HomeMy Public PortalAbout08-0105 Whittington R
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03 -3 -2008 PERMIT #: 080105
WORK DESCRIPTION REPLACE WINDOW
WORK LOCATION 126 LEWIS AVE
OWNER NAME GALE WHITTINGTON
ADDRESS PO BOX 334
CITY, ST, ZIP TYBEE ISLAND GA 31328 -0334
PHONE NUMBER
CONTRACTOR NAME WINDOW WORLD OF SAVANNAH
ADDRESS 2708 LEGION DR
CITY STATE ZIP THUNDERBOLT GA 31404
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 25.00
PROPERTY IDENTIFICATION
PROJECT VALUATION $ 297.00
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
r
Signature of Building Inspector or Authorized Agent: • _ / A _ 0 / 4,
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
, - --, .---.
' ■
I
• `---_, ..
--.../
,,,6„
. ‘:,-;‘.:. : : : - : ::. • ...
,
, f
/ A —) 1( 1 0 P4 0 c e--- j
,
,,, , ,_ Q,
,
,
inspeitko; Report ( 9
. e
\ /
N, ■... --■.-. _..-..■-■-■---.■.■..*^.- e'r
OW Of Tbee .1.5Boad
403 Bilitier Ave_
Tybee. IsIandl, GA 31325
1.1e: (912) 786-4573 ext., 114
Fax: (91)) 786-
,...\
P-F-,r 14 r t (l) ? 0 — . ( 05 il 7 t :7! P F•t a . i 47, • - — . .i t j ; 0 ...),_
9
.,.. . .. _
..,
r0 ntra e 1' rl v SI ko In: ct ntractor
to ,
/ 0
, ,„
corthirt P)
• bP•i` P \ S • w k
' 4 - 7 ''
___
Locatic.)ro 1 2 Co Le s
.... . _
of .I ps pectin ri,
Type Of 7 ra t• pect it) PI 1 .-- ( 4 DIO L.4 0.--
r- ,..A.) , r, cf(Dc...k_
,.. _____---•_,------ "
1 ri, t
4-ass Lt „.... L i
..„
9P55 214668 - 11111111111111111111111111111111111 111
1 '
T
F1M i
Fa ri i 1 ,
NFRC C -- Co-i
IrwgzenizA
Series 4000 Double Hung
• National Fenestration CPB# ASO
Rating Council@ SOLID UINYL — UELDED — DOUBLE GLZO
111•14:111214•11 13/16 IG. DS LO—E ARGON
. . ,
ENERGY PERFORMANCE RATINGS
U-Factor Solar Heat Gain Coefficient
0 32 , 1 82
, 0.30
(U.S./I-P) (Metric/S1)
ADDITIONAL PERFORMANCE RATINGS
Visible Transmittance
0.56
Manufactuier stipulates that these ratings conform to applicable NFRC procedures for dati•rminira whole
, product performance NFRC ratings are determined for a fixed set of environmental conditions and a
sp product size NFRC does not recommend any product and does not warrant the suiiab Sty of any
product for any specific use Go road manufacturer a literature for cthe oroduct nerformanoe infoimatiori.
vvww.dfro.org
I
i
_ _._
- CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
OR" DI DC
Location: / g PIN #
k4i NA ) ME ADDRESS TELEPHONE
Owner (r'lsl rr J P6 A _53 ! a f i
Architect Gro �1
or Engineer
Building GU /VP 2tO �70& C / DA De—
Contractor G'D )/2-A ./3L7 j7 55
(Check all that apply)
❑ pair [Residential El Footprint Changes
ri El Single Family El Discovery
El Minor Addition El Duplex ❑ Demolition
El Substantial Addition El Multi - Family
❑ Other El Commercial
Details of Project: PE PLk E GO l f. !> Ci LU
Estimated Cost of Construction: $ q / 0 0
Construction Type / (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.) /666
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories / Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction: �
On -site restroom facilities will be provided through / re
On -site waste and debris containers will be provided by t / Dote) t D
Construction debris will be disposed by by means of 7 Z -1(CZ_
I understand that I must comply with zoning, flood damage control, building, fire, shore
Protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that maybe necessary to restore drainage impaired by this
permitted construction.
Date: 3.3 --cg Signature of Applicant: i ; Y tir
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit 02 3
Code Enforcement Officer Inspections
Water /Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL s.