Loading...
HomeMy Public PortalAbout10) 7G SUPPLEMENT AGREEMENT TO ADMINISTERING AGENCY-STATE MASTER AGREEMENT FOR EL MONTE AVE HWY SAFETY IMPROV PROJCity Council March17,2015 Page 2 of 3 improve signal hardware and other safety related improvements, including installation of dynamic/variable speed warning signs, along the following roadways: • El Monte Avenue between Live Oak Avenue and Lower Azusa Road; • Lower Azusa Road between El Monte Avenue and Baldwin Avenue; • Baldwin Avenue between Lower Azusa Road and Live Oak Avenue; and • Broadway between Baldwin Avenue and Acacia Street. 3. In December, 2013, Caltrans informed the City that a fund of $282,900, as requested by the City, towards the total project cost of $314,500 was allocated in an Approved Project List of HSIP, Cycle 6 for Federal Fiscal Year 2014-15. 4. On November 9, 2014, Caltrans notified the City that necessary funds for the project's design and environmental (preliminary engineering) phase in the amount of $18,720 had been obligated and any work done on the project from that date on would be eligible for reimbursement. 5. On September 29, 2014, Caltrans sent the City the Program Supplement Agreement to the Administering Agency-State Master Agreement for City's review and approval for reimbursement of project expenditures. ANALYSIS: The total project cost is estimated to be $314,500 of which $20,800 is allocated for the project's design and environmental (preliminary engineering) phase. The Federal obligated fund for this phase is $18,720; the remaining $2,080 will be shared by the City as a requirement of Federal funding. The cost for the project's construction and construction engineering phase is estimated to be $293,700 of which $264,180 is federally funded under the HSIP program. The City's share of the cost in this phase is $29,520. See Table 1, below. Table 1 -Funding for El Monte Avenue Improvements $ 20,800 Project Design and Environmental Phase $ 18,720 Federally Funded Portion $ 2,080 City Funded Portion $ 293,700 Project Construction and Construction Engineering Phase $ 264, 180 Federally Funded Portion $ 29, 520 City Funded Portion $ 314,500 Total The City's total contribution for this project will be $31,600. The City's adopted Capital Improvement Budget for Fiscal Year (FY) 2014-2015 has a total of $31,600 from General Fund allocated to this project (CIP No.: P15-07). The remaining $282,900 will be from HSIP funds. City Council March 17, 2015 Page 3 of 3 The Program Supplement Agreement to the Administering Agency-State Master Agreement received by the City on September 29, 2014 must be signed by an authorized City personnel and returned to Caltrans. Upon receipt and ratification of the signed agreement, Caltrans will return a fully executed copy of the agreement to the City. Caltrans will not process any invoice from the City for reimbursement of project expenditures until the agreements are fully executed. CONCLUSION: The City Council is requested to adopt Resolution No. 15-5069 authorizing the City Manager to sign the Program Supplement Agreement to the Administering Agency-State Master Agreement, and send these documents to Caltrans for execution. FISCAL IMPACT: There will be no impact to General Fund for the Fiscal Year 2014-2015. ATTACHMENTS: A. Program Supplement Agreement No. 009-N to Administering Agency-State Master Agreement No. 07-5365R B. Resolution 15-5069 C. Caltrans Letter Authorizing Federal Funds D. Caltrans Letter Requesting the City to Sign the Agreement ATTACHMENT A Resolution No. 15-5069 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMPLE CITY AUTHORIZING THE CITY MANAGER OF THE CITY OF TEMPLE CITY OR HIS DESIGNEE TO SIGN THE PROGRAM SUPPLEMENT AGREEMENT NO. 009-N TO ADMINISTERING AGENCY-STATE MASTER AGREEMENT NO. 07-5365R. WHEREAS, the City of Temple City's El Monte Avenue Highway Safety Improvement Program (HSIP) project currently has $282,900 of Federal Highway Safety Improvement Program funds allocated to the Project; and WHEREAS, these funds will require that they are managed in accordance with the State of California Department of Transportation (Caltrans) Local Assistance Procedures Manual (LAPM); and WHEREAS, on December 3, 2013, Caltrans approved the City's fund allocation application authorizing the City to utilize $282,900 of Federal funds for installing/upgrading stop signs and other regulatory signs, improving signal hardware and other safety related improvements including installation of dynamic/variable speed warning signs along the roadway on El Monte Avenue between Live Oak Avenue and Lower Azusa Road; Lower Azusa Road between El Monte Avenue and Baldwin Avenue; Baldwin Avenue between Lower Azusa Road and Live Oak Avenue; and Broadway between Baldwin Avenue and Acacia Street. WHEREAS, Caltrans requires the City of Temple City to execute the Program Supplement Agreement No. 009-N to Administering Agency-State Master Agreement No. 07-5365R for the City's El Monte Avenue HSIP Project, in order to be eligible to receive the Federal share of eligible Project costs; and WHEREAS, the City Council of the City of Temple City has approved and agreed to this Program Supplement Agreement to Master Agreement; and NOW, THEREFORE, the City Council of the City of Temple City does hereby resolve, determine and order as follows: Section 1. Section 2. That the City Manager of said City, or his designee, is hereby authorized to sign said Agreements on behalf of the City. The City Clerk shall certify to the passage and adoption of this resolution. PASSED, APPROVED AND ADOPTED by the governing body of the City of Temple City on this 17th day of March, 2015. Mayor ATTEST: APPROVED AS TO FORM: City Clerk City Attorney Resolution No. 15-5069. Page 2 I hereby certify that the foregoing resolution, Resolution No. 15-5069, was duly passed, approved and adopted by the City Council of the City of Temple City at a regular meeting held on the 17th day of March, 2015, by the following vote: AYES: NOES: ABSENT: ABSTAIN: City Clerk Councilmember- Councilmember- Councilmember- Councilmember- CERTIFICATION-CITY OF TEMPLE CITY I, Peggy Kuo, City Clerk of the City of Temple City, do hereby certify that the foregoing document is full, true and correct copy of: Resolution No. 15-5069, A Resolution of the City Council of The City of Temple City Authorizing the City Manager of the City of Temple City or his designee to sign the Program Supplement Agreement No. 009- N to Administering Agency-State Master Agreement No. 07 -5365R and the The Original document is on file in the Office of the City Clerk, City of Temple City, California. Peggy Kuo City Clerk Dated: March 17, 2015 PROGRAM SUPPLEMENT NO. N009 to ADMINISTERING AGENCY-STATE AGREEMENT FOR FEDERAL-AID PROJECTS NO 07-5365R ATTACHMENT B Adv Project ID Date: September 19, 2014 0715000070 Location: 07 -LA-0-TMPC Project Number: HSIPL-5365(009) E.A. Number: Locode: 5365 This Program Supplement hereby adopts and incorporates the Administering Agency-State Agreement for Federal Aid which was entered into between the Administering Agency and the State on 10/"19/09 and Is subject to all the terms and conditions thereof. This Program Supplement is executed in accordance with Article I of the aforementioned Mesler Agreemenl under authority of Resolution No. approved by the Administering Agency on (See copy attached). The Administering Agency further stipulates that a~ a condition to the payment by the State of any funds derived from sources noted below obligated to this PROJECT, the Administering Agency accepts and will comply with the special covenants or remarks set f01th on the following pages. PROJECT LOCATION: Along El Monte Ave: Live Oal( Ave & Lower Azua Rd; Lower Azusa Rd: El Monte Ave & Baldwin; Baldwin Ave: Lower Azusa Rd & Live Oak; Broadway: Baldwin & Acadia in Temple City. TYPE OF WORK: Upgrade traffic signals; signs; and other safety improvements LENGTH: O.O(MILES) Estimated Cost $20,800.00 CITY OF TEMPLE CITY By Title Date Attest Fed(lral Funds .. MS30 $18,720.00 -·-- LOCAL $2,080.0( Matching Funds OTHER STATE OF CALIFORNIA Department of Transportation $0.00 By -;--:;:c::;-~-:-=-'--;----:-c:---:--~:-:-::­ Chief, Office of Project Implementation Division of Local Assistance Date~~-. I hereby certify upon my personal knowied~e that budgeted funds are available for this encumbrance: .. ··,~. Accounting Off~r--:~~c~·i:?<Zt"'-" 3J Date •f'/171 1 '1' $18.720.00 Chapter Statutes Item Year Program BC category Fund Source AMOUNT ! I i I .. I - Program Supplement 07 ·5365R-N009-ISTEA Page 1 of 3 STATE OF CALIFORNIA. DEPARTMENT OF TRANSPORTATION PROGRAM SUPPLMI':NT ANP CI':RTIFICATION FORM PSGF (REV. 0112010) TO: STATIO CONTROLLER'S OFFICE FROM: Clalns Audits 3301 -"C" Street, Rm 404 Sacramento, CA 95816 Department of Transportation SUBJECT: Encumbrance Document VF.Nr>OR/ LOCALAGENCY: CITY OF TEMPLE CITY CONTRACT AMOUNT: 1SOQ559 Local Assistance CHAPTER STATUTES ITEM 20 2013 2660-.,02-0890 YEAR 2013-2014 PiiUU nf DATE PREPARED: PROJEC.:T NUMBER 9/19/2014 0715000070 REQUISITION NUMBEH /CONTRACT NUMBER; RQS-2660-071500000302 PEC/PECT TASK I SUBTASK 2030010550 2620/0420 $18,720.00 AMOUNT 18,720.00 ADA Notic For individUals '.Vith sensory disabilities, this doC{)men\ Js available In altamate formals. Fot information, cull (015) 654-6410 ofTDD {916) -36B()orwrite Records and Forms Management, 1120 N. Street. M$-89, Sacramento, CA 95914. I 07-LA-0-TMPC HSIPL-5365{009) SPECIAL COVENANTS OR REMARKS 09/1812014 1. The ADMINISTERING AGENCY will advertise, award and administer this project in accordance with the current published Local Assistance Procedures Manual. 2. ADMINISTERING AGENCY agrees that it will only proceed with work authorized for specific phase(s) with an "Authorization to Proceed" and will not proceed with future phase(s) of this project prior to receiving an "Authorization to Proceed" from the STATE for that phase(s) unless no further State or Federal funds are needed for those future phase(s). 3. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices at least once every six months commencing after the funds are encumbered for each phase by the execution of this Project Program Supplement Agreement, or by STATE's approval of an applicable Finance Letter. STATE reserv.es the right to suspend future authorizations/obligations for Federal aid projects, or encumberances for State funded projects, as well as to suspend invoice payments for any on-going or future project by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-month period. · If no costs have been invoiced for a six-month period, ADMINISTERING AGENCY agrees to submit for each phase a written explanation of the absence of PROJECT activity along with target billing date and target billing amount. ADMINISTERING AGENCY agrees to submit the final report documents that collectively constitute a "Report of Expenditures" within one hundred eighty (180) days of PROJECT completion. Failure of ADMINISTERING AGENCY to submit a "Final Report of Expenditures" within 180 days of PROJECT completion will result In STATE imposing sanctions upon ADMINISTERING AGENCY in accordance with the current Local Assistance Procedures Manual. 4. The Administering Agency shall not discriminate on the basis of race, religion, age, disability, color, national origin, or sex in the award and performance of any Federal- assisted contract or in the administration of its DBE Program Implementation Agreement. The Administering Agency shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination In the award and administration of Federal-assisted contracts. The Administering Agency's DBE Implementation Agreement is incorporated by reference in this Agreement. Implementation of the DBE Implementation Agreement, including but not limited to timely reporting of DBE commitments and utilization, is a legal obligation and failure to carry out its terms shall be treated as a violation of this Agreement. Upon notification to the Administering Agency of its failure to carry out its DBE Implementation Agreement, the State may impose sanctions as provided for under 49 CFR Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.). 5. Any State and Federal funds that may have been encumbered for this project are Program Supplement 07-5365R-N009-ISTEA Page 2 of 3 07-LA·D·TMPC HSIPL-5365(009) SPECIAL COVENANTS OR REMARKS 09/18/2014 available for disbursement for limited periods of time. For each fund encumbrance the limited period Is from the start of the fiscal year that the specific fund was appropriated within tile State Budget Act to the applicable fund Reversion Date shown on the State approved project finance letter. Per Government Code Section 16304, all project funds not liquidated within these periods will revert unless an executed Cooperative Work Agreement extending these dates is requested by the ADMINISTERING AGENCY and approved by the California Department of Finance. ADMINISTERING AGENCY should ensure that Invoices are submitted to the District Local Assistance Engineer at least 75 days prior to the applicable fund Reversion Date to avoid the lapse of applicable funds. Pursuant to a directive from the State Controller's Office and the Department of Finance; in order for payment to be made, the last date the District Local Assistance Engineer can forward an invoice for payment to the Department's Local Programs Accounting Office for reimbursable work for funds that are going to revert at the end of a particular fiscal year is May 15th of the particular fiscal year. Notwithstanding the unliquidated sums of project specific State and Feder<~! funding remaining and available to fund project work, any invoice for reimbursement involving applicable funds that is not received by tile Department's Local Programs Accounting Office at least 45 days prior to the applicable fixed fund Reversion Date will not be paid. These unexpended funds will be irrevocably reverted by the Department's Division of Accounting on the applicable fund Reversion Date. 6. Award information shall be submitted by the ADMINISTERING AGENCY to the District Local Assistance Engineer within 60 days of project contract award and prior to the submittal of tile ADMINISTERING AGENCY'S first invoice for the construction contract. Failure to do so will cause a delay in the State processing invoices for the construction phase. Please refer to Section 15.7 "Award Package" of the Local Assistance Procedures Manual. 7. As a condition for recerv1ng federal-aid highway funds for the PROJECT, the Administering Agency cetiifies that NO members of the elected board, council, or other key decision makers a1·e on the Federal Government Exclusion List. Exclusions can be found at www.sam.gov. Program Supplement 07 -5365R-N009· ISTEA Page 3 of3 FEDERAL AID PROGRAM DLA LOCATOR: 07-LA-0-TMPC PREFIX: HSIPL PROJECT NO: 5365(009) AUTHORIZATION I AGREEMENT SUMMARY. (E-76) PROJECT LOCATION: VARIOUS LOG: TEMPLE CITY, EL MONTE, LOWER AZUSA, BALDWIN, BROADWAY TYPE OF WORK: CALIFORNIA DEPARTMENT OF TRANSPORTATION SEQ NO: 1 UPGRADE TRAFFIC S!GNALS;SIGNS & SAFETY IMPROVEMENT FED RRNO'S: PREV AUTH I AGREE DATES: STATE PROJ NO: 0715000070L-N AGENCY: TEMPLE CITY ROUTE: TIP DATA MPO: SCAG FSTIP YR: 13/14 STIP REF: 209-7000-1052 DISASTER NO: BRIDGE NO'S: PROG CODE MS30 FUNDING SUMMARY PHASE LINE NO 10 JMPVTYPE 15 PREV. OBLIGATION PE THIS REQUEST SUBTOTAL PREV. OBLIGATION R/W THIS REQUEST SUBTOTAL PREV. OBLIGATION CON THIS REQUEST SUBTOTAL PUC CODES: PROJ OVERSIGHT: DELEGATED/LOCAL ADMIN ENV STATUS I DT: RW STATUS I DT: INV RTE: BEGMP: END MP: URBAN AREA URB/RURAL FUNC SYS M IVIJ-\r-"L I LOS ANGELES~LONG BEACH-URBI-'..1'1 PROJECT COST FEDERAL COST $0.00 $0.00 $20,800.00 $18,720.00 $20,800.00 $18,720.00 $0.00 $0.00 $0.00 $0.00 so.oo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL: $20,800.00 $18,720.00 STATE REMARKS 08/25/2014 Sequence #1 request authorization for PE PE: R/W: CON: SPR: MCS: OTH: DEMO ID ACCOST $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 09/02/2014 Seq #1: Authorize federal funds for PE in the amount of $18,720.00 under MS30 with approved EPSP. Back up listing ID #hsip6-07-052. NEPA Document must be approved prior to begin Final Design(PSE). Lump sum option selected for PE. FEDERAL REMARKS AUTHORIZATION AUTHORIZATION TO PROCEED WITH REQUEST: PRE FOR: PRELIM ENGINEERING DOCUMENT TYPE: AAGR PREPARED IN FADS BY: NGUYEN, MAl KHOI REVIEWED IN FADS BY: ULAT, ALICIA SUBMITTED IN FADS BY: NGUYEN, ROBERT PROCESSED IN FADS BY: FOGLE, JERIL YNN APPROVED IN FMIS BY: VENESHIA SMITH ON 08/28/2014 897-2951 ON 09/02/2014 653-4150 ON 09/05/2014 FOR CAL TRANS ON 09/07/2014 FOR FHWA ON 09/09/2014 )> -; );! (') I s: m z -; (') SIGNATURE HISTORY FOR PROJECT NUMBER 5365(009) AS OF 09/10/2014 FHWA FMIS 4.0 SIGNATURE HISTORY MOD# SIGNED BY 0 JERILYNN FOGLE JOSUE M. YAMBO VENESHIA SMITH FHWA FMIS 3.0 SIGNATURE HISTORY CAL TRANS SIGNATURE HISTORY DOCUMENT TYPE SIGNED BY AUTH/AGREE NGUYEN, ROBERT SIGNED ON 09/08/2014 09/08/2014 09/09/2014 SIGNED ON 09/05/2014