HomeMy Public PortalAboutORD15955BILL NO. 2019-051
SPONSORED BY Councilman Mihalevich
ORDINANCE NO. /5155
AN ORDINANCE AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE
SUPPLEMENT AGREEMENT NO. 1 WITH JVIATION, INC. FOR SERVICES
ASSOCIATED WITH THE MASTER PLAN PROJECT RELATED TO THE FEASIBLITY
OF CONSTRUCTION OF A NEW AIRPORT TERMINAL BUILDING.
BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS
FOLLOWS:
Section 1. The Mayor and Clerk are hereby authorized to execute a supplement
agreement with Jviation, Inc. for services associated with the Master Plan related to the
feasibility of construction of a new airport terminal building.
Section 2. This agreement shall be substantially the same in form and content as
Exhibit A attached hereto.
Section 3. This Ordinance shall be in full force and effect from and after the date
of its passage and approval.
Passed:
J/o, 2O/
6ajvt,ueT(
Presiding Officer
ATTEST:
Approved:
Mayor Carrie Tergin
APPROVED AS TO FORM:
Ci y Clerk City
Airport Name: Jefferson City Memorial
Project No.: 18-040B-1
County: Callaway
AVIATION PROJECT CONSULTANT SUPPLEMENTAL AGREEMENT NO. 1
PLANNING SERVICES
THIS SUPPLEMENTAL AGREEMENT NO. 1 for Planning Services is entered
into by the City of Jefferson, Missouri (hereinafter, "Sponsor") and Jviation, Inc.
(hereinafter, "Consultant").
WITNESSETH:
WHEREAS, the Sponsor and the Consultant entered into an Agreement on May
14, 2018, to accomplish a project at the Jefferson City Memorial Airport, (hereinafter,
"Original Agreement"); and
WHEREAS, the Sponsor and the Consultant now desire to enter into
Supplemental Agreement No. 1 to otherwise complete, extend or continue the Original
Agreement as provided herein.
NOW, THEREFORE, in consideration of the mutual promises, covenants, and
representations contained herein the parties agree as follows:
(1) SCOPE OF SERVICES:
(A) The Services to be provided by the Consultant under
Supplemental Agreement No. 1 are additional services which are beyond the scope of
services provided in the Original Agreement. These additional professional services are
generally described and defined in Exhibit II - SA1, which is attached hereto and
incorporated herein by reference.
(2) FEES AND PAYMENTS:
(A) The Consultant shall be reimbursed in accordance with Section (9)
of the Original Agreement.
(B) The costs of Supplemental Agreement No. 1 shall be in addition to
the cost of the Original Agreement.
(C) The lump sum fee and maximum amount payable included in
Section (9) of the Original Agreement are hereby modified for Supplemental Agreement
No. 1 to be lump sum as follows:
1
Rev. 02/01/10
(D) Estimated costs for the services in Supplemental Agreement No. 1
are defined in Exhibit IV - SA1 and Exhibit V - SA1, which are attached hereto and
incorporated herein by reference.
(3) PERIOD OF SERVICE: Exhibit VI, Performance Schedule, of the
Original Agreement is hereby revised to include time for the performance of these
additional services. The projected completion date is revised to June 30, 2020, which
includes time for performance of all remaining services in the Original Agreement and
the services in Supplemental Agreement No. 1 and submittal of all deliverables.
(4) DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS:
(A) DBE Goal: The following DBE goal has been established for this
Supplemental Agreement No. 1. The dollar value of services and related equipment,
supplies, and materials used in furtherance thereof which is credited toward this goal
will be based on the amount actually paid to DBE firms. The goal for the percentage of
services to be awarded to DBE firms is 0% of the total Supplemental Agreement No. 1
dollar value.
(B) DBE Participation Obtained by Consultant: The Consultant has
obtained DBE participation, and agrees to use DBE firms to complete 0% of the total
services to be performed under this Supplemental Agreement No. 1 by dollar value.
The DBE firms which the Consultant shall use, and the type and dollar value of the
services each DBE will perform, is as follows:
DBE FIRM NAME, STREET AND
COMPLETE MAILING
ADDDRESS
ORIGINAL AMOUNT
SUPPLEMENTAL
AGREEMENT NO. 1
TOTAL
Fixed Fee
$29,560.00
$6,319.00
$35,879.00
Max. Fee Payable
$283,254.00
$50,502.00
$333,756.00
(D) Estimated costs for the services in Supplemental Agreement No. 1
are defined in Exhibit IV - SA1 and Exhibit V - SA1, which are attached hereto and
incorporated herein by reference.
(3) PERIOD OF SERVICE: Exhibit VI, Performance Schedule, of the
Original Agreement is hereby revised to include time for the performance of these
additional services. The projected completion date is revised to June 30, 2020, which
includes time for performance of all remaining services in the Original Agreement and
the services in Supplemental Agreement No. 1 and submittal of all deliverables.
(4) DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS:
(A) DBE Goal: The following DBE goal has been established for this
Supplemental Agreement No. 1. The dollar value of services and related equipment,
supplies, and materials used in furtherance thereof which is credited toward this goal
will be based on the amount actually paid to DBE firms. The goal for the percentage of
services to be awarded to DBE firms is 0% of the total Supplemental Agreement No. 1
dollar value.
(B) DBE Participation Obtained by Consultant: The Consultant has
obtained DBE participation, and agrees to use DBE firms to complete 0% of the total
services to be performed under this Supplemental Agreement No. 1 by dollar value.
The DBE firms which the Consultant shall use, and the type and dollar value of the
services each DBE will perform, is as follows:
DBE FIRM NAME, STREET AND
COMPLETE MAILING
ADDDRESS
TYPE OF DBE
SERVICE
TOTAL $ VALUE
OF THE DBE
SUBCONTRACT
CONTRACT
$ AMOUNT
TO APPLY
TO TOTAL
DBE GOAL
% OF
SUBCONTRACT
$ VALUE
APPLICABLE TO
TOTAL GOAL
(5) SUBCONSULTANTS:
(A) The Consultant agrees that except for those firms and for those
services listed below, there shall be no transfer of engineering services performed
under this Supplemental Agreement No. 1 without the written consent of the Sponsor.
Subletting, assignment, or transfer of the services or any part thereof to any other
corporation, partnership, or individual is expressly prohibited. Any violation of this
clause will be deemed cause for termination of this Supplemental Agreement No. 1.
Exceptions (Subconsultant Information):
2
Rev. 02/01/10
(6) ORIGINAL AGREEMENT: Except as otherwise modified, amended, or
supplemented by this Supplemental Agreement No. 1, the Original Agreement between
the parties shall remain in full force and effect and the terms of the Original Agreement
shall extend and apply to this Supplemental Agreement No. 1.
IN WITNESS WHEREOF, the parties have entered into this Supplemental
Agreement No. 1 on the date last written below.
Executed by the Consultant this oW5day of ,zp ,fif,c> , 2019.
Executed by the Sponsor this nAV\ day of Str Q 11, , 2019.
CONSULTANT SPONSOR
Jviation, Inc I City of Jefferson
0G'A ---C
By ..n: 414C_ By
Title *ffice Manager Title 1172 a30--( Cfrri& Terpo
ATTES
BY
Title Project Coordinator
3
ATTEST.
By
LAI
Title
APPROVED AS TO FORM:
Rev. 02/01/10
JVIATION
JEF General Aviation Terminal Facility — Feasibility Review
Scope of Services — Phase I and Phase II
September, 2019
PHASE I
Jviation is currently preparing a Master Plan Update for the Jefferson City Memorial Airport. Concepts
that were developed for the terminal area during this process will be further expanded upon to include
additional information related to the terminal facility. The Jefferson City Memorial Airport experienced
flooding in May, 2019 and is interested in the planning and feasibility of a new terminal facility to replace
the existing flooded structure.
Task 1.0: Project Coordination and Preliminary Needs Assessment
This initiative will bring various stakeholders together or may reach out to various stakeholders to discuss
the challenges and solutions or seek input to achieving a desired concept for a new terminal building.
Various stakeholders may include: Missouri Department of Transportation, State Emergency
Management Agency (SEMA), airport staff, City staff, and airport tenants. Information gathered during
this task may include Jviation attendance at meetings or during phone calls
Task 1 Deliverable: Develop project scope and related documentation. Determine study coordination
needs based on discussions with the airport sponsor. Attend meeting(s), phone calls, etc. with stakeholders
to gather input and facility needs.
Task 1.1: Conceptual Development Alternatives
al
Information obtained during the Master Plan process and during the project coordination phase will be
used to develop two (2) conceptual alternatives for review. This will entail a short narrative that includes
information that was gathered during the study. Conceptual development alternatives may include a
reviewof'the following items: terminal facility site location, space programming recommendations,
square footage recommendations, revenue and non -revenue producing areas, and regulatory and base
flood elevation requirements. A review of the alternatives will be provided to the airport sponsor for
consideration. If appropriate, rationale for phasing the facility can be described to move towards the
ultimate build out.
Task 2 Deliverable: ft/lotion will provide a short report and graphics for two (2) new terminal facility
conceptual alternatives. A review of the alternatives will be included in the report for the airport sponsor's
use.
11 Page
JVI1gTIDIV
PHASE 11
Task 2.0: Terminal Building Analysis
A code analysis will be completed as part of the terminal building planning process. Along with this review,
a review and discussion of building exteriors and interiors will be performed. This review may include a
discussion of exterior finishes, windows, roof drainage, energy efficiency, etc. A review of interior needs
may include flooring, ceilings, ADA restroom capabilities, etc. A discussion of the terminal facilities
structural system, mechanical, electrical and plumbing will be accomplished along with a review of fiber,
communication and fire protections needs.
Task 2.1: Airport Operating Revenue and Expenses
Sponsors records will be examined to determine the airport's financial resources. A summary of the
airport's operating revenue and expenses will be reviewed and the potential uses and sources of available
capital funds will be documented.
3IPage
JVI1gTIDRI
Task 1.2: Cost Estimates
This will include generating rough -order -of -magnitude cost estimates for the different alternatives. The
costs may include landside; (i.e., site prep, auto parking, roadway access, utilities, terminal facility,
security, fencing/gates), and airside if appropriate (i.e., site prep, apron, lighting, etc.) This will utilize
information from similar airport projects, nationwide data bases of construction costs, and local pricing
factors. Industry standard metrics will be utilized to complete the cost estimates to establish a feasibility
estimate for the proposed improvements.
Task 3 Deliverable: Jviation will provide a rough -order -of -magnitude cost estimate for two (2)
development alternatives.
Task 1.3: Agency Coordination
Jviation will provide coordination and guidance in preparation for meetings with key partners including
the FAA and MoDOT. Jviation will provide the documentation needed for these meetings and any follow
up information. Also, documentation related to airspace feasibility reviews will also be accomplished as
part of this task.
Task 4 Deliverable: Jviation will coordinate/attend/document meetings with FAA and MoDOT. Submit
appropriate 7460 information and other documentation as required.
Task 1.4: Final Project Deliverables
A report created from Tasks 1.1 and 1.2 will be produced. In addition, a project schedule will be updated
following Agency Coordination. Five (5) hardcopies and an electronic version of the study report will be
provided to the City. The City will submit copies to MoDOT for review and coordination. The final
recommendations from the terminal facility feasibility study will be included in the Airport Master Plan.
In addition, any presentation materials and/or drawings produced from this study will be provided
electronically.
At the conclusion of the study, Jviation will attend a meeting with airport and City staff to review and
discuss the study. Two members of Jviation's staff may attend the meeting in-person, while others may
attend via telephone.
Schedule and Fee
The estimated timeframe to complete this study and the tasks identified above is approximately 90 days
from Jviation's receipt of the notice to proceed. The fee for the study and the scope of services elements
outlined in Phase I is $38,580. The fee for the Phase II Scope of Services is $11,922 for a total project
budget of $50,502. Phase II may be implemented upon the completion of Phase I and after consultation
with the airport sponsor.
2IPage
EXHIBIT IV - SA1
DERIVATION OF CONSULTANT PROJECT COSTS (CONSTRUCTION)
EXHIBIT V - SA1
ENGINEERING CONSTRUCTION SERVICES -COST BREAKDOWN
5
Rev. 02/01/10
rfrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrfrr rrfrrrrrrrrrrrrrrrrrrrrrfrrrEXHIBIli1V
DERIVATION OF CONSULTANT PROJECT COSTS
JEFFERSON CITY MEMORIAL AIRPORT
JEFFERSON CITY, MISSOURI
PHASE I Terminal Feasibility Study
September 4, 2019
1 DIRECT SALARY COSTS:
ttttttttttttfffTlTLEfffffffffffffff iffffffffffffHOURSfffffffff
Planningf Manager
Senior'onsultant
Planner' III
Engineer
Architect' II
Architect
CAD/CIS Tech
Adminl Support
tttttttfffTotaltDirect'Salaryf Costs
RATE/HOUR ffffCOSTf($)ffff
0 $69.00 $0.00
36 76.00 2,736.00
62 40.00 2,480.00
12 45.00 540.00
36 40.00 1,440.00
56 19.00 1,064.00
72 28.00 2,016.00
30 21.00 630.00
2 LABOR AND GENERAL ADMINISTRATIVE OVERHEAD
ffffffffff Percentagefoff DirectfSalaryfCostsfff@
3 SUBTOTAL:
ttrrfffftfItems 1fandf2f
4 PROFIT:
15%rooItemf 3f Subtotal`
*Note: 0-15%Typical
5 OUT-OF-POCKET EXPENSES:
fffffa ffRentalf Vehicle
fffff b.ff Meals
fffff cff Motel*
2 Daystff@
2 Daysff@
2 Nigh s'@
df TravelandAirfnef C 2 Trips @
ffff of Misc flaneousf(printinp,tsliippirg,t
�tc...)
udesfestimated tans' and fees fo lodging
Total Out-of-Pockee Expenses
6 SUBCONTRACT COSTS:
ttffft
a¶Subconsultant
ttfffb. Subconsultant
fffffcffSubconsultant
7 MAXIMUM TOTAL FEE:
ftttttffff Items 1,f 2,f 3,f 4,f 5fandf6
191.20
$70.000 /Mile =
$55.00 /Dayff=
$114.00 /Nig!
$500.00 /Trip =
Subtotal
$140.00
$110.00
$228.00
$1,000.00
$580.00
= $10,906.00
= $20,852.00
= $31,758.00
= $4,764.00
$36,522.00
= $2,058.00 NottTo Exceed
$0.00
fffffffffffffffffff
= $38,580.00 Lump Sumf Fee
Exhibitf IVf f 1 updatedf12/2011
rninininininininirrriTriffriTifffiliffiffifffiffiliffiffExHIBITTIV
DERIVATION OF CONSULTANT PROJECT COSTS
JEFFERSON CITY MEMORIAL AIRPORT
JEFFERSON CITY, MISSOURI
PHASE II Terminal Feasibility Study
September 4, 2019
1 DIRECT SALARY COSTS:
fffffffffffffffTITLEfffffffffffffff iffffffffffffHOURSfffffffff RATE/HOUR ffffCOSTf{$)
Planning' Manager 4 $69.00 $276.00
Senior'onsultant 12 76.00 912.00
Planner'III 20 40.00 800.00
Engineer o 45.00 0.00
Architect' II 16 4 0.0 0 640.00
Architect 24 19.00 456.00
CAD/CIS Tech 8 28.00 224.00
Admin Support 12 21.00 252.00
ffffffffffTotalf Direcif Salary'Costs
2 LABOR AND GENERAL ADMINISTRATIVE OVERHEAD
ffffffffff PercentagefoffDirectfSalaryfCostsfff@
3 SUBTOTAL:
ttrrffff Items 1f andf2f
4 PROFIT:
15%rooItemf 3f Subtotal`
*Note: 0-15%Typical
191.20
= $3,560.00
= $6,807.00
= $10,367.00
= $1,555.00
Subtotal $11,922.00
5 OUT-OF-POCKET EXPENSES:
fffffaffRentalfVehicle Daysff@ $70.000 /'Mile = $0.00
fffff b.ffMealsfff
Days c@ $55.00 /f Dayff= $0.00
fffff Motel.Nighs @ $114.00 /fNig1= $0.00
ffd.Travelf andf AI•nef Costs Trips @ $500.00 /f Trip = $0.00
e. Miscellaneous (printing, slipping, tc...) = $0.00
�udesfestimated tans' and fees for' lodging
Total Out -of -Pocket' Expenses
6 SUBCONTRACT COSTS:
fffffa ¶Subconsultant
fffff b. Subconsultant
fffffc ffSubconsultant
7 MAXIMUM TOTAL FEE:
ffffffffffItems 1,f 2,f 3,f 4,f 5fandf6
$0.00 Not'To Exceed
_ $0.00
fffffffffffffffffff
= $11,922.00 Lump Sumf Fee
Exhibit' IVf f 1 updatedf12/2011