Loading...
HomeMy Public PortalAboutFiscal Year 2022-2026 Capital Improvement Program_202101271100083135Michael J. Driscoll Town Manager TOWN of WATERTOWN Office of the Town Manager. Administration Building 149 l twin Street Watertown, MA. 02412 Phone: 617-972-6465 www.warerrown-mn.gov towaingr@watertown-ina.gov To: Honorable Town Counci 1 From: Michael J. Driscoll, Town Manager Date: January 26, 2021 RE: Fiscal Year 2022-2026 Capital Improvement Program Pursuant to the provisions of the Watertown Home Rule Charter, the attached Town Council Resolution on the Fiscal Year 2022 Budget Process and the Town Council Resolution on Watertown's Ongoing Capital Project Budget Guidelines, I herewith present the Proposed Fiscal Year 2022-2026 Capital improvement Program (CIP). The Proposed Fiscal Year 2022-2026 General Fund CIP totals $467,799,100, which represents a decrease of $56,351,400 from the Fiscal Year 2021-2025 CIP. Potential renovation/reconstruction of school facilities totaling $289,500,000 is included as a subcategory in the Fiscal Year 2022-2026 Capital Improvement Program. Projects included in the potential renovation/reconstruction of school facilities are further outlined in the "Building for the Future" section of this correspondence and are as follows: • 3 Elementary Schools Project • High School & Related Costs $ 89,500,000 $200.000.000 $289,500,000 The bonding requirement for the Fiscal Year 2022-2026 CIP is $152,184,800 and the Street and Sidewalk bonds of $53,235,800 listed in Fiscal Year 2026 are not included in the bonding requirement. The funding source of $6,400,000 of the CIP has not been determined. The following are the projects/items with the funding source to be determined (TBD). • Former Police Facility Renovation/Reuse $ 4,800,000 • Former North Branch Renovation/Reuse $ 1,100,000 • Multi -Service Center Renovation $ 500 000 TOTAL: $ 6,400,000 1 The CIP includes all known capital needs, regardless of the source of funding. On June 28, 2016, in accordance with Fiscal Year 2017 Budget Policy Guideline II.L., a transfer of funds was considered in order to move forward with an updated Facilities Assessment Study that would detail the repairs and improvements needed to maintai.n the existing municipal facilities. The Ionorable Town Council approved the transfer of $134,000 for the Proposed Facilities Assessment Study of 18 existing school and municipal facilities. The Architecture firm of Gienapp Design Associates completed the Facilities Assessment Study of the eighteen buildings which includes recommendations for repairs and maintenance over the next ten years totaling $57.9 million. The Facilities Assessment Study has been utilized in the development of the Fiscal Year 2022-2026 CIP and will serve as a guide to allocate monies for ongoing maintenance, Water and Sewer Enterprise Funds Capital Improvement Program (CIP) The proposed Fiscal Year 2022-2026 Water and Sewer Enterprise Funds CIP totals $22,670,000 and is attached in this document. Stormwater Infrastructure Improvements of $36,100,000 are included in the same document with the funding source "to be determined "(TBD) to support design and construction of future projects targeting phosphorus removal to comply with the Town's NPDES permit, issued by the EPA. The Permit requires specific phosphorus reduction targets be met over a 20 -year timeframe as part of a Phosphorus Control Plan. To date, the Town has begun compiling information related to existing phosphorus removal activities and is also participating in a technical assistance grants from EPA and MADEP related to nutrient removal (including phosphorus). Several phosphorus control elements have been included in recent capital projects using existing funding sources. Litigation of the NPDES permit is complete, and although some timing and requirements of the Phosphorus Control Plan have been modified, the written plan must still be completed by June 30, 2023. Over the next two years, the Town will continue to develop a Phosphorus Control Plan and also identify funding needs, As indicated in the Fiscal Year 2016 Budget Message, and in accordance with Town Council's Budget Policy Guideline, a determination of how to fund future stormwater infrastructure improvements will be undertaken. Options exist including the creation of a stormwater utility, which could be set up as an Enterprise Fund (as the City of Newton has done); or financing could be established through the General Fund. On June 25, 2019, the Honorable Town Council approved a Proposed Loan Order totaling $1,050,000 utilizing monies from the MWRA .Inflow and Infiltration ICI Local Financial Assistance Program which consists ofa $787,500 grant (75%) and a $262,500 interest free loan (25%) payable over five years. On June 25, 2019, the Honorable Town Council also approved a proposed interest free Loan Order totaling $500,000 utilizing monies from the MWRA Local Water System Assistance Program (LWSAP). This program provides funds for replacing outdated unlined cast iron water mains in the Town's distribution system which will improve system water quality and increase system pressures and flows. Included in the Fiscal Years 2020 & 2021 Enterprise Funds CIP is the utilization of $2,100,000 from the MWRA Inflow and Infiltration In Local Financial Assistance Program which consists of a $1,575,000 grant (75%) and a $525,000 interest free loan (25%) payable over five years. Proposed Loan Orders will be brought forward for these projects. 2 Proposed interest free Loan Orders totaling $1,000,000 will also be brought forward utilizing monies from the MWRA Local Water System Assistance Program (LWSAP), as these monies are included in the Fiscal Years 2020 & 2021 Enterprise Funds C1P. As indicated above, this program provides funds for replacing outdated unlined cast iron water mains in the Town's distribution system which will improve system water quality and increase system pressures and flows. The following is a list of items that were contained in the Fiscal Years 2019 & 2021 Enterprise Funds CIF. Fiscal Year 2019 $270,000 Sewer Heavy-duty Crane Fiscal Year 2019 $ 60,000 Water Utility Truck Fiscal Year 2021 $250,000 Sewer Street Sweeper Fiscal Year 2021 $ 60,000 Water Utility Truck The Fiscal Year 2021 CIP items have been moved to Fiscal Year 2022 CIP. Proposed Loan Orders will be brought forward for these items subsequent to the Honorable Town Council's adoption of conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program. The Council's Committee on Public Works will be exploring options for the Department of Public Works' proposed replacement of Town -wide residential water meters. In Fiscal Years 2021 and 2022, The Department of Public Works will be undertaking multiple projects throughout the Town utilizing previously appropriated capital funds. The various projects are related to the following: • Inflow and Infiltration Removal • Sewer and Drain Replacement & Relining • Water System Improvements • Water Main Replacements All of the work to the water, sewer and drain systems directly impacts the Water and Sewer rates. Interest free loans and outright grants will enable the Town to perform necessary work with little or minimal impact on the rate payers. Fiscal Year 2016 Proposed Loan Order On March 10, 2020, the Honorable Town Council adopted twenty-eight (28) conceptual recommendations on the Fiscal Year 2021-2025 CIP. Conceptual recommendation #1 reads as follows: • Confirm the prior recommendation to proceed with the FY16 proposed loan order for $900,000 for Moxley Park Courts Renovations & Lighting (Design @ 100,000, Construction @ 800,000), subject to the condition that the Recreation Department shall hold community meetings to develop a design proposal and have one or more informational presentations to the Town Council. 3 A Proposed Loan Order will be brought forward for this item subsequent to the Honorable Town Council's adoption of conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program. • Moxley Courts Renovations & Lighting $ 900,000 Fiscal Year 2017 Proposed Loan Orders As previously stated, on March 10, 2020, the Honorable Town Council adopted twenty-eight (28) conceptual recommendations on the Fiscal Year 2021-2025 CIP. Conceptual recommendations #2 and #3 reads as follows: • Confirm the prior recommendation to proceed with the FY17 proposed loan order for $950,000 for improvements to the Casey Park baseball area (Design 0 100,000, Construction @ 850,000), subject to the condition that the Recreation Department shall hold community meetings to develop a design proposal and have one or more informational presentations to the Town Council. • Confirm the prior recommendation to proceed with the FY17 loan order for Victory Field Phase 2 for $3,000,000 in accordance with the Final Report of the Ad Hoc Committee on Victory Field Phase 2 dated June 28, 2018 as approved by the Town Council on August 14, 2018, subject to the outcome of the High School Feasibility Study. On June 25, 2019, the Honorable Town Council approved a transfer of funds totaling $284,500 in order to move forward with the design of Victory Field Phase 2. Proposed Loan Orders will be brought forward subsequent to the Honorable Town Council's adoption of conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program. • Casey Park Improvements • Victory Field Improvements (Phase II) $ 950,000 $ 3,000,000 TOTAL: $ 3,950,000 Fiscal Year 2018 Proposed Loan Orders On March 10, 2020, the Honorable Town Council adopted twenty-eight (28) conceptual recommendations on the Fiscal Year 2021-2025 CIP. Conceptual recommendations ##5 and #6 reads as follows: • Confirm the prior recommendation to proceed with the FY18 proposed loan order for $385,000 for Administration Building for asphalt roof shingle replacement, painting, and carpet. • Confirm the prior recommendation to proceed with the FY1 8 proposed loan order for $325,000 for the Community Path Design from Saltonstall Park to Taylor St, subject to coordination with the parking meter upgrades in the municipal parking lots, which may require additional monies; and policy guidance from the Public Works Committee. 4 The following is the list of items contained in the Fiscal Year 2018 CIP. Proposed Loan Orders will be brought forward subsequent to the Honorable Town Council's adoption of conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program, • Administration Building Improvements $ 385,000 • Community Path Design $ 325,000 TOTAL: $ 710,000 Fiscal Year 2019 Proposed Loan Orders On March 10, 2020, the Honorable Town Council adopted twenty-eight (28) conceptual recommendations on the Fiscal Year 2021-2025 CIP. Conceptual recommendations #7, #8, #9 and #10 reads as follows: • Confirm the prior recommendation to proceed with the FY19 proposed loan order for $877,000 for Public Works Equipment consisting of: • Highway Skid Steer @ 65,000 • Highway 48,000 GVW Dump Truck @ 243,000 • Snow & Ice 6 Wheel Combo Body Truck @ 265,000 • Snow & Ice Front Loader Blower Attachment @ 205,000 • Parks/Forestry Farm Tractor @ 75,000 • Parks/Forestry Infield Groomer @ 24,000 • Confirm the prior recommendation to proceed with the FY19 proposed loan order for $300,000 for the Saltonstall Park lighting improvements subject to the condition that the Recreation Department shall hold community meetings to develop a design proposal and have one or more informational presentations to the Town Council. • Confirm the prior recommendation to proceed with the FY19 proposed loan order for $215,000 for Administration Building Improvements consisting of: • Fire Alarm System replacement j 85,000 • Air Conditioning and Plumbing upgrades @ 130,000 • Confirm the prior recommendation to proceed the prior recommendation to proceed with the FY19 proposed loan order for $155,000 for Fire Station Improvements consisting of the following; however the East Station improvements may require additional money subsequent to further review by the on -call architect: • East Station HVAC and Plumbing upgrades @ 120,000 • Main Station apparatus bay floor recoating @ 35,000 The Fire Station Improvements have been moved to Fiscal Years 2022 and 2023 CIP. The following is the revised list of items contained in the Fiscal Year 2019 CIP. Proposed Loan Orders will be brought forward subsequent to the Honorable Town Council's adoption of conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program. • Public Works Equipment • Saltonstall Park Improvements • Administration Building Improvements 5 $ 877,000 $ 300,000 215,000 TOTAL: $ 1,392,000 Fiscal Year 2020 Proposed Loan Orders As a follow-up to the Honorable Town Council's adoption of conceptual recommendations on the Fiscal Year 2021-2025 Capital Improvement Program, the following is a revised list of items contained in the Fiscal Year 2020 CIP: • Community Path Construction — Taylor to Linear $ 3,000,000 • Arsenal Park Renovations (Phase A)* $ 1,600,000 • Connector Roads/Longer Streets Improvements $ 1,500,000 • Fire Stations Improvements $ 165,000 • Police Station Improvements $ 125,600 • Various School Improvements $ 95,000 TOTAL; $ 6,485,600 * Arsenal Park Renovations will be done in two phases with $2,700,000 included in the Fiscal Year 2021 CIP. Developer Mitigation & Proposed I -Cubed Funds will offset some of the cost. On June 23, 2020, the Ignorable Town Council approved a transfer of funds totaling $1,77$,200 to move forward with Arsenal Park Phase A Improvements. The School Improvements totaling $95,000 was related to design of the Middle School boilers which was done with previously appropriated monies. The Fire Station Improvements have been moved to Fiscal Year 2022 CIP. The following is a revised list of items contained in the Fiscal Year 2020 CIP. Proposed Loan Orders will be brought forward subsequent to the Honorable Town Council's adoption of the conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program: • Conurrunity Path Construction — Taylor to Linear $ 3,000,000 • Connector Roads/Longer Streets improvements $ 1,500,000 • Police Station Improvements $ 125,600 TOTAL: $ 4,625,600 Fiscal Year 2021 Proposed Loan Orders As you recall, the Fiscal Year 2021 Budget Message dated June 8. 2020 stated Proposed Loan Orders will be brought forward for various Capital items contained in the Fiscal Year 2021 CIP. The acquisition of the proposed items is consistent with one of the Honorable Town Council's priorities of not deferring maintenance and/or recognition of costs of capital equipment, facilities and infrastructure to future years. The items that were to be included in the Proposed Loan Orders are as follows: Three Elementary Schools Project $64,000,000 High School Building Project* $ 7,500,000 Arsenal Park Renovations (Phase B)** $ 2,700,000 Various School Improvements $ 2,574,000 Street & Sidewalk Improvements $ 2,500,000 Connector Roads/Longer Streets Improvements $ 1,500,000 Police Radio System Replacement $ 1,167,000 Public Works Equipment $ 590,000 6 Information Technology Fire Radio System Replacement Skating Arena Improvements Filippella Spray Park Renovation Emergency Ambulance Vehicle Underground Duct for Utilities Administration Building Improvements Saltonstall Park Gazebo Library Improvements Public Buildings Equipment Fire Station Improvements $ 575,000 $ 535,000 $ 444,000 $ 400,000 $ 355,000 $ 300,000 $ 130,000 $ 90,000 $ 75,000 $ 60,000 $ 41,600 TOTAL: $85,536,600 * Assumes Debt Exclusion Financing ** Developer Mitigatkrn & Proposed I -Cubed Funds will offset some of the cost On June 9, 2020, the Honorable Town Council unanimously approved a Proposed Loan Order totaling $103,455,000 to pay costs of constructing a new Hostner and Cunniff Elementary Schools. The above -mentioned $64,000,000 less $4,640,000 related to an upcoming Transfer of Funds of budgeted Fiscal Year 2021 monies for principal and interest was permanently borrowed today. The winning bid on the bonds was an average interest rate of 1,343% for the 20 -year General Obligation Bond Issue! Additionally, a Net Premium of $7,215,000 will be applied to the project costs and thereby lowering the Bond Issue to $52,145,000 as outlined below: $64,000,000 ($4,640,000) Upcoming Transfer ($7,215,000) Net Premium $52,145,000 Given the permanent borrowing occurred today, we have not had the opportunity to move the planned debt amounts related to today's bond issue into the permanent debt category. Therefore, we have listed the $64,000,000 as Planned Debt and will provide the accounting of today's bond sale at a later date. The Proposed Fiscal Year 2021 CIP of $7,500,000 for the High School Project will be included with the Fiscal Year 2022 Capital Improvement Program borrowing. On September 22, 2020, the Honorable Town Council approved a Proposed Loan Order totaling $355,000 to pay costs of purchasing a new ambulance for the Fire Department. On October 13, 2020, the Honorable Town Council approved a Proposed Loan Order totaling $188,000 to pay costs of repairing and upgrading the Town Hall elevator. On November 24, 2020, the Honorable Town Council approved a Transfer of Funds totaling $66,068 to move forward with the purchase of two tractor like snow blowers for the Department of Public Buildings that will be utilized for the sidewalks around the schools, 7 On December 8, 2020, the l lonorable Town Council approved a Transfer of Funds totaling $103,000 to move forward with the remodeling of six Middle School bathrooms. On January 12, 2021, the Honorable Town Council approved a Proposed Loan Order totaling; $1,771,000 to pay costs of the Town -wide Radio Infrastructure Improvements, Tonight, there is a First Reading on a Proposed Loan Order totaling $921,800 to pay costs of replacing two boilers at the Middle School. The following Fiscal Year 2021 CIP Items have been moved to Fiscal Years 2022 or 2023 CIP. Public Works Equipment Underground Duct for Utilities Skating Arena Improvements Saltonstall Park Gazebo Library Improvements $ 385,000 $ 300,000 $ 144,000 $ 90,000 $ 75,000 The following is a revised list of items contained in the Fiscal Year 2021 CIP. Proposed Loan Orders will be brought forward subsequent to the Honorable Town Council's adoption of the conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program. Three Elementary Schools Project $64,000,000 Arsenal Park Renovations (Phase B)* $ 2,700,000 Street & Sidewalk Improvements $ 2,500,000 Various School Improvements $ 1,622,800 Connector Roads/Longer Streets Improvements $ 1,500,000 Information Technology $ 575,000 Filippello Spray Park Renovation $ 400,000 Skating Arena Improvements $ 300,000 Public Works Equipment $ 205,000 Fire Station Improvements $ 41,600 TOTAL: $73,844,400 * Developer Mitigation & Proposed I -Cubed Funds will offset some of the cost School Capital Projects The Fiscal Year 2022-2026 CIP includes funding of various school improvements totaling $313,695,000 over the next five fiscal years. The breakdown of these improvements are as follows: • 3 Elementary Schools Project* $ 89,500,000 • High School & Related Costs`* $200,000,000 • School to be determined (High, Phillips) $ 16,722,000 • Bond Remodeling (Middle) $ 5,382,000 • Tax Revenue (various school buildings) $ 1,246,000 • Technology (various school buildings) $ 500,000 • Bond Equipment (Middle, High) $ 345,000 TOTAL: $313,695,000 itenovation/Rceongnielinn "* Proposed Debt Exclusion 8 If the High School Project moves forward and includes the Phillips School site, the improvements of"School to be determined" totaling $16,722,000 would be removed from the Fiscal Year 2022- 2026 CIP. The following is the breakdown of the School Capital Projects included in the Fiscal Year 2022 Capital Improvement Program. • "Three Elementary Schools Project $ 46,000,000 • High School Building Project* $ 15,000,000 • Middle School $ 3,156,000 • High School $ 335,000 • District $ 130,000 • Philips $ 15,00Q TOTAL: $ 64,636,000 Assumes Debt Exclusion Funding Building for the Future Initiative— Three Elementary Schools Project The information in this section has been previously provided and is being included for historical purposes. There are minor edits in the last few paragraphs on pages 12 & 13. On Much 13, 2017, the Honorable School Committee approved the award of a contract to Ai3 Architects, LLC to assist with moving forward with the Building for the Future Initiative. Building for the Future is a comprehensive, forward -looking initiative to address learning, operational and capacity improvements for all school facilities. On July 27, 2017, the Honorable Town Council and the Honorable School Committee held a joint meeting in order to have a presentation by Ai3 Architects LLC on their formal recommendations related to the Building for the Future Initiative. The following is an excerpt from the joint meeting minutes: PROJECT PRIORITY 1. The elementary schools and the high school have top priority and that the middle school is less crowded than any of these schools; therefore, it should be considered for renovation after the high school is completed. 2. The High School, being the single largest project, should continue to seek MSBA funding and that the Statement of Interest (SOI) should list the needs on a priority basis and identify them clearly. The revised SOI should help with obtaining the grant. 3. If the High School were accepted as an MSBA project, their timeline would not allow construction to begin until 2021. 4. If the Town were t❑ fund the Elementary School project independently of the MSBA grant program, construction could be completed prior to the High School construction in 2021. Given the three elementary schools and the high school were identified as high priorities, steps were taken to advance the continued development of both projects simultaneously, with the elementary schools project on a non MSBA path and the high school potentially on a path for MSBA assistance. A timeline was presented whereby the potential Elementary Schools Project estimated at $80 million - $120 million could be completed prior to the beginning of the High School construction. 9 The potential renovation/reconstruction of school facilities was included as a subcategory in the Fiscal Year 2019-2023 Capital Improvement Program and included the following projects: • 3 Elementary Schools Project $125,100,000 • High School Project $158,600,000 $283,700,000 As indicated during the Fiscal Year 2019 Preliminary Budget Overview Presentation on October 9, 2017 and subsequently formalized in the Honorable Town Council's Fiscal Year 2019 Budget Policy Guideline II. A., funding of the Elementary Schools Project is included in the Debt and Interest Forecast and all of this project is to be done within the confines of Proposition 2' 4. The projected High School Project would be funded with a debt exclusion financing and a grant from the Massachusetts School Building Authority (MSBA) and the breakdown of the projected financing is as follows: • Debt Exclusion • MSBA $ 82,472,000 $ 76,128,000 $158,600,000 On October 24, 2017, the Honorable Town Council approved a transfer of funds totaling $149,996 for Owner's Project Manager Services (OPM) for the evaluation of potential solutions and schematic design phases of the Three Elementary Schools Project. On December 12, 2017, the Honorable Town Council approved a Proposed Loan Order totaling $1,378,599 for the purpose of paying costs of Designer Services for the design, construction, addition to and/or renovation of the three elementary schools. Given all of the above, it was necessary to move for. -ward with the establishment of a School Building Committee. Thirteen (13) appointments to the Committee were made in March 2018 including the Honorable Town Council President Mark Sideris, Town Council Vice President Vincent Piccirilli, School Committee Chairman John Portz and School Committee member Lindsay Mosca. The Committee is the representative of the Town in all dealings with the architect including but not limited to the following: development and review of conceptual design options and the selection of a preferred design option, preparation of all design, construction, and bidding documents, supervision of public bidding process, award of -contract to successful bidder, compliance with the program and time requirements of the Town, evaluation of the quality, appropriateness and functional attributes of the architect's solution or proposal, periodic meetings with the architect and builder to assure compliance as the project moves forward, review of all change orders during the construction phase, and all other powers and duties as are necessary and appropriate. As indicated during the Fiscal Year 2020 Preliminary Budget Overview presentation on October 9, 2018, the Town was much closer in moving forward with two initiatives, fully funded retirement system and OPEB Liability funding; and financing of the three Elementary Schools Project within the confines of Proposition 2'A. Additionally, the Fiscal Year 2019 New Growth was $2.6 million over the original budget and these monies have been earmarked to fund Pension Costs, Other Post - Employment Benefits (OPEB) and the 3 Elementary Schools Project. 10 On December 11, 2018, the Honorable Town Council adopted and ranked the Fiscal Year 2020 Budget Policy Guidelines. The top ranked Fiscal Year 2020 Budget Policy Guideline ILA. reads as follows: Continue to develop Building for the Future Initiative funding in collaboration with the School Building Committee; for the Three Elementary Schools project by formalizing the proposal to use funds redirected from the retirement appropriation when the pension fund is fully funded while also paying down the OPEB liability; and for the MSBA High School project with the proposed debt exclusion funding. During the Fiscal Year 2020 Preliminary Budget Overview presentation, I indicated the School Building Committee has been working tirelessly to review conceptual design options for the three elementary schools in an effort to ultimately select a preferred design option that is in the best interests of the Town, the taxpayers and the successful education of our children. To that end, the School Building Committee had met twenty (20) times starting on March 14, 2018; and held 3 community forums at each of the elementary schools in November 2018 to receive feedback on the various conceptual design options. On January 8, 2019, the Honorable Town Council approved a modification to the Resolution on the Fiscal Year 2020 Budget Process. The submission date of the Fiscal Year 2020-20204 Capital Improvement Program was moved from January 22nd to January 31, 2019 in order to consider the School Building Committee's actions at their January 23, 2019 meeting. On January 23, 2019, the School Building Committee adopted the following motions: Motion 1: That the School Building Committee formally endorses and refers the conceptual and schematic design and cost estimate, as presented tonight (January 23, 2019) to the Town Manager for his consideration. (Unanimously voted) Motion 2: That the School Building Committee authorizes the Chair, along with representatives from Ai3 and Daedalus, to meet with the Town Manager to discuss the design and cost of the project as just referred. (Unanimously voted) The endorsed conceptual and schematic design includes all -new construction of the Hosmer and Cunniff Schools and comprehensive renovations and additions to the Lowell School. The proposed projects create modern, forward -thinking facilities and associated site amenities that meetthe educational, neighborhood, energy efficiency, and recreational goals established through a public process of meetings and forums. These projects are part of a long-term vision of providing outstanding education, recreation, and healthy neighborhoods throughout Watertown and will serve the Town for many decades. The approximately $170 million cost estimate includes the total project costs representative of the buildings, sitework, furniture, technology, and all associated costs of the completed and occupied facilities. On January 31, 2019, I respectfully recommended moving forward with the School Building Committee's endorsed conceptual and schematic design. Funding of $170,000,000 for the Three Elementary Schools Project was included in the Proposed Fiscal Year 2020-2024 Capital Improvement Program and all of this project is to be done within the confines of Proposition 2 V2. 11 The Honorable Town Council's Fiscal Year 2020-2024 Capital Improvement Program conceptual recommendation #18 reads as follows; • Concur with the decision to proceed with the "Building for the Future" initiative of $170,000,000 for the Three Elementary Schools Project funding within the confines of Proposition 2%, and not proceed with the $5,304,000 for renovation projects for the Cunniff, Hosmer, and Lowell schools shown in the FY2020-2024 CIP as NB (included in New Building) or R13 (included in Renovated Building). As a follow up to that conceptual recommendation and in accordance with the Honorable Town Council's Fiscal Year 2020 Budget Policy Guideline II.A, the following was the timeline for borrowing $170,000,000 for the Three Elementary Schools Project as outlined in the Fiscal Year 2020 Budget Message dated April 23, 2019: Fiscal Year 2020 $ 35,000,000 Fiscal Year 2021 $ 45,000,000 Fiscal Year 2022 $ 45,000,000 Fiscal Year 2023 45,000,000 $170,000,000 The School Building Committee working with Ai3 Architects LLC has completed the following phases related to the Three Elementary Schools Project: • Schematic Design Phase * Design Development Phase * Construction Document Phase • Construction Contractor Bidding After significant discussions with the School Committee, School Building Committee and Town Council, the Town leased Saint Jude School, Waltham beginning on July 1, 2020 through June 30, 2023 for swing space for the Three Elementary Schools Project. This decision will allow the CunnitT and Lowell Schools to be completed two years earlier than originally projected! The Cunniff and Hosmer Schools were bid as a single collective package in order to receive the most competitive pricing and to ensure the two schools will receive the same building systems and materials; and allow for management of a single contractor for these two projects. As previously stated, on June 9, 2020 the Honorable, Town Council unanimously approved a Proposed Loan Order totaling $103,455,000 to pay costs of constructing a new Hosmer and Cunni If Elementary Schools. During last Summer, the Hosmer PK-5 School was consolidated into the "Z -shaped" building. The Hosmer Preschool Program (5 classrooms) moved to the Phillips Building, which necessitated the Facilities Department relocating to another property in Watertown that will be rented during the construction of the Three Elementary Schools Project. Construction began at the Cunniff and Hosmer during this Summer and the Cunniff School will be completed by the end of this calendar year; and the Hosmer School will be completed by the Summer of 2022. 12 Construction will begin at the Lowell School during the Summer of 2022 and will be completed by the end of calendar year 2023. Given the leasing of Saint Jude's and the acceleration of the Cunniff and Lowell Schools Project with completion dates two years earlier than originally projected, the following is the timeline for borrowing S170,000,000 for the Three Elementary Schools Project; Fiscal Year 2020 $ 16,521,891 Fiscal Year 2021 $ 64,000,000 Fiscal Year 2022 $ 46,000,000 Fiscal Year 2023 $ 43,478,109 $170,000,000 As stated many times in the past couple of years, as a result of the aggressive funding of the Retirement System, financing of the 5170,000,000 for the Three Elementary Schools Project will be done within the confines of Proposition 2%:. Massachusetts School Building Authority Core Program - I-ligh School The information in this section has been previously provided and is being included for historical purposes with updated information on page 15. On March 28, 2017, the Honorable Town Council approved the submission of a Core Program Statement of Interest to the Massachusetts School Building Authority (MSBA). As indicated on the MSBA website, the Core Program is primarily for projects beyond the scope of the Accelerated Repair Program, including extensive repairs, renovations, addition/renovations, and new school construction. The Core Program in question is the High School and this was the fourth year of submission of a Statement of Interest. On December 13, 2017, the MSBA Board of Directors voted to invite the Statement of Interest (the "SOP) for the High School into the MSBA's Eligibility Period. The 270 -day Eligibility Period formalizes and streamlines the beginning of the MSBA's grant approval process and benefits the Town by providing a definitive schedule for the completion of preliminary requirements, assisting with the determination of financial and community readiness, and identifying needs for planning and budgeting. Successful completion of all activities in the Eligibility Period will allow the Town to be eligible for an MSBA invitation to Feasibility Study. Invitation into the Eligibility Period is not an invitation to Feasibility Study. Moving forward in the MSBA's process requires collaboration with the MSBA, and an invitation to Feasibility Study will require a further vote of the MSBA Board of Directors. To qualify for any funding from the MSBA, local communities must follow the MSBA's statute and regulations, which require MSBA partnership and approval at each step of the process. The Town's Eligibility Period commenced on April 2°d and concluded on December 28, 2018. On March 15, 2018, the Honorable Town Counciladopted twenty-seven (27) conceptual recommendations on the Fiscal Year 2019-2023 CIP. Conceptual recommendation #22 reads as follows: That the Administration continue to develop financially prudent financing for the "Building for the Future" initiative for funding of the 3 Elementary School Project within the confines of Proposition 2'/z; and the proposed debt -exclusion funding of the MSI3A High School Project. 13 On October 3, 2018, the School Building Committee unanimously approved a motion to request the Town Manager move forward with funding of $1,600,000 for the Feasibility Study and Schematic Design Phase for the Watertown High School Project. On November 13, 2018, the Honorable Town Council approved a Proposed Loan Order totaling $1,600,000 as a follow-up to the School Building Committee's request and in accordance with the above -mentioned conceptual recommendation. On December 12, 2018, the Massachusetts School Building Authority (MSBA) voted to invite the Town to partner with the MSBA in conducting a Feasibility Study for the Watertown High School. During the Feasibility Study phase, the Town and the MSBA will partner pursuant to the terns of the Feasibility Study Agreement to find the most fiscally responsible and educationally appropriate solution to the problems identified at the Watertown High School, The Feasibility Study, which will be conducted pursuant to the MSBA's regulations and policies, requires the Town to work with the MSB.A on the procurement of an Owner's Project Manager and Designer, which will help bring the Town's Feasibility Study to fruition. Subsequent to the submission of the Fiscal Year 2020-2024 Capital Improvement Program on January 31, 2019, on March 12111the Honorable Town Council adopted 29 conceptual recommendations including #19 which reads as follows: • Concur with the decision to proceed with the "Building for the Future" initiative using proposed debt -exclusion funding of the MSBA High School Project for $157,000,000, and not proceed with the $14,177,000 for renovation projects for the high school shown in the FY2020-2024 CIP as STI3D (School to Be Determined). On May 8, 2019, the MSBA approved the Town's selection of Compass Project Management as the Owner's Project Manager (OPM) for the High School Project. Subsequently, a contract totaling $343,925 was executed for these OPM services. On September 17, 2019, the MSBA Designer Selection Panel (DSP) voted Ai3 Architects LLC as the first -ranked firm for designer services for the High School Project. The DSP determined that Ai3 Architects LLC possesses the requisite skills and experience for this project, particularly in light of their extensive experience in the design and construction of schools in Massachusetts. The DSP indicated the Town should take the appropriate local steps necessary to award the contract for designer services. Subsequently, a contract totaling $1,131,900 was executed. The School Building Committee working with Ai3 Architects LLC has been working on the MSBA "Feasibility and Schematic" process which is broken down into three phases: 1. Preliminary Design Program 2. Preferred Schematic Study & Report 3. Schematic Design The Preliminary Design Program documentation was submitted to the MSBA in February 2020 for their approval to proceed to the next step, Preferred Schematic Study and Report. 14 Following a 2 -month pause in the project due to COVID-19, the Project Team and School Building Committee reconvened regular meetings in May of 2020 and continued development of a total of (5) options and (13) schemes. These schemes explored projects ranging from just upgrading the existing school to current codes (required by MSBA), phased addition/renovation options ofthe existing high school, phased new construction just on the high school site, phased new construction using the both the Phillip's site and the high school site, arid lastly phased new construction using Victory Field. These options/schemes were presented to the School Building Committee over a total of(9) virtual SBC meetings, as well as presented to the Community on (3) virtual Community Forums. On December 2, 2020, the School Building Committee unanimously voted to proceed with the Preferred Option 3D-4 of phased new construction using both the Phillips and existing high school site, and authorized Ai3 and Compass Project Management to submit the Preferred Schematic Study and Report (PSR) to the Massachusetts School Building Authority (MSBA) on December 29, 2020. The project is currently under review with the MSBA in anticipation of approval at the May 2021 Board Meeting. The PSR submission completes the Feasibility Study Phase for the Watertown High School project, after which the project will proceed into Schematic Design. The Honorable Town Council's Fiscal Year 2022 Budget Policy Guideline ILA. reads as follows: • Continue support for Building for the Future Initiative funding in collaboration with the School Building Committee, for the Three Elementary Schools project, and for the MSBA High School project with proposed debt exclusion funding in conjunction with outreach efforts to the community by the School Committee. As a follow-up to that Budget Policy Guideline and at this point, the $200,000,000 in the Fiscal Year 2021-2025 CIP has been included in the Fiscal Year 2022-2026 Capital Improvement Program for the High School & related costs with a funding source of a Proposed Debt Exclusion and a MSBA Grant. Given all of the above and the ongoing review with the MSBA, discussions will continue on how best to proceed and the High School & related costs may be amended. After completion of Schematic Design in late Fall of 2021, the Town would then be seeking a Debt Exclusion vote. Street and Sidewalk Improvements Street and sidewalk maintenance is one of the top priorities in the Honorable Town Council's Fiscal Years 2009 through 2022 Budget Policy Guidelines. Within the Fiscal Year 2022-2026 CIF, $105,333,400 is designated for street and sidewalk improvements. The Fiscal Year 2021 General Fund Budget includes $1,114,600 to augment projected Chapter 90 monies. Beginning in Fiscal Year 1999 and including Fiscal Year 2021, the Honorable Town Council has approved $16,269,844 for the Street and Sidewalk Improvements appropriation, an average of $707,385 for each ofthe twenty-three fiscal years. Beginning in Fiscal Year 2013 and continuing through Fiscal Year 2017, the Honorable Town Council authorized four (4) Loan Orders totaling $13,100,000 to fund Street and Sidewalk Improvements. 15 On September 26, 2017, the Honorable Town Council approved a Proposed Loan Order totaling $975,000 to fund Street and Sidewalk Improvements related to the Common Street Project (Mt. Auburn to Orchard Street). On June 5, 2018, the Honorable Town Council approved a Proposed Loan Order totaling $2,500,000 to fund street and sidewalk improvements contained in the Fiscal Year 2018 CIP. On September 10, 2019, the Honorable Town Council approved a Proposed Loan Order totaling $2,500,000 to fund street and sidewalk improvements contained in the Fiscal Year 2019 CIP. On February. 25, 2020, the Honorable Town Council approved a Proposed Loan Order totaling $2,500,000 to fund street and sidewalk improvements completed in the Fiscal Year 2020 CIP, On October 27, 2020, the Honorable Town Council approved a list of streets to be included in the Fiscal Year 2021 Road Program. A Proposed Loan Order totaling $2,500,000 will be brought forward next month to fund these Street and Sidewalk Improvements. As a follow-up to an adopted conceptual recommendation on the Fiscal Year 2019-2023, Fiscal Year 2020-2024 and Fiscal Year 2021-2025 Capital Improvement Programs, a Proposed Loan Order for $325,000 will be brought forward for the Community Path design from Saltonstall Park to Taylor Street, subject to coordination with the parking meter upgrades in the municipal parking lots; and policy guidance from Town Council's Public Works Committee. Subsequent to this design, $3,000,000 is included in the Fiscal Year 2020 CIP for construction of the Community Path. In accordance with an Action Item adopted by the Honorable Town Council at their January 8, 2019 Town Council Meeting, five future Loan Orders totaling $7,500,000 for "collective roads and longer streets" have been included in the Proposed Fiscal Year 20222026 Capital Improvement Program. Five future Loan Orders for Street and Sidewalk Improvements totaling $20,900,000 are included in the Proposed Fiscal Year 2022-2026 CIP. The following is the schedule of Proposed Loan Orders for Street and Sidewalk Improvements: Fiscal Year 2022 $ 4,300,000 Fiscal Year 2023 $ 4,000,000 Fiscal Year 2024 $ 4,300000 Fiscal Year 2025 $ 4,000,000 Fiscal Year 2026 $ 41300,000 TOTAL: $20,900,000 In summary, beginning in Fiscal Year 2013 and continuing through Fiscal Year 2026, the Honorable Town Council has or is planning on authorizing loan orders for Street and Sidewalk improvements totaling $51,300,000 over the fourteen fiscal years, all within the confines of Proposition 2 %. Capital Projects Stabilization Fund As you recall and as stated in the Fiscal Year 2019 Budget Message dated May 1, 2018, the original North East Solid Waste Committee Agreement (NESWC) expired in September 2005 and the Town has executed three. Post 2005 Agreements through Fiscal Year 2020. As a result of these actions and the foresight the Town had in funding the significant costs of the NESWC Agreement, transfers of $500,000 annually from the Capital Projects Stabilization Fund began in Fiscal Year 2006 and will continue through Fiscal Year 2020. 16 In order to continue the annual transfer of $500,000 beyond Fiscal Year 2020, we looked for opportunities to make transfers to this Stabilization Fund in an effort to support Capital Projects, On July 10, 2018, the Honorable Town Council appropriated $50Q000 to this Stabilization Fund in order to continue the annual transfer of $500,000 through Fiscal Year 2021. On October 23, 2018, the Honorable Town Council approved a Proposed Amendment to the Fiscal Year 2019 Budget that included an appropriation of $500,000 to this stabilization fund in order to continue the annual transfer of $500,000 through Fiscal Year 2022. On June 25, 2019, the Honorable Town Council appropriated $500,000 to this Stabilization Fund in order to continue the annual transfer of $500,000 through Fiscal Year 2023. On November 12, 2019, the Honorable Town Council approved a Proposed Amendment to the Fiscal Year 2020 Budget that included an appropriation of $500,000 to this stabilization fund in order to continue the annual transfer of $500,000 through Fiscal Year 2024. On July 14, 2020, the Honorable Town Council appropriated $500,000 to this Stabilization Fund in order to continue the annual transfer of $500,000 through Fiscal Year 2025. In order to continue the annual transfer beyond Fiscal Year 2025, we will look for opportunities to make transfers to this Stabilization Fund in an effort to support capital projects. CLOSING In addition to all of the above -mentioned Capital Projects, I respectfully recommend discussion continue in accordance with the Honorable Town Council's conceptual recommendation #28 on the Fiscal Year 2021-2025 CIP which reads as follows: 28. Concur with the Town Manager's recommendation for the Town Council to continue discussion on the following items: • Reuse of Town Buildings (Former North Branch Library & Former Police Station) • Record Storage Management & related issues • Department of Public Works Staging Areas • Acquisition of Land for open Space and/or Recreation use. I respectfully recommend discussions also continue with the Honorable Town Council regarding integrating additional improvements in Fiscal Years 2022-2026 including but not limited to the potential renovation/reconstruction of school facilities, and at the same time, looking to identify how best to fund these improvements. 1 look forward to working with the Honorable Town Council in their adoption of conceptual recommendations on the Fiscal Year 2022-2026 Capital Improvement Program. cc; Honorable School Committee Honorable Library Board of Trustees School Building Committee All Department Heads 17 ELECTED DFFEC1AI.S: Mark S. Sideris, Council President Vincent J. Pice rilli, Jr., Vice President & District C Councilor Caroline Bays Councilor At Large Anthony J. Donato, Councilor At Large Susan G. Falkoff, Councilor At Large Anthony Palontbi Councilor At Urge Angeline a Kounel is, District A Councilor Lisal. Feltner, District I3 Councilor Kenneth M. Woodland, District D Councilor Marilyn f Pronovost, Council Clerk Watertown Town Council Administration Building 149 Main Street Watertown, MA 02472 Phone: 617-972,6470 RESOLUTION # 11 2020—R-79 RESOLUTION ON THE FISCAL YEAR 2022 BUDGET PROCESS WHEREAS: Article 5 of the Watertown 1 -come Rule Charter sets out a process for the development and adoption of the annual operating budget and capital improvement program; and WHEREAS: The Town Council wishes to establish a timeline, consistent with the Charter, by which it will provided policy guidance to the Town Manager on the development of the budget and capital improvement program; and WHEREAS: Such a timeline will also give town residents notice of their opportunity to offer input on these important financial matters; NOW THEREFORE BE IT RESOLVED: That the Town Council ofthe City known as the Town of Watertown establishes the following timeline for the development of the Fiscal Year 2022 operating budget and capital improvement program: 1. The Fiscal Year 2022 Preliminary Budget Overview will be presented to the Town Council by October 13, 2020. 2. The Town Council will adopt its Fiscal Year 2022 Budget Policy Guidelines by November 24, 2020. 3. The proposed Fiscal Year 2022-2026 Capital Improvement Program will be presented to the Town Council by January 26, 2021. 4. The Town Council will adopt its conceptual recommendations an the Fiscal Year 2022-2026 Capital Improvement Program by March 9, 2021 subject to the availability of funds, I hereby certify that at a regular meeting ofthe Town C nci1 for which a quorum was present, the above Resolution was adopted by a vote of 7 for, against, and ("present on September 8, 2020. Mark S. id is, ://4 uncil President ELECTED OFFICIALS: Resoltltioll# 2013 - Mark S. Skis;is, Council President Stephen P, Corbett, Vice President John A, Donohue, Councilor At Large Susan G. Falkoff, Councilor At Large Aulliony Palcmba, Councilor AL Large Angeline 13. I<ounells, District A Councilor Cecilia Lenk, ❑istrict B Councilor Vincent,!. Plcolr1111. Jr., District 0 Councilor Kenneth M. Woodland District D Councilor Watertown Town Council Administration eulkting 149 Maln Street Watertown, MA 02472 Phone: 617-972.6470 Resolution; Watertown's Ongoing Capital Prroject Budget Guidelines WHEREAS the Town Council adopts budget policy guidelines each year pursuant to Section 5-1 of the Watertown Homo Rule Charter, so that the Town Manager can develop budgetary golds and the Town budget for the ;text fiscal year, mid ' WHEREAS in the Fiscal Year 2014 budget policy.guidelines, Attacltntent A "ADDITIONAL RECOMMENDATIONS ON CAPITAL PROJECTS" was included to use the Town's capital project funds in the most efficient nlatnler, and to improve the efficiency and transparency ofihe Capital Improvement Program (CIF) process, and WHEREAS these recommendations have become standard operating procedure for the Town of Watertown, and do not need to be revised each year. NOW THEREFORE BE IT RESOLVED that the Town Council of the City•known as the Town of Watertown hereby establishes the following recommendations on capital projects as permanent budget policy guidance, to be followed annually: 1. Status of existing capital. funds and projects: As part of the Jemmy CIP submission by the Town Manager, include from each department, a listing of all existing unspent capital funds (including Chapter 90, developer mitigation, grant flids, etc.) acid a status on each project or acquisition, including how and when remaining funds will 'be spent, effective November 30th. a. Inolude project fluids appropriated by the Town Council to the School Department, b. Include Water/Sewer Enterprise Fund reporting of capital projects & funds as a new section of the CIP separate front the General Fund. 2. Details on newj rojeots: As part of the January CIP submission by the Town Manager, provide details for all items in the CIP that have been previously Shown as annual lump sums in a single line. a. Include the School Department's "various school improvements". b. Include "Highway reconstruction" and "sidewalk reconstruction", with a forecast of streets to be done each year. c. Iticlude Water/Sewer Enterprise Fund capital projects as a new section of the CIP separate from the General Fund, with a forecast of streets to be done each year. d. Include transportation or water/sewer and stormwater projects which have or will be • proposed bite future, with no funding source yet identified. 3. Coordination Issues Related to Public Works projects: The increasing volume and complexity of public works projects requires a rethinking of how the Town does its planning to maximize the use of capital funds' and departmental resources, as well as providing information to the public in a timely, readily accessible fashion. a, To this end, the CHF needs to have a five-year forecast of what water/8ewer/stormwater•, road reconstruction, and sidewalk reconstruction are planned, by specific street, which will: i. Insure that work is sequenced to obtain the maximum life from road and sidewalk reconstruction without major water/sewer work compromising their integrity. ii. Allow utility companies adequate time to plait underground service replacements prior to road and sidewalk reconstruction, to avoid compromising their integrity. iii. Allow time for the Zoning Enforcement Office to notify property owners anon- . conforming driveways, while giving the owners adequate time to seek a variance. iv. Allow developers time to plan their projects in coordination With the Town, and avoid digging up newly installed roads and sidewalks. v. Allow abutting homeowners, who may want to pay for granite curbs on streets scheduled for asphalt curbs, time to arrange contracting and payment. vi. Allow time for the Tree Warden to notify abutters who nrny want a street tree in front of their properly, to allow for the placement of a tree pit prior to the installation of a new sidewalk. vii. Provide more transparency to citizens on public works projects and spending. viii, Allow the Public Works Committee or other appropriate committee adequate time to review the proposed work and provide policy guidance on the above as it relates to Watertowin's goals. • b. Issues of coordination and tinting need to be improved to insure the most efficient use of fuilds, and bonding of annual street construction projects should be coordinated with bidding such•that contractors can begin by April and be completed by November. o. The Public Works Department should address', on an ongoing basis: i. Assure adequate supervisory capacity to eliminate decision bottlenecks and improve timeliness of responses for•construction work, i1.. Notification to the public of what construction is happening and where and when it will occur nwst be improved, and should be available on the website and updated regularly. iii, Improve'coiupletion of punch list items on projects needs to be improved, including • painting of roadway markings, installation of traffic signs, removal of temporary construction sighs, cleanup of construction debris, etc. 4. Protection of investments: With Millions of dollars being spent each year in Watertown • on street and sidewalk construction, the administration should take a more aggressive role to protect the value of these investments to insure that maximum life is obtained from the new surfaces, BE IT FURTHER RESOLVED that this resolution shall be incorporated by reference into tho annual budget policy :uidelines that are adopted each year. Council Mem er I hereby certify that at a regular Meeting of the Town Council for which a quorum was present, the above Resolution was adopted by unanimous voice vote on December 9, 2013, Va1ei Papas, Council Clerk Mark S. Sideris, Council President FY 2022 - FY 2026 CEP General Fund E F H J K L M A B C 1 T OTALS FY '22 FY '23 FY '24 FY '25 FY'26 2 ADMINISTRATION! 3 Administration Building Improvements/Renovations Renovation/Reuse Former Police Facility 125.0 25.0 TR 25.0 TR 25.0 TR 25.0 TR 35 4 4,800 .0 4,800 .0 TBD 5 Multi -Ser vice Center Renovation 500 .0 50x .0 TBD 6 Renovation/Reuse former North Branch 1,100.0 1.100.0 TBD 7 2C• Replace Town Hall Chiller 495.0 495 .0 BR 8 Replace Carpets 210 .0 45.0 TR 45.0 TR 45 .0 TR 75 .0 TR 9 Paint Hallway/Offices 190.0 40 .0 TR 50 .0 TR 50 .0 TR 50 .0 TR 10 10 Replace Fan Coil Units & Air Handling Unit Ventilators 1,100 .0 1,100.0 BR 11 5120 Masonry & Metal R ep air s by door entrances 540.0 40 .0 BR 500 .0 BR 12 5/10 replace HVAC HAU-1 above c ouncil ch ambers 770.0 120.0 BR 650.0 BR 13 5/20 Ligthing Fixtures & Accessibility Issues 637.0 80.0 BR 577.0 BR 14 5/15 Roof Shingle Replacement/Roof Refurbishme nt 245.0 45 .0 BR 200 .0 BR 15 5 Add EV Stations 180.0 90.0 BR 90.0 BR 16 5 Upgrade Fire Alarm System 120 .0 20 .0 BR r 100.0 BR 17 15 Upgrade Fire Protection System 590.0 1 90 .0 BR 500 .0 BR 18 5 Upgrade Lighting 300.0 300 .0 BR 19 ADMINISTRATIO N SUBTOTAL 11,902 .0 7,005 .0 475.0 2,137.0 1,360.0 925.01 20 21 i 22 COMMUNITY DEVELOPM ENT 23 Monument Restoration & Replacement 75.0 15.0 TR 15.0 .TR 15.0 TR 15 .0 TR 15.01 T R 24 Public Art 75.0 15.0 TR 15.0 TR 15.0 TR 15.0 TR 15.0 TR 25 Commander's Mansion 150.0 30.0 TR 30.0 TR 30.0 TR 30.0 TR 30.0 TR 26 COMM UNITY DEVELOPMENT SUBTOTA L 300 .0 60.0 60.0 60.0 60 .0 60 .0 27 28 29 INFORMA TION TECHNOLO GY 30 , Additional Equipment 50, 0 10 .0 TR 10.0 TR 10.0 TR 10 .0 TR '10.0 TR • 31 • R eplacement of Equipment 575.0 _ 115.0 TR 115.0 TR 115.0 TR 115 .0 TR 115.0 TR 32 5 IT Infrastructure Improvements 1,500.0 300.0 BE 300.0 BE 300.0 BE 3000 BE 300.0 BE 33 5 Pe rmitting and Tra nsparency Dashboards Video Security and Access Control Fiber Loop Build -out a nd Cabling 200.0 100.0 BE 100.0 BE 34 35 36 5 5 5 Do cument Scanning 37 38 NFOR MATiON TECHNOLOGY SUBTOTAL 500. 0 500. 0 500.0 100. 0 100.0 100.0 BE BE BE 100.0 BE 109.0 BE . 100.0 BE 100.0 100 .0 100.0 BE BE BE 100.0 100.0 100.0 BE BE BE 100.0 100.0 100.0 BE BE BE 3,825. 0 825. 0 B25.0 725 .0 725 .0 725.0 39 40 FIRE DEPARTMENT 41 ALS Ambulance Medical Equipment Chiefs, & staff vehicles (3) 200, 0 40.0 'TR 40.0 TR 40.0 TR 40.0 TR 40.0 TR 42 120.0 60. 0 TR 60 .0 TR 43 Fire Building Improve ments/Renovations 300, 0 60. 0 TR 60.0 TR 60.0 TR 60.0 TR 60,0 TR Pace 1 of 8 FY 2022 - FY 2026 CIP General Fund A .- - 0 E F G H I J K L h1 1 TOTALS FY '22 FY '23 FY '24 FY '25 BE FY '26 44 5 DOT Type III Em ergency Ambulance V ehicl e 400 .0 400 .0 45 5 East End Fire Station HVAC!Plumbing 120 .0 120.0 BR 46 5 East End Fire Station Painting-Carpet-Lightino 115 .0 115.0 BR 47 5 Main Station- lntertor P ainting 50 .0 50 .0 BR 48 North Station - Fencing 30.0 30.0 T# 49 15 Ladder Truck, replacement for 2007 Ladder 2 1,250.0 1 .250 .0 BE 50 Headsets for Radios in App aratus 26.0 26 .0 TR 51 5 Main Station - Concret e Coating Apparatus Fl oor 80.0 80,0 .B R 52 5 Digitizers for Fire Alarm 80.1 80 .1 BE 53� 5 M ain Station Interior Repairs 50.0 50.0 BR 54 5 Main Striation Emergency Generator Repla cement 90.0 90 .0 BE 55 5 Main Station Kitchen Ductwork r 50 .0 50.0 BR 56 5 North Station - Site Paving 30.0 30.0 TR 57 5 Mobil Data Terminals for Apparatus 41 .0 41.0 BE 58 5 Station Alerting System 105.0 105 ,0 BE 59 5 Main & North Stations Apparatus Doors 65.0 65.0 BR 60 15 Engine Truck, replacement for 2011 Engine 1 750.0 750 .0 BE 61 5 Incide nt Command Vehicle (D eputy Chief) 75.0 75.0 BE 62 10 Firefighters Protectiv e Outer Gear 380 .0 380.0 BE 63 20 East End Station Replacement 4,000.0 4,000 .0 BR 64 FIRE DEPARTM ENT SUBTOTAL 8,407.1 1,691 .0 320 .1 466 .0 1,375 .0 4 ,555 .0 65 66 LIBRARY 67 ' Additional interior Outlets/power 20 .0 20.0 TR 68 5 Water infiltra tio n Repairs Children's Room 125 .0 125.0 BR 69 5 HVAC StudyfFeasibilty Needs 60.0 60.0 BR . 70 5 Replace Veneer (Various Locations) 50.0 i 50.0 BR 71 10 Replace Boilers & Pumps 150. 0 150.0 BR 72 20 Replace Chiller 150. 0 150.0 BR 73 5 Replace Roof Top Units/Compressors 452. 3 46.0 BR 415.3 BR 74 Painting 120.0 40.0 TR 40.0 TR 40.0 TR 75 Building Re nov ations/Replace me nt of Equip 305.0 61.0 TR 51.0 TR 61.0 TR 61.0 TR 61.0 TR 76 LIBRARY DEPARTM ENT SUBTOTAL 1,442.3 266.0 261.0 297.0 517 .3 101.0 77 78 POLICE DEPARTMENT . 79 Police Cruisers (3 annually) 942.4 170.6 TR 179 1 TR 188_0.TR 197.4 TR 207.3 TR 80 Ra dio Infrastructure/specialized equipme nt 200.0 40,0 TR 40.0 TR 40.0'TR 40.0 TR 40.0 TR 81 Police Building Improvements/Renovations 150.0 30. 0 TR 30.0 TR 30.0 TR 30.0 TR 1 30 .0 TR 82 5 Replace CAD/RMS, DHQ & BOR Servers (3) 39. 5: 39. 5 TR 83 5 A udio & Video Upgrades in 4 Conf./Training Ro oms 64.2° 64.2 BE 1 84 5 In Cruiser Video Sys tem 69.2 59.2 SE 85 POLICE SUBT OTA L 1:465.3 344. 3 318.3 25B.0 267.4 i 277.3 Page 2 of 8 FY 2022 - FY 2026 CIP Ge neral F und rr1 1 T OT ALS FY `22 86 87 88 10 89 PUBLIC SAFETY - PUBLIC WORKS Phase 2 of the Radio Infrastructure 2,376.0 2 .376,0 2,376.0 2,376.0 BR FY '23 FY '24 FY '25 { FY '26 0.0 0.0 0.0 0 .0 90 91 92 PUBLIC WORKS DEPARTMENT 93 Administration 94 16 Roof Replacement 4,000.0 2,000.0 BR 2,000 .0 BR J 95 10 DPW Building Sidewalks & Parking Lot 110.0 A. 110.0 BR 96 ADMINISTRATION SUBTOTAL 4,1'10.0 110.0 2,000.0 0.01 2,000.0 I# .0 97 98 99 Central Motors 100 Inspectors' Vehicles 350 .0 70.0 TR 70.0 TR 70.0 TR 70.0 ; TR 70.0 TR 101 5 Supervisor Vehic€e 50 .0 50.0 BE 102 "ENT==:_ MOTORS SUBTOTAL 400.0 70.0 70.0 70.0 70 .0 , 120 .0 103 104 105 Highwa y 106 5 Skid Steer 65 .0 65 .0 BE 107 10 Street Vac tor 85.0 85.0 BE 108 10 109 110 Rack Truck 150.0 HIGHWAY SUBTOTAL 1500 BE 300 .0 85.0 150 .0 65.0 111 1'12 113 Snow & Ice Removal Plows, Sanders, Salt control units/Replacement Salter 6 Wheeler - Snow Fighter (5} 400.0 114 10 900.0 115 10 Loader 300.0 116'. 117 10 Lo ader 314 Y ard SNOW & ICE RE1_QV 1L. SUBTOTA L 118 107,0 80 .0 TR 280.0 BE 300.0 BE 80 .0 TR 80.0 TR 80.0 TR 300.0 BE 80.0 TR 320.0 BE 107.0 BE 1,707.0 660,0 80.0 380.0 187.0 400 .0 119 120 Cemetery Off Road Utility Vehicle 4X4 (2) 60. 0' CEMETERY SUBTO TAL 60. 0 121 5 122 123 :30.0 BE 30.0 BE 30.0 30.0 124 Pro perty/Buildin g 125 10 Boiler R eplacement (2) 125.0 125.0 BR 126 127 10 Rough Te rrain Forklift PROPERTY/BUILDING SUBTOTAL 95. 0 220.0 125. 0 95.0 BE 95 .0 Page 3 of 8 FY 2022 - FY 2026 CEP General Fund A 0 D E F 0 H I J K L M 1 TOTALS FY '22 FY '23 FY '24 FY '25 FY '26 128 129 Parks & Forestry 130 10 Gazebo at Saitonstalr Park 90.0 90-0 BR 131 10 Swap Loader 200.0 200 .0 BE - 132 10 Tree Chipper 75 .0 75.0 BE 133 PARKS & FORESTRY SUBTOTAL 365.0 290.0 - 75.0 - - 134 135 _ 136 TO TAL DPW - TR 750.0 150.0 TR 150.0 TR 150.0 TR 150 .0 I T R 150.0 TR 137 TO TAL DPW - BE 2,087 .0 865.0 1 BE 1 30.0 BE 525.0 BE 202.0 BE 465 .0 BE 136 TOTAL DPW - BR 4,325.0 200.0 BR 1 2.125.0 BR 0.0 BR 2,000.0 BR 0.0 BR 139 PUBLIC WORKS SUBTOTAL 7,162.0 1,215.01 2.305 .0 675 .0 2;352 .01 615 ,0 140 141 142 RECREATION & PARKS 143 Tot Lot/Court Resurfacing as needed 500.0 250 .0 TR 250 0 TR 144 Casey Tot Lot, basketbal, tennis court resurf acing 150.0 150 .0 TR 145 'Sullivan: De sign-Plygrd equip, tot lot Wikwy Lighting 75.0 75.0 TR 146 5 Sullivan: Playground e quip, tot lot, Walkway Lighting 425.0 425.0 BR 147 20 Design Uc Field (Phase 111) Field House Addition 375.0' 375.0 :BR 148 20 Victory Field (Phase Ili) Field House Addition 3,750.0 3,750.0 BR 149 Fiilippello Park (Gra ve ) Batting Tunneil 25.0 25.0 TR 150 Victo ry Fie ld: Lacrosse Wall Ball 50.0 50 .0 TR 151 Howe PK: Design, Plygrd Equip, and resurface 150.0 150.0 TR 152 5 Howe PK: Design, Plygrd Equip, and resurface 125.0 125.0 BR 153 10 Victory Field Turf Replacement 1,200.0 1,200.3 BR 154 Bemis: Design, Plygrd Equip, ne w surf. & spray park 250.0 254 .0 TR 155 10 Bemis: Design, Plygrd Equip, new surf. & spray park 500. 0 - 500 .0 BR 156 10 Special Ne eds baseball/softball diamond 600.0 600.0 BR. 157 10 Filippello Design. plygmd equip and resurface 900. 0 900 .0 BR 158 10 Lowell Design Playground Equipment 500.0 500 .0 BR 159 RECREATION & PARKS SUBTOTA L 9,575. 0 1,025.0 5.300.0 1,350.0 1,150.0 750.0 160 161 162 SCHO OL DEPARTMENT 163 CUNNIFF SCHOOL 164 Replace classroom furniture 45,0 15 .D TR 15 .0 TR 15 .0 TR 165 Total for Crinniff 45.0 0.0 0,0 15.0 15 .0 15 .0 166 167 HO SMER SCHO OL 1 168 Update building fu rnitu re 75.0 25.0 TR 25.0 TR 25 .0 TR 169 1 Total for Hosmer f 75.0 0.0 1 0. 0 25.0 25 .0 25.0 Pa ge 4 of 6 FY 2022 - FY 2026 CJP General Fu nd D F 5 J L r;9 1 T OTALS FY '22 170 FY 23 FY '24 FY '25 FY '26 171 LOWELL SCHOOL 172 173 174 Replace and upcate classroom furniture Total for Lowe if 40.0 40.0 0.0 0.0 0.01 200 TR 20.0 TR 20,0 20 .01 175 WATERTOWN MIDDLE SCHOOL 176 Replac e/update classroom furniture 125.0 25-0 TR 25.0 TR 25-0 TR 25.0 TR 25.0 TF. 177 Paint Hallways/Classrooms 171 .0 51.0 TR 40.0 TR 40.0 TR 40 ,0 TR 178 5 Upgrade Phone System 50 .0 50.0 1 BE 179 10 R emodel Bathrooms (8 baths) 330.0' 210.0 BR 120.0 BR 180 5/15 HVA C (VRF) 2nd Floor 650.01 650 .0 BR 181 5/15 Fire Protection (new system) Z000 .0 ' 2,000.0 BR 182 Design Co urtyard landscape 10.0 10.0 TR 183 5 Renovate Courtyard landscape 105 .0 105 .0 BR 184 5/15 HVAC (V RF) 1st Flour 1,115 .0 170 .0 BR r 945,0. BR - 185 10 Re nov ate Bemis entrance 125.0 150 TR 110 .0 BR 186 15 Roofing Refurbishing 550.0 50.0 TR 500 .0 BR 187 Update Locks 50.0 50 .0 TR 188 ReKey Doors 50 .0 50.0 TR 189 5115 HVAC (VRF) Base" rni 472.0 72 .0 BR 400.0 BR 190 Wav erly Entrance Landscaping 100.0 100.0 TR 191 Carpeting Da mage (Various Areas) 40.0 40.0 TR 192 Reloca te Nurses Office 110.0 1 10 .0 TR ' 100.0 BR 193 Total for Middle Schcv' - - 5 ,053.0 3 ,156.0 1 .225.0 242.0 1 .305 .0 125 .0 194 '195 WATERTOWN HIGH SCHOOL 196 Replace classroom fu miture 125.0 197 5 FFE far M edical Assisting Progra m 295. 0 25.0 [TR 25.0.TR 25.0 TR 25.0 TR 25.0 TR 295.0 BE 198 5 V CT Floor Repair 150.0 50.0 STBD 50.0 STBD 50 .0 .STBD 199 15 Window Replacement (3 Phase) 8,300,0 50 .0 STBD 2,500.0 STBD 2,750.0 STBD 3.000-0 STBD 200 5 Roof Repairs Courtya rd landsca pe Fire Protectio n (new system) HVAC Upgrades Bathro om Renovations 60.0 20 .0 STBD 20 .0 S TBD 20,0 STBD 201 75. 0 15.0 TR 15.0 `T R 202 203 10 10 531.0 1,081,0 1 15.0 TR 15.0 TR 15.0 TR 50-0 98.0 STBD STBD 481.0 983 .0 STBD STBD 204 10 240.0 80.0 STBD 80.0 STBD 80.0 STBD 205 10 Locke r Room Upgrade s 736,0 70.0 STBD 333.0 STBD 333.0 STBD ' 206 20 Replace Boilers Accessibility Upgrades - Nurse Suite Bathrooms 1,320. 0 120.0 • STBD 1,200 .0 STBD 207 5 40,0 40.0 STBD 208 5 Science Lab Reno vations (De sign Study) Ceiling Improvements Re -pave parking lot & replace wood guard rail 94. 0 Entra nce Concrete Steps/pa th repair 50.0i 50.0 STBD 209 210 10 10 75.0 75.0 94.0 STBD STBD 211 5 30. 0 30.0 STBD Page 5 of 8 FY 2022 - FY 2026 CIP General Fund A I C D E F G H I J K L h:1 1 TOTALS FY '22 FY '23 FY 24 FY '25 STBD FY '26 212 5 ReKey Doors 50.0 50.0 213 10 Upgrade Lighting 1,500.0 1 .500 .0 STBD 214 Total for High Sci-i nol _ 14,752 .0 335.0 210.0 3,247,0 5,987.0 4.973.0 215 216 PHILLIPS SCHOOL 217 FumitureeEquipmentlFumishings- Phillips 75.0 15.0 TR 15 .3 TR 15.0 ITR 15 .0 TR 1 15 .0 'TR 218 5 Bathroom Fixtur e Upgrades 240 .0 60.0 STBD 60.0 • STBD 60-0 STBD 60.0 STBD 219 5110 Accessability improvements 825 .0 75.0 STBD. 500.0 STBD 250.0 STBD 220 5 window Dam ages/Replac ements 150.0 50 ,0 STBD 50 .0 STBD 50 .0 STBD 1 221 5110 Fire Alarm Upgrades 220.0 20.0 STBD 200.0 STBD 222 10 Replace Boiler#1 300.0 300 .0 STBD 223 5 Repave Parking Lots 90 .0 90.0 STBD 224 5 Re Ke y Doors 15 .0 15.0 STBD 225 10 Roof Repairs 75.0 75.0 STBD 226 10 Upgrade Fie Protectio n 500 .0 _ 500 .0 STBD 227 10 Upgrade Emergency Lighting 50.0 50.0 STBD 1228_ Total for Phillips School 2,540 .0 15.0 520.0 930.0 375.0 700.0 229 230 DISTRICT 231 Update Food Service Equipment 150 .0 30.0 TR 30.0 TR 30 .0 TR 30:0 [TR 30 ,0 TR 232 Security System Enhancements 40.0 ) 20.0 TR 20.0 TR 233 Scho ol Technoro gy 500,0 100.0 SA 100.0 SA 100.0: SA 100.0 SA 100 .0 SA 234 Total for District 690.0 130.0 150.0 130.0 , 130 .0 150 .0 235 236 POTENTIAL RENOVA TION/RECONSTRUCTION 237 20 Re noviReconst. - 3 Elementary School Bldg 89,500.0 46.°000.0 1BR 43.500.0 BR 238 20 Design/Plan - WHS & Rel. Costs (Debt Exclsn) 15,000.0 .5.11;:a 0 :DE - 239 20 High School & Related Costs (Debt Exclsn) 135,000.0 1 57.500.6 DE •-. .__ o.., DE 240 20 High School & Related Casts (M SBA) 50,000.0 25.000.0 MSBA 25,0170.0 .MBA 241 TOTAL RENOVJRECONSTR. 289,500. 0 61,000.0 136.000.0 02.500.0 0.0 0.0 242 243 SCHOOL DEPARTM ENT TOTALS 244 Total School Technology - SA 500. 0 100.0 SA 10,0 .0 SA 100.0 SA 100.0 SA 100 .0 SA 245 Total Various School lrnprovements - TR 1,246. 0 161.0 TR 280 0 TR 295.0 TR 320-4 TR 190.4 TR 246 Total V arious School Improvements- STBD 16,722. 0 0.0 STBD 675.0 STBD 4,122.0 STBD 6 .307.0 STBD 5,618.0 STBD 247 Total Various School Improvements MSBA 50;000. 0 0. 0 %I 25,000 .0 r 1SB 5,000 MBA. (_0.;M BA - lgitiSBA 248 Total Various School Improvements - DE 150,000. 0 [ 15,0000 3E 'Y" 500.Q DE _ _ 0.0 BE _ 0.0 BE 0 .0 BE 249 Total Various School Improvements - 2E 345.0 345.0 BE 0.0 BE 250 Total Various School Improvements - BR 94,882.0 49,030.0 BR 44,550.0 BR 72 .0 BR 1,130_0 'BR 100.0 BR 251 SCHOOL DEPARTMENT SUBTOTAL 313,695.0 64,636.0' 138,105. 0 97,089 .0 ' 7,857 .01 5.008 .0 252 r Page 6 of 8 FY 2022 - FY 2026 CIP General Fund A B C 0 E F H K 1 ]TOTALS FY'22 253 PUBLIC BUILDINGS Replace Maintenance Vehicl es Sidewalk snowblower/cabs FY '23 FY '24 FY '25 BY '26 I 254 50.0 50.0 TR 255 5 268,0 67.0 BE 67.0 BE 6+'J BE 67 .0 BE 256 Maintenance Division Furniture 25.0 15.0 TR t 10 .0 TR 257 5 Maintenance Division Mov e 50.0 50.0 BR 258 Johnson C ontr ols Re -Commissioning Equipm ent invent ory 50.0 50.0 TR 259 5 150.0 150.0 BE PUBLIC BUILDINGS SUBTOTAL 593.0 67.0 332 .0 117.0 67 .0 10.0 261 262' 263 SENIOR CENTER 284 5 Senior Shuttle Bus 150.0 150.0 BE ' 265 Design Canopy &walkway 10.0 10.0 TR 266 5 Re -Build C anopy & walkwayw/exterior lighting 50.0 50.0 BR ' 267 5/10 Upgrade Fire Alarm System 220.0 20.0 BR 200 .0 BR 268 15 Roof Re pairs/Repla cement 100 .0 100.0 BR 269 5 Exterior Painting 50 .0 50 .0 BR 270 De sign Back Porch/walkway Repair/Enhance back porch/wa lkway 10.0 10.0 TR 271 5 50.0 50.0 BR 272 Paint Hallway/Offices/Meeting Ro oms Bu ilding Renovation (desk,curtains,blinds) SENIO R CENTER SUBTOTAL 60 .0 30 .0 TR 30.0 TR 273 75.0 15.0 TR 15.0 TR 15.0 TR 15.0 TR 15.0 TR 274 775 .0 165.0 245.0 215.0 105.0 45.0 275 275 277 SKATING ARENA 278 279 5 Building Reno vations Ammonia Detection Syste m Doors/Compre ssor Upgrades Eye Wa shing Station Rebuild of Compre ssors Board Replacemen ts Electric Ice Resurfacing Machine Electrical Panel Upgrades Upgrade of Internal Lighting to LED Replacement of Stands (ADA Compliance) Ene rgy Mana gement System Enclosure of outside walls 150.0 65.0 30 .0 65 .0 TR BR 30.0 TR 30.3 R 1 30.0 TR 30.0; TR 280 5 15.0 15.0 BR 261 5 282 5 15. 0 15.0 BR 20.0 20.0 BR 283 10 165.0 165.0 BR 284; 285 10 5 150.0 150.0 BE 19.0' 27. 01 19.0 BR 286 287 5 10 200.0 27.0 BR 200 0 BR 288 5 42. 0 42.0 BE 289 10 30. 0 30.0 SR 290 5 Replace Boilers SKATING ARENA SUBTO TAL 50.0 50 .0 BR 291 948. 0 460. 0 1 276. 0 102 .0' 80.0 30 .0 292 293, .294 1 Pagel of FY 2022 - FY 2026 CIP General Fu nd A B C D E F. u H 1 J i{ L M 1 TOTALS FY '22 FY '23 ' FY '24 FY '25 FY '26 295 STREETS & SIDEWALKS 296 Mt . Auburn St.Corridor (Irving St -Coolidge Sq.- Cambridge line) 21,000.0 21,000.0 TIP 297 Highway reconstruction (Chap 90) 1,865 .0 3,233.8 Varo MIIIMINE 535.2'TR 614.5 NW- _ TR 645.2 TR 677.5 - TR 711.4 TR 298 Highway reconstruction (Tax Revenue) 299 5 Highway rec onstr uction (B onds) 10,000.0 - 2.000.0 STE 2.300.0 STB 2.00-0.0 STE 2.000.0 S TE 2,000.0 STE. 300 5 Highway reconstr .-Connector Roads/LongerStreets 7,500 .0 1.500.0 STB 1 .506.0 STE 1,500 .0 STB 1,500.0 STE 1,500 .0 STE 301 Highway reconstruction (Future Bonds) 38,962.2 38,962 .2 FSE 302 Sidewalk reconstruction ( Chap 90) 1,865.0 3,233 .8 V.. , :: 585.2 _. ._ TR . - _ 614.5 : _ TR S-7-:.- _ 545.2 TR r _ _ 303 Sidewalk reconstructi on (T ax Revenue) 677.5 TR 711 .4 TR 304 5 Underground Duct for Utilities 900 .0 300 .0 BR 300.0 SR 300 .0 BR 305 5 Sidewalk reconstruction (Bonds) 2,500 .0 500.0 SWB 500.0 SWB 500.0 SWB 500.0 SWB 500 .0 SWB 306 Sidewalk rec onstruction (Future Bonds) 14,273 .6 14 .273.6 FSB 307 STREETS & SIDEWALKS SUBTOTAL 105,333.4 6,216.4 26.975,0 6,336 .4 6,101.0 59,704 .6 308 309 GENERAL FUND CM 467,799.1 86,351 .7 175,797.4 149,827.4 22,416.7 73.805.9 310 311 COSTS BY SOURCE OF FUNDS 312 G ENERAL O BLIG ATIO N BONDS _ , 313 BE (EoUIPh.iENT) 9,696.5 3.591 2 1.096 .3 1,470 .4' 2,019 .0 1,520,0 314 BR ( REMODELING ) 122.488.3: . 53,951.01 52.851.0 4.065.0 5,821.3 5.800.0 315 STB ( STREET) 17,500.0' 3.500.01 3,500.0 3 .500.0 3,500.0 3 .500.0'. 316 SWB ( SIDEWA LK ) 2,500 .0 500.01 500.0 500.0 500.0 1 500 .0. 317 SUBTOTAL GENERAL OBLIGATIO N BONDS 152,184.8 81,542.2' 1 57.947 .3 9.535.0 11 .840.31 1 11 .320 .0 318 C9 _ -Na J _�1?1 T45.01 746.151 -14A4 .,. T 746_6 7401 320 FSB FUTURE STREET 8. SIDEWALK BONDS 53.235.8 0 .0, 0.0 0.0! 0.0 53,235 .8' 321 MSBA - 50. 000.0 0.0' 25.000 .0 25 .000 .0; 0 .0 0 .0 322 DE U3:O!: 350,000.0. 15.000.01 67,500.0 67.500.0' 0.0 0.0; 323 ST3D SCHOOL TO BE DETERMINED 16,722. 0 0.0 675.0 4,122.0' , 6,307 .0 5,618 .0 324 TR TAX REVENUE 14,026. 5 2,563.5 2,829.1 2,824.4 3,023.4 2,786.1 325 SA SCHOOL APPROPRIA TION 500.0 100.0 100.0 100.0 100.0 100.0 326 TIP TRANSPORTATION IMPROVEM ENT PROG. 21,000.0 0.0 21,000.0 0.0 0.0 0.0 327 TBD TO BE DETERMINED 6,400.0 6:400.0 0.0. 0 .0 0 .0 0.0 328 SUBTOTA L O THER 3`15,614.31 24, 809.5 117,850.1 100.292.4 10,176.4 62,485 .9 329 G RAND TOTAL 467.799. 1 86,351.7 175,7'97.4 109 .827 .4 22,016 .7 73,805.9 Page 8 of 8 FY2022-2026 CIP GENERAL FUND DEBT PROJEC TION A B C 0 E F 0 PERMANENT DEBT FY09 Band (Jul 08) FY22 FY'23 FY'24 FY'25 FY'26 2 3 ' 4 Prin (15,650,000) $ 500,000 $ 500.000 $ 500,000 $ 500,000 $ 500,000 5 LIT Int $ 165,938 $ 145,000 $ 123,750 $ 102,188 $ 80,000 6 Subtotal $ 665,938 $ 645,000 $ 623,750 $ 602,188 $ 580.000 7 8 FY10 Bond (Feb 10) 9 Prin (5,452,000) $ 270,000 $ 270,000 $ 270,000 $ 245,000 $ 210,000 10 LIT Int $ 78,751 $ 69 .300 $ 59,850 $ 50,401 $ 41,213 11 Subtotal $ 348,751 $ 339,300 $ 329,850 $ 295,401 $ 251,213 12 13 FY12 Bond (June 12) r14 Prin (3,722,000) $ 195,000 $ 125,000 $ 125,000 $ 125,000 $ 125,000 15 LIT Int $ 20,463 $ 16,563 $ 13,906 $ 11,250 $ 7,500 16 Subtotal $ 215,463 $ 141,563 $ 138,906 $ 136,250 $ 132,500 17 18 FY 14 Bond (Nov 13) 19 Prin (6,000,000) ESCC $ 275,000 $ 280,000 $ 285,000 $ 295,000 $ 305,000 20 LIT Int $ 117 .988 $ 112.488 $ 105,488 $ 97 .650 $ 88,800 21 Subtotal $ 392 ,988 $ 392,488 $ 390,488 $ 392,650 $ 393,800 22 23 FY 12 Bond (May 2014) 24 Prin (1,088,000) Victory Field $ 85,000 $ 85,000 $ 80,000 $ 80,000 $ 80,000 25 ! LJT int $ 15,975 $ 11,725 $ 7,600 $ 4,600 $ 1600 26 ' Subtotal $ 100,975 $ 96,725 $ 87,600 $ 84,600 $ 82600 27 28 FY 13 Bond (May 2014) 29 Prin (1,350,000) ESC() $ 90,000 $ 90,000 $ 90,000 $ 90,000 $ 90,000 30 LIT Int $ 22,950 $ 18,450 $ 13,950 $ 10,575 $ 8,325 31 Subtotal $ 112,950 $ 108,450 $ 103,950 $ 100 .575 $ 98.325 32 33 FY 13 Bond (May 2014) 34 Prin (207,000) Various School Buildings $ 15,000 $ 15,000 $ 15.000 $ 10,000 $ 10,000 35 UT Int $ 3,026 $ 2,275 $ 1,525 $ 1,025 $ 775 36 Subtotal $ 18,026 $ 17,275 $ 16,525 $ 11,025 $ 10,775 37 Page 1 of 9 FY2022-2026 CIP GENERAL FUND DEBT PROJECTION A 3 C D E F 6 j 1 FY '13 Bond (May 2014) ey �} FYTLL FY'23 FY'24 FY'25 FY'26 38 39 Prin (370,000) Casey Park $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 40 UT Int $ 6,225 $ 4,975 $ 3,725 $ 2,788 $ 2,163 41 Subtotal $ 31,225 $ 29,975 $ 28,725 $ 27,788 $ 27,163 42 43 FY 14 Refunding Bond Issue (May 2014) 44 Prin (7,933,000) $ 680,000 $ 680,000 $ 680,000 $ 670,000 $ - 45 L/T Int $ 101,750 $ 67,750 $ 33,750 $ 8,375 $ - 46 Subtotal $ 781,750 $ 747,750 $ 713,750 $ 678,375 $ - 47 48 FY 16 Bond (April 2016) 49 Prin (1,206.500) Various Equipment & Vehicles $ 55,000 $ 45.000 $ 40;000 $ 40,000 $ - 50 'LIT Int $ 5,400 $ 3,750 $ 2,400 $ 1,200 $ - 51 Subtotal $ 60,400 $ 48,750 $ 42,400 $ 41,200 $ - 52 53 FY 16 Bond (April 2016) 54 Prin (913,600) Various Municipal Buildings $ 104,000 $ 100,000 $ 100,000 $ 100,000 $ - 55 UT Int $ 12,000 $ 9,000 $ 6,000 $ 3.000 $ - 56 Subtota l $ 112.000 $ 149,000 $ 106,000 $ 103,000 $ - 57 58 FY 18 Bond (January 2018) 59 Prin (1,793,000) Vario us Equipment & Ve hicles $ 195,000 $ 195,000 $ 135,000 $ 120,000 $ 120,000 60 LIT int $ 44,300 $ 36,500 $ 28,700 $ 23,300 $ 18,500 61 Subtotal $ 239,300 $ 231;500 $ 163,700 $ 143,300 $ 138,500 62 63 FY 18 Bond (January 2018) 64 Prin (1.327,200) Va rious Municipal Buildings $ 135,000 $ 90,000 $ 75,000 $ 75,000 $ 75,000 65 UT Int $ 35,100 $ 29,700 $ 26,100 $ 23,100 $ 20,100 66 Subtotal $ 170,100 $ 119,700 $ 101,100 $ 98,100 $ 95,100 67 68 FY 18 Bond (January 2018) 69 Prin (4,034,800) Stree t and Sidewalks $ 585,000 $ 85,000 $ 85,000 $ 85,000 $ 85,000 70 L/T Int $ 40,200 $ 16,800 $ 13,400 $ 10,000 $ 6,600 71 Subtotal 5 625,200 $ 101,800 $ 98;400 $ 95,000 $ 91,600 72 73 FY2022-2026 ClP GENERAL FUND DEBT PROJEC TION A B C D E F G 1 FY 19 Bond (June 2019) Fr22 FY'23 FY124 FY'2S FY'26 74 75 Prin (1,325,500) Various School Buildings $ 240,000 $ 240,000 $ 240,000 $ 25,000 $ 25.000 76 UT Int $ 42,000 $ 30,000 $ 18,000 $ 6,000 $ 4,750 77 Subtotal $ 282,000 $ 270,000 $ 258,000 $ 31,000 $ 29,750 78 79 FY 19 Bond (June 2019) 80 Prin (837,500) Street and Sidewalks $ 165,000 $ 165,000 $ 165,000 $ - $ - 81 LIT Int $ 24 .750 $ 16,500 $ 8,250 $ - $ 82 Subtotal $ 189,750 $ 181,500 $ 173,250 $ - $ - 83 84 FY 19 Bond (June 2019) 85 Prin (908,000) Filippelio Park $ 90.000 $ 90,000 $ 90.000 $ 90,000 $ 90,000 86 LIT Int $ 36,000 $ 31,500 $ 27,000 $ 22,500 $ 18,000 ' 87 Subtotal $ 126,000 $ 121,500 $ 117,000 $ 112,500 $ 108,000 88 89 FY 19 Bond (June 2019) 90 Prin (1,443,500) Various Equipment & Ve hicles $ 160,000 $ 155,000 $ 145,000 $ 125,000 $ 125,000 91 LIT Int $ 52,750 $ 44,750 $ 37,000 $ 29,750 $ 23,500 92 Subtotal $ 212,750 $ 199 .750 $ 182 ,000 $ 154,750 $ 148,500 93 94 FY 20 Bond (June 2020) 95 Prin (3,223,467) Cunniff Elementary Design $ 165,000 $ 165,000 $ 165,000 $ 160.000 $ 160,000 96 LIT Int $ 110,350 $ 102,100 $ 93,850 $ 85,600 $ 77,600 97 Subtotal $ 275,350 $ 267,100 $ 258,850 $ 245 .600 $ 237,600 98 1 99 FY 20 Bond (June 2020) 100 Prin (5,729,088) Hosmer Eleme ntary Design $ 290,000 $ 290,000 $ 290,000 $ 290,000 $ 285,000 101 UT int $ 196,225 $ 181,725 $ 167 ,225 $ 152,725 $ 138,225 102 Subtotal $ 486,225 $ 471,725 $ 457,225 $ 442,725 $ 423,225 103 104 FY 20 Bond (June 2020) 105 Prin (1,122,445) Hosmer Elementary OPM $ 60,000 $ 60,000 $ 60,000 $ 55.000 $ 55,000 106 LJT Int $ 38,425 $ 35,425 $ 32,425 $ 29,425 $ 26,675 107 Subtotal $ 98,425 $ 95,425 5 92,425 $ 84,425 $ 81,675 108 109 Page 3 of 9 FY2022-2026 CIP GENERAL FUND DEBT PROJECTION A B C D E i F G 1 FY'22 FY'23 FY '24 FT25 FY'26 110 FY 20 Bond (June 2020) 111 Prin (245,000) Middle School Me n's Lockerrocm $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 112 LIT Ent $ 10,750 $ 9,500 $ 8,250 $ 7,000 $ 5,750 113 Subtotal 5 35,750 $ 34,500 $ 33,250 $ 32,000 5 30,750 114 115 FY 20 Bond (June 2020) 116 Prin (529,625) Street/Sidewalk Renovations $ 105,000 $ 105,000 $ 105,000 $ 105,000 $ - 117 LJT Int $ 21,000 $ 15,750 $ 10,500 $ 5,250 $ - 118 Subtotal $ 126.000 $ 120,750 $ 115,500 $ 110,250 $ - 119 120 FY 20 Bond (June 2020) 121 Prin (2,500,000) Street/Sidewalk Renovations $ 500,000 $ 500,003 $ 500,000 $ 500,000 $ - 122 UT int $ 100,000 $ 75,000 $ 50,000 $ 25,000 $ - 123 Subtotal $ 600,000 $ 575,000 $ 550,000 $ 525,000 $ - 124 125 FY 20 Bond (June 2020) 126 Prin (1,100,000) Ladder Truck $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 127 LIT Int $ 42,850 $ 39,100 $ 35,350 $ 31,600 $ 27,850 128 Subtotal $ 117,850 $ 114,100 $ 110,350 $ 106,600 $ 102,850 129 130 FY 20 Bond (June 2020) 131 Prin (1,175;375) Filippello Lights & Scoreboard $ 120 .000 5 120,000 $ 120,000 $ 120,000 $ 115,000 132 UT Int $ 52,750 $ 46,750 $ 40,750 $ 34,750 $ 28,750 133 Subtotal $ 172,750 $ 166,750 $ 163.750 $ 154,750 $ 143,750 134 135 TOTA L PERMANENT DEBT 136 Prin $ 5,200,000 $ 4,575,000 $ 4,485,000 $ 4,030,000 $ 2,580,003 137 UT Int $ 1. 397.916 $ 1,172,375 $ 968,744 $ 779,052 $ 627,675 138 Total Permanent 1 $ 6,597,916 1 $ 5,747,375 1 $ 5,453,744 ] $ 4,809,052 1 $ 3,207,676 139 140 141 AUTHORIZED NOT ISSUED DEBT 142 Prin (4,632,748) Elem. Schools Proj Design & OPM $ - $ 231,637 $ 231,637 $ 231,637 $ 231,637 143 LIT Int (4. 5%) $ 208,474 $ 208.474 $ 198,050 $ 187,626 $ 177,203 144 Subtotal S 208,474 $ 440,111 $ 429,687 $ 419.263 $ 408,840 145 Page 4 of FY2022-2026 CIP GENERAL FUND DEBT PROJECTION A B C D E F I G 1 FY'22 FY 23 FY'24 FY'25 1 FY'26 146 Prin (1,600,000) High School Feasibility Study $ 80,000 $ 80,000 $ 80,000 $ 80 .000 $ 80,000 147 LfT Int (4 .5°%0) $ 72,000 $ 68,400 $ 64,800 $ 61,200 $ 57,600 14.8 Subtotal $ 152,000 $ 148,400 $ 144.800 $ 141,200 $ 137,600 149 150 Prin (1,771,000) Public Saf ety Radio Infrastrucuture $ 177.100 $ 177,100 $ 177.100 $ 177,100 $ 177,100 151 UT Int (4.5%) $ 79.695 $ 71,726 $ 63,756 $ 55,787 $ 47,617 152 Subto tal $ 256,795 $ 248,826 $ 240,856 $ 232 .887 $ 224,917 153 154 Prin (355,000) Fire Ambulance $ 71,000 $ 71,000 $ 71,000 $ 71,000 $ 71,000 155 UT Int (4. 5%) $ 15,975 $ 12,780 $ 9,585 $ 6,390 $ 3.195 156 Subtotal $ 86,975 $ 83,780 $ 80,585 $ 77,390 $ 74,195 157 158 Prin (188,000) Admin. Bldg Elevator $ 37,600 $ 37,600 $ 37,600 $ 37,600 $ 37,600 159 LIT Int (4.5%) $ 8,460 $ 6,768 $ 5,076 $ 3,384 $ 1,692 160 Subtotal $ 46,060 $ 44,368 $ 42,676 $ 40,984 $ 39,292 161 162 TOTAL AUTHORIZED UNISSUED DEBT 163 Prin $ 365.700 $ 597,337 $ 597,337 $ 597,337 $ 597,337 6 UT Int $ 384,604 $ 368,148 $ 341.267 $ 314,387 $ 287,507 165, To tal Authorized Unissued 1 $ 750,304 1 $ 966,485 1 $ 938,604 1 $ 911,724 1 $ 884,844 166 167 PLANNED BOND DEBT 168 FY 16 Band (June 2017) 169 Print (900,000) See Schedule $ 90,000 $ 90,000 $ 90,400 $ 90,000 $ 90,000 170 UT Int (4. 5%) $ 40,500 $ 36 .450 $ 32,400 $ 28,350 $ 24,300 171 Subtotal $ 130,500 $ 126.450 $ 122,400 $ 118,350 $ 114,300 172 173 FY 17 Bond (June 2017) 174 Print (3,950,000) See Sche dule $ 395,000 $ 395,000 $ 395,000 $ 395,000 $ 395,000 175 LIT Int (4.5%) $ 177,750 $ 159,975 $ 142,200 $ 124,425 $ 106,650 176 Subtotal $ 572,750 $ 554,975 $ 537,200 $ 519,425 $ 501,650 177 178 FY 18 Bond (May 2018) 179 Prin (385,000) See Sche dule $ 38,500 $ 38,500 $ 38,500 $ 38,500 $ 38,500 180 UT lilt (4.5% ) $ 17,325 $ 15,593 $ 13,860 $ 12,128 $ 10,395 181 Subtotal $ 55,825 $ 54,093 $ 52,360 $ 50,628 $ 48,895 Page 5 of 9 FY2022-2026 CIP GENERAL FUND DEBT PROJECTION A 8 C 0 E F G 1 FY 18 Bond ( May 2018) FY'22 FY'23 FY`24 FY'25 FY'26 182 183, 184' Prin (325,000) Comm. P ath design $ 65 ,000 $ 65,000 $ 65,000 $ 65,000 $ 65 ,000 185 L1T Int (4.5%) $ 14,625 $ 11,700 $ 8,775 $ 5,850 $ 2.925 186 Subtotal $ 79,625 $ 76,700 $ 73,775 $ 70,850 $ 67,925 187 188 FY 19 Bond (May 2019) 189 Prix} (1,392,000) See Schedule $ 164,100 $ 164,100 $ 164,100 $ 164,100 $ 164,100 190 UT Int (4. 5°%) $ 62 ,640 $ 55,256 $ 47,871 $ 40.487 $ 33,102 191 Subtotal $ 226,740 $ 219,356 $ 211,971 $ 204,587 $ 197,202 192 193 FY 20 Bond (M ay 2020) 194 Prin (125,600) See Schedule $ 12,560 $ 12,560 $ 12,560 $ 12,560 $ 12,560 155 UT Int (4. 5%) $ 5,652 $ 5,087 $ 4,522 $ 3,956 $ 3,391 i 196 Subtotal $ 18,212 $ 17,647 $ 17,082 $ 16,516 $ 15,951 197 198 FY 20 Bond (May 2020) 199 Prin (4,500,000) CannJThrwys & Comm Path $ 600,000 $ 600,000 $ 600,000 $ 600,000 $ 600,000 200 LIT Int (4.5%) $ 202,500 $ 175,500 $ 148,500 $ 121,500 $ 94,500 201 Subtotal $ 802,500 $ 775,500 $ 748,500 $ 721,500 $ 694,500 202 203 Prin (64,000,000) 3 Elam School Bldg $ 3,200,000 $ 3,200,000 $ 3,200,000 $ 3,200,000 $ 3,200,000 204 UT Int (4.5%) $ 2,736,000 $ 2,592,000 $ 2,448,000 $ 2,304,000 $ 2,160,000 205 Subtotal $ 5,936.000 $ 5,792,000 $ 5,648,000 $ 5,504,000 $ 5,360,000 2061 207 FY 21 Bond (May 2021) 208 Prin (4,221,600) See Schedule $ 495,820 $ 495,820 $ 495,820 $ 495,820 $ 495,820 209 L1T Int (4.5%) $ 189,972 $ 167,660 $ 145,348 $ 123,036 $ 100,724 210 Subtotal $ 685,792 $ 663.480 $ 641,168 $ 618,856 $ 596,544 211 212 FY 21 Bon d (May 2021) 213 Prin (4,000,000) Str, Walk, Co nnlThrwys $ 800,000 $ 800,000 $ 800,000 $ 800,000 $ 800,000 214 UT Int (4. 5%) $ 180,000 $ 144,000 $ 108.000 $ 72.000 $ 36,000 215 Subtotal $ 980,000 $ 944,000 $ 908,000 $ 872,000 $ 836,000 216 217 Page 6 of 9 FY2022-2026 COP GENERAL FUND DEBT PROJECTION .. 13 C D E F 0 1 FY 21 Bond (May 2021) FY'22 FY'23 FY'24 FY'25 FY'26 218 219 Prin (1,622,800) School $ 106,290 $ 106,290 $ 106,290 $ 106,290 $ 106,290 220 ['Tint (4.5 %) $ 73,026 $ 68,243 $ 63,460 $ 58,677 $ 53,894 221 Subtotal S 179,316 $ 174 .533 $ 169,750 $ 164 .967 $ 160,184 222 223 FY 22 Bond (May 2022) 224 Prin (7,867,200) See Schedul e $ - $ 900,673 $ 900,673 $ 900,673 $ 900,673 225 L/T Int (4. 5%) $ - $ 354,024 $ 313,494 $ 272,963 $ 232,433 226 Subtotal $ - $ 1,254,697 $ 1,214,167 $ 1,173,636 $ 1,133,106 , 227 228 FY 22 Bond (M ay 2022) 229 Prin (4,300,000) Str, Walk, Duct & Conn{Thrwys $ - $ 860.000 $ 860,000 $ 860,000 $ 850,000 230 UT Int (4. 5%) $ - $ 193,500 $ 154,800 $ 116,130 $ 77,400 231 Subtotal $ - $ 1,053,500 $ 1,014,800 $ 976.100 $ 937,400 232 233 FY 22 Bond (May 2022) 234 Prin (3,375,000) School $ - $ 300,667 $ 300,667 $ 300,667 $ 300,667 235 UT Int (4.5%) $ - $ 151,875 $ 138,345 $ 124,815 $ 111;285 236 Subtotal $ - $ 452,542 $ 439,012 $ 425,482 $ 411,952 237 238 FY 22 Bond (July 2021) 239 Prin (46,000,000) 3 Elena School Bldg $ - $ 2,300,000 $ 2,300.000 $ 2,300,000 $ 2,300,000 240 LIT Int (4. 5%) $ 1,035,000 $ 2,018,250 $ 1,914,750 $ 1;811,250 $ 1,759,500 241 Subtotal $ 1.035,000 $ 4,318,250 $ 4,214,750 $ 4,111,250 $ 4,059.500 242 243 FY 23 Bond (May 2023) 244 Prin (9,397,300) See Schedule $ - $ - $ 863,210 $ 863,210 $ 863,210 245 UT Int (4.5/0) $ - $ - $ 422,879 $ 384,034 $ 345,190 246 Subtotal $ - $ - $ 1,286,089 $ 1,247,244 $ 1,208,400 247 248 FY 23 Bond (May 2023) 249 Prin (4,000,000) Str, Walk, & CannlThrwys $ - $ - $ 800,000 $ 800,000 $ 800,000 2S0 UT Int (4.5%) $ - $ - $ 180,000 $ 144 ,000 $ 108,000 251 Subtotal S - $ - S 980,000 $ 944,000 $ 908,000 252 253 Page 7 of 9 FY2022-2026 CIF GENERAL FUND DEBT PROJECTION A 8 C D E F G 1 FY 23 Bond (May 2023) FY'22 FY123 FY'24 FT26 FT26 254 255 Prin (1,050,000) School 5 - $ - $ 84,000 $ 84,000 $ 84,000 256 UT Int (4.5%) $ - $ - $ 47,250 $ 43.470 $ 39,690 257 Subtotal 5 - $ - $ 131,250 $ 127.470 $ 123 .690 258 259 FY 23 Bond (July 2022) 260 Prrn (43,478,109) 3 Fiem School Bldg $ - $ - $ 2,173,905 $ 2,173,905 $ 2,173 ,905 261 LIT Int (4.5%) $ - S 978,257 $ 1,907,602 $ 1,809,776 $ 1,760,863 262 Subto tal $ - $ 978,257 $ 4,081,507 $ 3,983,681 $ 3,934,768 263 264 FY 24 Bond (May 2024) 265 Prin (5.163.000) See Schedule $ - $ - $ - $ 571,383 $ 571;383 266 LIT Int (4. 5%) $ - $ - $ - $ 232,335 $ 206 .623 267 Subtotal $ - 3 - $ - $ 803,718 $ 778.006 268 269 FY 24 Band (M ay 2024) 270 Prin (4,300,000) Str, Walk, & ConniThrwys $ - $ - $ - $ 860,000 $ 860,000 271 UT Int (4.5%) $ - $ - $ - $ 193,500 $ 154,800 272 Subtotal $ - $ - $ - $ 1,053,500 $ 1,014,800 273 274 FY 24 Bond (May 2024) 275 Prin (72,000) School $ - $ - $ - $ 4,800 $ 4,800 276 LIT Int (4.5%) $ - $ - $ - $ 3,240 $ 3,024 277 Subtotal $ - $ - $ - $ 8,040 $ 7,824 278 279 FY 25 Bond (May 2025) 280 Prin (6,710,300) See Schedule $ - $ - $ - $ - $ 747,693 281 UT Int (4.54% $ - $ - $ - $ - $ 301,964 282 Subtotal $ $ - $ - $ - $ 1,049,657 283 284 FY 25 Bond (May 2025) 285 Prin (4,000,000) Str, Walk, & ConniThrwys 5. - $ - $ - $ - $ 800,000 286 LIT Int (4.5% ) 3 - $ - $ - $ - $ 180.000 287 Subtotal - $ - $ - $ - $ 980,000 288 289 Pad _ .f FY2022-2026 CIP GENERAL FUND DEBT PROJECTION A B C D E F 0 1 FY'22 , FY'23 FY'24 PY'25 FY'26 290 FY 25 Bond ( May 2025) 291 Prin (1,130,000) School $ - $ - $ - $ - $ 83,000 292 LIT Int (4.5%) $ - $ - $ - $ - $ 50,850 293 Subtotal $ - $ - $ - $ - $ 133,850 294 295 TOTAL PLANNED BOND DEBT 296 Principal $ 5,967.270 $ 10,328,610 $ 14,249,725 $ 15,685,909 $ 17,316,602 297 Long Term Inte re st $ 4,734,990 $ 7,127,369 $ 8,242.055 $ 8,029,892 $ 7,957,503 298 TOTAL PLANNED DEBT 1 $ 10,702,260 1 $ 17,455,979 I $ 22,491,780 I $ 23,715,801 I $ 25,274,105 299 300 SCHOOL DEBT EXCLUSION 301 FY 22 Bond (June 2022) 302 Prin (15,000,000) See Schedule $ - $ 750,000 $ 750,000 $ 750,000 $ 750,000 303 LIT Int (4. 5%) $ - $ 675.000 $ 641,250 $ 807,500 $ 573,750 304 Subtotal $ - $ 1.425,000 $ 1,391,250 $ 1,357.500 $ 1,323,750 305 306 FY 23 Bond (May 2023) 307 Prin (67,500,000) See Schedule $ - $ - $ 3,375,000 $ 3,375,000 $ 3,375,000 308 LIT Int (4.5%) $ - $ - $ 3,037,500 $ 2,885,625 $ 2,733,750 309 Subtotal $ - $ - $ 6 .412,500 $ 6,260,625 $ 6,108,750 310 311 FY 24 Bond (May 2024) 312 Frill (67,500,000) See Schedule $ - $ - $ - $ 3 ,375,000 $ 3,375.000 313 UT Int (4. 5%) $ - $ - $ - $ 3,037,500 $ 2,885,625 314 Subtotal $ - $ - $ - $ 6,412,500 $ 6,260,625 315 316 TOTA L SCHOOL DEBT EXCLUSION 317 Principal $ - $ 750,000 $ 4,125,000 $ 7,500,000 $ 7,500,000 318 Long Term Interest $ - $ 675,000 $ 3,678,750 $ 6.530 ,625 $ 6,193,125 319 TOTA L SCHOOL DEBT EXCLUSION 1 $ - 1 $ 1,425,000 I $ 7,803,750 1 $ 14,030,625 I $ 13,693,125 320 321 322 To tal Permanent, Authorized/Uniss ued, Planned & School Debt Exclusion 323 Principal $ 11. 532,970 $ 16,250,947 $ 23,457,063 $ 27,813 ,246 $ 27,993,940 324 Long Term Interest $ 6,517,510 $ 9,342:892 $ 13.230,816 $ 15,653,956 $ 15,065,810 325 Grand To tal [ $ 18,050,480 1 $ 25,593,839 / $ 36,687,879 I $ 43,467,202 L$ 43,059,750 Page 9 of 9 TOWN OF WATERTOWN CIP FY 22 TO FY 26 COST ANALYSIS AUTHO RIZED UNISSUED DEBT 20 3 ELEM. SC:I-L PROJ. PLANSFCESIGN 20 3 PI FM . SCH. PR1J_ PL ANS/DESIGN BR 12 BR 19 20 HIGH SCHOOL FEASIBILITY STUDY BR 19 10 PUBLIC SAFETY RADIO SYSTEM REPLAC MNT BE 21 5 FIRE: A MBULANCE BE 21 5 ADMIN BLDG : REPAIR ELEVATOR BR 21 TOTAL AUTHORIZED UNISSUED DEBT PLANNED DEBT t0 DESIG N MO XLEY CTS RENOVlLIGFITS 10 MOXLEY COURTS RENO WLJG I-fTS 10 VICTORY TR ACK, FIELD & CRT REND 10 DESIGN OF CASEY PARK RENOV. 10 CASEY PARK RENOV , LIG HTSISCBRD 10 ADMIN BLDG: SHINGLE. PAINT. RUG BR 16 BR 18 BR 17 BR 17 BR 17 BR 18 5 COM M. PATH DESIGN[TAYLORJLINEAR) SWB 18 5 ADMIN. BLD REPLACE FIRE ALARM 10 ADM BLO AC & PLUMBING UPGRADE 5 HIGHWAY: SKID STEER 10 HIGHWAY: DUMP TRUCK 55000 GVW 10 SNO W&ICE:COMBQ BODY 6 WHEELER 10 SNOW&ICE BLOWERA TTACHMENT 5 POCKS&FRSTRY: TRACTOR FARM 5 PRKS&FRSTRY: INFIELD GROOM ER 10 SALT ONSTALL COURT, PARKING LGT BE 19 BR 19 BE 19 BE 19 BE 19 BE 19 BR 19 BE 19 BR 19 10 EXTERIOR PAINTING OF POLICE STA TION BR 20 10 COMM. PATH CONSTR. (TAYLORILINEAR) SWB 20 5 HIGHWAY (CONNECTORITHR0UGHWAYS) STB 20 20 F1ENOVFR ECONST 3 ELEM SCH BLDG 8R 21 10 ARSENAL PARK RENOVAT IONS BR 21 5 1T: GIS BE 21 5 T: UPGRADE PHONE SYSTEM BE 21 5 IT- REPLACE & UPGRADE TECHNOLOGY BE 21 5 IT. DOCUM ENT MANAGEMENT SYSTEM BE 21 5 FIRE NORTH STATION - FLOOR DRAIN RP BR 21 COST FY 22 PRINCIPAL INTERES T FY 23 PRINCIPAL INTEREST FY 24 PRINCIPAL INTEREST FY 25 PRINCIPAL INTEREST Ff 26 PRINCIPAL I NTEREST 5 3,488.471 5 - $ 156,981 S 174.424 5 155,981 $ 174,424 5 149,132 5 174,424 $ 141,283 5 174,4224 $ 133,434 $ 1,144,277 5 - 5 51,492 5 57 ,214 $ 51,492 5 57,214 $ 48,918 5 57,214 5 46,343 3 57,214 $ 45,769 $ 4,632,748 5 - $ 208.474 $ 231,637 5 206,474 $ 231,537_ $ 106,050 5 231.637 $ 187.626 5 231,637 5 177,203 5 1,600 ,000 $ 80 ,000 5 72 ,000 5 80,060 $ 66.400 3 60 ,000 $ 64 ,600 5 80,000 5 61.200 $ 60,000 5 57,600 $ 1,600,000 5 80,000 $ 72.000 $ 80,000 5 66,490 5 80,000 $ 64.800 5 80,000 $ 61,200 5 80,000 5 57,600 5 1,771,000 5 177 ,100 $ 79,695 $ 177,100 $ 71,726 5 177 ,100 3 65,755 $ 177,100 $ 55,787 $ 177,100 $ 47,917 $ 355,000 $ 71,000 5 15,975 $ 71,000 $ 12.780 5 71 ,000 $ 9 ,585 5 71,000 5 6,390 5 71,000 5 3.195 5 188 ,000 $ 37,600 5 6.460 5 37,$00 3 6,768 5 37 .600 S 5 ,076 3 37,600 5 3,364 $ 37,600 $ 1,692 5 2,314,000 5 285 .700 $ 104.130 5 285,700 5 91,274 5 285,700 5 78,417 $ 285,700 5 65,561 $ 285,700 $ 52.704 5 8 .546,748 $ 365,700 5 364 ,604 $ 597,337 $ 358,147.5 597,337 5 341,267 $ 597,337 $ 314,367 5 597,337 $ 287,507 3 100,000 5 10,000 5 4,500 5 10,000 5 4,050 , $ 10 ,000 5 3,800 5 10,004 5 3,150 5 10,000 5 2,700 5 600,000 5 60.000 $ 36,000 5 80,000 $ 32,400 ' 5 80,000 5 28,800 5 80.006 3 25,200 5 80,000 5 21,600 5 900,000 5 90,000 3 40,500 3 90,000 5 36,450 5 90,000 5 32,400 a 90.000 5 28,350 $ 90,000 $ 24,300 5 3.000,000 3 300,000 $ 135,000 $ 300,000 5 121,500 $ 300,000 5 148,000 5 300 .000 5 94,500 S 300 ,000 5 81,000 $ 100,000 5 10.000 5 4,500 6 10,000 $ 4,050 $ 10,000 $ 3,$00 5 10,000 $ 3,150 5 10,000 S 2,700 5 850,000 3 85,000 $ 38,250 5 85.000 $ 34.425 3 85,000 5 30,500 5 85.000 $ 26,775 5 85.000 5 22,950 3 3,950,000 $ 395,000 5 177 .750 5 395 ,000 3 159,975 5 325,000 5 142,200 5 395 ,006 $ 124 ,425 5 395.000 5 106650 $ 385.000 5 38,500 5 17,325 5 38 .500 5 15,593 5 38,500 $ 13,860 5 38,500 5 12,128 3 36,500 5 10.395 6 385,000 $ 38,500 5 17,325 S 38 .500 5 15,593 5 38,500 5 13,880 5 38 ,500 5 12 .128 3 38 .530 3 10,395 5 326.000 $ 65,000 5 14,625 3 66,000 $ 11,700 5 65,000 5 8,775 $ 65,000 $ 5,850 5 65 .000 $ 2,925 $ 325,000 5 65,000 5 14,525 $ 55,000 $ 11,700 3 65,000 5 8, 775 5 65,000 $ 5,850 5 65,000 5 2,925 $ 35.000 $ 17,000 5 3,825 $ 17,000 $ 3,060 5 17,000 $ 2,295 5 17,000 $ 1,530 5 17,000 $ 765 5 130,004 $ 13,000 5 5.850 $ 13,000 $ 5,265 5 13,000 5 4,680 $ 13,000 $ 4,095 5 13,000 $ 3.510 5 65,000 5 13,000 5 2,925 5 15,000 $ 2.340 $ 13,000 5 1 .755 5 13,000 5 1,170 5 13,000 $ 585 5 243, 1000 $ 24,300 3 10,935 5 24,300 5 9.842 5 24,300 $ 8,742 5 24,300 5 7,655 , $ 24,300 $ 6 .561 3 265,000 $ 26,500 5 11.925 5 26,500 5 10.733 $ 26,500 $ 9.540 5 26,500 5 8 ,346 $ 26,500 3 7,155 5 205,000 $ 20,600 3 5.225 5 20,500 5 9.303 $ 20 ,500 5 7,380 $ 20,500 5 6,458 ' 5 20,500 $ 5,535 3 75,000 $ 15,000 5 3,375 $ 15,000 $ 2,700 5 16 ,000 5 2,025 5 15,000 8 1,350. 5 15,000 8 675 5 24,500 $ 4,800 8 1.050 5 4,800 $ 864 $ 4.800 $ 648 $ 4,800 $ 432 $ 4,800 5 218 5 306,0001 $ 30,000 $ 133.500 $ 30,000 5 12,150 $ 30,000 5 10,800 $ 30,000 5 9,450 $ 30,000 5 8,100 5 1,392,000' 5 164.100 3 52, 640 $ 164,100 $ 55,258 $ 1&4,100 $ 47,871 3 164,100 5 40,487 5 164,104 5 33,102 5 125,600 5 12,560 $ 5,552 $ 12,560 5 5,067 5 12,560 5 4,522 5 12,560 5 3,956 5 12,560 5 3,391 5 125,600 5 12,560 5 5.652 5 12, 560 $ 5,067 5 12,550 $ 4,522 $ 12 ,560 $ 5,956 5 12,560 5 3,391 $ 3,000,000 5 300,000 5 135,000 5 300,000 5 121,500 3 300,000 $ 108,000 $ 390 .000 $ 94,500 $ 340,008 S 81,000 5 1.500,000 5 300,000 $ 67,500 5 300,000 5 54,000 6 300,000 S 40.500 S 300.040 5 27.000 $ 300.000 $ 13,500 $ 4,500,000 5 600,000 $ 202,500 $ 600. 000 5 175,500 5 600,000 $ 146,500 $ 600,000 5 121 ,500 5 600 ,000 5 94,500 $ 64,000,000 $ 3,200,000 52. 738,000 $ 3,200. 000 $ 2. 592,000 $ 5,200,000 5 2,448,000 $ 3,200 .000 $ 2,304,000 5 3,200,000 $ 2,160,000 $ 64.000,000 5 3,200,000 $ 2,735,000 $ 3,200.000 $ 2, 502,000 5 3,200,000 5 2 .448 .000 5 3 ,200 ,000 5 2 .304,000 5 3,200.000 $ 2 ,160 ,000 5 2,700,000 $ 270,000 $ 121,509 $ 270,000 5 109,350 $ 270,000 $ 97,200 5 270.000 $ 85,050 5 270 .000 5 72,900 $ 50.000 5 10,000 $ 2,250 5 10,040 $ 1,800 $ 10,000 $ 1,350 5 10,000 5 900 5 10.000 $ 454 $ 175.000 $ 35,000 5 7,875 5 35,000 5 $,300 5 35,000 £ 4,725 5 35,000 5 3.150 5 35.000 5 1,575 $ 270,000 5 54,000 5 12,150 $ 54,000 $ 9. 720 $ 54,000 5 7,290 $ 54,000 $ 4,860 $ 54,000 5 2,430 5 80,000 $ 16,004 5 5,600 $ 16,000 $ 2,880 $ 16,000 $ 2,150 $ 16,000 $ 1,440 $ 16,000 5 720 5 41.600 5 8,324 $ 1,872 5 8,320 $ 1.49$ 5 6,320 $ 1.123 5 8,320 $ 748 S 8,320 3 374 T OWN OF WATE RTOWN CIF FY 22 TO FY 26 COST ANALYSIS FY 10 HIGHWAY SERVICE FLAT BED BE 21 5 PROP&BLDG SIGN TRUCK BE 21 10 FILIPPELLO: SPRAY PRK DESIGN & RENO BR 21 10 RINK REPAIR HANDICAP RAMP BR 21 5 HIGHWAY CONNECTOR/THROUGHWAYS) STB 21 5 HIGHWAY RECONSTR STB 21 5 SIDEWALKRECONSTR SWB 21 5 MIDDLE: DESIGN HVAC 3RD FLOOR 20 M IDDLE: REPLACE BOILER S 15 MIDDLE: HVAC (VRF) CA FETERIA BR 21 BR 21 BR 21 20 ADMIN. BLDG: REPLACE CHILLER BR 22 5 IT INFRASTRUCTURE IMPROVEMENTS BE 22 5 IT: PERMITTING TRANSPARENCY DASHBRDS BE 22 5 IT : VIDEO SECURITY & ACCESS CONTROL BE 22 5 IT: FIBER LOOP BUILD OUT & CABLING BE 22 5 IT: DOCUM ENT SCANNING BE 22 15 FIRE LADDER TRUC K BE 22 5 FIRE: EAST STATION HVA CPPLUMBING BR 22 5 FIRE EAST STA TION PAINT/CARP/LIGHTING BR 22 5 FIRE: MAIN STATION INTERIOR PAINTING BR 22 5 UBRARY: REPAIR CHILDREN'S ROOM WATER BR 22 5 LIBRARY: HVAC STUDY/FEASIBILITY NEEDS BR 22 5 POLICE: AUDIO & VIDEO UPGRA DES 4 CONF BE 22 10 PUBLIC SAFETY PH 2 RADIO 1NFRASTRUCUTR BR 22 10 DPW BLDG SIDEWLKS & PRKNG LOT BR 22 10 HIGHWAY STREET VACTOR BE 22 10 SNOW&ICE: SALTER 6 WHEELER BE 22 10 SNOW&ICE, LOADER BE 22 10 PA RKS: GAZEBO ATSALTONSTALL PARK BR 22 10 PARKS&FORESTRY: SWAP LOADER BE 22 5 SULLIVAN PLYG RD EQUIP, TOT, WLKWY BR 22 20 VICT. FLD: PHASE 3 FlELDHOUSE DESIGN BR 22 5 PUB. BLDG& SIDEWALK SNOWBLOWER BE 22 5 SENIOR CENTER SHUTTLE BUS BE 22 5 RINK: AM MONIA DETECTION SYSTEM BR 22 5 RINK DOORS/COMPRESSOR UPG RADES BR 22 5 RINK EYE WASHING STATION BR 22 5 RINK: REBUILD OF COMPRESSORS BR 22 10 131N1{ BOARD REPLACEMENTS BR 22 10 R INK ELECT ICE RESURF. MACHINE BE 22 5 PROP&BLDG:UNDER GROUNOD UBT BR 22 5 HLGHWAY (CONNECTGRff4ROUGHWA YS) STB 22 5 HIGHWAY RECONSTR ST6 22 5 SIDEWALK RECONSTR SWB 22 5 MIDDLE UPGRADE PHONE SYSTEM BR 22 10 MIDDLE: REMODEL BA THROOM S BR 22 15 MIDDLE HVAC (VRF) 2ND FLOOR BR 22 15 MEDDLE: FIRE PROTECTIO N (NEW SYSTEM ) BR 22 5 MIDDLE: DESIG N HVAC 1ST FLOOR BR 22 COST FY 22 PRIN CIPAL INTEREST FY 23 P RINCIPAL INTEREST FY 24 PRINCIPAL INT EREST FY 25 PRINCIPAL INTEREST _ FY 26 PRINCIP AL INTEREST $ 85,000 $ 8.500 $ 3.825 5 6 .500 $ 3,443 5 8,500 $ 3,050 5 8.500 $ 2,678 5 6,500 5 2,295 $ 120,000 $ 24,000 $ 5,400 5 24,000 $ 4,320 5 24,000 5 3,240 5 24,000 5 2,160 5 24.000 5 1,060 5 403,000 5 40,000 $ 18,000 5 40 ,000 3 15,200 $ 40,000 S 14,400 $ 40.000 5 12,600 $ 40 .000 5 10,600 $ 300,009 $ 30,000 $ 13,500 5 30,000 $ 12,150 $ 30,000 5 10,804 5 30,003 $ 9,450 5 30 .000 5 8,100 5 4,221 .600 $ 495,820 5 189,972 5 495,820 5 167,660 $ 495,620 5 145,348 $ 496.820 $ 123.036 $ 405.820 5 100,724 5 1,500.000 $ 300.000 5 67.500 S 300,000 $ 54.000 5 300 ,000 5 46 .500 5 300,030 5 27.000 5 300,000 $ 13,500 $ 2,000,000 5 400,000 5 90,000 5 400,000 $ 72,000 5 400,000 5 54,000 5 400,000 5 36,000 5 400,000 5 15,000 5 500.000 $ 100,000 S 22.500 5 100,000 5 18,000 5 100,000 5 13.50D $ 100,000 $ 9.000 5 100,000 $ 4 ,500 $ 4,000,000 5 800,000 S 160,000 $ 600,000 5 144 ,000 $ 800,000 $ 108,04D ~ 5 800,000 $ 71000 $ 500,000 5 35 ,000 5 101,000 5 20 ,200 5 4.545 $ 20,200 $ 3,636 5 20.200 $ 2,727 5 20,200 5 1,818 5 20 ,200 5 909 $ 921,800 $ 46 ,090 $ 41,481 $ 46,090 $ 39,407 5 46,090 $ 37,333 5 46,090 $ 35,259 $ 45,090 $ 33,185 5 500,000 5 40.000 5 27,000 5 40,000 $ 25,200 3 40 ,00D 5 23,400 5 40,000 5 21,600 _$ 40,000 5 19,800 $ 1,622,800 $ 106,290 5 73,426 5 106 ,290 $ 56.243 $ 106,290 $ 53,460 $ 105,290 $ 58,677 $ 106,290 5 53,894 5 495,000 5 24,750 5 22,2751 5 24,750 5 21,161 $ 24,750 5 20,048 $ 24,750 5 18,934 5 300,000 5 60,000 $ 13,500 ' 5 60,000 5 10,500 5 60,000 $ 8,100 5 60,000 5 5,400 5 100,000 $ 20,000 $ 4,500 1 $ 20,000 5 3,600 5 20.000 5 2,700 5 20,000 $ 1,800 $ 100,000 5 20,000 5 4,500 5 20,300 $ 3,$00 5 20,000 5 2,700 5 20,000 5 1,800 5 100,000 $ 20,000 5 4,500 $ 20,000 $ 3,600 5 20,000 5 2,700 $ 20,000 $ 1,800 5 100,000 $ 20,000 5 4,500 5 20,000 5 3,$00 5 20,000 5 2,700 $ 20,000 $ 1,800 5 1,250,000 $ 83,333 $ 56,250 5 83,333 $ 52,500 5 83,333 5 45,750 5 83,333 $ 45,000 5 120,000 5 24.006 5 5,400 5 24,000 5 4,320 5 24.000 $ 3,240 5 24,000 5 2,160 $ 115,000 5 23 .000 5 5 ,176 5 23,000 5 4,140 5 23,000 $ 3,105 5 23,000 $ 2,070 $ 50.000 5 10,000 $ 2,250 S 10,000 5 1,800 5 10 ,000 5 1,350 5 10.000 5 900 $ 125,000 5 25,000 5 5,625 $ 25,000 5 4,500 5 25,000 $ 3,375 5 25,000 5 2,250 5 60, 000 5 12,000 $ 2,700 $ 12,000 $ 2,160 $ 12,000 5 1 .620 5 12,000 5 1 ,050 $ 64.200 $ 12,840 5 2,889 $ 12 .640 5 2,311 $ 12,840 $ 1.733 5 12,640 5 1,156 5 2,376.000 5 237,600 $ 106,920 $ 237,600 5 96.228 $ 237,600 $ 55,536 5 237,500 5 74,844 5 110,000 $ 11,060 $ 4 ,950 5 11.000 S 4 .455 5 11,000 5 3,960 S 11,090 5 3,465 5 65,000 5 8,500 5 3 ,825 $ 5.500 $ 3.443 5 8,500 $ 3,060 $ 8 .800 $ 2,678 5 260,060 5 28,000 $ 12,600 6 28.000 5 11,340 3 28,000 5 10,060 : $ 28,000 5 8 .820 5 300,036 $ 30,000 5 13 ,500 5 30,000 5 12 .150 5 30,000 5 10,800 ; 5 30,000 5 9 ,450 5 90,900 $ 9,000 5 4,050 $ 9,000 5 3 ,545 5 9,000 5 3,240 , $ 9,000 $ 2,835 5 200,000 $ 20,000 5 5,000 6 20,000 $ 8,100 $ 20,000 $ 7,200 3 20,000 $ 6,300 3 425,0001 5 85,000 5 19,125 $ 65,000 $ 15,3001 $ 85,000 5 11,475 $ 85,000 5 7,550 5 375,000 $ 18,750 5 16,875 5 18 ,750 $ 16,031 . $ 18,750 $ 15,188 5 18,750 5 14,344 5 67,000 5 13,400 5 3,015 3 13,400 5 2,412 $ 13,400 $ 1,909 $ 13,400 5 1,206 S 150,000 $ 30,000 $ 6,750 5 34,000 $ 5,460 $ 30,000 5 4,050 S 30,000 5 2,700 $ 65,000 $ 13.000 5 2,925 $ 13,000 5 2,340 5 13.000 S 1.755 $ 13 ,004 $ 1,170 $ 15,000 5 3,004 $ 675 5 3,000 $ 540 $ 3,000 $ 405 $ 3.000 $ 270 5 15,000 S 3. 000 $ 675 $ 3,000 $ 540 $ 3.000 $ 405 5 3 ,000 5 270 $ 20,000 $ 4,000 $ 900 5 4,000 5 720 5 4 .000 5 549 5 4.000 5 360 $ 105,000 5 18,500 $ 7,425 3 16,500 $ 6,883 $ 16,500 $ 5,940 5 16 ,500 S 5,198 $ 150,000 $ 15,000 5 6,750 5 15,000 $ 6,075 5 15,000 $ 5 ,400 5 15.000 5 4,725 $ 7.867,200 $ - 5 - $ 900,673 5 35. 4,024 5 900,673 $ 313,494 $ 900,573 $ 272,953 5 900.673 5 232,435 $ 340, 000 $ 60,000 5 13,500 5 60,000 5 10,800 $ 60,000 $ 6,100 $ 60,000 $ 5,400 $ 1,500, 000 $ 300,000 $ 67. 500 5 300.000 S 54 ,000 $ 300.000 5 40,500 5 300,000 $ 27,000 5 2,000,000 5 400,000 $ 90,000 $ 403,000 5 72 ,000 $ 400 ,000 $ 54 ,00D $ 400 .000 $ 36,000 $ 500. 000 $ 100,000 $ 22. 500 5 100,000 $ 16.000 5 100,060 $ 13 ,500 $ 100,000 $ 9,000 $ 4,300.000 5 - 5 - $ 660,000 $ 193. 500 5 860, 000 $ 154 ,800 5 660,000 $ 116,100 $ 860,400 $ 77,400 3 50.000 $ 10,000 5 2.250 5 10,000 5 1,800 5 10,000 $ 1,350 $ 10,000 $ 904 $ 210,000 5 21,000 $ 9.450 3 21,000 $ 8.505 $ 21,000 5 7,560 5 21,000 5 6,615 $ 850,000 5 43,333 $ 29,250 $ 43.333 S 27.300 3 43,333 5 25,350 $ 43,333 $ 23.400 5 2,000,000 5 133,333 5 90,000 3 103. 333 $ 84. 000 6 133,333 $ 78,000 $ 133,333 5 72,000 S 170,000 $ 34,000 $ 7,650 3 34, 000 5 6,120 $ 34,000 $ 4,590 $ 34,000 5 3 ,060 TOWN OF WATERTOWN CJP FY 22 TO FY 26 COST ANALYSIS 5 HIGH: FFE FOR MEDICAL ASST 20 RENO VJRECO NST3 EL E71 SCH 5 ADMIN BLDG: DESIGN MASONR 5 ADMIN BLDG: DESIGN HVAC-I 5 ADMIN BLDG: DESIGN LIGHT1N{ 5 A DMIN BLDG: DESIGN ROO F RE 5 ADD EV STATIONS 5 IT: INFRASTRUCTURE IMPRO V 5 FT: PERMOTINOTT RAN SPARENC 5 IT: VIDEO SECURITY & ACCESS 5 IT: FIBER LOOP BUILD OUT & 5 IT: DOCUM ENT SCANNING 5 FIRE: MAIN STATION CONCRET 5 FIRE' D IG ITIZERS FOR FIR E AL1 5 LIBRARY: REPLACE V ENEER (V 10 LIBRARY: REPLACE BORERS & 5 POLICE_ IN C RUISER V IDEO SY' 15 DPW A DMIN, BLDG: ROOF REPS 5 CEMETERY: OFF ROAD UTILfTY 20 PROPIE LOG: BOILER REPLA CE 20 VICT. FLD: PH 3 FEELDHOUSE A 10 VICTOR Y FIELD TUR F REPLACE 5 HOWE PARK: DESIGN, EQUIP. 5 PUB. SLOGS.: SIDEWALK SNO1 5 PUB BLDG: EQUIPMENT INVEPF 5 SR CTR: WLKWY ENT REPA IR I 5 SR CTR: DESIGN UPGRADE FlF 15 SR CTR: ROOF REPAIRS/REP 5 SR CTR: E XTERIOR ERIOR PA INTING 5 R INK ELECTRICAL PA NEL UPG 5 UPGRADE INTERNAL LIGHTING 10 Rl N K: REPLACEMENT OF STAN 5 HIGHWAY (CONNECTORffHRO 5 HIGHWAY RECQNSTR 5 SIDEWALK RECONSTR 5 MIDDLE RENOV ATE COUR-1Y R 15 MIDDLE: HVA C (V RF9 1ST FLC 20 RENOVRECONST 3 ELEM SCH 20 ADMIN BLDG : MASONRY & A�1EF 10 ADM IN BLDG : REPLACE HVAC I 20 ADMIN BLDG: LIG HTING a ACCT 15 ROOF SHINGLE REPLACEJROO 5 ADD EV STA TIONS 5 IT: INFRASTRUCTURE IMPROV 5 IT: VIDEO SECURITY & ACC ES: 5 IT: FIBER LOOP BUILD O UT & C 5 IT: DOCUM ENT SCANNING 5 FIRE: MAIN STATION INTERIOR FY COST FY 22 PRINCIPAL INTEREST FY 23 I PRINCIP AL INT EREST FY 24 PRINCIPAL INTEREST FY 25 PRINCIPAL INTEREST _ FY 26 PRINCIPAL INTEREST TING PROD_ BE 22 5 295,000 I 5 59,000 $ 13,275 $ 59,000 5 10,620 5 59,090 3 7,965 $ 59,004 5 5,310 5 3,375,000 ' 5 - 5 $ 300,667 5 151,875 5 300,667 $ 138,345 I $ 300,667 5 124,815 5 300,867 $ 111 ,265 BL DG BR 22 5 46,000,000 I $ 1,035,000 . $ 2.300,000 S 2,018,250 5 2,300,000 $ 1,914,750 5 2,300,000 5 1,811,250 5 2,300,000 5 1,759,500 $ 46,000,000 5 - 51,035,000 $ 2.300,004 5 2,018,250 $ 2,300,000 5 1,914,750 $ 2.300,000 5 1.811,250 5 2 ,300,000 5 1,759,500 .Y& METAL 9R 23 5 40,000 5 8,080 $ 1,800 $ 8,000 $ 1,440 6 8 ,004 5 1,050 4U CC ER 23 $ 120,000 5 24,000 $ 5,400 $ 24 .000 5 4.320 6 24,000 5 3,240 3/ACCESS ER 23 5 80,000 5 12,000 5 2,700 5 12,000 $ 2,160 5 12,000 5 1,620 :PEAIRS SR 23 5 45,000 S 5,000 5 2,025 5 9,000 5 1,620 5 9,000 5 1,215 BR 23 3 90.000 $ 15,090 $ 4,050 $ 18,000 5 3,240 $ 18,000 5 2,430 EMENTS BE 23 5 300,000 5 60,000 $ 13,500 $ 60,000 $ 10,800 5 60,000 5 8,100 :Y DASE-IBRDS BE 23 5 100,000 5 20 ,000 $ 4,500 $ 20 ,000 5 3,600 5 20,000 5 2,700 • CONTROL BE 23 5 100,000 $ 20,000 $ 4,500 $ 20,000 5 3,600 5 20,000 6 2,700 4SLING BE 23 5 100,000 I 5 29,000 5 4,500 5 20 ,000 5 3,600 5 20,000 5 2,700 BE 23 5 100,000 $ 20,000 $ 4,500 $ 20,000 5 3,600 5 20,000 5 2,700 ECOATING ER 23 $ 80,000 $ 16,000 5 3,600 3 16,000 $ 2,530 5 16,000 5 2,160 kRM 8E 23 5 80,100 5 15,020 5 3,605 5 16,020 5 2,684 $ 16.020 5 2,163 AR.LOC-} BR 23 5 50,000 1 5 10,000 5 2,250 5 10 ,000 5 1,800 5 10,000 5 1,350 PUMPS ER 23 5 150,000 5 15,000 $ 6,750 5 15 .000 5 6,075 5 15,000 $ 5,400 STEM BE 23 5 69,200 6 13,640 $ 3,114 3 13,840 5 2,491 5 13,840 $ 1,866 .ACEMENT BR 23 5 2,000,004 $ 133,333 $ 90,000 5 133.333 5 84,000 5 133,333 5 78,000 VEH BE 23 5 30,000 5 6,000 5 1,330 $ 6.000 $ 1,080 5 6,000 5 810 MENT ER 23 5 125,000 5 6,250 5 5,625 5 6,250 5 5,344 5 6,250 5 5,063 C1NRENO BR 23 5 3, 750, 000 3 187,500 5 166,750 5 157 .500 5 160,315 5 187 ,500 $ 151,575 EMENT ER 23 $ 1, 200,000 5 120.000 5 54,000 $ 120,000 5 48,600 5 120,000 5 43,200 1 RESURFACE SR 23 $ 125,000 i 25,000 5 5,625 5 25 .000 5 4,500 $ 25,000 $ 3.375 N BLOWER BE 23 $ 67,000 5 13,400 $ 3,015 $ 13.400 5 2 ,412 S 13,400 5 1,609 row/ SYST BE 23 $ 150,000 S 30,000 5 6,750 5 30 .000 .5 5,400 5 30,000 $ 4,050 NCLUGHT BR 23 $ 50,000 5 10,000 5 2,250 5 10 .000 5 1,800 5 10.000 $ 1,350 :E ALARM BR 23 5 20, 000 5 4,000 5 900 5 4,000 5 720 5 4.000 5 540 ACEMENT BR 23 5 100,000 5 6,667 5 4,500 5 6 ,667 5 4,200 5 8.687 5 3,900 BR 23 5 50,000 $ 10,000 5 2,250 5 10,000 5 1,800 5 10 .000 5 1,350 RADES BR 23 $ 19, 000 5 3,800 5 855 5 3,800 $ 684 S 3 .840 5 513 TO LEO BR 23 $ 27,000 5 5,400 5 1 ,215 $ 5,400 $ 972 5 5.400 5 729 DS 8R 23 $ 200, 000 5 20,000 $ 9,000 5 20,000 5 8,100 $ 20.000 5 7,200 5 9,397,300 5 - $ - 5 - S - 5 883,210 5 422,679 5 663,210 5 3$4,034 $ 863,210 $ 345,190 UGHWAYS) STB 23 $ 1,500,000 S 3000,000 5 67,605 5 300,000 5 54,080 $ 300,000 $ 40,500 STS 23 $ 2,000,000 5 400,000 5 90,000 5 400,000 $ 72 .000 5 400 ,000 5 54,000 SW$ 23 $ 500,000 3 100,000 $ 22 ,500 $ 100 ,000 5 18-000 5 100,000 5 13,500 $ 4,000,000 5 - 5 - 5 - 6 - 5 600,000 5 180,000 5 800,000 $ 144,000 5 800,400 $ 108,000 D LANDSCP BR 23 $ 105, 000 5 21,004 5 4.725 5 21,000 $ 3 350 $ 21,900 5 2,635 R BR 23 $ 945,000 5 63 ,000 3 42,525 $ 63,000 $ 39.890 5 63,000 5 36,855 $ 1,050,000 5 - 5 - 5 - $ - $ &4,000 5 47,250 $ 84,000 $ 43,470 5 84,000 $ 39,690 BLDG BR 23 $ 43,478,109 $ 978. 257 5 2,173,906 5 1,907 ,602 5 2,173,005 5 11,800,776 $ 2,175,005 $ 1,760 .863 $ 43,478, 109 5 - $ - 3 - $ 978,257 5 2.173,905 5 1,907,602 5 2,173,905 $ 1,809 ,776 5 2,173 ,945 5 1 ,7 660,863 A t. REPAIR BR 24 5 500,000 $ 25,000 $ 22,300 $ 25,000 5 21,375 -MU CC BR 24 $ 650,000 5 65,000 5 29,250 5 65,000 5 26,225 SSIBILFTY 615 24 $ 577,000 $ 28,850 $ 25,965 $ 28,850 $ 24,667 F REFURB1S555 BR 24 $ 200. 000 3 13,333 $ 9 .000 $ 13,333 $ 8,400 BR 24 $ 90. 000 5 18,000 5 4 .050 5 18 ,000 $ 3,240 EMENTS BE 24 5 300,000 5 60,000 $ 13 ,500 6 80,000 5 10,800 i CONTROL BE 24 5 100, 000 5 20,000 $ 4,500 S 20,000 $ 5,600 ABU NG BE 24 5 100,000 $ 20,000 $ 4,500 5 20.000 $ 3,600 BE 24 5 100.480 5 20,000 $ 4,500 $ 20,000 $ 3.500 REPAIRS BR 24 5 50,000 I 5 10,000 5 2 ,250 5 10 ,000 5 1 .600 TOWN OF WATERTOWN CIP FY 22 TO FY 26 C OST AN ALYSIS FY 5 FIRE: MA1N STN. REPLACE PMER G GEN BE 24 5 FIRE M AIN STATION KITCHEN DUCTWORK BR 24 5 FIRE MOBIL DATA TER M. F OR APPARATUS BE 24 5 FIRE: STATION ALERTINGSYS TEM BE 24 20 LIBRARY REPLACE CHILLER BR 24 5 LIBRARY Repl. Roof Top Uniis1Compressors 3R 24 10 HIGHWAY RACK TRUCK BE 24 10 SNOW&ICE: SALTER 6 WHEELER BE 24 10 PARKS&FORESTRY: TREE CHIPPER BE 24 10 BEMIS DESIGN. PLYGRD EQUIP. SPRAY BR 24 10 REC; SPECIAL NEEDS DIAMOND BR 24 5 PUB. BLDGS.: SIDEWALK SNOWBLOWER BE 24 5 PUB BLDGS: MAINTENANCE M OVE BR 24 10 SR CTR: UPGRADE FIRE ALARM SYSTEM BR 24 5 RINK ENERGY MANAGEM ENTSYST. BE 24 - 10 RINK ENCLOSURE OF OUTSIDE WALLS BR 24 5 PROP&BLDG:UNDERGROUND DUCT BR 24 5 HIG HWA Y (CONNECTOR/THROUGHWAYS) STB 24 5 HIGHWAY RECONSTR STB 24 5 SIDEWALK RECONSTR SWB 24 15 M IDDLE: HV AC (VRF) BASEMENT BR 24 10 ADM IN. BLDG : REPLAC E FAN COIL& AHiIV BR 25 5 A DMIN BLDG: UPGRADE FIRE ALARM SYST. BR 25 15 UPGRADE FIRE PROTECTIO N SYSTEM BR 25 5 IT: INFRASTRUCTURE IMPROV EM ENTS BE 25 5 IT: VIDEO SECURITY &ACCESS CONTROL BE 25 5 IT: FIBER LOOP BUILD OUT & CABLING BE 25 5 IT: DOCUMENT SCANNING BE 25 5 FIRE: AMBULANCE BE 25 5 FIRE: MAIN & NORTH S T. APPARATUS DOORS BR 25 15 FIRE: ENGINE 1 TRUCK REPLA CEMENT BE 25 5 LIBRARY: REPLA CE ROOF TOP UNITS/COMP. BR 25 15 DPW ADMIN. BLDG: ROOF REPLACEMENT BR 25 5 HIGHWAY: SKID STEER BE 25 10 SNOW AND !CE: LOADER 314 YARD BE 25 5 CEMETERY: OFF ROAD UTILITY VEH BE 25 10 FILIPPEIIO DESIGN, EQUIP. & RESURFACE BR 25 5 PUB. BLDGS.: SIDEWALK SNOWBLO WER BE 25 5 SR CTR REPA IR/ENHANCE BACKPORGH BR 25 10 RINK: REPLA CE BOILERS BR 25 5 HIGHWAY (CONNECTOR/THROUGHWAYS) STB 25 5 HIGHWAY RECONSTR STB 25 5 SIDEWALK RECONSTR SWB 25 10 M IDDLE: REMODEL BATHROOMS BR 25 10 MIDDLE; RENOVA TE BEM IS ENTRANCE BR 25 15 MIDDLE: ROOFING REFURBISHING BR 25 15 MIDDLE: HVAC (VRF) 1ST FLOOR AR 25 TOTAL. PLA NNED DEBT COST FY 32 PRINCIPAL INTEREST 1=Y 23 PRINCIPAL I NTEREST FY 24 PRINCIPAL INTEREST FY 25 P RINCIPAL INTEREST FY 26 PRINCIPAL INTEREST $ 90,000 5 18,000 5 4 ,050 5 16 ,000 $ 3,249 $ 50,000 $ 10,000 $ 2,250 $ 10,005 $ 1,600 $ 41.000 5 8,200 $ 1,845 $ 5,200 5 1,475 $ 105,000 $ 21,050 $ 4.725 $ 21,005 $ 3,780 5 150.000 5 7,500 5 6,750 5 7,500 6 6,413 $ 48,040 5 5,200 5 2,570 5 5,200 5 1,658 $ 150,000 5 15,000 5 6,750 3 15,000 5 6.075 $ 300.000 $ 30,000 $ 13,500 5 30,900 5 12.150 $ 75,000 3 7,500 5 3,375 5 7 ,500 $ 3 .038 5 500.000 5 50,000 $ 22,500 $ 50,000 5 20,250 5 600,000 5 60,000 6 27,000 5 60,000 5 24,300 5 67,000 $ 13,400 $ 3,015 $ 13,400 $ 2,412 5 50,000 5 10,000 5 2,250 5 10,000 5 1,500 5 200,000 5 20,000 $ 9,000 $ 20,000 5 8,100 5 42,000 5 8,400 3 1,890 5 8,400 5 1,512 5 30,000 5 3.000 $ 1.350 5 3,000 $ 1.215 $ 5,163,000 5 - 5 - 5 - 5 - $ - 5 - 5 571,383 5 232,335 $ 571,363 5 206,623 3 300,000 3 55,000 $ 13,500 6 60,000 3 10,800 5 1,500,000 $ 300.000 S 57,500 5 300.000 5 54,000 5 2,000,000 5 400,000 $ 90,000 5 400,000 $ 72,000 5 500,000 3 100 ,000 $ 22.500 5 100,000 5 18,000 5 4.390,000 $ - 5 - 5 - $ - 5 - 5 - $ 860,000 5 193,500 $ 860,000 5 154,800 5 72,000 5 4,846 5 3 ,240 4.600 5 3.024 $ 72 000 $ 5 6 S -5 - 3 3 4,800 5 3,240 _5 3 4,690 5 3,024 5 1,100,000 5 110,000 S 49,500 5 20,000 3 4,000 3 900 5 90,000 3 6 .000 3 4,050 $ 300,000 5 50,000 $ 13,500 5 100. 000 5 20 .000 5 4 ,500 5 100,000 5 20.000 5 4,500 $ 100. 000 5 20,000 5 4,500 5 400,000 5 80,000 5 18,000 5 $3,000 5 13,000 5 2,925 5 750,000 5 50 ,000 $ 33 .750 $ 416,300 $ 83,260 5 18,734 3 2,000,000 $ 133,333 $ 90,000 3 65,000 5 13,000 5 2.925 5 107,000 5 10,700 5 4 ,615 5 30,000 $ 6,000 $ 1,350 3 900,000 5 90,000 S 40,500: 5 67,000 ' 5 13,400 5 3,015 5 50,000 $ 10,004 5 2,250 5 50,000 5 5,000 5 2,250 $ 6,710,300 , 5 - $ - 5 - 5 - $ - $ 5 - 3 - 5 747,693 5 301,9$4 S 1,500,000 6 300,000 6 67,500 + 5 2,000,000 $ 400,000 $ 90,000 $ 500,000 5 100.000 5 22,500 5 4. 000,000 $ - $ - $ - 3 - 3 - 5 - _ 5 - 5 - 5 800,000 5 180,000 5 120, 000 5 12,000 5 5,400 $ 110,000 5 11.000 5 4,950 $ 500,000 5 33,333 5 22,500 $ 400, 000 5 26.667 5 18 ,000 $ 1,130,000 5 - 5 - 5 - 5 - 3 - 5 - $ - $ - $ 83.006 $ 50,850 5 5,967,270 54,734,990 $ 10,328,610 $ 7,127,369 5 14,249,725 3 8,242,055 5 15,685,909 5 8,029 ,592 5 17,316,602 5 7.957,503 T OWN OF WATE RTOWN CAP FY 22 TO FY 26 COST ANALYSIS COST SCHOOL DEBT EXCLUSION 20 HIGH SC HOOL PLANNING $ DESIGN BR 22 5 15,004,000 20 HIGH SCE-OOL RENOVJCONSTRUCTI ON ER 23 5 67 ,500,000 20 HIGH SCHOOL RENOViC0NSl-WCTION BR 24 5 87.500 ,006 TOTAL SCHOOL DEBT EXCLUSION 5 150,000,000 TO TAL PERMANENT DEBT TOT AL AUTHO RIZED UNISSUED DEBT TOTAL PLA NNED DEBT (FY22 - FY 26) SUB -TOTAL TOTAL SCHOOL DEBT EXCLUSION G RAND TOTAL FY 22 PRINCIPAL INTEREST FY 23 PRINCIPAL INTEREST FY 24 PRINCIPAL INTEREST FY 25 PRINCIPAL INTEREST FY 26 PRINCIPAL INTEREST $ 750.000 5 675,000 5 750,600 5 641,250 S 750,000 5 607,500 $ 750,000 5 573,750 5 2 ,375,000 5 3,037,600 5 2,375.000 5 2,885,625 S 3.375.000 5 2.733,750 5 3,375,000 5 3,037,600 5 3,375,040 5 2 .585,526 5 - $ - $ 750,000 $ 675,000 5 4,125,000 5 3,676,750 9 7,500,000 3 6 ,530,625 5 7,500,040 5 5 .193,125 5 5 .200,000 51,397,916 3 4,575,000 5 1,172,375 5 4.485,000 $ 988,744 $ 4,030,000 $ 779.052 5 2,550 ,000 $ 627,676 $ 365,700 5 364,604 5 597 ,337 $ 368 .148 S 597,337 5 341,267 5 597,337 5 314 ,387 $ 597,337 5 287 ,507 $ 5 ,567 ,270 54,734,990 $ 10,328,610 $ 7,127 .369 5 14.249.725 5 8,242.055 5 15 ,685,969 5 8,029,892 -$ 17,316,602 5 7,957,503 $ 11,532,970 56,517,510 $ 15,504,947 5 8,667.892 S 19,3332 ,063 5 9,552 .066 $ 20,313,246 6 9,123,331 $ 20,493,940 5 8,872 .685 $ - $ - 5 750,000 $ 675,000 5 4,125 ,000 5 3,675 ,750 5 7.500,000 $ €,530,625 5 7,500,000 $ 5,193,125 $ 11,532,970 3 6,517 .510 $ 16,250,947 5 9,342,892 $ 23,457 .053 5 13,230,816 5 27 ,813,246 515,653,955 $ 27,893,940 5 15,065,810 $ 18,050,480 5 25,593,839 $ 36,687,879 $ 43.467,202 5 43,059,750 FY 2022 - FY 2026 CIP WATER/SEWER FUNDS A P C D E F G H ] J K L M 1 TOT ALS FY22 FY23 FY 24 fY 25 FY 26 2 WATER/SEWER ENTERPRISE FUNDS l 3 SEWER 4 Drain System Rehabilitation 4,000.0 860.01 SR 800.0 SR 800.0' SR 800 .0 SR 800.0 SR 5 MWRA I & I 3,937.5 787 .5 SGR t. `! . at °K- . T 787.5'S GR 767.5 SGR 787.5 S GR 6 MWRAI&I 1,312.5 3,750.0 750 .0 SEB 750.0 SEB 750.0 SEB 750.0 SEB 750.0 SEB 7 10 Sewer System Improvements 8 10 35 GVW Service Truck . 170.0 170.0 SEB 9 10 Street Sweeper I 250 .0 250 .0 SEB 10 10 Sewer Vac 400 .0 400 .0 SEB 11 10 Strap Dump Truck 190 .0 ' 190.0 SEB - 12 10 Mini - Excavator 130.0 '30 .0 SEB 13 SEWER SUBTOTA L 14,140.0 2,850.0 2,790 .0 3,000.0 2:770 .01 2,730 .0 14 15 WATER _ 16 Water system improvements 1,000 .0 _ 2 WR 20D .0 WR 200.6IWR 2QQ.Q VR ++ a V]+$ _ _. 17 10 MWRA LVVSAP 2,500.0 , . - 'JRAB 50v.0 r .r'.=4A8 500.0 Mv,..R 18 M WRA LLP 1,600.0 300-0 MVVRA 300.0 MWR AL1 300.0 MVVR AL 300.0 MWRAL 300.0 MWRAL 19 10 Water Meter Replacement Program 3,000 .0 1,500 .0 WEB 1,500.0[WEB 20 10 Tre nch Safety Box Truck 160 ,0 160.0 WEB 21 5 Utility Truck 60.0 60.0 WEB 22 10 Gate Valve/Mini Vac Truck 140.01 140.0 WEB 23 Service Respnse Truck 170.0 _ 170.0 WEB 24 WATER SUBTOTAL 8,530.0 2,560 .0' 2,640.0 1,000 .0; 1,000 .0 1,330 .0 25 26 TOTAL WA TER & SEWER 22,670.0 5,410.0 5,430.0 4,000.0 3,770.0 4,060.0 27 ' , 28 STORMWATER 0.0 29 Phase 2 M S4 Permit Management Plan 250.0 50. 0 TBD 50 .0 TBD 50.0 TBD 50.0' TBD 50.0 TBD 30 Phase 2 MS4 Canstructionllmprovements 35,400.0 100.0 TBD 100 .0 TBD 100 .0 TBD 100.0 TBD 35,000 .0 TBD 31 Phase 2 MS4 Phosphorous Con trol Plan 450.0 50.0 TED 100.0 TBD 100.0 TBD 100 .0 TBD 100 .0 ~35 ,150.0 TBD 32 STORMWATER SUBTO TAL 36,100.0 200.0 250.0 250.0 250.0 33 34 TOT. WATER, SEWER & STO RMWATER 58:770.0 5,610.0 5,680.0 4,250 .0 4,020.0 r 39,210.0 35 36 COSTS BY SOURCE OF FUNDS 37 SR SEWER REVENUE 4,000.0 800.0 800.0 800.0 800-0 800.0 38 SEB SEWER EQUIPMENT BONDS 4.890. 0 1,000. 0 940.0 1,150.0 920 .0 880 .0 39 40 TBD -F TO BE. DETERMINED 363 100. 0 _ 12.5 3,937.5 200, 0 787.5 250.0 250.0 767.5 250.0 787 .5 35,150.0 787.5 ='• _ - Inte 41 SG R MWRA Gran. 787. 5 42 MWRAL MWRA LLP 1.500,0 300. 0 304.0 300.0 300.0 300.0 43 ViR WATER REVENUE 1,000.0 200.0 200.0 200.5 200.0 200.0 44 WEB WATER EQUIPMENT BONDS 3,530.0 1,560.0 1,540.0 0.0 0.0 330.0 45 GRAND TOTAL - ENTERPRISE FUNDS 58,770.0 5,810.0 5,680. 0i 4,250.0 4,020.0 39,210.0 FY 2022-2026 GAP ENTERPRISE FUND DEBT PROJECTION A B C D E F L G q SEWER PERMANENT DEBT FY14 Refunding Bond Issue ( May 14) FY'22 FY'23 FY'24 FY'25 FY'26 2 3 4 Prin (675,003) - DPW Building UT Int $ 67,500 $ 67,500 $ 67,500 5 8 ,438 $ 5:063 5 1,688 $ - $ - 5 5 - 5 6 Subtotal 5 75,938 $ 72.563 5 69,188 $ - 5 - 7 8 FY 16 Band (November 15) 9 Prin (302,500) - MWRA $ 60500 $ - 5 - $ - $ - 10 LfT Int (0%) 5 - $ - 5 - $ - $ - 11 Subtotal S 50,500 $ - 5 - $ - $ - 12 13 . FY 18 Bond (January 18) 14 Prin (565,550) - Various Equipment 5 50,000 $ 60,000 $ 50.000 $ 50,000 $ 45,000 15 LfT Int $ 14,200 $ 11,800 $ 9.400 $ 7.400 $ 5,400 16 Subtotal 5 74 .200 $ 71,800 $ 59,400 5 67 .400 $ 50,400 17 18 F Y' 18 Bond (February 18) 19 Prin (288,200) - M WRA $ 57,6640 5 57,640 5 - 5 - 5 - 20 UT Int (06) $ - $ - $ - 5 - 5 - 21 Subtotal $ 57,640 5 57,640 $ - $ - $ - 22 23 FY 18 Bond (M arch 19) 24 Prin (262, 500) - MWRA $ 26,250 $ 26.250 $ 26,250 $ 26,250 $ 26,250 25 LJT int (0°l0) 5 - $ - S - $ - $ - 26 . Subtotal a 26,250 5 26,250 $ 26,250 $ 26,250 $ 26,250 27 28 FY 19 Bond (June 19) 29 , Prin (139, 000) - Various Equipment 5 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 30 1 LJ T Int 5 5,250 $ 4,500 $ 3,750 $ 3,000 $ 2,250 31 Subtotal $ 20,250 $ 19,500 $ 18,750 $ 18,000 $ 17,250 32 33 FY19 Bond (December 19) 34 Prin (262,500) - MWRA 5 26.250 5 26,250 $ 26,250 5 26,250 $ 26,250 35 , L"T Int (0%) $ - $ - $ - 8 - € - 36 (Subtota l $ 26,250 5 26,250 $ 26 ,250 $ 26,250 $ 26 .250 37 SEWER PERMANENT DEBT 38 Prin $ 313,140 5 252,640 $ 185,300 $ 117,500 $ 112,500 39 L•'T Int $ 27,888 $ 21,353 $ 14,838 $ 10,400 5 7,650 43 TO TAL SEWER PERMANENT DEBT I $ 341,028 15 274,003_1 $ 199,838 1 5 127,900 1 $ 120,150 41 42 SEWER A UTHORIZED UNISSUED DEBT 43 FY18 Band (June 18) 44 Prin (160,000) See schedule $ 16,000 $ 15,000 5 16,000 $ 16,000 $ 16,000 45 L/T Int (4. 5%) $ 6,480 $ 5,760 5 5,040 $ 4,320 $ 3,600 46 Subtotal 5 22,480 $ 21,760 $ 21,040 $ 20,320 $ 19,600 47 SEWER AUTHORIZED UNLSSUED DEBT 48 Prin 3 16,000 5 16,000 5 16,000 $ 16,000 $ 16,000 49 LIT Int $ 6,480 $ 5,760 $ 5,040 $ 4,320 $ 3,600 50 TO TAL SEWER A UTHORIZED UNISSUED DEBT 1 $ 22,4801 $ 21,760 1 $ 21,040 1 $ 20,320 1 $ 19,600 51 FY 2022-2028 CIP ENTERPRISE FUND DEBT PROJECTION B C D E F U 1 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 57 FY22 Bond (June 22) 89 Prin (1,000.000)- See Schedule 70 UT Int (4.5%) 71 Subto tal 68 FY'22 FY'23 FY'24 FY'25 FY'26 SEWER PLANNED DEBT FY19 Bond (June 21) Prin (270,000) - H eavy Crere $ 27,000 $ 27,000 $ 27,000 $ 27,000 $ 27,060 L/T Int (0%) $ 12,150 $ 10,935 $ 9,720 $ 8,505 5 7,290 Subtotal $ 39,150 $ 37.935 $ 36,720 $ 35 ,505 $ 34,290 FY20 B ond (June 21) Prin (262.500) - MWR A VT Int (0 %) Subtotal 26,250 $ 26.250 5 26,250 5 26.250 $ 26,250 5 - $ - 5 - $ - $ - $ 26,250 $ 26,250 5 25,250 5 26,250 5 26,250 FY 21 Bond (June 21) Prin (262.500) - MWRA $ 26,250 $ 26,250 $ 26,250 $ 26 .250 $ 26,250 UT Int (0% ) 5 - $ - 5 - 5 - $ - Subtotal 5 26,250 $ 26,250 3 28,250 5 26.250 $ 28,250 72 73 FY22 Bond (June 22) 74 Prin (262,500)- M WRA 75 UT Int (0%) 75 Su bto tal 77 78 79 80 81 82 83 84 85 86 87 FY23 Bond (June 23) Pnn (940,000) - See Schedule UT Int (4, 5% ) Subtotal FY23 Bond (June 23) Prin (262,500) - MWRA UT Int (0%) Subtotal 88 FY24 Bond (June 24) 89 Prin (1,150,000) - See Schedule 90 UT lnt (4.5%) 91 Subtotal 92 93 FY24 Bond (June 24) 94 Prin (262.500) - MWRA 95 UT Int (0% ) 96 Subtotal $ - $ - $ - $ 52,500 $ 52,500 97 98 FY25 Band (June 25) 99 Prin (920,000) - See Schedule $ - $ 5 - $ $ 115,000 100 UT Int (4.5%) $ - $ $ - $ $ 46,575 101 Subtotal 8 $ - $ - 5 $ 161,575 $ - $ 100,000 $ 100 .000 5 100,000 $ 100,000 $ - $ 45,000 $ 40,500 $ 36,000 $ 31,500 $ - $ 145,000 $ 140 .500 $ 136,000 5 131,500 $ - $ 26,250 $ 26,250 $ 25,250 $ 25,250 $ - 5 - $ - $ - $ $ - $ 26,250 $ 26.250 5 26.250 $ 25,250 5 - $ 94,000 5 94,000 $ 94,000 - $ 42,300 5 38,070 $ 33.840 136,300 $ 132,070 $ 127,840 - $ 52,500 $ 52,500 $ 52,500 W $ - $ - 5 5 $ 5 - $ $ $ $ 52,500 $ 52,500 5 52,500 - $ 115,000 3 115,000 - $ 51,750 5 46,575 - $ $ 166,750 5 161,575 5 $ - 5 $ 52,500 5 52,500 $ - $ - 5 - $ - $ FY 2022-2026 CIP ENTERPRISE FUND DEBT PROJECTION A B 0 0 E F G 1 FY'22 FY23 FY'24 FY'25 ; FY'26 102 103 FY25 Bond (June 25) 104 Prin (262,500) - MWRA 8 $ - 5 - $ - $ 52,500 105 UT lnt (0 %) 5 $ - 5 - $ - $ - 106 Subtotal 5 - $ - 5 - $ - $ 52,500 107 SEWE R PLANNED DEBT 108 Prin S 70 .500 5 205,750 $ 352,250 $ 519,753 $ 687,250 ; 109 UT Int 5 12,150 $ 55,935 8 92,524 $ 134,325 $ 165,780 110 TOTAL SEWER PL ANNED DEBT 1$ 91,650 1 $ 261,685 1 $ 444,774 1 $ 654,075 1 $ 853,030 111 112 SEWER PERMANENT. RUTH. UNISSUED AND PLANNED DEBT 113 Prin 5 408,640 5 474,390 $ 553,250 $ 653,250 $ 815,750 114 L/T Int $ 46:518 5 83,058 5 112,398 5 149,045 $ 177,030 115 TOTAL SEWER PERMANENT, AUTH . UNISSUED AND PLANNED DEBT 1 $ 455,158 1 $ 557,448 1 $ 665,648 1 $ 802,295 1 $ 992,780 1/6- 117 WATER PERMANENT DEBT 118 FY13 Bond (June 13) 119 Prin (1. 500,000) - MWRA $ 150,000 $. 150,000 $ - 8 - 8 - 120 UT Int $ - $ - $ 8 - 8 - 121 Subto tal $ 150 ,000. $. 150,003 $ - 5 - $ - 122 123 FY/4 Refunding Bond Issue (May 14) 124 Prin (675,000) - DPW Building $ 67,500 8 67,503 $ 67,500 5 - 8 - 125 L/Tlnt $ 8,438 5 5,063 $ 1,688 5 - 8 - 126 Subtotal 5 75,938 $ 72,563 $ 59,188 $ - 8 - 127 128 FY15 Bon d (August 15) 129 Prin (900,000) MWRA LWSAP 5 50,000 $ 50 .000 5 50,000 $ 50,000 $ 50,000 130 LIT fn# $ - $ - $ - $ - $ - 131 Subtotal $ 50,000 $ 50.000 5 50,000 $ 50,000 $ 50,000 132 133 FY15 Bond (April 15) 134 Prin (140,000) See Schedule 8 15,000 $ 15,000 3 15,000 $ 15,003 $ - 135 UT Int 8 1.800 $ 1,350 5 900 $ 450 $ - 136 Subtotal 5 15,800 8 16,350 $ 15,900 $ 15,450 $ - 137 138 FY 15 Bond (November 16) 139 Prin (500,000) MWRA LWSAP $ 50,000 $ 50,000 $ 50 .000 $ 50,000 5 50.000 140 IJT Int (0%) $ - $ - $ - 5 - 5 - 141. Subtotal $ 50,000 5 50,000 $ 50.000 3 50.000 8 50.000 142 143 FY 18 Bond (January 18) 144 Prin (164,450) - Bacichoe $ 15, 000 5 15,000 $ 15 ,000 5 15.000 $ 15.000 145 UT Int $ 4,200 5 3,600 $ 3.000 $ 2,400 5 1,800 146 Subtotal $ 19,200 $ 18,600 $ 18,000 $ 17,400 5 16,500 147 148 FY 18 Bond (February 18) 149 Prin (478,000) - MWRA $ 47,800 $ 47,804 $ 47,800 $ 47,800 5 47,800 150 UT lnt (0%) $ - $ - $ - $ - 5 - 151 Subtotal $ 47.800 $ 47.800 $ 47,800 $ 47,800 5 47,800 FY 2022-2026 CIS' ENTERP RISE FUND DEBT PROJECTION A B C D a 1 FY'22 FY'23 FY'24 FY'25 FY '26 152 153 FY18 Bond (March 19) 154 Prin (500,000) MWRA LWSAP $ 50,000 5 50,000 $ 50,000 $ 50,000 S 50,000 155 UT Int (4%) $ - $ - $ - $ - 5 - 156 Subtotal $ 50,400 $ 50,000 $ 50,000 $ 50,000 $ 50,000 157 158 FY /9 Bond (June 19) 159 Prin (181,500) - Various Equipment $ 20,000 $ 24,000 $ 20,000 $ 20,000 $ 20,000 160 UT Int $ 7,000 $ 6,000 $ 5,000 $ 4,000 $ 3,000 161 Subtotal $ 27,000 5 26.000 $ 25,000 $ 24,000 $ 23,000 162 163 FY19 Bond (February 20) 164 Prin (500,000) - MWRA $ 50,000 $ 50,000 5 50,000 5 50,000 $ 50,000 165, UT Int (0%) $ - $ - 8 - $ - 5 - 166 Subtotal $ 50,000 $ 50,000 $ 50 .000 $ 50,000 5 50,000 157 WATER PERMANENT DEBT 168 Prin $ 516.300 $ 515.300 $ 365,300 8 297,800 $ 282,800 169 L/T Int $ 21 .43$ 8 16,013 $ 10,588 $ 5,550 3 4,800 170 TOTAL WATER PER MANENT DEBT 1 $ 536,738 1 $ 531,313 1 $ 375,888 18 304,650 1 $ 287,600 171 172 WATER AUTHORIZED UNISSUED DEBT 173 FY18 Bon d (Ju ne 18) 174 Prin (210,000) See Schedule 5 21,000 $ 21,000 $ 21,000 $ 21,000 $ 21,000 175 LIT Int (4.5% ) 8 9,450 $ 8,505 $ 7,560 5 6,615 $ 5,670 i-61S ubtotal $ 30,450 $ 29,505 $ 28,560 $ 27,615 $ 26,670 177 WATER AUTHORIZED UNISSUED DEBT 178 Prin 5 21,000 $ 21,000 $ 21,000 5 21,000 $ 21,000 179 L''T int $ 9,450 $ 8,505 $ 7.560 8 6,615 $ 5.670 180 TOTAL WATER AUTHORIZED UNISSUED DEBT 1 $ 30.450 1 $ 29,505 I $ 28,560 15 27,615 1 5 26 ,670 181 182 WA TER PLANNED BOND DEBT jjFY19 Bond (June 21) 184 Prin (60,000) MWRA LWSAP & LLP $ 12,000 $ 12,000 $ 12,000 $ 12,000 $ 12,000 185 LITInt (4.5. %) $ 2,700 $ 2,160 $ 1,620 $ 1,080 5 540 186 Subtotal $ 14,700 5 14,160 5 13,620 $ 13,080 $ 12,540 187 188 FY20 Bond (June 21) 189 Prin (800,000) M WRA LWSAP & LLP $ 80,000 $ 80,000 5 80,000 $ 80,000 $ 80,000 190 LIT Int (0%) 8 - $ - 5 - $ - $ - E91 Subtotal $ 80,000 $ 80,000 $ 80.000 $ 80,000 5 80,000 192 193 FY21 Bond (June 21) 194 Prin (800,000) M WRA LWSAP & LLP $ 80,000 5 30,000 $ 80,000 5 80,000 $ 80.000 195 LIT Int (0%) $ - $ - $ - 5 - $ - 196 Subtotal $ 80,900 5 80,000 $ 80,000 5 80,000 $ 80,000 197 195 FY20 Bond (June 21) 199 Prin (1,500,000) Meter Replace me nt $ /50,000 $ 150,000 $ 150,000 $ 150.000 $ 150,000 200 UT Int (4.5.% ) $ 67,500 $ 60,750 $ 54,000 $ 47 ,250 $ 40,500 201 Subtotal 5 217,500 $ 210.750 $ 204,000 $ 197,250 $ 190,500 FY 2022-2026 CIP ENTERPRISE FUND DEBT PROJECTION ] B 1 C D E F G FY'22 FY23 FY24 FY'25 FT26 202 203 FY21 Bond(June21) 204 Prin (1,500,000) Met er Replacement $ 150,000 $ 150,000 $ 150.000 5 150,000 $ 150.000 205 UT Int (4.5. %) $ 67 ,500 5 60,750 5 54,000 5 47,250 5 40,500 206 Subtotal 8 217.500 $ 210,750 $ 204,000 5 197.250 5 190,500 2W 208 FY22 Bond (June 22) 209 Prin (800,000) MWRA LWSAP & LLP $ - 5 80,040 $ 80,000 8 80,000 5 80,000 210 Lff Int (0%) $ - $ - $ - $ - 8 - 211 Subtotal $ - 5 80,000 $ 80,000 $ 80,000 5 80,000 21L 213 FY22 Bond (.tun e 22) 214 Prin (1,560,000) Meter Replacement/Truck 5 - $ 162,000 5 152,000 $ 162,000 $ 162,000 215 UT Int (4.5.%) $ - $ 70,200 $ 62,910 $ 55,620 $ 48,330 216 Subtota9 $ - $ 232 .200 5 224,910 $ 217,620 $ 21,330 FY23 Bond (June 23) 218 219 Phi) (800,000) MWRA LWSAP & LLP $ - $ - S 80,000 $ 80,000 $ 80,000 220 UT Int (0%) $ - $ - $ - $ - $ - 221 Subtotal $ - $ - 5 80,000 $ 80,000 $ 80,000 11L 223 FY23 Bond (June 23) 224 Prin (1,640,000) Meter Replace rnentlTruck $ - 5 - $ 164,000 5 164 .000 $ 164,000 225 LIT Int (4. 5. %) $ - $ - $ 73.800 5 66.420 $ 59,040 226 Subtotal $ - 3 - $ 237,800 $ 2330.420 $ 223,040 227 228 FY24 Bond (.tune 24) 229 Prin (800,000) MWRA LWSAP & LLP $ - 5 $ - $ 80,000 $ 80,000 230 UT Int (0%) S - _ 8 - $ - 5 - 231 Subto tal S - 8 80 ,000 5 80 ,000 232 233 FY25 Bond (June 25) 234 Prin (800,000) MWRA LWSAP & LLP 5 - $ - $ - $ - $ 80,000 235 LJT Int (0%) $ - $ - $ - $ - $ - 236 Subtotal 5 - $ - $ - $ - $ 80,000 237 238 239 WATER PLANNED DEBT 240 Pnn $ 472,000 $ 714,000 5 958,000 $ 1,038,000 $ 1,118,000 241 DT int $ 137,700 $ 193,860 5 246,330 $ 217,620 5 188,910 242 TOTAL WATER PLANNED DEBT [ $ 609,700 1 $ 907,860 1 $ 1,204,330 1 $ 1 .255,620 I $ 1.346,910 243 244 WATER PERMANENT, AUTH. UNISSUED AND PLANNED DEBT 245 Prin 8 1,008,300 $ 1,250,300 $ 1,344,300 $ 1,356.800 $ 1,421,800 246 UT Int $ 168,588 $ 218,378 $ 264,478 5 231,085 $ 199,380 247 TO TAL WATER PERMANENT, AUTH, UNISSUED AND PLANNED DEBT J $ 1,176,888 1 $ 1,468,678 / $ 1,608,778 1 5 1,587.8855 1 5 1,621,180 248 249 TOTAL WATER AND SEWER DEBT 250 Long Term Principal $ 1,416,940 $ 1,724.690 $ 1,897,550 $ 2,010,050 5 2.237,550 251 Long Term Interest $ 215,105 $ 301,435 $ 376,675 $ 380,130 5 375,410 252 TOTAL WATER AND SEWER DEBT J $ 1,632,045 1 $ 2.026,125 1 $ 2,274,425 1 $ 2,390,180 1 5 2,613,960