Loading...
HomeMy Public PortalAbout2019-06-13 packetNotice of Meeting & Tentative Agenda City of Jefferson Public Works & Planning Committee Thursday, June 13, 2019 7:30 a.m. John G. Christy Municipal Building, 320 East McCarty Street Boone/Bancroft Room (Upper Level) TENTATIVE AGENDA 1) Introductions 2) Approval of the May 9, 2019 Committee meeting minutes 3) New Business 1. Flood/Tornado Updates (Britt Smith) 2. Standby Pay Code Update (Britt Smith) 3. HDR Contract for Sewer Protection on the Missouri River (Matt Morasch) 4. Bartlett and West Contract for Roundabout at Clark and Dunklin (David Bange) 5. Supplemental Appropriation for Veteran's Plaza Renovation (David Bange) 6. Waiver of Ground Lease and Other Fees Due to Airport Flooding (Britt Smith) 4) Other Topics 5) Citizen opportunity to address Council/Staff on Stormwater and Other Public Works Issues • 608 Norris (Kelly Bowers) 6) Adjourn NOTES Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request. Please call (573) 634-6410 with questions regarding agenda items. Committee Members Ken Hussey Ron Fitzwater David Kemna Mark Schreiber Laura Ward MINUTES JEFFERSON CITY PUBLIC WORKS AND PLANNING COMMITTEE Council Chambers John G. Christy Municipal Building 320 East McCarty Street May 9, 2019 Present: Staff Present: Matt Morasch, Director of Public Works Britt Smith, Operations Division Director David Bange, City Engineer Don Fontana, Stormwater Engineer Mark Mehmert, Transit Division Director Sonny Sanders, Director of Planning and Protective Services Alex Rotenberry, Planner Ryan Moehlman, City Counselor Steve Crowell, City Administrator Brenda Wunderlich, Administrative Supervisor Attendance 10 of 12 11 of 12 11 of 12 12 of 12 10 of 11 Chairman Hussey called the meeting to order at 7:30 a.m. A quorum was present at this time. The following guests were present: Mayor Carrie Tergin; Councilman Rick Mihalevich; Ashley Varner; and Nicole Roberts, News Tribune. 1. Introductions Introductions were made at this time. 2. Approval of the April 11 and April 15, 2019 Committee meeting minutes Councilman Kemna moved and Councilman Schreiber seconded to approve the April 11 and April 15, 2019 minutes, motion carried. 3. New Business 1. Modifications of Chapter 32 for Complete Streets and related Changes, Modifications to Chapter 33, and Standard Drawings Update (David Bange) Mr. Bange explained the updates and additions to Chapters 32 and 33 of the City Code in addition to an update of the Standard Construction Drawings. There was discussion among Committee members and staff regarding the changes. Mr. Bange stated the revisions are just for the Committee's information at this time. Staff will get comments from developers and the Home Builders Association. 2. Bank Erosion on the East Branch of Wears Creek along Highway 50 (Matt Morasch) Mr. Morasch explained the erosion on the creek bank at Coca Cola along Highway 50. MirtuteslJefferson City Public Works and Planning Committee May 9.2019 2 There was discussion among Committee members and staff regarding the responsibility of this issue, cost sharing options, and the possibility of lining the creek with a gabian basket. Mr. Crowell stated if the property owners would bring in a proposal staff would bring this issue back to the Committee. *Councilman Fitzwater left at this time (8:13 a.m.). 3. Cole County Courthouse Landscaping Plan (David Bange) Mr. Bange explained the proposal by the County Commission to make minor alterations to the existing High Street landscaping as they look to make improvements to the overall landscaping and pedestrian accommodations around the Cole County Courthouse. 4. Plan to Overlay Country Club Drive (David Bange) Mr. Bange explained the Country Club Drive pavement is deteriorated and has no pedestrian accommodation. Staff plans to overlay the drive from Highway 179 to the splitter island at the mall, including a paved shoulder that will be striped for pedestrian use. There was discussion among Committee members and staff regarding cost, complaints about no pedestrian access on the drive, and the possibility of a future sidewalk. *Councilman Schreiber left the meeting at this time (9:53 a.m.). 4. Other Topics • 2019-2020 Public Works and Planning Committee Calendar Councilman Kemna moved and Councilwoman Ward seconded to approve the meeting calendar, motion carried. Councilmen Fitzwater and Schreiber were absent from this vote. 5. Citizen Opportunity to address Council/Staff on Stormwater and Other Public Works Issues There were no citizens present to address the Committee. 6. Adjourn Councilman Kemna moved and Councilwoman Ward seconded to adjourn the meeting at 9:01 a.m., motion carried. Councilmen Fitzwater and Schreiber were absent from this vote. Department of Public Works Memorandum 320 E. McCarty Street • Jefferson City, Missouri 65101 • P 573-634-6410 • F 573-634-6562 • www.ieffcitymo.orq Date: June 7, 2019 To: Public Work and Planning Committee From: Britt E. Smith, P.E. Subject: Standby Pay Adjustment Staff requests the committee approval of an increase in the rate of pay for public works employees required to be on standby during non -working hours. As the committee may be aware, public works personnel, from our street as well as the collections and treatment plant wastewater divisions, are required to maintain staff on call during non -working hours. Per the personnel policy manual, these staff members are currently compensated $8 per weekday and $20 per weekend day. This amount has not been adjusted in at least 20+ years. We suggest adjusting the rate to the pay schedule so that future adjustments are made with each adjustment to the salary schedule. We propose the weekday rate go to one hour of pay for the base rate of a grade 10 (currently $15.80 per hour a street and utility workers pay grade) with the weekend rate of 2.5 times the base rate (which is how the ordinance is written now). Staff is requesting an adjustment to fairly compensate employees for maintaining a state of readiness in their off hours (for example not drinking alcohol, driving a response truck during all personal trips/appoints and always maintaining contact with a cell phone/pager). Our proposal is outlined on the attached. The estimated fiscal impact to the remainder of the current year's budget is expected to be less than $4,000 and can be covered within existing budget. cc: Matt Morasch, P.E. Attachment Section 8-15 Stand-by/on-call status. (a) The following shall be the criteria for treatment of personnel who are required to carry a communications device. (1) Pay. Any non-exempt employee who is required to carry a communication device after regular duty hours, on weekends, or holidays shall be reimbursed $8,00 the rate of one hours pay for the base salary of a pay grade 10 employee per weekday or $28-80 2.5 times the daily weekday rate per day for weekends and holidays except for employees who are provided a communications device as a convenience in communications only and are not required to maintain a state of readiness for duty as is required of on-call status. (2) Schedule. Supervisors who have determined a need within their areas of responsibility for regularly scheduled stand-by shall prepare a duty roster to provide, whenever possible, one month's notice to those employees who are providing the service. The term of service shall normally be one week in length. 30 -inch diameter sanitary sewer between Wears Creek and Millbottom 2002 AERIAL 2003 D 30 -inch diameter sanitary sewer between Wears Creek and Millbottom 2015 AERIAL tho 2019 Flood water entered sewer. Manhole has been Repaired. Next Steps • Need permanent solution to protect sewer main. • Execute Contract with HDR, Inc. • Will Require approvals by — US Army CoE — Union Pacific Railroad Memorandum 320 East McCarty Street • Jefferson City, Missouri 65101 • P: 573.634.6410 • F: 573.634.6562 • www.ieffersonc tvmo.00v Date: June 7, 2019 To: Public Works and Planning Committee From: David Bange P.E., City Engineer Subject: Contract for the Design of the Roundabout at Clark and Dunklin The traffic study of Clark Avenue has been completed and Staff would like to make the Committee aware that we are preparing a contract with Bartlett and West for the design of the roundabout that was proposed at the intersection of Clark Avenue and Dunklin Street. The intersection of Clark and Dunklin was listed among the projects that were approved in sales tax G as part of the joint City/County funding. Staff will be working with the County to develop a joint funding agreement for this project. Given the cash flow within the sales tax this project will not be constructed until 2022, however, moving forward with the design will provide opportunity to give notice to the adjoining property owners who will be affected by this project. The proposed scope of services has been attached. If you have any questions I can be reached at 634-6433. DB:db U:\PublicworkslEngineeringldbangelPUBLIC WORKS & PLANNINGl201916-20191CIark and Dunklin.docx EXHIBIT A SCOPE OF SERVICES FOR CLARK AND DUNKLIN INTERSECTION IMPROVEMENTS PROJECT GENERAL BACKGROUND The project area is generally described as the intersection of Clark Avenue and Dunklin Street. The existing intersection is two-way stop controlled on Dunklin Street and includes a left turn bypass lane for traffic heading east on Dunklin Street that wants to turn north onto Clark Avenue. The intersection is functioning from a traffic capacity standpoint, but the geometric configurations of the intersection create confusion. A 2019 traffic study of the Clark Avenue interchange and surrounding intersections concluded that a roundabout at the Clark Avenue and Dunklin Street intersection would provide significant operational and safety improvements. This project will include design of a single -lane roundabout, new pavement and sidewalks, stormwater improvements, intersection lighting, pavement striping and signage. Topographic and boundary survey will be completed by the City. All right-of-way and easement documents, as well as all property owner negotiations will be also be completed by the City. Services provided by the Consultant will include the production of preliminary, right-of-way and final plans, utility coordination, and limited assistance during bidding and construction. More detailed descriptions of the included tasks are stated below: Figure 1: Project Scope TASK 1 — DATA COLLECTION AND SURVEYS 1.1 The City will perform all topographic, and boundary surveys. 1.2 Prepare and submit a survey request to the City in PDF form. 1.3 All easement and right-of-way documents will be prepared by the City. Coordination on needed easements and adjustments to easements from negotiations as necessary. 1.4 Perform 1 site visit to field check topographic information prior to design. TASK 2 — PRELIMINARY DESIGN SERVICES 2.1 Attend project kickoff meeting with City staff. 2.2 Develop roadway alignment/profile for Clark Avenue within the survey limits. 2.3 Develop roadway alignment/profile for Dunklin Street within the survey limits. 2.4 Develop roundabout geometry on project mapping. Adjust geometry for speed curves and truck turning movements. City to provide truck dimensions. 2.5 Develop bike lane & sidewalk geometry and curb ramp details. 2.6 Determine conceptual grading. 2.7 Conduct drainage design including drainage areas, hydrologic calculations using Rational Method and hydraulic calculations using Manning's Equation. Drainage design to follow City of Jefferson and APWA guidelines. 2.8 Determine phasing concept and make appropriate adjustments to roundabout geometry to accommodate. 2.9 Determine retaining wall locations and heights based on grading and phasing needs. 2.10 Create preliminary plans for project, utilizing AUTOCAD/Civil 3D, consisting of the following: 2.10.1 Cover Sheet 2.10.2 Typical Sections/General Notes (1 sheet assumed) 2.10.3 Roadway Plan/Profile Sheets (assumes 4 sheets) 2.10.4 Storm Sewer Plan/Profile Sheets (assumes 2 sheets) 2.10.5 Driveway Profile Sheets (assumes 2 sheets) 2.10.6 Retaining Wall Profile Sheet (assumes 1 sheet) 2.10.7 Cross Sections (assumes 6 sheets) 2.11 Prepare preliminary opinion of probable costs. 2.12 Conduct 2 preliminary design review meetings with City staff during the course of preliminary design. 2.13 Perform 1 site visit during preliminary design to field check the plans. 2.14 Submit the preliminary plans and opinion of probable cost to the City for review in PDF format. 2.15 Prepare utility conflict plans for the project . 2.16 Attend public meeting. TASK 3 — RIGHT OF WAY DESIGN SERVICES 3.1 Modify plans based on preliminary plan reviews, Utility meeting and public meeting comments: 3.1.1 Cover Sheet 3.1.2 Typical Sections/General Notes (1 sheet assumed) 3.1.3 Roadway Plan/Profile Sheets (assumes 4 sheets) 3.1.4 Storm Sewer Plan/Profile Sheets (assumes 2 sheets) 3.1.5 Driveway Profile Sheets (assumes 2 sheets) 3.1.6 Retaining Wall Profile Sheet (assumes 1 sheet) 3.1.7 Cross Sections (assumes 6 sheets) 3.2 Develop right of way and easement requirements. 3.3 Provide right of way plans to the City in PDF format. Provide AutoCAD files of proposed layout and right of way/easements to the City in AutoCAD 2018 format files. 3.4 Revise right of way and easement layout once based on property owner negotiations. 3.5 No legal descriptions or property owner negotiations are included in this scope of work. TASK 4 — FINAL DESIGN SERVICES 4.1 Create final plans for project, utilizing AUTOCAD/Civil 3D, consisting of the following: 4.1.1 Cover Sheet 4.1.2 Typical Sections/General Notes (assumes 1 sheet) 4.1.3 Typical Detail Sheets (assumes 2 sheets) 4.1.4 Summary of Quantities (assumes 1 sheet) 4.1.5 Right of Way/Easement Plan (assumes 1 sheet) 4.1.6 Existing Removals Plan (assumes 1 sheet) 4.1.7 Roadway Plan/Profile Sheets (assumes 4 sheets) 4.1.8 Curb Return Plan/Profile Sheets (assumes 4 sheets) 4.1.9 Splitter Island Plan/Profile Sheets (assumes 2 sheets) 4.1.10 Truck Apron & Central Island Plan/Profile Sheet (assumes 1 sheet) 4.1.11 Roundabout Grading Plan (assumes 1 sheet) 4.1.12 Storm Sewer Plan/Profile Sheets (assumes 2 sheets) 4.1.13 Driveway Profile Sheets (assumes 2 sheets) 4.1.14 Sidewalk Ramp Detail Sheet (assumes 1 sheet) 4.1.15 Retaining Wall Profile Sheet (assumes 1 sheet) 4.1.16 Retaining Wall Detail Sheet (assumes 1 sheet) 4.1.17 Lighting Plan sheet (assumes 1 sheet) 4.1.18 Lighting Detail sheets (assumes 6 sheets) 4.1.19 Erosion Control Plan (assumes 1 sheet) 4.1.20 Traffic Control and Phasing Plan (assumes 6 sheets) 4.1.21 Detour Plan (assumes 2 sheets) 4.1.22 Signing and Pavement Marking Plan (assumes 2 sheets) 4.1.23 Cross Sections (assumes 6 sheets) 4.1.24 No jointing plan is included in this scope of work. 4.1.25 No landscaping plan is included in this scope of work. 4.1.26 No water quality plan is included in this scope of work. 4.2 Compute final quantities, develop bid form and prepare final estimate of probable cost. 4.3 Develop any project specific technical specifications. It is anticipated that the City's standard specifications will be utilized. The City to complete front end documents to be combined with the JSPs. 4.4 Submit the final plans, bid forms and Engineer's Estimates to the City for review in electronic form. 4.5 Prepare a set of final utility coordination plans for the project. 4.6 Conduct a final design coordination meeting with utility companies. 4.7 Conduct 1 final design review meeting with City staff during course of final design. 4.8 Make final changes to plans, technical special provisions, bid form and Engineer's Estimate based on City staff comments. Sign and Seal. TASK 5 — PROJECT MANAGEMENT AND COORDINATION 5.1 No additional meetings are included in this scope of services. 5.2 Quality Reviews: 5.2.1 Perform periodic reviews of project for quality assurance purposes. Perform a quality control review of the project deliverables at each submittal stage. 5.2.2 Perform a field check of proposed construction improvements. 5.3 Administration and Coordination: 5.3.1 Perform duties necessary for administration of project contract. Prepare and administer project expenses and invoicing to CITY. 5.3.2 General communication with CITY. This includes email updates, phone conversations, and general correspondence on approximately a bi-weekly basis during the course of the project. TASK 6 — BIDDING PHASE SERVICES 6.1 Attend prebid meeting at City office. 6.2 Contractor correspondence during bidding. 6.3 Addendum preparation (assumes 1 addendum). 6.4 City to conduct bid opening, prepare bid tabulation, and make contractor recommendation. Consultant to review the bid tab for any unbalanced bidding concerns. 6.5 No additional meetings are included in this scope of services. TASK 7 — CONSTRUCTION PHASE SERVICES 7.1 Attend preconstruction meeting. 7.2 Contractor correspondence during construction (assumes 4 phone calls and associated review). 7.3 All construction observation to be performed by the City. 7.4 Shop drawing review is not included in this scope of services. It is anticipated that the City will review all submittals from the contractor. Exhibit 0 Popo 1 of 2 PROJECT FEE ESTIMATING SHEET Clark and Dunklin Intersection Improvements Project Jefferson City, Cote County, MO Teaks Staff Hour Labor Costs Other prep Costs Total Fee Subtotal Fee Eng. VII Eng. IV Eno. II Eng. Tech VII Admin. III Item Cost 5185.00 5130.00 5110.00 5105.00 585.00 1. DATA COLLECTION AND SURVEYS 81,100.00 1.1 The City will perform a8 topographic, and boundary surveys. 50.00 50.00 1.2 Prepare and submit a survey request to the City in PDF form. 1 1 5240.00 5240.00 1.3 All easement and right-of-way documents will be prepared by the City. Coordination on needed easements and adjustments to easements from negotiations as necessary. 2 4 5700.00 5700.00 1,4 Perfomr 1 s4e visit to Meld check topographic information prior to design. 2 5220.00 Mileage, Prints 520.00 5240.00 2. PRELIMINARY DESIGN SERVICES 562,133.00 2,1 Attend project kickoff meeting with City staff. 2 22 5810.00 Prints 510.00 5820.00 2.2 Develop roadway alignment/profile for Clark Avenue within the survey limits. 1 2 5350.00 CAD 514.00 5384.00 2,3 Develop roadway alignment/profile for Dunkiin Street within the survey limits, 1 2 5350.00 CAD 514.00 5364.00 2.4 Develop roundabout geometry on project mapping. Adjust geometry for speed curves and truck turning movements City to provide truck dimensions 2 12 50 57,390.00 CAD 5350.00 57.740.00 2.5 Develop bike lane 8 sidewalk geometry and curb ramp details. 1 2 8 51,305.00 CAD 558.00 51,361.00 2.6 Determine conceptual orading. 1 2 16 $2,185.00 CAD 5112.00 52.297.00 2.7 Conduct drainage design including drainage areas, hydrologic calculations using Rational Method and hydraulic calculations using Manning's Equation. Drainage design to follow City of Ipffervnn and APWA nuidelinns 2 6 40 55.770.00 CAD. Prints 5300.00 56.070.00 2.8 Determine phasing concept and make appropriate adjustments to roundabout geometry to accommodate 2 8 24 53,75000 CAD. Prints 5188.00 53.938.00 2.9 Determine retaining wall Locations and heights based on grading and phasing needs. 1 4 5570.00 CAD. Prints 548.00 5818.00 2.10 Create preliminary plans for project, utilizing AUTOCAD/Civil 3D. consisting of the folktymlar 2.10.1 Cover Sheet 1 1 2 $450.00 CAD. Prints 541.00 5491.00 2.10.2 Typical Sections/General Notes (1 sheet assumed) 2 4 8 51,540.00 CAD, Prints 5104.00 51.644.00 2.10.3 Roadway Plan/Profile Sheets (assumes 4 sheets) 2 4 18 40 58.810.00 CAD. Prints 5412.00 57222.00 2.10.4 Storm Sewer Plan/Profile Sheets (assumes 2 sheets) 2 4 24 53.490.00 CAD, Prints 5188.00 53,676.00 2.10.5 Driveway Profile Sheets (assumes 2 sheets) 1 4 8 51,410.00 CAD, Prints 5104.00 51,514.00 2,10.6 Retaining Wal Profile Sheet (assumes 1 sheet) 1 2 4 5770.00 CAD. Prints 562.00 5832.00 2.10.7 Cross Sections (assumes 6 sheets) 1 4 8 12 92,825.00 CAD, Prints 5160.00 52.985.00 2,11 Prepare preliminary opinion of probable costs. 2 8 8 51,980.00 51,980.00 2.12 Conduct 2 preliminary design review meetings with City staff during the course of preliminary desion 4 4 4 51,620.00 Mi teage, Prints 520.00 51.640.00 2.13 Perform 1 site visit during preliminary design t0 fied ck Chethe plans. 2 5220,00 Milaago. Prints 520.00 5240.00 2.14 Submit the preliminary plans and opinion of probable cost to the City for review in PDF format 2 5280.00 5280.00 2.15 Prepare utility conflict plans for the project 1 4 8 51,410.00 Mileage, Prints 520.00 51,430.00 2.15 Distribute utility plans and hold a utility coordination meeting with impacted utility Companies. 24 2 51.070.00 Mileage. Prints 520.00 51,090.00 2.18 Prepare exhbiits for a public meeting. 1 2 8 12 52,585.00 CAD. Prints 5160.00 52,725.00 2.16 Attend public meeting. 2 2 2 5810.00 Mileage, Prints 520.00 5830.00 3. RIGHT OF WAY DESIGN SERVICES 514,899.00 3.1 Modify plans based on preliminary plan reviews, Utility meeting and public meeting comments: 5000 3.1.1 Cover Sheet 1 2 5320.00 CAD, Prints 541.00 5381.00 3.1.2 Typical Sections/General Notes (1 sheet assumed) 1 2 3320.00 CAD. Prints 541.00 5361.00 3.1.3 Roadwav Plan/Profile Sheets (assumes 4 sheets) 2 8 12 12 03,690.00 CAD, Prints 5188.00 53.878.00 3.1.4 Storm Sewer PIan/Proble Sheets (assumes 2 sheets) 2 6 8 51,780.00 CAD. Prints 5118.00 51.878.00 3.1.5 Driveway Profile Sheets (assumes 2 sheets) 1 2 4 5770,00 CAD, Prints 562.00 5832.00 3.1.8 Retaining Wal Profile Sheet (assumes 1 sheet) 1 4 5570.00 CAD, Prints 548.00 5618.00 3.1.7 Cross $eCllefis (assumes 6 sheel5) 1 2 12 8 52.585.00 CAD. Prints 3180.00 52.745.00 3.2 Develop right of way and easement requirements. 1 4 8 8 52,405.00 CAD. Prints 5132.00 52,537.00 3.3 Provide right of way plans to the City in PDF format. Provide AutoCAD files of proposed layout and right of way/easements to the City in AutoCAD 2018 format files. 22 3480.00 Prints 510.00 5480.00 3.4 Revise right of way and easement layout once based on property owner negotiations. 1 2 4 4 51.285.00 Prints 510.00 51295.00 3.5 No legal descriptions or property owner negotiations are included in this scope o1 work. 4. FINAL DESIGN SERVICES 188,340.00 4.1 Create final plans for project, uilizing AUTOCAD/Civil 3D, consisting of the following: 4,1.1 Cover Sheet2 5220.00 CAD, Prints 534.00 5254.00 4.1.2 Tvpical Sections/General Notes (assumes 1 sheet) 1 1 2 5450.00 CAD, Prints 541.00 5491.00 4.1.3 Typical Detail Sheets (assumes 2 streets) 2 8 8 51,550.00 CAD, Prints 5104.00 51,654.00 4.1.4 Summary of Quantities (assumes 1 sheet) 1 4 4 5990.00 CAD, Prints 576.00 51668.00 Exhidt 6 Pogo 2 oft Tasks Staff Hours Labor Costs Other Direct Coats Total Frio Subtotal Fan Eng. Vil Eng. IV Eng. II Eng. Tech V11 Admin. III Item Cost 5165.00 5130.00 5110.00 5105.00 585.00 4,1,5 Right of Way/Easement Plan (assumes 1 sheet) 1 1 6 2 51,185.00 CAD, Prints 576.00 5124100 4.1.6 Existing RemOvels Plan (assumes 1 sheet) 1 4 2 9780.00 CAD. Prints 382.00 5842.00 4,1.7 Roadway PIanProfiie Sheets (assumes 4 sheets) 1 4 12 8 52,845.00 CAD. Prints 5160.00 53,005.00 4.1.6 Curb Reum Plan/Profile Sheets (assumes 4 sheets) 1 8 18 12 53,965.00 CAD, Prints 5216.00 $4,181.00 4.1,9 Splitter Island Plan/Profile Sheets (assumes 2 sheets) 1 8 18 12 53,965.00 CAD, Prints 5218.00 54,181.00 4,1.10 Truck Apron 8 Central Island PIvnJProfile Sheet (assumes 1 5h00t) 4 8 8 52.030.00 CAD, Prints 5118.00 52.148.00 4.1,11 Roundabout Grading Plan (assumes 1 sheet) 2 8 12 12 93,690.00 CAD, Prints 5188.00 53,878.00 4,1,12 Storm Sewer Plan/Profile Sheets (assumes 2 sheets) 2 12 12 52.840.00 CAD, Prints 5188.00 53,028.00 4.1.13 Driveway Profile Sheets (assumes 2 sheets) 1 4 4 5890.00 CAD. Prints 578.00 91,088.00 4,1,14 Sidewalk Ramp Detail Sheet (assumes 1 sheet) 1 12 6 52,080.00 CAD, Prints 5148.00 52228.00 4.1.15 Retaining Wall Profile Sheet (assumes 1 sheet) 1 2 2 5560.00 CAD, Prints 548.00 5608.00 4,1.18 Retaining Wall Detail Sheet (assumes 1 sheet) 4 12 8 52,470.00 CAD. Prints 5148.00 52,616.00 4.1.17 Lighting Plan sheet (assumes 1 sheet) 2 8 8 51,980.00 CAD, Prints 5132.00 52,112.00 4.1.18 Unhtinq Detail shoats (assumes 6 sheets) 6 16 32 55.900.00 CAD, Prints 5356.00 58258.00 4.1.19 Erosion Control Pian (assumes 1 sheet) 1 4 2 5780.00 CAD. Prints 562.00 5842.00 4.1.20 Traffic Control and Phasing Plan (assumes 6 sheets) 2 8 18 12 54,390.00 CAD, Prints 5216.00 54.608.00 4.1,21 Detour Plan (assumes 2 sheets) 1 4 8 8 52,195.00 CAD. Prints 9116.00 52,313.00 4.1.22 Signing and Pavement Marking Plan (assumes 2 sheets) 1 2 6 8 51,925.00 CAD, Prints 9118.00 52,043.00 4.1.23 Cross Sections (assumes 6 sheets) 1 4 12 8 92,845.00 CAD. Prints 5160.00 53,005.00 4.1,24 NO 10intinq plan is included in this SC000 Of work. 50.00 50.00 4,1.25 No landscaping pian is included in this scope of work. 50.00 $0.00 4,1.28 110 water quality plan is included in this scope of work. 50.00 90.00 4.2 Compute final quantities, develop bid form and prepare final estimate of probable cost 2 4 8 8 52,570.00 Prints 910.00 52.580.00 4.3 Develop any project specific technical specifications. bis anticipated that the City's standard specifications will be utilized. The City to complete front end documents to be combined with the ISPs 1 8 12 52285.00 Prints 510.00 52275.00 4.4 Submit the final plans, bid forms and Engineer's Estimates t0 the City for review in etectronic form 2 528000 526000 4.5 Prepare a Set of 9091 utility coordination plans for the prosect 1 4 8 8 52,405.00 CAD. Prints 5132.00 52,537.00 4.8 Conduct a final design coordination meeting with utility companies. 2 8 2 51,590.00 Prints $10.00 51.800.00 4.7 Conduct 1 final design review meeting with City staff during course of final design. 2 2 2 5810.00 Prints 510.00 5820.00 4.8 Make final changes to plans, technical special provisions. bid form and Engineer's Estimate based on City staff comments Sian end Seal 2 8 16 12 54,390.00 CAD, Prints 5216.00 54,808.00 5. PROJECT MANAGEMENT AND COORDINATION 39,450.00 5.1 No additional meetings are included in this scope of services. 50.00 90.00 5.2 Quality Reviews; 5.2.1 Perform periodic reviews of project for quality assurance purposes. Performa quality control review of the project deliverables at each submittal stage. 12 31,980.00 Prints $0.00 51.880.00 5.2.2 Perform a field check of proposed construction improvements 2 2 5480.00 Ponta. Menge 920.00 5500.00 5.3 Administration and Coordination 5.3.1 Perform duties necessary for administration of project contract Prepare and administer oroioct expenses and inv0icin010 CITY 8 a 6 52,880.00 Prima 310.00 32,890.00 5.3.2 General communication with CITY. This includes email updates, phone conversations, and general correspondence on approximately a biweekly heals rkrdnn the Course nl the aroiect 8 16 8 54,080.00 54,080.00 6. BIDDING PHASE SERVICES 54,178.00 6.1 Attend °rebid meeting at City office. 4 4 5960.00 5960.00 6.2 Contractor correspondence during bidding. 2 2 2 5810.00 Pitts, ktleage 520.00 5830.00 6.3 Addendum preparation (assumes 1 addendum). 4 8 8 52,030.00 CAD, Prints 5118.00 52.148.00 8.4 City to conduct bid opening, prepare bid tabulation. and make contractor recommendation. Consultant to review the bid tab for any unbalanced bidding concerns. 1 1 3240.00 5240.00 6.5 No additional meetings are included in this scope of services. 50.00 50.00 7. CONSTRUCTION PHASE SERVICES 52290.00 7 1 Attend °reconstruction meeting. 2 2 5480.00 5480.00 7.2 Contractor correspondence during construction (assumes 4 phone calls end associated review). 4 4 8 51,800.00 Prints 510.00 51,810.00 7.3 All construction observation to be performed by the CitY 50.00 50.00 7.4 Shop drawing review is not included in this scope of services. I1 is anticipated that the City w;0 review en submittals from the contractor 5000 50.00 TOTALS 80 229 574 364 16 5145.690.00 58,878.00 5152.586.00 Grand Total 9152,566.00 Memorandum 320 East McCarty Street • Jefferson City, Missouri 65101 • P. 573.634.6410 • F: 573.634.6562 • www jeffersoncitymo.gov Date: June 7, 2019 To: Public Works and Planning Committee From: David Bange P.E., City Engineer -Db Subject: Modifications to the Veteran's Plaza Staff would like to keep the Committee informed concerning changes which have been planned for the Veteran's Plaza located to the north of the police station. Currently all of the bricks in the display cases have been inscribed with veteran's names and continued requests have led to newly inscribed bricks being placed in the walking surface at the base of the display cases. The members of the veteran's memorial board have sought ways for these new additions to be displayed in the same manner as the older ones. A plan has been developed that would reduce the size of the coping that surrounds each display so that additional bricks can be placed within the existing cases. The plan would allow for an additional 452 bricks. Once the 263 inscribed bricks on the ground are relocated there would remain 189 available spaces within the display cases. With only a handful of bricks being requested each year this modification should be able to accommodate the need well into the future. City staff is currently working to develop specifications that will lead to a contract for this work to take place. The plan also looked for space beyond what could be gained by the modifications to the existing cases and has shown the possible construction of four additional display cases that would add a further 704 spaces. This is seen as a future phase which could be built when needed to meet the demand. A schematic drawing showing these cases has been attached. Funding for this project will come from the Veteran's Plaza fund. A supplemental appropriation from that account will be necessary to fund the proposed modifications. If you have any questions I can be reached at 634-6433. DB:db U:\Public works\Engineering\dbange\PUBLIC WORKS & PLANNING12019\6-20191Veteran's Plaza.docx 111 E. McCARTY ST. 1807 615/2018 PHASE 2 SUMMARY [704 BRICKS ADDED] • FOUR NEW PEDESTALS AND BENCHES. • MODIFY IRRIGATION. • MODIFY WIRING AND REMOVE FLOOR RECESSED LIGHTS • NEW LIGHTING. MORTH 3/3211=1'-0" Pe-=U-11�tl=1i.�11= s ri rsttKx+.� Jefferson City, Missouri Department of Public Works Memorandum 320 E. McCarty Street • Jefferson City, Missouri 65101 • P 573-634-6410 • F 573-634-6562 • www.jeffcitymo.org Date: June 10, 2019 To: Public Work and Planning Committee From: Britt E. Smith, P.E. Subject: Airport Lease Fee Reduction Staff requests the committee discussion related to the possibility of suspending and/or reducing lease and other fees at the airport due to flood conditions. As the committee is aware, various fees are charged associated with the airport operation. A partial list includes: • Ground leases (where private individuals lease ground to build a hangar); • Building leases (for restaurant and/or office space within the terminal); • Student instruction fee; and • Agriculture lease. Tenants of the airport have made requests to staff to consider reducing and/or suspending some or all of these fees until such time as the airport can reopen for operations. The revenue from these leases average approximately $10,000 per month. At this time, it would be difficult to gauge the full fiscal impact of any action as we are uncertain of the duration of the flooding conditions. cc: Matt Morasch, P.E. Attachment