Loading...
HomeMy Public PortalAbout09-0531 Knight d CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 12 -30 -2009 PERMIT #: 090531 WORK DESCRIPTION REMODEL BATH; KTCHN COUNTER WORK LOCATION 120 LEWIS AVE OWNER NAME L. GRACE ET AL KNIGHT ADDRESS 120 LEWIS AVE CITY, ST, ZIP TYBEE ISLAND GA 31328 -9714 PHONE NUMBER CONTRACTOR NAME L. GRACE ET AL KNIGHT ADDRESS 120 LEWIS AVE CITY STATE ZIP TYBEE ISLAND GA 31328 -9714 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 55.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $5,000.00 TOTAL BALANCE DUE: $ 55.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: 0(1414- (0/i P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org In C. \,,,...,„ 41 Gly of Tybele Island - .f...'olynnat.anity Devei.eplinent Oept. • I i 1 rams,- I: Inspect:an Report Zg .. 4+ 403 Butler Ave:. . P.O. Sox 274 - lybet... Island, G.Sik 31328 .... rs ...f '• 'I d Phone 912313 ext 114 - Fax 212.785.9539 / .............__ Permit N o. n ,93 Dat•E Requested e - 0 ) - ,- ' • / / Owner's Narrie K.:', Date ikieedel:rf`, Ge 4 Subcc,, Contact Iniakination .':',.f: 1, "r.,k.', - 7 / : - ::?,;' - ' 2 4/,;• - q- Pirsjc.3fit Address _ j__1_ / 1 illi 1/4 1{14)4 .... r , 1 , 1 SCpe 0 J.4.47-----:-.- a o i b 1:1,7L.• 4/. A -. C...i7! ---; - - 'i:j:C. tii7 4.,, 4 , 1 ns pecto r - Date o Inspection , 4.--1 fy ( 2- /c) -----‹ 1 ,2— i -- -‘ - I n5pectie n __ 2.1&_;:i_2_ii?f," -i• fr`-- i fk .4-- I -‘ /(_/ ' Pass Fail [3 Fee 40` i kiS pectio n Pass r"," Fail r Fee Laspertion Pass 0 Fail Fee laspection Pass [1 Fail a City of Tybee istand - corranikiratv Development Dept. 4 1 5 k I y :41'.. Inspectiars Report 71 4 - 1 Z / # f : 403 Butler Ave. - P.-0, Bo 1749 - TybPd. T.ziontl GA. Phone 912286.4573 ext, 114 , fax 912.786.9539 / Permit ti10, (26 --( 131 Date Requested 4 le?' iTh Owner's Name t ! 6j—j- ---t. Date Needed Ci i'" • i F Gen. Contractor Sivbcc,Fotwactor .•,_ Co ntact Y rah) rinat iG n .e - - T :73, .. 5 , ff. .141)16 4 4 - - -1— -- ;a4, - ar:-.7,.?)/ ,... Project Address 17 ,4.)1 5-, LI. i 1 _ Scope of Work 16aid T34-, 1 L 1--t / Inspector ,--;(-/ Date of Inspectiori 4 1 14 7 , ( L ) 1 .__)„ .. , :40 ___4 / ,o. ( , Inspection Pass 0 Fail it Fee \J OH TF,... ----&-) X Inspection Pass fl 1F t'i Fee g . 1,r,671) 4,7FEA 1 rtspection Pass 0 Fail [3 Fee Inspection Pass 0 Fa 3 c3 Fee 7'i i During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by GL • Construction debris will be disposed by 7E LF by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this peunitted construction. 1 Date: 12,-/3407 g nature of Ap Si licant: ��$ l p Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning /variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit Code Enforcement Officer Inspections Water /Sewer Water Tap Storm /Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL 5S'.