HomeMy Public PortalAbout08-0139 Gay sv\:,740.
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03-31-2008 PERMIT#: 080139
WORK DESCRIPTION REPLACE DOORS FOR ADA ACCESS
WORK LOCATION 602 FIRST ST A
OWNER NAME KEITH&ANN GAY
ADDRESS PO BOX 2841
CITY,ST,ZIP TYBEE ISLAND GA 31328-2841
PHONE NUMBER
CONTRACTOR NAME VIPER CONTRACTING LLC
ADDRESS PO BOX 1968
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 40.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $1,500.00
TOTAL BALANCE DUE: $ 40.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-5737
www.cityoftybee.org
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADDED VALUE
DATE ISSUED: 04/16/08 PERMIT#: 080139
WORK DESCRIPTION DOORS FOR ADA ACCESS; KNEE WALL;MINOR ELEC
WORK LOCATION 602 FIRST ST A
OWNER NAME KEITH&ANN GAY
ADDRESS PO BOX 2841
CITY,ST,ZIP TYBEE ISLAND GA 31328-2841
PHONE NUMBER
CONTRACTOR NAME VIPER CONTRACTING LLC
ADDRESS PO BOX 1968
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 65.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $3,500.00
ADDED$2000 VALUE TO PERMIT TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: 1 ,�� „ ■ #1111F
v -
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-5737
www.cityoftybee.org
I ,
) '''M • ,
r i
,!.;1.:.'..2''',.,' •
;:;-:::...• ..":f‘. 1_j__/) .,;
inspection Report
- City of Tybee Island
403 Butler Ave.
P.O. Box 2749
Tybee Island, GA 31328
Phone: (912) 186-4573 ext. 114
FPX: (912) 786-9_539
---$
, ,<- _, ---, (---) Km r
PPrmil. Ne-k, i ,, C.) - ) ‘ ki 7 Date R en uested
,
Owner's', rfi agile '1.. e:--i-k_. .-L.)a Lk Date Needed 0 5--
U
Gen. C:o ntrac tv ft±V_Ilae..3"- _____ Subcontractor
________
Co ntact ftiumbr Al -4-ck
: --.) ,,,\ 1-.7 ... . 5",,ti- 1
Itocation ___,..().! ) e._ -_- p---\ j r--; --v ----- • ••______
1 ns pe cto r 1/1,4 Date of Inspection , . .------2' 05
1 Type of InspE.-:ction
I
i
. (?.. . ( Amsy.
I
1 r---1
Fail A )
I
1
,-, 4/ &_•'. ..,
?r 3 e- c- -- \ --.)---( ' '-)
1 000 ' 41:42
1" 6i 4
/ / Oft
-..-.7-•• ..,- '''',.. i I ,
-177, ..) L,,til- ,'' lik) 13 7,-... ) C
t.--f _t_ I ,
i ! ,
li 4,---ri....,
--i
/
, .
,,'
,' ..
-
' • ,1 • --- „ .,..•
(-.1.yi*,/' 4• _ t,i( 1 . ..,....ii
(111-
1.)6i ----' - ,;'>
)
, 1 LI
1v 7 .-1,., fr i ; ' t 0 /
/
,'''
1..._, 1
.5 ),(,/,,(2 /--ifiVy -9( //,, --, ;
/ 7 Ociff /4
[:. Pei
ss2d-
....-- ---g-7,-,--"47,742 ,l/ Dry? ---5,D,---pi7- uot142.ads-411- Jo adAl
F a 2-ii-ii., tl cllaadsui Jo a4ea p76, 1 ol.3adsui
/
pg /.. f uoge3cri
%,---///) -1 s ---/
--
C & b--e -7....5 V2 -3 Li 71...,?>...,..„ • aquin 1,-1 43e4uo3
•
' Z__:: L'.#--- 4-77-73-Wiao4ae.quoacins -----'--) ar i .104312.14U 03 'u 9
r-'
Aooz 1 iy / PePaeN a4P0 -7'
pa4sanbzu awo
L7
6E! 5981 (ZY6) :xei
- . VII ""Xa ELSV-98L (ZI6) :atioqd
rol.P44 ' '' gzETE viD 'pupils' aaqA_L
6VLZ xo "Ord
., "am' Janne coil
Purls' aatliti jo AID
1,10d6a 1101136dStli
•..
, .. .. . .
q u-• •••:;;.,..-:
(,--..,.
,-----
!, 1
.. ■_„, , ,
• _ ,.,..,,
6, 0■3cl'
CITY OF TYBEE ISLAND, GEORGIA'
APPLICATION FOR BUILDING PERMIT
Location: "0 j(/A g C7R-47 PIN# y - G 00 OC�'v
NAME ADDRESS �T ELEPHONE
Owner ff- f°114 6 I o P,Ca LA Pe- ztrt U
Architect
or Engineer
Building
Contractor Vi Fte ( (15zz)
(Check all that apply)
❑ R it ❑ Residential ❑ Footprint Changes
enovation ❑ Single Family ❑ Discovery
Minor Addition ❑ Duplex ❑ Demolition
❑ Substantial Addition ❑ Multi-Family
❑ Other ❑ Commercial
Details of Project: i't c 3 6 t�6 012 6 v& I b v
CQ44 CS !.015V-ck., oPa. EyTe 112,u_ looft€_/$64,0(43 op
Estimated Cost of Construction: $
1 cs&) ° , ' .
an
Construction Type C I (Enter appropriate number) ¢ //tto i2 �`
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood &Masonry (5) Steel &Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIE I _ -_ ; ION SURVEY OF LOT and complete the
following information based on th- • structio s rawi _ and site plan:
#Units #Bedroo s #Bathrooms
Lot Area Li ing s• ce(s to sq. ft.
#Off-street parking space'.
Trees located & listed on .ite plan
Access:
Driveway (ft.) With cul ert' With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Verti •istance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction: P D
On-site restroom facilities will be provided through 0 Q U I (�
On-site waste and debris containers will b provided by kb, �, "F .
Construction debris will be disposed by CU-) ).i y means of Aalf 4.4 Ai *re
VW
I understand that I must comply with zoning, flood damage control,building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 313) Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not,has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
( -
Distance to water main tap site _
Distance to sewer stub site '
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit 4500
Code Enforcement Officer Inspections I5,
Water/Sewer Water Tap
Storm/Drainage Sewer Stub
Inspections Aid to Const.
City Manager
%% ZOO,& /-� 0 r 40 414 TOTAL Ql
We/ii( q— ill I o r `44' 0 - �- so
05
DEpf.CF
$A1URAL ,iREE•,
RESOURCES 4
••
GEORGIA ,.
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other -• '-anmental issues such as asbestos removal techniques, lead abatement,
ground _�- inatign, or unusual site conditions may have EPD regulations that could affect the
'ect.
1
4g
Und s gne \, Date
Printed Nam I
Office Use Only:
Project Address:
Permit Number: