINN
E
S
O
T
A
BO
W
E
N
DOV
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13046
Wastewater
11
$300,000
St. Louis City
Lemay/RDP
Mississippi River Tributary Areas
Capital
20Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FLOW METERING AND MONITORING (2022)
Vendor Services
1101 - General Fund
COMPUTER MODELING OF THE SEWER SYSTEM REQUIRES FLOW DATAIN ORDER TO BE ACCURATELY CALIBRATED TO FIELD CONDITIONS.
CONDUCT FLOW METERING AND MONITORING OF THE WASTEWATERSYSTEM TO COLLECT AND ANALYZE DATA ON FLOWS AND SYSTEMRESPONSE DURING WET WEATHER EVENTS. THIS INFORMATION WILLBE USED TO CALIBRATE HYDRAULIC MODELS TO DETERMINE IFPROJECTS ARE REQUIRED.
SERVICES MAY BE RENEWED THROUGH FY2026 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12801
Wastewater
16
$2,500,000
Various
Various
Various
Asset Management
21Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -CONSTRUCTION MANAGEMENT (2022)
General Services -Construction Inspection
6660 - SanitaryReplacement Fund
CONSTRUCTION MANAGEMENT NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEEDS THE CAPACITY OFINTERNAL STAFF.
RETAIN CONSTRUCTION MANAGEMENT CONSULTANT FOR AS NEEDEDSERVICES. SERVICES MAY BE RENEWED THROUGH FY2023 BASED ONPERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12387
Wastewater
14
$2,000,000
Various
Various
Various
Asset Management
22Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2018) CONTRACT B
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGN SERVICES.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12894
Wastewater
11
$50,000
Various
Various
Various
Asset Management
23Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2022) CONTRACT A
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED FACILITY & SEWER DESIGNSERVICES. SERVICES MAY BE RENEWED THROUGH FY2023 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13098
Wastewater
11
$475,000
Various
Various
Various
Asset Management
24Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - FACILITY &SEWER DESIGN (2022) CONTRACT B
GSA - (Design) CIRPFunds
6660 - SanitaryReplacement Fund
DESIGN NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL STAFF.
RETAIN DESIGN FIRM FOR AS NEEDED CONDITION AND REMAININGUSEFUL LIFE ASSESSMENTS IN SUPPORT OF ONGOING PLANNINGEFFORTS. SERVICES MAY BE RENEWED THROUGH FY2023 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13099
Wastewater
11
$250,000
Various
Various
Various
Asset Management
25Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2022) CONTRACT A
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13102
Wastewater
11
$85,000
Various
Various
Various
Asset Management
26Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2022) CONTRACT B
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13103
Wastewater
11
$85,000
Various
Various
Various
Asset Management
27Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT -GEOTECHNICAL (2022) CONTRACT C
GSA - GeotechnicalCIRP Funds
6660 - SanitaryReplacement Fund
GEOTECHNICAL INVESTIGATION NEEDS TO SUPPORT CAPITALPROJECTS THROUGHOUT THE DISTRICT EXCEED THE CAPACITY OFINTERNAL STAFF.
RETAIN GEOTECHNICAL FIRM FOR AS NEEDED SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13104
Wastewater
11
$85,000
Various
Various
Various
Asset Management
28Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT A
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13087
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
29Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT B
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13088
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
30Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT C
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13089
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
31Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - PROPERTYAPPRAISAL (2021) CONTRACT D
Appraisal Services
1101 - General Fund
APPRAISAL SERVICES ARE REQUIRED TO SUPPORT THE DISTRICT'SCAPITAL PROGRAM.
PERFORM AS NEEDED APPRAISAL SERVICES TO SUPPORT THEDISTRICT'S PROGRAM. SERVICES MAY BE RENEWED THROUGH FY2023BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13090
Unallocated
12
$75,000
Various
Various
Various
Non-recurring
32Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT A
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13108
Wastewater
11
$50,000
Various
Various
Various
Asset Management
33Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT B
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13109
Wastewater
11
$50,000
Various
Various
Various
Asset Management
34Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT C
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13110
Wastewater
11
$50,000
Various
Various
Various
Asset Management
35Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT D
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13111
Wastewater
11
$50,000
Various
Various
Various
Asset Management
36Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - SURVEYSERVICES (2022) CONTRACT E
GSA - (Survey) CIRPFunds
6660 - SanitaryReplacement Fund
SURVEY NEEDS TO SUPPORT CAPITAL PROJECTS THROUGHOUT THEDISTRICT EXCEED THE CAPACITY OF INTERNAL SURVEY STAFF.
RETAIN SURVEY FIRM FOR AS NEEDED SURVEY SERVICES. SERVICESMAY BE RENEWED THROUGH FY2023 BASED ON PERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES. APORTION OF CONTRACT MAY BE FUNDED OUT OF FUND 5120 FORSTORMWATER SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13112
Wastewater
11
$50,000
Various
Various
Various
Asset Management
37Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAMPTON CREEK SANITARY RELIEF (DEERCREEK TRUNK TO OXFORD DR) PHASE I
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
OVERCHARGED SEWERS. ELIMINATION OF CONSTRUCTED SSOOUTFALL REQUIRED.
CONSTRUCT 7,500 FEET OF 12-INCH TO 72-INCH SANITARY SEWER.
§¨¦64
§¨¦170
DALE
M
E
T
R
O
L
I
N
K CLAYTON
WISE
WYDOWN
FOLK
BRENTWOOD
PINE
HA
N
L
E
Y
YA
L
E
BELLEVUE
DAVIS
ETHEL
WHITE
LINDEN
BR
E
D
E
L
L
BOL
AND
SU
T
T
O
N
ROSALIEEULALIE
YORK
MARY
LAWN
CLAYTONIA HOOVER
PARK
PRIVATE
ZEPHYR
FO
R
E
S
T
LO
U
I
S
GAYOLA
DEL
NO
R
TE
WI L L I A M S
ALAMO
HIGH
SCHOOL
McCAUSLAND
MC
C
U
T
C
H
E
O
N
SWAN
SOUTH W E S T
A
U
D
U
B
O
N
MADGE
SALEM
B
U
C
K
BRUNO
OXFORD
URBAN
ALICIA
DE
M
U
N
WRENWOOD
CECELIA
LILE
ELINOR
E A G E R
PLATEAU
ROSE
H
I
L
L
V
A
L
E
FLORENCE
MA
R
T
I
N
I
MOORLANDS
PARKDALE
LY
L
E
NASHVILLE
ANNA
LINDBE R G H
ELLIS
P
OLO
RANKEN HIAWATHASTRAS
S
N
E
R
LOHMEYER
A R LI N G T O NCOLLINS
RALPH
HA Z E LME
L
V
I
N
OAKKNOLL
SNOWDON
LANHAM
BL
E
N
D
O
N
DA
R
T
F
O
R
D
HI
L
L
LITZSINGER
MITCHELL
PO
R
T
E
R
HORNER
ST
R
I
T
A
GARDEN
WARNER
RI
C
H
E
R
T
HELEN
ED
W
A
R
D
ORLANDO
BRIDGEPORT
GE
R
H
A
R
D
OAKLAND
S
U
D
B
U
R
Y
ALABAMA
H
O
P
E
ANTLER
TH
R
U
S
H
ALICIA
EAGER
YALE
M
E
T
R
O
L
I
N
K
BRUNO
L I N D BER G H
MARY M AN C H ESTERRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12334
Wastewater
11
$200,000
Various
Lemay/RDP
Deer Creek
Capital
38Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM - BADEN RELIEF PHASE IV (HEBERT)BUILDING DEMOLITION AND DESIGN
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
STREET FLOODING AND BUILDING BACKUPS DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT STORMWATER DETENTION BASIN AND COLLECTIONSYSTEM TO ENABLE THE REMOVAL OF STORMWATER FLOWS FROMTHE OVERCHARGED COMBINED SEWER SYSTEM.
SUPPLEMENTAL APPROPRIATION TO THE DESIGN CONTRACT FORCONSTRUCTION PHASE SERVICES, AND DESIGN UPDATES DUE TOCONSTRUCTION ISSUES.
TERMINAL
KIE
N
L
E
N
ST L
O
U
I
S
LUCASNHUNT
MYRON
67T
H68T
H69T
H
MOU
N
T
EDM
U
N
D
SAL
Z
M
A
N
ERI
C
K
WELL
S
M
A
R
CRE
S
C
E
N
T
OGD
E
N
VAL
L
E
LESC
H
E
N
LIN
D
E
L
L
CHE
R
R
Y
MAR
K
E
T
GRE
E
R
PRI
V
A
T
E
OAK
D
A
L
E
OVE
R
L
E
A
JESS
E
J
A
C
K
S
O
N
ROS
E
B
U
D
MYRT
L
E
WEL
L
S
T
O
N
AR
D
E
N
ROC
K
B
R
O
O
K
LOR
R
A
I
N
E
KEN
N
E
R
L
Y
AUD
R
E
Y
BAI
L
E
Y
ISAB
E
L
L
A
LEXI
N
G
T
O
N
LATT
A
IDAD
A
L
E
OAK
G
R
O
V
E
WAB
A
D
A
OAK
G
R
O
V
E
PRIV
A
T
E
PRIVATE
CR
E
S
C
E
N
T
WEL
L
S
T
O
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10641
Wastewater
11
$600,000
St. Louis City
Bissell
Harlem
Capital
39Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAWTHORNE ESTATES SANITARY RELIEF (RANCHLN TO CLAYTON HILLS LN)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,870 FEET OF 12-INCH SANITARY SEWER.
RANCH
CE
D
A
R
V
A
L
L
E
Y
HA
W
T
H
O
R
N
E
WINDMOOR
CLAYTON HILLS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12299
Wastewater
11
$319,000
Town and Country
Lemay/RDP
Deer Creek
Capital
40Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
PROJECT TO RECEIVE PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21 AND FY 22. TOTAL CONSTRUCTION BUDGET IS$155,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
K
O
C
H
K
INSWOOD
GREGG
REAVIS
B
A
R
R
A
C
K
S
FOR
D
E
R
CC
C
GRANTLIN
D
TELF O R D
HOFFM
E
IS
T
E
R
ARLEE
S
HERMAN
MI
L
D
GENTR
Y
FAIN
IONE
P RIVATE
JO
P
L
I
N
CL
I
F
F
RINGER
SHE RI D A N
PO
T
T
L
E
ORI
E
N
T
RIP
A
LU
N
A
POP
L
A
R
GARK
WILL
LA
R
K
CLA
G
E
R
OUT E R
VICTORY
AVEN
U
E
H
BOUNDA R Y
HO
R
N
JEFFERSONIAN
PAU
L
E
HAL S EY
FIRST
PEC
A
N
A
S
HROCK
JAC
I
N
T
O
SOUTHSHIRE
ARRA
S
J
E
FFERSON
BLU
E
R
I
D
G
E
BA
N
I
S
T
E
R
ALL
E
N
LI
S
I
E
U
X
KA
S
K
E
BUN
K
E
R
BIRC
H
P
R
IVATE
TELEGRAPHRD
L E M A YFERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
11
$400,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
41Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
L51 PUMP STATION FORCEMAIN IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN FROM THE L51 PUMP STATION TO THE MISSOURIRIVER WWTF IS NEARING THE END OF ITS USEFUL LIFE.
CONSTRUCT 8,800 FEET OF 36-INCH REPLACEMENT FORCEMAIN.
PROJECT RECEIVES PARTIAL FUNDING/SUPPLEMENTALAPPROPRIATION IN FY 25. TOTAL CONSTRUCTION BUDGET IS $6,871,000.
CREVE C
O
E
U
R
M
I
L
L
CENTRAL
M
I
D
L
A
N
D
CITY
O
FMARYLAND HEIGHTS
P
R
I
C
H
A
R
D
F
A
R
M
SLAUGHTER
P
R
I
V
A
T
E
W
E
S
T
R
I
C
K
W ESFOR D
C
O
T
T
O
N
W
O
O
D
W
ES
MEADE
FORT
E
C
A
S
I
N
O
C
E
N
T
E
R
M
A
R
I
N
E
PRIVATE
P
R
I
V
A
T
E
P
R
I
V
A
T
E
P
R
I
V
A
T
E
PRIVATE
P
RIVATE
P
R
I
V
A
T
E
P R I VATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13227
Wastewater
11
$1,161,000
Various
Missouri
Various
Capital
42Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDBERGH SANITARY RELIEF (MEADOWSIDE DRTO N LINDBERGH BLVD)
Design Services
6660 - SanitaryReplacement Fund
SANITARY SEWER IS EXPOSED AT CREEK CROSSINGS, INADEQUATECAPACITY, AND SEWER BACKUPS.
CONSTRUCT 2,760 FEET OF 12-INCH TO 18-INCH SANITARY SEWER.
P R I V A TE
N O R F O L K S O U T H E R N
CE
N
T
R
A
L
M
I
D
L
A
N
D
MEADOWSI
D
E
RISH
O
N
H
I
L
L
LACKLA N D
LACKLA N D HILL
O A K S P U R
POOL
N
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11943
Wastewater
11
$401,000
Unincorporated
Missouri
Fee Fee Creek
Capital
43Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$150,000
Various
Lemay/RDP
Various
Asset Management
44Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER & MIDDLE RDP CSO CONTROLS SYSTEMIMPROVEMENTS (WATERSHED CONSULTANT)
Professional Services
6660 - SanitaryReplacement Fund
MITIGATION OF CSO FLOWS INTO THE RIVER DES PERES IS REQUIREDBY CONSENT DECREE, NECESSITATING CONSTRUCTION OF A DEEPSTORAGE TUNNEL SYSTEM.
DESIGN OF 47,400 FEET OF CSO STORAGE TUNNEL, CONSOLIDATIONSEWERS, AND DEWATERING PUMP STATIONS. THIS PROJECT ALSOINCLUDES MANAGEMENT SERVICES, FIELD INVESTIGATIONS ANDPRELIMINARY STUDIES.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦55
§¨¦270
§¨¦44
§¨¦70
§¨¦64
§¨¦170
§¨¦255
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11109
Wastewater
16
$270,000
Various
Lemay/RDP
Various
Asset Management
45Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 AND P-483. P-489 TO BEELIMINATED BY SEPARATE PROJECT #10869. TOTAL CONSTRUCTIONBUDGET IS $180,000,000.
§¨¦55
§¨¦270
§¨¦55
KERT
H
MA
T
T
I
S
G R A V OIS
WEL
L
S
KELL
E
R
MERAMEC BOTT O M
AMB
S
KENNER
L
Y
T
H
E
I
S
S
EA
S
T
CONCORD
AL
L
E
N
ALSW
E
L
L
S C H U E S SLER
MENTZHILL
RI N G ER
B A U ER
BU T L E R HILL
GREENTON
S
USONHILLS
PO I N T E
CARIBEE
HAWKINS
GE
R
A
L
D
KE
M
P
F
H
A
G
E
M
A
N
N
OLSEN
GREGORY
DIER
S
P
R
I
VATE
MAIN
RI VERCURVE
VALMEYER
TESCORD
M A N G O
W
A
T
S
O
N
GATESBURY
DAN
T
ONAIRE
GRIFF
I
N
A C O RN
LANGTREE
VALLEYSIDE
FUCH
SFI
J
I
B AHNFYRE
FERN B
E
A
C
H
ED
L
O
U
CLAYR
I
D
G
E
S
T
A
R
L
I
T
ATLNTIC
LA
R
K
I
N
LITTLEROCK
TIOGA
COYL
E
TOWNE SOUTH
PRIVA
T
E
PRIVATE
AMBS
BAUER
PR
I
V
A
T
E
P
R
I
V
A
T
E
T E S S O N FERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
11
$650,000
Various
Meramec
Meramec Tributary Areas
Capital
46Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $89,500,000. ASSET RENEWAL OFDETERIORATING ITEMS AT THE PLANT, BUDGETED AT $27,700,000, WILLALSO BE BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PINETOP
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
PINETOP
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
11
$1,000,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
47Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
ConstructionManagement ServicesDuring Construction
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $89,500,000. ASSET RENEWAL OFDETERIORATING ITEMS AT THE PLANT, BUDGETED AT $27,700,000, WILLALSO BE BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PINETOP
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
PINETOP
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
14
$2,000,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
48Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MCCUTCHEON RD AND THORNDELL SANITARYRELIEF
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,275 FEET OF 12-INCH TO 15-INCH SANITARY SEWER.
B
E
R
K
S
H
I
R
E
MC
C
U
T
C
H
E
O
N
THORNDELL
GREENRIDGE
MC
K
N
I
G
H
T
MCKNIGHTWOODS
RIDG E T O P
SARANAC
MCKNIGHT O RCHARD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12346
Wastewater
11
$405,000
Richmond Heights
Lemay/RDP
Deer Creek
Capital
49Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MULBERRY CREEK SANITARY RELIEF (HARWICHDR TO S LINDBERGH BLVD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 4,300 FEET OF 15-INCH TO 18-INCH SANITARY SEWER.
RO
B
Y
N
ED
D
I
E
N
P
A
R
K
M
A
N
D
A
HARW
I
C
H
R
U
S
D
O
N
LOWILL
G L E N F I E L D
S U N S E T
BE
T
H
M
A
T
T
H
E
W
S
WESTWICK
RONNIE MO
R
E
S
I
F
O
X
P
A
R
K
FOX
BARBERTON
COURTYARDLAKE
TRENTMORE
BA R D M O N T
S
T
U
R
D
Y
W
E
STH
AVEN
WO O D P ARK
F O X M EADO
W
S
CRESTMOOR
LEELAINE
S
L
I
N
D
B
E
R
G
H
B
L
V
D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12355
Wastewater
11
$531,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
50Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NORMANDIE SANITARY RELIEF (PAGE AVE TOSAINT CHARLES ROCK ROAD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-454 AND BP-457 REQUIRE REMOVAL.
CONSTRUCT 8,930 FEET OF 24-INCH TO 42-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-454 AND BP-457.
PROJECT RECEIVES PARTIAL FUNDING/SUPPLEMENTALAPPROPRIATION IN FY25. TOTAL CONSTRUCTION BUDGET IS $9,059,000.
PAGE
HA
N
L
E
Y
TERMINAL
CANTON
NO
R
T
H
N
S
O
U
T
H
LYNN
FE
R
G
U
S
O
N
PE
N
N
S
Y
L
V
A
N
I
A
RAF
T
ROBBIN S
MONROE
QU
E
N
D
O
70
T
H
LA
M
B
BLOOM
KI
N
G
S
L
A
N
D
LIBERTY MALLARD
PU
R
D
U
E
ALER
T
MADISO
N
TITUS
WH
E
A
T
O
N
UT
I
C
A
LEADALE
MILAN
TE A L
NO
R
M
A
N
D
Y
NIX
O
N
D U S K Y
V
I
N
I
T
A
ALBIN
FA
R
I
S
UNDERHILL
MARILLAC
ELLERTON
HILLSDALE
SA
L
E
R
N
O
LER
O
Y
EADS
PAR
K
TRENTON
FALCON
ALLEN
WAYNE
CO
L
B
Y
BE
L
R
U
E
H
A
Y
W
O
OD
BR
A
D
F
O
R
D
FLORA
VE
R
L
BALF
O
U
R
PARTRIDGE
IO
N
A
GRA
N
D
EL
C
O
DR
I
F
T
W
A
Y
GREENDALE
MI
L
F
O
R
D
FAIRHAM
NORFOLK SOUTHERN
EN
G
E
L
H
O
L
M
CO
R
Y
WHITE OAKA
N
N
A
BER
G
A
M
O
T
WASHINGTON
CURTIS
CASTLEPARK
WAYNE
FE
R
G
U
S
O
N
LYNN
LE
R
O
Y
P
A
R
K
MALLARD
VI
N
I
T
A
TRENTON
BLOOM
STCHARLESROCKRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12360
Wastewater
11
$1,661,000
Unincorporated
Lemay/RDP
University City Branch
Capital
51Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION REPLACEMENT PROJECTS (PHASEI)
Engineering DuringConstruction Services
6660 - SanitaryReplacement Fund
DETERIORATING PUMP STATIONS THROUGHOUT THE DISTRICTREQUIRE REPLACEMENT/REHABILITATION.
DESIGN REPLACEMENT OF PUMP STATIONS P-702 (EARTH CITY) ANDP-708 (EXPRESSWAY).
PROJECT INCLUDED DESIGN OF REPLACEMENT FOR PUMP STATIONSP-702 AND P-708. PUMP STATION P-708 TO BE CONSTRUCTED UNDERPROJECT NUMBER 12153.
R
A
M
S
LAKEFRONT
E
A
R
T
H
C
I
T
Y
A
M
E
R
I
C
A
N
E
A
G
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11701
Wastewater
11
$150,000
Various
Missouri
Missouri River Tributary Areas
Capital
52Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RADAR RAINFALL DATA (2020)
Vendor Services
1101 - General Fund
PIPE FLOWS FROM INFLOW AND INFILTRATION DUE TO RAIN EVENTSARE NEEDED TO PROPERLY CALIBRATE HYDRAULIC SYSTEM MODELS.
INTEGRATE EXISTING RAIN GAUGE NETWORK WITH RADAR IMAGING,FOR USE IN CONJUNCTION WITH FLOW METERING,INFLOW/INFILTRATION STUDIES, AND HYDRAULIC MODELCALIBRATIONS. SERVICES MAY BE RENEWED THROUGH FY2024 BASEDON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12006
Wastewater
16
$150,000
Various
Various
Various
Asset Management
53Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RDP TRIBUTARIES & UPPER RDP CSO CONTROLS& LOWER MERAMEC SYSTEM IMPROVEMENTS(WATERSHED CONSULTANT)
Professional Services
1101 - General Fund
MAJOR WASTEWATER SYSTEM CONTROLS ARE REQUIRED TO OBTAINCONSENT DECREE COMPLIANCE.
PERFORM AS NEEDED PROGRAM MANAGEMENT, PLANNING,ANALYSIS, AND DESIGN SERVICES FOR MAJOR WASTEWATER SYSTEMCONTROLS TO MEET CONSENT DECREE REQUIREMENTS.
SUPPLEMENTAL APPROPRIATION FOR ONGOING SERVICES. MAYINCLUDE CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦270
§¨¦70
§¨¦170
§¨¦255
§¨¦64 §¨¦270
§¨¦70
§¨¦55
§¨¦255
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11153
Wastewater
16
$600,000
Various
Various
Various
Asset Management
54Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCADA SYSTEM UPGRADE
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
MONITORING AND AUTOMATION CAPABILITIES NEEDED TO OPTIMIZETHE USE OF AVAILABLE INFRASTRUCTURE, AND INCREASE LEVEL OFSERVICE.
CONSTRUCT SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)IMPROVEMENTS TO ALLOW FOR ACTIVE CONTROLS TO MANAGE WETWEATHER FLOWS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13467
Wastewater
11
$1,000,000
Various
Various
Various
Capital
55Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SMITH CREEK LADUE ROAD SANITARY RELIEF(ROYAL MANOR DR TO HEWLETT CT)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 5,180 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
LADUE
BELLINGTON
ROYAL M A N OR
HE
W
L
E
T
T
CONWA
YGARDENS
FA
L
A
I
S
E
CONWAY
DOW
NS
BOOT H
BAY
P
R
I
V
A
T
E
LA
D
U
E
L
A
K
E
CABI
N
G
R
O
V
E
LADUEWOODS
TOPSFIELD
CONWAY HOLMES
RO
Y
A
L
W
A
Y
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12202
Wastewater
11
$518,000
Creve Coeur
Missouri
Creve Coeur Creek
Capital
56Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-736 TOP-750)
Design Services(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
CORROSION AND DETERIORATION OF EXISTING FORCEMAIN.
CONSTRUCT 15,600 FEET OF 2-INCH TO 16-INCH FORCEMAIN.
PROJECT TO INCLUDE ABANDONMENT OF UNUSED PORTIONS OF THECAULKS CREEK FORCEMAIN.
EDISON
SPIRIT
C
E
P
I
G
O
D
D
A
R
D
CENTRAL MIDLA
N
D
T
R
A
D
E
C
E
N
T
E
R
U
N
I
O
N
P
A
C
I
F
I
C
S
P
U
R
C
H
E
S
T
E
R
F
I
E
L
D
I
N
D
U
S
T
R
I
A
L
PRI VATEWILDHORSECREEK
C
H
E
S
T
E
R
F
I
E
L
D
B
U
S
I
N
E
S
S
PR
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12628
Wastewater
11
$220,000
Chesterfield
Missouri
Missouri River Tributary Areas
Capital
57Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SPOEDE ROAD SANITARY SEWER IMPROVEMENTS
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS.
CONSTRUCT 750 FEET OF 12-INCH SANITARY SEWER.
SP
O
E
D
E
OAK GAT
E
CHAMINADE
VILLA COUBLAY
GLENABBEY
OA
K
P
A
R
K
NO
T
R
E
D
A
M
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13623
Wastewater
11
$120,000
Creve Coeur
Lemay/RDP
Deer Creek
Capital
58Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. JOACHIM'S SANITARY RELIEF (ST. GENEVIEVELN TO LYNROS DR)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,600 FEET OF 18-INCH TO 24-INCH SANITARY SEWER.
PROJECT INCLUDES THE SCOPE OF WORK FROM PROJECT 12216, ST.JOACHIM'S SANITARY RELIEF (ST. GENEVIEVE LN TO ST. MARMARY DR)
AS
H
B
Y
WR
I
G
H
T
WI
S
M
E
R
SI
M
S
ST ANN
S T K A THERINE
WE
S
T
R
I
D
G
E
KREM
SA
N
J
O
S
E
STHENRY
BENSON
ST
GR
EGORY
EA
S
T
R
I
D
G
E
CH
A
U
C
E
R
S T MATTHEW
DE
L
T
A
STLUKE
GE
R
A
L
D
I
N
E
TE
N
N
Y
S
O
N
HOL
T
W
I
C
K
ST
C
L
O
V
I
S
S
T
M
ARK
ASHBY PLACE
MA R M A RY
STWILLIAMS
ST
GENEVIE V E
LYNR
O
S
ST RIC H A R D
ST
D
O
N
A
L
D
MECCA
ST
CHRISTOPHER S T A R T H U R
CHARJEAN
STANTHO N Y
ST
M
A
R
T
H
A
CONS T A N C E
EMORY
JANI
C
E
SI
M
S
STMARTHA ST
C
H
A
R
L
E
S
R
O
C
K
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12214
Wastewater
11
$550,000
St. Ann
Coldwater
Coldwater Creek
Capital
59Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. LOUIS COMBINED SEWER OVERFLOWSPROGRAM - CORPS OF ENGINEERS - PHASE II
Professional Services
1101 - General Fund
CORPS OF ENGINEERS EVALUATIONS ARE NEEDED FOR FUTUREFEDERAL CONSTRUCTION PROJECTS IN THE COMBINED SEWER AREA.
IMPLEMENT PROJECTS TO REDUCE OR CONTROL COMBINED SEWEROVERFLOWS IN THE COMBINED SEWER AREA.
FUNDS WILL BE USED TO PROVIDE TO THE CORPS THE 25% LOCALMATCH REQUIRED UNDER THIS FEDERAL PROGRAM. ORIGINALPROJECT NUMBER WAS 11608/2001141.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13608
Wastewater
16
$10,000
Various
Various
Various
Non-recurring
60Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. MATTHIAS SANITARY RELIEF (ST. SHAWN LNTO STONEHARD DR)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 2,154 FEET OF 30-INCH SANITARY SEWER.
CY
P
R
E
S
S
LIANA
TROPIC
ASHB
Y
INTERNATIONAL
ST SHAWN
ST LAWRENCE
ST CLEMENT
SPR
I
N
G
STONE
H
A
R
T
CYP R E S S V I L L A G E
ST
P
H
I
L
I
P
W
I
N
D
A
L
E
GARDENVIEW
ST A
G
N
E
S
ST
S
T
E
P
H
E
N
ST
R
E
G
I
N
A
HIT O W E R
ST
L
E
O
N
A
R
D
CYPRESS TOWN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12217
Wastewater
11
$306,000
St. Ann
Coldwater
Coldwater Creek
Capital
61Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW GAUGE OPERATION ANDMAINTENANCE (USGS)
Vendor Services
1101 - General Fund
DATA IS REQUIRED TO DETERMINE URBAN RAINFALL/RUNOFFRESPONSE OF WATERSHEDS AND IS UTILIZED FOR WATER QUANTITYAND QUALITY EVALUATION OF STREAMS.
CONTINUE THE STREAM GAUGE DATA COLLECTION PROGRAM INCONJUNCTION WITH WASTEWATER AND STORMWATER PLANNING ANDDESIGN EFFORTS, AND TO SUPPORT REPORTING WHICH IS REQUIREDPURSUANT TO THE CONSENT DECREE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10766
Unallocated
16
$540,000
Various
Various
Various
Asset Management
62Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STREAM FLOW WATER QUALITY SAMPLING (2020)
Vendor Services
1101 - General Fund
STREAM SAMPLING IS REQUIRED TO DOCUMENT WATER QUALITYCHANGES FROM IMPLEMENTATION OF THE CSO LTCP, SSOELIMINATIONS, & STORMWATER MANAGEMENT PROGRAMS.
PERFORM SAMPLING AND ANALYSIS OF STREAM WATER QUALITYWITHIN MSD'S SERVICE AREA. SERVICES MAY BE RENEWED THROUGHFY2022 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12004
Unallocated
16
$270,000
Various
Various
Various
Asset Management
63Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UPPER FISHPOT EAST SANITARY RELIEF (FIELDAVE TO WOLFF LN)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS
CONSTRUCT 3,225 FEET OF 15-INCH SANITARY SEWER AND 256 FEET OF12-INCH TO 54-INCH STORM SEWER.
CLAYTON
VIRGINIA
WO
L
F
F
HILLTOP
CLARKSON PINES
FIELD
OZARK
TRAIL
BO
N
N
I
E
HU
N
T
E
R
S
G
L
E
N
C
L
A
R
K
S
O
N
C
L
A
Y
T
O
N
RE
N
D
I
N
A
SPRINGER
L
A
F
A
Y
E
T
T
E
KENSINGTON WAY
CLARKSON EXEC
OREGON TRAIL
CL
A
R
K
S
O
N
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12242
Wastewater
11
$404,000
Ellisville
Meramec
Fishpot Creek
Capital
64Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS-SPANISH SANITARY RELIEF (MALAGA STTO TRAMPE AVE)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGE SANITARY SEWERS.
CONSTRUCT 2,400 FEET OF 27-INCH SANITARY SEWER.
LA
V
I
D
A
TRAMPE
SP
A
N
I
S
H
CR
I
T
E
R
I
O
N
RIO
JA
R
D
I
N
MURCIA
ME
N
D
O
Z
A
MALAGA
SORIA
BU
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
CABRILLO
BURGOS
DOMINICA
COLUMBUS
PATRICIAN
PATRICIAN
PATRICIAN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12271
Wastewater
11
$363,000
Unincorporated
Bissell
Spanish Lake
Capital
65Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WESTWOOD COUNTRY CLUB SANITARY RELIEF(DEER CREEK TO WESTWOOD CT)
Design Services
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 4,600 FEET OF 12-INCH TO 18-INCH SANITARY SEWER.
PRIVATE
TU
C
K
E
R
WESTWOOD W ESTFIELD
W
E
S
T
W
O
O
D
L
A
K
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12132
Wastewater
11
$513,000
Westwood
Lemay/RDP
Deer Creek
Capital
66Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WET WEATHER OPTIMIZATION STUDY
Pre-Design Services
1101 - General Fund
ACTIVE CONTROLS ON TUNNELS AND TANKS CAN IMPROVE WATERQUALITY BY INCREASING THE LEVEL OF SERVICE OF EXISTINGINFRASTRUCTURE AND PLANNED IMPROVEMENTS.
PERFORM WET WEATHER OPTIMIZATION STUDY TO INCREASE THELEVEL OF SERVICE OF EXISTING AND PLANNED INFRASTRUCTURE.INCLUDES MODELING AND ALTERNATIVES ANALYSIS, AND SUPPORTFOR ESTABLISHING A SENSOR NETWORK AND SCADA FOR ACTIVECONTROLS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13436
Wastewater
11
$1,500,000
Various
Various
Various
Non-recurring
67Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WOODSON SANITARY RELIEF (FLORA AVE TOLACKLAND RD)
Design Services
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-024, BP-533 AND BP-534 REQUIREREMOVAL.
CONSTRUCT 3,100 FEET OF 12-INCH TO 21-INCH SANITARY SEWER. ELIMINATE CONSTRUCTED SSO OUTFALLS BP-024 AND BP-533
MI
L
T
O
N
SENECA
WABADAY
WO
O
D
S
O
N
GO
O
D
A
L
E
AD
D
I
E
MEADOWBROOK BRO
W
N
PALMER
OS
A
G
E
SY
C
A
M
O
R
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12300
Wastewater
11
$391,000
Overland
Lemay/RDP
University City Branch
Capital
68Page
2022
6 April 2021
Page 1 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12847 BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
$4,000,000 69
12584 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
$4,216,000 70
13031 BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
$2,906,000 71
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
$11,000,000 72
12110 CANTERBURY AND ROLAND SANITARY
RELIEF (NELSON DR TO ROLAND BLVD)
$1,084,000 73
12110 CANTERBURY AND ROLAND SANITARY
RELIEF (NELSON DR TO ROLAND BLVD)
$320,000 74
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
$1,240,000 75
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
$60,000 76
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$5,000,000 77
13568 CLAYTON MERAMEC ELEMENTARY PRIVATE
I/I REMOVAL (S. MERAMEC AVE AT WALINCA
TER)
$500,000 78
13446 CLAYTON RD 9925 SANITARY SEWER
REPLACEMENT
$285,000 79
11724 COLDWATER SANITARY RELIEF SECTION B, C
& D - SECTION B REHABILITATION
$1,600,000 80
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 81
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
$3,000,000 82
12472 DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD) PHASE
III AND PHASE IV
$17,500,000 83
12615 DEER CREEK SANITARY TUNNEL (CLAYTON
RD TO RDP) - PUMP STATION
$15,000,000 84
12740 DOLAN PLACE AND GRANDVIEW PLACE
COMBINED SEWER RELIEF
$3,000,000 85
6 April 2021
Page 2 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-
708) REPLACEMENT
$1,700,000 86
13599 EARTH CITY UPS PUMP STATION (P-702)
REPLACEMENT PHASE II
$1,500,000 87
12819 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2022)
$3,500,000 88
12166 FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
$930,000 89
10012 FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
$600,000 90
12173 FISHPOT TRUNK WEST AND ED LOU LANE I/I
REDUCTION (SMITH DR AND VLASIS DR)
$300,000 91
12175 GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD TO
WINDSOR SPRINGS DR)
$5,030,000 92
12272 GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT COVE
CT)
$740,000 93
13597 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE IB
$3,000,000 94
12996 INFRASTRUCTURE REPAIRS (FACILITIES)
(2022)
$3,000,000 95
13016 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT A
$2,500,000 96
13017 INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT B
$2,500,000 97
12988 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2022)
$7,000,000 98
11711 JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
$35,000,000 99
12590 LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
$2,932,000 100
12741 LOUISVILLE AVENUE AND OAKLAND AVENUE
COMBINED SEWER RELIEF
$2,275,000 101
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$48,000,000 102
6 April 2021
Page 3 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13409 LOWER MERAMEC WWTF - ADMINISTRATION
BUILDING FACILITY IMPROVEMENTS
$1,800,000 103
13408 LOWER MERAMEC WWTF - INFLUENT PUMP
STATION IMPROVEMENTS
$17,500,000 104
13407 LOWER MERAMEC WWTF - SOLIDS HANDLING
EQUIPMENT REPLACEMENT
$3,900,000 105
13518 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS PHASE
II
$2,700,000 106
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$30,000,000 107
13082 LOWER MERAMEC WWTF FITTING
REPLACEMENT
$1,800,000 108
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
$2,000,000 109
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
$4,000,000 110
13222 MISSOURI RIVER WWTF DIGESTER GAS
STORAGE COVER REPLACEMENT
$1,289,000 111
12364 OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
$445,000 112
12368 PRICE TO PIONEER SANITARY RELIEF $4,000,000 113
10161 SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
$753,000 114
12201 SHREWSBURY SANITARY RELIEF SEWER AND
I/I REDUCTION (WEIL AVE AND I-44)
$980,000 115
10756 SOUTH BROADWAY AT MERAMEC COMBINED
SEWER REPLACEMENT
$1,500,000 116
12212 ST. GEORGE CREEK SANITARY RELIEF (DAISY
LN TO GRAVOIS RD TO NEW HAMPSHIRE AVE)
$3,305,000 117
12213 ST. JACQUES SANITARY RELIEF (ST. JACQUES
ST TO N LAFAYETTE ST)
$155,000 118
12221 SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
$2,515,000 119
6 April 2021
Page 4 of 4
WASTEWATER CONSTRUCTION PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR
TO JENNER LN)
$1,905,000 120
13361 TREVILLIAN 20 AND 50 SANITARY SEWER
REPLACEMENT
$435,000 121
13292 WASHINGTON TERRACE 14 SEWER
REPLACEMENT
$279,000 122
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
$1,600,000 123
12491 WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
$2,900,000 124
TOTAL:$281,979,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BADEN CITYSHED MITIGATION BASINS (CALVARY,FREDERIK, PARTRIDGE AND TILLIE) -SEPARATION SEWERS
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS, STRUCTURE AND STREET FLOODING.
CONSTRUCT 11,000 FEET OF STORM SEWER FOR SOFT SEPARATION.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 23. TOTAL CONSTRUCTION BUDGET IS $6,300,000.
§¨¦70
§¨¦70
H
A
L
L
LUCASNHUNT
NORFOLKSOUTHERN
UNION
SWITZER
GOO
D
F
E
L
L
O
W
MC L ARAN
M
E
T
R
O
L
I
N
K
PAR
K
LEE
JAN
E
T
HEL
E
N
ST CYR
WREN
HORD
MIM
I
K
A
J E N NIN G S S T A TI O N
KIE
N
L
E
N
LILLIAN
SHREV E
THRUS
H
MYRO
N
CAR
T
E
R
HAM
I
L
T
O
N
LI
L
A
C
C
H
U
R
C
H
NEWBY
W OODSTOCK COZENS
T E R M IN A L
ST L
O
U
I
S
FERG
U
S
O
N
E
A
S
T
EDIS
O
N
B R O WN
HI
L
L
S
BEL
T
CARRI
E
T
H
E
K
L
A
M
A
R
Y
H
A
R
N
E
Y
P A U L
MAR
K
E
T
SUN
B
U
R
Y
R
O
S
A
LIE
EUC
L
I
D
POPE
BEG
G
D
UENKE
GER
A
L
D
I
N
E
APR
I
C
O
T
NELSON
EXUMA
DAR
B
Y
OR
I
O
L
E
LANG
K
I
R
K
NEMNICH
S N O W
HA
L
E
Y
70T
H
RAVINIA
E
L
L
I
S
O
N
GILMO
R
E
FONTAINE
EMMA
ALB
I
A
BADEN
T IFFIN
BOYCE
EDNA
A
S
T
R
A
M A Y
LAUR
A
COLLETT
PRIV
A
T
E
LEBON
CASTRO
MEAD
SCRANTON
WA
C
O
GIMBL
I
N
ROLAND
ELW
A
R
D
SA
N
D
I
E
G
O
ELKAN SOLWAY
BLASE
EDM
U
N
D
VAL
L
E
A
D
L
E
R
FIR
H
O
L
B
O
R
N
THATC
H
E
R
HIGH RIDGE
SA
L
E
R
N
O
ETO
N
WILBER
TBAHAMA
HOWELL
RA
M
P
I
7
0
J
E
N
D
A
L
E
ADAMS
M
E
T
R
O
L
I
N
K
NEMNICH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12847
Wastewater
15
$4,000,000
St. Louis City
Bissell
Baden
Capital
69Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2022) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 100,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12345, 12331, 12165,AND 12187.
§¨¦64
§¨¦270
§¨¦270S
M
O
1
4
1
H
W
Y
NMO141HWY
CLARKSONRD
MA N C HE S T E R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12584
Wastewater
15
$4,216,000
Various
Various
Various
Capital
70Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL - COLDWATER - MISSOURI - MERAMECPUBLIC I/I REDUCTION (2022) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 34,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12185, 12159, 12085,AND 12210.
§¨¦70
§¨¦270
§¨¦170
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13031
Wastewater
15
$2,906,000
Various
Various
Various
Capital
71Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL POINT WWTF TRICKLING FILTER MEDIAREPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
AGING TRICKLING FILTER MEDIA NEARING END OF USEFUL LIFE.
REPLACE TRICKLING FILTER MEDIA ON SIX FILTERS AT THE BISSELLPLANT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS$25,000,000.
H
A
L
L
GRAND
N
O
R
F
O
LK
SOUTHERN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12566
Wastewater
15
$11,000,000
St. Louis City
Bissell
Bissell
Capital
72Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CANTERBURY AND ROLAND SANITARY RELIEF(NELSON DR TO ROLAND BLVD)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,680 FEET OF 8-INCH TO 15-INCH SANITARY SEWER, ANDCONSTRUCT 680 FEET OF NATURAL CHANNEL STABILIZATION.
5120 FUNDING IS FOR STORMWATER PROJECT 11016, WHICH IS TO BECOMBINED WITH THIS PROJECT AND CONSTRUCTED UNDER THISPROJECT NUMBER.
PA
S
A
D
E
N
A
LUC
A
S
N
H
U
N
T
ROL
A
N
D
FLOR
I
A
N
NEL
S
O
N
IRA
MEL
B
A
COL
O
N
I
A
L
OREON
WINCHESTER
GRO
V
E
L
A
N
D
FARL
E
Y
NOR
M
A
N
D
Y
ONE
I
L
L
BRISTOL
C R E S T LAND
H U N TINGTON
REDE
R
HU
N
T
E
R
WILL
O
W
W
O
O
D
CANTERBU R Y BLUE
S
P
R
U
C
E
OAK
R
I
D
G
E
HEN
D
E
R
S
O
N
ALBE
R
I
C
I
BRET
O
N
STANDREWS
NOR
T
H
O
A
K
S
COL
O
N
I
A
L
P ASADENA
BRISTO L
ROLAND
NEL
S
O
N
ONE
I
L
L
R
O
LAND
ROL
A
N
D
CRE
S
T
L
A
N
D
CANTERBURY
NA
T
U
R
A
L
B
R
I
D
G
E
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12110
Wastewater
15
$1,084,000
Northwoods
Bissell
Bissell
Capital
73Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CANTERBURY AND ROLAND SANITARY RELIEF(NELSON DR TO ROLAND BLVD)
Construction
5120 - DistrictwideStormwater Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,680 FEET OF 8-INCH TO 15-INCH SANITARY SEWER, ANDCONSTRUCT 680 FEET OF NATURAL CHANNEL STABILIZATION.
5120 FUNDING IS FOR STORMWATER PROJECT 11016, WHICH IS TO BECOMBINED WITH THIS PROJECT AND CONSTRUCTED UNDER THISPROJECT NUMBER.
PA
S
A
D
E
N
A
LUC
A
S
N
H
U
N
T
ROL
A
N
D
FLOR
I
A
N
NEL
S
O
N
IRA
MEL
B
A
COL
O
N
I
A
L
OREON
WINCHESTER
GRO
V
E
L
A
N
D
FARL
E
Y
NOR
M
A
N
D
Y
ONE
I
L
L
BRISTOL
C R E S T LAND
H U N TINGTON
REDE
R
HU
N
T
E
R
WILL
O
W
W
O
O
D
CANTERBU R Y BLUE
S
P
R
U
C
E
OAK
R
I
D
G
E
HEN
D
E
R
S
O
N
ALBE
R
I
C
I
BRET
O
N
STANDREWS
NOR
T
H
O
A
K
S
COL
O
N
I
A
L
P ASADENA
BRISTO L
ROLAND
NEL
S
O
N
ONE
I
L
L
R
O
LAND
ROL
A
N
D
CRE
S
T
L
A
N
D
CANTERBURY
NA
T
U
R
A
L
B
R
I
D
G
E
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12110
Wastewater
15
$320,000
Northwoods
Bissell
Bissell
Capital
74Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAREY CT 1664 SANITARY AND STORM SEWERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
SLOPE FAILURES CAUSING DAMAGE TO EXISTING SANITARY SEWER.
CONSTRUCT 668 FEET OF 8-INCH SANITARY SEWER, 585 FEET OF30-INCH TO 42-INCH STORM SEWER TO REPLACE ERODING CHANNEL,AND 30 FEET OF 15-INCH STORM SEWER.
MOST OF THE STORM SEWER CONSTRUCTION IS REQUIRED TOPROTECT THE SANITARY LINE FROM EROSION AND SLOPE FAILURE.
DUNN
VILLEMARIA
MIS
S
O
U
RI
B
O
T
T
O
M CAREY
L
E
AFCREST
C
OR
K
P
R
I
V
A
T
E
HURSTBO ROUG H
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12753
Wastewater
15
$1,240,000
Hazelwood
Missouri
Bonfils
Capital
75Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAREY CT 1664 SANITARY AND STORM SEWERREPLACEMENT
Construction
5120 - DistrictwideStormwater Fund
SLOPE FAILURES CAUSING DAMAGE TO EXISTING SANITARY SEWER.
CONSTRUCT 668 FEET OF 8-INCH SANITARY SEWER, 585 FEET OF30-INCH TO 42-INCH STORM SEWER TO REPLACE ERODING CHANNEL,AND 30 FEET OF 15-INCH STORM SEWER.
MOST OF THE STORM SEWER CONSTRUCTION IS REQUIRED TOPROTECT THE SANITARY LINE FROM EROSION AND SLOPE FAILURE.
DUNN
VILLEMARIA
MIS
S
O
U
RI
B
O
T
T
O
M CAREY
L
E
AFCREST
C
OR
K
P
R
I
V
A
T
E
HURSTBO ROUG H
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12753
Wastewater
15
$60,000
Hazelwood
Missouri
Bonfils
Capital
76Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRESIMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 23. TOTAL BUDGET IS $8,516,000.
EDISON
CENTRAL MIDLAND
C R Y S T A L S P R I N G S
B R I G H T H URST
L
A
N
S
B
ROOKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
15
$5,000,000
Chesterfield
Missouri
Caulks Creek
Capital
77Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAYTON MERAMEC ELEMENTARY PRIVATE I/IREMOVAL (S. MERAMEC AVE AT WALINCA TER)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REMOVE STORM DRAINS AND DOWNSPOUTS CONNECTED TO THESANITARY SEWER.
METROLINK
SHAW PAR
K
POL
O
FOREST PARK
BRE
N
T
W
O
O
D
CE
N
T
R
A
L
ORLANDO
VENETIAN
ROSILINE
WALINCA
REAR
M I D D L E P O LO
ME
R
A
M
E
C
NORTH POLO
BE
M
I
S
T
O
N
SHIRLE
Y
F O R E S T P A R K
CE
N
T
R
A
L
MET R O L I N K
ME
R
A
M
E
C
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13568
Wastewater
15
$500,000
Clayton
Lemay/RDP
Deer Creek
Capital
78Page
2022
FISCAL YEAR:
Description of Problem/Issue
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAYTON RD 9925 SANITARY SEWERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
FAILING SANITARY SEWER.
Scope of Project
CONSTRUCT 395 FEET OF 12-INCH SANITARY SEWER.
§¨¦64§¨¦64
CLAYTO
N
WA
R
S
O
N
SOUTHFORTY
D
W
Y
E
R
FO
X
B
O
R
O
WARRIDG E
SPRINGWOOD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13446
Wastewater
15
$285,000
Ladue
Lemay/RDP
Deer Creek
Capital
79Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER SANITARY RELIEF SECTION B, C & D- SECTION B REHABILITATION
Construction
6660 - SanitaryReplacement Fund
AGING AND DETERIORATED SANITARY TRUNK SEWER REQUIRESSTRUCTURAL REHABILITATION.
REHABILITATE 2,650 FEET OF 54-INCH TO 66-INCH SANITARY SEWERUSING THE CURED IN PLACE PIPE METHOD.
HU
M
E
S
LIN
D
S
A
Y
WAS
H
I
N
G
T
O
N
CLA
R
K
MU
L
L
A
N
P
H
Y
BOO
N
E
LAF
A
Y
E
T
T
E
PAU
L
ST M
A
R
I
E
EST
E
S
KE
E
V
E
N
HAR
R
I
S
O
N
CH
A
R
B
O
N
I
E
R
P
A
D
DOCK
JEF
F
E
R
S
O
N
ST J
O
S
E
P
H
WR
E
N
LOEKES
CAS
T
E
L
L
O
GR
A
H
A
M
AUB
U
C
H
O
N
ST ANTHONY
RUE
S
T
D
E
N
I
S
ST CATHERINE
AVON
MOULE
ST LOUIS
F
L
O
RLAND
5TH
KO
S
T
K
A
AL
L
E
N
LIL
A
C
LOV
E
L
A
N
D
LOVE
V
E
R
LENE
FLI
C
K
E
R
STCHARLES
RIVO
L
I
MANRESA
KA
Y
STJEAN
BOULDER
CARLA
RU
T
H
THUNDER
B
I
R
D
GRANTS
STDENI S
BEL
L
A
R
M
I
N
E
RYA
N
TRINITY
W
E
L
L
I
N
G
T
O
N
RUE
S
T
C
A
T
H
E
R
I
N
E
VE
R
S
A
I
L
L
E
S
RI
D
G
E
WATERFORD
TYSON
SUNS
E
T
AL
M
A
D E W AYNE
JE
N
K
E
E
RAD
F
O
R
D
PAL
M
QU
E
E
N
A
N
N
FLI
G
H
T
NAO
M
I
TA
M
M
A
R O S E T T A FOX RUN
DE
L
R
E
Y
LO Y OLA
STARLET
PIM
L
I
C
O
MER
C
U
R
Y
RETFORD
ST REGIS
SALLY
S
T
E
D
I
T
H
F
L
O
R
V
A
L
6TH
S
U
S
S
E
X
CANTERB U R Y
BABLER
COL
L
I
E
R
S TI R R UP
S H O REHAM
BROWN
PAMELA
RON
D
A
ST M
I
C
H
A
E
L
LULA
LILA
ENSENAD
A
IRIS
MERR
I
A V ANT
THOMPSON
G
L
E
N
O
R
O
KAEL
BR
U
C
E
MCN
U
L
T
Y
REGIN
A
MY
R
T
L
E
SLUSSER
POM
P
A
N
O
SP
R
I
N
G
V
A
L
L
E
Y
MUL
I
A
N
LAVIN
LOU
I
S
E
WESCOTT
BRO
W
N
LINDB
E
R
G
H
LINDBERGH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11724
Wastewater
15
$1,600,000
Unincorporated
Coldwater
Coldwater Creek
Capital
80Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦255
§¨¦170
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Mississippi River Tributary Areas
Non-recurring
81Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE - RIVER DES PERES
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE RIVER DES PERES WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦270
§¨¦44
§¨¦55
§¨¦70
§¨¦64
§¨¦170
§¨¦55
§¨¦270
§¨¦64 §¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13078
Wastewater
15
$3,000,000
Various
Lemay/RDP
River Des Peres
Non-recurring
82Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DC-02 & DC-03 SANITARY RELIEF (BRENTWOODBLVD TO CONWAY RD) PHASE III AND PHASE IV
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY TRUNK SEWERACTIVATING CONSTRUCTED SSOS.
CONSTRUCT 16,200 FEET OF 8-INCH TO 54-INCH SANITARY SEWER, TOALLEVIATE SYSTEM SURCHARGING. ELIMINATE CONSTRUCTED SSOOUTFALLS BP-155, BP-170, BP-348, BP-349, BP-198, BP-545, AND BP-591.
Comments/Remarks
PROJECT RECEIVES FINAL PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FY22. TOTAL CONSTRUCTION BUDGET IS$45,500,000.
§¨¦64
§¨¦64
CLAYTON
LAY
OLD WARSON
MC
K
N
I
G
H
T
T R E N T
WARSON
PR
I
C
E
LITZSINGER
SOUTHFORTY
BARNES
DANIEL
CE
L
L
A
KE
N
T
R OAN
OVERHIL
LS
D E N N Y
GODWI N
CO
N
W
A
Y
MA
G
N
O
L
I
A
S
PRINGWOOD
ARTHUR
P I C A R DY
WIND I N G R I D GE
INDIAN
ELLSWORTH
LO
G
C
A
B
I
N
PAR K
OV
E
R
B
R
O
O
K
H
I
G
H
D
O
W
N
ANZEIGER
PRIV ATE
TWIN SPRINGS R
O
LLINGROCK
MAYFAIR
WAR R IDGE
WILD ROSE
WATE R B U R Y
LYLEWOOD
RAUS
C
H
E
R
DUNLEIT
H
OA
K
B
E
N
D
LI N D W O RTH
D
W
Y
E
R
LE
A
G
R
A
M
WOODACRE
EX
M
O
O
R
CAPITOL
D E E R C REEKPRIVATE
PRIVATE
P RI V A T E
LITZSINGER
S
L
I
N
D
B
E
R
G
H
B
L
V
D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12472
Wastewater
15
$17,500,000
Ladue
Lemay/RDP
Deer Creek
Capital
83Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK SANITARY TUNNEL (CLAYTON RD TORDP) - PUMP STATION
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXCESSIVE INFLOW AND INFILTRATION CAUSING SURCHARGING INEXISTING SEWERS AND ACTIVATING CONSTRUCTED SSOS.
CONSTRUCT A 21 MGD PUMP STATION FACILITY, FOR THE DEER CREEKTUNNEL PROJECT.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS$30,000,000.
§¨¦44
M
E
T
R
O
L
I
N
K
BURLING
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
CARR LA
N
E
BURLINGTONNORTHERNSANTAFEBURLING
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12615
Wastewater
15
$15,000,000
Shrewsbury
Lemay/RDP
Deer Creek
Capital
84Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DOLAN PLACE AND GRANDVIEW PLACECOMBINED SEWER RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED MAINS.
CONSTRUCT 610 FEET OF 12-INCH TO 36-INCH COMBINED SEWER, AND650 FEET OF REINFORCED CONCRETE BOX CULVERT 9 FOOT WIDE BYSIX FOOT HIGH.
§¨¦64
§¨¦64
WISE
WEST PARK
CE
N
T
R
A
L
CLA
Y
T
O
N
KR
A
F
T
FO
R
E
S
T
DOLAN
OAKLAND
BERTHOLD
RAMP I64
GR
A
N
D
V
I
E
W
McCA
U
S
L
A
N
D
FO
R
E
S
T
WISE
BERTHOLD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12740
Wastewater
15
$3,000,000
St. Louis City
Lemay/RDP
Oakland
Capital
85Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EARTH CITY EXPRESSWAY PUMP STATION (P-708)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-708 NEEDS REPLACEMENT TO MEET CURRENTSERVICE LEVEL DEMANDS.
REPLACE PUMP STATION P-708.
THIS PROJECT WAS DESIGNED UNDER PROJECT 11701.
R
A
M
S
LAKEFRONT
E
A
R
T
H
C
I
T
Y
A
M
E
R
I
C
A
N
E
A
G
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12153
Wastewater
15
$1,700,000
Unincorporated
Missouri
Mississippi River Tributary Areas
Capital
86Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EARTH CITY UPS PUMP STATION (P-702)REPLACEMENT PHASE II
Construction
6660 - SanitaryReplacement Fund
DETERIORATING PUMP STATION AT END OF USEFUL LIFE.
CONSTRUCT REPLACEMENT OF PUMP STATION P-702, 266 FEET OF8-INCH FORCE MAIN, AND 128 FEET OF 8-INCH TO 72-INCH SANITARYSEWER.
PHASE I WORK CONSTRUCTED UNDER PROJECT 11701, SEE ORDINANCE14649.
RID
E
R
NO
R
F
O
L
K
S
O
U
T
H
E
R
N
NO
R
F
O
L
K
S
O
U
T
H
E
R
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13599
Wastewater
15
$1,500,000
Unincorporated
Missouri
Missouri River Tributary Areas
Capital
87Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR WASTEWATERPROJECTS (2022)
Property RightsAcquisition
6660 - SanitaryReplacement Fund
IMPLEMENTATION OF THE CAPITAL IMPROVEMENT ANDREPLACEMENT PROGRAM AND CONSENT DECREE, REQUIRE PROPERTYRIGHTS ACQUISITION FOR EASEMENTS AND PURCHASES.
PROVIDE EASEMENT ACQUISITION FUNDING FOR CAPITALIMPROVEMENT AND REPLACEMENT PROGRAM WASTEWATERPROJECTS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12819
Wastewater
13
$3,500,000
Various
Various
Various
Asset Management
88Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FENTON CREEK PUMP STATION (P-425)IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
REPLACE PUMP STATION P-425, CONSTRUCT 700 FEET OF 4-INCH FORCEMAIN, AND CONSTRUCT 840 FEET OF 8-INCH SANITARY SEWER.
P
R
E
M
I
O
NOCHE
PIEDRAS
GAN
S
O
FELIZ
PEQUENO
TREE TRAILS
BIRCH
MEADO
W
VAD
E
R
A
D URANGO
KI
N
G
S
T
R
A
I
L
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12166
Wastewater
15
$930,000
Unincorporated
Meramec
Fenton Creek
Capital
89Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FF-07 FEE FEE CREEK SANITARY RELIEF(MEADOWSIDE DR TO WILLOW BROOK DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 3,700 FEET OF 8-INCH TO 24-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-069.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $4,600,000.
SCHUETZ
WILLOW
BROOK
ME
A
D
O
W
S
I
D
E
DU
N
S
T
O
N
QUEENSWAY
GANDY
CR
E
S
T
E
D
V
I
E
W
PO
R
T
D
I
A
N
E
M E DIA
TE
N
N
A
N
T
CRICKETT HILL
GR
A
E
L
E
R
PR
I
V
A
T
E
PINEROW
PO
R
T
R
O
Y
A
L
RI SHONHILL
PEBBLEBROOK
G L ENRIDGE
FAIRBOROUGH
POOL
WILL ROGERS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10012
Wastewater
15
$600,000
Unincorporated
Missouri
Fee Fee Creek
Capital
90Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
FISHPOT TRUNK WEST AND ED LOU LANE I/IREDUCTION (SMITH DR AND VLASIS DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS, ANDEXCESSIVE I/I FLOWS AT THE VANCE ROAD PUMP STATION AND GRANDGLAIZE WWTF.
REPLACE 343 FEET OF 8-INCH SANITARY SEWER, AND PERFORMPRIVATE I/I REDUCTION AT 14 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12508. THIS PROJECTINCLUDES THE SCOPE OF WORK FROM PROJECT 12158.
§¨¦44
§¨¦55
§¨¦270
§¨¦55
§¨¦44
§¨¦270
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12173
Wastewater
15
$300,000
Ballwin
Meramec
Fishpot Creek
Capital
91Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GEYER SANITARY RELIEF AND WINDSOR SPRINGSP-521 STORAGE (BIG BEND BLVD TO WINDSORSPRINGS DR)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SEWERS.
CONSTRUCT 6,460 FEET OF 10-INCH FORCEMAIN, UPGRADE WINDSORSPRINGS PUMP STATION, AND PERFORM PRIVATE I/I REDUCTION AT 7PROPERTIES.
PUBLIC I/I INCLUDED IN 12057.
§¨¦44
§¨¦44
GE
Y
E
R
FO
R
E
S
T
LEMP
WI
L
T
O
N
OR
C
H
A
R
D
CO
U
C
H
BURLINGTO
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
C R A G W O L D
G R A N D
MARYHURST
DEANE
PRIVATE
S U N S E T H I L LS
WINDSOR
MONICA
MIDWAY
MARCO
OA
K
S
H
I
R
E
WINDSORSPR I N G
GRANDVIEW
FOREST GLEN
S U N S E T
O
F F I C E
GEY E R FORE S T
PROSPECT
TA
Y
L
O
R
FLORALEA
ASHWOOD
HARRISON
ST
A
T
I
O
N
B
E
N
D
HUTHMAKER
S
K
I
R
K
W
O
O
D
R
D
WATSON RD
MO366 HWY
S
K
I
R
K
W
O
O
D
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12175
Wastewater
15
$5,030,000
Various
Lemay/RDP
Gravois Creek
Capital
92Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAND GLAIZE TRUNK SANITARY RELIEF(BALLWIN GOLF CLUB TO CLAYMONT COVE CT)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS IN THE GRAND GLAIZE TRUNKSEWER.
CONSTRUCT 1,935 FEET OF 6-INCH TO 15-INCH SANITARY SEWER.
CLAYMONT
GEREMMA
B
E
L
L
E
R
I
V
E
SUNNYSLOPE
DEN
B
I
G
H
CA
P
R
I
C
E
G
A
R
D
E
N
S
PINE TREE
WELLSHIRE
CLAYMONTCOVE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12272
Wastewater
15
$740,000
Ballwin
Meramec
Grand Glaize Creek
Capital
93Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HAMPTON CREEK SANITARY RELIEF (DEERCREEK TRUNK TO OXFORD DR) PHASE IB
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS AND SSOS REQUIRING REMOVAL.
CONSTRUCT 324 FEET OF 72-INCH SANITARY SEWER, INCLUDING 128FEET OF PIPE IN TUNNEL AND NEW JUNCTION CHAMBER.
H
A
N
L
E
Y
PO
R
T
E
R
ME
L
V
I
N
BA
R
T
O
L
D
FAWN
M
E
T
R
O
L
I
N
K
FLORENCE
CO
L
E
M
A
N
B
R
E
C
K
E
N
R
I
D
G
E
I
N
D
U
S
T
R
I
A
L
FAWN
ME
L
V
I
N
M
E
T
R
O
L
I
N
K
M A N C H ESTE R R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13597
Wastewater
15
$3,000,000
Brentwood
Lemay/RDP
River Des Peres
Capital
94Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (FACILITIES) (2022)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
FACILITIES HAVE NEEDS FOR REPAIRS OR IMPROVEMENTS THAT POSEMAJOR OPERATIONAL DIFFICULTY, EXPENSE, OR RISK TO WAIT FORCAPITAL PROJECT DELIVERY.
CONSTRUCT REPAIR, REPLACEMENT, OR IMPROVEMENT PROJECTS TOADDRESS NEEDS AT FACILITIES SUCH AS TREATMENT PLANTS ANDPUMP STATIONS.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12996
Wastewater
17
$3,000,000
Various
Various
Various
Asset Management
95Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2022) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13016
Wastewater
15
$2,500,000
Various
Various
Various
Capital
96Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (REHABILITATION)(2022) CONTRACT B
Construction
6660 - SanitaryReplacement Fund
DETERIORATED AND DAMAGED SEWER LINES CAUSE PIPE COLLAPSES,BLOCKED MAINS, AND BUILDING BACKUPS.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR SYSTEMREHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BY SEWERCLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13017
Wastewater
15
$2,500,000
Various
Various
Various
Capital
97Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
INFRASTRUCTURE REPAIRS (WASTEWATER) (2022)
Work Order Repair Costs(Capital)
6660 - SanitaryReplacement Fund
AGING AND DETERIORATING WASTEWATER INFRASTRUCTURE IS INNEED OF REPAIR AND/OR REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF WASTEWATERINFRASTRUCTURE DISTRICTWIDE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12988
Wastewater
17
$7,000,000
Various
Various
Various
Asset Management
98Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
JEFFERSON BARRACKS TUNNEL (LEMAY WWTPTO MARTIGNEY PS)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING COLLECTION SYSTEM IS UNDERSIZED FOR CURRENTCONDITIONS. PORTIONS OF THE SYSTEM ARE VULNERABLE TODAMAGE IN HIGH RIVER CONDITIONS.
CONSTRUCT 17,000 FEET OF 7 FOOT DIAMETER DEEP TUNNEL,ELIMINATING THE MARTIGNEY (P-306) AND JEFFERSON BARRACKS(P-305) PUMP STATIONS.
PROJECT TO RECEIVE PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 21 AND FY 22. TOTAL CONSTRUCTION BUDGET IS$155,000,000.
§¨¦255
§¨¦55
§¨¦255
§¨¦55
K
O
C
H
K
INSWOOD
GREGG
REAVIS
B
A
R
R
A
C
K
S
FOR
D
E
R
CC
C
GRANTLIN
D
TELF O R D
HOFFM
E
IS
T
E
R
ARLEE
S
HERMAN
MI
L
D
GENTR
Y
FAIN
IONE
P RIVATE
JO
P
L
I
N
CL
I
F
F
RINGER
SHE RI D A N
PO
T
T
L
E
ORI
E
N
T
RIP
A
LU
N
A
POP
L
A
R
GARK
WILL
LA
R
K
CLA
G
E
R
OUT E R
VICTORY
AVEN
U
E
H
BOUNDA R Y
HO
R
N
JEFFERSONIAN
PAU
L
E
HAL S EY
FIRST
PEC
A
N
A
S
HROCK
JAC
I
N
T
O
SOUTHSHIRE
ARRA
S
J
E
FFERSON
BLU
E
R
I
D
G
E
BA
N
I
S
T
E
R
ALL
E
N
LI
S
I
E
U
X
KA
S
K
E
BUN
K
E
R
BIRC
H
P
R
IVATE
TELEGRAPHRD
L E M A YFERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11711
Wastewater
15
$35,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
99Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY PUBLIC I/I REDUCTION ANDREHABILITATION (2022) CONTRACT A
Construction
6660 - SanitaryReplacement Fund
INFLOW AND INFILTRATION CAUSING OVERCHARGED SEWERS.
REHABILITATE 42,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE PIPE METHOD, TO REDUCE PUBLIC I/I AND TO RENEWTHE SYSTEM.
INCLUDES PUBLIC I/I REDUCTION FROM PROJECTS 12328, 12141, AND12339.
§¨¦44
M
E
T
R
O
L
I
N
K
H
A
N
L
E
Y
UNIO
N
P
A
C
I
F
I
C
FOLK
LANSDOWNE
MARSHALL
YA
L
E
CLARK
McCAUSLAND
BO
M
P
A
R
T
PERNODNEWPORT
TUXEDO
FYLER
OLEATHA
BE
L
L
E
V
U
E
BANCROFT WA
T
S
O
N
LINDENWOOD
BURLINGTONNORTHERN SAN T A F E
WHITE
SO U T H W E S TBR
E
D
E
L
L
MU RDOCH
SU
T
T
O
N
ROSALIEEULALIE WEAVER
ARSENAL
GL E N
HANCOCK
WABASH
P ACIFIC
SU
M
M
I
T
ZEPHYR
JO
Y
PLATEAU
FOREST
PINE
LO
U
I
S
GAYOLA
MARQUETTE
WINONA
WI L L I A M S
MARDEL
C A M B RID GE
GARNER
FLORA
BRADLEY
SALEM
MA
R
Y
SUTHERLAND
G R E E N W OOD
BRUNO
GLADES
LOCKWOOD
FAIRVI EW
LYNDOVER
M A N H A TT A N
PR
A
T
H
E
R
ARTHUR
MITCHELL
IV
A
N
H
O
E
BA
R
T
O
L
D
URBAN
YE
A
T
M
A
N
SMILEY
ALICIA
SCANLAN
CECELIA
SP
R
I
N
G
P
A
R
K
FLORENCE
MA
R
T
I
N
I
OXFORD
C O M M O N W EALTH
ELM
THOLOZAN
LYLE
ARLINGT
O
N
S
U
S
S
E
X
ANNA
KR
A
F
T
ODELL
SARAHELLIS
MAURICE
GOFF WALDEMAR
JAMES
RANKENSTRAS
S
N
E
R
GREELEY
LA VETA
ME
L
V
I
N
LANHAM
S UN N E N
E
C
O
F
F
VINEPO
R
T
E
R
RI
C
H
E
R
T
HELEN
COMFORT
ALABAMA
GREELEY
YALE
ALICIA
SU
M
M
I
T
WABAS
H
MARY
UNIONPACIFIC
GLADES
GLE
N
BRUNO
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12590
Wastewater
15
$2,932,000
Various
Lemay/RDP
Various
Capital
100Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOUISVILLE AVENUE AND OAKLAND AVENUECOMBINED SEWER RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED MAINS.
CONSTRUCT 950 FEET OF 12-INCH TO 36-INCH RELIEF SEWER, AND 800FEET OF 96-INCH COMBINED SEWER FOR WET WEATHER STORAGE.
§¨¦64
§¨¦64
OAKLAND
BERTHOLD
TA
M
M
WELLS
CLAYTON
AR
T
H
I
L
L
SA
N
F
O
R
D
CH
I
L
D
R
E
S
S
LO
U
I
S
V
I
L
L
E
FA
I
R
M
O
U
N
T
TA
M
M
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12741
Wastewater
15
$2,275,000
St. Louis City
Lemay/RDP
Oakland
Capital
101Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 AND P-483. P-489 TO BEELIMINATED BY SEPARATE PROJECT #10869. TOTAL CONSTRUCTIONBUDGET IS $180,000,000.
§¨¦55
§¨¦270
§¨¦55
KERT
H
MA
T
T
I
S
G R A V OIS
WEL
L
S
KELL
E
R
MERAMEC BOTT O M
AMB
S
KENNER
L
Y
T
H
E
I
S
S
EA
S
T
CONCORD
AL
L
E
N
ALSW
E
L
L
S C H U E S SLER
MENTZHILL
RI N G ER
B A U ER
BU T L E R HILL
GREENTON
S
USONHILLS
PO I N T E
CARIBEE
HAWKINS
GE
R
A
L
D
KE
M
P
F
H
A
G
E
M
A
N
N
OLSEN
GREGORY
DIER
S
P
R
I
VATE
MAIN
RI VERCURVE
VALMEYER
TESCORD
M A N G O
W
A
T
S
O
N
GATESBURY
DAN
T
ONAIRE
GRIFF
I
N
A C O RN
LANGTREE
VALLEYSIDE
FUCH
SFI
J
I
B AHNFYRE
FERN B
E
A
C
H
ED
L
O
U
CLAYR
I
D
G
E
S
T
A
R
L
I
T
ATLNTIC
LA
R
K
I
N
LITTLEROCK
TIOGA
COYL
E
TOWNE SOUTH
PRIVA
T
E
PRIVATE
AMBS
BAUER
PR
I
V
A
T
E
P
R
I
V
A
T
E
T E S S O N FERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
15
$48,000,000
Various
Meramec
Meramec Tributary Areas
Capital
102Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF - ADMINISTRATIONBUILDING FACILITY IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
PLANT EXPANSION REQUIRES ADDITIONAL STAFF AND WORKSPACE.
EXPAND ADMINISTRATION BUILDING TO ACCOMMODATE STAFFOFFICES, EXPANDED LOCKER ROOMS, AND CONFERENCE ROOM.
PROJECT TO BE DESIGNED, BID, AND CONSTRUCTED UNDER PROJECT12255.
FINE
PR
I
V
A
T
E
WILLIAMSON
PINETOP
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
APPEL
PINETOP
TELEGRAPH
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13409
Wastewater
15
$1,800,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
103Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF - INFLUENT PUMPSTATION IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
PUMPS OPERATING OUT OF PUMP DESIGN CURVE DURING LOW FLOWCONDITIONS, EXCESSIVE WEAR AND TEAR TO PUMPS, VIBRATIONISSUES AND OVERHEATED BEARINGS.
INSTALL NEW LOW FLOW JOCKEY PUMP AND ASSOCIATED PIPING ANDCONTROLS, REPLACE 2 800 HP PUMPS AND IMPROVE DISCHARGEPIPING SUPPORTS, AND IMPROVE VIBRATION ISSUES ASSOCIATED WITHTHE EXISTING 3 2,000 HP PUMPS.
PROJECT TO BE DESIGNED, BID, AND CONSTRUCTED UNDER PROJECT12255.
FINE
PR
I
V
A
T
E
WILLIAMSON
PINETOP
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
APPEL
PINETOP
TELEGRAPH
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13408
Wastewater
15
$17,500,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
104Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF - SOLIDS HANDLINGEQUIPMENT REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
EXISTING EQUIPMENT APPROACHING END OF LIFE AND IN NEED OFREPLACEMENT.
REPLACE EXISTING FINE SCREENS, WASHER COMPACTORS, AND ODORCONTROL UNIT AT SCREEN SHAFT.
PROJECT TO BE DESIGNED, BID, AND CONSTRUCTED UNDER PROJECT12255.
FINE
PR
I
V
A
T
E
WILLIAMSON
PINETOP
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
APPEL
PINETOP
TELEGRAPH
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13407
Wastewater
15
$3,900,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
105Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF CORROSION ANDHUMIDITY CONTROL IMPROVEMENTS PHASE II
Construction
6660 - SanitaryReplacement Fund
EXCESSIVE HUMIDITY IN SOME AREAS CAUSING CORRODEDCOMPONENTS.
APPLY WATERPROOF MEMBRANE ON SHAFT WALLS FROM ELEVATION318 TO 358, INCLUDING WALL PREPARATION AND NECESSARY JOINTREPAIRS, AND REPLACE CORRODED PIPES AND APPLY PIPE COATINGS.
PROJECT TO BE BID AND CONSTRUCTED UNDER PROJECT 12255.
F
I
N
E
PR
I
V
A
T
E
WILLIAMSON
PINETOP
A
P
P
E
L
O LD T E L E G R A P H
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
PRIVATE P R I V ATE
P INETOP
TELEGRAPH
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13518
Wastewater
15
$2,700,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
106Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Construction
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $89,500,000. ASSET RENEWAL OFDETERIORATING ITEMS AT THE PLANT, BUDGETED AT $27,700,000, WILLALSO BE BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PINETOP
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
PINETOP
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
15
$30,000,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
107Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF FITTINGREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
FITTINGS AND VALVES ARE DETERIORATING AND LEAKING DUE TOSETTLING.
INSTALL 60-INCH AND 48-INCH FITTINGS AND ISOLATION VALVES ONPRIMARY INFLUENT AND EFFLUENT LINES.
PROJECT TO BE BID AND CONSTRUCTED UNDER PROJECT 12255.
FINE
PR
I
V
A
T
E
WILLIAMSON
PINETOP
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
APPEL
PINETOP
TELEGRAPH
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13082
Wastewater
15
$1,800,000
Unincorporated
Meramec
Meramec Tributary Areas
Capital
108Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MC-02 WATSON TO EDGAR RD SANITARY RELIEF(SKME-580A)
Construction, Phase II
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 9,050 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-557.
SUPPLEMENTAL APPROPRIATION IN FY 23. TOTAL BUDGET IS $8,130,000,INCLUDING A $2M DEVELOPER REIMBURSEMENT TO CONSTRUCT PARTOF THE PROJECT.
ED
G
A
R
LA
C
L
E
D
E
S
T
A
T
I
O
N
IM
S
E
FLORENCE
RAVENSRIDGE
FIELDSTON
PRIVATE
BUSCH
PE
M
B
R
O
K
E
LACLEDE G R O V E S
CU
L
V
E
R
H
I
L
L
HURSTGREEN
O L D W E S T B URY
KIRKY
CANON
VILLAWOOD
RADNOR
VI
C
A
R
OAK KNOLL MANOR
LORD S HILL
CHA T WELL
CHESTNUTHILLS
ST JAMES
C R A T H E S
O A K KNOLL MANOR
WAT
S
O
N
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10024
Wastewater
15
$2,000,000
Various
Lemay/RDP
Mackenzie Creek
Capital
109Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MC-02 WATSON TO EDGAR RD SANITARY RELIEF(SKME-580A)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 9,050 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-557.
SUPPLEMENTAL APPROPRIATION IN FY 23. TOTAL BUDGET IS $8,130,000,INCLUDING A $2M DEVELOPER REIMBURSEMENT TO CONSTRUCT PARTOF THE PROJECT.
ED
G
A
R
LA
C
L
E
D
E
S
T
A
T
I
O
N
IM
S
E
FLORENCE
RAVENSRIDGE
FIELDSTON
PRIVATE
BUSCH
PE
M
B
R
O
K
E
LACLEDE G R O V E S
CU
L
V
E
R
H
I
L
L
HURSTGREEN
O L D W E S T B URY
KIRKY
CANON
VILLAWOOD
RADNOR
VI
C
A
R
OAK KNOLL MANOR
LORD S HILL
CHA T WELL
CHESTNUTHILLS
ST JAMES
C R A T H E S
O A K KNOLL MANOR
WAT
S
O
N
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10024
Wastewater
15
$4,000,000
Various
Lemay/RDP
Mackenzie Creek
Capital
110Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MISSOURI RIVER WWTF DIGESTER GAS STORAGECOVER REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
FLEXIBLE MEMBRANE MATERIAL DEGRADING AND NEARING END OFUSEFUL LIFE.
REPLACE TWO MEMBRANE GAS STORAGE COVERS FOR THEANAEROBIC DIGESTERS.
P
R
I
V
A
T
E
P RIV A T E
PRIVATE
P
R
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13222
Wastewater
15
$1,289,000
Maryland Heights
Missouri
Missouri River Tributary Areas
Capital
111Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
OAKWOOD FARMS PUMP STATION (P-470)ELIMINATION
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-470 NEEDS TO BE REPLACED OR ELIMINATED.
CONSTRUCT 920 FEET OF 8-INCH SANITARY SEWER. DECOMMISSIONAND ABANDON EXISTING PUMP STATION P-470 AND ASSOCIATEDFORCEMAIN.
JA
C
O
B
GATE
F
O
R
D
O
A
K
M
O
N
T
F
A
R
M
O
A
KBORO
U
G
H W E S TRUN
OAKBRIAR FARM
R I D G E OAK
BR
O
O
K
M
O
N
T
F
A
R
M
CAST
L
E
M
A
N
O
R
GATEFORD RIDGE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12364
Wastewater
15
$445,000
Ballwin
Meramec
Kiefer Creek
Capital
112Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PRICE TO PIONEER SANITARY RELIEF
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 5,665 FEET OF 8-INCH TO 24-INCH SANITARY SEWER.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 23. TOTAL CONSTRUCTION BUDGET IS $5,744,000.
DI
E
L
M
A
N
MEEKS
M
E
S
A
UNION PACIFI
C
PAGE
LA JOLLA
CROC
K
E
T
T
INDIA N M E A D O WS
HURON
PIONEER
G R A NDVIEW
C O D Y
WA
L
T
E
R
S
RIDDLE
WI
S
H
A
R
T
DIELMANROCKISLANDINDUSTRIAL
MO
H
A
V
E
EL
M
R
I
D
G
E
WI
B
R
A
C
H
T
O
T
T
A
W
A
Y
U
C
C
A
NORFOLK
SOUTHERN
KI
N
A
R
K
PRICE
CHICAGO HE I G H TSWE
R
R
E
M
E
Y
E
R
ZI
M
M
E
R
M
A
N
DIELMAN
INDUS T R IA L
LOTSIE
NATALIE
MEEKS §¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12368
Wastewater
15
$4,000,000
Olivette
Lemay/RDP
University City Branch
Capital
113Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SCHUETZ ROAD SANITARY RELIEF (FORESTBROOK LN TO SUNNY WOOD CT)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 1,033 FEET OF 8-INCH TO 15-INCH SANITARY SEWER.
GU
E
L
B
R
E
T
H
FO
R
E
S
T
B
R
O
O
K
CORBEIL
TUXF
O
R
D
M
E
A
D
O
W
L
A
R
K
W
I
L
L
O
W
B
R
O
O
K
GLENRIDGE O
XFORD H ILL
BILST O N
GOSPORT
GREEN BRIAR
SUNNY WOOD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10161
Wastewater
15
$753,000
Unincorporated
Missouri
Fee Fee Creek
Capital
114Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SHREWSBURY SANITARY RELIEF SEWER AND I/IREDUCTION (WEIL AVE AND I-44)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
PERFORM PRIVATE I/I REDUCTION AT 202 PROPERTIES.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12057.
WEIL
MURDOCH
SHREWSBURY
LACLEDE
STATION
LANSDOWNE WA
B
A
S
H
DEVONSHIRE
GREELEY
TUXEDO
SUTHERLAND
METRO
LI
N
K
NEWPORT
NOTTINGHAM
SPRING
GARDEN
BURLINGTONNORTHE R N S A N T A F E
ARLINGT
O
N
WI
L
S
H
U
S
E
N
BRUNSWICK
DA
N
B
U
R
Y
DE
V
I
L
L
E
LE
N
O
X
SUFF
O
L
K
YE
A
T
M
A
N
RI
V
E
R
D
E
S
P
E
R
E
S
ST
C
H
A
R
L
E
S
HAZEL
KA
I
N
EX
E
T
E
R
MARDEL
SWON
OAK
W
O
O
D
DALE
ST
V
I
N
C
E
N
T
MI
C
H
A
E
L
SU
M
M
I
T
GROVE
AMELIA
LINDENWOOD
VE
R
G
U
E
N
E
KENRIDGE
ST
M
I
C
H
A
E
L
HI
V
I
E
W
PRIVATECATALPA
PRO VIDENCE
CO
T
T
A
G
E
MELBOURNE
TAMPA
LA
U
R
E
L
L
A
CARDINA
L
R
I
D
G
E
THOLOZAN
WEIL
EX
E
T
E
R
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12201
Wastewater
15
$980,000
Various
Lemay/RDP
Mackenzie Creek
Capital
115Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SOUTH BROADWAY AT MERAMEC COMBINEDSEWER REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
EXISTING 15-INCH COMBINED SEWER IS DETERIORATED WITHNUMEROUS GRADE CHANGES. LINE HOLDS DEBRIS AND BLOCKSEASILY CAUSING STREET FLOODING.
CONSTRUCT 1,700 FEET OF 12-INCH TO 30-INCH COMBINED SEWER.
§¨¦55 §¨¦55OH
I
O
IO
W
A
GASCONADE
MERAMEC
CA
L
I
F
O
R
N
I
A
MONTANA
UNIO
N
P
A
C
I
F
I
C
J U DITH
CHARITON
PIE
D
M
O
N
T
GASCONADE
IO
W
A
IO
W
A
GASCONADE
UNIONPACIFIC
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10756
Wastewater
15
$1,500,000
St. Louis City
Bissell
Dakota
Capital
116Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. GEORGE CREEK SANITARY RELIEF (DAISY LNTO GRAVOIS RD TO NEW HAMPSHIRE AVE)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-404 REQUIRES REMOVAL.
CONSTRUCT 2,510 FEET OF 8-INCH TO 21-INCH SANITARY SEWER.ELIMINATE CONSTRUCTED SSO OUTFALL BP-404.
WEBER
N
I
L
E
S
STERLING
MA
C
K
E
N
Z
I
E
A
L
T
H
E
A
LAVERN
DAISY
R
A
M
B
L
E
R
TO
B
E
Y
SWIFTON
NE
I
E
R
IRENE
D
A
R
L
E
N
E
BR
I
N
K
E
R
AS
T
E
R
CH
A
R
L
T
O
N
NILES
STERLING
GRAVOIS R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12212
Wastewater
15
$3,305,000
Unincorporated
Lemay/RDP
Gravois Creek
Capital
117Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ST. JACQUES SANITARY RELIEF (ST. JACQUES STTO N LAFAYETTE ST)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. CONSTRUCTED SSO OUTFALLBP-110 REQUIRES REMOVAL.
CONSTRUCT 195 FEET OF 8-INCH SANITARY SEWER, REPLACE 154 FEETOF 12-INCH SEWER WITH 15-INCH SEWER, AND ELIMINATECONSTRUCTED SSO OUTFALL BP-110.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12509.
LA
F
A
Y
E
T
T
E
JEF
F
E
R
S
O
N
ST
J
A
C
Q
U
E
S
ST M
A
R
I
E
CLA
R
K
EL
M
D
A
L
E
S
T
A
L
B
E
R
T
ST BAPTISTA
ST AUGUSTA
ST
C
H
R
I
S
T
I
N
A
S
T
E
D
ITH
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12213
Wastewater
15
$155,000
Florissant
Coldwater
Coldwater Creek
Capital
118Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUB-TRUNK #2 SANITARY RELIEF (BIRMINGHAMCT TO COVE LN)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALLS BP-210, BP-211 AND BP-213 REQUIREREMOVAL.
CONSTRUCT 4,400 FEET OF 18-INCH TO 21-INCH SANITARY SEWER.CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLSBP-210, BP-211 AND BP-213.
BAYONNE
DORIS
CA
D
I
G
A
N
JUNE
CR
I
T
E
R
I
O
N
EDMAR
CROSSETT
RUESTA
PETITE
RA
Y
M
O
N
D
ROSARY
SURF SIDE
TWILLMAN
MURIEL
LARIMORE
CLAUDINE
PHILMAR
TAOS
MACKIN
MAJORC A
FRANCETTA
BU
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
A
N
T
A
F
E
PRENDERGAST
RIA
Z
A
PA
R
K
M
O
N
T
ASPEN W OODSMONTICELLO
COPPERGATEORTEGA
R E D RIVER
ESTRADA
MARBELLA
PLACER
BAVO
N
A
PR
I
V
A
T
E
CA
R
A
W
A
Y
CA
T
H
E
R
I
N
E
CLAUDINE
ES
T
R
A
D
A
R
I
A
Z
A
CLAUDINE
PR
I
V
A
T
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12221
Wastewater
15
$2,515,000
Unincorporated
Bissell
Watkins Creek
Capital
119Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR TOJENNER LN)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.CONSTRUCTED SSO OUTFALL BP-214 REQUIRES REMOVAL.
CONSTRUCT 4,300 FEET OF 8-INCH TO 27-INCH SANITARY SEWER.CONTINGENCY PROJECT TO ELIMINATE CONSTRUCTED SSO OUTFALLBP-214.
CLAUDINE
JUNE
RO
S
A
R
Y
EDMAR
SHARDELL
MURIEL
PO
G
G
E
M
O
E
L
L
E
R
N
O
R
G
A
T
E
P R E N D E R GAST
PHILMAR
FRAN CETTATA
L
B
O
T
T
MONTICELLO
WI
T
H
E
R
S
F
I
E
L
D
PO
R
T
S
M
O
U
T
H
SH
E
R
R
I
N
G
T
O
N
KI
N
G
S
P
O
R
T
RUESTA
MA
R
T
I
N
RO
C
K
H
A
M
P
T
O
N
HI
D
D
E
N
L
A
K
E
MARYWELL
A S HE
BORO
SURF SIDE
CLAUDINE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11669
Wastewater
15
$1,905,000
Unincorporated
Bissell
Watkins Creek
Capital
120Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
TREVILLIAN 20 AND 50 SANITARY SEWERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND DETERIORATING SEWER.
REPLACE 360 FEET OF 6-INCH VCP WITH 8-INCH SEWER.
BE
R
R
Y
OA
K
S
CORNELIA
L O C K W O O DTREVILLIAN
ALGONQUIN
BARSTOW
GL
E
N
K
I
R
K
LOCKWOOD LOCKWOOD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13361
Wastewater
15
$435,000
Various
Lemay/RDP
Gravois Creek
Capital
121Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WASHINGTON TERRACE 14 SEWERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
CRACKED AND BROKEN PIPE.
REPLACE 100 FEET OF 15-INCH COMBINED SEWER.
UN
I
O
N
DELMAR
WASHINGTON
KINGSBURY
BE
L
T
WATERMAN
SAVOY
WATERMAN
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13292
Wastewater
15
$279,000
St. Louis City
Lemay/RDP
Mississippi River Tributary Areas
Capital
122Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)FORCEMAIN REPLACEMENT (COAL BANK RD TOSPRING GARDEN DR)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING FORCEMAIN HAS EXTENSIVE DAMAGE CAUSED BYHYDROGEN SULFIDE AND AIR POCKETS.
CONSTRUCT 10,100 FEET OF 20-INCH FORCEMAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $5,600,000.REPLACES CAPACITY PROJECT 12254.
§¨¦270
§¨¦270DUNN
COAL BANK
PRIVATE
UP
H
I
L
L
MI
L
D
R
E
D
DUND
EE
LO
O
K
A
W
A
Y
RODERICK GL
E
N
G
A
R
R
Y
SPRINGGARD E NMONT
E
I
T
H
M CALPINE
BRIGADOON
P R I VATE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12922
Wastewater
15
$1,600,000
St. Louis City
Bissell
Watkins Creek
Capital
123Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WATKINS CREEK PUMP STATION (P-101)REPLACEMENT
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
AGING MECHANICAL AND ELECTRICAL SYSTEMS, SECONDARYCONTAINMENT IS NEEDED FOR ON-SITE CHEMICALS, AND CURRENTLOCATION IS SUBJECT TO FREQUENT FLOODING.
CONSTRUCT NEW SUBMERSIBLE PUMP STATION AT AN ALTERNATELOCATION OUTSIDE OF THE FLOODPLAIN.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 22. TOTAL CONSTRUCTION BUDGET IS $7,900,000.REPLACES CAPACITY PROJECT 12254.
COAL BANK
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12491
Wastewater
15
$2,900,000
Unincorporated
Bissell
Watkins Creek
Capital
124Page
2022
6 April 2021
Page 1 of 1
WASTEWATER CONTINUED PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
11796 HARLEM BADEN RELIEF
PHASE IV (HEBERT) -
HAMILTON TO DARVER
TRUNK SEWER
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN MARCH 2022.
$6,000,000
11678 WEBSTER GROVES TRUNK
E SANITARY
REHABILITATION AND I/I
REDUCTION PHASE IV
PART 3
PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN SEPTEMBER 2021.
$1,300,000
TOTAL: $7,300,000
6 April 2021
Page 1 of 2
WASTEWATER CONTINGENCY PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
$101,000,000 125
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
$3,516,000 126
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
$5,000,000 127
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
$3,000,000 128
11796 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
HAMILTON TO DARVER TRUNK SEWER
$3,300,000 129
13548 HARLEM BADEN RELIEF PHASE IV (HEBERT) -
SEWER REHABILITATION
$2,768,000 130
13231 HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
$4,000,000 131
13596 LEMAY 1 PUMP STATION (P-301) COOLING
TOWER REPLACEMENT
$650,000 132
13510 LINDWORTH STORM SEWER SEPARATION $1,600,000 133
13510 LINDWORTH STORM SEWER SEPARATION $400,000 134
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
$48,000,000 135
12255 LOWER MERAMEC WWTF EXPANSION PHASE
II
$30,000,000 136
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
$2,130,000 137
10715 NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
$4,000,000 138
13566 PUMP STATION MANLIFT REPLACEMENT $2,400,000 139
12218 STONINGTON PLACE SANITARY RELIEF
(CLAYTON RD TO GEORGIAN ACRES ST)
$300,000 140
12262 VALLEY VIEW PUMP STATION (P-734)
REPLACEMENT
$380,000 141
6 April 2021
Page 2 of 2
WASTEWATER CONTINGENCY PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
TOTAL:$212,444,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO: 15
TASK NAME:
Construction
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BISSELL & LEMAY WWTF FLUIDIZED BEDINCINERATORS
6660 - SanitaryReplacement Fund
LONG TERM SOLUTION FOR SOLIDS HANDLING AT TREATMENTFACILITIES IS NEEDED.
CONSTRUCT FLUIDIZED BED INCINERATORS AT THE BISSELL ANDLEMAY WASTEWATER TREATMENT FACILITIES, TO INCLUDEREDUNDANT SLUDGE ACCEPTANCE SYSTEMS AND SOLIDS HANDLINGSYSTEM IMPROVEMENTS.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FUTURE FISCAL YEARS. TOTAL CONSTRUCTIONBUDGET IS $515,000,000.
§¨¦55
§¨¦64
§¨¦44
§¨¦70
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12565
Wastewater
$101,000,000
Various
Various
Various
Capital
125Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CAULKS CREEK A PUMP STATION (P-750)IMPROVEMENTS
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
EXISTING PUMP STATION IS DETERIORATING AND REQUIRESIMPROVEMENT.
CONSTRUCT IMPROVEMENTS TO PUMP STATION P-750.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 23. TOTAL BUDGET IS $8,516,000.
EDISON
CENTRAL MIDLAND
C R Y S T A L S P R I N G S
B R I G H T H URST
L
A
N
S
B
ROOKE
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12248
Wastewater
15
$3,516,000
Chesterfield
Missouri
Caulks Creek
Capital
126Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE MISSISSIPPI WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦55
§¨¦64
§¨¦44
§¨¦170
§¨¦255
§¨¦170
§¨¦55
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11146
Wastewater
15
$5,000,000
Various
Bissell
Mississippi River Tributary Areas
Non-recurring
127Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CSO VOLUME REDUCTION GREENINFRASTRUCTURE - RIVER DES PERES
Construction
1101 - General Fund
CONTROL AND REDUCTION OF COMBINED SEWER OVERFLOWS ASREQUIRED BY THE CONSENT DECREE.
INSTALLATION OF GREEN SOURCE CONTROL DEVICES TO REDUCESTORMWATER VOLUMES ENTERING THE COMBINED SEWER SYSTEM INTHE RIVER DES PERES WATERSHED.
THIS PROJECT TO BE IMPLEMENTED IN COOPERATION WITH THE CITYOF ST. LOUIS AND OTHER AGENCIES. MAY INCLUDE CAPITAL ANDNON-CAPITAL SERVICES.
§¨¦270
§¨¦44
§¨¦55
§¨¦70
§¨¦64
§¨¦170
§¨¦55
§¨¦270
§¨¦64 §¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13078
Wastewater
15
$3,000,000
Various
Lemay/RDP
River Des Peres
Non-recurring
128Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -HAMILTON TO DARVER TRUNK SEWER
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
CONSTRUCT 3,660 FEET OF 12-INCH TO 108-INCH STORM ANDCOMBINED SEWERS, AND 900 FEET OF PIPE IN TUNNEL.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 23. TOTAL CONSTRUCTION BUDGET IS $9,300,000.
KIE
N
L
E
N
TERMINAL
S T L O UIS
DAR
V
E
R
HAM
I
L
T
O
N
EDM
U
N
D
PRIVA
T
E
CRE
S
C
E
N
T
GRE
E
R
IDAD
A
L
E
BAIL
E
Y
AUD
R
E
Y
IRV
I
N
G
JAMESAHARVEY
STO
R
E
Y
ST L
O
U
I
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11796
Wastewater
15
$3,300,000
Various
Bissell
Bissell
Capital
129Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM BADEN RELIEF PHASE IV (HEBERT) -SEWER REHABILITATION
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND FLOODING DUE TO OVERCHARGEDCOMBINED SEWERS.
REHABILITATE 26,000 FEET OF THE PUBLIC SEWER SYSTEM USING THECURED IN PLACE METHOD.
THIS PROJECT MAY BE CONSTRUCTED BY THE CORPS OF ENGINEERSUNDER A COOPERATIVE AGREEMENT WITH THE DISTRICT.
TERM
I
N
A
L
KIE
N
L
E
N
LU
C
A
S
N
H
U
N
T
67T
H
MYRON68T
H
MOU
N
T
EDMUND
69T
H
SAL
Z
M
A
N
WELL
S
M
A
R
CRESCENT
PRIVA
T
E
VAL
L
E
OGD
E
N
LESC
H
E
N
LIN
D
E
L
L
MAR
K
E
T
GRE
E
R
ROS
E
B
U
D
WEL
L
S
T
O
N
KEN
N
E
R
L
Y
ROC
K
B
R
O
O
K
AR
D
E
N
ALLE
Y
BAIL
E
Y
ISAB
E
L
L
A
LEXI
N
G
T
O
N
LATT
A
CR
E
S
C
E
N
T
MAR
K
E
T
GRE
E
R
WEL
L
S
T
O
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13548
Wastewater
15
$2,768,000
Various
Bissell
Various
Capital
130Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HARLEM CITYSHED MITIGATION BASINS(ASHLAND AND ESSEX)
Construction
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND STREET FLOODING.
CONSTRUCT 2 STORMWATER DETENTION BASINS, AND 2 RAINGARDENS.
Comments/Remarks
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTAL APPROPRIATION IN FY 24. TOTAL BUDGET IS $6,200,000.
§¨¦70
§¨¦70
UNI
O
N
LEE
TERMINAL
BEL
T
SHR
E
V
E
EUC
L
I
D
GREE
R
LABA
D
I
E
SEM
P
L
E
ARL
I
N
G
T
O
N
COR
A
BRO
W
N
WAB
A
D
A
ST L
O
U
I
S
TERR
Y
PENR
O
S
E
GER
A
L
D
I
N
E
MAFF
I
T
T
PALM
BIRC H E R
ASHL
A
N
D
KOSS
U
T
H
LOTU
S
FARL
I
N
NOR
W
O
O
D
CART
E
R
BUR
D
NORT
H
L
A
N
D
LEXI
N
G
T
O
N
MAR
C
U
S
ABN
E
R
AND
E
R
S
O
N
HIGH
L
A
N
D
ELMB
A
N
K
HER
B
E
R
T
CUPP
L
E
S
NEW
S
T
E
A
D
COTE
B
R
I
L
L
I
A
N
T
E
CALV
I
N
BESS
I
E
PAR
I
S
MAR
G
A
R
E
T
T
A
WEL
L
S
HAMM
E
T
T
DRY
D
E
N
SAN
F
R
A
N
C
I
S
C
O
SAC
R
A
M
E
N
T
O
KENNERLY
AUB
E
R
T
TAY
L
O
R
PATT
O
N
THEO
D
O
S
I
A
ACADEM
Y
SIE
M
E
R
S
CLA
R
A
WILL
I
A
M
BAY
A
R
D
WAL
T
O
N
SEX
A
U
E
R
GRO
V
E
R
CHE
S
T
E
R
TERR
Y
MAR
C
U
S
PALM
PALM
BRO
W
N
COR
A
LEXI
N
G
T
O
N
HIGH
L
A
N
D
LEXI
N
G
T
O
N
EUCLI
D
WAB
A
D
A
GREE
R
COTE
B
R
I
L
L
I
A
N
T
E
NOR
T
H
L
A
N
D
LABA
D
I
E
TERMINA
L
PALMASHLAND
GRE
E
R
TERMINAL
MAFF
I
T
T
TERMINAL
LOTU
S
ASHL
A
N
D
COR
A
EUC
L
I
D
FARL
I
N
NO R W O O D
MAFF
I
T
T
NATURALBRIDGERD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13231
Wastewater
15
$4,000,000
Various
Bissell
Harlem
Capital
131Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LEMAY 1 PUMP STATION (P-301) COOLING TOWERREPLACEMENT
Construction
6660 - SanitaryReplacement Fund
COOLING TOWERS, AND RELATED PIPING AND VALVES ARE OVER 30YEARS OLD AND AT THE END OF THEIR USEFUL LIFE.
REMOVE AND REPLACE EXISTING COOLING TOWERS, PIPING, ANDVALVES
MA
R
C
E
A
U
HU
R
C
K
CA
T
A
L
A
N
MINN
E
S
O
T
A
ES
P
E
N
S
C
H
I
E
D
VIRG
I
N
I
A
PEN
N
S
Y
L
V
A
N
I
A
AD
E
L
I
A
NEL
L
I
E
MICH
I
G
A
N
MICH
I
G
A
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13596
Wastewater
15
$650,000
St. Louis City
Lemay/RDP
Lemay Creek
Capital
132Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDWORTH STORM SEWER SEPARATION
Construction
5120 - DistrictwideStormwater Fund
OVERCHARGED SANITARY SEWERS. STREET AND STRUCTUREFLOODING FOR MUNICIPALITY'S PORTION OF PROJECT.
CONSTRUCT 1,070 FEET OF 21-INCH TO 48-INCH STORM SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT TWO PROPERTIES.
STORMWATER PORTION OF PROJECT BEING DONE AT THE REQUEST OFAND TO BE REIMBURSED BY THE CITY OF LAUDE UNDER ACOOPERATIVE AGREEMENT WITH THE DISTRICT.
LI
T
Z
S
I
N
G
E
R
PR
I
V
A
T
E
OA
K
B
E
N
D
LIN
D
W
O
R
T
H
DA
N
I
E
L
LITZSINGER W OODS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13510
Wastewater
15
$1,600,000
Ladue
Lemay/RDP
Deer Creek
Capital
133Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LINDWORTH STORM SEWER SEPARATION
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS. STREET AND STRUCTUREFLOODING FOR MUNICIPALITY'S PORTION OF PROJECT.
CONSTRUCT 1,070 FEET OF 21-INCH TO 48-INCH STORM SEWER, ANDPERFORM PRIVATE I/I REDUCTION AT TWO PROPERTIES.
STORMWATER PORTION OF PROJECT BEING DONE AT THE REQUEST OFAND TO BE REIMBURSED BY THE CITY OF LAUDE UNDER ACOOPERATIVE AGREEMENT WITH THE DISTRICT.
LI
T
Z
S
I
N
G
E
R
PR
I
V
A
T
E
OA
K
B
E
N
D
LIN
D
W
O
R
T
H
DA
N
I
E
L
LITZSINGER W OODS
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13510
Wastewater
15
$400,000
Ladue
Lemay/RDP
Deer Creek
Capital
134Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC RIVER SYSTEMIMPROVEMENTS - BAUMGARTNER TO FENTONWWTF TUNNEL
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
THE FENTON WWTF IS AN INTERIM FACILITY AND IT'S ELIMINATION ISPART OF THE EAST WEST GATEWAY SECTION 208 REGIONAL WATERQUALITY MANAGEMENT PLAN.
CONSTRUCT 36,000 FEET OF 8-FOOT DIAMETER DEEP TUNNEL TOCONVEY WASTEWATER FROM THE FENTON WWTF TO THEBAUMGARTNER TUNNEL, TO ENABLE TREATMENT OF FLOWS AT THELOWER MERAMEC WWTF.
PROJECT ELIMINATES PUMP STATIONS P-446 AND P-483. P-489 TO BEELIMINATED BY SEPARATE PROJECT #10869. TOTAL CONSTRUCTIONBUDGET IS $180,000,000.
§¨¦55
§¨¦270
§¨¦55
KERT
H
MA
T
T
I
S
G R A V OIS
WEL
L
S
KELL
E
R
MERAMEC BOTT O M
AMB
S
KENNER
L
Y
T
H
E
I
S
S
EA
S
T
CONCORD
AL
L
E
N
ALSW
E
L
L
S C H U E S SLER
MENTZHILL
RI N G ER
B A U ER
BU T L E R HILL
GREENTON
S
USONHILLS
PO I N T E
CARIBEE
HAWKINS
GE
R
A
L
D
KE
M
P
F
H
A
G
E
M
A
N
N
OLSEN
GREGORY
DIER
S
P
R
I
VATE
MAIN
RI VERCURVE
VALMEYER
TESCORD
M A N G O
W
A
T
S
O
N
GATESBURY
DAN
T
ONAIRE
GRIFF
I
N
A C O RN
LANGTREE
VALLEYSIDE
FUCH
SFI
J
I
B AHNFYRE
FERN B
E
A
C
H
ED
L
O
U
CLAYR
I
D
G
E
S
T
A
R
L
I
T
ATLNTIC
LA
R
K
I
N
LITTLEROCK
TIOGA
COYL
E
TOWNE SOUTH
PRIVA
T
E
PRIVATE
AMBS
BAUER
PR
I
V
A
T
E
P
R
I
V
A
T
E
T E S S O N FERRYRD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11746
Wastewater
15
$48,000,000
Various
Meramec
Meramec Tributary Areas
Capital
135Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
LOWER MERAMEC WWTF EXPANSION PHASE II
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
ADDITIONAL FLOW TO THE LOWER MERAMEC WWTF DUE TOELIMINATION OF THE FENTON WWTF, AND POTENTIAL FUTURENUTRIENT REMOVAL PERMIT REQUIREMENTS.
EXPAND THE EXISTING WWTF TO INCREASE CAPACITY FORADDITIONAL FLOW, AND UPGRADE THE FACILITY TO ENABLEACCOMMODATION OF POTENTIAL NUTRIENT REMOVALREQUIREMENTS.
TOTAL CONSTRUCTION BUDGET IS $89,500,000. ASSET RENEWAL OFDETERIORATING ITEMS AT THE PLANT, BUDGETED AT $27,700,000, WILLALSO BE BID WITH 12255.
F
I
N
E
PR
I
V
A
T
E
PINETOP
WILLIAMSON
BECKER
K
I
N
G
S
R
I
D
G
E
MANOR
S A G EBROOK
S I L V E R PIN E
PINETOP
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12255
Wastewater
15
$30,000,000
Unincorporated
Meramec
Mississippi River Tributary Areas
Capital
136Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
MC-02 WATSON TO EDGAR RD SANITARY RELIEF(SKME-580A)
Construction(SupplementalAppropriation)
6660 - SanitaryReplacement Fund
BUILDING BACKUPS AND OVERCHARGED SANITARY SEWERS.
CONSTRUCT 9,050 FEET OF 8-INCH TO 36-INCH SANITARY SEWER, ANDELIMINATE CONSTRUCTED SSO OUTFALL BP-557.
SUPPLEMENTAL APPROPRIATION IN FY 23. TOTAL BUDGET IS $8,130,000,INCLUDING A $2M DEVELOPER REIMBURSEMENT TO CONSTRUCT PARTOF THE PROJECT.
ED
G
A
R
LA
C
L
E
D
E
S
T
A
T
I
O
N
IM
S
E
FLORENCE
RAVENSRIDGE
FIELDSTON
PRIVATE
BUSCH
PE
M
B
R
O
K
E
LACLEDE G R O V E S
CU
L
V
E
R
H
I
L
L
HURSTGREEN
O L D W E S T B URY
KIRKY
CANON
VILLAWOOD
RADNOR
VI
C
A
R
OAK KNOLL MANOR
LORD S HILL
CHA T WELL
CHESTNUTHILLS
ST JAMES
C R A T H E S
O A K KNOLL MANOR
WAT
S
O
N
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10024
Wastewater
15
$2,130,000
Various
Lemay/RDP
Mackenzie Creek
Capital
137Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
NEW ENGLAND TOWN CLIFF CAVE PUMP STATION(P-323) IMPROVEMENTS
Construction
6660 - SanitaryReplacement Fund
PUMP STATION IS AT THE END OF ITS LIFE CYCLE. DETERIORATEDSANITARY AND STORM SEWERS.
CONSTRUCT 3,500 FEET OF 8-INCH TO 12-INCH SANITARY SEWER, 1,600FEET OF 6-INCH FORCEMAIN, AND REPLACE SANITARY PUMP STATIONP-323.
THIS PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS $5,600,000.
BUSSE
N
C
L
I
F
F
C
A
VE
CHATPORT BLUFF
DOBER
HUNTSPORT
GLENRICH
HEMPLINE
W I N C A N T ON
PIERPORT
ST
E
E
L
E
R
I
D
G
E
AS
H
T
O
N
C
I
R
C
L
E
HALYARD
ROCK HARBOR
H
E
M
P
L
I
N
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10715
Wastewater
15
$4,000,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
138Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
PUMP STATION MANLIFT REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
STATE INSPECTION VIOLATIONS AND DETERIORATING EQUIPMENT.
REPLACE MANLIFTS IN VARIOUS PUMP STATIONS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13566
Wastewater
15
$2,400,000
Various
Various
Various
Capital
139Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STONINGTON PLACE SANITARY RELIEF (CLAYTONRD TO GEORGIAN ACRES ST)
Construction
6660 - SanitaryReplacement Fund
OVERCHARGED SANITARY SEWERS.
CONSTRUCT 238 FEET OF 12-INCH SANITARY SEWER.
PUBLIC I/I REDUCTION INCLUDED IN PROJECT 12042.
CLAYTON
STONINGTON
SP
O
E
D
E
H
U
N
T
L
E
I
G
H
D
O
W
N
S
C O U N T RY ESTATES
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12218
Wastewater
15
$300,000
Frontenac
Lemay/RDP
Deer Creek
Capital
140Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
VALLEY VIEW PUMP STATION (P-734)REPLACEMENT
Construction
6660 - SanitaryReplacement Fund
PUMP STATION P-734 NEEDS REPLACEMENT TO MEET SERVICE LEVELDEMANDS.
REPLACE PUMP STATION P-734.
VA
L
L
E
Y
HERWORTH
SU
N
M
E
A
D
O
W
SUNDANCECREEK
VALLE
Y
O
A
K
S
E
S
T
A
T
E
S
V
A
L
L
E
Y
E
S
T
A
T
E
S
WIN
D
H
A
V
E
N
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12262
Wastewater
15
$380,000
Wildwood
Missouri
Caulks Creek
Capital
141Page
2023
6 April 2021
Page 1 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
12000 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2020)
Various $2,500,000
12907 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2020)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $150,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
13608 Professional
Services
ST. LOUIS COMBINED SEWER OVERFLOWS
PROGRAM - CORPS OF ENGINEERS - PHASE
II
Various $10,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $540,000
12004 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2020)
Various $270,000
13436 Pre-Design
Services
WET WEATHER OPTIMIZATION STUDY Various $1,500,000
FUND TOTAL: $18,220,000
5120 - DISTRICTWIDE STORMWATER FUND
12110 Construction CANTERBURY AND ROLAND SANITARY
RELIEF (NELSON DR TO ROLAND BLVD)
Northwoods $320,000
12753 Construction CAREY CT 1664 SANITARY AND STORM
SEWER REPLACEMENT
Hazelwood $60,000
6 April 2021
Page 2 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $380,000
6660 - SANITARY REPLACEMENT FUND
12079 Design Services ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
Unincorporated $95,000
12847 Construction BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
St. Louis City $4,000,000
12565 Design Services
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $2,050,000
12584 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT A
Various $4,216,000
13031 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2022)
CONTRACT B
Various $2,906,000
13033 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
Various $48,000
12586 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
Various $58,000
12587 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
Various $87,000
13124 Design Services BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
Various $52,000
12566 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
St. Louis City $11,000,000
12108 Design Services BURNING TREE INFRASTRUCTURE REPAIR
(N. WATERFORD DR TO FOX RUN DR)
Florissant $103,000
12110 Construction CANTERBURY AND ROLAND SANITARY
RELIEF (NELSON DR TO ROLAND BLVD)
Northwoods $1,084,000
12753 Construction CAREY CT 1664 SANITARY AND STORM
SEWER REPLACEMENT
Hazelwood $1,240,000
12248 Construction CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $5,000,000
12114 Design Services
(Supplemental
Appropriation)
CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
Chesterfield $1,035,000
12122 Design Services CLARK AVE SANITARY RELIEF (LACLEDE
STA RD TO YEATMAN AVE)
Webster Groves $323,000
13568 Construction CLAYTON MERAMEC ELEMENTARY
PRIVATE I/I REMOVAL (S. MERAMEC AVE
AT WALINCA TER)
Clayton $500,000
6 April 2021
Page 3 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13446 Construction CLAYTON RD 9925 SANITARY SEWER
REPLACEMENT
Ladue $285,000
11724 Construction COLDWATER SANITARY RELIEF SECTION B,
C & D - SECTION B REHABILITATION
Unincorporated $1,600,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $2,700,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $4,800,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $7,000,000
12130 Design Services CONWAY ROAD SANITARY RELIEF
(CONWAY LN TO DWYER AVE)
Ladue $108,000
12140 Design Services
(Supplemental
Appropriation)
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $150,000
12141 Design Services CSO - SHREWSBURY AVE CSO
INTERCEPTOR (I-293)/OUTFALL (L-166)
SEWER SEPARATION
Shrewsbury $450,000
12326 Design Services DANIEL BOONE - LAWNVIEW CREEK I/I
REDUCTION
Unincorporated $161,000
12472 Construction
(Supplemental
Appropriation)
DC-02 & DC-03 SANITARY RELIEF
(BRENTWOOD BLVD TO CONWAY RD)
PHASE III AND PHASE IV
Ladue $17,500,000
12615 Construction
(Supplemental
Appropriation)
DEER CREEK SANITARY TUNNEL
(CLAYTON RD TO RDP) - PUMP STATION
Shrewsbury $15,000,000
12740 Construction DOLAN PLACE AND GRANDVIEW PLACE
COMBINED SEWER RELIEF
St. Louis City $3,000,000
12153 Construction EARTH CITY EXPRESSWAY PUMP STATION
(P-708) REPLACEMENT
Unincorporated $1,700,000
13599 Construction EARTH CITY UPS PUMP STATION (P-702)
REPLACEMENT PHASE II
Unincorporated $1,500,000
12819 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2022)
Various $3,500,000
11737 Design Services
(Supplemental
Appropriation)
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $100,000
12166 Construction FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
Unincorporated $930,000
10012 Construction
(Supplemental
Appropriation)
FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
Unincorporated $600,000
13046 Design Services FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $300,000
6 April 2021
Page 4 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12173 Construction FISHPOT TRUNK WEST AND ED LOU LANE
I/I REDUCTION (SMITH DR AND VLASIS DR)
Ballwin $300,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $2,000,000
12894 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2018)
CONTRACT B
Various $50,000
13098 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT A
Various $475,000
13099 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT B
Various $250,000
13102 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
Various $85,000
13103 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
Various $85,000
13104 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
Various $85,000
13108 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
Various $50,000
13109 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
Various $50,000
13110 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
Various $50,000
13111 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
Various $50,000
13112 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
Various $50,000
12175 Construction GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD
TO WINDSOR SPRINGS DR)
Various $5,030,000
12272 Construction GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT
COVE CT)
Ballwin $740,000
12334 Design Services
(Supplemental
Appropriation)
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $200,000
13597 Construction HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE IB
Brentwood $3,000,000
10641 Engineering
During
Construction
Services
HARLEM - BADEN RELIEF PHASE IV
(HEBERT) BUILDING DEMOLITION AND
DESIGN
St. Louis City $600,000
6 April 2021
Page 5 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11796 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $6,000,000
12299 Design Services HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
Town And Country $319,000
12996 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2022)
Various $3,000,000
13016 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT A
Various $2,500,000
13017 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022) CONTRACT B
Various $2,500,000
12988 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2022)
Various $7,000,000
11711 Construction
(Supplemental
Appropriation)
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $35,000,000
11711 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL (LEMAY
WWTP TO MARTIGNEY PS)
Unincorporated $400,000
13227 Design Services L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $1,161,000
12590 Construction LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
Various $2,932,000
11943 Design Services LINDBERGH SANITARY RELIEF
(MEADOWSIDE DR TO N LINDBERGH BLVD)
Unincorporated $401,000
12741 Construction LOUISVILLE AVENUE AND OAKLAND
AVENUE COMBINED SEWER RELIEF
St. Louis City $2,275,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $48,000,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $650,000
13409 Construction LOWER MERAMEC WWTF -
ADMINISTRATION BUILDING FACILITY
IMPROVEMENTS
Unincorporated $1,800,000
13408 Construction LOWER MERAMEC WWTF - INFLUENT PUMP
STATION IMPROVEMENTS
Unincorporated $17,500,000
13407 Construction LOWER MERAMEC WWTF - SOLIDS
HANDLING EQUIPMENT REPLACEMENT
Unincorporated $3,900,000
6 April 2021
Page 6 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13518 Construction LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS
PHASE II
Unincorporated $2,700,000
12255 Design Services
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,000,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $2,000,000
12255 Construction LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $30,000,000
13082 Construction LOWER MERAMEC WWTF FITTING
REPLACEMENT
Unincorporated $1,800,000
10024 Construction,
Phase II
MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $2,000,000
10024 Construction MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $4,000,000
12346 Design Services MCCUTCHEON RD AND THORNDELL
SANITARY RELIEF
Richmond Heights $405,000
13222 Construction MISSOURI RIVER WWTF DIGESTER GAS
STORAGE COVER REPLACEMENT
Maryland Heights $1,289,000
12355 Design Services MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
Crestwood $531,000
12360 Design Services NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $1,661,000
12364 Construction OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
Ballwin $445,000
12368 Construction PRICE TO PIONEER SANITARY RELIEF Olivette $4,000,000
11701 Engineering
During
Construction
Services
PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
Various $150,000
13467 Design Services
(Supplemental
Appropriation)
SCADA SYSTEM UPGRADE Various $1,000,000
10161 Construction SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
Unincorporated $753,000
12201 Construction SHREWSBURY SANITARY RELIEF SEWER
AND I/I REDUCTION (WEIL AVE AND I-44)
Various $980,000
12202 Design Services SMITH CREEK LADUE ROAD SANITARY
RELIEF (ROYAL MANOR DR TO HEWLETT
CT)
Creve Coeur $518,000
10756 Construction SOUTH BROADWAY AT MERAMEC
COMBINED SEWER REPLACEMENT
St. Louis City $1,500,000
12628 Design Services
(Supplemental
Appropriation)
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-750)
Chesterfield $220,000
6 April 2021
Page 7 of 7
WASTEWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13623 Design Services SPOEDE ROAD SANITARY SEWER
IMPROVEMENTS
Creve Coeur $120,000
12212 Construction ST. GEORGE CREEK SANITARY RELIEF
(DAISY LN TO GRAVOIS RD TO NEW
HAMPSHIRE AVE)
Unincorporated $3,305,000
12213 Construction ST. JACQUES SANITARY RELIEF (ST.
JACQUES ST TO N LAFAYETTE ST)
Florissant $155,000
12214 Design Services ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
St. Ann $550,000
12217 Design Services ST. MATTHIAS SANITARY RELIEF (ST.
SHAWN LN TO STONEHARD DR)
St. Ann $306,000
12221 Construction SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
Unincorporated $2,515,000
11669 Construction SUB-TRUNK #3 SANITARY RELIEF (MURIEL
DR TO JENNER LN)
Unincorporated $1,905,000
13361 Construction TREVILLIAN 20 AND 50 SANITARY SEWER
REPLACEMENT
Various $435,000
12242 Design Services UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
Ellisville $404,000
13292 Construction WASHINGTON TERRACE 14 SEWER
REPLACEMENT
St. Louis City $279,000
12922 Construction
(Supplemental
Appropriation)
WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK
RD TO SPRING GARDEN DR)
St. Louis City $1,600,000
12491 Construction
(Supplemental
Appropriation)
WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
Unincorporated $2,900,000
12271 Design Services WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
Unincorporated $363,000
11678 Construction,
Phase III
WEBSTER GROVES TRUNK E SANITARY
REHABILITATION AND I/I REDUCTION
PHASE IV
Webster Groves $1,300,000
12132 Design Services WESTWOOD COUNTRY CLUB SANITARY
RELIEF (DEER CREEK TO WESTWOOD CT)
Westwood $513,000
12300 Design Services WOODSON SANITARY RELIEF (FLORA AVE
TO LACKLAND RD)
Overland $391,000
FUND TOTAL: $317,932,000
GRAND TOTAL:$336,532,000
6 April 2021
Page 1 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2023)
Various $200,000
13087 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT A
Various $75,000
13088 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT B
Various $75,000
13089 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT C
Various $75,000
13090 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2021) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $100,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
13436 Pre-Design
Services
WET WEATHER OPTIMIZATION STUDY Various $1,500,000
FUND TOTAL: $19,655,000
4102 - IMPROVEMENT FUND
6 April 2021
Page 2 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13153 Construction LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
Unincorporated $4,000,000
FUND TOTAL: $4,000,000
5120 - DISTRICTWIDE STORMWATER FUND
13510 Construction LINDWORTH STORM SEWER SEPARATION Ladue $1,600,000
12200 Construction SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $267,000
FUND TOTAL: $1,867,000
5590 - MO RIVER BONFIL SUBD #448 OMCI FUND
12353 Design Services MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE III
Hazelwood $45,000
FUND TOTAL: $45,000
6660 - SANITARY REPLACEMENT FUND
12077 Construction AMBLEWOOD SANITARY RELIEF
(WATERFORD DR TO BIRCHBARK DR)
Florissant $2,386,000
12847 Construction
(Supplemental
Appropriation)
BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
St. Louis City $2,300,000
12085 Construction BANFF SANITARY RELIEF (CAITHNESS RD
TO LANARK RD)
Unincorporated $167,000
12088 Construction BAXTER - MERAMEC BOTTOMS - VALLEY
PARK PRIVATE I/I REDUCTION
Ballwin $336,000
12090 Design Services BC-01 PHASE III AND BC-02 PHASE II
SANITARY RELIEF (I-170 TO
HEATHERWOOD DR)
Ladue $1,175,000
12565 Construction, D
esign-Build
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $101,000,000
12565 Construction, Pr
oposer Stipend
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $2,000,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $8,600,000
13033 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT C
Various $7,070,000
12586 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT D
Various $3,594,000
6 April 2021
Page 3 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12587 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT E
Various $4,251,000
13124 Construction BISSELL - COLDWATER - MISSOURI -
MERAMEC PUBLIC I/I REDUCTION (2023)
CONTRACT F
Various $4,213,000
12548 Engineering
During
Construction
Services
BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $1,000,000
12548 Construction BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $18,000,000
11847 Construction BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $11,000,000
12105 Design Services BRUNSTON SANITARY RELIEF (BRUNSTON
DR TO MATTESE VILLA DR)
St. Louis City And
County
$112,000
12248 Construction
(Supplemental
Appropriation)
CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
Chesterfield $3,516,000
12552 Construction COLDWATER CREEK WWTF REPAIRS AND
IMPROVEMENTS (2022)
Unincorporated $5,714,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $2,500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $6,000,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $6,000,000
12139 Construction CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $10,000,000
12139 Engineering
During
Construction
Services
CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $250,000
12140 Construction CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $16,000,000
12140 Engineering
During
Construction
Services
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $250,000
12820 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2023)
Various $2,000,000
12159 Construction EDMUNDSON SANITARY RELIEF (EDMUND
AVE TO BATAAN DR)
Woodson Terrace $2,900,000
6 April 2021
Page 4 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11737 Engineering
During
Construction
Services
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $1,200,000
11737 Construction, D
esign-Build
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $6,000,000
11888 Construction FABICK PUMP STATION (P-444)
IMPROVEMENTS (SKME-404E)
Fenton $750,000
12170 Design Services FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $2,324,000
12171 Construction FF-15 AND FF-16 SANITARY RELIEF PHASE II
REHABILITATION
Maryland Heights $2,000,000
12178 Construction FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $4,000,000
12185 Construction FRIEDENS (PARTIAL) I/I REDUCTION (CHAIN
OF ROCKS DR AND FONTAINE PL)
Bellefontaine
Neighbors
$1,584,000
13516 Design Services
(Supplemental
Appropriation)
GASLIGHT SQUARE SEWER
IMPROVEMENTS PHASE II
St. Louis City $1,500,000
12157 Construction GC-06 GRAVOIS CREEK TO BRIARSTONE
AND GATES SANITARY RELIEF PHASE II
Various $4,090,000
12387 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
Various $2,000,000
13098 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT A
Various $475,000
13099 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2022)
CONTRACT B
Various $250,000
13102 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
Various $85,000
13103 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
Various $85,000
13104 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
Various $85,000
12400 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2021) CONTRACT A
Various $200,000
13108 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
Various $50,000
13109 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
Various $50,000
13110 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
Various $50,000
6 April 2021
Page 5 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13111 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
Various $50,000
13112 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
Various $50,000
12174 Design Services GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
Kirkwood $447,000
12176 Design Services GLEN ECHO SANITARY RELIEF
(ENGELHOLM AVE TO HENDERSON AVE)
Normandy $495,000
12264 Construction GLENFIELD SANITARY RELIEF (WATSON
WOODS CT TO S LINDBERGH BLVD)
Sunset Hills $1,938,000
13221 Design Services GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2024)
Valley Park $100,000
12281 Design Services GRAND NATIONAL SANITARY RELIEF
(GRAND NATIONAL DR TO KNEELAND RD)
Unincorporated $136,000
12291 Construction GREENBRIAR #2 PUMP STATION (P-448)
ELIMINATION
Des Peres $689,000
12334 Construction HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $17,000,000
12334 Engineering
During
Construction
Services
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $280,000
11796 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HAMILTON TO DARVER TRUNK
SEWER
Various $3,300,000
13548 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - SEWER REHABILITATION
Various $2,768,000
13231 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $4,000,000
13337 Design Services HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $250,000
13432 Construction HATHAWAY DRIVE SANITARY RELIEF Jennings $902,000
12997 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2023)
Various $3,000,000
13018 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT A
Various $2,500,000
13019 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023) CONTRACT B
Various $2,500,000
12989 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2023)
Various $7,000,000
13596 Construction LEMAY 1 PUMP STATION (P-301) COOLING
TOWER REPLACEMENT
St. Louis City $650,000
11817 Design Services
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $450,000
6 April 2021
Page 6 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12330 Construction LINDSAY - ST. ALBERT PRIVATE I/I
REDUCTION
Florissant $625,000
13510 Construction LINDWORTH STORM SEWER SEPARATION Ladue $400,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $48,000,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $750,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $2,000,000
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $30,000,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $750,000
10024 Construction
(Supplemental
Appropriation)
MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
Various $2,130,000
10715 Construction NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $4,000,000
12357 Construction NEWPORT LANDING PUMP STATION (P-480)
ELIMINATION
Unincorporated $626,000
12433 Construction NORTH FEE FEE CREEK PUBLIC I/I
REDUCTION
Various $6,000,000
12368 Construction
(Supplemental
Appropriation)
PRICE TO PIONEER SANITARY RELIEF Olivette $1,744,000
13566 Construction PUMP STATION MANLIFT REPLACEMENT Various $2,400,000
12189 Construction ROBYN HILLS NUMBER 1 PUMP STATION (P-
417) REPLACEMENT
Sunset Hills $670,000
12195 Construction S BRENTWOOD BLVD SANITARY RELIEF
(DAYTONA DR TO WALINCA TERRACE)
Clayton $4,681,000
12196 Design Services S GORE AVE SANITARY RELIEF (GRAY AVE
TO OAK TERR)
Webster Groves $140,000
12200 Construction SAYLESVILLE SANITARY RELIEF
(SAYLESVILLE DR TO S GREENTRAILS DR)
Chesterfield $2,960,000
13467 Construction SCADA SYSTEM UPGRADE Various $5,000,000
6 April 2021
Page 7 of 7
WASTEWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13185 Professional
Services
SLUDGE TRANSFER FORCEMAIN DESIGN
(CONTRACT A)
Various $7,200,000
12218 Construction STONINGTON PLACE SANITARY RELIEF
(CLAYTON RD TO GEORGIAN ACRES ST)
Frontenac $300,000
12249 Design Services
(Supplemental
Appropriation)
UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
Unincorporated $130,000
13444 Construction VALLEY SANITARY RELIEF PHASE III Various $4,000,000
12262 Construction VALLEY VIEW PUMP STATION (P-734)
REPLACEMENT
Wildwood $380,000
10794 Design Services WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $2,000,000
12280 Construction WHITE PLAINS SANITARY RELIEF
(SALTBOX DR TO CEDAR CREEK RD)
Chesterfield $1,986,000
12284 Design Services WILSON AVE SANITARY RELIEF (HARRISON
AVE TO CLEVELAND AVE)
Kirkwood $270,000
12302 Construction WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $5,000,000
FUND TOTAL: $432,029,000
GRAND TOTAL:$457,596,000
6 April 2021
Page 1 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2023)
Various $200,000
13091 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $200,000
12006 Vendor
Services
RADAR RAINFALL DATA (2020)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $18,255,000
5590 - MO RIVER BONFIL SUBD #448 OMCI FUND
12353 Construction MISSOURI RIVER BONFILS SANITARY
SEWER REHABILITATION PHASE III
Hazelwood $1,492,000
6 April 2021
Page 2 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $1,492,000
6660 - SANITARY REPLACEMENT FUND
12079 Construction ARV ELLEN SANITARY RELIEF (TESSON
CREEK ESTATES DR TO MADAFORD LN)
Unincorporated $365,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $15,600,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $156,000,000
12548 Construction
(Supplemental
Appropriation)
BISSELL POINT WWTF FINE SCREEN,
CONCRETE AND GATE IMPROVEMENTS
St. Louis City $11,816,000
11847 Construction
(Supplemental
Appropriation)
BLACK CREEK - HADDINGTON COURT
RELIEF SEWERS
Ladue $7,100,000
13439 Design Services BONFILS PUMP STATION (P-784)
REHABILITATION
Unincorporated $500,000
12106 Design Services BUCKHURST DR TO OAK HILL DR
SANITARY RELIEF
Ellisville $181,000
12108 Construction BURNING TREE INFRASTRUCTURE REPAIR
(N. WATERFORD DR TO FOX RUN DR)
Florissant $448,000
12114 Construction CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
Chesterfield $5,000,000
12122 Construction CLARK AVE SANITARY RELIEF (LACLEDE
STA RD TO YEATMAN AVE)
Webster Groves $1,607,000
12550 Design Services COLDWATER CREEK WWTF REPLACEMENT
SLUDGE FORCEMAIN
Various $1,700,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $500,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $5,800,000
13224 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
SLUDGE TRANSFER FORCEMAINS
Various $350,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,000,000
12129 Design Services CONWAY MEADOWS SANITARY RELIEF
(CONWAY RD TO I-64)
Chesterfield $111,000
12130 Construction CONWAY ROAD SANITARY RELIEF
(CONWAY LN TO DWYER AVE)
Ladue $512,000
12133 Design Services COUNTRY HOME DR SANITARY RELIEF
(SUMMITT TREE CT TO AUTUMN PEAK DR)
Unincorporated $343,000
6 April 2021
Page 3 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12134 Design Services COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $115,000
12139 Construction
(Supplemental
Appropriation)
CSO - BRENTWOOD AND RED BUD AVE CSO
INTERCEPTOR (I-118)/OUTFALL (L-111)
ELIMINATION AND SEWER SEPARATION
Richmond Heights $6,000,000
12140 Construction
(Supplemental
Appropriation)
CSO - MARY AVENUE SOUTH OF
MANCHESTER CSO INTERCEPTOR (I-
132)/OUTFALL (L-106) ELIMINATION PHASE
II
Brentwood $10,500,000
12141 Construction CSO - SHREWSBURY AVE CSO
INTERCEPTOR (I-293)/OUTFALL (L-166)
SEWER SEPARATION
Shrewsbury $2,000,000
12326 Construction DANIEL BOONE - LAWNVIEW CREEK I/I
REDUCTION
Unincorporated $392,000
12147 Design Services DIETRICH GLEN PUMP STATION (P-525)
IMPROVEMENTS
Unincorporated $100,000
12151 Design Services DUBRAY SANITARY RELIEF (S. BALLAS RD
TO DUBOIS CT)
Kirkwood $312,000
12821 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2024)
Various $2,000,000
11737 Construction,
Design-Build
(Supplemental
Appropriation)
ELTORA WET WEATHER STORAGE
FACILITY
Pagedale $4,447,000
13046 Construction FILLMORE PUMP STATION (P-308)
REHABILITATION
St. Louis City $1,700,000
12178 Construction
(Supplemental
Appropriation)
FLORISSANT/DUNN SANITARY RELIEF (ST.
ANTHONY LN TO I-270)
Florissant $2,122,000
13534 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2024)
Various $2,000,000
13100 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT A
Various $450,000
13101 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT B
Various $250,000
13105 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT A
Various $75,000
13106 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT B
Various $75,000
13107 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT C
Various $75,000
6 April 2021
Page 4 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13095 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2024) CONTRACT A
Various $200,000
13113 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT A
Various $50,000
13114 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT B
Various $50,000
13115 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT C
Various $50,000
13116 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT D
Various $50,000
13117 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT E
Various $50,000
13221 Construction GRAND GLAIZE WWTF REPAIRS AND
IMPROVEMENTS (2024)
Valley Park $400,000
12815 Construction GRAVIOS CREEK SANITARY TRUNK
RELOCATION AND STREAM STABILIZATION
(AFFTON ATHLETIC COMPLEX TO GREEN
PK IND DR)
Unincorporated $2,628,000
12334 Construction
(Supplemental
Appropriation)
HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
Various $9,608,000
11797 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $4,000,000
11798 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $6,000,000
12695 Professional
Services
HARLEM BADEN RELIEF SYSTEM
IMPROVEMENT DESIGN (CONTRACT A)
St. Louis City $250,000
13231 Construction
(Supplemental
Appropriation)
HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX)
Various $2,200,000
12942 Construction HARLEM CITYSHED MITIGATION BASINS
(ASHLAND AND ESSEX) - SEPARATION
SEWERS
Various $4,800,000
12299 Construction HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
Town And Country $1,633,000
12998 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2024)
Various $3,000,000
13020 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT A
Various $5,000,000
13021 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024) CONTRACT B
Various $5,000,000
12990 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2024)
Various $7,000,000
11957 Construction JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $5,660,000
6 April 2021
Page 5 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11957 Engineering
During
Construction
Services
JEFFERSON BARRACKS TUNNEL
CONSOLIDATION SEWERS
Unincorporated $74,000
13227 Construction L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $4,000,000
11817 Construction LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $14,000,000
11817 Engineering
During
Construction
Services
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $440,000
13153 Construction
(Supplemental
Appropriation)
LEMAY WWTF REPAIRS AND
IMPROVEMENTS (2023) (GRIT TANKS AND
SECONDARY CLARIFIER DUCT BANK)
Unincorporated $3,000,000
11943 Construction LINDBERGH SANITARY RELIEF
(MEADOWSIDE DR TO N LINDBERGH BLVD)
Unincorporated $1,221,000
11820 Design Services
(Supplemental
Appropriation)
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $2,000,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
11746 Construction
(Supplemental
Appropriation)
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $52,000,000
11746 Engineering
During
Construction
Services
LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO
FENTON WWTF TUNNEL
Various $750,000
12255 Construction
Management
Services During
Construction
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $1,800,000
12255 Construction
(Supplemental
Appropriation)
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $29,500,000
12255 Engineering
During
Construction
Services
LOWER MERAMEC WWTF EXPANSION
PHASE II
Unincorporated $750,000
13442 Design Services MANORS OF CLARKSON PUMP STATION (P-
727) REHABILITATION
Clarkson Valley $100,000
12346 Construction MCCUTCHEON RD AND THORNDELL
SANITARY RELIEF
Richmond Heights $2,305,000
12483 Design Services
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,200,000
6 April 2021
Page 6 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13515 Construction N CLAY 728 SANITARY RELOCATION Kirkwood $300,000
10715 Construction
(Supplemental
Appropriation)
NEW ENGLAND TOWN CLIFF CAVE PUMP
STATION (P-323) IMPROVEMENTS
Unincorporated $1,600,000
12359 Design Services NOONING TREE PARK SANITARY RELIEF
(WHITREE LN TO BRIGHTFIELD MANOR DR)
Chesterfield $300,000
12360 Construction NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $5,000,000
12699 Professional
Services
PUMP STATION REPAIR AND
IMPROVEMENT DESIGN (CONTRACT C)
Various $50,000
13467 Construction
(Supplemental
Appropriation)
SCADA SYSTEM UPGRADE Various $3,000,000
12202 Construction SMITH CREEK LADUE ROAD SANITARY
RELIEF (ROYAL MANOR DR TO HEWLETT
CT)
Creve Coeur $1,979,000
12204 Design Services SOUTH COUNTY RELIEF PUMP STATION (P-
419) IMPROVEMENTS
Unincorporated $500,000
12628 Construction SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-750)
Chesterfield $12,000,000
12628 Engineering
During
Construction
Services
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-750)
Chesterfield $500,000
12206 Construction SPIRIT OF ST. LOUIS 1 PUMP STATION (P-
735) REPLACEMENT
Chesterfield $494,000
13623 Construction SPOEDE ROAD SANITARY SEWER
IMPROVEMENTS
Creve Coeur $480,000
12214 Construction ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
St. Ann $3,222,000
12217 Construction ST. MATTHIAS SANITARY RELIEF (ST.
SHAWN LN TO STONEHARD DR)
St. Ann $2,253,000
12219 Design Services STRASSNER AVE SANITARY RELIEF (BLACK
CREEK TRUNK TO SWALLOW DR)
Brentwood $667,000
12220 Design Services SUB-TRUNK #11 SANITARY RELIEF
(BELGROVE DR TO LOTHIAN CIR)
Unincorporated $78,000
12224 Construction SUNSET COUNTRY CLUB PUMP STATION (P-
408) REPLACEMENT AND STORAGE
Sunset Hills $1,000,000
12231 Construction TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Various $6,000,000
12241 Construction UPPER BADEN SANITARY RELIEF
(JENNINGS STATION RD TO OAKRIDGE
BLVD)
Northwoods $2,974,000
12242 Construction UPPER FISHPOT EAST SANITARY RELIEF
(FIELD AVE TO WOLFF LN)
Ellisville $1,980,000
12249 Construction UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
Unincorporated $6,000,000
6 April 2021
Page 7 of 7
WASTEWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12263 Design Services VILLE PATRICIA SANITARY RELIEF (VILLE
ROSA LN TO CAMPUS PARKWAY DR)
Hazelwood $305,000
12270 Design Services WATKINS CREEK SANITARY RELIEF
(KENRAN INDUSTRIAL BLVD TO FARM
POND CT)
Unincorporated $2,080,000
12279 Construction WESTON PLACE PUMP STATION (P-771)
IMPROVEMENTS
Town And Country $276,000
12132 Construction WESTWOOD COUNTRY CLUB SANITARY
RELIEF (DEER CREEK TO WESTWOOD CT)
Westwood $2,834,000
12288 Construction WILTON PUMP STATION (P-412)
REPLACEMENT AND STORAGE
Kirkwood $610,000
12300 Construction WOODSON SANITARY RELIEF (FLORA AVE
TO LACKLAND RD)
Overland $2,155,000
12302 Construction
(Supplemental
Appropriation)
WW-2 AND WW-3 WARSON WOODS
SANITARY RELIEF
Various $4,785,000
FUND TOTAL: $479,007,000
GRAND TOTAL:$498,754,000
6 April 2021
Page 1 of 6
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12804 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2023)
Various $3,000,000
12908 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2023)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
13078 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
Various $3,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13096 GSA - (Design)
Operating
Funds
GENERAL SERVICES AGREEMENT -
LANDSCAPE DESIGN (2023)
Various $200,000
13091 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $210,000
12816 Vendor
Services
RADAR RAINFALL DATA (2025)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12806 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2023)
Various $350,000
FUND TOTAL: $18,265,000
6660 - SANITARY REPLACEMENT FUND
12076 Design Services AFFTON I/I REDUCTION (WANDA, LEONA
CROSBY, AND POEPPING TESSON)
Unincorporated $414,000
13051 Design Services ALSWELL PUMP STATION (P-422)
REHABILITATION
Sunset Hills $150,000
6 April 2021
Page 2 of 6
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13050 Design Services ANITA LANE PUMP STATION (P-464)
REHABILITATION
Unincorporated $100,000
13052 Design Services BADEN SANITARY PUMP STATION (P-118)
REHABILITATION
St. Louis City $100,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $15,000,000
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $159,000,000
12567 Design Services BISSELL POINT WWTF TRICKLING FILTER
PUMP REPLACEMENT
St. Louis City $2,000,000
12105 Construction BRUNSTON SANITARY RELIEF (BRUNSTON
DR TO MATTESE VILLA DR)
St. Louis City And
County
$447,000
12114 Construction
(Supplemental
Appropriation)
CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
Chesterfield $3,200,000
12117 Design Services CELLA SANITARY RELIEF (ROLLING ROCK
LN TO CLAYTON RD)
Ladue $540,000
12851 Design Services CHATHAM MANOR PUMP STATION (P-520)
ELIMINATION
Unincorporated $250,000
13441 Design Services CHRISTOPHER HILLS PUMP STATION (P-468)
REHABILITATION
Unincorporated $100,000
13239 Design Services COLDWATER CREEK WWTF DEMOLITION
ABANDONED GRIT AND PRIMARY
CLARIFIERS TANKS
Unincorporated $100,000
11152 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL
FACILITIES
Various $50,000
11826 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK
TUNNELS
Various $2,900,000
13224 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
SLUDGE TRANSFER FORCEMAINS
Various $2,800,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,000,000
12822 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2025)
Various $2,000,000
12170 Construction FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $10,000,000
12845 Design Services FRIENDSHIP VILLAGE PUMP STATION (P-
516) ELIMINATION
Sunset Hills $540,000
13516 Construction GASLIGHT SQUARE SEWER
IMPROVEMENTS PHASE II
St. Louis City $9,000,000
6 April 2021
Page 3 of 6
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13534 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2024)
Various $1,100,000
13100 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT A
Various $450,000
13101 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT -
FACILITY & SEWER DESIGN (2024)
CONTRACT B
Various $250,000
13105 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT A
Various $75,000
13106 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT B
Various $75,000
13107 GSA -
Geotechnical
CIRP Funds
GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2024) CONTRACT C
Various $75,000
13095 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT - SEWER
AND CHANNEL DESIGN (2024) CONTRACT A
Various $200,000
13113 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT A
Various $50,000
13114 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT B
Various $50,000
13115 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT C
Various $50,000
13116 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT D
Various $50,000
13117 GSA - (Survey)
CIRP Funds
GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2024) CONTRACT E
Various $50,000
12603 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT
ENGINEERING SERVICES 2025 PLUS
BUDGET
Various $400,000
12174 Construction GEYER SANITARY RELIEF (W. MONROE AVE
TO W. ESSEX AVE)
Kirkwood $2,480,000
12176 Construction GLEN ECHO SANITARY RELIEF
(ENGELHOLM AVE TO HENDERSON AVE)
Normandy $1,960,000
12246 Design Services GRAND GLAIZE WET WEATHER PUMP
STATION
Valley Park $671,000
13240 Design Services GRAND GLAIZE WWTF GENERATOR AND
SWITCHGEAR REPLACEMENT
Valley Park $250,000
12281 Construction GRAND NATIONAL SANITARY RELIEF
(GRAND NATIONAL DR TO KNEELAND RD)
Unincorporated $545,000
12261 Land Purchase GRAVOIS CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $2,000,000
6 April 2021
Page 4 of 6
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12261 Design Services GRAVOIS CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $8,015,000
11797 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - DARVER TO 69TH STREET
TRUNK SEWER
Various $2,500,000
11798 Construction
(Supplemental
Appropriation)
HARLEM BADEN RELIEF PHASE IV
(HEBERT) - HODIAMONT TO CHERRY
TRUNK SEWER B
Various $4,200,000
13053 Design Services HARLEM LIFT PUMP STATION (P-104)
REHABILITATION
St. Louis City $100,000
13337 Construction HARMONY-ACORN SEWER SEPARATION
AND I/I REDUCTION PHASE II
Unincorporated $2,000,000
12846 Construction HEIMOS PUMP STATION (P-503) FORCEMAIN
REPLACEMENT
Unincorporated $1,177,000
12999 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2025)
Various $3,000,000
13022 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025) CONTRACT A
Various $5,000,000
13023 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025) CONTRACT B
Various $5,000,000
12991 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2025)
Various $8,000,000
13227 Construction
(Supplemental
Appropriation)
L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
Various $2,871,000
11817 Construction
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $24,440,000
12589 Design Services LEMAY PUBLIC I/I REDUCTION (2026)
CONTRACT A
Various $100,000
11820 Design Services
(Supplemental
Appropriation)
LMRDP CSO STORAGE TUNNEL
(BROADWAY TO RDP TUBES)
St. Louis City $1,000,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
12251 Design Services MACKENZIE CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $3,230,000
13048 Design Services MASTER LIFT 1 PUMP STATION (P-717)
REHABILITATION
Creve Coeur $1,000,000
12850 Design Services MERAMEC BLUFFS (RIVER RIDGE P-501,
PINE TREE ESTATES P-466, AND SUNSET
RIDGE P-504) PUMP STATION ELIMINATIONS
Unincorporated $300,000
10869 Construction MERAMEC BOTTOMS PUMP STATION (P-489)
INTERCEPTOR SEWER
Unincorporated $1,940,000
6 April 2021
Page 5 of 6
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12483 Design Services
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION
St. Louis City $1,200,000
12486 Construction, D
esign-Build
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE IV
St. Louis City $5,000,000
12556 Design Services MISSOURI RIVER WWTF ENGINE
GENERATOR REPLACEMENT
Maryland Heights $1,200,000
12355 Construction MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
Crestwood $3,325,000
12356 Design Services NEW ENGLAND VILLAGE 2 PUMP STATION
(P-496) IMPROVEMENTS
Unincorporated $195,000
12360 Construction
(Supplemental
Appropriation)
NORMANDIE SANITARY RELIEF (PAGE AVE
TO SAINT CHARLES ROCK ROAD)
Unincorporated $4,059,000
12460 Construction OAKLAND COMBINED SEWER DETENTION
AND STORAGE (CLAYTON AVE AND
OAKLAND AVE)
St. Louis City $1,000,000
13406 Design Services ROYAL ARMS CT SANITARY RELIEF Unincorporated $100,000
12196 Construction S GORE AVE SANITARY RELIEF (GRAY AVE
TO OAK TERR)
Webster Groves $550,000
12198 Design Services SALZMAN SANITARY RELIEF (PAGE AVE TO
SALZMAN AVE)
Wellston $210,000
13077 Construction SLUDGE TRANSFER FORCEMAIN - GRAND
GLAIZE WWTF TO FENTON
Various $6,000,000
13076 Construction SLUDGE TRANSFER FORCEMAIN - LOWER
MERAMEC WWTF TO LEMAY WWTF
Various $14,000,000
12628 Construction
(Supplemental
Appropriation)
SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-
736 TO P-750)
Chesterfield $7,500,000
13339 Design Services SUN VALLEY SANITARY RELIEF Unincorporated $350,000
12231 Construction
(Supplemental
Appropriation)
TM-01 TWO MILE CREEK OUTFALL
SANITARY RELIEF
Various $3,469,000
13215 Design Services TOWER GROVE MANCHESTER TUNNEL AND
COLLECTOR SEWERS
St. Louis City $9,600,000
11992 Construction UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12249 Construction
(Supplemental
Appropriation)
UPPER MATTESE TRUNK SANITARY RELIEF
(THEISS RD TO LIBERTY TRAIL RD)
Unincorporated $3,540,000
12440 Design Services
(Supplemental
Appropriation)
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
12266 Design Services WARSON TERRACE SANITARY RELIEF
(FOXBORO RD TO CONWAY RD)
Ladue $70,000
12271 Construction WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
Unincorporated $1,927,000
6 April 2021
Page 6 of 6
WASTEWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
10794 Construction WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $6,000,000
12375 Design Services WHITE PLAINS SANITARY RELIEF (CEDAR
CREEK RD TO E CHESTERFIELD PKY)
Various $335,000
12284 Construction WILSON AVE SANITARY RELIEF (HARRISON
AVE TO CLEVELAND AVE)
Kirkwood $1,100,000
13535 Design Services WWTF SCADA IMPROVEMENTS Various $1,000,000
FUND TOTAL: $423,345,000
GRAND TOTAL:$441,610,000
6 April 2021
Page 1 of 5
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
1101 - GENERAL FUND
11144 Professional
Services
BISSELL - COLDWATER - MISSOURI -
MERAMEC SANITARY SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $650,000
12805 Vendor
Services
CCTV INSPECTION AND PHYSICAL
INSPECTION OF SEWERS (2026)
Various $3,000,000
12909 Vendor
Services
CRITICAL INFRASTRUCTURE ASSESSMENT
AND ASSET INVESTIGATION (2026)
Various $1,700,000
11146 Construction CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
Various $5,000,000
12801 Vendor
Services
FLOW METERING AND MONITORING (2022) Various $2,500,000
13091 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT A
Various $75,000
13092 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT B
Various $75,000
13093 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT C
Various $75,000
13094 Appraisal
Services
GENERAL SERVICES AGREEMENT -
PROPERTY APPRAISAL (2024) CONTRACT D
Various $75,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $220,000
12816 Vendor
Services
RADAR RAINFALL DATA (2025)Various $150,000
11153 Professional
Services
RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $600,000
10766 Vendor
Services
STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
Various $605,000
12807 Vendor
Services
STREAM FLOW WATER QUALITY
SAMPLING (2026)
Various $350,000
FUND TOTAL: $15,075,000
6660 - SANITARY REPLACEMENT FUND
12074 Design Services ADAMS SANITARY RELIEF (BARRETT
STATION RD TO W. MONROE AVE)
Various $2,160,000
12565 Engineering
During
Construction
Services
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $9,000,000
6 April 2021
Page 2 of 5
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12565 Construction,
Design-Build
(Supplemental
Appropriation)
BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
Various $95,000,000
13309 Design Services BISSELL POINT WWTF FINAL CLARIFIER
TANK REHABILITATION
St. Louis City And
County
$860,000
12568 Design Services BISSELL POINT WWTF INFLUENT PUMP
STATION IMPROVEMENTS
St. Louis City $240,000
13308 Design Services BISSELL POINT WWTF PRELIMINARY AND
PRIMARY CONCRETE PRESERVATION
St. Louis City $500,000
13439 Construction BONFILS PUMP STATION (P-784)
REHABILITATION
Unincorporated $1,500,000
12106 Construction BUCKHURST DR TO OAK HILL DR
SANITARY RELIEF
Ellisville $725,000
12123 Design Services CLAYTON ROAD SANITARY RELIEF
(WESTWOOD DR TO CROMWELL DR)
Clayton $218,000
13239 Construction COLDWATER CREEK WWTF DEMOLITION
ABANDONED GRIT AND PRIMARY
CLARIFIERS TANKS
Unincorporated $400,000
12550 Construction COLDWATER CREEK WWTF REPLACEMENT
SLUDGE FORCEMAIN
Various $4,000,000
12549 Design Services COLDWATER CREEK WWTF WAREHOUSE
STORAGE PROJECT
Unincorporated $175,000
13560 Design Services COLDWATER SANITARY RELIEF SECTION B,
C, & D - SECTION B REHABILITATION PHASE
II
Various $400,000
13224 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
SLUDGE TRANSFER FORCEMAINS
Various $1,700,000
11151 Professional
Services
CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION
FACILITIES
Various $4,000,000
12129 Construction CONWAY MEADOWS SANITARY RELIEF
(CONWAY RD TO I-64)
Chesterfield $444,000
12133 Construction COUNTRY HOME DR SANITARY RELIEF
(SUMMITT TREE CT TO AUTUMN PEAK DR)
Unincorporated $1,375,000
12134 Construction COWMIRE CREEK SANITARY
REPLACEMENT I-70 CROSSING (ST.
CHARLES ROCK RD TO MARK TWAIN LN)
Bridgeton $426,000
12629 Design Services CREVE COEUR CREEK (L-52) FORCEMAIN
REHABILITATION (P-718 TO MO RIVER
WWTF)
Maryland Heights $500,000
12431 Design Services CSO - LACLEDE STATION RD AND RANKEN
AVE (I-181/L-131) CSO ELIMINATION
Richmond Heights $179,000
12144 Design Services DARTMOUTH AVENUE SEWER SEPARATION University City $218,000
11833 Design Services DELCREST SANITARY RELIEF Various $394,000
12147 Construction DIETRICH GLEN PUMP STATION (P-525)
IMPROVEMENTS
Unincorporated $300,000
6 April 2021
Page 3 of 5
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12151 Construction DUBRAY SANITARY RELIEF (S. BALLAS RD
TO DUBOIS CT)
Kirkwood $1,250,000
13520 Construction EARLSFIELD SANITARY RELIEF AND
KINGSTON PUMP STATION (P-326)
ELIMINATION
Unincorporated $250,000
12823 Property Rights
Acquisition
EASEMENT ACQUISITION FOR
WASTEWATER PROJECTS (2026)
Various $2,000,000
12168 Design Services FENTON CREEK SANITARY RELIEF
(REMINGTON OAKS TER TO DELEON CT)
Unincorporated $186,000
12170 Construction
(Supplemental
Appropriation)
FENTON WASTEWATER TREATMENT
FACILITY ELIMINATION
Fenton $7,138,000
12182 Construction FOX BRIDGE PUMP STATION (P-484)
STORAGE
Sunset Hills $295,000
13516 Construction
(Supplemental
Appropriation)
GASLIGHT SQUARE SEWER
IMPROVEMENTS PHASE II
St. Louis City $5,500,000
13057 General
Services -
Construction
Inspection
GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2026)
Various $1,700,000
12603 GSA - (Design)
CIRP Funds
GENERAL SERVICES AGREEMENT
ENGINEERING SERVICES 2025 PLUS
BUDGET
Various $1,800,000
13412 Design Services GRAND GLAIZE WWTF BISULFITE STORAGE
AND CHEMICAL FEED FACILITY
Valley Park $460,000
13443 Design Services GRAND GLAIZE WWTF BOSKER SPARE UNIT Valley Park $200,000
12261 Design Services
(Supplemental
Appropriation)
GRAVOIS CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $4,000,000
12292 Design Services GREENTON WAY TO OAKLAWN DR
SANITARY RELIEF
Unincorporated $211,000
12294 Design Services GREGORY COURT SANITARY RELIEF
(TESSON FERRY RD TO SAPPINGTON RD)
St. Louis County $406,000
12369 Design Services HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE II
Richmond Heights $3,696,000
11799 Construction HARLEM BADEN RELIEF PHASE IV
(HEBERT) - SEWER SEPARATION CHERRY
TO 68TH STREET
Various $3,850,000
13000 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS (FACILITIES)
(2026)
Various $3,000,000
13024 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2026) CONTRACT A
Various $5,000,000
13025 Construction INFRASTRUCTURE REPAIRS
(REHABILITATION) (2026) CONTRACT B
Various $5,000,000
6 April 2021
Page 4 of 5
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
12992 Work Order
Repair Costs
(Capital)
INFRASTRUCTURE REPAIRS
(WASTEWATER) (2026)
Various $8,000,000
12313 Design Services JEFFERSON BARRACKS CREEK SANITARY
RELIEF (N. KINSWOOD LN TO S. FRANRU
LN)
Unincorporated $575,000
13047 Design Services KIEFER CREEK PUMP STATION (P-473)
REHABILITATION
Unincorporated $1,000,000
12323 Design Services LAKE FOREST DR SEWER SEPARATION Richmond Heights $572,000
11817 Construction
(Supplemental
Appropriation)
LEMAY NO. 3 PUMP STATION AND FORCE
MAIN
Unincorporated $4,260,000
12589 Construction LEMAY PUBLIC I/I REDUCTION (2026)
CONTRACT A
Various $3,340,000
11109 Professional
Services
LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
Various $270,000
12251 Land Purchase MACKENZIE CREEK WATERSHED
DOWNSTREAM SANITARY STORAGE
FACILITY
Unincorporated $2,000,000
13442 Construction MANORS OF CLARKSON PUMP STATION (P-
727) REHABILITATION
Clarkson Valley $400,000
12340 Design Services MARCO PUMP STATION (P-406)
REPLACEMENT
Kirkwood $195,000
12344 Design Services MARTIGNEY SANITARY RELIEF (KOCH RD
TO WOOD HILL DR)
Unincorporated $1,320,000
12486 Construction,
Design-Build
(Supplemental
Appropriation)
MISSISSIPPI FLOODWALL ORS PUMP
STATIONS REHABILITATION PHASE IV
St. Louis City $3,000,000
13400 Design Services MISSOURI RIVER WWTF FLOOD
PROTECTION AND ACCESS IMPROVEMENTS
Maryland Heights $400,000
12359 Construction NOONING TREE PARK SANITARY RELIEF
(WHITREE LN TO BRIGHTFIELD MANOR DR)
Chesterfield $1,190,000
13338 Design Services OLDE ENGLISH SANITARY RELIEF Unincorporated $1,200,000
12365 Design Services OLIVETTA STREET SEWER SEPARATION University City $560,000
12367 Design Services PIONEER TO FAIRVIEW SANITARY RELIEF Overland $210,000
12441 Design Services
(Supplemental
Appropriation)
RDP TRIBUTARIES (DEER CREEK) CSO
TUNNEL
Various $4,000,000
13440 Design Services RIDER TRAIL NORTH PUMP STATION (P-703)
REHABILITATION
Unincorporated $100,000
12199 Design Services SAPPINGTON SANITARY RELIEF (LIBERTY
TRAIL DR TO OLEANDER DR)
St. Louis City And
County
$223,000
6 April 2021
Page 5 of 5
WASTEWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
13077 Construction
(Supplemental
Appropriation)
SLUDGE TRANSFER FORCEMAIN - GRAND
GLAIZE WWTF TO FENTON
Various $4,100,000
13076 Construction
(Supplemental
Appropriation)
SLUDGE TRANSFER FORCEMAIN - LOWER
MERAMEC WWTF TO LEMAY WWTF
Various $9,300,000
12204 Construction SOUTH COUNTY RELIEF PUMP STATION (P-
419) IMPROVEMENTS
Unincorporated $2,500,000
12219 Construction STRASSNER AVE SANITARY RELIEF (BLACK
CREEK TRUNK TO SWALLOW DR)
Brentwood $2,670,000
12220 Construction SUB-TRUNK #11 SANITARY RELIEF
(BELGROVE DR TO LOTHIAN CIR)
Unincorporated $313,000
11992 Construction
(Supplemental
Appropriation)
UNIVERSITY CITY SANITARY STORAGE
FACILITY
University City $50,000,000
12440 Design Services
(Supplemental
Appropriation)
UPPER RDP (UNIVERSITY CITY) CSO
STORAGE TUNNEL
University City $4,000,000
13049 Design Services UPTON PUMP STATION (P-309)
REHABILITATION
St. Louis City $500,000
12252 Design Services UR-11 BALSON AVENUE SANITARY RELIEF University City $1,000,000
12263 Construction VILLE PATRICIA SANITARY RELIEF (VILLE
ROSA LN TO CAMPUS PARKWAY DR)
Hazelwood $1,180,000
10794 Construction
(Supplemental
Appropriation)
WEBSTER GROVES TRUNK E SANITARY
RELIEF (SKME-628)
Brentwood $5,000,000
12303 Design Services WYDOWN BLVD AND WESTWOOD DR
SANITARY RELIEF
Clayton $97,000
FUND TOTAL: $284,131,000
GRAND TOTAL:$299,206,000
6 April 2021
Page 1 of 1
STORMWATER ENGINEERING PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
$100,000 142
11937 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
$30,000 143
10070 HALL STREET STORM SEWERS $500,000 144
13595 STORMWATER ASSET INVESTIGATIONS (2022)$800,000 145
TOTAL:$1,430,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GENERAL SERVICES AGREEMENT - WATERQUALITY SUPPORT SERVICES (2021)
GSA - (Planning)Operating Fund
5110 - StormwaterRegulatory Fund
WATER QUALITY EXPERTISE IS NEEDED TO SUPPORT THE DISTRICT'SREGULATORY AND LEGAL EFFORTS.
RETAIN ENGINEERING FIRM FOR AS NEEDED WATER QUALITY SUPPORTSERVICES. SERVICES MAY BE RENEWED THROUGH FY2023 BASED ONPERFORMANCE.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 12842
Stormwater
11
$100,000
Various
Various
Various
Asset Management
142Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
GRAVOIS CREEK OMCI STORMWATER DESIGN(CONTRACT F)
Professional Services
5571 - Gravois CreekOMCI Fund
STORMWATER ISSUES EXIST IN AREAS WHERE FUNDING IS AVAILABLE.
DESIGN STREAMBANK STABILIZATION IMPROVEMENTS IN THEGRAVOIS CREEK WATERSHED.
§¨¦270
§¨¦55
§¨¦44
§¨¦55
G R A V OIS R DWATSONRD
LEMA
Y
F
E
R
R
Y
R
D
T ESS O N FERRYRD
MAN C H E S T E R R D
C H I P P E WA BLVD
E M O 3 0 H W Y
S
K
I
R
K
W
O
O
D
R
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11937
Stormwater
16
$30,000
Various
Lemay/RDP
Gravois Creek
Non-recurring
143Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALL STREET STORM SEWERS
Design Services(SupplementalAppropriation)
5120 - DistrictwideStormwater Fund
STREET FLOODING ALONG HALL STREET FROM ADELAIDE TORIVERVIEW DRIVE.
CONSTRUCT 5,500 FEET OF 12-INCH TO 66-INCH STORM SEWER, 523FEET OF 72-INCH TUNNEL, AND 16,800 FEET OF DRAINAGE DITCHALONG HALL STREET.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS$10,920,000.
§¨¦70
§¨¦70
H
A
L
L
UNION
SWITZER
PAR
K
LEE
T E R MIN
A
L
MCLARA
N
ERA
WREN
MIM
I
K
A
SHREV E
THRUS
H
CART
E
R
BEACO
N
C
H
U
R
C
H
NE
W
B
Y
ROB
I
N
TAR
A
COZENS
J E N N I N G S S TA TI ON
RUSKI
N
EMER
S
O
N
CARRI
E
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
ANTA
FE
ADELA
I
D
E
PENR
O
S
E
H
A
R
N
E
Y
S
H
A
N
N
O
N
TAYLO
R
FLO
Y
R
O
S
A
L
I
E
M
C
KIS
S
O
C
K
EUCLI
D
HORNSB
Y
CALVA
R
Y
GERALDINE
WALL
B
U
L
W
E
R
ELIAS
O RIO L E
M E L V I NHORD
P
R
A
N
G
E
FONTAINE
O R A N
ASTO
RIA
SELLS
LEBON
LO
W
E
L
L
FARL
I
N HARRI
S
QUEEN
S
WESC
O
T
T
ATHLO
N
E
ACAC
I
A
AUBER
T
CATALI
N
A
RAFORD
RIVERVIEWDR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10070
Stormwater
11
$500,000
St. Louis City
Bissell
Various
Capital
144Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER ASSET INVESTIGATIONS (2022)
Vendor Services
5120 - DistrictwideStormwater Fund
ACCURATE MAPPING INFORMATION NEEDED TO BETTER ANALYZE THESTORMWATER NETWORK AND ESTIMATE FUTURE MAINTENANCE ANDCAPITAL IMPROVEMENT NEEDS.
VENDOR FIELD INVESTIGATION SERVICES TO UPDATE DISTRICT'SSTORMWATER ASSET INFORMATION. SERVICES MAY BE RENEWEDTHROUGH FY2024 BASED ON PERFORMANCE.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13595
Stormwater
16
$800,000
Various
Various
Various
Asset Management
145Page
2022
6 April 2021
Page 1 of 2
STORMWATER CONSTRUCTION PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
11408 BROADHEAD #921 STORM SEWER $265,000 146
13488 COLDWATER CREEK OMCI REIMBURSEMENTS
PROGRAM
$1,076,519 147
13487 DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
$1,958,164 148
11535 DEKAMAY DRIVE STORM SEWER (MGJB-130)$355,000 149
13474 EASEMENT ACQUISITION FOR DEER CREEK
OMCI PROJECTS (2021)
$350,000 150
13476 EASEMENT ACQUISITION FOR MALINE OMCI
PROJECTS (2021)
$80,000 151
13475 EASEMENT ACQUISITION FOR UNIVERSITY
CITY OMCI PROJECTS (2021)
$95,000 152
11598 ORCHARD AND WINDSOR LANE STORM
SEWER
$250,000 153
10293 RECO AVENUE BANK STABILIZATION $250,000 154
13491 SEMINARY OMCI REIMBURSEMENTS
PROGRAM
$124,292 155
13005 STORMWATER INFRASTRUCTURE REPAIRS
(2022)
$6,000,000 156
13127 STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022)
$2,000,000 157
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
$200,000 158
13490 SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
$149,498 159
13489 UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
$495,049 160
10351 WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
$395,000 161
10351 WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
$486,000 162
6 April 2021
Page 2 of 2
STORMWATER CONSTRUCTION PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
TOTAL:$14,529,522
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
BROADHEAD #921 STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
CHANNEL EROSION AT END OF 30-INCH CMP.
CONSTRUCT 176 FEET OF 30-INCH STORM SEWER.
LAREDO
FARMVIEW
DE
L
R
E
O
TRAMPE
RIO GRANDE
BR
O
A
D
H
E
A
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11408
Stormwater
15
$265,000
Unincorporated
Bissell
Spanish Lake
Capital
146Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
COLDWATER CREEK OMCI REIMBURSEMENTSPROGRAM
Construction, Phase II
5564 - Coldwater CreekOMCI Fund
STORMWATER ISSUES IN THE COLDWATER CREEK OMCI TAXINGSUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THECOLDWATER CREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦70
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13488
Stormwater
15
$1,076,519
Various
Coldwater
Coldwater Creek
Non-recurring
147Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEER CREEK OMCI REIMBURSEMENTS PROGRAM
Construction, Phase II
5566 - Deer CreekOMCI Fund
STORMWATER ISSUES IN THE DEER CREEK OMCI TAXING SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE DEERCREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦270
§¨¦64
§¨¦170
§¨¦64
§¨¦170
OLIVE BLVD
M A N C H E S T E R R D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
WATS O N R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13487
Stormwater
15
$1,958,164
Various
Lemay/RDP
Deer Creek
Non-recurring
148Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
DEKAMAY DRIVE STORM SEWER (MGJB-130)
Construction
5120 - DistrictwideStormwater Fund
FREQUENT STRUCTURAL FLOODING FROM OVERLAND FLOW.
CONSTRUCT 1,050 FEET OF 12-INCH TO 24-INCH STORM SEWER.
RING
E
R
LIN
D
LIN TE
L
DEK
A
M
A
Y
DA
M
A
S
C
U
S
BRIDG
E
R
I
D
G
E
MIL
I
S
S
A
SAPPINGTON BARRACKS
BRID G E T
R
INGFIELD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11535
Stormwater
15
$355,000
Unincorporated
Lemay/RDP
Martigney Creek
Capital
149Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR DEER CREEK OMCIPROJECTS (2021)
Property RightsAcquisition
5566 - Deer CreekOMCI Fund
DEER CREEK OMCI STORMWATER PROJECTS REQUIRE ACQUISITION OFPROPERTY RIGHTS TO ENABLE CONSTRUCTION OF IMPROVEMENTS.
EASEMENT ACQUISITION APPROPRIATION FOR STORMWATERPROJECTS TO BE FUNDED BY THE DEER CREEK OMCI.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦64
§¨¦170
§¨¦64
§¨¦170
OLIVE BLVD
M A N C H E S T E R R DS
L
I
N
D
B
E
R
G
H
B
L
V
D
W ATSO N R D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13474
Stormwater
13
$350,000
Various
Lemay/RDP
Deer Creek
Asset Management
150Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR MALINE OMCIPROJECTS (2021)
Property RightsAcquisition
5576 - Maline CreekOMCI Fund
MALINE OMCI STORMWATER PROJECTS REQUIRE ACQUISITION OFPROPERTY RIGHTS TO ENABLE CONSTRUCTION OF IMPROVEMENTS.
EASEMENT ACQUISITION APPROPRIATION FOR STORMWATERPROJECTS TO BE FUNDED BY THE MALINE OMCI.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦70
§¨¦270
§¨¦170
NATURALBRIDGERD
NLINDBERGHBLV D
RIVERVIEWDR
L I N D B E R G H
LEWISNCLARKBLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13476
Stormwater
13
$80,000
Various
Bissell
Maline Creek
Asset Management
151Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EASEMENT ACQUISITION FOR UNIVERSITY CITYOMCI PROJECTS (2021)
Property RightsAcquisition
5584 - University CityOMCI Fund
UNIVERSITY CITY OMCI STORMWATER PROJECTS REQUIREACQUISITION OF PROPERTY RIGHTS TO ENABLE CONSTRUCTION OFIMPROVEMENTS.
EASEMENT ACQUISITION APPROPRIATION FOR STORMWATERPROJECTS TO BE FUNDED BY THE UNIVERSITY CITY OMCI.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦170
§¨¦70
§¨¦170OLIVE BLVD
ST
C
H
A
R
L
E
S
R
O
C
K
R
D
N
LINDBERGH
BLVD
S
LINDBERGH
BLVD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13475
Stormwater
13
$95,000
Various
Lemay/RDP
University City Branch
Asset Management
152Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
ORCHARD AND WINDSOR LANE STORM SEWER
Construction
5120 - DistrictwideStormwater Fund
YARD AND GARAGE FLOODING.
CONSTRUCT 579 FEET OF 24-INCH STORM SEWER.
GE
Y
E
R
FO
R
E
S
T
OR
C
H
A
R
D
WINDSOR
BOXWOOD
LEMP
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11598
Stormwater
15
$250,000
Kirkwood
Meramec
Meramec Tributary Areas
Capital
153Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
RECO AVENUE BANK STABILIZATION
Construction
5571 - Gravois CreekOMCI Fund
EROSION ALONG PARKING LOTS AND DRIVEWAYS.
CONSTRUCT 595 FEET OF ROCK BLOCK TOE WALL, COMPOSITEREVETMENT, AND HEAVY STONE REVETMENT BANK STABILIZATION.
RECO
SAPPINGTON
S
A
M
O
A
RAYBUR
N
AL
O
H
A
ROSAIRE
R
A
Y
C
R
E
S
T
WESTGL
E
N
TWIN
C
R
E
S
T
B
A
L
I
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10293
Stormwater
15
$250,000
Crestwood
Lemay/RDP
Gravois Creek
Capital
154Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SEMINARY OMCI REIMBURSEMENTS PROGRAM
Construction, Phase II
5593 - Sem Br Of RiverDes Peres OMCI Fund
STORMWATER ISSUES IN THE SEMINARY OMCI TAXING SUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THESEMINARY OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦44EL
M
MA
C
K
E
N
Z
I
E
HEEGE
WEIL
WEBER
LA
C
L
E
D
E
S
T
A
T
I
O
N
GR
A
Y
RO
C
K
H
I
L
L
LOCKWOOD
ED
G
A
R
GO
R
E
P
A
R
D
E
E
VA
L
C
O
U
R
GLENDALE
LANSDOWNE
GRANT
CHESHIRE
RIV
E
R
D
E
S
P
E
R
E
S
UNION P A CI F I C
MA
P
L
E
MURDOCH
EL
T
O
N
TULIP
LI
L
A
C
MA
T
H
I
L
D
A
I
V
Y
JACKSON
STAELYOLDWATSON
SELMA
GRAMO N D
BURLINGTON N O RTHERNSANTAFE
BANCROFT
M
C
C
A
U
S
L
A
N
D
PL
A
N
T
KI
T
JO
Y
VAUK
LUCIA
DA
N
A
VA
S
E
L
VITA
ROSE
JE
F
F
E
R
S
O
N
O A K
GE
N
E
S
T
A
WE
L
L
S
SUN
R
A
Y
P RIVATE
AC
O
R
N
TU R F
S U T HERLAND
FLORENCE
R
A
D
I
O
CO
L
L
E
E
N
PI
L
O
T
SOUTHSIDE
F O R E S T
LA
N
V
A
L
E
ED
E
N
CLARA
HEATHER
EL
G
I
N
S A V I O
BRUNSWICK
AL
M
A
NE
I
E
R
KI
D
D
E
R
PH
I
L
O
YALE
FLAMINGO
BU
L
L
R
U
N
FER
N
A
L
D
DO B B I N
JO
E
L
IDAMOR
L A K E
BR
I
D
L
E
HAZEL
HOSMER
BUSCH
TY
L
E
R
CH
I
V
V
I
S
ME
N
O
L
A
LO
C
K
S
L
E
Y
BU
R
N
T
O
A
K
LA
C
E
Y
NO
R
M
A
L
L
O
U
KIRKY
EWERS
RA
B
E
T
H
WEIL
EL
M
SE
L
M
A
V
A
SEL
G
R
A
N
T
WATSON RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13491
Stormwater
15
$124,292
Various
Lemay/RDP
Seminary Branch
Non-recurring
155Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIRS (2022)
Work Order Repair Costs(Capital)
5120 - DistrictwideStormwater Fund
AGING AND DETERIORATING STORMWATER INFRASTRUCTURE IS INNEED OF REPAIR AND REPLACEMENT.
CONSTRUCT REPAIR OR REPLACEMENT OF STORMWATERINFRASTRUCTURE THROUGHOUT THE DISTRICT.
PROJECT MAY INCLUDE BOTH CAPITAL AND NON-CAPITAL SERVICES.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13005
Stormwater
17
$6,000,000
Various
Various
Various
Asset Management
156Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER INFRASTRUCTURE REPAIRS(REHABILITATION) (2022)
Construction
5120 - DistrictwideStormwater Fund
DETERIORATED AND DAMAGED STORMWATER SEWER LINES CAUSEPIPE COLLAPSES, BLOCKED SEWERS, AND STREET AND YARDFLOODING.
CONSTRUCT CURED-IN-PLACE PIPE INSTALLATION FOR STORMWATERSYSTEM REHABILITATION AND REPAIR, AS NEEDS ARE IDENTIFIED BYSEWER CLEANING AND INSPECTION EFFORTS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13127
Stormwater
15
$2,000,000
Various
Various
Various
Capital
157Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
STORMWATER QUALITY GREENINFRASTRUCTURE - SMALL GRANT RAINSCAPINGPROGRAM
Construction
5110 - StormwaterRegulatory Fund
RAINSCAPING NEEDED TO ADDRESS WATER QUALITY OF STORMWATERRUNOFF THROUGH PUBLIC PARTICIPATION.
SMALL GRANT PROGRAM TO FUND CONSTRUCTION AND ENCOURAGETHE USE OF RAINSCAPING TECHNIQUES BY INDIVIDUALLANDOWNERS.
§¨¦44
§¨¦55
§¨¦64
§¨¦70
§¨¦270
§¨¦170
§¨¦255§¨¦44
§¨¦70
§¨¦55
§¨¦170
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13352
Stormwater
15
$200,000
Various
Various
Various
Non-recurring
158Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
SUGAR CREEK OMCI REIMBURSEMENTSPROGRAM
Construction, Phase II
5583 - Sugar CreekOMCI Fund
STORMWATER ISSUES IN THE SUGAR CREEK OMCI TAXINGSUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THE SUGARCREEK OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦270
GE
Y
E
R
BA
L
L
A
S
ADAMS
U N I O N P A C I F I C CL
A
Y
ESSEX
DE
S
P
E
R
E
S
D O U G H E R T Y F E R R Y
TA
Y
L
O
R
HA
R
R
I
S
O
N
CO
U
C
H
C R A I G
ANN
ROSE HILL
WOODBINE
NIRK
BURLINGTON NORTHERN SAN T A F E
B
A
R
R
E
T
T
S
T
ATION
B OAZ
RU
T
H
B
O
P
P
LARK
EV
A
N
S
ED
N
A
WAY
PEEKESI
M
M
O
N
S
WILSON
L E M P
LEE
M A R S H A L L
VA
N
B
U
R
E
N
HIG
H
L
A
N
D
P I N G R Y
SARAH
THORNHILL
I
R
I
S
MONROE
WO
O
D
G
A
T
E
FR
I
E
D
A
NA
N
A
BA
C
H
TA
L
L
I
E
RA Y N E R
LINWOOD
J E WEL
SPINDLE
S
TGILES
ARGONNE
G A BRIEL
GRAND
KIRKSHIRE
JANET
WESTVIEW
GR
U
P
P
SARALA
L
I
N
D
EM
A
N
FO
L
G
E
R
OGE
PAMELA
KNIERIM
BONR O Y A L
FRANCES
PRIVATE
WINSLOW
NICHOLAS
WINDSOR
MOZA
R
T
LYNKIRK
CLINTON
JEWEL
PRIVATE
BALLAS
U N I O N P A C I F I C
CL
A
Y
HA
R
R
I
S
O
N
PRIVATE TA
Y
L
O
R
JEWEL
TA
Y
L
O
R
M A NCHESTER RD
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13490
Stormwater
15
$149,498
Various
Meramec
Sugar Creek
Non-recurring
159Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
UNIVERSITY CITY OMCI REIMBURSEMENTSPROGRAM
Construction, Phase II
5584 - University CityOMCI Fund
STORMWATER ISSUES IN THE UNIVERSITY CITY OMCI TAXINGSUBDISTRICT.
OFFER STORMWATER GRANTS TO MUNICIPALITIES WITHIN THEUNIVERSITY CITY OMCI.
THIS PROGRAM WILL OFFER GRANT REIMBURSEMENTS TOMUNICIPALITIES TO PROMOTE RESOLUTION OF STORMWATER ISSUES.
§¨¦170
§¨¦64
§¨¦70
§¨¦170OLIVE BLVD
N
LINDBERGH
BLVD
ST
C
H
A
R
L
E
S
R
O
C
K
R
D
S
L
I
N
D
B
E
R
G
H
B
L
V
D
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13489
Stormwater
15
$495,049
Various
Lemay/RDP
University City Branch
Non-recurring
160Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WC-33 LA PADERA - EL CAMARA STORMIMPROVEMENT
Construction
5120 - DistrictwideStormwater Fund
CREEK BANK EROSION ALONG PROPERTIES BETWEEN LA PADERALANE AND EL CAMARA DRIVE.
CONSTRUCT 1,160 LINEAR FEET OF ROCK LINING ANDBIOSTABILIZATION.
PROJECT TO BE SPLIT FUNDED BETWEEN FUNDS 5587 AND 5120. USE OFFUND 5587 WILL BE MAXIMIZED, TO SPEND DOWN THIS OMCI FUNDBALANCE.
E
L
C
A
M
A
R
A
L
A
P
A
D
E
R
A
S
H
E
F
F
I
E
L
D
DALLAVIS
R
E
D
B
A
R
N
S
T
R
A
N
D
E A R LMAR
LAS SOMBRIAS
EL CAMPO
FARM PO
N
D
GLASGOW
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10351
Stormwater
15
$395,000
Unincorporated
Bissell
Watkins Creek
Non-recurring
161Page
2022
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
WC-33 LA PADERA - EL CAMARA STORMIMPROVEMENT
Construction
5587 - Watkins CreekOMCI Fund
CREEK BANK EROSION ALONG PROPERTIES BETWEEN LA PADERALANE AND EL CAMARA DRIVE.
CONSTRUCT 1,160 LINEAR FEET OF ROCK LINING ANDBIOSTABILIZATION.
PROJECT TO BE SPLIT FUNDED BETWEEN FUNDS 5587 AND 5120. USE OFFUND 5587 WILL BE MAXIMIZED, TO SPEND DOWN THIS OMCI FUNDBALANCE.
E
L
C
A
M
A
R
A
L
A
P
A
D
E
R
A
S
H
E
F
F
I
E
L
D
DALLAVIS
R
E
D
B
A
R
N
S
T
R
A
N
D
E A R LMAR
LAS SOMBRIAS
EL CAMPO
FARM PO
N
D
GLASGOW
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10351
Stormwater
15
$486,000
Unincorporated
Bissell
Watkins Creek
Non-recurring
162Page
2022
6 April 2021
Page 1 of 1
STORMWATER CONTINUED PROJECTS - FY22
PROJECT
NUMBER
PROJECT NAME REASON PROJECT CONTINUED COST
ESTIMATE
10880 SIMS AVE STORM BUYOUT PROJECT CONTINUED DUE TO COORDINATION WITH
PROPERTY OWNERS. ANTICIPATE BOARD INTRODUCTION
IN MARCH 2022.
$200,000
11224 TIMBER TRAIL - BRIAR
RIDGE CHANNEL
IMPROVEMENTS
PROJECT CONTINUED DUE TO COORDINATION WITH THE
CITY OF FRONTENAC. ANTICIPATE BOARD
INTRODUCTION IN SEPTEMBER 2021.
$249,000
TOTAL: $449,000
6 April 2021
Page 1 of 1
STORMWATER CONTINGENCY PROJECTS - FY23
PROJECT
NUMBER
PROJECT NAME COST ESTIMATE PAGE
13285 CLAYTON CITY HALL STORM SEWER $1,590,000 163
11179 EVERMAN AVE 9518 STORM SEWER $280,000 164
10070 HALL STREET STORM SEWERS $100,000 165
10070 HALL STREET STORM SEWERS $7,000,000 166
11273 REASOR DRIVE STORM SEWER $465,000 167
TOTAL:$9,435,000
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
CLAYTON CITY HALL STORM SEWER
Construction
5563 - Clayton CentralOMCI Fund
STORM SEWER SURCHARGING AND FLOODING OF A CITY OF CLAYTONPARKING GARAGE UNDERGROUND LEVEL.
CONSTRUCT 360 FEET OF 12-INCH TO 36-INCH STORM SEWER.
PROJECT MAY BE CONSTRUCTED BY THE CITY OF CLAYTON UNDER AFUNDING AGREEMENT WITH THE DISTRICT, DUE TO THE IMPACT ONCITY FACILITIES.
HA
N
L
E
Y
FORSYTH
CE
N
T
R
A
L
MARYLAND
BE
M
I
S
T
O
N
CARONDELET
LI
N
D
E
N
LY
L
E
WESTMORELAND
LY
L
E
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 13285
Stormwater
15
$1,590,000
Clayton
Lemay/RDP
Deer Creek
Capital
163Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
EVERMAN AVE 9518 STORM SEWER
Construction
5564 - Coldwater CreekOMCI Fund
YARD FLOODING, PONDING, AND BASEMENT FLOODING.
CONSTRUCT 500 FEET OF 15-INCH TO 18-INCH STORM SEWER.
HO
O
D
BU
R
N
S
MILTON
TENNYSON
SP
E
N
C
E
R
EVERMAN
MARLOWE
WA
L
L
I
S
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11179
Stormwater
15
$280,000
Overland
Coldwater
Coldwater Creek
Non-recurring
164Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALL STREET STORM SEWERS
Engineering DuringConstruction Services
5120 - DistrictwideStormwater Fund
STREET FLOODING ALONG HALL STREET FROM ADELAIDE TORIVERVIEW DRIVE.
CONSTRUCT 5,500 FEET OF 12-INCH TO 66-INCH STORM SEWER, 523FEET OF 72-INCH TUNNEL, AND 16,800 FEET OF DRAINAGE DITCHALONG HALL STREET.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS$10,920,000.
§¨¦70
§¨¦70
H
A
L
L
UNION
SWITZER
PAR
K
LEE
T E R MIN
A
L
MCLARA
N
ERA
WREN
MIM
I
K
A
SHREV E
THRUS
H
CART
E
R
BEACO
N
C
H
U
R
C
H
NE
W
B
Y
ROB
I
N
TAR
A
COZENS
J E N N I N G S S TA TI ON
RUSKI
N
EMER
S
O
N
CARRI
E
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
ANTA
FE
ADELA
I
D
E
PENR
O
S
E
H
A
R
N
E
Y
S
H
A
N
N
O
N
TAYLO
R
FLO
Y
R
O
S
A
L
I
E
M
C
KIS
S
O
C
K
EUCLI
D
HORNSB
Y
CALVA
R
Y
GERALDINE
WALL
B
U
L
W
E
R
ELIAS
O RIO L E
M E L V I NHORD
P
R
A
N
G
E
FONTAINE
O R A N
ASTO
RIA
SELLS
LEBON
LO
W
E
L
L
FARL
I
N HARRI
S
QUEEN
S
WESC
O
T
T
ATHLO
N
E
ACAC
I
A
AUBER
T
CATALI
N
A
RAFORD
RIVERVIEWDR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10070
Stormwater
11
$100,000
St. Louis City
Bissell
Various
Capital
165Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
HALL STREET STORM SEWERS
Construction
5120 - DistrictwideStormwater Fund
STREET FLOODING ALONG HALL STREET FROM ADELAIDE TORIVERVIEW DRIVE.
CONSTRUCT 5,500 FEET OF 12-INCH TO 66-INCH STORM SEWER, 523FEET OF 72-INCH TUNNEL, AND 16,800 FEET OF DRAINAGE DITCHALONG HALL STREET.
PROJECT RECEIVES PARTIAL FUNDING / SUPPLEMENTALAPPROPRIATION IN FY 24. TOTAL CONSTRUCTION BUDGET IS$10,920,000.
§¨¦70
§¨¦70
H
A
L
L
UNION
SWITZER
PAR
K
LEE
T E R MIN
A
L
MCLARA
N
ERA
WREN
MIM
I
K
A
SHREV E
THRUS
H
CART
E
R
BEACO
N
C
H
U
R
C
H
NE
W
B
Y
ROB
I
N
TAR
A
COZENS
J E N N I N G S S TA TI ON
RUSKI
N
EMER
S
O
N
CARRI
E
B
U
R
L
I
N
G
T
O
N
N
O
R
T
H
E
R
N
S
ANTA
FE
ADELA
I
D
E
PENR
O
S
E
H
A
R
N
E
Y
S
H
A
N
N
O
N
TAYLO
R
FLO
Y
R
O
S
A
L
I
E
M
C
KIS
S
O
C
K
EUCLI
D
HORNSB
Y
CALVA
R
Y
GERALDINE
WALL
B
U
L
W
E
R
ELIAS
O RIO L E
M E L V I NHORD
P
R
A
N
G
E
FONTAINE
O R A N
ASTO
RIA
SELLS
LEBON
LO
W
E
L
L
FARL
I
N HARRI
S
QUEEN
S
WESC
O
T
T
ATHLO
N
E
ACAC
I
A
AUBER
T
CATALI
N
A
RAFORD
RIVERVIEWDR
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 10070
Stormwater
15
$7,000,000
St. Louis City
Bissell
Various
Capital
166Page
2023
FISCAL YEAR:
Description of Problem/Issue
Scope of Project
Comments/Remarks
Metropolitan St. Louis Sewer District
TASK NO:
TASK NAME:
BUDGET:
FUND:
MUNICIPALITY:
MAJOR SERVICE AREA:
WATERSHED:
PROJECT TYPE:
EXPENSE TYPE:
REASOR DRIVE STORM SEWER
Construction
5564 - Coldwater CreekOMCI Fund
MISCELLANEOUS STRUCTURE AND YARD FLOODING.
CONSTRUCT 870 FEET OF 15-INCH TO 24-INCH STORM SEWER.
FROST
BUCKEYE
REASOR
CADY
DRUMMOND
WHITE
VIERL
I
N
G
HENTSCHEL
§¨¦ 64
§¨¦ 44
§¨¦ 55
§¨¦ 64
§¨¦ 70
§¨¦270
§¨¦170
§¨¦255§¨¦ 44
§¨¦ 70
PROJECT NO: 11273
Stormwater
15
$465,000
Various
Bissell
Maline Creek
Capital
167Page
2023
6 April 2021
Page 1 of 3
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
11408 Construction BROADHEAD #921 STORM SEWER Unincorporated $265,000
11535 Construction DEKAMAY DRIVE STORM SEWER (MGJB-
130)
Unincorporated $355,000
10070 Design Services
(Supplemental
Appropriation)
HALL STREET STORM SEWERS St. Louis City $500,000
11598 Construction ORCHARD AND WINDSOR LANE STORM
SEWER
Kirkwood $250,000
13595 Vendor
Services
STORMWATER ASSET INVESTIGATIONS
(2022)
Various $800,000
13005 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2022)
Various $6,000,000
13127 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022)
Various $2,000,000
10351 Construction WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
Unincorporated $395,000
FUND TOTAL: $10,565,000
5564 - COLDWATER CREEK OMCI FUND
13488 Construction,
Phase II
COLDWATER CREEK OMCI
REIMBURSEMENTS PROGRAM
Various $1,076,519
FUND TOTAL: $1,076,519
5566 - DEER CREEK OMCI FUND
13487 Construction,
Phase II
DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $1,958,164
13474 Property Rights
Acquisition
EASEMENT ACQUISITION FOR DEER CREEK
OMCI PROJECTS (2021)
Various $350,000
11224 Construction TIMBER TRAIL - BRIAR RIDGE CHANNEL
IMPROVEMENTS
Frontenac $249,000
6 April 2021
Page 2 of 3
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $2,557,164
5571 - GRAVOIS CREEK OMCI FUND
11937 Professional
Services
GRAVOIS CREEK OMCI STORMWATER
DESIGN (CONTRACT F)
Various $30,000
10293 Construction RECO AVENUE BANK STABILIZATION Crestwood $250,000
FUND TOTAL: $280,000
5576 - MALINE CREEK OMCI FUND
13476 Property Rights
Acquisition
EASEMENT ACQUISITION FOR MALINE
OMCI PROJECTS (2021)
Various $80,000
FUND TOTAL: $80,000
5583 - SUGAR CREEK OMCI FUND
13490 Construction,
Phase II
SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $149,498
FUND TOTAL: $149,498
5584 - UNIVERSITY CITY OMCI FUND
13475 Property Rights
Acquisition
EASEMENT ACQUISITION FOR UNIVERSITY
CITY OMCI PROJECTS (2021)
Various $95,000
10880 Land Purchase SIMS AVE STORM BUYOUT Overland $200,000
13489 Construction,
Phase II
UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
Various $495,049
FUND TOTAL: $790,049
5587 - WATKINS CREEK OMCI FUND
10351 Construction WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
Unincorporated $486,000
FUND TOTAL: $486,000
5593 - SEM BR OF RIVER DES PERES OMCI FUND
13491 Construction,
Phase II
SEMINARY OMCI REIMBURSEMENTS
PROGRAM
Various $124,292
FUND TOTAL: $124,292
6 April 2021
Page 3 of 3
STORMWATER PROJECTS - FY22
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
GRAND TOTAL:$16,408,522
6 April 2021
Page 1 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
12842 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
10070 Engineering
During
Construction
Services
HALL STREET STORM SEWERS St. Louis City $100,000
10070 Construction HALL STREET STORM SEWERS St. Louis City $7,000,000
11530 Construction LARIMORE STORM SEWER Unincorporated $3,000,000
13595 Vendor
Services
STORMWATER ASSET INVESTIGATIONS
(2022)
Various $800,000
13006 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2023)
Various $4,000,000
13128 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2023)
Various $3,000,000
FUND TOTAL: $17,900,000
5563 - CLAYTON CENTRAL OMCI FUND
13285 Construction CLAYTON CITY HALL STORM SEWER Clayton $1,590,000
FUND TOTAL: $1,590,000
5564 - COLDWATER CREEK OMCI FUND
13488 Construction,
Phase II
COLDWATER CREEK OMCI
REIMBURSEMENTS PROGRAM
Various $1,076,519
11179 Construction EVERMAN AVE 9518 STORM SEWER Overland $280,000
10895 Construction FAIRWAY CT 3901 BANK STABILIZATION St. Ann $265,000
11325 Construction NORTH NEW FLORISSANT - FOX RUN
STORM SEWER
Florissant $614,000
11273 Construction REASOR DRIVE STORM SEWER Various $465,000
6 April 2021
Page 2 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11133 Construction SHERWOOD DR. #2790 STORM SEWER Unincorporated $228,000
FUND TOTAL: $2,928,519
5565 - CREVE COEUR FRONTENAC OMCI FUND
12940 Design Services CLERBROOK LANE STORM SEWER (LADUE
1608.03)
Ladue $80,000
FUND TOTAL: $80,000
5566 - DEER CREEK OMCI FUND
12911 Construction BALLAS MEADOWS DR 12403 STORM
SEWER IMPROVEMENTS
Des Peres $131,000
11176 Construction BALLAS RD. - BALWYCK LN. BANK
STABILIZATION
Des Peres $285,000
12469 Construction BEAUCAIRE DRIVE - MARK DRIVE -
MONACO DRIVE STORM SEWER
Warson Woods $490,000
12703 Construction DANIEL ROAD STORM SEWER RELIEF Ladue $477,000
11205 Construction DEARBORN DR STORM SEWER Warson Woods $225,000
13487 Construction,
Phase II
DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $1,958,164
10587 Construction EAST ESSEX AVE 802 - 804 STORM SEWER Glendale $290,000
11226 Construction FIRETHORN DR 2050 STORM
IMPROVEMENTS
Frontenac $440,000
11471 Construction HIGHGATE - ENFIELD STORM SEWER Olivette $370,000
12900 Construction LITZSINGER #10412 STORM SEWER
IMPROVEMENTS
Frontenac $165,000
11972 Construction MEADOW CREEK LN 508 STORM SEWER Warson Woods $118,000
11034 Construction OUTER LADUE AND CHIPPER STORM
SEWER
Frontenac $770,000
10310 Construction QUAILWAYS DR. #8 CHANNEL
IMPROVEMENTS
Creve Coeur $543,000
11161 Construction WHITEHALL CT - PINE AVE STORM SEWER Brentwood $270,000
FUND TOTAL: $6,532,164
5571 - GRAVOIS CREEK OMCI FUND
13457 Design Services SANDERS DRIVE 1009 STORM SEWER Crestwood $100,000
6 April 2021
Page 3 of 3
STORMWATER PROJECTS - FY23
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
FUND TOTAL: $100,000
5576 - MALINE CREEK OMCI FUND
11286 Construction BALLMAN DRIVE 300 BLOCK STORM
SEWER
Ferguson $650,000
10394 Construction DENNIS AND KAPPEL STORM SEWER Unincorporated $415,000
11277 Construction LONGFORD DRIVE 1851 STORM SEWER Unincorporated $85,000
FUND TOTAL: $1,150,000
5583 - SUGAR CREEK OMCI FUND
13490 Construction,
Phase II
SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
Various $149,498
FUND TOTAL: $149,498
5584 - UNIVERSITY CITY OMCI FUND
11314 Construction GLENMARY TO WHITE ROSE STORM
IMPROVEMENTS
Olivette $440,000
11313 Construction TRENTON AVE 9400 BLOCK CHANNEL
IMPROVEMENTS
Overland $386,000
13489 Construction,
Phase II
UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
Various $495,049
FUND TOTAL: $1,321,049
5593 - SEM BR OF RIVER DES PERES OMCI FUND
13491 Construction,
Phase II
SEMINARY OMCI REIMBURSEMENTS
PROGRAM
Various $124,292
FUND TOTAL: $124,292
5594 - BLACK CREEK SUBD #455 OMCI FUND
11472 Construction BILTMORE DR AND BEMISTON AVE STORM
SEWER
Clayton $165,000
11001 Design Services DAYTONA DRIVE STORM SEWER
IMPROVEMENTS
Clayton $60,000
FUND TOTAL: $225,000
GRAND TOTAL:$32,400,522
6 April 2021
Page 1 of 1
STORMWATER PROJECTS - FY24
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
10070 Construction
(Supplemental
Appropriation)
HALL STREET STORM SEWERS St. Louis City $3,920,000
13595 Vendor
Services
STORMWATER ASSET INVESTIGATIONS
(2022)
Various $800,000
13007 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2024)
Various $5,000,000
13129 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2024)
Various $4,000,000
FUND TOTAL: $13,720,000
GRAND TOTAL:$14,020,000
6 April 2021
Page 1 of 2
STORMWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
13008 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2025)
Various $5,000,000
13130 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2025)
Various $4,000,000
FUND TOTAL: $9,000,000
5564 - COLDWATER CREEK OMCI FUND
12745 Construction N WATERFORD 2735 STORM
IMPROVEMENTS
Florissant $84,000
FUND TOTAL: $84,000
5565 - CREVE COEUR FRONTENAC OMCI FUND
12940 Construction CLERBROOK LANE STORM SEWER (LADUE
1608.03)
Ladue $120,000
FUND TOTAL: $120,000
5566 - DEER CREEK OMCI FUND
12940 Construction CLERBROOK LANE STORM SEWER (LADUE
1608.03)
Ladue $120,000
FUND TOTAL: $120,000
5571 - GRAVOIS CREEK OMCI FUND
13457 Construction SANDERS DRIVE 1009 STORM SEWER Crestwood $370,000
FUND TOTAL: $370,000
5576 - MALINE CREEK OMCI FUND
6 April 2021
Page 2 of 2
STORMWATER PROJECTS - FY25
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
11185 Construction KATHLYN AND LEITH STORM SEWERS Berkeley $78,000
11289 Construction KINCAID AVENUE STORM SEWER St. John $68,000
11296 Construction NEWELL AND NOAH DRIVE STORM SEWER Ferguson $101,000
11294 Construction TIFFIN AVE TO WESLEY AVE STORM
IMPROVEMENTS
Ferguson $90,000
FUND TOTAL: $337,000
5583 - SUGAR CREEK OMCI FUND
11332 Construction CULLODEN ROAD 819 - 827 STORM SEWER Kirkwood $111,000
10872 Construction NORTH GEYER AND VILLA GARDEN STORM
SEWER
Kirkwood $39,000
FUND TOTAL: $150,000
5594 - BLACK CREEK SUBD #455 OMCI FUND
11001 Construction DAYTONA DRIVE STORM SEWER
IMPROVEMENTS
Clayton $193,000
FUND TOTAL: $193,000
GRAND TOTAL:$10,674,000
6 April 2021
Page 1 of 1
STORMWATER PROJECTS - FY26
PROJECT
NUMBER
TASK DESC PROJECT NAME MUNICIPALITY COST
ESTIMATE
5110 - STORMWATER REGULATORY FUND
13299 GSA -
(Planning)
Operating Fund
GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2024)
Various $100,000
13352 Construction STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
Various $200,000
FUND TOTAL: $300,000
5120 - DISTRICTWIDE STORMWATER FUND
13009 Work Order
Repair Costs
(Capital)
STORMWATER INFRASTRUCTURE REPAIRS
(2026)
Various $5,000,000
13131 Construction STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2026)
Various $4,000,000
FUND TOTAL: $9,000,000
5566 - DEER CREEK OMCI FUND
11168 Construction BRIARBROOK TRAIL STORM SEWER Des Peres $212,800
11164 Construction LAWNWOOD DR. #1442 STORM SEWER Des Peres $92,000
FUND TOTAL: $304,800
GRAND TOTAL:$9,604,800
6 April 2021
Page 1 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12173 FISHPOT TRUNK WEST AND ED LOU LANE I/I
REDUCTION (SMITH DR AND VLASIS DR)
WASTEWATER BALLWIN 91
12272 GRAND GLAIZE TRUNK SANITARY RELIEF
(BALLWIN GOLF CLUB TO CLAYMONT COVE
CT)
WASTEWATER BALLWIN 93
12364 OAKWOOD FARMS PUMP STATION (P-470)
ELIMINATION
WASTEWATER BALLWIN 112
12140 CSO - MARY AVENUE SOUTH OF MANCHESTER
CSO INTERCEPTOR (I-132)/OUTFALL (L-106)
ELIMINATION PHASE II
WASTEWATER BRENTWOOD 16
13597 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE IB
WASTEWATER BRENTWOOD 94
12114 CAULKS CREEK PUMP STATION B (P-751)
RELOCATION
WASTEWATER CHESTERFIELD 8
12248 CAULKS CREEK A PUMP STATION (P-750)
IMPROVEMENTS
WASTEWATER CHESTERFIELD 77
12628 SPIRIT 2 FORCEMAIN IMPROVEMENTS (P-736 TO
P-750)
WASTEWATER CHESTERFIELD 57
13568 CLAYTON MERAMEC ELEMENTARY PRIVATE
I/I REMOVAL (S. MERAMEC AVE AT WALINCA
TER)
WASTEWATER CLAYTON 78
10293 RECO AVENUE BANK STABILIZATION STORMWATER CRESTWOOD 154
12355 MULBERRY CREEK SANITARY RELIEF
(HARWICH DR TO S LINDBERGH BLVD)
WASTEWATER CRESTWOOD 50
12202 SMITH CREEK LADUE ROAD SANITARY RELIEF
(ROYAL MANOR DR TO HEWLETT CT)
WASTEWATER CREVE COEUR 56
13623 SPOEDE ROAD SANITARY SEWER
IMPROVEMENTS
WASTEWATER CREVE COEUR 58
12242 UPPER FISHPOT EAST SANITARY RELIEF (FIELD
AVE TO WOLFF LN)
WASTEWATER ELLISVILLE 64
6 April 2021
Page 2 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12108 BURNING TREE INFRASTRUCTURE REPAIR (N.
WATERFORD DR TO FOX RUN DR)
WASTEWATER FLORISSANT 7
12213 ST. JACQUES SANITARY RELIEF (ST. JACQUES
ST TO N LAFAYETTE ST)
WASTEWATER FLORISSANT 118
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
WASTEWATER HAZELWOOD 75
12753 CAREY CT 1664 SANITARY AND STORM SEWER
REPLACEMENT
WASTEWATER HAZELWOOD 76
11598 ORCHARD AND WINDSOR LANE STORM SEWER STORMWATER KIRKWOOD 153
12130 CONWAY ROAD SANITARY RELIEF (CONWAY
LN TO DWYER AVE)
WASTEWATER LADUE 14
12472 DC-02 & DC-03 SANITARY RELIEF (BRENTWOOD
BLVD TO CONWAY RD) PHASE III AND PHASE
IV
WASTEWATER LADUE 83
13446 CLAYTON RD 9925 SANITARY SEWER
REPLACEMENT
WASTEWATER LADUE 79
13222 MISSOURI RIVER WWTF DIGESTER GAS
STORAGE COVER REPLACEMENT
WASTEWATER MARYLAND
HEIGHTS
111
12110 CANTERBURY AND ROLAND SANITARY RELIEF
(NELSON DR TO ROLAND BLVD)
WASTEWATER NORTHWOODS 73
12110 CANTERBURY AND ROLAND SANITARY RELIEF
(NELSON DR TO ROLAND BLVD)
WASTEWATER NORTHWOODS 74
12368 PRICE TO PIONEER SANITARY RELIEF WASTEWATER OLIVETTE 113
12300 WOODSON SANITARY RELIEF (FLORA AVE TO
LACKLAND RD)
WASTEWATER OVERLAND 68
11737 ELTORA WET WEATHER STORAGE FACILITY WASTEWATER PAGEDALE 19
6 April 2021
Page 3 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12346 MCCUTCHEON RD AND THORNDELL SANITARY
RELIEF
WASTEWATER RICHMOND
HEIGHTS
49
12141 CSO - SHREWSBURY AVE CSO INTERCEPTOR (I-
293)/OUTFALL (L-166) SEWER SEPARATION
WASTEWATER SHREWSBURY 17
12615 DEER CREEK SANITARY TUNNEL (CLAYTON RD
TO RDP) - PUMP STATION
WASTEWATER SHREWSBURY 84
12214 ST. JOACHIM'S SANITARY RELIEF (ST.
GENEVIEVE LN TO LYNROS DR)
WASTEWATER ST. ANN 59
12217 ST. MATTHIAS SANITARY RELIEF (ST. SHAWN
LN TO STONEHARD DR)
WASTEWATER ST. ANN 61
10070 HALL STREET STORM SEWERS STORMWATER ST. LOUIS CITY 144
10641 HARLEM - BADEN RELIEF PHASE IV (HEBERT)
BUILDING DEMOLITION AND DESIGN
WASTEWATER ST. LOUIS CITY 39
10756 SOUTH BROADWAY AT MERAMEC COMBINED
SEWER REPLACEMENT
WASTEWATER ST. LOUIS CITY 116
12566 BISSELL POINT WWTF TRICKLING FILTER
MEDIA REPLACEMENT
WASTEWATER ST. LOUIS CITY 72
12740 DOLAN PLACE AND GRANDVIEW PLACE
COMBINED SEWER RELIEF
WASTEWATER ST. LOUIS CITY 85
12741 LOUISVILLE AVENUE AND OAKLAND AVENUE
COMBINED SEWER RELIEF
WASTEWATER ST. LOUIS CITY 101
12847 BADEN CITYSHED MITIGATION BASINS
(CALVARY, FREDERIK, PARTRIDGE AND
TILLIE) - SEPARATION SEWERS
WASTEWATER ST. LOUIS CITY 69
12922 WATKINS CREEK PUMP STATION (P-101)
FORCEMAIN REPLACEMENT (COAL BANK RD
TO SPRING GARDEN DR)
WASTEWATER ST. LOUIS CITY 123
13046 FILLMORE PUMP STATION (P-308)
REHABILITATION
WASTEWATER ST. LOUIS CITY 20
6 April 2021
Page 4 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13292 WASHINGTON TERRACE 14 SEWER
REPLACEMENT
WASTEWATER ST. LOUIS CITY 122
12299 HAWTHORNE ESTATES SANITARY RELIEF
(RANCH LN TO CLAYTON HILLS LN)
WASTEWATER TOWN AND
COUNTRY
40
10012 FF-07 FEE FEE CREEK SANITARY RELIEF
(MEADOWSIDE DR TO WILLOW BROOK DR)
WASTEWATER UNINCORPORAT
ED
90
10161 SCHUETZ ROAD SANITARY RELIEF (FOREST
BROOK LN TO SUNNY WOOD CT)
WASTEWATER UNINCORPORAT
ED
114
10351 WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
STORMWATER UNINCORPORAT
ED
161
10351 WC-33 LA PADERA - EL CAMARA STORM
IMPROVEMENT
STORMWATER UNINCORPORAT
ED
162
11408 BROADHEAD #921 STORM SEWER STORMWATER UNINCORPORAT
ED
146
11535 DEKAMAY DRIVE STORM SEWER (MGJB-130) STORMWATER UNINCORPORAT
ED
149
11669 SUB-TRUNK #3 SANITARY RELIEF (MURIEL DR
TO JENNER LN)
WASTEWATER UNINCORPORAT
ED
120
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
41
11711 JEFFERSON BARRACKS TUNNEL (LEMAY WWTP
TO MARTIGNEY PS)
WASTEWATER UNINCORPORAT
ED
99
6 April 2021
Page 5 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11724 COLDWATER SANITARY RELIEF SECTION B, C
& D - SECTION B REHABILITATION
WASTEWATER UNINCORPORAT
ED
80
11943 LINDBERGH SANITARY RELIEF (MEADOWSIDE
DR TO N LINDBERGH BLVD)
WASTEWATER UNINCORPORAT
ED
43
12079 ARV ELLEN SANITARY RELIEF (TESSON CREEK
ESTATES DR TO MADAFORD LN)
WASTEWATER UNINCORPORAT
ED
1
12153 EARTH CITY EXPRESSWAY PUMP STATION (P-
708) REPLACEMENT
WASTEWATER UNINCORPORAT
ED
86
12166 FENTON CREEK PUMP STATION (P-425)
IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
89
12212 ST. GEORGE CREEK SANITARY RELIEF (DAISY
LN TO GRAVOIS RD TO NEW HAMPSHIRE AVE)
WASTEWATER UNINCORPORAT
ED
117
12221 SUB-TRUNK #2 SANITARY RELIEF
(BIRMINGHAM CT TO COVE LN)
WASTEWATER UNINCORPORAT
ED
119
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
47
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
48
12255 LOWER MERAMEC WWTF EXPANSION PHASE II WASTEWATER UNINCORPORAT
ED
107
12271 WATKINS-SPANISH SANITARY RELIEF
(MALAGA ST TO TRAMPE AVE)
WASTEWATER UNINCORPORAT
ED
65
6 April 2021
Page 6 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12326 DANIEL BOONE - LAWNVIEW CREEK I/I
REDUCTION
WASTEWATER UNINCORPORAT
ED
18
12360 NORMANDIE SANITARY RELIEF (PAGE AVE TO
SAINT CHARLES ROCK ROAD)
WASTEWATER UNINCORPORAT
ED
51
12491 WATKINS CREEK PUMP STATION (P-101)
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
124
13082 LOWER MERAMEC WWTF FITTING
REPLACEMENT
WASTEWATER UNINCORPORAT
ED
108
13407 LOWER MERAMEC WWTF - SOLIDS HANDLING
EQUIPMENT REPLACEMENT
WASTEWATER UNINCORPORAT
ED
105
13408 LOWER MERAMEC WWTF - INFLUENT PUMP
STATION IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
104
13409 LOWER MERAMEC WWTF - ADMINISTRATION
BUILDING FACILITY IMPROVEMENTS
WASTEWATER UNINCORPORAT
ED
103
13518 LOWER MERAMEC WWTF CORROSION AND
HUMIDITY CONTROL IMPROVEMENTS PHASE II
WASTEWATER UNINCORPORAT
ED
106
13599 EARTH CITY UPS PUMP STATION (P-702)
REPLACEMENT PHASE II
WASTEWATER UNINCORPORAT
ED
87
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
WASTEWATER VARIOUS 110
10024 MC-02 WATSON TO EDGAR RD SANITARY
RELIEF (SKME-580A)
WASTEWATER VARIOUS 109
10766 STREAM FLOW GAUGE OPERATION AND
MAINTENANCE (USGS)
UNALLOCATED VARIOUS 62
6 April 2021
Page 7 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 44
11109 LOWER & MIDDLE RDP CSO CONTROLS
SYSTEM IMPROVEMENTS (WATERSHED
CONSULTANT)
WASTEWATER VARIOUS 45
11146 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE
WASTEWATER VARIOUS 81
11151 CONSTRUCTION MANAGEMENT SERVICES -
TANK/TREATMENT/PUMP STATION FACILITIES
WASTEWATER VARIOUS 13
11152 CONSTRUCTION MANAGEMENT SERVICES -
LOWER AND MIDDLE RDP TUNNEL FACILITIES
WASTEWATER VARIOUS 11
11153 RDP TRIBUTARIES & UPPER RDP CSO
CONTROLS & LOWER MERAMEC SYSTEM
IMPROVEMENTS (WATERSHED CONSULTANT)
WASTEWATER VARIOUS 54
11701 PUMP STATION REPLACEMENT PROJECTS
(PHASE I)
WASTEWATER VARIOUS 52
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 46
11746 LOWER MERAMEC RIVER SYSTEM
IMPROVEMENTS - BAUMGARTNER TO FENTON
WWTF TUNNEL
WASTEWATER VARIOUS 102
11826 CONSTRUCTION MANAGEMENT SERVICES -
LOWER MERAMEC AND DEER CREEK TUNNELS
WASTEWATER VARIOUS 12
11937 GRAVOIS CREEK OMCI STORMWATER DESIGN
(CONTRACT F)
STORMWATER VARIOUS 143
12000 CCTV INSPECTION AND PHYSICAL INSPECTION
OF SEWERS (2020)
WASTEWATER VARIOUS 9
12004 STREAM FLOW WATER QUALITY SAMPLING
(2020)
UNALLOCATED VARIOUS 63
12006 RADAR RAINFALL DATA (2020)WASTEWATER VARIOUS 53
6 April 2021
Page 8 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12175 GEYER SANITARY RELIEF AND WINDSOR
SPRINGS P-521 STORAGE (BIG BEND BLVD TO
WINDSOR SPRINGS DR)
WASTEWATER VARIOUS 92
12201 SHREWSBURY SANITARY RELIEF SEWER AND
I/I REDUCTION (WEIL AVE AND I-44)
WASTEWATER VARIOUS 115
12334 HAMPTON CREEK SANITARY RELIEF (DEER
CREEK TRUNK TO OXFORD DR) PHASE I
WASTEWATER VARIOUS 38
12387 GENERAL SERVICES AGREEMENT -
CONSTRUCTION MANAGEMENT (2022)
WASTEWATER VARIOUS 22
12565 BISSELL & LEMAY WWTF FLUIDIZED BED
INCINERATORS
WASTEWATER VARIOUS 2
12584 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT A
WASTEWATER VARIOUS 70
12586 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT D
WASTEWATER VARIOUS 4
12587 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT E
WASTEWATER VARIOUS 5
12590 LEMAY PUBLIC I/I REDUCTION AND
REHABILITATION (2022) CONTRACT A
WASTEWATER VARIOUS 100
12801 FLOW METERING AND MONITORING (2022) WASTEWATER VARIOUS 21
12819 EASEMENT ACQUISITION FOR WASTEWATER
PROJECTS (2022)
WASTEWATER VARIOUS 88
12842 GENERAL SERVICES AGREEMENT - WATER
QUALITY SUPPORT SERVICES (2021)
STORMWATER VARIOUS 142
12894 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2018) CONTRACT B
WASTEWATER VARIOUS 23
12907 CRITICAL INFRASTRUCTURE ASSESSMENT AND
ASSET INVESTIGATION (2020)
WASTEWATER VARIOUS 15
6 April 2021
Page 9 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
12988 INFRASTRUCTURE REPAIRS (WASTEWATER)
(2022)
WASTEWATER VARIOUS 98
12996 INFRASTRUCTURE REPAIRS (FACILITIES) (2022) WASTEWATER VARIOUS 95
13005 STORMWATER INFRASTRUCTURE REPAIRS
(2022)
STORMWATER VARIOUS 156
13016 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2022) CONTRACT A
WASTEWATER VARIOUS 96
13017 INFRASTRUCTURE REPAIRS (REHABILITATION)
(2022) CONTRACT B
WASTEWATER VARIOUS 97
13031 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2022) CONTRACT B
WASTEWATER VARIOUS 71
13033 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT C
WASTEWATER VARIOUS 3
13078 CSO VOLUME REDUCTION GREEN
INFRASTRUCTURE - RIVER DES PERES
WASTEWATER VARIOUS 82
13087 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT A
UNALLOCATED VARIOUS 29
13088 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT B
UNALLOCATED VARIOUS 30
13089 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT C
UNALLOCATED VARIOUS 31
13090 GENERAL SERVICES AGREEMENT - PROPERTY
APPRAISAL (2021) CONTRACT D
UNALLOCATED VARIOUS 32
13098 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2022) CONTRACT A
WASTEWATER VARIOUS 24
13099 GENERAL SERVICES AGREEMENT - FACILITY &
SEWER DESIGN (2022) CONTRACT B
WASTEWATER VARIOUS 25
6 April 2021
Page 10 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13102 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT A
WASTEWATER VARIOUS 26
13103 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT B
WASTEWATER VARIOUS 27
13104 GENERAL SERVICES AGREEMENT -
GEOTECHNICAL (2022) CONTRACT C
WASTEWATER VARIOUS 28
13108 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT A
WASTEWATER VARIOUS 33
13109 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT B
WASTEWATER VARIOUS 34
13110 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT C
WASTEWATER VARIOUS 35
13111 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT D
WASTEWATER VARIOUS 36
13112 GENERAL SERVICES AGREEMENT - SURVEY
SERVICES (2022) CONTRACT E
WASTEWATER VARIOUS 37
13124 BISSELL - COLDWATER - MISSOURI - MERAMEC
PUBLIC I/I REDUCTION (2023) CONTRACT F
WASTEWATER VARIOUS 6
13127 STORMWATER INFRASTRUCTURE REPAIRS
(REHABILITATION) (2022)
STORMWATER VARIOUS 157
13227 L51 PUMP STATION FORCEMAIN
IMPROVEMENTS
WASTEWATER VARIOUS 42
13352 STORMWATER QUALITY GREEN
INFRASTRUCTURE - SMALL GRANT
RAINSCAPING PROGRAM
STORMWATER VARIOUS 158
13361 TREVILLIAN 20 AND 50 SANITARY SEWER
REPLACEMENT
WASTEWATER VARIOUS 121
13436 WET WEATHER OPTIMIZATION STUDY WASTEWATER VARIOUS 67
6 April 2021
Page 11 of 11
PROJECT INDEX BY MUNICIPALITY FOR FISCAL YEAR - FY22
PROJECT
NUMBER
PROJECT NAME PROJECT
TYPE
MUNICIPALITY PAGE
NUMBER
13467 SCADA SYSTEM UPGRADE WASTEWATER VARIOUS 55
13474 EASEMENT ACQUISITION FOR DEER CREEK
OMCI PROJECTS (2021)
STORMWATER VARIOUS 150
13475 EASEMENT ACQUISITION FOR UNIVERSITY
CITY OMCI PROJECTS (2021)
STORMWATER VARIOUS 152
13476 EASEMENT ACQUISITION FOR MALINE OMCI
PROJECTS (2021)
STORMWATER VARIOUS 151
13487 DEER CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 148
13488 COLDWATER CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 147
13489 UNIVERSITY CITY OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 160
13490 SUGAR CREEK OMCI REIMBURSEMENTS
PROGRAM
STORMWATER VARIOUS 159
13491 SEMINARY OMCI REIMBURSEMENTS PROGRAM STORMWATER VARIOUS 155
13595 STORMWATER ASSET INVESTIGATIONS (2022) STORMWATER VARIOUS 145
13608 ST. LOUIS COMBINED SEWER OVERFLOWS
PROGRAM - CORPS OF ENGINEERS - PHASE II
WASTEWATER VARIOUS 60
12122 CLARK AVE SANITARY RELIEF (LACLEDE STA
RD TO YEATMAN AVE)
WASTEWATER WEBSTER
GROVES
10
12132 WESTWOOD COUNTRY CLUB SANITARY
RELIEF (DEER CREEK TO WESTWOOD CT)
WASTEWATER WESTWOOD 66