Loading...
HomeMy Public PortalAbout2019-11-14 packetNotice of Meeting & Tentative Agenda City of Jefferson Public Works & Planning Committee Thursday, November 14, 2019 7:30 a.m. John G. Christy Municipal Building, 320 East McCarty Street Boone/Bancroft Room (Upper Level) TENTATIVE AGENDA 1) Introductions 2) Approval of the September 12, 2019 Committee meeting minutes 3) New Business 1. Amending Chapter 8, Article V, Property Maintenance Code (Sonny Sander) 2. Amending Appendix Y — Changing Determination Method of Construction Value from RS Means to ICC Valuation (Larry Burkhardt) 3. 2018 Building Code Review (Larry Burkhardt) 4. 200 and 202 East High Street Update (Sonny Sanders) 5. Proposed revisions to City of Jefferson Standard Drawings (David Bange) 6. Lien Release Agreement (Ryan Moehlman) 7. Update on New Transit Facilities (Mark Mehmert) 8. CIP Updates: Dunklin/Clark; Dunklin Bridge; East High (David Bange) 9. Waiver of Ground Lease and Other Fees Due to Airport Flooding (Britt Smith) — Requestor: Abbott Aviation 10. Amtrak Facility Grant (Britt Smith) 11. Pamela/Linden Stormwater (David Bange) 4) Citizen opportunity to address Council/Staff on Stormwater and Other Public Works Issues • Sidewalk on North Ventura Avenue (Ken Dobbs) 5) Adjourn NOTES Individuals should contact the ADA Coordinator at (573) 634-6570 to request accommodations or alternative formats as required under the Americans with Disabilities Act. Please allow three business days to process the request Please call (573) 634-6410 with questions regarding agenda items Committee Members Ken Hussey *Ron Fitzwater David Kemna Mark Schreiber Laura Ward *Left early MINUTES JEFFERSON CITY PUBLIC WORKS AND PLANNING COMMITTEE Council Chambers John G. Christy Municipal Building 320 East McCarty Street September 12, 2019 Present: Staff Present: Matt Morasch, Director of Public Works Britt Smith, Operations Division Director David Bange, City Engineer Sonny Sanders, Director of Planning & Protective Services Eric Barron, Planning/MPO Manager Ahnna Nanoski, Planner I Katrina Williams, Transportation Planner Ryan Moehlman, City Counselor Steve Crowell, City Administrator Brenda Wunderlich, Administrative Supervisor Chairman Hussey called the meeting to order at 7:30 a.m. A quorum was present at this time. The following guests were present: Councilman Rick Mihalevich; Mayor Carrie Tergin; Mike Woolley, 1109 Southwest Boulevard; Andrew Wempe and Lillian Kinard, Republic Services; Danisha Hogue, News Tribune; and Dick Aldrich, KJLU. Attendance 4 of 5 5 of 5 5 of 5 5 of 5 5 of 5 1. Introductions Introductions were made at this time. 2. Approval of the August 8, 2019 Committee meeting minutes Councilman Kemna moved and Councilman Fitzwater seconded to approve the August 8, 2019 minutes, motion carried. 3. New Business 1. Proposed Modifications of Bill No. 2019-040, for Chapter 32 (Streets and Sidewalks) by Revising the Duties and Responsibilities of Property Owners Regarding Sidewalks (David Bange) Mr. Bange explained staff is seeking the Committee's endorsement of modifications to the language of the sidewalk ordinance which is currently on the Council's informal calendar and move it to the Council as a substitute to the current bill. He stated the proposed amended language removes all references to offset dimensions, introduces the wording "dangerous or hazardous condition", and removes what was proposed as paragraph E of Section 32-99. Minutes/Jefferson City Public Works and Planning Committee September 12, 2019 There was discussion among Committee members and staff regarding the number of trip and fall cases and the liability belonging to the City and not the property owner, claims and settlements paid out, property owners maintaining sidewalks, staff being proactive rather than reactive, and funding and priorities. Councilman Fitzwater moved and Councilman Schreiber seconded to move the substitute ordinance with the removal of Sec. 32-98. 2. to the City Council with recommendation to approve. 2. City/County Agreement for Militia Drive Railroad (David Bange) 2 Mr. Bange explained staff is seeking the Committee's endorsement to enter into an agreement with Cole County for the joint maintenance of the Algoa railroad spur. Currently the responsibility of track maintenance is the County and inspection and upkeep of the railroad crossing is the City. There was discussion among Committee members, staff and those present regarding the immediate need for repairs at the railroad crossing, the cost of repairs, and taking on additional maintenance costs. Councilman Fitzwater moved and Councilwoman Ward seconded to draft the joint City/County maintenance agreement and send to the County Commission and City Council with recommendation to approve, motion carried. *Councilman Fitzwater left the meeting at this time (8:32 a.m.). 3. Downtown Overlay Zoning District (Eric Barron) Mr. Barron explained the downtown area currently does not have building design standards. Staff will be preparing a draft overlay zoning district for the area which would establish standards for building design based on the existing style of buildings located downtown. Staff will then put the document out for review and hold a public meeting. There was discussion among Committee members and staff regarding the general elements, including build -to line, height, building materials, window design, entryway and roof design. Discussion continued regarding signage and keeping the historic nature of buildings. 4. Airport Flood Update (Britt Smith) Mr. Smith updated the Committee on the Airport flooding: • The Street Division completed repairs to Taxiway C and Runway • Temporary office space has been installed • Grant and consultant agreement for a feasibility study to replace the terminal will appear on the next Council agenda • ATC service restored the middle of August • Additional work on the maintenance building is underway • Staff is working with our consultant and MoDOT to put together a replacement project bid for the field light • The FAA reports a complete replacement of the Instrument Landing System and Approach lights is needed. 5. Recycling Market Update (Sonny Sanders/Republic Services) Mr. Sanders introduced Mr. Wempe and Ms. Kinard with Republic Services. Minutes/Jefferson City Public Works and Planning Committee September 12, 2019 Ms. Kinard stated Republic Services has done two recycling surveys, mailings to customers, and media campaigns on recycling. Customers are still not using the recycling bins as they are intended. In February a letter was sent to the City Council requesting to negotiate a price increase and in April Republic appeared before the council regarding a price increase. 3 Mr. Wempe stated the cost of recycling has increased eight percent which equates to 20 cents per home. Republic would like to renegotiate an increase of $1.00 per home, increase the budget on recycling activities to the City, and Republic would like the City to share in market increases and decreases. There was discussion among Committee members, staff, and those present regarding recycling for renters, new recycling labels on boxes customers receive, the agreement still have six years, and recycling contamination. Councilwoman Ward moved to not move a renegotiation forward. Then withdrew the motion. Councilman Schreiber requested staff inform the Council that this discussion has come up again. 4. Other Topics Councilwoman Ward requested an update on the Dunklin Street Bridge project. Mr. Bange explained the 300 block opened last week. The contractor is working on the handicap ramps at Dunklin and Broadway and installing a sewer line. Hopefully by next week the water may be down to work on the stormwater pipe and then build the bridge. • Mr. Sanders invited the Committee to the Comprehensive Plan Workshop on September 19, 2019 from 5:30 to 7:30 p.m. at the East Elementary School gym located at 1229 E. McCarty Street. He also stated there is a survey on the City website. 5. Citizen Opportunity to address Council/Staff on Stormwater and Other Public Works Issues There was no one present to address the Council/Staff. 6. Adjourn Councilman Kemna moved and Councilwoman Ward seconded to adjourn the meeting at 9:14 a.m., motion carried. Public Works and Planning Committee November 14, 2019 Staff Summary of Proposed Bill to adjust building permit fees These proposed modifications to City Code will allow a building plan review fee to be collected and also to allow an equitable means to determine minimum new construction value. Plan review fees are common with most municipalities. Currently, we do not collect a fee until the building permit is issued. As for construction valuation, it was recognized here in Jefferson City to be important as current code requires RS Means estimating tools to determine the construction value. This value is the basis of determining the permit fee amount since it is multiplied against a percentage (e.g. $ construction value * 0.005 for non-residential or 0.0025 for residential). In the building permit application process, plans are submitted for review prior to a building permit being issued. The plans are reviewed for conformance with the building code. This review does take a considerable amount of time, especially for non-residential construction. The proposed modification to City Code allows a way to recover some of these costs if a building permit is not issued for non-residential construction. This has happened recently where a set of plans are reviewed and then a building permit is not requested. The proposed plan review rate will not cause an increase of the current building permit fee for non-residential construction since the plan review fee will be credited to the building permit fee -- if a permit is executed based on those plans. As stated previously, the construction valuation is used to calculate the permit fee. Sometimes, the construction valuation is undervalued by the permit applicant. This undervaluation is sometimes caused by the contractor/owner not charging labor costs or possibly intentionally trying to lower the permit fee. To help reduce disagreements, a minimum value amount needs to be quickly established. The construction valuation of new construction and additions according to City Code is supposed to be estimated using RS Means. Using this method to calculate construction valuation is time consuming. There are many variables in RS Means and could take up to a day to calculate a project. Using the International Code Council (ICC) square foot costs would allow a minimum value to be calculated in a much shorter time span. Additionally by having a more consistent minimum valuation, it helps to more evenly distribute the City of Jefferson's cost recovery to individual permits. Attached are some examples using the ICC table along with actual square foot costs. These modifications are proposed to help the Building Regulations permit process to be faster and more equitable. We are recommending the proposed bill be forwarded to the full City Council for their consideration. BILL NO.: SPONSERED BY COUNCILMAN ORDINANCE NO.: AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AMENDING THE CITY CODE, APPENDIX Y FOR CHAPTER 8 (BUILDINGS AND BUILDING REGULATIONS) , PERTAINING TO CLARIFICATIONS OF THE BUILDING OFFICIAL AND MISCELLANEOUS CODE ADJUSTMENTS. NOW, THEREFORE BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1: Appendix Y, Sec. 8-20 (SCHEDULE OF ADMINISTRATIVE FEES, PERMITS, LICENSES AND OTHER CHARGES) is amended as follows: 8 20 Non -Residential Building Permit Construction Value multiplied by a factor 0.0050 (0.50%) except that a minimum fee of $25.00 shall apply. When the Construction Value is over $10,000,000, the amount over $10,000,000 shall be multiplied by a factor of 0.0020 (0.20%) and shall be added to the $50,000 base permit fee. 8 20 Plan Review Fees Non -Residential proiects that rewire plans shall may 20% of the permit fee for Ian review. This amount will then be credited to the building permit fee if a permit is executed for the submittedIp ansa 8 20 Miscellaneous Projects Construction Value multiplied by a factor of 0.00125 (0.125%). Miscellaneous Projects are defined as those that do not provide for construction of any permanent residential or commercial structure, including new parking lots, parking lot expansions, automobile display lots and expansions thereof, and landscaping improvements. 8 20 The minimum Construction Value for new construction and additions shall be determined by the Building Official using the latest August publication of the International Code Council Building Valuation Data which shall be effective as of November 1 of the Year it is • ublished based -on the -latest eerie Section 2: This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed: Approved: Presiding Officer Mayor Carrie Tergin ATTEST: APPROVED AS TO FORM: City Clerk City Counselor The Building Official may, after the permit is issued, adjust the fee for work that is added if the added work results in an increase in the Construction Value. Section 2: This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed: Approved: Presiding Officer Mayor Carrie Tergin ATTEST: APPROVED AS TO FORM: City Clerk City Counselor Non -Residential Construction Project Cost Date Issued Description Total Feos Pernmlt No Service Address 5450,000.00 5787,800.00 5125,000.00 1/30/2019 NEW 4-PLEX APARTMENTS / 2 BDRMS 2 BATHS 2/4/2019 NEW CONSTRUCTION; DAY CARE 7,800 SQ FT. 3/19/2019 NEW CONSTRUCTION OFA 40' x 80' TRAILER MAINTENANCE SHOP. $60,000.00 3/27/2019 NEW POST FRAME METAL BUILDING FROM MENARDS WITH CONCRETE FLOOR AND DRIVEWAY TO GARAGE DOORS NEW TEXAS ROADHOUSE RESTAURANT- 7,163 sf. GROUND UP 51,693,950.00 5/16/2019 CONSTRUCTION AND ALL ASSOCIATED SITE WORK, LANDSCAPING & PAVING. 52,498,085.00 5/22/2019 NEW CONSTRUCTION OF AN ALDI FOOD STORE. 22,152 SQ FT. $300,000.00 8/16/2019 NEW CONSTRUCTION, 3 PLEX (A,B,C), MILLBROOK SUBDIVISION. 2 BDRM,1 BATH UNITS. 55,061,301.00 8/26/2019 NEW CONST FOR NEW BANK/OFFICE BUILDING 5761,000.00 9/4/2019 NEW BURGER KING RESTAURANT WITH DRIVE-THRU. 5345,000.00 10/10/2019 FUTURE SCOOTERS COFFEE. 52,658.00 BP19-0020 $4,356.00 BP19-0023 5625.00 BP19-0073 $717.00 BP19-0091 $8,886.75 BP19-0149 2116 SILVERTON CT 225 OSCAR DR 1723 INDUSTRIAL DR 224 OSCAR DR 3104 S TEN MILE DR 52,581.49 BP19-0075 2411 MISSOURI BLVD $1,917.00 BP19-0405 2117 SILVERTON CT 525,723.51 BP19-0422 1200 W STADIUM BLVD $4,222.00 BP19-0437 521 MISSOURI BLVD 51,725.00 BP19-0513 2245 MISSOURI BLVD 'Type of square ICC Actual Use Construction 'footage Cost/sf) Cost/sf I R-2 VB 4,984 5112.76 $90.29 1-4 VB 7,800 5142.33 5101.00 U IIB 3,200 $71.30 $39.06 U VB 1,920 548.30 $31.25 A-2 VB 7,163 5143.33 5236.49 M IIB 22,152 $125.68 5112.77 R-2 VB 3,730 5112.76 580.43 B IIB 25,455 5175.70 5198.83 A-2 VB 2,943 $143.33 5258.58 B VB 557 $134.99 5619.39 FY19 Residential Construction Cost per sf Square foot finished Project Cost Date Issued Description Total Fees for Building Permit Inspection fees (tbtal less sewer taps) of 5417) Permit No Service Address Comment $143.68 2,784 $400,000.00 11/13/2018 TWO FAMILY (DUPLEX) NEW CONSTRUCTION. LOT41 NOTTING HILL DR. 2784 Sq Ft., 2 BEDRM, 2 BATH. 2 UNITS. 5164.71 2,125 5350,000.00 11/19/2018 NEW SF CONSTRUCTION; 3 BEDRM, 2 BATH, 2125 SQ FT. SF 1 -STORY NEW CONSTRUCTION LOT 43 TURTLE CREEK 5112.15 1,605 5180,000.00 12/10/2018 SUBDIVISION. 1605 SQ FT. 5108.32 1,754 $190,000 00 12/10/2018 NEW SF CONSTRUCTION LOT 45 TURTLE CREEK SUBDIVISION. 1754 SQ FT. NEW 1 -STORY, SF CONSTRUCTION, LOT 44 TURTLE CREEK 5106.98 1,748 5187,000.00 12/10/2018 SUBDIVISION. 1748 SQ FT, 5102.51 1,756 5180,000.00 2/20/2019 NEW SF CONSTRUCTION ON LOT 42 IN TURTLE CREEK SUBDIVISION. 3 BEDRM,2 BATH, 1756 SQ FT. 5120.00 1,800 5216,000.00 3/5/2019 NEW SF RES CONSTRUCTION, LOT 65 TURTLE CREEK SUBDIVISION. 1800 SQ FT. 5110.14 1,725 $190,000.00 3/5/2019 NEW SF CONSTRUCTION, LOT 49 IN TURTLE CREEK SUBDIVISION. 1725 SQ FT. NEW SF CONSTRUCTION, MELODY HILLS SEC 3 SUBDIVISION. 3 5114.29 1,750 5200,000.00 3/7/2019 BDRM, 2 BATH 1750 SQ FT. NEW SF CONSTRUCTION, LOT435 COVINGTON GARDENS $76.19 1,575 5120,000.00 3/8/2019 SUBDIVSION, 3 BDRM, 2 BATH, 1575 SQ FT. NEW SF CONSTRUCTION, LOT 112 IN WESTWOOD PART 3 5107.60 1,487 5160,000.00 3/20/2019 SUBDIVISION. 3 BEDRM 2 BATH, 1487 5Q FT. NEW SF CONSTRUCTION ON LOT 30 & SOME OF LOT 29.160' $90.18 11,344 51,023,000.00 3/27/2019 FRONTAGE ALONG CONSTITUTION DRIVE. 11,344 54:1 FT. GARAGE AND RETAINING WALL. 555.56 900 550,000.00 3/29/2019 PRIOR BURN & DEMO. NEW SF 900 SQ FT RE -BUILD, 2 BEDRM 1 BATH. 5184.21 1,900 5350,000.00 4/4/2019 NEW SF HOME CONSTRUCTION, 1900 5Q FT. NEW CONSTRUCTION SF HOME IN TURTLE CREEK SUBDIVISION; 3 5136.13 1,910 5260,000.00 4/11/2019 BEDRM, 21/2 BATH, 1910 SQ FT. 5109.51 1,461 5160,000.00 4/11/2019 NEW SF HOME CONSTRUCTION, LOT 10 OF GREENBERRY TERRACE. 146150 FT, 2 STORY. NEW SF CONSTRUCTION LOT 5 & 6 IN RIVER BLUFF ESTATES. 5 5275.70 5,622 51,550,000.00 4/17/2019 BEDRM, 4 BATH, 5622 SQ FT. Freestanding garage, pool house and pool. $182.69 2,600 5475,000.00 5/6/2019 NEW 2600 SQ FT, SINGLE FAMILY HOME CONSTRUCTION IN RIVERS EDGE SUBDIVISION, 4 BATHRM, 3 BDRM. $80.00 1,500 5120,000.00 5/10/2019 NEW SINGLE FAMILY HOME / LOT 137 & 138 COLONIAL HILLS ESTATES / 1500 SF / 3 BDRMS 2 BATHS $93 38 2,281 5213,000.00 5/10/2019 NEW SF CONSTRUCTION IN WESTMINSTER ESTATES, 2281 SQ FT, 2 1/2 Bath, 3BORM. 5141.40 1,768 5250,000.00 5/17/2019 NEW CONSTRUCTION SF HOME IN TURTLE CREEK SUBDIVISION, LOT S7; 3 BEDRM, 2 BATH, 1768 SQ FT. $65.18 1,360 590,000.00 6/3/2019 NEW SF 1 -STORY CONSTRUCTION, 4BDRM, 4 BATH. LOT 4 GORDONS SUBDIVISION. 566.18 1,360 590,000.00 6/3/2019 NEW SF 1 STORY CONSTRUCTION, 4 BDRM, 2 BATH. lots 8,9&10 MORRIS & EDMONDS SUBDIVISION. 561.06 1,474 590,000.00 6/3/2019 NEW SF 2 -STORY CONSTRUCTION, 4 BDRM, 2 BATH. 5139.13 1,725 5240,000.00 6/6/2019 NEW SF CONSTRUCTION; LOT 55, TURTLE CREEK SEC 2 SUBDIVISION, 1725 SQ FT, 3 BEDRM, 2 BATH. 5148.15 2,700 $400,000.00 6/10/2019 NEW SF CONSTRUCTION IN KAUFFMAN HILLS SUBDIVISION, LOT 44. 4 BATH, 4 BDRM, 27005Q FT HOME. 5132.02 1,780 5235,000.00 7/1/2019 NEW SF CONSTRUCTION IN TURTLE CREEK SUBDIVISION, 1780 SQ FT, 1 STORY HOME. 51,417.00 51,292.00 5867.00 5892.00 5884.50 5867.00 5957.00 5892.00 5917.00 5717.00 5817.00 52,974.50 5125.00 51,292.00 51,067.00 5817.00 $4,292.00 51,604.50 5708.00 5949.50 51,042.00 5642.00 $642.00 5642.00 51,017.00 51,417.00 51,004.50 51,000.00 8P18-0377 5875.00 BP18-0391 5450.00 BP18-0402 5475.00 BP18-0403 5467.50 BP18.0404 5450.00 8P19•0041 5540.00 BP19-0055 $475.00 8P19.0056 5500.00 8P19.0061 5300.00 8P19-0063 5400.00 BP19-0076 52,557.50 BP19-0088 5125.00 8P19.0094 $875.00 8P19-0100 $650.00 BP19-0112 5400.00 BP19-0114 53,875.00 BP19-0115 51,187.50 BP19-0133 5291.00 BP19-0136 5532.50 BP19-0137 5625.00 8P19-0150 5225.00 BP19-0171 5225.00 BP19-0170 5225.00 BP19-0172 5600.00 8P19.0179 51,000.00 6P19-0189 5587.50 BP19-0279 1433 NOTTING HILL DR 2444 COUNTRY CLUB DR 4663TANMAN CT 4671 TANMAN CT 4665 TANMAN CT 4659 TANMAN CT 4664 TANMAN CT 4654 TANMAN CT 321 SCHUMATE CHAPEL RD 2046 HASTINGS RD 1804 WOODCLIFT DR 404 CONSTITUTION DR 721 WALSH ST 500 BOONVILLE RD 812 RONAN CT 1411 ELUS BLVD 1503 RIVER BLUFF CT 2323 GREEN MEADOW DR 1730 PROVIDENCE DR 802 NOB HILL 807 RONAN CT 207 CHESTNUT ST 1612 EDMONDS ST 317 E ASHLEY ST 811 RONAN CT 912 SHERWOOD DR 837 RONAN CT FY19 Residential Construction 5152 87 2,126 5325,000.00 7/16/2019 NEW SF CONSTRUCTION, LOT 3 HATTING PLACE, 2126 SQ FT. 1 STORY, 3 Bdrm, 2 Bath. 5140.00 2,500 5350,000.00 7/23/2019 NEW SF CUSTOM 2500 SQ FT, 1 -STORY HOME IN MONTICELLO ACRES SUBDIVISION. 3 BDRM, 3 BATH. 5118.42 1,748 5207,000.00 7/23/2019 NEW SF CONSTRUCTION IN TURTLE CREEK SEC 2 SUBDIVISION - LOT 51.1748 SQ FT. $126 72 1,815 5230,000.00 7/23/2019 NEW SF CONSTRUCTION IN TURTLE CREEK SECT 2 SUBDIVISION. 1815 SQ FT. $71.20 2,528 5180,000.00 g/ pig NEW SF CONSTRUCTION IN COVINGTON GARDENS SUBDIVISION. 4 BEDRM, 3 BATH, 2528 SQ FT. 5108.18 1,479 5160.000.00 8/2/2019 NEW SF CONSTRUCTION IN COVINGTON GARDENS SUBDIVISION. 2 BEDRM, 3 BATH, 1479 SQ FT. LOT 58 NEW CONSTR OF 2 DUPLEXES AT CORNER OF WILDWOOD DR & 5104.38 5,116 5534,000.00 8/6/2019 SHERMANS HOLLOW. (ADDRESSES 3402. 3404, 3408, 3410) PAID 2 573.33 561.05 573.33 5108.70 5113.27 5131.13 5106.95 580.30 5177.65 1,500 5110,000.00 1,474 590,000.00 1,500 5110,000.00 1,748 5190,000.00 1,854 5210,000.00 1.754 5230,000.00 2,244 5240,000.00 2,758 5221.480.00 3,490 5620,000.00 Actual Average cost per sf 5115.71 SEWER CONNECTS. 8/16/2019 NEW SF CONSTRUCTION IN COVINGTON GARDENS, SEC 5, LOT439, 3 BEDRM, 2 BATH, 1500 SQ FT, SPLIT FOYER. 8/16/2019 NEW 2 -STORY, 4 -BEDROOM, 2 BATH HOME IN OWENS SUBDIVISION. 8/16/2019 NEW SF CONSTRUCTION IN COVINGTON GARDENS, SEC S, 3 BEDRM, 2 BATH, 1500 SQ FT, LOT 440. 8/27/2019 NEW SF CONSTRUCTION IN TURTLE CREEK SUBDIVISION, 1748 SQ FT. 8/27/2019 NEW SF CONSTRUCTION ON LOT 54 IN TURTLE CREEK SUBDIVISION. 1854 SQ FT. 8/27/2019 NEW SF CONSTRUCTION ON LOT 55 IN TURTLE CREEK SUBDIVISION. 1754 SQ FT. 9/17/2019 NEW SF CONST AT LOT 76 TURTLE CREEK SUBDIVISION. 2244 SQ FT. 10/2/2019 PREVIOUS DEMO DUE TO FIRE. CONSTRUCTION OF A 2758 SQ FT HOME, WITH 4 BEDRM, & 3 BATHS. 10/31/2019 NEW SF CONSTRUCTION ON LOT 2 IN RIVER BLUFF ESTATES SUBDIVISION, 3490 SQ FT. Proposed ICC for R-3 (type V8) $121.24 plus 522.45 for unfinished basement SF 51,229.50 51,292.00 $934.50 5992.00 5867.00 $817.00 52,169.00 5692.00 5642.00 5692.00 5892.00 5942.00 5992.00 $1.017.00 5553.70 $1,967.00 5812.50 BP19-0323 5875.00 BP19-0351 5517.50 BP19-0350 5575.00 BP19-0352 5450.00 8P19.0377 5400.00 8P19-0376 51,335.00 1019-0387 5275.00 BP19-0407 5225.00 BP19-0401 5275.00 8P19-0406 $475.00 BP19-0427 5525.00 8P19 0428 5575.00 8P19.0429 5600.00 BP19-0461 5553.70 BP19.0493 51,550.00 8P19-0546 2448 COUNTRY CLUB DR 431 VIRGINIA TRI. 833 RONAN Cr 815 RYDER CT 2127 HAMPSHIRE DR 2123 HAMPSHIRE DR 3410 SHERMANS HOLLOW 2 taps 2062 HASTINGS RD 1204E HIGH ST 2104 HASTINGS RD 825 RONAN CT 821 RONAN CT 817 RONAN CT 834 RYDER Cr 215 TOMAHAWK RD 1515 RIVER BLUFF CT no tap COMMERCIAL/INDUSTRIAL/ INSTITUTIONAL M.530 Restaurant Virs.-a.sit .I H arka' '" ..f �•%r. `C Costs per square foot of floor area Exterior Wall S.F. Area 2000 2800 3500 4200 5000 5800 6500 7200 8000 LF. Perimeter 180 212 240 268 300 314 336 344 368 Wood Clapboard Wood Frame 238.35 225.75 219.45 215.25 211.90 207.70 205.70 203.00 201.55 Brick Veneer Wood Frame 248.85 234.95 228.00 223.35 219.70 214.95 212.75 209.70 208.10 Stone Veneer Rigid Steel 282.60 264.40 255.30 249.30 244.45 237.95 235.05 230.80 228.70 Fiber Cement Rigid Steel 245.50 233.20 227.05 222.95 219.75 215.65 213.75 211.10 209.70 E.I.F.S. Reinforced Concrete 277.15 262.35 255.00 250.10 246.20 241.15 238.85 235.55 233.80 Stucco Reinforced Concrete 277.80 262.95 255.55 250.60 246.70 241.60 239.20 235.95 234.20 Perimeter Adj., Add or Deduct Per 100 LF. 28.35 20.25 16.20 13.45 11.25 9.80 8.65 7.85 7.10 Story Hgt. Adj., Add or Deduct Per 1 Ft. 2.85 2.35 2.10 1.95 1.80 1.70 1.65 1.50 1.45 For Basement, add $ 38.80 per square foot of basement area using rhe basic spec/ ccations shown on the facing page. These costs should be adjusted where necessary for design alternatives and owner's requirements. Common additives Desorption Bar, Front Bor Bock bar Booth, Upholstered, custom stroight "L' or 13' shaped Cupola, Slack unit, redwood 30' square, 37" high, aluminum roof Copper roof Fiberglass, 5'-0' base, 63' high 6'-0' base, 63" high Decorative Wood Beams, Non load bearing Rough sawn, 4" x 6" 4'x8" 4°x 10" 4'x 12" 8' x 8" Emergency lighting, 25 watt, battery operated Lead battery Nickel cadmium Unit L.F. LF. LF. L.F. Ea. Ea. Eo. Ea. LE LE. L.F. LF. L.F. Ea. Eo. $ Cost Description 470 Fireploce, Brick, not incl. chimney or foundation 375 30' x 29' opening 265 - 485 Chimney, standard brick 274.460 Single flue, 16" x 20' 20" x 20" 840 2 Flue, 20" x 24" 485 20" x 32" 4500 - 4900 Kitchen Equipment 5300.7875 Broiler Coffee urn, twin 6 gallon 9.40 Coder, 6 h. long 10.55 Dishwasher, 10-12 racks per hr. 13.15 Food wormer, counter, 1.2 KW 14.45 Freezer, 44 C.F., reach in 15 Ice cube maker, 50 Ib. per day Range with 1 oven 335 Refrigerators, Prefabricated, walk-in 555 7'6" high, 6' x 6' 10' x 10' 12' x 14' 12' x 20' Unit $ Cost Ea. 3450 V.LF. VLF. V.LF. VLF. Ea. Ea. Eo. Eo. Ea. Ea. Eo. Ea. S.F. S.F. S.F. S.F. 114 136 166 208 4450 2975 3775 4075 785 5475 2100 3250 141 110 96 136 194 Important: See the Reference Section for Location Factors. Mode) costs calculated for a 1 story building with i12' story height and 5,000 square feet of floor area Restaurant Unit Unit Cost Cost 1 % Of Per S.F. I Sub -Total A. SUBSTRUCTURE 1010 1020 1030 2010 2020 Standard Foundations Special Foundations Slab on Grade Basement Excavation i Basement Walls Poured concrete; strip and spread footings; 4' foundation wall N/A 4" reinforced concrete Site preparation for slab and trench for foundation wall and footing N/A S.F. Ground - S.F. Slab S.F. Ground - 10.43 - 5.87 .57 - 10.43 - 5.87 .57 - 10.7% B. SHELL 1010 I'Floor 1020 2010 2020 2030 3010 I 302011 B10 Superstructure Construction Roof Construction B20 Exterior Enclosure Exterior Walls Exterior Windows Exterior Doors B30 Roofing Roof Coverings Roof Openings Wood columns Wood roof truss, 4:12 slope Wood siding on wood studs, insulated 70% of wall Curtain glozing wall system 30% of wall Aluminum & glass double doors, hollow metal doors Asphalt strip shingles, gutters and downspouts N/A S.F. Floor. S.F. Roof S.F. Wall Each Each S.F. Roof 18 6.98 25.69 45.90 7035 16.52 .46 I 7.82 12.95 4.21 7.05 2.53 - 5.2% 15.3% 1.6% C. INTERIORS 1010 1020 1030 2010 3010 3020 3030 Partitions Interior Doors Fittings Stair Construction Wall Finishes Floor Finishes Ceiling Finishes Fire rated gypsum board on wood studs 25 S.F. Floor/LF. Partition Single leaf hollow core wood doors 1000 S.F. Floor/Door Plastic laminate toilet partitions N/A 80% Paint, 20% ceramic tile 70% Carpel tile, 30% quarry tile Gypsum board ceiling on wood furring S.F. Partition Each S.F. Floor - S.F. Surface S.F. Floor S.F. Ceiling 7.40 656 .93 - 2.93 9.08 4.91 2.96 .66 .93 - 2.34 9.08 4.91 13.2% D. SERVICES 1010 1020 2010 2020 2040 3010 3020 3030 3050 3090 4010 4020 5010 5020 5030 5090 D10 Conveying I Elevators & Lihs Escalators & Moving Walks D20 Plumbing Plumbing Fixtures Domestic Water Distribution Rain Water Drainage D30 HVAC Energy Supply Heat Generating Systems Cooling Generating Systems Terminal & Package Units Other HVAC Sys. & Equipment D40 Fire Protection Sprinklers Standpipes DSO Electrical Electrical Service/Distribution Lighting & Branch Wiring Communications & Security Other Electrical Systems N/A N/A Restroom, kitchen and service fixtures, supply and drainage 1 Fixture/350 S.F. Floor Gas fired water healer Roof drains N/A Included in D3050 N/A Multizone unit gas heating, electric cooling, kitchen exhaust system N/A Wet pipe sprinkler system Standpipe 400 Ampere service, ponelboords and feeders Fluorescent fixtures, receptacles, switches, A.C. and misc. power Addressable olorm system N/A I - - Each S.F. Floor S.F. Roof - - - S.F. Floor - S.F. Floor S.F. Floor S.F. Floor S.F. Floor S.F. Floor - - - 3383 5.75 - - - 39.76 - 9.44 2.35 4.75 10.27 3.78 - - 9.53 5.75 - - - 39.76 - 9.44 2.35 4.75 10.27 3.78 - 0.0 °a 9.6% 25.1 % 7 4% 11.9% E. EQUIPMENT 1010 1020 1030 1090 & FURNISHINGS Commercial Equipment Institutional Equipment Vehicular Equipment Other Equipment N/A N/A N/A N/A - - - - - - - - - - - - 0.0 F. SPECIAL 1020 1040 CONSTRUCTION I Integrated Construction Special Facilities N/A N/A - - - - 0.0 G. BUILDING SITEWORK N/A Sub -Total 158.40 100% CONTRACTOR FEES (General Requirements: 10%, Overhead: 5%, Profit: 10%) ARCHITECT FEES 25% 7% 39.64 13.86 Total Building Cost 211.90 For customer support on your Square Foot Costs with RSMeans data, call 800.448.8182. 195 • Simple design from standard plans • Single family - 1 full bath, 1 kitchen • No basement • Asphalt shingles on roof • Hot air heat • Gypsum wallboard interior finishes • Materials and workmanship are average • Detail specifications on p. 27 Note: The iflusfrolion shown may contain some optional components (for example: garages and/or fireplaces) whose costs are shown in the modifications, adjustments, & alternatives below or at the end of the square foot sedion. Base cost per square foot of living area Exterior Wall Wood Siding - Wood Frame Brick Veneer - Wood Frame Stucco on Wood Frame Solid Masonry Finished Basement, Add Unfinished Basement, Add Living Area 1000 1200 1400 1600 1800 2000 2200 2600 3000 3400 3800 153.05 138.30 131.10 126.15 121.05 115.85 112.15 105.50 99.10 96.00 93.35 159.40 144.20 136.65 131.45 126.00 120.60 116.70 109.60 102.90 99.65 96.80 147.55 133.25 126.35 121.60 116.80 111.70 108.30 101.90 95.80 92.95 90.35 173.85 157.60 149.15 143.45 137.25 131.45 127.00 118.95 111.55 107.85 104.55 23.65 23,30 22.55 22.00 21.45 21.05 20.60 19.90 19.30 18.90 18.60 9.40 8,75 8.25 7.95 7.60 7.30 7.10 6.60 6.30 6.05 5.85 Modifications Add to the total cost Upgrade Kitchen Cabinets Solid Surface Countertops (Included) Full Bath - including plumbing, wall and floor finishes Half Bath - including plumbing, wall and floor finishes One Car Attached Garage One Car Detached Garage Fireplace & Chimney Adjustments For multi family - add to total cost Additional Kitchen Additional Bath Additional Entry & Exit Separate Heating Separate Electric For Townhouse/Rowhouse - Multiply cost per square foot by Inner Unit End Unit $ + 5907 +8111 + 4789 + 15,383 + 20,232 + 7845 $ + 10,268 +8111 + 1804 r. 1748 + 1868 .90 .95 Alternatives Add to or deduct from the cost per square foot of living area Cedar Shake Roof Clay Tile Roof Slate Roof Upgrade Walls to Skim Coat Plaster Upgrade Ceilings to Textured Finish Air Conditioning, in Heating Ductwork In Separate Ductwork Heating Systems, Hot Water Heat Pump Electric Heat Not Heated Additional upgrades or components Kitchen Cabinets & Countertops Bathroom Vanities Fireplaces & Chimneys Windows, Skylights & Dormers Appliances Breezeways & Porches Finished Attic Garages Site Improvements Wings & Ells Page 1n Important: See the Reference Section for Location Factors (to adjust for your city) and Estimating For RESIDENTIAL Average • Simple design from standard plans • Sinyle family - 1 full bath, 1 kitchen • No basement • Asphalt shingles on roof • Hot air heat • Gypsum wallboard interior finishes • Materials and workmanship are average • Detail specifications on p. 27 Note: The illustration shown may contain some optional components (for example: garages and/or fireplaces) whose costs are shown in the modifications, adjustments, & alteratives below or at the end of the square foot section. Base cost per square foot of living area Exterior Wall Living Area 1200 1400 1600 1800 2000 2400 2800 3200 3600 4000 4400 Wood Siding - Wood Frame 152.75 142.90 130.35 127.85 122.95 115.20 109.25 103.20 100.10 94.60 92.80 Brick Veneer - Wood Frame Stucco on Wood Frame Solid Masonry Finished Basement, Add Unfinished Basement, Add 159.70 149.20 136.20 133.60 128.40 120.10 113.95 107.45 104.20 98.35 96.45 146.60 137.35 125.25 122.70 118.25 110.90 105.15 99.50 96.55 91.30 89.65 174.80 162.85 148.75 146.20 140.25 130.80 124.15 116.70 112,95 106.50 104.40 20.00 19.60 18.85 18.75 18.25 17.45 17.15 16.55 16,20 15.85 15.60 7.80 7.20 6.75 6.65 6.35 5.90 5.65 5.30 5.10 4.85 4.75 Modifications Add to the total cost Upgrade Kitchen Cabinets Solid Surface Countertops (Included) Full Bath - including plumbing, wall and floor finishes Half Bath - including plumbing, wall and floor finishes One Car Attached Garage One Car Detached Garage Fireplace & Chimney djustments multi family - add to total cost dditional Kitchen ditional Bath dditional Entry & Exit porate Heating parate Electric Townhouse/Rowhouse - i,hply cost per square foot by Unit nit $ + 5907 +8111 + 4789 + 15,383 + 20,232 + 8605 $ + 10,268 +8111 + 1804 + 1748 + 1868 .90 .95 Alternatives Add to or deduct from the cost per square foot of living area Cedar Shake Roof Clay Tile Roof Slate Roof Upgrade Walls to Skim Coat Plaster Upgrade Ceilings to Textured Finish Air Conditioning, in Heating Ductwork In Separate Ductwork Heating Systems, Hot Water Heat Pump Electric Heat Not Heated Additional upgrades or components Kitchen Cabinets & Countertops Bathroom Vanities Fireplaces & Chimneys Windows, Skylights & Dormers Appliances Breezeways & Porches Finished Attic Garages Site Improvements Wings & Ells + 1.55 +3 + 3.40 + .60 + .61 + 2.82 + 5.77 + 1.26 + 1.48 - 1.73 - 3.39 Page 58 59 59 59 60 60 60 61 61 37 °►cant: See the Reference Section for Location Factors (to adjust for your city) and Estimating Forms. 31 Mcc INTERNATIONAL =!t CODE COUNCIL People Helping People Build a Safer World" Building Valuation Data — AUGUST 2019 The International Code Council is pleased to provide the following Building Valuation Data (BVD) for its members. The BVD will be updated at six-month intervals, with the next update in February 2020. ICC strongly recommends that all jurisdictions and other interested parties actively evaluate and assess the impact of this BVD table before utilizing it in their current code enforcement related activities. The BVD table provides the "average" construction costs per square foot, which can be used in determining permit fees for a jurisdiction. Permit fee schedules are addressed in Section 109.2 of the 2018 International Building Code (IBC) whereas Section 109.3 addresses building permit valuations. The permit fees can be established by using the BVD table and a Permit Fee Multiplier, which is based on the total construction value within the jurisdiction for the past year. The Square Foot Construction Cost table presents factors that reflect relative value of one construction classification/occupancy group to another so that more expensive construction is assessed greater permit fees than less expensive construction. ICC has developed this data to aid jurisdictions in determining permit fees. It is important to note that while this BVD table does determine an estimated value of a building (i.e., Gross Area x Square Foot Construction Cost), this data is only intended to assist jurisdictions in determining their permit fees. This data table is not intended to be used as an estimating guide because the data only reflects average costs and is not representative of specific construction. This degree of precision is sufficient for the intended purpose, which is to help establish permit fees so as to fund code compliance activities. This BVD table provides jurisdictions with a simplified way to determine the estimated value of a building that does not rely on the permit applicant to determine the cost of construction. Therefore, the bidding process for a particular job and other associated factors do not affect the value of a building for determining the permit fee. Whether a specific project is bid at a cost above or below the computed value of construction does not affect the permit fee because the cost of related code enforcement activities is not directly affected by the bid process and results. Building Valuation The following building valuation data represents average valuations for most buildings. In conjunction with IBC Section 109.3, this data is offered as an aid for the building official to determine if the permit valuation is underestimated. Again it should be noted that, when using this data, these are "average" costs based on typical construction methods for each occupancy group and type of construction. The average costs include foundation work, structural and nonstructural building components, electrical, plumbing, mechanical and interior finish material. The data is a national average and does not take into account any regional cost differences. As such, the use of Regional Cost Modifiers is subject to the authority having jurisdiction. Permit Fee Multiplier Determine the Permit Fee Multiplier: 1. Based on historical records, determine the total annual construction value which has occurred within the jurisdiction for the past year. 2. Determine the percentage (%) of the building department budget expected to be provided by building permit revenue. 3. Permit Fee Multiplier = Example Bldg. Dept. Budget x (%) Total Annual Construction Value The building department operates on a $300,000 budget, and it expects to cover 75 percent of that from building permit fees. The total annual construction value which occurred within the jurisdiction in the previous year is $30,000,000. $300,000 x 75% Permit Fee Multiplier = = 0.0075 $30,000,000 Permit Fee The permit fee is determined using the building gross area, the Square Foot Construction Cost and the Permit Fee Multiplier. Permit Fee = Gross Area x Square Foot Construction Cost X Permit Fee Multiplier Example Type of Construction: IIB Area: 1st story = 8,000 sq. ft. 2nd story = 8,000 sq. ft. Height: 2 stories Permit Fee Multiplier = 0.0075 Use Group: B 1. Gross area: Business = 2 stories x 8,000 sq. ft. = 16,000 sq. ft. 2. Square Foot Construction Cost: B/IIB = $175.70/sq. ft. 3. Permit Fee: Business = 16,000 sq. ft. x $175.70/sq. ft x 0.0075 = $21,084 Important Points • The BVD is not intended to apply to alterations or repairs to existing buildings. Because the scope of alterations or repairs to an existing building varies so greatly, the Square Foot Construction Costs table does not reflect accurate values for that purpose. However, the Square Foot Construction Costs table can be used to determine the cost of an addition that is basically a stand-alone building which happens to be attached to an existing building. In the case of such additions, the only alterations to the existing building would involve the attachment of the addition to the existing building and the openings between the addition and the existing building. • For purposes of establishing the Permit Fee Multiplier, the estimated total annual construction value for a given time period (1 year) is the sum of each building's value (Gross Area x Square Foot Construction Cost) for that time period (e.g., 1 year). • The Square Foot Construction Cost does not include the price of the land on which the building is built. The Square Foot Construction Cost takes into account everything from foundation work to the roof structure and coverings but does not include the price of the land. The cost of the land does not affect the cost of related code enforcement activities and is not included in the Square Foot Construction Cost. Square Foot Construction Costs a, b, c Group (2018 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage 246.61 238.50 232.82 223.18 209.86 203.80 216.12 191.69 184.50 A-1 Assembly, theaters, without stage 225.65 217.54 211.85 202.22 189.15 183.09 195.16 170.98 163.79 A-2 Assembly, nightclubs 191.96 186.56 182.12 174.70 164.94 160.39 168.64 149.29 144.33 A-2 Assembly, restaurants, bars, banquet halls 190.96 185.56 180.12 173.70 162.94 159.39 167.64 147.29 143.33 A-3 Assembly, churches 226.69 218.58 212.89 203.26 191.60 185.54 196.20 173.43 166.24 A-3 Assembly, general, community hails, libraries, museums 190.63 182.52 175.84 167.20 153.09 148.07 160.14 134.97 128.78 A-4 Assembly, arenas 224.65 216.54 209.85 201.22 187.15 182.09 194.16 168.98 162.79 B Business 197.81 190.62 184.70 175.70 160.65 154.63 168.95 141.15 134.99 E Educational 207.77 200.59 194.83 186.43 173.71 164.91 180.01 151.89 147.25 F-1 Factory and industrial, moderate hazard 117.60 112.19 105.97 101.84 91.54 87.26 97.61 75.29 70.95 F-2 Factory and industrial, low hazard 116.60 111.19 105.97 100.84 91.54 86.26 96.61 75.29 69.95 H-1 High Hazard, explosives 109.99 104.58 99.35 94.22 85.14 79.87 89.99 68.89 N.P. H234 High Hazard 109.99 _ , 104.58 99.35 94.22 85.14 79.87 89.99 68.89 63.56 H-5 HPM 197.81 190.62 184.70 175.70 160.65 154.63 168.95 141.15 134.99 1-1 Institutional, supervised environment 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33 1-2 Institutional, hospitals 330.92 323.73 317.81 308.81 292.72 N.P. 302.06 273.22 N.P. 1-2 Institutional, nursing homes 229.68 222.49 216.58 207.57 193.53 N.P. 200.83 174.02 N.P. 1-3 Institutional, restrained 224.86 217.67 211.75 202.75 188.96 181.94 196.00 169.45 161.29 I-4 Institutional, day care facilities 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33 M Mercantile 142.95 137.54 132.11 125.68 115.38 111.83 119.62 99.73 95.77 R-1 Residential, hotels 199.70 192.92 186.99 179.78 164.90 160.43 179.93 148.60 143.96 R-2 Residential, multiple family 167.27 160.49 154.56 147.35 133.71 129.23 147.50 117.40 112.76 R-3 Residential, one- and two-family d 154.28 150.09 146.35 142.65 137.55 133.92 140.30 128.74 121.24 R-4 Residential, care/assisted living facilities 197.83 191.05 185.12 177.91 163.28 158.81 178.06 146.98 142.33 5-1 Storage, moderate hazard 108.99 103.58 , 97.35 93.22 83.14 78.87 88.99 66.89 62.56 S-2 Storage, low hazard 107.99 102.58 97.35 92.22 83.14 77.87 87.99 66.89 61.56 U Utility, miscellaneous 84.66 79.81 74.65 71.30 64.01 59.80 68.04 50.69 48.30 a. Private Garages use Utility, miscellaneous b. For shell only buildings deduct 20 percent c. N.P. = not permitted d. Unfinished basements (Group R-3) = $22.45 per sq. tt. Memorandum 320 East McCarty Street • Jefferson City, Missouri 65101 • P: 573.634.6410 • F: 573.634.6562 • www.jeffersoncitymo.cov Date: November 12, 2019 To: Public Works and Planning Committee From: David Bange P.E., City Engineer rijr-6 Subject: Revisions to the Standard Construction Drawings Staff would like to make the Committee aware that we are preparing to issue an update to the Standard Construction Drawings which were last updated in in January to 2013. We are looking to promulgate the revised drawings on January 1, 2020. These revisions have been underway for about eighteen months and were first discussed with this Committee in December of 2018. At that time it was suggested that the proposed changes be decimated to various interested parties for comment. To that end the proposed changes were first sent to Central Missouri Professional Services and the Heath Clarkson with the Home Builders Association in July of 2019, and they were sent to them again as well as to Bartlett & West, MECO, and Barr Engineering in October of this year. To this point the only comments we have received have been positive, along with the suggestion of a few additional details to be considered for inclusion. Currently the revisions are going through a final internal review and correction in preparation for their distribution. Among a host of little things the whole of the Standard Construction Drawings were updated to provide a more unified presentation of material, minor changes to some of the construction details, and the addition of details that had not previously been in the standards such as roof drains and outlet structures for water quality basins. Three changes of note are the addition of the requirement to place 3" of free draining stone under all streets, the removal of the requirement to seal contraction joints in concrete pavements, and the addition of epoxy coated dowel bars in the contraction joints of arterial concrete pavements. A draft version of these drawings can be made available if so requested. If you have any questions I can be reached at 634-6433. DB:db U:1Public Works\Engineering\dbange\PUBLIC WORKS & PLANNING\2019\11-2019\Changes to Standard Drawings.docx LIEN RELEASE AGREEMENT THIS DEVELOPMENT AGREEMENT ("this Agreement") is made and entered into on the last day executed by a party, as indicated on the signature pages below, by and between the City of Jefferson, Missouri, a municipal corporation of the State of Missouri ("City") ("Developer"). RECITALS The Subject Property. The Developer is the contract purchaser of certain land currently located in the incorporated area of the City of Jefferson currently owned by (the "Seller"), generally located at and identified in the Cole County tax records as Parcel No. (the "Subject Property"). Proposed Project. Developer desires to redevelop the Subject Property for resident purposes. NOW, THEREFORE, in view of the foregoing Recitals and in consideration of the mutual promises, declarations, covenants and agreements of the City and Developer as hereinafter set forth, the Parties hereto do hereby agree as follows: 1. City's Obligations for Development. a) Upon execution of this agreement, the City shall temporarily release and hold in abeyance all special tax bills, including penalties and interest, which had been previously assessed on the Subject Property by the City. Nothing herein shall be deemed to release any generally applicable property taxes assessed on the Subject Property. 2. Developer's Obligations for Development. a) In Developer's contract to purchase the Subject Property, Developer shall require that any purchase funds provided to Seller shall be first credited out of escrow to the City for delinquent administrative fees (include Abandoned Property Registration fees), penalties, and interest. b) Within thirty (30) days of the execution of this Agreement or closing on the Subject Property, whichever is later, Developer shall pay all delinquent generally applicable property taxes previous assessed on the Subject Property. c) Developer shall redevelop the Subject Property by (describe the project, including timeframe) d) During term of this Agreement, Developer shall not allow any generally applicable property taxes assessed on the Subject Property to become delinquent. 1 e) During term of this Agreement, Developer shall not allow the Subject Property to become a nuisance or contain nuisance conditions, as that term is defined in the Jefferson City Code. 3. Failure to Comply. This Agreement shall have a term ending on January 1, 2023. If at the end of the term of this Agreement Developer has been in continuous compliance with the requirements of this Agreement, the special tax bill temporarily released in Paragraph 1(a) of this Agreement shall deemed to be permanently released without further action of the City. If at the end of the term of this Agreement Developer has not been in continuous compliance with the requirements of this Agreement, the City may reinstate the special tax bills on the Subject Property with the County Collector and such shall special tax bills may be collected as a debt against the Developer. 4. Amendments. The obligations of the Developer set forth in in the Agreement shall run with the land and be binding on future owners, successors, or assigns. 5. Remedies. The parties to this Agreement may, either in law or equity, by suit, action, mandamus or other proceedings in court, seek declaratory relief, enforce and compel specific performance of this Agreement, provided that in no event shall the City have any liability in damages, costs (including attorneys' fees) or any other monetary liability to Developer or any affiliate of Developer, any person claiming through Developer, or to their respective successors, assigns, heirs and personal representatives in respect of any suit, claim, or cause of action arising out of this Agreement or any of the actions or transactions contemplated herein. 6. Third Party Actions. Developer shall have the right, but not the obligation to assume the costs of defense of any action or proceeding initiated by a third party challenging this Agreement, or any other actions or transactions contemplated by this Agreement (including, without limitation, to settle or compromise any claim or action for which Developer has assumed the defense) with counsel of Developer's choosing and the City and Developer agree that so long as no conflicts of interest exist between them, the same attorney or attorneys may simultaneously represent the City and Developer in any such proceeding. In no event shall the City have any liability to Developer for damages or otherwise in the event that all or any part of this Agreement or the ordinances approving this agreement shall hereafter be declared invalid or unconstitutional in whole or in part by a final (as to which all rights of appeal have been exhausted or expired) judgment of a court of competent jurisdiction, and, in the event Developer elects not to assume such defense and costs, the City shall have no obligation to defend or to assume the costs of defense of any such action. 7. Hold Harmless. Developer at its sole cost and expense, hereby agrees to indemnify, protect, release, defend (with counsel acceptable to the City) and hold harmless the City, its municipal officials, elected officials, boards, commissions, officers, employees, attorneys, and agents from and against any and all causes of action, claims, demands, all contractual damages and losses, economic damages and losses, all other damages and losses, liabilities, fines, charges, penalties, administrative and judicial proceedings and orders, judgments, remedial actions of any kind, and all costs and expenses of any kind, including, without 2 limitation, reasonable attorney's fees and costs of defense arising, directly or indirectly, in whole or in part, from the action or inaction of Developer, its agents, representatives, employees, contractors, subcontractors or any other person for whose acts Developer may be liable, in the activities performed, or failed to be performed, by Developer under this Agreement or in the development of the Subject Property, or from breach of this Agreement, except to the extent arising from or caused by the sole or gross negligence or willful misconduct of the City, its elected officials, officers, employees, agents or contractors. The indemnification, duty to defend and hold harmless obligations set forth in this Section shall survive for a period of five (5) years from the final date of the term of this agreement. 8. Compliance with Laws. Developer shall comply with all applicable state, local, and federal laws in the performance of this Agreement, including obtaining all applicable building permits to complete the project described in Paragraph 2(c). 9. Entire Agreement. This Agreement contains the entire and complete agreement between the City and the Developer with respect to matters contained herein, all as hereinabove described in the Recitals for this Agreement and the above numbered paragraphs of this Agreement. Parties agree that this Agreement constitutes a lawful contract between the Parties and Developer hereby acknowledges and agrees that this Agreement and provisions of the City's Code of Ordinances applicable to this Agreement constitute lawful exercises of the City's authority and police power. (Signature Pages to Follow) 3 IN WITNESS WHEREOF, the Parties have executed this Agreement and shall be effective on the last day and year indicated below. ATTEST: Emily Donaldson, City Clerk Approved as to form: Ryan Moehlman, City Counselor STATE OF MISSOURI COUNTY OF COLE ) ) SS ) CITY: City of Jefferson, Missouri By: Carrie Tergin, Mayor Date: On this day of , 20_, before me appeared Steven S. Crowell, to me personally known, who, being by me duly sworn did say that she is Mayor of the City of Jefferson, Missouri, a Missouri constitutional charter city and municipal corporation, and that said instrument was signed on behalf of said City, by authority of its City Council, and said Mayor Carrie Tergin acknowledged said instrument to be the free act and deed of said City and that she executed the same for the purposes therein stated. IN TESTIMONY WHEREOF, I have hereunto affixed my hand and notarial seal at my office in the State and County aforesaid, on the day and year hereinabove first written. My commission expires: , Notary Public 4 DEVELOPER: By: Name & Title: Date STATE OF MISSOURI ) ) SS COUNTY OF COLE ) On this day of , 20_, before me appeared , to me personally known, who, being by me duly sworn did say that he/she is of , a , and that said instrument was signed on behalf of said company, by authority of its governing body, and said acknowledged said instrument to be the free act and deed of said company and that he executed the same for the purposes therein stated. IN TESTIMONY WHEREOF, I have hereunto affixed my hand and notarial seal at my office in the State and County aforesaid, on the day and year hereinabove first written. My commission expires: , Notary Public 5 Memorandum 320 East McCarty Street • Jefferson City, Missouri 65101 • P: 573.634.6410 • F: 573.634.6562 • www.jeffersoncitvmo.gov Date: November 12, 2019 To: Public Works and Planning Committee From: David Bange P.E., City Engineer Subject: Project Update .--UPb Staff would like give the Committee a status update on the major projects that we have underway. Dunklin Street Bridge and Corridor As you are aware this project began in the spring of this year with the goal of being completed on November 27th. Flooding in June and continued high water in the creek have hampered progress and forced changes in the construction sequence. Currently the contractor is working to finish the section between Missouri Boulevard and Wears Creek. With warmer weather predicted for next week the intention is to lay the asphalt in this section and to provide temporary pavement in the disturbed sections of the 400 block so that the street can be opened to traffic for the winter. In the spring of 2020 the road would again be closed to allow for the building of the new bridge and the reconstruction of the remaining section of street between Wears Creek and Mulberry Street. Dunklin and Clark Roundabout Work on this project has progressed steadily since it was included as an item within the Sales Tax G literature. This began with the securing of STP funds through CAMPO for a traffic study of the corridor which was performed by Bartlett and West beginning in October of 2017 and was completed in March of 2019. The findings of the study were discussed with the Committee in June and a contract for the design of a roundabout at the Clark and Dunklin intersection was signed with Bartlett & West in July of this year. Preliminary schematics showed the need to acquire the property at 1136 E. Dunklin Street and when seen by the property owners they requested that the City more forward with the purchase. The property was appraised and the owner accepted the offer of the appraised value. The City has also been in conversation with MoDOT concerning the possibility of extending the project to include improvements to the interchange with Highway 50/63 through the use of cost share funds. A decision concerning these funds should be made by MoDOT within the coming months. E. High Street The design of this project is complete and an open house was held in October. The project was advertised on November 3rd with the bid opening set for November 19th. We would look to present the contract to the Council at their meetings in December and would issue the notice to proceed in January. If you have any questions I can be reached at 634-6433. DB:db U:\Public Works \Engineering\dbange\PUBLIC WORKS & PLANNING\2019\11-2019\Project Update.docx ABBOTT AVIATION TECHNOLOGIES AVIONICS, MAINTENANCE, MANAGEMENT Britt Smith City of Jefferson RE: Public Works & Planning Meeting 320 East McCarty Jefferson City, MO 65101 Mr. Smith, This letter requests a review of Jefferson City Municipal Hangar Land Leases be added to the agenda of the November 14, 2019, Public Works and Planning meeting at 7:30am. Abbott Aircraft Sales and Service, DBA, Abbott Aviation Technologies, pleads that the City consider proration of land leases for 2019 due to the flooding of hangars. In addition to the leases paid, tenants incurred costs associated with damages to hangars and other property, fees for move out, and decreased income. Though AAT had paid the City of Jefferson for the "rental of premises," our business also had to pay to utilize hangar space in Columbia while the land was out of commission. We also request the City to discuss "Fair and Reasonable" rates for current and future airport land leases. Comparable to Columbia and Fulton airports whose hangars are not situated in flood plains, Jefferson City rates are exorbitant. Especially considering, at this time, no measures have been taken to prevent future flooding. Sincerely, Jonathan Abbott Angie Abbott 510 Airport Rd. • Jefferson City, MO 65101 • Phone: 573-761-3331 • FAX: 573-761-3335 www.aatavionics.com Memorandum 320 East McCarty Street • Jefferson City, Missouri 65101 • P: 573.634.6410 • F: 573.634.6562 • www.jeffersoncitymo.gov Date: November 12, 2019 To: Public Works and Planning Committee From: David Bange P.E., City Engineer e -P/ Subject: Linden and Pamela Stormwater The Committee often hears requests from citizens concerning stormwater issues. In many instances staff has indicated that the problems being presented are on private property and need to be addressed by the homeowner. The project below is a case in which the property owners took it upon themselves to fix a stormwater issue affecting their property. The property in question is addressed as 803 Linden Drive which is located at the southwest corner of the intersection of Linden and Pamela Drives. In 1952 the house on this property was built over the top of an existing stormwater pipe that caries water from near Swifts Highway across Darlene Drive and through a number of backyards before arriving at a junction box/inlet at the rear of the house. The pipe then runs diagonally under the house and has a junction box located under the floor of the garage before reaching another structure in the front yard. With the technical assistance and pipe provided by the City the homeowner hired a contractor to install the pipe around the rear and side of the house so that the pipe under the house could be abandoned and filled. The project included approximately 130 feet of pipe and two new structures. This was no small undertaking as the installation of the pipe required the excavation of a significant amount of rock. Now as it nears completion the homeowner no longer has to worry about the inevitable pipe failure and the damage that it would cause to his house. An aerial view showing the location of the old pipe (blue) and the new pipe (red) is attached along with several pictures taken during the installation of the pipe. If you have any questions I can be reached at 634-6433. DB:db U:IPublic Works\Engineering\dbange\PUBLIC WORKS & PLANNING12019111-20191Linden & Pamala Stormwater.docx Memorandum U: \PublicVVorks\Engineering\dbangoVPUaUCVVORK8&puAww|NG\2o1o^11eu1nu|nuonmPomalaGmnnwoter.dmx Memorandum U:1Public Works\Engineering\dbange\PUBLIC WORKS & PLANNING\2019\11-2019\Linden & Pamala Stormwater.docx