BUILDING PERMIT
DATE ISSUED: 02-12-2008 PERMIT#: 080066
WORK DESCRIPTION: CARPORT
WORK LOCATION: 204 SEVENTH ST
OWNER NAME VALERIE&JAMES HARTZ
ADDRESS 204 7TH ST#HC-32
CITY,ST,ZIP TYBEE ISLAND GA 31328-8711
PHONE NUMBER
CONTRACTOR NAME VALERIE&JAMES HARTZ
ADDRESS 204 7TH ST#HC-32
CITY STATE ZIP TYBEE ISLAND GA 31328-8711
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEE'S CHARGED $ 25.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $650.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-5737
www.cityoftybee.org
rz.
Inspection Report
city at Tybee island
403 Butler Ave.
P-O. Box 2749
Tybee Island, GA 31328
Phone: (912) 786-4573 ext. 114
Fax: (912) 786-9539
13t-- 1/)it n 03- L-.) (a.7 Date Requested (0 ebb
OIAMOV +Kg 1 Date seeded
Gen, contractor Subcontractor
Contact Number E ci 0 2 0 L4 Q:) 3
Location 2 i-4
r4-k S+._
C (7( ) in / 0
elcpPt-to r _ Date of spectiou
Type flt ipecn n ear- poi-4- D (;)
- _
Pass
row"
Fail
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
,1'::n �;
4
o�'
Location: ,Q It rill si: PIN# it a-0 pe'c-- //'°OO7
NAME ADDRESS TELEPHONE
Owner - H6 R 7- 4- 1-4
Architect ' " 2 2 D-g`/4 O • _
or Engineer
Building `•e,(i. b v; it
Contractor
•
(Check all that apply)
❑ Repair sidential 1E1 F• ootprint Changes
❑ Renovation Single Family ❑ D• iscovery
❑ Minor Addition ❑ Duplex ❑ Demolition
E]jbstantial Addition El Multi-Family ther 465 e07 h/e -)-- fl Commercial
Secure e-e/rperr, —f—L �`'
Details of Project: f isf.iv / r-e-5.Ic� « C,el r- r / Il j 1X 5ecire
il- 1-c 1 rov/j41 til_ ' coilcrele inot11?✓ed 71-1 e
Estimated Cost of Construction: $ Q
Construction Type 6 (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(please specify) 1,
(2) Wood&Masonry (5) Steel &Masonry .51-t e-/ Cq p l Ki
(3) Brick Veneer .
Proposed use: C 0 {r_i 1 f?3 /de
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units #Bedrooms #Bathrooms
Lot Area Living space (total sq. ft.)
#Off-street parking spaces
Trees located &listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys,heating
units,ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On-site restroom facilities will be provided through `10 m or /i7e1
On-site waste and debris containers will be provided by "z
Construction debris will be disposed by E! 4 f rk by means of c,i fy p
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: ./Cite Signature of Applicant: Ale
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone _
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site c ) y� 4
Distance to sewer stub site C£
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator ■ 1 Permit .25;
�/
Code Enforcement Officer t✓ �f�b, � , t/J�S� Inspections
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL
`.1 cit.) cbq
-Z cc) :e.4..)-c.L.r o-w,40°-2-�
Koa) `S -yrars 4
'ti is Co c rib off. 1 ek.) Ock.) er�
R,4 ,v10hvv'- 10 p,4-1-'
a,`r bcc ( ij 4-71- or ins(
AoG.a'fi0 v •
G�1ose � ,1► ', le,