Loading...
HomeMy Public PortalAbout09-0511 Hand t � j CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 12 -7 -2009 PERMIT #: 090511 WORK DESCRIPTION ELEC - REPLACE SERVICE AT DOCK WORK LOCATION 1313 VENETIAN OWNER NAME PETER & BARBARA HAND ADDRESS 280 ELIZABETH ST NE STE A110 CITY, ST, ZIP ATLANTA GA 30307 -1964 PHONE NUMBER CONTRACTOR NAME J A M ELECTRIC CO INC ADDRESS 1626 BLYTHE ISLAND DR CITY STATE ZIP BRUNSWICK GA 31523 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 25.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $2,000.00 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: , -XI P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 72 City of Tybee Isizatti C.Diurnunity DevelopgrEent Dept. r • FzSpectian Report z 403 Butler Ave., = P f i.E 2749 Tybee Island, A 3 „.. „ Phone 912:T86.4513 ext. 114 - Fax 912.73a,g539 Permit No. nc? - 0 I Date Requested I Owner's N BUIE k Date Needed i2 Gen. Coritractor Subcontgactor tr\ P C "* 2 3 ntact Information k ,2 ProJect. Address ) Q )7. Scope of Work e c P I (:) ! r V • <- u '`) Inspector '274 Date of Inspectioiy /,e1//./ 0. 7 inS - Get:to n F/7-- F .42), 1 — Pass 12I Fail [..] Fee , Inspection Pass Fail E3 Fee n..SJ 6 n-ear p a-rci Inspection Pass E3 Fail Fee IDS pectiort Pass 1:3 Fail Fee sq..) 1 \Q0` r� CITY OF TYBEE ISLAND °� BUILDING & ZONING DEPARTMENT '; P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 • Fax (912) 786 -9539 ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date / 2 — Z - — 0 7 New Work eplacement Location of work (street address) / 3 / 3 // .e ,� -e ¢ ,. A — A ' 1 4 1 - CPo - o 9 - 0/ Z Contractor A m. e/ c /�� 1,,. 2 C Telephone ?/ z — Z 3 0 - 57 */ 3 Address of Contractor /a 7 ‘ /S4.k -- S / c , il — . 4 w A Property Owner A iLR i /1 o" Telephone Date work will be ready for inspection, if known Pe it Number Estimated cost of construction -,, O -° ' r Z o A/C Unit and Heat Pump Range Hood - commercial Attic Ventilation Fan ' Service: / o o amps ALL WIRING, Bell Transmitter - low voltage Sign Circuit - wattage Border /Outline Lighting Smoke Detector - low voltage SERVICE Building Saw Spa or Tub - grounding INCLUDED, Exit Lights - life safety Special Outlet Heat Pump Swimming Pool - grounding MUST BE Meter Box Water Heater Motor(s): hp Welder - 220 volts circuit COPPER. NO Outlets -110 volts circuit Well Pump - grounding ALUMINUM Parking Lot Lights X -ray Pool Lights - grounding Other ALLOWED. Range - commercial APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service, the undersigned understands and agrees: 1. Connection of temporary electrical service does not remove the requirement to comply with all State of Georgia minimum construction codes. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy may result in disconnection of the electrical service until all violations and deficiencies are corrected. /S .�-- / L Z - o 9 ■ Owner /Contractor Signature Date X /G L ---A 'J . Owner /Contractor Printed Name • • APPROVAL Fee 2 6. Building Official Date 142-?-o9 G'(2 -265 -g8g4