Loading...
HomeMy Public PortalAbout08-0064 Savannah Cabinet Shop FF , c3 �5 H�q ti l4 CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 02 -12 -2008 PERMIT #: 080064 WORK DESCRIPTION: RENOVATIONS WORK LOCATION: 16 TYBRISA ST 217 OWNER NAME SAVANNAH CABINET SHOP ADDRESS 1014 ABERCORN ST CITY, ST, ZIP SAVANNAH GA 31401 PHONE NUMBER 912 - 236 -4982 CONTRACTOR NAME SAVANNAH CABINET SHOP ADDRESS 1014 ABERCORN ST CITY STATE ZIP SAVANNAH GA 31401 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEE'S CHARGED $ 55.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $5,000.00 TOTAL BALANCE DUE: $ 55.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: r %:5 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org $ � CITY OF TYBEE ISLAND BUILDING PERMIT ADDED VALUE DATE ISSUED: 03/07/08 PERMIT #: 080064 WORK DESCRIPTION RENOVATIONS WORK LOCATION 16 TYBRISA ST 217 OWNER NAME SAVANNAH CABINET SHOP ADDRESS 1014 ABERCORN ST CITY, ST, ZIP SAVANNAH GA 31401 PHONE NUMBER 912 -236 -4982 CONTRACTOR NAME SAVANNAH CABINET SHOP ADDRESS 1014 ABERCORN ST CITY STATE ZIP SAVANNAH GA 31401 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 85.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $8,000.00 ADDED $3000 EN VALUE TOTAL BALANCE DUE: $ 30.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: L ,i�� /Yli1�Q /C� P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -5737 www.cityoftybee.org ..,•• •.. Inspection Report city of Tybee Island 403 Butler Ave. P.O. Box 2749 Tybee Isidnd, GA 31328 Phone: (912) 786-4573 ext. 114 De,/ Fax: (912) 786-9539 Permit No OR (7)06 I Date Requested Owner's Name 60e i Date Needed 3t' 2 Gen, Contractor LV_hri2fShOl) Subcontractor Contact Number (A H c23 - 6 / F52 I 6 Location (,,OW G=a 3'eabrec-2 e t1 q) ( • /574 Inspector 111 Date of Inspection • Type of Inspection F» / Ai tl 1//Ott.J Ck< !Pass 4 bowl Ke 422.13.5c3 Fa:A CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: C0- �1.�1� 211 PIN # NAME ADDRESS TELEPHONE - rti5 S o>ctN4\YE Owner 1 01'4 AcT 6 T ° I I Z & -Lti g c to 1 1■1Cr- SC<V w■- NA s1 0 I Architect or Engineer Building Contractor' (Check all that apply) 111 Repair ❑ Residential ❑ Footprint Changes ), Renovation ❑ Single Family ❑ Discovery El Minor Addition ❑ Duplex Demolition ❑ Substantial Addition ❑ Multi - Family ❑ Other Commercial Details of Project: O o v.A 12,CAN3 U b14 OAJ Neu) F/o on r i AJQ — M (nor 6�6._ ( fie oc eie Ou 7 AP ce. 2 ) LE-T- Estimated Cost of Construction: $ -4- 3,0x0 ('ems RA {mo / RpQ k (cheS S ` 8 1-0 Construction Type '"I (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: 1- \'01_ "V.--0 (N.A. / Co N 1 U^ ft L Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units ( # Bedrooms # Bathrooms i Lot Area Living space (total sq. ft.) '2.-c6 # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through ��t�Ll -4 ( L ul . On -site waste and debris containers will be provided by c Construction debris will be disposed by by means of I understand that I must comply with zoning. flood darnaae control. building. fire, shore protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: Fbe 7;(x) Signature of Applicant: � pP gd � Note: A Hermit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site \ . 1$' Distance to water main tap site I ) 3 Distance to sewer stub site T A / Water meter size Storm drainage '' Approvals: Signature Date FEES Zoning Administrator /77< Permit L --- Code Enforcement Offic: C{�G• � / 1� �� Inspections Water /Sewer U Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL .ter `o ,add; �/a et �^ REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: Project I.D.: Attachments approved by: Date: