HomeMy Public PortalAbout08-0034 McCaine r
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 01 -22 -2008 PERMIT #: 080034
WORK DESCRIPTION: REROOF
WORK LOCATION: 1807 BUTLER
OWNER NAME RAY MCCAINE
ADDRESS
CITY, ST, ZIP ATLANTA GA 00000
PHONE NUMBER
CONTRACTOR NAME CECIL PAEZ
ADDRESS 616 ATLANTA AVE
CITY STATE ZIP ATLANTA GA 00000
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 25.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,000.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: fn /
,,s_.. Y
__L
v .
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
41$
Location: 1 b OA)t`f L PIN #
NAME , I ADDRESS TELEPHONE
Owner ,\ LEiYlti jbt)� - '10 ( _
Architect
or Engineer
Building l
Contractor o t�A L (,2kb P .klo(y)'CL PtoL
,,
(Check all that apply)
❑ Repair ❑ Residential ❑ Footprint Changes
El Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition n Duplex ❑ Demolition
❑ Substantial Additiop, ❑ Multi- Family
Other , t - rzx) ❑ Commercial
1 1
Details of Project:
)Estimated Cost of Construction: $, O a Q (')
Constru ion Type (Enter a opriate number)
(1) Woo Frame (4) Maso (6) Other (please specify)
(2) Wood . Masonry (5) Steel Masonry
(3) Brick V- eer
Proposed use:
Remarks: \ /
ATTACH A COPY 0 THE CE' IFIED ELEVATION SURVEY OF LOT and complete the
following information b. - 4 o 1 e construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking sp.. es
Trees located & listet on site plan
Access:
Driveway / (ft.) With cult' ? With swale?
Setbacks: Fr , t Rear Sides (L) (R)
# Stories Height Vertical distance m sured from the average adjacent
grade of - the building to the extreme high point of the building, c sive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through DV
On -site waste and debris containers will be provided by 4 J 17+ •
Construction debris will be disposed by 09-6-5 1 provided
z by of 1 �..rcJ
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: ) 2 a ) C7 Si of Applicant:
-t �.
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit
Code Enforcement Officer Inspections
Water /Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL