Loading...
HomeMy Public PortalAbout08-0027 Jackson CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 01 -17 -2008 PERMIT #: 080027 WORK DESCRIPTION: REPAIR FLOOR & FENCE WORK LOCATION: 1311 BUTLER AVE OWNER NAME PAUL JACKSON ADDRESS PO BOX 1690 CITY, ST, ZIP TYBEE ISLAND GA 31328 -1690 PHONE NUMBER CONTRACTOR NAME BOBBY CHU CONSTRUCTION CO INC ADDRESS 1A 6TH STREET CITY STATE ZIP TYBEE ISLAND GA 31328 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE U TOTAL FEE'S CHARGED $ 25.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $1,000.00 TOTAL BALANCE DUE: $ 25.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: v � P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: /// r 3 - G'.' j1i.e. • PIN # NAME ADDRESS TELEPHONE Owner tfB $ .¢'.r, r bd 4 1t MLJ fit-Cie/0A- P.v.s .X /G•o z Wt �► , 7b'G - go/8 Architect 7,3 Z$ or Engineer Building j 7tjl;.� C44. — Contractor C .Aut.P�i1,w ri (C40-ck all that apply) r[/7 Repair ❑ Residential ❑ Footprint Changes ❑ Renovation ❑ Single Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition ❑ lylulti- Family ❑ Other ' • [ Commercial feePsdelc Details of Project: ZIALlit / ?d 14.c 1:74494 74 �A /Z treA411,. — 444441 reafe4. fgitee /s1 1 Estimated Cost of Construction: $ ' Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by ■ C'aasragera;... by means of OutAir,sre....-- 6 tki.r, cps,- I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drai paired by this permitted construction. Date: / ' ' 7. 0 S Signature of Applicant: ' V Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit Code Enforcement Officer Inspections Water /Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL Dianne Otto From: Chuck Bargeron Sent: Thursday, March 06, 2008 12:39 PM To: Dianne Otto Cc: Brannyn G. Allen; Warren Millikan Subject: RE: permit I went back to the site at 12:04pm and looked in and under the building. All the sinks and toilets in the building are the same other than cleaning them up. Looks like a toilet seat has been replaced. Equipment in the kitchen area is being cleaned and reinstalled. The bar area looks like the same things that were there. Looking under the building there is some new PVC pipe replaced likely when the floor was repaired and reconnected to floor drains. And the grease trap looks as if has been reconnected as required. We can have Ray look at these. I see no total replacement or anything that appears to have been added new. You can see where old pipe had been cut and replaced as needed to work on the floor. New paint, carpet and a lot of cleaning. Chuck From: Dianne Otto Sent: Thursday, March 06, 2008 10:57 AM To: Chuck Bargeron Cc: Brannyn G. Allen; Warren Millikan Subject: permit See attached. Dianne K. Otto Administrative Assistant Building & Zoning dotto a(�citvoftvbee.orq Phone: (912) 786 -4573 ext. 114 Fax: (912) 786 -9539 Planning Commission Meeting Transcript February 19, 2008 John Major: "There were a couple of guys working there when I looked at the property. Are they working for you or are they ... ?" Paul Jackson: "A couple different contractors. There are guys that were doing the floor in the kitchen — it was totally rotten, so we had to tear out the entire floor, and replace the floor. And then we have had some plumbers tighting up some of the things inside. And painters and things like that. Just contractors. And I do have one or two guys that help me occasionally just doing some of the — the parking lot, cleaning up the parking lot, we had to repair the fence out front." Chuck: Building permit 08 -0027 was pulled on 01/17/08 for 1311 Butler Avenue. The cost of construction was listed as $1, 000 for "repairing rotten floor in kitchen; repairing rotten fence in front." The permit fee was $25. There wasn't any plumbing on it. This is a commercial site. Does the original permit need to be upgraded? Does the work need to be inspected? Thanks, Dianne Otto