Loading...
HomeMy Public PortalAboutPB Report_101 Walnut St_2019_1211TOWN OF WATERTOWN Department of Community Development and Planning PLANNING BOARD Administration Building 149 Main Street Watertown, MA 02472 Phone; 617-972-6417 Fax: 617-972-6484 www.watertown-ma.gov PLANNING BOARD REPORT Board Members: Jeffrey W. Brown, Chair Janet Buck Jason Cohen Gary Shaw Payson Whitney, III On December 11, 2019 with five (5) members of the Planning Board (Board) present, case number ZBA- 2019-31, a Special Permit with Site Plan Review, was considered. The Board submits the following Report, as requested by the ZBA, to aid the ZBA in deciding on the application before it. Case#: Subject Property: Parcel ID: Zoning District: Petitioner/Owner: Zoning Relief Sought: Special Permit Granting Authority: Site Plan Review Meeting(s): Date of Staff Report: Planning Board Meeting: Zoning Board Hearing: ZBA-2019-31 ASP/AVAR -Amendment to ZBA-2017-04 ASP/AVAR and ZBA-2001-47 ASP/AVAR (see also companion Case to ZBA-2019- SP/SR) 101 Walnut St. 1035-1-0/1038-9-0 1-3 (Industrial) Zoning District New Green Apple Limited Partnership Amendment of Control Plans/Decision of ZBA-2017-04 ASP/AVAR and ZBA-2001-47 ASP/AVAR to allow access easement and parking lot reconfiguration Zoning Board of Appeals September 22, 2019 Conditional Approval, December 6, 2019 (5-0) December 11, 2019 Scheduled December 18, 2019 101 Walnut Street December 11, 2019 ZBA-2019-31 ASP/AVAR Planning Board Report I. PUBLIC NOTICE (M.G.L. c. 40A, §11) A. Procedural Summary Petition ZBA-2019-31 ASP/AVAR was heard by the Planning Board on December 11, 2019 and is before the Zoning Board of Appeals December 18, 2019. As required by M.G.L. c. 40A, sec.11 and the Watertown Zoning Ordinance, notice was given as follows: • Published in newspaper of record (Watertown Tab) November 29 and December 6, 2019 • Posted at the Town Administration Building on November 27, 2019 • Mailed to Parties in Interest on November 27, 2019. B. Legal Notice "101 Walnut Street New Green Apple Limited Partnership, 125 High Street, Boston MA 02110, requests the Zoning Board of Appeals grant a Amend Special Permit in accordance with Watertown Zoning Ordinance §9.04 to amend previously approved control plan and conditions to allow an access easement and parking lot reconfiguration. Located in the "1-3" (Industrial) Zoning District. ZBA-2019-31" North to existing entrance to be removed Looking north to area of new entrance Existing Community Path crossing Approximate area of the easement Page 2 of 6 101 Walnut Street December 11, 2019 ZBA-2019-31 ASP/AVAR Planning Board Report ll. DESCRIPTION A. Site Characteristics and Background The subject property is a 213,015 s.f. (4.89 acre) lot with a substantial grade change from north to south. The site was previously an industrial site used for manufacturing and was converted to a mixed office light industrial use in 1988. The property had a single entrance from Walnut Street and received subsequent approval to create a secondary access to Arsenal Street. The site has a large parking lot facing Arsenal street and along the westerly side of the site. B. Surrounding Land Use This site is located in the Industrial -3 (1-3) Zoning District, located adjacent to the 85 Walnut St. redevelopment site (Doble) to the West, Lexus of Watertown to the East, Walnut Street to the north, and Arsenal Street to the south. The surrounding area is comprised of a variety of large-scale retail, residential and office uses. Lower density residential is primarily located to the north across Walnut Street and to the south and east on Arsenal Street. C. Nature of the Request The request is to amend the control plans for a reconfigured parking lot and driveways near Walnut Street and at Arsenal Street. The reconfiguration does not change the total number of parking spaces. The change creates a single access point for the two sites (85 and 101 Walnut Street) on the north at Walnut Street and a new shared access and easements from Arsenal Street. The southern access easement would be considered a Private Way for the two sites. D. Relevant Permitting History Prior approvals from the board are shown below. The requested approval would update the control plans of the 2001 amendment to the Special Permit and Variance (ZBA-01-47) to reflect a new entrance at Arsenal Street, modified access at Walnut Street to allow access to 85 Walnut Street, and reconfiguration of the parking and drive aisle in a new easement area. • ZBA-2017-04 ASP/AVAR — to amend previous approval to allow construction of 2,460 square feet within the mezzanine for overall office space from 94,500 square feet to 96, 960 square feet. • ZBA-01-47-SP/ASP/AVAR: to amend the amendment 94-51 ASP/AVAR and the original Special Permit/Variance #87-88-16 SP/VAR to: • Convert an additional 18,550 square feet of space from industrial to office use with gross building square footage to remain at 94,500 square feet • Permit ancillary parking for 39 spaces on an adjacent lot (Arsenal Street Access Partnership/ASAP Lot). The total site is required to have 286 parking spaces. • Allow use of Arsenal St with a restriction to allow a right only at the unsignalized driveway. • Condition A33 - Block off access to Doble Engineering once they are not a sub -tenant. (recommend striking Condition A33 since there will be a new Private Way) • ZBA 1994-51 ASP/AVAR — updated the Control Plans, permitted expansion of the structure to 94,500 square feet with 18,550 sf for industrial and 75,950 sf for office, and required at least 248 parking spaces. • ZBA 1988 SP/VAR 87-88-16 — request to convert the existing structure with interior change from 77,000 square feet to 98,000 square feet. The approved project required: • Maximum building size of 94,500 square feet with 44,300 sf for industrial use and 50,200 sf for office use Page 3 of 6 101 Walnut Street December 11, 2019 ZBA-2019-31 ASP/AVAR Planning Board Report • At least 206 parking spaces and allowed 6 spaces to be reduced for future access to Arsenal Street III. PUBLIC COMMENT The Petitioner for 85 Walnut Street held two community meetings where public comment was received. The first meeting was held on September 16, 2019 at the 85 Walnut Street site and primarily discussed the architecture and community context. A second meeting was held on October 30, 2019 at which they discussed changes to the site plan and transportation in more detail. They talked about improved site access from Walnut Street and from Arsenal Street through an easement on 101 Walnut Street. Planning Board Meeting, December 11, 2019, see comments within Planning Board Deliberation, below. IV. ANALYSIS AND FINDINGS A. Plan Consistency Met: The proposed amendment for better connectivity is consistent with the Town's adopted planning documents. 1. Strategic Framework for Economic Development - 2011 • The 'Union Market' area was identified as one of five key redevelopment opportunities with specific target industries including mid -size and larger information technology and advanced manufacturing firms. • This site is part of the area subject to pressure for automotive and 'big -box' development and the new connection, as proposed supports a key economic development cluster identified within the plan. The study said, "The fragmented industrial uses, RR right of way and grade changes have created a major barrier between neighborhoods to the north and south, leaving little opportunity to take advantage of proximity to the River and the Perkins Campus." Substantial negotiations between this property owner and the owner of 101 Walnut Street have allowed an easement on the adjacent property. This reconfiguration and reconfigured easements allow the site to remove a substantial amount of pavement and two adjacent driveways. This area of 'Union Market' is recommended to be preserved as commercial and R & D. 2. Comprehensive Plan - 2015 The Comprehensive Plan Land Use chapter envisions a dynamic mixed -use corridor for Arsenal Street with a mix of successful businesses. The resulting development pattern will improve the streetscape, activate the sidewalk, and support redevelopment of opportunity sites. The land use map indicates this area to be categorized for an office -industrial mix of uses that create a vibrant business atmosphere. This change allows the site to better take advantage of an opportunity to strengthen the life science and office cluster of uses that exists within this area of Arsenal Street. The amendment creates better pedestrian and bicycle connectivity from north -south and has removed several barriers that limited access to these large sites from Arsenal Street. 3. Findings for Control Plan Amendment: The amended layout of the site for 101 Walnut Street allows for the development of a new access to Arsenal Street in a safer location and at an existing road rather than in a less safe offset intersection that currently exists. The safer and improved access for both sites also removes a very wide curb cut to the Page 4 of 6 101 Walnut Street December 11, 2019 ZBA-2019-31 ASP/AVAR Planning Board Report site at Arsenal St. and replaces it with landscaping. The landscape should match the existing with the reuse of the granite wall and appropriate shade tree plantings where the driveway was located. This proposed new access point will include signalized, four-way controls and will allow for turning lanes to support the traffic flow of Arsenal St. The project includes on -site and off -site pedestrian and bicycle improvements to help create safer connection to the Arsenal Street Corridor, and the companion approval will provide traffic calming along Walnut Street. The Arsenal Street entrance requires the creation of a private drive from Arsenal Street to the structured parking garage at 85 Walnut Street. The naming of this Private Way will require final review and approval by the Town. The change will provide significant improvements for pedestrians, transit, bicycles and vehicles. The project proposes a shared driveway for access to both the 85 and 101 Walnut Street properties off of Walnut St and also onto Arsenal Street. This plan removes the existing double driveway condition on Walnut Street which creates dangerous crossing movements. It also better defines the curb opening for pedestrian and bicycle safety. Removal of utility poles will also necessitate the replacement of the flood lighting on the Walnut Street driveway with full -screened lighting, which minimizes the impact to the neighborhood, as conditioned in the companion decision for 85 Walnut Street. The site plan shall be updated with location of lighting within the easement areas and lighting plans shall include any lights installed within the easement of 101 Walnut Street. The Community Path is maintained in the winter months by the larger property owners from Irving St to the beginning of this site, and beyond from the Lexus site to School Street, where it ends. Staff suggests that if this Petitioner is able to, they commit to keeping this section maintained for winter use, in cooperation with 85 Walnut so that the whole segment from Irving Street to School Street is maintained. V. Planning Board and Staff Recommendation and Conditions: Testimony was taken at the Planning Board meeting on December 11, 2019. Public comments specific to the access onto Arsenal Street included concerns from Steve Kalmanides (spelling?) at 227-229 Arsenal Street in regard to increased traffic, trucks, and existing issues with right turns into the site on Arsenal Street. He felt the site should use Walnut Street and felt there was nothing positive for Arsenal Street. Paula Halpin, on Walnut Street mentioned potential for cut -through from Walnut to Arsenal. The Board discussed the iterations and changes to make the project better. Payson Whitney identified that the realignment with Louise Street was a benefit, the Walnut Park is well done, and suggested that the language for winter maintenance of the Community Path be committed to in the conditions. Jason Cohen further identified the improved Walnut Street access as positive and asked about shorter pedestrian routes from Arsenal Street since that is where the bus route is. Janet Buck acknowledged public comments and suggested that the community is in a transitional period and that the Town is pushing developers to have different parking plans and reduced parking. The Board made two motions to recommend approval of the request for 85 Walnut Street and for the changes to 101 Walnut Street, as suggested by the Staff, with a vote of 5-0 for approval. The Board and Staff recommends that the approved site plan be amended as submitted in the control plans to reflect the access easement, reconfigured parking, and walkways with modifications to the previous approvals and specifically, Condition ZBA-01-47-SP/ASP/AVAR Condition # A33 should be Page 5 of 6 101 Walnut Street December 11, 2019 ZBA-2019-31 ASP/AVAR Planning Board Report deleted since there will be a new Private Way. The Condition is in regard to a requirement that the previous access to Doble Engineering be blocked off once they are not a sub -tenant. Control Plan: This approval is based upon the Control Plan titled "101 Walnut Street Site Plan" SP -1, Issued for on 11/12/2019 by RJO'Connell & Associates, Inc. as modified (to include updated landscape where driveway is removed, and show compliant new lighting, if necessary, within the easement area, and appropriate pedestrian access). Page 6 of 6