HomeMy Public PortalAboutStaff Report_101 Walnut St �1630 TOWN OF WATERTOWN
X .
Department of
Community Development and Planning
STAFF REPORT
This Staff Report is a technical analysis of the submitted application material and the required
findings of the Watertown Zoning Ordinance. It is based only upon information submitted prior
to the public hearing and may be revised or updated with new recommendations,findings
and/or conditions as new information is obtained by Planning Staff during the public hearing
process.
Case#: ZBA-2019-31 ASP(Companion Case to ZBA-2019-SP/SR)
-Amendment to ZBA-2017-04 ASP/AVAR and ZBA-2001-47
ASP/AVAR
Subject Property: 101 Walnut St.
ParcellD: 1035-1-0/1038-9-0
Zoning District: 1-3 (Industrial) Zoning District
Petitioner/Owner: New Green Apple Limited Partnership
Zoning Relief Sought: Amendment of Control Plans/Decision of ZBA-2017-04
ASP/AVAR and ZBA-2001-47 ASP/AVAR to allow access
easement and parking lot reconfiguration
Special Permit Granting Authority: Zoning Board of Appeals
Site Plan Review Meeting(s): September 22, 2019
Date of Staff Report: December 6, 2019
Staff Recommendation: Conditional Approval
Planning Board Meeting: Scheduled December 11, 2019
Zoning Board Hearing: Scheduled December 18, 2019
101 Walnut Street December 6, 2019
ZBA-2019-30 SP/SR Staff Report
I. PUBLIC NOTICE(M.G.L.c.40A,§11)
A. Procedural Summary
Petition ZBA-2019-31 ASP/AVAR is scheduled to be heard by the Planning Board on
December 11, 2019 and the Zoning Board of Appeals December 18, 2019. As required by
M.G.L. c. 40A, sec.11 and the Watertown Zoning Ordinance, notice was given as follows:
• Published in the newspaper of record (Watertown Tab) November 29 and December 6, 2019
• Posted at the Town Administration Building on November 27, 2019
• Mailed to Parties in Interest on November 27,2019.
B. Legal Notice
"101 Walnut Street New Green Apple Limited Partnership, 125 High Street, Boston MA
02110, requests the Zoning Board of Appeals grant a Amend Special Permit in accordance
with Watertown Zoning Ordinance§9.04 to amend previously approved control plan and
conditions to allow an access easement and parking lot reconfiguration. Located in the "1-3"
(Industrial)Zoning District. ZBA-2019-31"
C
North to existing entrance to be removed Looking north to area of new entrance
rY
y i -
t
e_
s.t.
— s
-J
Existing Community Path crossing Approximate area of the easement
Page 2 of 6
101 Walnut Street December 6, 2019
ZBA-2019-30 SP/SR Staff Report
II. DESCRIPTION
A. Site Characteristics and Background
The subject property is a 213,015 s.f. (4.89 acre) lot with a substantial grade change from north
to south. The site was previously an industrial site used for manufacturing and was converted to
a mixed office light industrial use in 1988. The property had a single entrance from Walnut
Street and received subsequent approval to create a secondary access to Arsenal Street. The
site has a large parking lot facing Arsenal street and along the westerly side of the site.
B. Surrounding Land Use
This site is located in the Industrial-3 (1-3) Zoning District, located adjacent to the 85 Walnut St.
redevelopment site (Doble)to the West, Lexus of Watertown to the East,Walnut Street to the
north, and Arsenal Street to the south. The surrounding area is comprised of a variety of large-
scale retail, residential and office uses. Lower density residential is primarily located to the
north across Walnut Street and to the south and east on Arsenal Street.
C. Nature of the Request
The request is to amend the control plans for a reconfigured parking lot and driveways near
Walnut Street and at Arsenal Street. The reconfiguration does not change the total number of
parking spaces. The change creates a single access point for the two sites (85 and 101 Walnut
Street) on the north at Walnut Street and a new shared access and easements from Arsenal
Street. The southern access easement would be considered a Private Way for the two sites.
D. Relevant Permitting History
Prior approvals from the board are shown below. The requested approval would update the
control plans of the 2001 amendment to the Special Permit and Variance (ZBA-01-47) to reflect
a new entrance at Arsenal Street, modified access at Walnut Street to allow access to 85 Walnut
Street, and reconfiguration of the parking and drive aisle in a new easement area.
• ZBA-2017-04 ASP/AVAR—to amend previous approval to allow construction of 2,460 square
feet within the mezzanine for overall office space from 94,500 square feet to 96,960 square
feet.
• ZBA-01-47-SP/ASP/AVAR: to amend the amendment 94-51 ASP/AVAR and the original Special
Permit/Variance#87-88-16 SP/VAR to:
• Convert an additional 18,550 square feet of space from industrial to office use with gross
building square footage to remain at 94,500 square feet
• Permit ancillary parking for 39 spaces on an adjacent lot(Arsenal Street Access
Partnership/ASAP Lot). The total site is required to have 286 parking spaces.
• Allow use of Arsenal St with a restriction to allow a right only at the unsignalized
driveway.
• Condition A33-Block off access to Doble Engineering once they are not a sub-tenant.
(recommend striking Condition A33 since there will be a new Private Way)
• ZBA 1994-51 ASP/AVAR—updated the Control Plans,permitted expansion of the structure to 94,500
square feet with 18,550 sf for industrial and 75,950 sf for office,and required at least 248 parking spaces.
• ZBA 1988 SP/VAR 87-88-16—request to convert the existing structure with interior change from
Page 3 of 6
101 Walnut Street December 6, 2019
ZBA-2019-30 SP/SR Staff Report
77,000 square feet to 98,000 square feet. The approved project required:
• Maximum building size of 94,500 square feet with 44,300 sf for industrial use and 50,200
sf for office use
• At least 206 parking spaces and allowed 6 spaces to be reduced for future access to
Arsenal Street
III. PUBLIC COMMENT
The Petitioner for 85 Walnut Street held two community meetings where public comment was
received. The first meeting was held on September 16, 2019 at the 85 Walnut Street site and
primarily discussed the architecture and community context. A second meeting was held on
October 30, 2019 at which they discussed changes to the site plan and transportation in more
detail. They talked about improved site access from Walnut Street and from Arsenal Street
through an easement on 101 Walnut Street.
IV. ANALYSIS AND FINDINGS
A. Plan Consistencv
Met:The proposed amendment for better connectivity is consistent with the Town's adopted
planning documents.
1. Strategic Framework for Economic Development-2011
• The 'Union Market' area was identified as one of five key redevelopment
opportunities with specific target industries including mid-size and larger
information technology and advanced manufacturing firms.
• This site is part of the area subject to pressure for automotive and 'big-box'
development and the new connection, as proposed supports a key economic
development cluster identified within the plan. The study said, "The
fragmented industrial uses, RR right of way and grade changes have created a
major barrier between neighborhoods to the north and south, leaving little
opportunity to take advantage of proximity to the River and the Perkins
Campus."
Substantial negotiations between this property owner and the owner of 101 Walnut Street have
allowed an easement on the adjacent property. This reconfiguration and reconfigured
easements allow the site to remove a substantial amount of pavement and two adjacent
driveways.This area of'Union Market' is recommended to be preserved as commercial and R&
D.
2. Comprehensive Plan -2015
The Comprehensive Plan Land Use chapter envisions a dynamic mixed-use corridor for Arsenal
Street with a mix of successful businesses. The resulting development pattern will improve the
streetscape, activate the sidewalk, and support redevelopment of opportunity sites. The land
use map indicates this area to be categorized for an office-industrial mix of uses that create a
vibrant business atmosphere.
This change allows the site to better take advantage of an opportunity to strengthen the life
science and office cluster of uses that exists within this area of Arsenal Street. The amendment
Page 4 of 6
101 Walnut Street December 6, 2019
ZBA-2019-30 SP/SR Staff Report
creates better pedestrian and bicycle connectivity from north-south and has removed several
barriers that limited access to these large sites from Arsenal Street.
3. Findings for Control Plan Amendment:
The amended layout of the site for 101 Walnut Street allows for the development of a new
access to Arsenal Street in a safer location and at an existing road rather than in a less safe
offset intersection that currently exists. The safer and improved access for both sites also
removes a very wide curb cut to the site at Arsenal St. and replaces it with landscaping. The
landscape should match the existing with the reuse of the granite wall and appropriate shade
tree plantings where the driveway was located.
This proposed new access point will include signalized, four-way controls and will allow for
turning lanes to support the traffic flow of Arsenal St.The project includes on-site and off-site
pedestrian and bicycle improvements to help create safer connection to the Arsenal Street
Corridor, and the companion approval will provide traffic calming along Walnut Street.The
Arsenal Street entrance requires the creation of a private drive from Arsenal Street to the
structured parking garage at 85 Walnut Street. The naming of this Private Way will require final
review and approval by the Town.
The change will provide significant improvements for pedestrians,transit, bicycles and vehicles.
The project proposes a shared driveway for access to both the 85 and 101 Walnut Street
properties off of Walnut St and also onto Arsenal Street. This plan removes the existing double
driveway condition on Walnut Street which creates dangerous crossing movements. It also
better defines the curb opening for pedestrian and bicycle safety. Removal of utility poles will
also necessitate the replacement of the flood lighting on the Walnut Street driveway with full-
screened lighting,which minimizes the impact to the neighborhood, as conditioned in the
companion decision for 85 Walnut Street. The site plan shall be updated with location of
lighting within the easement areas and lighting plans shall include any lights installed within the
easement of 101 Walnut Street.
The Community Path is maintained in the winter months by the larger property owners from
Irving St to the beginning of this site, and beyond from the Lexus site to School Street,where it
ends. Staff suggests that if this Petitioner is able to,they commit to keeping this section
maintained for winter use, in cooperation with 85 Walnut so that the whole segment from Irving
to School Streets is maintained.
V. Staff Recommendation and Conditions:
Staff recommends that the approved site plan be amended as submitted in the control plans to
reflect the access easement, reconfigured parking, and walkways.
Conditions:ZBA-01-47-SP/ASP/AVAR Condition#A33 that required the previous access to
Doble Engineering be blocked off once they are not a sub-tenant should be deleted since
there will be a new Private Way.
Control Plan:This approval is based upon the Control Plan titled "101 Walnut Street Site Plan"
SP-1, Issued for on 11/12/2019 by RJO'Connell &Associates, Inc. as modified (to include
Page 5 of 6
101 Walnut Street December 6, 2019
ZBA-2019-30 SP/SR Staff Report
updated landscape where driveway is removed, and show compliant new lighting, if necessary,
within the easement area)
Page 6 of 6