Loading...
HomeMy Public PortalAbout08-0046 Strickland t/ CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 01 -28 -2008 PERMIT #: 080046 WORK DESCRIPTION: REPAIR RESIDENTIAL BLDG 14, l'�' O °41 WORK LOCATION: 1508 JONES OWNER NAME A.C. STRICKLAND ADDRESS 355 SUITE S CITY, ST, ZIP SAVANNAH GA 31406 PHONE NUMBER CONTRACTOR NAME ACE ROOFING ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 63.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $6,000.00 TOTAL BALANCE DUE: $ 63.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA 1 ' APPLICATION FOR BUILDING PERMIT () S Location: / S �" PIN # NAME ADDRESS TELEPHONE Owner r - LA) Architect or Engineer Building A 3s Contractor CC_ " ` / ` 1 1 9 (Check all that apply) ❑ R air Single idential ❑ Footprint Changes enovation Family ❑ Discovery ❑ Minor Addition ❑ Duplex ❑ Demolition ❑ Substantial Addition n Multi - Family ❑ Other ! El Commercial Details of Project: v " ° K c H $4 nci (( ( e J 4/N-4) .5 V c Estimated Cost of Construction: $ , 000 ` O J Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIF G ° • ATION SURVEY OF LOT and complete the following information based o - . - ction dr. ings and site plan: # Units B - • ooms # Bathrooms Lot Area I Li , spa (t tal s . ft.) # Off - street parking s p aces Trees located & liste• on si : pl. Access: Driveway ' .) W' h cu vert? With swale? Setbacks: Front R ar / Sides (L) (R) # Stories Hei Verti distance measured from the average adjacent grade of the building to the extilitio gi gi point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through • On -site waste and debris containers will be provided by • Construction debris will be disposed by D,„ 4,,,c1( by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired . {this permitted construction. i Date: 1.-- Signature of Applicant/ Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site I Distance to water main tap site „ Distance to sewer stub site Y A / S 1 1k) `Y Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit Le. DO Code Enforcement Offi -r �'� �� )a�,G� Dl_ 2g S Inspections /,: . ©D Water /Sewer U Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL 3. �'