Loading...
HomeMy Public PortalAbout20000308 - Agendas Packet - Board of Directors (BOD) - 00-05 Regional 0,pen ice MIDPENINSULA REGIONAL OPEN SPACE DISTRICT Meeting 00-05 I SPECIAL AND REGULAR MEETINGS BOARD OF DIRECTORS MIDPENINSULA REGIONAL OPEN SPACE DISTRICT 6:30 p.m. Wednesday, March 8 2000 Di 1 Circle 330 ste C c e Los Altos, California Please Note: 6:30 p.m. Special Meeting Start Time 7:30 p.m. Regular Meeting Start Time AGENDA* ROLL CALL SPECIAL MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT--CLOSED SESSION The Closed Session will begin at 6:30 p.m. At the conclusion of the Closed Session, the Board will adjourn the Special Meeting Closed Session to the Regular Meeting, and, at the conclusion of the Regular Meeting, the Board may reconvene the Special Meeting Closed Session. 1. Conference with Labor Negotiator- Government Code Section 54957.6 Agency Negotiators - Susan Schectman, Deirdre Dolan, John Escobar Employee Organization - S.E.I.U. Local 715 2. Conference with Labor Negotiator - Government Code Section 54957.E Agency Negotiators - Craig Britton, Deirdre Dolan, John Escobar Employee Orgyanization - Non-represented Employees REGULAR MEETING OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT ** ORAL COMMUNICATIONS - Public ADOPTION OF AGENDA *** ADOPTION OF CONSENT CALENDAR—K.Nitz *** WRITTEN COMMUNICATIONS 330 Distel Circle . Los Altos, CA 94022-1404 . Phone: 650-691-1200 FAX:650-691-0485 . E-mail: mrosd@openspace.org « Web site:www.openspace.org Board of Directors:Pete Siemens,Mary C. Davey,Jet!Cyr,Deane Little, Nonette Hanko,Betsy Crowder,Kenneth C. Nitz * General Manager:L.Craig Britton Meeting 00-05 Page 2 BOA"BUSINESS 7:35 1 Proposed Preliminary Action Plan for the Implementation of the District's Basic Policy for Fiscal Year 2000-2001; Review the Proposed Preliminary Action Plan for the 2000-2001 Fiscal Year, Modify as Necessary, and Adopt the Preliminary Action Plan - C. Britton 8:00 2 Initial Presentation of the Budget for Fiscal Year 2000-2001; Review the Proposed Budget for the 2000-2001 Fiscal Year; Approve the Proposed Budget Guidelines for Board Conference Attendance - C. Britton 3 Authorization to Change District's Designation of Authorized Signatories for Entering Safe Deposit Boxes; Adopt the Attached Resolution of the Board of Directors of Midpeninsula Regional Open Space District Establishing Signatories for Entering Safe Deposit Boxes (Mid- Peninsula Bank) -D. Dolan REVISED CLAIMS 8:20 INFORMATIONAL REPORTS —Brief Reports or announcements concerning pertinent activities of District Directors and Staff 8:30 ADJOURNMENT Times are estimated and items may appear earlier or later than listed. Agenda is subject to change of order. TO ADDRESS THE BOARD: The Chair will invite public comment on agenda items at the time each item is considered by the Board of Directors. You may address the Board concerning other matters during Oral Communications. Each speaker will ordinarily be limited to three minutes. Alternately, you may comment to the Board by a written communication, which the Board appreciates. All items on the consent calendar may be approved without discussion by one motion. Board members, the General Manager, and members of the public may request that an item be removed from the Consent Calendar during consideration of the Consent Calendar. Regional Open ,,: ,ice g P _ 1 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT R-00-31 Meeting 00-05 March 8, 2000 AGENDA ITEM 1 AGENDA ITEM Proposed Preliminary Action Plan for the Implementation of the District's Basic Policy for Fiscal Year 2000-2001 ASSISTANT GENERAL MANAGER'S RECOMMENDATION Review the proposed Preliminary Action Plan for the 2000-200 fiscal year, modify as necessary, and adopt the Preliminary Action Plan. DISCUSSION The District's activities are guided by an annual Action Plan that implements the Basic Policy and other Board policies. The Action Plan's function is to summarize the purposes and current emphasis of the District's major programs, to identify key projects, to allocate budget, and to be a basis for evaluation of progress. The fiscal year 2000-2001 Action Plan reflects both extraordinary opportunities and success in furthering the District's mission. The District proposal to annex the San Mateo County coast is the most significant and complex project ever undertaken by the District. The Action Plan identifies staff and consultant resources necessary to make this project successful. At the same time, the District has experienced tremendous success over the past few years in its acquisition efforts, and in its efforts to improve and publicize its lands for low-intensity public recreational use. The District has now preserved over 44,000 acres of open space land on the Peninsula. But with this success we have seen a dramatic increase in management responsibilities, projects, and issues to be resolved. In spite of their best efforts, staff has not been able to keep up with the demand for services, including work on some major planning and policy questions of great interest to the Board and the public. The proposed Action Plan includes new staff resources in several key areas that will allow District programs to continue performing to the standard expected by the Board and the public. Each Program Manger will highlight specific proposals and related projects and services during their individual Action Plan presentations at this evening's meeting. 330 Distel Circle • Los Altos,CA 94022-1404 a Phone:650-691-1200 FAX:650-691-0485 • E-mail:mrosd@openspace.org • Web site:www.openspace.org Board of Directors:Pete Siemens,Mary C.Davey,Jed Cyr,Deane Little,Nonette Hanko,Betsy Crowder,Kenneth C. Nitz •Genera!Manager:L.Craig Britton R-00-31 Page 2 The proposed Action Plan could be altered as a result of your March 8 meeting deliberations, the budget formulation, the Administration and Budget Committee review process, and your final approval of the Action Plan, which is ordinarily considered at your second meeting in March. Prepared by: L. Craig Britton, General Manager John Escobar, Assistant General Manager Deirdre Dolan, Administration and Human Resources Manager Mike Williams, Real Property Representative Randy Anderson, Planning Manager Mary de Beauvieres, Senior Planner Contact person: L. Craig Britton, General Manager ACTION PLAN FOR THE IMPLEMENTATION OF THE BASIC POLICY OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT FOR THE 2000-2001 FISCAL YEAR I. OPEN SPACE ACQUISITION PROGRAM A. Negotiations and Special Projects Subprogram B. Enterprise Program C. Land Protection Program 111. OPEN SPACE PLANNING PROGRAM A. Advance Planning Subprogram B. Current Planning Subprogram III. OPERATIONS PROGRAM A. Field Operations Subprogram B. Resource Management Subprogram IV. PUBLIC AFFAIRS PROGRAM A. General Public Information and Outreach Subprogram B. Legislative, Funding, and Organizational Relations Subprogram C. Visitor Services Subprogram V. ADMINISTRATION PROGRAM A. Administration/Human Resources Subprogram B. Legal Services Subprogram OPEN SPACE ACQUISITION PROGRAM Subprograms A. Negotiations and Special Projects B. Enterprise C. Land Protection To Implement the BASIC POLICY OBJECTIVE: The District seeks to purchase or otherwise acquire interest in the maximum feasible area of strategic open space land within the District planning areas, including baylands and foothills. The District seeks to link its open space lands with federal, state, county, and city parklands and watershed lands. General Program Emphasis for 2000-2001 The program's emphasis will be to acquire the higher priority projects funded under the District's Financing Authority. Lower priority properties will be pursued through long-term options, available grant funding, bargain sales, and gifts. The District will continue to work with Peninsula Open Space Trust (POST) to acquire land and to further the District's overall open space acquisition goals. The Enterprise Subprogram will focus on maximizing rental income consistent with Open Space Management policies, and on maintaining and improving District rental structures. The Land Protection Subprogram will focus on conducting comprehensive land acquisition studies, monitoring land use planning activities surrounding District preserves, and protect interests in land by resolving conflicts arising from easement and encroachment issues. In the event the California Safe Neighborhoods, Clean Water, Clean Air and Coastal Protection Bond Act of 2000 (Proposition 12) is passed by the voters in March, this action plan may require amendment for final Board approval to provide for the additional acquisition efforts that may be needed to respond to additional grant funds. Staff Resource (Regular, full-time positions, unless otherwise indicated) Land Acquisition Manager (vacant position) Real Property Representative Senior Acquisition Planner Land Protection Specialist Real Property Assistant -2 - 2000-2001 Negotiations and Special Projects Subprogram Objective To provide for the acquisition of all real property rights necessary to secure a recreational and open space greenbelt in the foothills and baylands, including rounding out and improving public access to existing preserves and connecting District preserves with other public lands. Key Projects 1. New Land Commitments - Convert the budgeted funds in the New Land Commitments budget category into open space lands, at desirable prices, focusing on the higher priority properties which specifically protect the greenbelt - including rounding out and improving public access to existing preserves, connecting to other preserves or public lands, and furthering the completion of the San Francisco Bay Trail and Bay Area Ridge Trail with potential ultimate trail connections to the Pacific Coast. Balance the desirability of the potential acquisition with the availability of limited funds, including, if possible, private financing with favorable terms and obtaining trail easements. 2. Pursue Key Acquisitions - To protect the scenic ridgeline at the District's northern boundary, pursue negotiations to acquire critical properties under threat of present or future development. Pursue acquisition of important properties at District's southern boundary linking District lands with State park lands including potential connection between the Bay Area Ridge Trail and Santa Cruz County's Coastal Trail. 3. Alternative Acquisition Methods - Obtain Board approval on appropriate options, at market prices or less, to acquire desirable properties that might be affordable upon the possible passage of Proposition 12 and available funding which would result in additional funding for land acquisition. Explore various alternative terms of purchase (installment purchases, defensible fee, etc.) to offer advantages and incentives to landowners including formation of a possible assessment district, as well as cost savings to the District. 4. Grants, Gifts, Bargain Sales and Joint Acquisitions - To augment lted acquisition funds, explore new grant opportunities, and focus on acquiring open space lands through bargain sales, and/or gifts where possible. Pursue the joint acquisition of appropriate properties with Santa Clara County Parks near the Lexington Reservoir. Work closely with Peninsula Open Space Trust (POST) to pursue grant opportunities to acquire lands that provide potential regional and coastal trail r l connections such as the POST owned Loma recta Ranch property, and lands that round out existing open space preserves such as the POST owned Upper Bear Creek Redwoods and Guadalupe Land Company properties. Other Projects and Activities 1. Maintain a multi-year spending plan for open space acquisition which optimizes use of cash and borrowed funds to accomplish acquisition goals within extremely tight budget constraints. 2. Complete the annexation process through the Local Agency Formation Committee in San Mateo County to include properties which are outside of the District's current boundaries. - 3 - 3. Continue to pursue sale or exchange of the "Teague Hill" surplus property. 4. Provide on-going acquisition planning and priorities input to the Planning team. 5. Explore additional methods to protect open space lands for less than the total cost of fee acquisition (open space easements, acquisition of development rights, development dedication, exchange or sale of development rights, cooperation with private individuals and groups, etc.). 6. Encourage other agencies to acquire through various means, including grants park and open space lands, that are consistent with their goals and will help complete the greenbelt. 7. Initiate and maintain contacts with landowners, real estate appraisers and brokers, developers, architects, engineers, zoning and planning officials, and financial institutions. 8. Maintain a relocation assistance program utilizing staff and consultants as necessary. 9. Compile current information on real estate market activity, including ordering preliminary title reports on a timely basis for research into potentially available properties. 10. Catalog information of special interest, such as deed restrictions, encumbrances, financing and tax considerations. This activity includes the establishment and continuation of a working relationship with title companies and other information sources. -4 - 2000-2001 Enterprise Subprogram Objective To manage all of the District's revenue-producing activities in such a way as to maximize income from enterprise accounts consistent with Open Space Management policies, incorporating compatible new programs when possible. Key Projects 1. Administer Enterprise Accounts -Administer rental accounts, communication and agricultural leases, consistent with open space management policies, to maintain and enhance revenue stream through competitive and current rate structure, effective maintenance programs and communication with tenants. 2. Maintain Rental Structures - Carry out maintenance and improvements to rental houses to keep buildings and grounds in a safe, sanitary, and attractive condition, and to increase net rental income. Administer long term and recurring maintenance priorities on rental properties. 3. Administer Historic Leases - Oversee lease compliance and renovation requirements at historic Picchetti winery, Thornewood estate, and Fremont Older house. Pursue lease extension and potential j agricultural lease with new tenant as art of the historic Picchetti winery. � P ry 4. Identifyand Pursue Alternative Lease Arrangements -Investigate long term leasehold interest g g g agreements and alternative lease arrangements for the appropriate enterprise properties to enhance net income and minimize maintenance costs to the District in accordance with Board policy. Other Projects and Activities 1. Pursue sale of term ownerships on a demand basis for long-term interest arrangements (estate for years, lifetime tenancy) for former Bean and Smith residences. If successful, this program will provide additional funding for land acquisitions. 2. Prepare annual rental surveys on District rental houses and Ranger residences. 3. Investigate new enterprise proposals as initiated by other groups or individuals that would be compatible with District goals and objectives. 4. Consolidate District's communication leases and maximize communication rental income. - 5 - 2000-2001 Land Protection Subprogram Objective To preserve and protect District open space lands by conducting land acquisition planning activities to identify acquisition priorities and, once acquired, to further protect these lands by defending the District's property rights from incompatible and encroaching land use activities. Key Projects 1. Land Acquisition Planning - To provide comprehensive land acquisition studies and devise acquisition priorities to guide the acquisition program. Provide site specific information to land negotiators to assist them in developing terms and conditions for acquisition projects. Seek acquisition grant opportunities for high priority projects, including joint acquisition projects with other public agencies and organizations. Collaborate with Planning and Operations Programs to facilitate incorporation of land acquisitions into the District greenbelt. 2. Land Development Monitoring - To protect public and private open space lands from negative impacts associated with adjacent land development where there is a relationship to the District's land interests. Work with local jurisdictions, environmental organizations and private property owners in trying to protect open space lands through the public review processes. When appropriate, partner with private property owners in seeking balanced land use plans that will maximize open space preservation. 3. Easement Monitoring - To protect and monitor District lands encumbered by private and public easements and, conversely, protect District-owned open space easements where located on private and public lands. When easements are potentially violated, resolutions will be sought that protect and enhance open space values and minimize legal costs. Seek compliance with easements or, if necessary, seek modifications to enhance open space protection. Use proper enforcement techniques if conflict resolution can not be achieved. 4. Encroachment Reduction - To protect open space preserves from encroachments and preserve District property rights. Work closely with Planning, Operations and Legal programs to achieve early identification of potential encroachments and seek resolution by negotiations and enforcement, if necessary. Use a variety of techniques to resolve encroachment issues including restoration, mitigation and boundary line adjustments to maximize open space protection. Develop a procedural manual for enforcement of encroachments on District land. Other Projects and Activities 1. Review land development proposals and monitor easements to achieve encroachment reduction. 2. Review and update land acquisition priorities and begin to integrate into District's Geographical Information System. 3. Conduct land acquisition studies and related planning activities, prepare acquisition reports and conduct due diligence investigations when necessary. - 6 - 4. Establish method for monitoring and responding to easement agreements involving private inholdings at Windy Hill Open Space Preserve and other lands where complex purchase agreements have resulted in the need for proactive management of such agreements. 5. Clarify and monitor easements and other rights associated with Bear Creek Redwoods Open Space Preserve. 6. Administer the District volunteer conservation easement monitoring program, and continue to work with Peninsula Open Space Trust to administer their easement monitoring program. 7. Work actively and regularly with District legal counsel to maintain and pursue District's legal program where titles to existing District lands are threatened by encroachment, claim of adverse rights, liens, or other interference with District's real property rights. 8. Work with Operations Program in negotiating road agreements and resolving encroachments with adjoining property owners to ensure District's real property rights are protected and minimize the District's maintenance responsibilities where appropriate. 9. Initiate and maintain contacts with landowners, County code enforcement officers, zoning and planning officials, surveyors and various regulatory agencies. 10. Work to clear and perfect title on District-owned land through the orderly, prioritized disposition of title and legal encumbrances(mineral and water rights, claims of prescriptive easements, encroachments, etc.) where appropriate. - 7 - OPEN SPACE PLANNING PROGRAM Subproo-ams A. Advance Planning B. Current Planning To Implement the BASIC POLICY OBJECTIVES: The District follows management policies that ensure proper care of the land, that provide public access appropriate to the nature of the land, and that are consistent with ecological values and public safety. The District works with, and encourages, public and private agencies to preserve, maintain, and enhance open space. The District protects and restores the natural diversity and integrity of its resources for their value to the environment and the public, and provides for the use of the preserves consistent with resource protection. Program Emphasis for 2000-2001 A significant amount of Planning staff time will focus attention on special advance planning projects, including coordinating and supporting the proposal to expand the District's boundaries to include the San Mateo County coast. A major two-year project to develop an area-wide Master Plan for Sierra Azul Open Space Preserve is in progress, as are the review of the District's Trail Use Policies and Guidelines, and improvement of the District's trail signing system. The Planning Program will continue progress on Work Program projects in the areas of Information Systems (GIS and GPS use and development) and Current Planning, including site planning, storm-damage repairs, and capital improvements. Significant time will be allocated to Interdepartmental Support, such as new acquisitions, land protection, and legal projects. Staff Resources (Regular, full-time positions unless otherwise indicated) Planning Manager Senior Planner(1) Open Space Planner H (2) Open Space Planner 1(1) Planning Technician(2) Planning Secretary(1) Proposed Additions for 2000-2001 Open Space Planner H (1) - 8 - 2000-2001 Advance Planning Subprogram Objective Assist with the formulation, review, and refinement of policies, plans, and procedures for the management and development of preserves on a District-wide, regional, or preserve-specific basis. Work with local agencies on joint planning and implementation projects, to share information, and to encourage planning decisions that support the preservation of open space and natural resources and development of enjoyable, manageable regional trail systems. Key Projects 1. Annexation of the San Mateo County Coast—Administer and coordinate a consultant contract to accomplish annexation of the District to the San Mateo County Coast, including preparation of a Service Plan, Fiscal Impact Analysis, Environmental Document, and management of the annexation process for the action. Provide Planning representation at staff, consultant, ad hoc committee, and key public or stakeholder meetings and other related meetings and general public communications. 2. Trail Use Policy and Guidelines Review—Review and revise policies based on growing experience with trail use management and planning and Board concerns about preserving a tranquil nature experience in the preserves. Includes public input process and review of updated District-wide trail use designations. Subsequent phases include updated guidelines for trail use management, trail system planning, and typical trail design and layout standards. 3. Sierra Azul Area Plan—Continue and complete the Resource Inventory and Assessment Phase focusing on p ry g natural and cultural resources and existing roads. Provide resource management recommendations and constraints for planning. Initiate Master Planning process, coordinating staff, consultant, and public input for Board consideration. Initiate preparation of environmental document. 4. System for Land Use Decisions- Continue long-term project described in FY 1998/1999 Action Plan and Work Program and FY 1999/2000 Work Program to create a framework system for assessing sites, identifying site preparation and management needs, and for decisions on opening and improving lands. This project is groundwork for update of the District's Use and Management Planning Policies. It relates to the Sierra Azul Area Plan, Trail Use Policy Review, and other major projects, and will examine these projects in the context of a District-wide overview of significant needs, efforts, and progress. Working meetings of a staff committee are proposed approximately every two weeks, with the long-term goal of formulating recommendations to the Board. 5. Trail Signage Improvements—Working with Staff Sign Committee to improve the District's trail-signing system based on collected input from field staff, volunteers, and Board members; completed research of materials and approaches used by other agencies; and confirmation of recommended methods for improving the system. Update the Sign Manual and Inventory System. Implement changes to signs on site, based on need for replacement. - 9 - 2000-2001 Current Planning Subprogram Objective Implement policies and regional plans, prepare and implement site-specific plans and capital improvement projects, and respond to preserve use and management issues. Includes mapping, signing, and other ongoing public information services. Key Projects 1. Design and Implementation of Storm Related Repairs—Continue studies, plans, permitting, and construction administration for repair or replacement of public improvements to re-establish patrol and/or trail access. ♦ Purisima Creek Redwoods Open Space Preserve Determine potential reuse or disposition of surplus Grabtown Gulch Bridge. Prepare alternate project proposal as appropriate (FEMA funded). ♦ El Corte de Madera Creek Open Space Preserve ■ Virginia Mill Trail—Construct repairs, realignment, and closure/restoration of storm-damaged portions(FEMA funded), potentially including trail bridge(not FEMA funded). ■ Methuselah Creek Crossing—Construct trail bridge(potential crew project—NRTFA funded) ■ Lawrence Creek Bridge—Construct headwalls to stabilize bridge. 2. Employee Residence,Bear Creek Redwoods-Conduct feasibility studies, survey and perc testing, prepare plans and secure permits to construct a home on-site. 3. El Corte de Madera Creek Trail Use Plan (Study Area 2) Implementation—Implement restoration, realignments, and construction of new trails as outlined in the plan(crew project, NRTFA funded). i 4. Preserve Staging Area Planning—Conduct studies, prepare plans, and obtain permits for construction of new public staging areas with restrooms at Jacques Ridge site,Mt. Umunhum Area, Sierra Azul Open Space Preserve(joint project with Santa Clara County Parks,NRTFA funded) and at El Corte de Madera Open Space Preserve. 5. Administrative Office Remodel and Expansion —Coordinate construction contract to expand Administrative Office workspace into portion of leased space and remodel to accommodate increased staff. 6. Foothills Operations Facilities Study—Work with architectural and/or engineering consultant, evaluate overall potential Foothills operational facilities needs. Make a determination to retrofit existing shop building to improve structural integrity or design new shop structure. Complete design work, apply for permits. Other Projects and Activities Refer to the attached Proposed Planning Department Work Program for Fiscal Year 2000/2001 for other projects and activities. - to - i OPERATIONS PROGRAM Subprograms A. Field Operations B. Resource Management To Implement the BASIC POLICY OBJECTIVE: The District follows management policies that ensure proper care of the land, that provide public access appropriate to the nature of the land, and that are consistent with ecological values and public safety. General Program Emphasis for 2000-2001 Continue to provide responsible stewardship of all District lands by furnishing those public safety, maintenance, construction, and resource management activities necessary to protect and enhance the natural resources and ensure safe and appropriate use of District lands. Implementation of Board-adopted Resource Management Policies and Trail-use Policies and Guidelines will continue to be the primary focus of the operations program. Current Staff Resources Assistant General Manager (1/2 time in Operations - 1/2 in Planning) Operations Manager (vacant) Area Superintendents (2) Support Services Supervisor Operations Analyst Resource Management Specialist Supervising Rangers (2) Maintenance &Construction Supervisors (2) Secretary Rangers (14) Equipment Mechanic-Operators (2) Lead Open Space Technicians (4) Open Space Technicians (8) Farm Maintenance Worker 10,000 Seasonal Open Space Technician hours Pr s Additions for 2 -200 1 opo ed 000 Supervising Rangers - Patrol (2) Lead Open Space Technicians 2 ........................ .... :.................,..............,................::.::::::�..: .:.n..n.,. :....:,........,....................... .... ....:.:.. F.......::::::::,x:::::::::x:::::.....,.::::n•:r ....r:r:::::::x::xi{n.r.:.......:ih.......-. .... ....r......:v. ..:....r......r....:....................v....................,.................................. . :.. ............:::::•,�:::::m:::::::::::::F.{:-:::??•ii:�i}iii::rr,{.;.;,;x{{•iiiiii:4:is?4:??•ii:iiiii: :r v•..v ;..f.. ._..............................................:....................:... ... .. .. ..::, .. ,y.. .... .; ?..- y�.. >::•:f::3ai?;;:`::isSi;�•;;':i:;:;•%;;;t;;:q?:::.'•:::'t:;::;:'t?;;:;iG: :.:::::.�.::?.:..:.::.�::::::::::.r• :::::::;::?:;.,•.:.:•;•.•:.:�:::•;:•ti:,.•.:�.;�::::::::..:::�•::•'.::::;••`:i::;3:::::;5;:;::5:':...::o;o-s:r••::•:c:•;...,......:::.:...................,..,,,•:.;.:•:::.,•::::::::.•::.:.;::.:;.;,•:.::�:::::::::::..;+;:.:•.:::.::..�:::.:+::•::•:a:rr::•::•::::•::•:r::•::•>o-::•:»:•o-:;:•:: i#•7.�FlA'k:::�"�#i•Wi*��5: .-. � �ri:isai>;i`%::i'i'.S:�S�a.2;.2t;�i :i?i•,{.: :':`:�`:=;:,5'i'r'i2iSSi SS:;Si'i'S{rSf�P:"t�Sr�!'i'S 11 2000- 2001 Field Operations Ka Projects 1. Operations Program Review-Work with the Ad Hoc Committee to complete writing of the Action Plan and present the Action Plan to the full Board. Continue work on high priority tasks identified in the Action Plan, and incorporate the tasks into the regular Operations work plans. a. Update of the Operations Manual - Revise the Operations Manual to incorporate the variety of memorandums and procedural standards developed over many years into a standardized and centralized format. Develop a system which makes information easily accessible and makes updating easy. b. Analysis/Upgrade of Current Radio System - Complete the analysis currently being done of the radio system, and upgrade the system to provide better coverage. c. Improvement of the Training Program - Complete the work currently being done the by the training committee to create a list of required and optional training for Operations staff, and to create a training calendar. Schedule identified training for staff. 2. Restoration and Mitigation of Off-trail Impacts of Public Use- Close and restore existing undesignated trails and shortcut trails. Increase efforts to prevent the establishment of undesignated trails. Mitigate natural resource impacts and improve alignments of existing trails to minimize erosion. Work to ensure visitor compliance of restoration area closures. The focus for this fiscal year will be on areas where compliance is poor and high rates of vandalism occur. 3. Improvement of the data collection methods in the Operations Program - Utilize staff expertise, and possibly involve a database consultant, to improve the collection and dissemination of information about the enforcement activities and incidents occurring on District lands. Transition from the current manual system to a computerized database system. 4. Deer Hollow Farm Agreement - Negotiate and implement an agreement with the City of Mountain View, and other entities, for the long term operation of Deer Hollow Farm. Implement related agreements with Santa Clara County. 5. Interpersonal Communication Skills and Performance Standards Development-Continue to build on the influencing skills training received by the entire staff since 1996; assist in the training of influencing skills of all new employees. Complete the process of developing performance standards for supervisors and begin developing performance standards for other staff, and continue to provide leadership and supervision training to supervisors as necessary to facilitate the completion of these tasks and enhance the overall quality of supervisory skills within the program. Other Projects and Activities 1. Patrol Services a. Monitor public use and land use regulation compliance, and educate the visiting public on proper use of District preserves. I 12 b. Enforce District land use regulations by providing active ranger patrol and after hours call-out response, as well as implementing patrol agreements with other agencies. c. Respond to accidents and other emergencies occurring on District lands. d. Identify and mitigate potential hazards on open space preserves to enhance public safety. e. Monitor special events, use permits, and resource protection-related impacts on District lands. f. Support the goals of the Public Affairs program by providing staff for special events and other projects, as time permits. g. Manage the Alma College property, and work with other programs to plan for appropriate public use. h. Conduct focussed patrols in areas where a high number of incidents of directed vandalism are occurring. 2. Maintenance and Construction a. Develop cost-effective methods of meeting site maintenance needs. b. Implement Use and Management Plan recommendations, as appropriate. c. Maintain lands, buildings, vehicles, and equipment to a safe and appropriate standard of appearance and utility. d. Provide supervision of volunteer projects, support enterprise subprogram field maintenance needs, and assist consultants and contractors with capital improvement projects as necessary. e. Implement resource management plans and specific projects, as appropriate. f. Improve public access and use through capital improvement projects, while protecting natural resources from the impact of public use. 3. Management and Administration a. Improve liaison with local police, fire, and municipal court jurisdictions, based on recommendations from the Operations Program Review, and direction from the ad hoc Board committee. b. Provide for safe access and site security by negotiating road maintenance and caretaker agreements. c. Coordinate management of District vehicles and equipment. 13 d. Coordinate an occupational health and safety program for field operations. e. Coordinate ongoing training and skills enrichment for field staff. f. Provide input and assistance with review of the Trail Use Policies and Guidelines. g. Increase computer use in field offices, provide training for supervisors, improve record- keeping through use of databases, continue to improve e-mail capabilities/use between the offices. h. Explore alternative methods for managing District baylands with adjacent public agencies. L Update permit policies, including a review of the blanket permit system and permit fee structure. 14 2000 - 2001 Resource Management Objective Inventory and analyze the state of District natural resources, including the natural resources of specific preserves to identify needs and priorities. Utilize volunteers and consultants to expand District staff's capabilities. Develop procedures and strategic implementation plans to address the resource management needs of District land. Maintain regular contact and work with, other agencies, local authorities and specialists in the field, to restore or manage the District's natural resources. Key Projects 1. Grassland management implementation plan - Develop a set of management guidelines to increase native species diversity and control yellow starthistle and Harding grass. Monitor treatment areas, conduct a prescribed bum and restore five acres of native grassland; train staff on management techniques and seed collection; and complete a comprehensive report summarizing three years of grassland management, including recommendations for long-term sustainability. 2. Pulgas Ridge Open Space Preserve Habitat restoration - Restore native plant communities by eradicating non- native plant species. Implement the Pulgas Ridge Open Space Preserve's restoration plan. Work with staff and California Conservation Corps to continue treatment of management area one. Investigate potential options to recycle the larger Eucalyptus trees. 3. Wild pig control program -Enter into a trial control program, using the services of a contract trapper, to lessen the impact of wild pigs on the South Skyline Area. Work with staff to identify problem areas and assist contract trapper. Monitor the progress of other wild pig control efforts in the area. Other Projects and Activities 1. Resource inventory - Inventory and record key flora, fauna, natural features and biotic communities. Work with the Planning staff to develop a database system to record and display resource information. Compile all known information, and solicit information from experts in the field and from other agencies. Hire consultant to inventory bat species District-wide. 2. Seed increase program -Establish a "District," seed propagation program to ensure an endemic seed source for restoration projects. Collect representative local native grass and forb seed for grower to produce 2000lbs of seed annually. Establish collection sites, schedule staff training, and ensure proper storage, labeling and documentation of collected seed. 3. Invasive non-native plant removal and monitoring- Continue to work with field staff to develop a treatment schedule and monitoring protocols for various invasive non-native plant populations identified in the Invasive Exotic Plant Inventory. 4. Wildlife surveys -Work with field staff to establish schedules for Bluebird, deer and red-legged frog surveys. Document and summarize results for annual report. 15 5. Resource management program development - Work with area superintendents to incorporate more resource management in to staff s responsibilities. 6. Pond management - Establish management objectives for ponds on District land. Work with field staff to develop habitat improvements and monitoring schedules for specific ponds. 7. Sierra Azul Master Plan -Assist planning in setting guidelines for the resource assessment of the plan. Review consultant's findings with planning. 16 PUBLIC AFFAIRS PROGRAM Subprograms A. General Public Information and Outreach B. Legislative,Funding, and Organizational Relations' C. Visitor Services To Implement the BASIC POLICY OBJECTIVE: The District educates and makes clearly visible to the public the purposes and actions of the District, and actively encourages public input and involvement in the District's decision-making process and other activities. General Program Emphasis for 2000-2001 Maximize the general public's awareness and understanding of the District, its goals, and its activities, by reaching all communities served and all other target audiences with District information through a variety of means and methods; implement the top priorities of the District's legislative plan; maintain environmental education program and volunteer involvement, and maximize public participation in District programs; provide District materials and information to the San Mateo County coastside communities to ensure their full knowledge and understanding of the District, its programs and activities as they relate to a proposed annexation of that area. i Staff Resources (Regular, full-time positions unless otherwise indicated) Public Affairs Manager Visitor Services Supervisor Volunteer Coordinator Docent Coordinator Public Affairs Assistant Interpretive Aide(Nature Center)* Special Events Aide (District Disnlays)* (proposed) *The interpretive aide and special events aide positions are seasonal and part time. 17 i 2000-2001 General Public Information and Outreach Subprogram Objective To generate additional support among the general public for completing the greenbelt by increasing the positive perception and awareness of the District's mission, objectives, accomplishments, programs, and effective management of public lands and financial resources. Key Projects 1. Children's Activity - Schedule and coordinate a children's activity/event, theme and location to be determined, to build on the success of and reach the same audience as the former Kids'Art of Open Space event, to take place no later than March 31, 2001; initial idea is a Junior Ranger program. 3. Annual Report-Publish a District 1999-2000 Annual Report by June 1, 2000, followed by three regular issues of Open Space News. 4. Coastal Community Outreach -Provide District materials and information to the San Mateo County coastside communities to ensure their full knowledge and understanding of the District, its programs and activities as they relate to a proposed annexation of that area. Other Projects and Activities 1. Produce a District"Good Neighbor" brochure for distribution to property owners with land adjoining District preserves. 2. Assist the Planning and Operations programs to develop a trail use education plan, focusing on bicycle and dog usage, in coordination with the Board's Trail Use Policy and Guidelines Committee review process. 3. Maintain a high level of regular media coverage of District activities and accomplishments. 4. Continue to work with the Planning Program to create new site maps for preserve brochures, and continue updating, producing, and distributing existing site maps, brochures, and other collateral materials as needed. 5. Maintain and maximize the schedule of community presentations and displays. 6. Continue providing public affairs services to other programs, i.e., attendance and input at meetings, press releases, flyers, displays, mapping, media liaison, etc. 7. Utilize in-house staff to maintain and update the District's web site on the Internet. 8. Continue to update and expand the District's newsletter mailing list. 10. Re-focus outreach efforts toward corporations for the purpose of providing District information and presentations. 18 2ooa-2001 Le islg ative, Funding, and Organizational Relations Subprogram Objective To carry out the high priority elements of the District's legislative plan and to inform other public agencies and private organizations about the District's activities and goals. Key Projects 1. Coastal Preservation Effort-Work with the general manager and the Coastal Ad Hoc Committee of the Board toward the proposed District expansion to the San Mateo County coast, and all related tasks and activities to include possible future funding measures. 2. Funding for Mount Umunhum Clean Up—Work with legislators to develop and implement a strategy to obtain Federal funding toward clean up of the former Almaden Air Force Station at Mount Umunhum, in the Sierra Azul Open Space Preserve. 3. Other Lobbying Efforts -Work with the general manager and the District's Sacramento lobbyist to preserve current and future state funding for the District, and to carry out elements of the District's legislative plan. 4. Sponsor Legislation -Work with the District's legislative advocate and with legislators and their staffs to sponsor high-priority legislation from the District's Legislative Plan. 5. Regional Funding-Work with the Bay Area Open Space Council, the Planning and Conservation League, and others to develop and/or support potential regional, State, or other alternative funding mechanisms. Other Projects and Activities 1. Work with Director Siemens (as current President of the Santa Clara County Special Districts Association) and the general manager toward obtaining special district representation on the Santa Clara County Local Agency Formation Commission. 2. Continue to work with the Planning Program to provide publicity and outreach efforts for the Board's revisiting of the Trail Use Guidelines. 3. Continually review and analyze legislation, determine District's position on bills, and take appropriate action, if any, on bills. 4. Work with legislators, legislative committees, state and federal administrators, other agencies, private organizations and interested citizens for information and action regarding state legislation and specific local issues. 5. Support federal, state, or local legislation, which will benefit the District. 19 6. Provide support and services for specific District projects requiring legislative support, such as grant applications. 7. Maintain contact with other organizations and agencies and encourage them to assist the public in differentiating between agencies, and for the exchange of information, cooperation on special projects and participation in special events such as conferences and seminars, to keep the District informed of current issues. 8. Provide District information to local candidates in the 2000 elections, and set up information meetings with candidates as need is determined, including a candidates' forum or information meetings with candidates for seats on the District Board of Directors. 9. Continue to provide staff support to the Legislative, Finance, and Public Affairs Committee, and work as needed to develop District positions on and involvement in statewide open space issues. 10. Provide a District presence in key legislative activities, meetings, and conferences in Sacramento, through CPRS, PCL, or with the District's legislative advocate. I i 20 1 i 2000-2001 Visitor Services Subprogram Objective To encourage active public participation in the maintenance, restoration, and protection of the District's natural resources, and provide cultural, historical, and environmental education opportunities to the public. Key Projects 1. Interpretive Program -Develop a master plan that defines the District's interpretive program objectives, including historical interpretation at Picchetti Ranch, using interpretation as a tool to address resource management issues, and identifying the goals of the docent program. 2. Docent Recruitment-Design single-subject "short courses" for prospective volunteers that want to participate in the docent program, but have time restrictions or are only interested in a particular subject. These volunteers would be limited to leading activities related to the short courses they have completed. The short-course concept is long-range, beginning with earthquake geology in Fiscal Year 2000-2001. 3. Environmental Education -Focus on recruiting and training additional outdoor education docents to meet the increasing demand for field trips. Provide ongoing training opportunities for current outdoor education docents. Investigate methods of providing disadvantaged school classes with transportation to field trips at Skyline Ridge. 4. Daniels Nature Center-Work with exhibit designer to develop seasonal displays for the exterior exhibit case. Continue to open the nature center to the public on weekends mid-March to mid-November. Change the operating hours to better accommodate visitor use patterns. Other Projects and Activities 1. Recruit and train docents and other volunteers, and provide public information about volunteer programs, projects, and events through regular newsletters. 2. Coordinate monthly volunteer service projects and short- and long-term special request volunteer projects. 3. Conduct a broad range of public interpretive programs on open space preserves. 4. Coordinate the volunteer trail patrol program, and provide ongoing training for trail patrol volunteers and docents. 5. Maintain the artifacts and furnishings in the historic Grant Cabin. 6. Maintain and operate the David C. Daniels Nature Center. 7. Provide leadership training to field staff assigned to work with volunteers. 21 ADMINISTRATION PROGRAM Subprograms A. Administration/Human Resources Subprogram B. Legal Services Subprogram To Implement the BASIC POLICY OBJECTIVE: The staff administers the affairs of the District on behalf of the public so as to maximize accomplishment of the goals and objectives of the District within existing financial and other constraints. General Program Emphasis for 2000 - 2001 Guide and support the District-wide effort to develop and improve leadership, supervisory, and interpersonal communication skills among all staff in order to enhance the District's work environment. Foster staff participation in carrying out the District's short and long-term goals and objectives. Maintain the District's viability as an open space acquisition and management agency. Work toward potential expansion of the District's boundaries to include coastal lands in San Mateo County. Staff Resources (Regular, full-time positions unless otherwise indicated) General Manager Legal Counsel (two-thirds time) Controller (one-quarter time) Administration/Human Resources Manager Research Attorney Senior Administrative Analyst/District Clerk Office Manager/Secretary to the General Manager Accounting Specialist Secretary (60% time) Receptionist Network Specialist (50% time) Proposed Additions for 2000 -2001 Increase Secretary to full time Increase Network Specialist to 60% time 22 2000-2001 Administration/Human Resources Subprogram Objective: To provide overall coordination, direction, and administrative foundation for all District activities so as to maximize the accomplishment of the Board's policies and directives, to implement the Action Plan, and to maintain the District's viability as an open space acquisition and management agency. Key Projects 1. District Funding - Work to preserve current and future state funding for the District. Continue to provide multi-year information/scenarios on District's long-term finances, including bonded indebtedness and cash flow, and to address the need to rely on the availability of grant funds for major development projects. Pursue alternate sources of secure additional funding to meet acquisition and open space management needs. 2. Human Resources -Work with all program areas to enhance the overall quality and effectiveness of the District's work environment by developing and improving leadership, supervisory, and interpersonal communication skills. Carry out District's personnel and labor relations functions. Enhance organizational effectiveness and morale through increased communications, staff meetings, training seminars, and team building activities. As a follow-up to the Operations Program Review, conduct a District-wide morale assessment to determine impacts of changes made so far, and to identify potential strategies to enhance morale. 3. Elections - Coordinate necessary election services and activities for Wards 3, 4 and 7. 4. Coastal Expansion - Coordinate the efforts of the Board, consultants, and staff to work toward completion of the annexation of the coastal lands in San Mateo County. Other Projects and Activities 1. Continue to foster a management team approach for overall management of the District's activities. 2. Provide financial management and accounting services, including investment of temporarily idle funds. 3. Perform administrative and legal obligations as required by State law, promote and oversee the District's safety program, and oversee coordination of equipment/infrastructure needs at the main office. 4. Provide personnel support and employee relations services to all programs. 5. Update Action Plan; coordinate program evaluations for Action Plan progress. 23 i 6. Prepare, monitor, and revise, as necessary, annual budget. 7. Coordinate preparation and distribution of all materials for Board's regular and special meetings. 8. Involve Board of Directors in planning of the annual special Board meeting to be held as part of Board's Good Neighbor Policy. 9. Administer a comprehensive risk management program. 10. Monitor the ongoing procurement policy for the purchase of recycled and alternative paper products and other office supplies. i 11. Upgrade the District's network computer system to increase efficiency and reliability; expand day-to- day technical support to include both field offices; and continue to assess system, develop resources, and manage technological change and improvements. 12. Develop and maintain standard Board and staff orientation manuals. I 24 I 2000-2001 Legal Services Subprogram Objective To provide timely legal services to the Board and to all District Programs to assist in formulating and implementing District policies and projects in accordance with law. Key Projects 1. Real Property - Provide legal advice concerning District real property, including acquisition, disposition, title and encroachment issues, easement issues, permits to enter District land, and preserve maintenance issues. Anticipated major projects: LGCC v. MROSD (litigation concerning acquisition of Bear Creek Redwoods OSP); appellate proceedings ObermUer v. MROSD (Long Ridge OSP); trial in Richard v. MROSD (Thornewood OSP); revision of Pichetti Winery lease (Montebello OSP). 2. Risk Management - Process and monitor current claims and litigation against the District; refine risk management procedures; represent District's interests in insurance coverage matters; provide oversight of matters handled by outside counsel. Anticipated major projects: Trial in Moshell v. MROSD (drainage damage claims at Teague Hill OSP); Picha v. MROSD (appeal of civil rights claim alleged as result of arrest). 3. Human Resources - Assist in carrying out labor relations functions; serve as chief negotiator on District's bargaining team; negotiate successor agreement to current Memorandum of Agreement with Local 715; provide legal advice on personnel matters. 4. Coastal Expansion - Provide advice concerning legal requirements applicable to coastal annexation related issues in the LAFCO and CEQA process; develop mechanisms to adopt eminent domain policy in secure manner. Other Projects and Activities 1. Continue to provide legal research concerning historic parcels and chain of title to assist in resolving real property issues or in support of planning and acquisition projects. 2. Provide advice concerning legal requirements applicable to public agencies such as the Brown Act, conflict of interest, election law and the California Environmental Quality Act. 3. Assist Programs in bidding process and contract administration for public works and professional services contracts. 4. Prepare and review District legal documents such as contracts, resolutions, and leases. 5. Represent District's legal interests in relation to other government agencies. 6. Advise District on court rulings and legislation affecting the District and on legislation proposed by the District. 25 i Preliminary Draft of Planning's FY 2000/2001 Work Program Tasks for Remainder of FY N CDCD No. Project Preserve Staff Tasks for FY 2000/2001 1999/2000 �•• r N N N 7 F }'•` ,ram• ' L:on : tan a plann�n 1 Expansion of the District's Boundaries to Distrkt-wide RA,MF Coordinate and provide background Coordinate and provide informaton to Include the San Mateo County Coast information to consultant to initiate consultants for preparation of Service Plan, Service Plan. Prepare for,and attend Fiscal Impact Analysis,and environmental staff,ad hoc committee and CAC documentation. Organize and attend staff, meetings ad hoc committee,public,and stakeholder X X X X X X meetings and LAFCO hearings 2 Area Plan Sierra Azui MF, DV, Initiate consultant contracts for Phase 1: Complete Phase 1,Resource Inventory and Resource inventory; complete winter Assessment,focusing on natural and surveys and mapping,coordinate field cultural resources and existing roads. staff Input Provide resource management recommendations and constraints for planning.Initiate master planning process X X X X X X Involving staff,consultant.public and Board Input. Initiate preparation of environmental document. #�01 c;` and Procedures Rtanntn 3 Trail Use Policy and Guidelines Review District-wide RA, Senior Continue meetings with Board ad hoc Review and revise trail use policy Planner, AR committee to discuss Trail Use Policy. beginning with the development of District- Begin public meeting process to wide trill use designations. Upon develop District-wide trail use progress/completion,continue with:a)trail designations. use management,b)trail system planning, X X X X X X and c)typical trap design and layout standards 4 System for Laird Management,Use,and Disrict-wide All,plus other Staff committee to meet every 2 weeks Continue to meet ever 2 weeks. Goal is Access Decisions;(Groundwork for update of key staff to formulate basic system to formulate recommendations to Board. U&M Planning Policies) X X X X X X version 13 Page 1 Preliminary Draft of Planning's FY 2000/2001 Work Program tt. C-4 21 C31 0 0 0a Tasks for Remainder of FY C) U: 0 C4 C4 CD 0 cc Z 4 CD C4 C4 4 No. Project Preserve Staff 1999/2000 Tasks for FY 2000/2001 0) = = C 0 CD a) 0 ® Q C) L cc C4 44 C4 94 N 44 x W gg:g M -W--------- -------------- -H SO ............................ ......... Land-Management Support�� . ............... ...... 6 Permits to Enter General Dv,AR,DD Research,prepare,and monitor Research,prepare,and monitor Permits to Permits to Enter"removal,Sierra Enter.Coordinate with other Programs. x x x X x x AM conductoring,Neely) 6 Outside Project Review General RA, Senior Review other agency agendas, Review other agency agendas;research, Planner, research,comment,and testify on comment,and tea"on outside p"*xft Consultant,DV, outside projects per District Interests per District Interests MF,JC (Comment on Stanford Master Plan, x x x x x x Skylawri Mortuary,stc.,Alpine Road repairs) I I I 7 Grant Preparation District-wide DV,AR Prepare or assist on possible LWCF Prepare or assist on grant applications and graft application follow-up,Ind.NRTFA,HCF,EEM, LWCF,S.C.Co.Historic,do. x x x x 8 Kabcenell Property Development Windy Hill RA,Senior Review and comment on application to If Town approves Sks Development: Planner,JC Town for Site Developinart Permit for Permit,work with Acquisition to obtain access driveway. Board approval@ on project,coordinate access Muss during construct on,monitor X x x x development. 9 Krone-BMW Acquisition El Sereno RA,Consultant Solicit&cortract with engineer for Coordinate engineering consultant on preparation of asseserrient district preparation of assessment district documentation for water service. documentation. x x Geotech for landslide studies.Review documents&conditions. 10 Moshell Litigation Teague Hill RA,JC Provide research and testimony to Provide research and testimony to respond respond to lawsuit against District to Wwouft against District x x 11 Vineyard Lease Picchattl DV, Senior Assist Acquisition in development of a new Ranch Planner,JC vineyard Mom messith water system and rights,review public access and erosion x x control plans,prepare U&M Amendment version 13 Page 2 Preliminary Draft of Planning's FY 2000/2001 Work Program Tasks for Remainder of FY ►: N +� N *� N +: N •: +� N No. Project Preserve staff Tasks for FY 2000/2001 1 1998/2000 0 c ia o a H .- a M .r 12 Rancho San Antonio County Park Rancho San RA,JC,Savor Comment on"punch list"Item Assist in site management,improvement, Management Issues Antonio Planner neighbor coordination X X X X X X ResauirC� Mgt s @ : men :Penn n »:: ::.;:::.>`>: >:::> :>:>: « > : t. . &.Su orE 13 Resource Management Assistance DistrI t-wide MF,AR,DD Provide support to Resource Provide support to Resource Management j Management Specialist;mapping,aerial Specialist;mapping,aerial photos,GPS, photos,GPS,and advice on and advice on management or study management or study approaches. approaches.Participate on staff Resource Participate on staff Resource Management Committee,monitor and Management Committee,monitor and participate In regional resource X X X X X participate In regional resource management planning efforts.Prepare and management planning efforts. follow-up on resource planning grand applications. 14 Timber Harvest Review District-wits MF,DD Review WM%t Timber Harvest Plan; Review and comment on timber harvest work w!GM and Public Aftairs to plans that may impact District lands and X X X X X secure District rW to review such Intervals. plarne hom CDF ::ram.: .:`:'.""' .'?'t::r{;t :•h.: �:}`.}•: }.,- 'S:t;+u: ...?'fir.J?.• ;r•Stir,� 3` :f ?,+� t}�� f •_�}� '•`:�}:>• +:.tr.,•i'� �':v,.'�?k:�:t'?•�ti-:;x�.: ?,,Y,$.. :�,'�..:..`�,?.,:.y{'�.:'•.r,,} �' ••:•..r:.•:•.+s:,i::,S,:,., �' .j t ' .: ,r�':`'�.t,.r+{,.rt .t :. .:%}f...+�'r:?'. t: ;t:..•.:..`..: ,.r3•::..•} ,�::`{. r.; .s ..v. 'fit .t j•;•,t,. ;}}?. r.�' tr ....,+�..::t t:'..., ff5••'•• +. h ,{s,'`:..;r.fir e. k t r r: l ._3 { :•+vr h t :1' ;k•: .'•v{ .{ rfr •tr�t r.{w:r.'}.t +�fi.r�r t? �$} 4 ?�7r•:..r...il'•.�'ti} f. � r..f.}. :t r.tri'tr'.•: ::}•.:}rY:. {:r{ : r ...............r.........:.,.........,..........v..... •.. .r.,•. ..:.i... v .?.':..2?:..� : •'.r .. r.}''•.4v, r +.,.;��f.�v`'v�.•{+ { }.}? •. .. r.. v...r. ... {•: rr•.. 15 Trail Signs District-wide AR,Senior Coordinate sign program including Coordinate sign program kxAWMg layouts Planner layouts and placing orders. Preparation and placing orders. Preparation of X X X X X X of lamkhated signs,bulletin board laminated signs,bulletin board updates, updates,etc. etc. .4 Graphic Exhibits General AR,DD Coordinate graphic exhibits and naps Coordinate graphic exhibits and maps needed for reports,presentations, needed for reports,presentations, X X X X X X brochures,etc. brochures,etc. 17 Trail Signage improvements District wide AR,MF Evaluate trail directional signs to Based upon research and input,make determine effectiveness,identify key recommendations to Sign Committee. problems,and recommend solutions. Upon resolution of approach and approval X X Research materials,approaches used of recommendatkms,knplement changes by other agencies. as signs need to be replaced. i♦ version 13 Page 3 I ale t�r I Preliminary Draft of Planning's FY 2000 / 2001 Work Program y. o a o o floc Tasks for Remainder of FY N N C ` N N N No. Project Preserve Staff Tasks for FY 2000/2001 �j 1999/2000 aw o 0 0 0 0 .0 o C$ 40 w o N N N N N N N 18 GIS Program Development District-wide MF,AR,DD Continue development of mapping Continue development of mapping system system and procedures to trade and procedures to track DbtW*land DisA s land holdings,trails,facilities holdings,trails,facilities and their land their attributes;Integrate GIS with attributes;Integrate GIS with existing existing databases(dedication, databases(dedication,acquisition,others); X X X X X X acquisition,others);develop data layers develop data layers for use In DistrictAvide for use In District-wide and coastal and coastal annotation planning. annmostion planning. 19 GIS Training District-wide MF,AR,DD Provide staff with training to develop In- Provide staff with training to develop hn- haste expertise and to enhance GIS house expertise and to enhance GIS capabilities; establish shvKWdtzed capabilities; establish standardized mapping procedures; develop data mapping procedures; develop data X X X X X dictionary;establish large-format dictionary;establish targe-forrnat plotting platting capabilities. capabilities. 20 GPS Development District-wide MF,AR,DD Based on acquisition of unit,participate Pending purchase of GPS unit,train staff In GPS data collection at Sierra Azul for to use GPS technology In conjunction with initial training and overview of the GIS system for acquisition studies and technology encroachment mordorhng; resource X X X X X management/planning;and for trail planning applications. 21 Patrol Map Book Revisions District-wide MF,DD,AR Make necessary revisions to patrol map books for publication of updated version. X x X X 22 After Hours Signs District-wile AR,MF Upon prioritization of problem areas by field staff(Skyline and Foothft)and sign committee,work with local permitting X X agencies to post areas adjacent to District holdings as night-time"no parking"arm. :f . ... --. .. .•. . ...:....:::::..:...rr.,...r. . ? f$ '•{:{2rrr3rF:'•r',{..:•: ,�.::>r.?•:}a�k:`>:ti:?} :•?;,, y :.,ttfiiS,::ci• h .r.:,., .`:,.,?? •rr'�•? +{t••rtr>' : k.;�••: '��'?�'�^.�?: > x`' •4.+., , ...•k rt•:. f'':::�''4.:.fr �' t a... 'v''}.:: i`+.+v'•:+v:.v .:}"4.}•`h i'...b,.,a ? }' .,?'.'tr'i. v, ', }1v v vh 4^t• .A,,ry ':;p;•, , i'%'•{`viFi':'.•:?:f}%::r.. r: rN. .,{. '.,v:: ^Op;.•. ;f.. v ..•lv ,Y.•? , r,.v,.,+.•�''';.?+. r}.F..r:......v. h,r, ..vfi'vv•v 4. 'i .{..r ,J,�n'•'•:'i.J + f '•.•�f{.•n �}!�F ?iy{....f,....•,.n.+i•: •? }} � fr}};?: + ,r.ti•:' •:S" .e.h h ,l vv. ,} �: f.F,^;. ir, •4 •4 vv.. .......................... .....'r' { •r.'r.::.•:,r{.}v.;f.:r': ,f f $ v?•''•.v? �":: `$'. ?ix:??..::.vw::;•::.v:::.�:::.v::... ...hv:;.•:::•,::•?:..r...}.n,....+•: '•hr:.'+i..:::.L$}^v.•} ,r,Jr,r:.{•r• .+.;:'�'. v. f vv, .{..:'kvi. $ ."v. ... r r• .. . ... .......... ..... ....... ......... .... Sito 23 Miscellaneous Small Site Planning Projects Dishict-wide All,depending Paul Trail layout,Brooks Trail U&M Ravenswood wederid mitigation,Pulgas upon project amendment,FOOSP oak mitigation,RSA County perk coordination,Bay Trail coordination X X X X X X (Ravenswood),Cooley londhnp studies, etc. version 13 Page 4 I Prell inary Draft of Planning's FY 2000/ 2001 Work Program yy.. yy � oda. o � o � o t+- oo Tasks for Remainder of FY N *� N N .� N No, Project Preserve staff Tasks for FY 2000/2001 , o c o o 1999/2000 Z o C o o s o 0 'I NNN N d NN 24 Bench Siting(incl.U&M amendment) District-wide DV,RA With assistance from tkld staff, Obtain Board approval. develop a W of donor beach locations on appropriate preserves. Review with X X U&M Committee. 25 Employee Residence Bear Creek DV,JC, Senior Research pem*requirements for Redwoods Planner, Installation of mobile or modular unit. Arrange studies,tests and design;obtain Corn�nt Investigate utNitfes for potential P from S.C.Co.,and prepare bid X X X X X X Use. docurnents to develop a modular or mobile hams on the preserve. 26 Interim Access Improvements and Site Thornewood Senior Planner, Assess conditions,study needs, Pit or coordinate instal ion of new pre- Preparation-Procter Property Consultant,JC, coordinate with Town of Woodside and fab foot bridge&2 trail bridges,study and AR Woodside Trails Club for replacement designate trail alignments,identify needed of bridge. Coordinate demo of existing Improvements and clean-up,prepare naps X X X bridge by Town. and signs 27 Parking Lot El Corte de Senior Planner, Conduct evaluations of roadside Obtain Board approval on conceptual Madera AR,Consultant parking areas,potential parking areas design;prepare construction drawings; within preserve in preparation of U&M submit for permits. Seek available grant X X X Committee meeting. funding. 28 Grabtown Gulch Bridge(FEMA funded) Purlaima JC,Senior Determine disposition of Grabtown Gulch Planner, bridge. Retain structural engineer to Consultant evaluate potential bridge reuse&retrofit, including evaluation of Whittemore Bride aft. Evaluate potential for use at lover La X X X Honda Creek. Prepare plans,obtain permits as appropriate. 29 Fo othills Operations,Facilities Study/Shop Rancho San Senor Plantar Evaluate overall potential Foothil ls Building Upgrade s Seismic U rade Antonio Consultant facilities needs,with consultant Find consultant with corp yard experience. Make a determination to either retrofit existing shop building to improve X X X structural integrity,or design new shop Begin design work If appropriate. version 13 Page 5 Preliminary Draft of Planning's FY 2000 i 2001 Work Program o o o o o 0 Tasks for Remainder of FY +� N N N N N N No. Project Preserve staff 1999/2000 Tasks for FY 2000/2001 C o Q o o0 CD o o i V N N N N N N 30 Jacques Ridge Parking(depends upon Santa W.Umunhum DV,JC, Design 15-vehicle lot,restroom,and minor Clara County)-NRTFA funded Consultant, trail connections at Hides Road and Nit. Umunhum Road,based on concept plans from grant application QoInt project w/S.C. Co.Parks—need operating agreement). X X X Prepare bid documents,obtain permits. v.. .. .. „. .. {.: .. ...... ...... ....... ......, ..............:., ..:............,...... ..,... ,.. .r. .,•rr: >r� ..., .r ,.. , �<x~':,, -::::cs:�<xas'v,•• :..{r .,Y..,,...r ? :.?.r,:;,::dr :•f '`r•:'+.,�.,::+::;;.'•::.ht•.+:x,•:.,• ::•,-r. a?�' .v .�. {:. ? .;?.. ,{•,xn"ti,fir`•✓ ,{ ,.. ,�,^•:: .3• •?.. `*,• .rk�': :. +, :•••{•r:-^,,{rr.. �•,,•`•,. �``'w {q,}y,}}•{x..:.. •i ..X.v,{. ...4.:'x..{`%:xi•}:;:•:,;, ....{....r.'ry::v::.v: rv+?. •rx-:?r. 4:{,'• - r.�••. .,h-:,•v.v :.'x '{',•.•.v 4x�. ,.'v. :r$'.:Y.•.. v : `., .' 1 •:.y •.`',.$.,, :ti r k..' :. ,•:r:::..:......S'f r r \ `• ,•{,{::,, ,• <•.•- .;,. ht ,k•,+ .:;etc.e" +,. {rRt•:<. r..{:i•..,, •es,.:..^p::xxh`e�:•.•.:r :•a... f.:?:t `-, `„ '+. .Kr' •,,. ^{ r..., •r.. } �k ->':?k,;x..a::::::.:;:,•:::r,::::: :•:::::.:::::::::::;..,.,.:tf::x.sfi`•,,,:.,.:k,.:.•`.•x •:.x,,:t::.:...,...::.•: ^.+'.•:..s�:•::,'::.,•��rx,+r..... .............. •4`{+.`;:,.,,'`h,,xh.h�'.v.•�.•.`•, ....... :c•.,, .,6 r:.-:. ...'r.^., .hit,.. ?. .rr:+..: f: `, F > 31 Red Bam La Honda JC,Senior Prepare bid documents,obtain permits, Planner bid,and construct repairs to cupola, replacement of roof on red bam,Including X X X X evaluation of historical significance. ::ParkingAreas: Structures 32 Administration Office Improvements Distel Circle JC,RA Coordinate architect's cor*vd for Upon receipt of permits,coordinate improvements to accommodate contract to remodel administrative office to expanding staff. Based on Board address immediate staff needs&utilize X X X authorization,solicit&select contractor.portion of lease space. _,..i o d Tra> s/Ras, . 33 Alpine Road Bypass Coal Creek Senior Planner, Use&Management Plan arnendment Use&Management Pion amwxIment AR preparation and approval. , preparation. Upon designation action by Board,construct bypass trail;Including restoration of offshoot trait and steep X X sections. [Crew Project] 34 Lawrence Creek Bridge(NRTFA funded) El Corte de JC,Consultant Determine approach,prepare Upon completion of design work and Madera engineered drawings for submittal to receipt of necessary permits,repair County for permits. Submit. footings for Lawrence Creek Bridge, X X X Including minor creeltbank restoration. version 13 Page 6 Preliminary Draft of Planning's FY 2000/ 2001 Work Program yy.. � C � O t c t c t o o No. Project Preserve staff Tasks for Remainder of FY Tasks for FY 2000/2001 N N N ,� N 9 N N 1999/2000 Ct40 tC" o co '! o boo a r N N N e) N N tV 36 Virginia Mill Trail&Creek Crossing(FEMA El Corte de Consultant,JC, Determine beat approach to repair Upon receipt of permits,solicit bids,award funded) Madera Senior Planner stem damage. May Include landslide contract,construct improvements. repair,rye-routing trall,and/or clearing log jam,possible trall bridge. Pursue X X X X Permits as necessary. 36 Methuselah Creek Crossing(NRTFA funded) El Corte de JC,Consultant, Complete engineering to design Upon completion of design of footings& Madera Senor Ptanr footings. Submit to County for building receipt of permits,bid&award contract,& Permit. oonskuct trail bridge across El Corte de X X X X Madera Creek. (Crew Project) I S7 Grabtown Gulch Trail,Incl.trail bridge(FEMA Puri sima AR,DD,JC, Prepare application to RCD. Submit for Lay out trail between Grobtown Gulch and funded) Senor Planner permit. Borden Hatch on north side of Puristma Creek(Ind.trail bridge).(Crew project) X X 38 Trail Realignments,Closures and Restoration El Corte de Senior Planner, Obtain"blanket"permit(RCD or S.M. Work with field staff to prioritize (NRTFA funded) Madera Consultant Co.). realignments and restoration work as Identifled in the Trail Use Plan for the Preserve. Complete high priority projects. X X X (Crew project) 39 Review Trail Use Plan St.Joseph's DV,MF,Senior Prepare U&M reports and coordinate crew Hill Planner project to realign,or close and restore portion of Segment 19;construct adopted trail on north side of hilltop,and realign X X steep section of ball between flume and Jones Trail. 40 Realign Certain Trails In Conjunction with Windy Hill AR,DD If construction of the alternate driveway Is Kabconell Driveway Improvements approved,the trap linking the Willowbrook gate with Spring Ridges Trail will reed to realigned. Other minor trails as necessary. X [Crew k ] version 13 Page 7 Preliminary Draft of Planning's FY 2000/ 2001 Work Program Tasks for Remainder of FY N v N N ; N N No. Project Preserve Staff 1999/2000 Tasks for FY 2000/2001 w o a a a 40 7) o Vo 'Eo 400 � V. PNNN �� N CNN scellaneou >.l rove eats ` I Site Preparation' Bear Creek RA,JC,DD, Coordinate of Tripp house, �p�e prof if not p�FY.41 . Redwoods Consultant OUtI >D a� *Weds,site desnup, n0 e*bsdos determination and removal(if X X necessary),obtain demo pennit from S. C.Co. Bid project and coordinate contractor cdeanup. 42 Backpack Camp Monte Bello AR,JC,Senior Develop water source(Wd.Inckiding City Planner of Palo Alto permits) tndude Irrigation system for plantings new group site. X X X version 13 Page 8 Contract Services and Capital Improvements: Projected Expenses for FY 99/00 & Proposed Budget for FY 00/01 Rev.022800 Adopted Total Projected proposed FY00/01 Project Preserve Proposed Tasks FY 94l00 Budget Expenses FY Budget 99100 i w GRAPHICS DESIGN/DISPLAY(Budget Code 5202) Computer Mapping System General Outside computer mapping services 7,500 1,900 2,500 Sub-total 7,500 1,900 2,500 PLANNING CONSULTANTS(Budget Code 5206) Coastal annexation service plan and EIR,other mist. 328,000 100,000 100,000 Coastal Annexation (budgeted @ 50%) General consulting tasks as needed CIS Program Development General Digital maps and associated information 10,500 8,630 7,700 Trail Use Policy&Guidelines Review General 50,000 610 Review outside projects for impacts on District lands Outside Project Review Genera! 1,000 4,000 Planning Team Development General Consultant on team business methods 7,500 3,560 2,500 Conduct resource inventory and assessment for 50,000 36,500 88,000 Area Plan Preparation (budgeted @ 50%) Sierra Azul Phase I of area plan preparation Pinto Way Lot Line Adjustment Teague Hill 6,625 Unanticipated Pln'ing&Eng'nring Consultants General 2,400 Unanticipated Pln'ing&Eng'nring Consultants ISkyline 5,000 1,050 5,000 Unanticipated Pln'ing&Eng'nring Consultants Foothills 5,000 50 5,000 Sub-total 456,000 160,425 212,200 OTHER PROFESSIONAL SERVICES(Budget Code 5299) Prepare various development grant components and 2,500 205 2,500 Grant Preparation General follow-up. Planning share of expense to correct patrol map 1,500 2,100 Patrol Map Books General books Other FEMA Services General 2,150 Unanticipated Professional Services General 5,000 3,135 3,000 Sub-total 9,000 5,490 7,600 Page 1 A Contract Services and Capital Improvements: Projected Expenses for FY 99/00 & Proposed Budget for FY 00101 Rev.022800 Adopted Total Projected Proposed FY00/01 Project Preserve Proposed Tasks FY 99100 Budget Expenses FY Budget 99/00 SITE PREPARATION EXPENSES(Budget Code 8110) --]-Msc .na.ticipated site cleanup 5,000 1,000 Site Cleanup-Unanticipated locations General Sub-total I 1 5,000 1,000 0 STRUCTURES-EXTERIOR/INTERIOR(Budget Code 8201) Two seasonal exterior exhibits 1,500 3,330 4,000 Nature Center Skyline Ridge Conduct facilities study for Foothills Operations;may include seismic upgrade of existing shop building 40,000 Foothills Operations Facilities Study/Seismic Upgrade Foothills Improve drainage to protect foundation and chimney Rancho San of Annex 20,000 Improve Drainage around Annex Antonio Bear Creek Engineering studies;permits 10,000 45,000 Employee Residence Redwoods Sierra Azul Employee Residence Mt. Umunhum 125,000 Diesel Tank for Skyline Field Office Skyline Ridge 10,000 22,930 La Honda Restore cupola and replace roof on red barn 21,000 Red Barn Creek Unanticipated Structures Expenses General 0 880 Sub-total 136,500 37,140 130,000 WATER(Budget Code 8204) Back pack Camp Imonte Bello I Well location siting;drilling 15,000 Sub-total 0 0 15,000 SEWER I SEPTIC(Budget Code 8205) -Replace Restrooms Purisinia Creek Complete installation of restro(An 46,250 48,515 4,000 Replace Restrooms Skyline Ridge Complete installation of restroom 46,250 48,515 4,000 Replace Restroom Rancho 47,500 36,370 Unanticipated restroorn expense lGeneral 1,235 Sub-total 140,000 134,635 8,000 Page 2 Contract Services and Capital Improvements: Projected Expenses for FY 99/00 & Proposed Budget for FY 00/01 Rev.022800 4. Adopted Total Projected Proposed FY00/01 Project Preserve Proposed Tasks FY 99/00 Budget Expenses FY Budget 99/00 PARKING AREA(Budget Code 8207) El Corte de Upon approval,prepare construction drawings, 25,000 25,000 Parking Lot Madera obtain permits. Soda Springs Parking&Trail Plan Kennedy Area 5,000 Redesign Parking Lots to Improve Drainage Russian Ridge 32,000 37,950 Redesign Parking Lots to Improve Drainage Los Trancos 25,000 30,000 Jacques Ridge Parking Mt Umunhum Design and obtain permits 25,000 Improve Drainage within Parking Lot lWindy Hill 1 15,000 Unanticipated parking area expenses lGeneral 130 Sub-total 87,000 83,080 50,000 TRAILS and ROADS(Budget Code 8209) El Corte de Restoration of closed routes and realignments based 30,000 10,000 Trail Improvements Madera on priorities(to be determined) Grabtown Gulch Bridge Purisima Creek Determination of reuse/relocation,design 30,000 9,015 30,000 Storm Related Repairs General 20,000 11,340 El Corte de Road&Trail Inventory Madera 5,000 8,500 El Corte de Prepare plans,obtain permits,construct 30,000 1,965 17,500 Methuselah Trail&Creek Crossing Madera El Corte de Prepare plans,obtain permits,construct 8,000 3,000 85,650 Virginia Mill Trail&Creek Crossing Madera Pending approvals,realign trail Brooks Trail Realignment Fremont Older 3,000 Follow-up work on 1999 repairs 200,000 177,690 25,000 Purisima Creek Road Purisima Creek Old Page Mill Road Skyline Ridge I 5,000 Upper Patrol Road La Honda 4,650 9,760 El Corte de Design footings;repair 10,000 15,000 Lawrence Creek Bridge -Madera Bear Creek Improvements to roads and trails[ 560 20,000 Bear Creek Redwoods Redwoods I Page 3 Contract Services and Capital Improvements: Projected Expenses for FY 99/00 & Proposed Budget for FY 00/01 Rev.022800 Adopted Total Projected Proposed FY00/01 Project Preserve Proposed Tasks FY 99/00 Budget Expenses FY Budget 99/00 Permit from RCD;construct trail,incl.foot bridge 5,000 Grabtown Gulch Trail Purisima Creek St.Joseph's May entail closure/realignments;new construction Implement Trail Use Plan Hill 2,000 If alternative driveway is approved,realign connector Realign Trails:Kabcenell Driveway Improvements Windy Hill trail(Spring Ridge-Willowbrook) 2,000 Upon approval,construct trail to bypass Alpine Road closure,restore other routes in area 2,000 Alpine Road Bypass Coal Creek Permits;construct trail bridge,trailhead&stile 65,000 Interim Access Improvements-Proctor Fhornewood Unanticipated 21 Unanticipated trail or road expense lGeneral ,710 Sub-total 342,650 243,540 282,150 SIGNS(Budget Code 8210) Mapboard Trailhead Signs-Updates General Map printing, lamination. 3,000 3,000 3,000 Signs are designed and/or ordered on an as-needed Foothills Preserve Signs-Misc. General basis. 7,500 4,000 7,500 Signs are designed and/or ordered on an as-needed 7,500 6,000 7,500 Skyline Preserve Signs-Misc. General basis. Prioritize problem areas;obtain permits,install signs After Hours Signs General 1,500 1,500 Mapboard fabrication,installation(2 sets) 1,500 1,500 Mapboard Trailhead Signs Ravenswood Sub-total 21,000 14,500 19,500 PROTECTIVE BARRIERS(Budget Code 8211) Stock for small scale improvements. Foothills Fences&Gates General 1,500 3,000 5,000 Skyline Fences&Gates General Stock for small scale improvements. 1,500 1,500 1,500 Bear Creek Fence and gate stock to secure site Misc.Fences and Gates 0 24,500 5,000 ,Redwoods Sub-total 3,000 29,000 11,500 Page 4 Contract Services and Capital Improvements: Projected Expenses for FY 99/00 & Proposed Budget for FY 00/01 Rev.022800 Adopted Total Projected Proposed FY00/01 Project Preserve Proposed Tasks FY 99/00 Budget Expenses FY Budget 99100 DEMOLITION(Budget Code 8213) Permits,demo contract Bartels Clean-up Mt.Umunhum 10,000 685 Permits,demo contract Calvillo Clean-up Mt.Umunhum 7,500 Bear Creek Demolish agricultural sheds,incl.Tripp house(does Building Demo&Site Clean-up Redwoods not include college buildings) 5,150 54,000 Unanticipated Demo Projects lGeneral 0 0 25,000 Sub-total 10,000 13,335 79,000 MISCELLANEOUS(Budget Code 8299) Handicapped Parking Stalls General 2,500 Norton Bench Los Trancos 3,800 3,400 Eberhardt Bench Skyline 3,500 Unanticipated Projects lGeneral 5,000 1,020 Sub-total 11,300 7,920 0 Total 1 1,228,950 731,965 817,450 Page 5 Regional Open !. ice MIDPENINSULA REGIONAL OPEN SPACE DISTRICT R-00-32 Meeting 00-05 March 8, 2000 AGENDA ITEM 2 AGENDA ITEM Initial Presentation of the Budget for Fiscal Year 2000-2001 ASSISTANT GENERAL MANAGER'S RECOMMENDATIONS 'Ceccz,_ 1. Review the proposed budget for the 2000-2001 fiscal year. 2. Approve the Proposed Budget Guidelines for Board Conference Attendance. The proposed budget for the 2000-2001 fiscal year will be presented again at your March 22 meeting for final consideration and adoption. The controller's annual report will be presented at the March 22 meeting. The Administration and Budget Committee will report to you at the March 22 meeting. DISCUSSION Overview This report presents the proposed expense budget for the April 1, 2000,through March 31, 2001, fiscal year. Staff will review the proposed budget at your March 8 meeting. The proposed budget for the 2000- 2001 fiscal year currently totals $33,235,331 and breaks down as follows: Land Purchases $20,000,000 Debt Services $6,078,811 Operating Expenses $6,331,120 Public Access Improvements $490,150 Staff Facility Improvements $207,000 Coastal Annexation $128,250 The proposed$6,331,120 operating budget does not include any cost-of-living or other salary adjustments for employees represented by S.E.I.U. Local 715 and office, supervisory, and management staff. Because of union negotiations, and pending review of the salary and benefit classification study, exact adjustments are not known at this time, but will be brought back to the Board at a later time. In past years, estimated expenses have been included for various employee benefits. Because of the District's April I fiscal year start date, and the pending status of union negotiations, exact contribution rates are not known at this time, but will be brought back to the Board at a later time. 330 Distel Circle . Los Altos, CA 94022-1404 e Phone:650-691-1200 FAX:650-691-0485 . E-mail: mrosdr+openspace.org • Web site:www.openspace.org Board of Directors:Pete Siemens,Mary C.Davey,led Cyr,Deane Little,Nonette Hanko,Betsy Crowder,Kenneth C.Nitz 9 General Manager:L.Craig Britton R 00-32 Page 2 The District's general insurance costs (liability,property, auto,etc.)have been estimated for purposes of this report. The overall insurance package will be presented at your March 22 meeting, and the actual premium amounts will be included in the final budget report. At this time,the proposed budget does not include funding for the potential management and operation of Rancho San Antonio County Park in the operating budget. If negotiations are successful, and the Board determines to undertake this project, staff will recommend a budget augmentation for Board review in conjunction with any approval of the Rancho San Antonio County Park management agreement. The proposed operating budget represents a 5.24%increase over the fiscal year 1999-2000 adopted budget. This budget includes the proposed addition of five new full-time positions,the change from half-time to two-thirds time for the Network Specialist,and a change from two-thirds time to full-time for the Administrative Assistant/Human Resources position. The operating budget excludes expenses relating to the Coastal Annexation($128,250). Staffing Changes Proposed in this year's budget are the addition of five new positions and minor changes to two existing positions,as illustrated in the chart at the end of this narrative section. Detailed explanations by program area,including justifications for the addition of new positions are as follows: ■ Planning Program Propose to add Planner I position: The original draft 2000-2001 fiscal year budget included funding of $31,500 for approximately half-time contract planner assistance on 13 projects and tasks. In comparison, the current salary and benefit cost for the proposed additional Planner I position for 9 months is$35,765. A full year would be$47,687. These additional salary and benefit costs would be significantly offset by the reduction in ongoing contract planner costs,which have been deleted from the budget based on the assumption that the additional position would be provided. As an alternative to hiring permanent staff,the use of contract planners has several serious disadvantages that have combined to prevent Planning from being able to initiate and coordinate contract planners effectively on projects and to spend the full amounts budgeted. ■ Operations Program Propose to add two(2)full-time Supervising Patrol Ranger positions, and two(2)full-time Lead Open Space Technicians. Staff proposes the addition of two Supervising Rangers (Patrol)and two Lead Open Space Technicians,for a total of four new positions in the 2000-2001 fiscal year. These additions were discussed with the Administration and Budget Committee,and reviewed by the Board at your February 9, 2000,meeting,as part of the Operations Program Five Year Staffing Plan(see report R-00-24). These additions are recommended to meet the needs of field staffs increasing workload,and to manage the growing number of acres of land owned or managed by the District. ■ Administration Program Propose to increase Administrative Assistant position from 60%to full-time: The Administrative Assistant is a confidential position,integrally involved with all aspects of human resources, including benefits administration,hiring,discipline,union negotiations,etc. With more recruitment and subsequent demands on human resources,increased confidential and specialized support is needed. Increasing the Administrative Assistant from two-thirds to full time will provide needed daily support and consistency in administering the human resources program. R-00-32 Page 3 Propose to increase Network Specialist position from half-time to 60%time: Daily routine maintenance and troubleshooting of the District's computer hardware and software systems has been consuming approximately 15-20 hours per week,at the main office alone. With the initiation of email capabilities at the field offices in 1999-2000,there has been an increasing need to provide ongoing support to the field as well. This, in addition to providing support for the District's network upgrade,will assume a greater role in the overall administration and proactive adaptation of the District's computer resources. The minor increase in the Network Specialist's hours will ensure that the technical and support needs of both the main office and field offices are met. A summary of the proposed staffing changes is shown below. PROPOSED STAFFING CHANGES,2000-2001 BUDGET Position Planning Operations Administration Supervising Patrol Rangers 2 NEW Lead Open Space Technician 2 NEW Planner I NEW Administrative Assistant Increase from 60%to full-time Network Specialist Increase from 50%to 60% Proposed total full time equivalent increase in positions: Five and one-half(five full-time;one half-time) Target Average Six Percent Budget Growth Guideline for Operating;Expenses The Board initially approved the target average 6%growth guideline for District operating expenses on September 28, 1994(see report R 94-100). Operating expenses were defined to include salary and benefits, services and supplies, and fixed assets. The cost of capital improvements relating to public access and staff facilities were excluded from the operating expenses growth guideline. The guideline was implemented during lean tax revenue years and designed to be a target average allowing,for example,one year to be 5%and the next year to be 7%. During the 1999-2000 budget review process,the Board reviewed and revised the 6%budget growth guideline. The revised guideline generally reflects the original 1994 guideline,but better defines operating expenses and special projects that may be considered outside of the guidelines. Under the revised 6% budget growth guideline,operating expenses include salaries and benefits, services and supplies, and fixed assets associated with the administration of the District's five programs. Expenditures for land acquisition, capital improvements (including public access,field staff and administrative facilities),and special projects are considered outside operating expenses. Special projects are non-routine large-scale projects that have a cumulative expense of over$100,000,which may or may not result in major shifts to programs,or staff increases. Examples include the coastal annexation study and recovery from a major natural disaster. Since 1994,the only exclusion for special projects are those relating to coastal annexation;$378,165 was excluded in the 1999-2000 adopted budget. The 2000-2001 proposed operating budget is$6,331,120 and has been adjusted to exclude$128,250 for annexation expenses. The adjusted operating budget is 5.4%over the 1999-2000 adopted operating budget but does not,as yet, include adjustments for salaries and benefits. The Rancho San Antonio County Park management expenses have been excluded from the operating budget because it is not known,at this time, R-00-32 Page 4 whether or not the District will assume the management responsibility for the park. Although the expenses would be offset by a one-time contribution by the County of Santa Clara to the District's general fund,the annual expenses would be significant enough that consideration should be given to excluding them from the operating budget or adjusting the 6%budget growth guideline upward. The guideline has been adjusted upward on only one occasion in 1998-1999 when the resource management program was shifted from the capital improvement program to the operating budget. Increases in adjusted operating budgets and expenses,as compared with the guideline,are shown in the following table: FY 95-96 FY 96-97 FY 97-98 FY 98-99 FY 99-00 FY 00-01 Operating Budget >.9% >3.8% >10.3% >11% >7.4% >5.2% Growth Actual& >1.9% >4.1% >6.7% >11.5% >8.8% >4.7% Projected Expense Growth Over the six-year period since the implementation of the 6%budget growth guideline,growth in the operating budget has averaged 5.7%per year when compounded annually. Over the five-year period ending in 1999-2000,growth in actual and projected expenses will also average 5.7%. A graph of the six- year growth and additional two-year projections is shown in Attachment A. Budget Review Process The 2000 Administration and Budget Committee,composed of Directors Cyr(committee chair), Siemens, and Davey,reviewed the proposed budget on the Board's behalf during a series of six open,publicly noticed meetings in February. The committee work included reviewing the proposed Action Plan for each program,the proposed 2000-2001 budget by program and category expense groupings(as well as by major projects and activities),the 1999-2000 projected expenditures, and the 6%budget growth guideline for District operating expenses. The committee members received for their review detailed sub-account printouts for all the detail line items included in the proposed budgets. Controller M. Foster met with the committee on February 25 to discuss projected revenues,debt service, and a District cash flow analysis. The Controller's report will be presented to the Board separately at the March 22 meeting. The Administration and Budget Committee will present their report to the Board at the March 22 meeting. Proposed Program Budgets The following section on the 2000-2001 proposed budget is presented by program to facilitate your review. Attachment B of this report shows in detail the 2000-2001 proposed budget broken down by program and major expenditure categories. R-00-32 Page 5 1. OPEN SPACE ACQUISITION AND LAND PROTECTION PROGRAM 99-00 Adopted 99-00 Projected 00-01 Proposed Budget Exp. Budget Salaries&Benefits $250,450 $238,700 $275,400 Services&Supplies 88,950 89,060 113,580 Fixed Assets— Operating Expenses 173,000 1401900 137,600 Enterprise Subprogram 117,950 110,975 111,775 Debt Service 5,547,000 5,921,901 6,078,811 Land 20,000,000 21,025,000 20,000,000 TOTAL $26177 350 $27 526 536 $26 717166 The 2000-2001 proposed budget for Open Space Acquisition Program is$26,717,166,a 2%increase over the 1999-2000 adopted budget. Excluding debt service payments,the Acquisition Program budget is $20,638,355. Controller M. Foster indicates that$20,000,000 would be available in 2000-2001 for acquisition of land. Salaries and benefits represent a 9.96%increase over the 1999-2000 adopted budget as a result of the first full-year of funding for the Land Protection Specialist. The Acquisition Program's emphasis during 2000-2001 is to continue focusing efforts on securing high priority properties and completing several grant-funded acquisition projects. With the addition of the Land Protection Subprogram,there is a 32%increase over the 1999-2000 adopted budget for services and supplies to conduct engineering studies and environmental assessments. This subprogram focuses on the protection of property rights of new and existing open space lands. Fixed asset expenses directly related to land acquisition,such as appraisals, site engineering,escrow fees, title insurance, and legal fees are budgeted at$125,000. This is a 26.7%decrease from the 1999-2000 budget,and reflects a reduction in legal fees. In addition,$12,000 is included in fixed asset expenses for capital improvements to the Distel office building and$600 is provided for office equipment. Improvements to the Distel office are not included in the operating budget. Debt service payments are 9.6%above the 1999-2000 adopted budget,as a result of the two new note issues during 1999. Debt service for principal repayment and interest on the District's land contracts and note issues is budgeted at$6,078,811 for the 2000-2001 fiscal year. This amount includes the final $25,000 installment of interest-free principal payment for the acquisition of the Urrere property in Sierra Azul Open Space Preserve. The 2000-2001 proposed budget for the Enterprise Subprogram is$111,775. The subprogram's proposed budget is divided into two major areas: 1)ongoing regular enterprise activities,and 2)expenditures related to the District's administrative office building. Funds budgeted for ongoing,regular enterprise activities reflect a decrease of 5.2%below the adopted 1999-2000 budget. Operating expenses for the office building are budgeted at$30,125 for the tenant space and will be handled in a separate facilities account within the Enterprise Subprogram. Operating expenses for the portion of the building occupied by the District are included in the Administration Program. R-00-32 Page 6 In 1999-2000,projected net income from the District's enterprise properties is$626,230,an increase over 1998-1999 income of approximately 3.1%. Net income for fiscal year 2000-2001 is projected at $683,000,a 9%increase as a result of leasing the Distel office space at current market rental rate,and the new Bear Creek stables lease. 2. PLANNING PROGRAM 99-00 Adopted 99-00 Projected 00-01 Proposed Budget Exp. Bu et Salaries&Benefits $453 300 $432,775 $507,550 Services&Supplies 498,500 187,435 252,290 Fixed Assets— Operating Expenses 4,250 15,700 5,600 Staff Facility Improvements 135,000 32,930 105,000 Capital Improvement Projects 621,450 531,720 490,150 TOTAL $1 712 500 $1 200 560 $1 360 590 The 2000-2001 proposed Planning Program budget is$1,360,590 and represents a 21%decrease below the 1999-2000 adopted budget of$1,712,500. The proposed decrease is primarily due to decreases in services and supplies and capital improvement projects. The Planning Program's proposed operating budget for 2000-2001 is$765,440 and represents a 20% decrease below the adopted 1999-2000 budget. Discounting the coastal annexation expenses of$361,665 for 1999-2000,which were exempted from the budget guideline as a special project,and$100,000 for coastal annexation expenses in 2000-2001,the numbers represent an 11%increase over the adopted 1999- 2000 budget. The operating budget is comprised of salaries and benefits,services and supplies,and fixed assets relating to office equipment. Two percent of the increase in the operating budget is due to the proposed addition of an Open Space Planner I position,budgeted at 9 months of the fiscal year,or $35,765. Background and justification for this additional position is provided later in this section of the report. Major planning projects involving significant consultant contracts make up a substantial part of the services and supplies budget,and thus impact the operating budget. The Sierra Azul Area Plan is an example. This project will serve as a pilot study for how to fully consider resources in preserve plans, in accordance with the Resource Management Policies adopted in 1994. Environmental consultants are currently working to collect the necessary baseline field data that will assist in the subsequent planning process. This project is anticipated to require extensive Board committee discussion and public participation,and continued planning consultant assistance. The estimated cost of consultant services in FY 2000-2001 is$176,000. The second major project in this budget category is the Coastal Annexation Study. Consultants are currently preparing the draft Service Plan, and getting ready to start the Fiscal Impact Analysis and Environmental Document. The estimated cost of consultant services is$200,000. Because there is a history of delays and under-expenditures on these and other large,complex planning projects,these two projects are budgeted at 50%of the actual anticipated expenditures,or$88,000 and $100,000, respectively. As part of efforts to manage overall District budget growth, a budget guideline of$600,000 per year for capital improvement projects(CIP)was introduced in 1994-1995. This cap was reduced to$500,000 beginning in 1998-1999 to account for the transfer of the resource management program from capital improvements to the Operations Program operating budget. Grant income is considered above the i R-00-32 Page 7 $500,000 growth cap,allowing capital improvement budgets to exceed the cap by the amount of actual development grant income. In October 1998,the Administration and Budget Committee reviewed the CIP budget guideline for public access facilities,and agreed with staffthat the$500,000 guideline should be adjusted from a 3-year average to a 5-year average,to distribute the impact of substantial short-term fluctuations that ordinarily occur in the program. The 2000-2001 budget was prepared using this methodology. At the same time,the Committee reviewed a staff recommendation to establish a guideline for capital improvements relating to field staff and administrative facilities. Prior to this,only public access facilities were subject to a guideline. A guideline of$150,000 averaged over a 5-year period was established. This budget was developed using this guideline. Attachment C outlines the guideline for the capital improvement program,and shows the five-year figures for field staff and administrative facilities. The 1999-2000 staff facility improvements budget of$135,000 included development of an employee residence in the Mt. Umunhum area of Sierra Azul,and installation of a diesel fuel tank at the Skyline field office. The diesel fuel tank installation is complete. The employee residence project was dropped when staff secured a nearby rental residence that could serve the same purpose. The 2000-2001 staff facility improvements budget of$105,000 includes projects to conduct a facilities study for the operations program in the Foothills Area, structural improvements to the Annex at Rancho San Antonio,and engineering studies to construct an employee residence at Bear Creek Redwoods. Budget for remodeling of the Administrative offices is contained in the Administration budget Attachment C shows the 5-year figures for capital improvement projects with the adjustments for development grants and FEMA reimbursements. The 2000-2001 proposed CIP budget is$490,150. Subtracting the projected development grant income of$35,000,and projected FEMA reimbursements of $149,340,the adjusted CIP budget is$305,810. Averaged over a 5-year period,the CIP budget is $392,752,which is 21%below the allowable guideline of$500,000. Projected grant income for 2000- 2001 is for additional El Corte de Madera Creek trail improvements and FEMA projects. Actual FEMA reimbursements for 1999-2000 total$131,018. ° amount f 621450. - 00 projected CIP expenses are 531 720 or 14/o below the budgeted amo O $The 1999 2 0 o ected C S P J l� � g This projected under expenditure is due to cost savings on the Purisima Creek Road repair project and several projects that did not move forward this fiscal year for a variety of reasons. The projects include the design of parking for El Corte de Madera Creek,and repairs to Lawrence Creek bridge, also at El Corte de Madera Creek Open Space Preserve. Key CIP projects for 2000-2001 include additional FEMA repair projects at Purisima Creek Redwoods and El Corte de Madera Creek,building demolitions and road and trail improvements at Bear Creek Redwoods,and parking lot designs for El Corte de Madera and the Jacques Ridge area.of Sierra Azul Open Space Preserve. Justification for Additional Planning Staff The need for an additional staff position in the Planning Program is based upon increased workload. Several specific factors have caused workload to increase dramatically over the past few years: ■ Continued strong land acquisition efforts, including some lands with significant existing facilities and public use that require intensive planning and management over several years. R-00-32 Page S ■ Legal and land management issues related to encroachments and disputes about management responsibility have dramatically increased. ■ Several serious storm events causing extensive damage to roads,trails and bridges,and a multi-year backlog of major projects. The District has taken advantage of opportunities to obtain FEMA funding to cover at least a part of the repair cost,but this has required a dramatic increase in staff time to manage the grants and projects. ■ Increased efforts to create or update policy for land use and management have been needed due to growing public use and recent District experience(ADA,resource management,dogs,rock climbing, hang gliding,pigs,invasive vegetation,trail use, resource-based master planning and many internal procedures). ■ Two new field offices have been planned and constructed,an expansion and remodel of the main office space is currently underway,and many other staff facilities and infrastructure projects have been completed or are underway. ■ The Coastal Annexation Study. ■ Specific public access planning and implementation has continued,but at a reduced rate due to the above priorities. The projects that have been undertaken are almost exclusively based on grant funding. The District has always hired contract planners to help address excess workload until additional staff is warranted and feasible. Contract planners are persons with general planning or design background,as opposed to specialized planning or engineering consultants. They tend to be people who are looking for either permanent employment or temporary,part-time employment. The District typically pays between $30 and$50 per hour for contract planner services,compared to$75 to over$100 per hour for specialized consultant services. Because of their mobility and temporary situation,contract planners are typically hard to find and keep. The budget for contract planners is carried in the individual project budgets or in budget categories for unanticipated projects. The 1999-2000 fiscal year budget included funds for a half-time contract planner to compensate for staff time on the Coastal Annexation project,and for help on several FEMA repair and other construction projects. The original draft 2000-2001 fiscal year budget included funding of$31,500 for approximately half-time contract planner assistance on 13 projects and tasks. In comparison,the current salary and benefit cost for the proposed additional Planner I position for 9 months is$35,765. A full year would be$47,687. These P Po 1� Y additional salary and benefit costs would be significantly offset by the reduction in ongoing contract planner costs,which have been deleted from the budget based on the assumption that the additional position would be provided. As an alternative to hiring permanent staff,the use of contract planners has several serious disadvantages: ■ Contract planners have often been unavailable at the times or to the extent needed,and have sometimes terminated the relationship,leaving the District with no alternative but to hire expensive consultants to do the work. R-00-32 Page 9 ■ The District makes an investment in orienting these persons about the District in general,and on specific projects and procedures,but often does not benefit from a long-term relationship. ■ IRS regulations preclude having these persons work regularly on site or in the role of staff,and it has been very difficult to coordinate with contract planners on complex,changing projects when they cannot be present in the office on an ongoing basis. ■ Since they are not employees,contract planners cannot do many necessary tasks,such as communicating to the public about the District,reviewing or authorizing expenditures,or preparing official letters or reports. The above factors have combined to prevent Planning from being able to initiate and coordinate contract planners effectively on projects and to spend the full amounts budgeted. Overall,workload and economics indicate that the District would be better served by adding an additional Planner I position than by continuing to rely so heavily on contract planning services,given the current demonstrated need for a full-time staff member. 3. OPERATIONS PROGRAM 99-00 Adopted 99-00 Projected 00-01 Proposed Budget Exp. Budget Salaries &Benefits $2,360,250 $2,274,065 $2 424,550 Services &Supplies 712,900 763,262 820,450 Fixed Assets— Operating Expenses 194,700 196,447 211,500 TOTAL S3,267,850 S3,233,774 S3,456,500 The 2000-2001 proposed budget for the Operations Program is$3,456,500. The addition of two Lead Open Space Technicians and two Supervising Ranger(Patrol)positions accounts for the greatest percentage of growth in the Operations budget. Priorities for the 2000-2001 proposed budget include the continued growth of the Operations Program to address the acquisition of new lands and increased public use of existing lands. Growth of the Resource Management Program continues to out-pace the balance of the Operations Program. At this time,the 2000-2001 proposed budget does not include funding for the management and operation of Rancho San Antonio County Park in the operating budget. If negotiations are successful,staff will recommend a budget augmentation for Board review in conjunction with any approval of a Rancho San Antonio County Park management agreement. The 2000-2001 proposed budget does include continued funding for Deer Hollow Farm. However,approval of an agreement with Santa Clara County for Rancho San Antonio would necessitate additional funding for Deer Hollow Farm on the County's behalf. The 2000-2001 proposed salaries and benefits budget is$2,424,550,a 2.7%increase over the 1999-2000 adopted budget. Two new Lead Open Space Technician positions and two new Supervising Ranger positions are funded for nine months of the fiscal year to allow for a three-month recruiting and hiring period. The addition of these positions was discussed in the Operations Staffing Plan,which was approved by the Board at your February 9,2000 meeting(see report R-00-24). Vacancies created by promotions to higher classifications may result in a more modest growth in salary and benefits than anticipated this year. I R-00-32 Page 10 The 2000-2001 proposed services and supplies budget is$820,450. This is 15.1%over the 1999-2000 adopted budget(7.5%over the projected expenses for 1999-2000). Substantial increases in fuel prices and legal fees accounted for a significant portion of the over-expenditures for last year. Increases in road and trail repairs to mitigate storm damage,the five—year replacement of body armor for rangers,and increased uniform,equipment and training costs for new staff account for a significant portion of the growth in the services and supplies budget. The Resource Management project budget is$106,000(a 6.6%increase over 1999-2000),which is included in the services and supplies budget. This budget funds numerous projects as described in the resource management action plan. The most significant of these is the fourth year of the Russian Ridge grassland management plan($41,000),and a continuation of the habitat restoration work being done at Pulgas Ridge($26,000). The wild pig control program is budgeted for$20,000. However,actual implementation of a wild pig control program will require Board approval of a Memorandum of Understanding with Fish and Game,as well as a contract with a professional trapper. The 2000-20001 proposed fixed assets budget is$211,500, an 8.6%increase over the 1999-2000 adopted budget. The proposed budget is consistent with the five-year capital equipment schedule shown in Attachment D. Four patrol trucks, (two additions and two replacements)account for$115,500. The proposed budget also includes a$73,000 cost for a replacement for the 1989 Heston road-brushing tractor, and attachments. Additional expenses include$8,500 for the completion of an upgrade of handheld radios. 4. PUBLIC AFFAIRS PROGRAM 99-00 Adopted 99-00 Projected 00-01 Proposed Budget Exp. Budget Salaries&Benefits $325,325 $308,775 $291,300 Services &Supplies 192,000 196,837 203,325 Fixed Assets— Operating Ex penses 3,000 4,100 8,400 Special Projects 1 11,500 1 6,413 1 28,250 TOTAL $531825 $516125 $531275 The Y fiscal year 2000-2001 Public Affairs Program budget shows a .10 %decrease from the proposed 1999-2000 fiscal year adopted budget. While certain accounts are proposed for increases(such as purchases of computer equipment in fixed assets),the overall decrease is accomplished through smaller reductions in other accounts,while the program continues to be funded at an aggressive level. Salaries and benefits are 10.46%less than 1999-2000 budget amounts,accounted for by the projected vacancy of the Public Affairs Manager and Visitor Services Supervisor positions in the early part of the 2000-2001 fiscal year. Public Affairs'total proposed budget includes approximately$28,250 in expenses related to the coastal annexation project. These expenses are for development of informational materials and are not included in the operating budget. The proposed services and supplies budget includes general services and supplies,publications, special projects,and visitor services. There is an increase of 5.90%over last year's budget,which includes $10,000 for visitor map reprints and printing cost increases, $2,900 for new indoor tabletop display boards and new table, and$2,250 for promotional products to distribute at events and displays. R 00-32 Page 11 It is proposed that$8,400 be budgeted in the 2000-2001 Public Affairs Program fixed assets budget for purchase of a new computer system, and a laptop and computer projector for use District-wide. 5. ADMINISTRATION PROGRAM 99-00 Adopted 99-00 Projected 00-01 Proposed Budget Exp. Budget Salaries&Benefits $692,950 $705 750 691,960 Services & Supplies $296,150 $272,550 368,050 Fixed Assets— Operating Expenses $13,600 $8,850 19,800 Special Projects&Office Facilities $65,000 $35,000 1 90,000 TOTAL $1067,700 $1 022 150 1 S1,169,8001 The 2000-2001 proposed Administration Program budget represents a 9.56%increase over the 1999-2000 adopted budget. While there are minor changes proposed to staffing,the increase is primarily a result of the cost of capital improvements to the 330 Distel office facilities,and the addition of election year expenses. The salaries and benefits category includes your board appointees'salaries, currently budgeted at$192,200. Salaries for members of the Administration Program staff are shown at $366,850. Also in the salary and benefits category is$30,000 for Directors' compensation. We are considering elimination of the exemplary service awards program for office,supervisory,and management staff due to declining participation, thereby reducing the budget by$25,000. As the service center for most District operational and administrative activities,the services and supplies budget of$296,150 includes funding for such basic items as: Postage($16,000), Telephone($203,500),Auditor($14,000), Office Equipment Leases($22,000),and Utilities and Maintenance($33,000). To offset the possible elimination of the exemplary service program,we are recommending adding$4,000 to enhance the annual staff recognition event. This category also includes election expense calculated at$28,000(assuming only one of three wards will require an election),$14,000 for technology consultant and software/hardware expenditures to upgrade the District's network operating system, and$15,000 for personnel consultant to fulfill recommendations in the Operations Program Review for morale assessment. These one-time expenses account for the bulk of the 24.28%increase in this category from the 1999-2000 budget. Operating expenses for the administrative office building have increased to 80%(rather than 50%)of shared expenses due to office expansion. Proposed in this year's budget is a total of$5,100 for Board member attendance at conferences and seminars, as outlined in Attachment E,Proposed Budget Guidelines for Board Conference Attendance. The fixed assets category,which includes new and replacement equipment and furniture,is increased 45.59%over the 1999-2000 budget. Improvements to structures include$75,000 for office expansion. This includes$12,000 for roof repair at Distel Circle,$13,500 for furniture and built-ins during office remodel, and$6,300 for computer equipment and network server upgrade. The operating budget excludes $90,000 in capital improvements expenses for the Distel administrative office. R-00-32 Page 12 Prepared by: Craig Britton,General Manager John Escobar,Assistant General Manager Deirdre Dolan,Administration/Human Resources Manager Randy Anderson,Planning Manager Mary de Beauvieres, Senior Planner Michael Williams, Real Property Representative Del Woods, Senior Acquisition Planner Peggy Coats, Senior Administrative Analyst Gordon Baiflie, Operations Analyst Bunny Congdon,Accounting Specialist Contact person: Craig Britton,General Manager Attachments: A. Overall Five-Year Operating Budget Growth and Additional Two-Year Projections B. Proposed 2000-2001 Budget C. Proposed Capital Improvement Program Budget for FY 2000-2001 D. Capital Equipment Schedule, Operations Program E. Guidelines for Board Conferences (OPERATING BUDGET ANALYSIS Excluding Salary/Benefit Increases 7,000,000 Difference between 2000-01 budget and 6% Growth Guideline=$31,504 6,500,000 - - - - Adjusted 6% Growth Line for 1998 RM 6,000,000 — - 5,500,000 - - 5,000,000 Average Budget Growth 94/95 to 00/01 5.7% ' Average Actual Growth 94/95 to 99/00 5.7% ; 4,500,000 - - - -- - Projected Budget Growth 00/01 to 00/02 6.0% Budget Growth 99/00 to 00/01 5.2% y 4,000,000 ---- -- - - - - -------- -- - -----__- -------------- - ---__--------------- --- ------- - - - ---- - - - - - H 1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 q 6% Growth Budget Growth 9 Actual Growth y 3/1/00, 4:31 PM ATTACHMENT "B" 29-Feb-00 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (a) PRELIMINARY BUDGET BY PROGRAM 2000-2001 (Dollars) -------------------------- - --------------- - --------------- - --------------- - ------------- - --------------- - --------------- Acquisition Planning Operations Public Affairs Administration TOTALS Budget Category Program Program Program Program Program (All Programs) -------------------------- I --------------- I --------------- --------------- I ------------- I --------------- I ___---_-------- REVENUES __________________________ I --------------- --------------- --------------- I ------------- I --------------- I --------------- Tax Revenue 14,999,000 14,999,000 _______________ I --------------- --------------- I ------------- I --------------- I _-__----------_ Grant Income 2,585,000 147,000 2,732,000 --------------- I --------------- I --------------- I _____________ --------------- -__----________ Interest Income 1,750,000 1,750,000 --------------- I --------------- I --------------- I _____________ I --------------- -------_______- Rental Income 683,000 683,000 --------------- --------------- --------------- ------------- --------------- --------------- Other Income 100,000 0 100,000 -------------------------- I --------------- I --------------- --------------- I ------------- I --------------- --------------- TOTAL INCOME 3,368,000 147,000 0 0 16,749,000 20,264,000 -------------------------- --------------- --------------- --------------- ------------- --------------- --------------- INCREASE IN RESERVES I (12,971,331) ---------------- --------------- --------------- --------------- ------------- --------------- --------------- ATTACHMENT "B-2" MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (b) PRELIMINARY BUDGET BY PROGRAM 2000-2001 (Dollars) I ------------------------- - ------------- - ------------- - --------- -- - ----------- - --------------- - ------------- I Acquisition I Planning I Operations I Public Affairs Administration TOTALS Budget Category Program I Program I Program I Program Program (All Programs) I -------------------------- --------------- I --------------- I --------------- I ------------- --------------- --------------- I I I I I I I I I EXPENDITURES I -------------------------- I --------------- I --------------- I --------------- I ------------- I --------------- --------------- Debt Service I I I I I I -------------------------- I ------------- I --------------- I -------------- I ------------- I --------------- --------------- interest 4,434,362 I I I 4,434,362 I -------------------------- I --------------- I --------------- I --------------- I ------------- --------------- --------------- I Principal I 1,644,449 I I 1,644,449 I I 3,288,898 1 I -------------------------- I --------------- I --------------- I --------------- I ------------- I --------------- --------------- I SUBTOTAL 6,078,811 I I I 6,078,811 I -------------------------- I --------------- I --------------- I --------------- I ------------- I --------------- --------------- I Salaries I I I I I I I -------------------------- I ------------- I -------------- I -------------- I ------------- I --------------- --------------- a) Gen.Mgr.Appointees I 230,750 I 412,600 I 1,908,900 1 232,850 366,850 3,151,950 II --------------- I --------------- I --------------- I ------------- I --------------- --------------- I I b) Salary Incentive Awards 1 I I I I 0 1 0 1 I --------------- I ------------- I --------------- I ------------- I --------------- --------------- c) General Manager I I I I I 110,350 110,350 1 II --------------- I --------------- I --------------- I ------------- I --------------- --------------- I 1 d) Legal Counsel I I 1 I I 66,850 (;6,850 II --------------- I --------------- I --------------- I ------------- I --------------- ------------- 1 e) Controller 1 I 1 I I 15,000 15,000 1 I -------------------------- I --------------- I --------------- I --------------- I ------------- I --------------- I --------------- Benefits I 44,650 I 94,950 I 515,650 I 58,450 1 102,900 816,600 -------------------------- I --------------- I --------------- I --------------- I ------------- I --------------- --------------- Directors' Fees 1 1 I 1 30,000 30,000 I --------- --------------- I --------------- I --------------- I --------------- I ------------- I --------------- --------------- SUBTOTAL I 275,400 1 507,550 I 2,424,550 1 291,300 1 691,950 1 4,190,750 -------------------------- I --------------- I --------------- I --------------- ------------- I --------------- I --------------- ATTACHMENT "B-3" MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (c) PRELIMINARY BUDGET BY PROGRAM 2000-2001 (Dollars) I ------------------------- - -------------- - -------------- - --------------- - ------------ - --------------- - ------------- I Acquisition I Planning I Operations I Public Affairs Administration I TOTALS Budget Category Program I Program Program I Program I Program I (All Programs) I -------------------------- --------------- I --------------- I --------------- ------------- I --------------- i ________-______ SERVICES & SUPPLIES -------------------------- --------------- I --------------- I --------------- I ------------- I --------------- I ____-___-______ I Legal Services 15,000 I I 40,000 I 10,000 I 65,000 i --------------- I --------------- I --------------- ------------- I --------------- I _______________ Regular Outside Services 15,000 I 500 I 33,800 0 1 7,500 56,800 I I --------------- I --------------- I --------------- I ------------- I --------------- I --------------- I Land Option Fees 0 I I I I 0 1 _______________ I --------------- I --------------- ------------- I --------------- I --_-_-_----____ Contract Services 75,175 I 222,300 I 103,900 13,500 63,200 478,075 _______________ I --------------- I --------------- ------------- I --------------- I _________--____ Election/Annexation I I I 28,000 I 28,000 I _______________ I _______________ I --------------- ------------- _______________ I -_---_-_----__- Library and Subcriptions 350 I 400 I 700 1,400 I 6,500 I 9,350 I _______________ I --------------- I --------------- ------------- I --------------- I ----_---------- Film & Developing 600 I 600 500 I I 1,700 _______________ I --------------- --------------- ------------- --------------- I --------------- I Rents and Leases I I 13,600 450 I 27,900 I 41,950 --------------- I --------------- I --------------- ------------- I --------------- I --------------- I Utilities 15,780 I 1,500 26,950 I 56,500 I 100,730 _______________ I --------------- I --------------- _____________ I --------------- I --__----_---_-- Postage 300 200 I 0 29,000 I 16,000 45,500 I I _______________ --------------- --------------- ------------- --------------- I -----__-----__- Printing and Duplicating 100 4,700 I 4,500 2,300 I 15,800 I 27,400 I _______________ --------------- --------------- ------------- --------------- I -____-_-_--____ Insurance 26,000 I 117,500 141,250 184,750 I --------------- I -------------- I --------------- ------------- I --------------- --------------- I Advertising 1,100 2,000 I 6,000 1,500 I 5,000 15,600 I I --------------- I --------------- I --------------- ------------- I --------------- --------------- I Maps and Aerials I 1,200 I 0 1 I I 1,200 I _______________ I --------------- I _______________ ------------- I --------------- _-____---______ Private Vehicle Expense 4,000 I 7,000 2,500 1,200 I 4,700 I 19,400 I --------------- I --------------- I --------------- ------------- I _______________ I _-__--_________ District Vehicle Expense 172,400 I 172,400 I --------------- I --------------- I -------------- ------------- I --------------- --------------- I Business Meeting Expense 600 I 250 1,100 3,975 I 3,500 I 9,425 I I --------------- I --------------- I --------------- I ------------- I --------------- I --------------- Personnel Development 3,650 I 9,065 I 29,600 I 2,650 I 34,000 I 78,965 I --------------- I --------------- I --------------- ------------- I --------------- I -___-____-____- Maint./Repair Equipment I 0 1 19,700 I 500 I 20,200 I --------------- --------------- --------------- I ------------- --------------- I ______--_------ Operating Expenses-Distel 0 I I I 0 --------------- I --------------- I _______________ ------------- I --------------- I _______________ Computer Expenses 600 I 2,375 2,000 1,100 I 10,700 I 16,775 I _______________ --------------- --------------- ------------- --------------- I ______--_______ Office Supplies/Sml Equip. 300 I 1,400 I 2,200 325 I 7,800 I 12,025 I _______________ I --------------- I --------------- ------------- I --------------- -_---_--_---_-- Field Supplies/Sml Equip. I I 70,450 I 70,450 I I _______________ --------------- --------------- ------------- --------------- I --____--__---_- Outside Maint.Services 60,600 ( 168,450 I I 29,100 I 258,150 _______________ I --------------- I --------------- I ------------- --------------- I --------------- Property Taxes & Permits I I I 4,600 I I 4,600 _______________ I --------------- --------------- I ------------- --------------- I -_-__-__----_-- Comm. Publications I I I I 150,375 150,375 I i --------------- --------------- I --------------- I ------------- --------------- _-_-_--___-___- Comm. Special Projects I I 8,250 8,250 --------------- --------------- I --------------- I ------------- I --------------- _________---_-_ Volunteer Program I I I 15,400 I 15,400 I I _______________ _______________ _______________ I ------------- I --------------- -----------____ Miscellaneous I I 150 I 100 I I I --------------- I --------------- --------------- I ------------- I --------------- I --------------- I Annexation I 5,000 I I 0 1 0 1 5,000 -------------------------- I --------------- I --------------- --------------- ------------- I --------------- I _______-____-__ SUBTOTAL 225,355 I 252,290 I 820,450 231,575 I 368,050 I 1,897,470 I -------------------------- --------------- I --------------- I --------------- ------------- I --------------- I --------------- I • ATTACHMENT "B-4" MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (d) PRELIMINARY BUDGET BY PROGRAM 2000-2001 (Dollars) -------------------------- - --------------- - --------------- _ --------------- - ------------- - ------------- - ------------- Acquisition Planning Operations Public Affairs Administration TOTALS Budget Category Program Program Program Program Program (All Programs) __________________________ I _______________ I --------------- --------------- I ------------- I --------------- I _______________ FIXED ASSETS -------------------------- Previous Land Commitment ( 1,477,000 1,477,000 _______________ _______________ _______________ I ------------- --------------- _______________ New Land Purchases 18,523,000 18,523,000 --------------- I --------------- --------------- ------------- --------------- _______________ Appraiser 20,000 20,000 --------------- I --------------- --------------- ------------- I --------------- I -____-_-_______ Site Acquisition Expense 10,000 10,000 _______________ I _______________ _______________ I _____________ I --------------- I ------------_-_ Legal Fees 50,000 50,000 _______________ I _______________ _______________ I ------------- I --------------- I -------_--___-_ Relocation 0 0 --------------- I _______________ --------------- I ------------- I --------------- I -____-----_---_ Title Insurance 20,000 20,000 _______________ _______________ _______________ I _____________ I _______________ I -____.____.____ Negotiation Consultants 5,000 ' _______________ I --------------- --------------- I _____________ I _______________ -___-__________ Site Engineering 10,000 10,000 _______________ I _______________ _______________ _____________ --------------- _______________ Site Preparation Expense 0 0 -----""------ --------------- --—----------- ------------- --------------- --------------- Option Fees 10,000 10,000 _______________ I --------------- --------------- I _____________ I _______________ I _______________ Structures & Improvements 12,000 595,150 90,000 697,150 --------------- I _______________ I _______________ I _____________ I _______________ I _______________ Field Equipment 15,500 15,500 _______________ _______________ _______________ I ------------- --------------- I _____________-- Office Equipment 600 5,600 7,500 8,400 19,800 41,900 _______________ _______________ I _______________ I _____________ I _______________ I _______________ Vehicles 188,500 188,500 ----—____________________ --------------- -------------— '------------- ------—----- ---—---------- --------------- SUBTOTAL 20,137,600 600,750 I 211,500 8,400 109,B00 21,063,050 -------------------------- I _______________ --------------- _______________ _____________ --------------- ________._.____ TOTAL OF ALL EXPENDITURES 26,717,166 1.,360,590 3,456,500 531,275 1,169,800 33,235,331 -------------------------- I --------------- --------------- --------------- _____________ --------------- ____-__________ TOTAL EXPENDITURES EXCLUDING LAND AND DEBT SERVICE 131,315 1,360,590 3,456,500 131,275 1,169,800 7,156,520 -------------------------- I _______________ I _______________ I _______________ I _____________ I _______________ I _______________ ',i Proposed Capital Improvement Program Budget FY 2000 / 2001 Capital Improvement Program: Public Access Facilities Rev.02/29/00 Guideline: $500,0001Year Averaged over a 5 Year Period FY 1996/97 FY 1997/98 FY 1998/99 FY 1999/00 FY 2000/01 Actual Actual Actual Projected Proposed* .... .. ................ Facilities, Public 331 ,403 544,396 491 ,934 369,040 3681840 (Plus) FEMA Projects 333,039 106,605 162,680 1213�0 (Equal) Gross CIP 331,403 877,435 598,539 531,720 4JQ150 (Less) Grant Income 16,728 83,005 171, 140 35700t (Less) FEMA Income 62,118 7,7711 209,3651 131,018 1499NO. (Equal) Adjusted CIP 252,557 786,6591 218,0341 400,702 305810 Capital Improvements, Public Facilities (i.e., parking areas, trails, signing) Average: $392,752 FEMA Projects: Storm repair projects Adjusted CIP = Gross CIP-(Grant Income + FEMA Income) Capital Improvement Program: Staff and Administrative Facilities Guideline: $150,000/Year Averaged over a 5 Year Period FY 1996/97 FY 1997/98 FY 1998/99 FY 1999/00 FY 2000/01 Actual Actual Actual Projected Proposed* Facilities, Field 549,168 7,625 23,329 32,930 105000 Facilities, Admin 30,000119750Q4 j Average: $164,610 n Field facilities: Non-public capital improvements (Le., S.Azul employee residence $45,000, FRO study$40,000, and and annex repairs$20,000) y Administrative facilities: Public improvements (i.e., Distel Admin. Office improvements $75,000) 2/18/00 2000-2005 OPERATIONS PROGRAM 5-Year Capital Equipment Schedule, Proposed 2/18/00 (with current year expenditure) 1999-2000 2000-2001 2001-2002 2002-2003 2003-2004 2004-2005 Vehicles: a)Rel2lacemen Patrol (two) $52,000 (two) $52,000 (two) $54,000 Maintenance (two) $54,000 (two) $54,000 ................... .................I......... .................................................................. .................. .......... ....................................................-........ ...................................................... ................-........---........... b)NeNv Patrol (two) $55,000 (two) $63,500 (two) $58,000 Maintenance (two) $59,000 (two) $50,000 (two) $50.000 (one) $30.000 Machinery and chipper $20,000 tractor with $73,000 Dump truck& $80,000 backhoe $60,000 crawler $70,000 small tractor $25,000 Heavy cranes $6,000 brushing mower transport trailer 'dozer Equipment (two)ATV $14,000 Office (two)computers $5,200 computers $7.500 computers $4,500 computers $4,500 Equipment &tables &furniture Misc.Equipment a)Field $7,000 $7,000 $7,000 $7,500 $7,500 b)Radio $10,200 $8,500 $7,000 $5,000 $2,000 c)Fire $31,000 $26,000 $26,000 $34,000 $26,000 I TOTALS $193,4001 $211,5001 $222,0001 $221.0001 $225.5001 $212,500 >I n Six year average: $218,500.00 CapEquip-200OA-2-18.xis ATTACHMENT "E" Proposed Budget Guidelines for Board Conference Attendance Objective: It is important that Board members are afforded the opportunity to keep current on Legislation, policies, practices and other matters pertinent to District business. Therefore, a modest amount of money should be budgeted each fiscal year for Board attendance at conferences and seminars directly related to open space preservation and management of parks and open space agencies. 1 . Each fiscal year, a total of $5,100 will be budgeted for Board member attendance at conferences and seminars directly related to open space preservation and/or administration of parks and open space organizations, to be allocated as follows: A. Out-of-Area/State: $3,000 total to provide for 2 conferences at an estimated amount of $1,500 each. B. Local: $300 per Board member, or $2,100 per year. 2. Attendance at out-of-area/state conferences will be assigned as follows: one conference for the President, or his/her designee, to attend the annual Special Parks Districts Forum; and one California Special District Association training for a newly elected Board member, or a Board-approved and Board-assigned conference for an alternate member in the event there is no newly elected member that year. 3. Each Board member may elect to attend appropriate local conferences or seminars related to District business up to his/her annual budgeted allowance without further Board approval. Attendance at such a conference or seminar will be reported to the Board in advance of attendance, and a summary report of the conference itself will be reported following attendance. - ---- — —�������------ -- — — -- -- — —�-��������-�---- — —1 � � uo-e*-vu ACQUISITION ' PROGRAM zo e.*s xovnToo u0000c oy/oo | o*on | »*oo | yy/nv | no/oz | / SALARIES BENEFITS | Adopted | Projected | Actual | Adopted | | Budget | Expenses | o"»"=e` | Budget | | | | | | -------------------- | ------- | ------' | ------- | ------ | ----------- «zuv namomL yvmvmEv APPOINTEES | 202.250 | 196.800 | v | 230,750 | -------------------- | ------- | ------- | ------- / ------ | ----------- oz v=""n Leaders | » | » | » | n | o, a"pe,.ia"r, p,"ce",ionaz (Perm) | zoo',m | zs^.mo | " | 188,750 | wzms DEL & c»o � »' Temporary Employees | » | « | » | « | | o« o°",°ta=iauo~ri"^l (Perm) | ^z.yoo | ^z.,00 | o | ^z.ono | Lru^ � os Administrative/Technical (Perm) | » | » | » | « | / zzo.°= ime | » | » | o | « | / ma�^~ue" �"�"*u^�� | » | » | » | « | ~ | -------------------- | ------- | ------' | ------' | ------ | ----------- � moo ncTzRoxsNr PLANS | z^.sno | z^.00n | u | ,z'eso | | ---------------------------------------- | ------------- | ------------- | ------------- | ------------ | ----------- oz eers | zz.^so | 22.125 | o | 17,900 | ' o` oy.^nn"int"°"*ef.c"mn. | « | « | « | z'w« | | 'm uo �m°u�" | � o,o | z o,, | u | z ^,o | � ^sv" mzxo u �u�~~^ ' ' ' | -------------------- | ------- | ------' } ------' | ------ | ----------- � ^400 nxon, zwao^vNco | zo'^oo | 15.975 | v | zo'p,v | | ' ------ --------- | ------' | ------' | ------' | -----^' | --- — ----------- | 'u Health | 14.550 | 10.675 | » | 11.750 | m Dental | 3.150 | `.««« | « | ^.m" | | � o` ziu. soo | ^z' | » | 6»» | � � o* L==s r°=m Disability | z.«uo | z.os | o | z.^ov | m u=n�v° ����"" | sso | 300 ( n | 350 | | � �=p^*�° ^�""" � nr Vision | 400 | `so | » | s»» | oo Cafeteria Plan/Section zzs | ,n | m | » | m | � ------------------------------- -------- | ------------- | ------------- | ------------- | ------------ | ----------- ^soo orurr w^mo^roo zmona^ncc | 3.300 | 1.925 | ^ | 3.750 | � ---------------------------------------- | ------------- | ------------- | ------------- | ------------ | ----------- ` oz Worker's Compensation | ,.mo | 1'92' | » | 3'750 | | | » | « | » | » | | -------------------- | -------- | ------' | ------- | ------ | ---------------------- TOTAL nALAorsm & BENEFITS | zm.^sn | ,m.roo | o | 275.400 | � -------------------- | —'----- | ------- | ------' | ------ | ----------- _ � � � � | / . � � � | � ° —/ 1/ - � | � � I= ACQUISITION - PROGRAM 20 P.2/5 BUDGET 99100 .....................r...r...r..rr.rrrr. . .........rrrr r r........r..w . .w r.rrrrrr... . .w.rrr.rrr.. . .....r..wwrwrrrw.wwww. 99/00 I 99/00 I 99/00 I 00/01 SERVICES & SUPPLIES I Adopted Projected I Actual I Adopted Budget Expenses I Expenses I Budget ---------------------------------------- I ------------- I ------------- I ------------- I ------------ I ---------------------- 4900 LEGAL FEES I 20,000 I 1,901 I 0 1 15,000 -------------------------------------- I ------------ I ------------ I ---- ------ I --------- 01 Special Legal Fees I 20,000 I 1,901 I 0 15,000 ---------------------------------------- I ------------- I ------------- I ------------- ---------- I ---------------------- 5000 REGULAR OUTSIDE SERVICES" I 15,000 I 16,350 I 0 15,000 ----------------------------------- I ------------- I ------------- I ------------- ------------ I --------------------- 03 Note Paying Agent I 15,000 I 16,350 I 0 1 15,000 04 Temporary Office Help I 0 1 0 1 0 0 1 ---------------------------------------- I ------------- ------------- I ------------- I ------------ I ---------------------- -------------------------------------- I ------------- I ------------- I ------------- i ------------ i ---------------------- 5101 LAND OPTION FEES •r I 5,000 I 0 1 0 1 0 1 ________________________________________ I _____________ I _____________ I _____________ I ____________ i --__-__---____-_-_____ ________________________________________ ------------- ------------- I _____________ I ____________ I ______________________ 5200 CONTRACT SERVICES'• I 35,500 67,931 I 0 1 75,175 --------------------------------------- I ------------- ------------ I ------------ I ----------- I ---------------------- 04 Architect/Engineer I 5,000 I 12,581 I 0 1 20,000 06 Planning Consultant I 2,000 825 I 0 1 2,500 08 Mapping Services I 3,000 I 50 I 0 1 1,500 09 Acquisition Consultant I 7,000 I 6,000 I 0 1 10,000 10 Appraiser I 10,000 I 10,000 I 0 1 8,000 11 Acquisition Reports/Studies I 2,500 0 1 0 1 2,500 12 Preliminary Title Services I 1,000 I 4,500 I 0 I 4,000 99 Other Professional Services I 5,000 I 33,975 I 0 1 26,675 0 1 0 1 0 1 0 1 ---------------------------------------- I ------------- I ------------ I ------------- I ------------ ---------------------- 5400 LIBRARY AND SUBSCRIPTIONS I 300 I 150 I 0 I 350 --------------------------------------- I ------------- I ------------- I ------------- I ------------ I --------------------- 01 Photographs and Films I 200 I 0 1 0 100 02 Books and Subscriptions— I 100 I 150 I 0 1 150 99 Miscellaneous I 0 1 0 1 0 100 ---------------------------------------- i ------------ I ------------ i ----------- I ------------ I ----------------------- I ------------- i ------------- I ---------- -- I --------- I ---------------------- 5501- -- - -FILM -& DEVELOPMENT I 0 1 550 I 0 1 600 0 0 0 I I -----------------___________-________ I ------------- I _____________ I ------------- I __________- I ______________________ 5700 UTILITIES I 22,950 I 19,670 I 0 1 15,780 ________________________________________ I _____________ I _____________ I _____________ I ------------ I ---------------------- O1 Electrical I 15,000 I 12,800 I 0 1 10,000 02 Water I 1,750 I 1,900 0 1 1,700 03 Gas 4,300 I 3,100 0 1 2,300 04 Garbage 1,450 I 1,400 I 0 1 1,300 05 Telephone I 450 I 470 0 1 480 --------------------------------------- ------------- I ------------- ------------- I ------------ I ---------------------- --------------------------------------- ------------- I ----------- ------------- I ------------ I ---------------------- 5801 POSTAGE- 300 200 0 1 300 ---------------------------------------- I ------------- I ---- --------- I ---- ------- I ------------ I ---------------------- -________________________________________ I ___________ _____________ I _____________ I ____________ I ____-_________________ 5900 PRINTING AND DUPLICATING'• I 300 100 I 0 I 100 ---------------------------------------- I ------------- I ------------- I ------------- I ------------ ----------------------- 02 Duplicating/Xeroxing I 150 I 100 I 0 1 100 04 Photo Processing I 150 I 0 1 0 1 0 99 Miscellaneous I 0 1 0 1 0 1 0 --------------------------------------- I ------------- ------------ I ------------- I ------------ ---------------------- ACQUISITION - PROGRAM 20 P.3/5 BUDGET 99/00 ' «ww««•w«ww....•ww•w.•««..•.w.«..«..«•.«« . «..•.«.«..... • .««•....•.w.« « «w«««...•«••• « w.•w«w««.««. . .«.•.«...•.«ww.««..:.. 99/00 99/00 99/00 00/01 SERVICES & SUPPLIES Adopted I Projected I Actual Adopted Budget Expenses Expenses Budget ----—---------------------—----------- ------------- ---------—-- ------------ 6000 INSURANCE 25,900 25,125 0 26,000 ---------------------------------------- ------------- ---------—-- ------------- ------------ ---------------------- 02 MROSD Sites 25,900 25,125 0 26,000 0 0 0 0 -------------------------------------- ----------—- ------------- ------------- ------------ --------—------------ 6100 ADVERTISING 1,500 2,050 0 I 1,100 ------------------------------- ------------- ------------- ------------- ------------ - -------------- 01 Legal/Classified 1,500 2,050 0 1,i00 0 0 0 0 ---------------------------------------- I ------------- ' ------------- I ------------- ' ------------ -----------------_---- 6200 MAPS AND AERIALS" 500 601 0 1,200 ------------------------—-------------- ------------- ------------- ------------- -----——--- ---------------------- 01 Maps 100 28 0 200 02 Aerials 400 573 0 1,000 0 0 0 0 ________________________________________ _____________ I _____________ _____________ I ------------ I -------------------- 6301 PRIVATE VEHICLE EXPENSE" 4,000 3,800 0 4,000 ---------------------------------------- ------------- ---------—-- ------------- ------------ ---------------------- -------------------------—------------ ------------- ------------- -—---------- ------------ ---------------------- 6500 BUSINESS MEETING EXPENSES" 600 520 0 600 ----------------------------7----------- ------------- ------------- ------------- ------------ ---------------------- 01 Local Meal Conferences 500 470 0 500 02 Out-of-Town Business Meetings 100 SO 0 100 0 0 0 0 ---------------------------------------- ------------- ------------- ------------- ------------ ------------------—-- 6600 PERSONNEL DEVELOPMENT" 1 3,800 1,030 0 3,650 -----------——--------------—------— ------------- ------------- ----——----- ------------ ---------------------- 01 Training and Seminars 1,450 350 0 1,000 02 Tuition Reimbursement 0 160 0 300 03 Membership and Dues 100 0 0 100 04 Professional Conferences 2,250 520 0 2,250 0 0 0 0 -------------------'--------—---------_ ------------- ------------- ------------- ---—------- --------—----------— 6800 COMPUTER EXPENSES 1,900 600 0 600 ---------------------------------------- ------------- I ------------- ------------- I ------------ I _--___-__-_____-----_- 01 Software 800 250 0 0 02 Computer Supplies 250 150 0 400 03 Laser Printers 0 0 0 0 04 Repair & Replacement 850 200 0 200 ----r----- ------- ------- ------------- ------------ ------------ ----------------------- r ACQUISITION - PROGRAM 20 P. 4/5 BUDGET 99/00 .r rrrr r.rwwrrrrr..r.r.rwrr.r..r.rrr.r.w. w .wr r..r:r.www w www..rwrwr.rw . wrwwwrr..rrr. . .rwwwwwrrw.r . rrrrrrwwrrwrrr.wr.r..r 99/00 99/00 99/00 00/01 SERV=CES & SUPPLIES Adopted Projected Actual Adopted Budget Expenses Expenses Budget ------------------------- ------------- ------------- ------------ ------------ ---------------------- 6900 OFFICE SUPPLIES/SMALL EQUIPT. 300 275 0 300 ---------------------------------------- ------------- ------------- ------------- 01 Office Equipment (under $200)** 100 90 0 ( 100 02 Office Supplies 200 185 0 200 0 0 0 ---------------------------------------- ------------- ------------- ------------- ------------ ---------------------- 7000 FIELD SUPPLIES/SMALL EQUIPT. 0 0 0 0 -------------------------------------- ------------- ------------- ------------ ------------ ---------------------- 02 Field Supplies/Consumables 0 0 0 0 ---------------------------------------- ------------- ------------- ------------- ------------ ---------------------- 7100 OUTSIDE MAINTENANCE SERVICES 68,950 57,100 0 60,600 ---------------------------------------- ------------- ------------ ------------- ------------ ---------------------- 01 Structures--Exterior/Interior 36,000 28,500 0 32,500 02 Janitorial and Cleaning 4,200 4,000 0 3,200 03 Electrical 3,000 700 0 2,000 04 Water 3,750 3,700 0 3,300 05 Sewer/Septic 2,750 1,000 0 2,800 06 Heating 5,500 4,200 0 5,000 09 Trails & Roads 8,000 12,800 0 7,500 12 Resource Management 1,750 1,900 0 1,700 13 Pest Control 3,500 0 0 2,100 99 Miscellaneous 500 300' 0 500 -------' ----------------------- ------------- ------------ ------------- ----------- ---------------------- ---------------------------------------- ------------- I ------------- ----------- ------------ ---------------------- 7201 PROPERTY TAXES 0 2,082 ( 0 I 0 ____________________________________--- I _____________ ------------- ------------- I ____________ I __-________-_____---- -------------------------------------- ------------- ------------ ------------ ------------ ---------------------- 7301 MISCELLANEOUS*" 100 0 0 0 _________________________-_____________ I _____________ I _____________ I ------------- I ____________ ------________________ ---------------------------------------- ------------- ------------- ------------- ------------ ----------------------- 7701 ANNEXATION 0 0 0 5,000 ---------------------------------------- ------------- _____________ ------------ --------------------- TOTAL SERVICES AND SUPPLIES _ 206,900 200,035 0 225,355 --------------------------------------- ------------- ------------- I ------------- ------------ --------------------- 1 ACQUISITION - PROGRAM 20 P.5/5 BUDGET 99/00 99/00 I 99/00 I 99/00 I 00/01 FIXED ASSETS Adopted I Projected I Actual I Adopted Budget Expenses I Expenses I Budget 8100 LAND EXPENDITURES 20,170,500 I I 21,163,550 I o f 20,125,000 01 Previous Land Commitments I 603,000 I 0 0 1,477,000 02 New Land Purchases I 19,397,000 I 21,025,000 I 0 I 18,523,000 03 Appraisal I 30,000 I 19,650 I 0 1 20,000 04 Site Engineering I 10,000 I 17,700 I 0 I 10,000 05 Legal Fees I 100,000 I 40,000 I 0 I 50,000 06 Relocation I 500 I 0 I 0 I 0 I 07 Title Insurance I 10,000 I 28,000 I 0 I 20,000 08 Negotiation Consultants I 0 1 0 I 0 5,000 09 Misc.Site Acquisition Expenses I 5,000 I 16,700 I 0 10,000 11 Option Fees I 15,000 I 16,500 0 10,000 I Fee Defeasanoe ___________________________________ I ------------- I ------------- ------------- ------------ I ____-_--_________-____ 8200 STRUCTURES AND IMPROVEMENTS I 0 1 0 0 12,000 ------------- I ------------- ---—-------- I ------------- I ------------ I --------------------- 02 DC Structures-Exterior/Int. I 0 1 a l 0 j 12,000 05 Sewer/Septic I 0 1 0 1 0 1 0 1 09 Roads & Trails .I 0 1 0 1 0 1 0 1 11 Protective Barriers I 0 1 0 1 0 1 0 12 Resource Management I 0 1 0 1 0 1 0 --------------------------------------- --------- I I - I "'-"-'----- I "---"----------'----- 8300 EQUIP. EXPENSE/OFFICE OVER 200 I 2,500 I 2,350 I 0 600 I - --------------------------------- i ------------ I I I - ---------------------- 01 Furniture .0 I 0 1 0 1 02 Machines I 2,000 2,350 I 0 1 600 ---------------------------------------- --------- TOTAL FIXED ASSETS 20,173,000 I 21,165,900 I O I 20,137,600 I —------------------------------------ I ------------- I ------------- I ------------- I ------------ I -----—-—------------ ------------------------------------- I ------------- I ------------ I ------------- I ----------- I --------------------- DEBT SERVICE I I I 9100 INTEREST - LAND - _ I 3,673,786 I 4,773,681 I 0 I 4,434,362 -------------------- I -----—------ I ------------- I ------------- ------------ ---------------------- 01 Installment Purchase Contracts I 45,781 I 45,781 0 44,545 02'Negotiable Promissory Notes ( 3,628,005 I 4,727,900 0 I 4,389,817 —---—------------------------ i ------------- ------ ------------- I ----------- i ---------------------- 9200 PRINCIPAL REPAYMENT - LAND I 1,873,214 1,148,220 I 0 I 1,644,449 -------------------------------------- I ----------- I I I --------—-- ---------------------- 01 Installment Purchase Contracts 43,214 I 18,220 I 0 I 44,449 02 Negotiable Promissory Notes 1,830,000 I 1,130,000 I 0 1 1,600,000 -------------------------—----------- ------------- I ------------- I ------------- I ------------ I ------—-------------- TOTAL DEBT SERVICE I 5,547,000 I 5,921,901 I 0 1 6,078,811 ---------------------------------------- I ------------ I ------------- I ------------- •I ------------ ---------------------- -------------—------------------------- I ------------- I ------------- I ------------- ------------ ---------------------- TOTAL BUDGET I 26,177,350 I 27,526,536 0 26,717,166 1 New Land Purchases: .. 0.. 28-Feb-00 PLANNING - PROGRAM 30 P.1 BUDGET 99/00 rxxrxrrrrr+++xx++rr++rxwxrwrrr++rrrr+ + +vr++rrwwwrr r rrrwrrrrrr wr r rrxxrrrrvrrx ♦ rxxvvvvwvrxx r rrrwrr.+xrrr:+r+++++rvry r 99/2000 99/2000 I 99/2000 2C00/01 Adopted ! Projected I Actual I Proposed SALARIES & BENEFITS Budget I Expenses I Expenses I Budget ------------------------------------- ------------ I ------------ f ------------ I ------------ I ------------------------ I 4100 GENERAL MANAGER I I I I I APPOINTEES 354,250 [ 342,200 I 0 1 412,600 ------------------------------------- ------------ I ------------ I ------------ I ------------ I ------------------------ I O1 Group Leaders I 67,700 I. 68,075 I 0 1 71,500 I I 02 Supervisory/Professional (Perm) 196,250 I 191,850 ( 0 I 237,550 I I 03 Temporary Employees I 0 ( 0 ( 0 1 0 04 Secretarial/Clerical (Perm) I 30,050 j 29,575 I 0 1 32,500 ( I 05 Administrative/Technical (Perm) I 60,250 ( 52,700 I 0 I 71,050 ( I 06 Administrative/Technical (Temp) I 0 1 0 1 0 1 0 1 I I I I I I I I I I I I I ------------------------------------- I ------------ I ------------ I ------------ I ------------ I ------------------------ I 4300 RETIREMENT PLANS ( 42,350 I 46,675 I 0 ( 39,250 ------------------------------------- I ------------ I ------------ ------------ I ------------ I ------------------------ I 01 Pers ( 38,100 I 41,050 I 0 1 32,000 03 G.M. Appointees/Def.Comp. ( 0 1 1,450 0 1 2,150 ( I 04 SS Medical I 4,250 I 4,175 I 0 1 5,100 I I ------------------------------------- I ------------ ------------ I ------------ I ------------ I ------------------------ I 4400 GROUP INSURANCE I 51,250 I 40,125 I 0 1 49,300 I I ------------------------------------- I ------------ ! ------------ I ------------ I ------------ I ------------------------ I O1 Health I 39,300 I 29,000 ( 0 1 34,800 I 02 Dental I 6,450 I 6,125 I 0 1 8,150 I I 03 Life ! 900 I 850 I 0 1 1,050 I I 04 Long Term Disability 2,450 I 2,375 ( 0 2,850 06 Employee Assistance 1,150 j 9c0 I 0 1,200 I I 07 Vision 850 1 750 ( 0 1,100 I ! 08 Cafeteria/Plan Section 125 I 150 1 125 ( 0 150 ---------------------r--------------- I ------------ ----------- ! ------------ I ------------ I ------------------------ 4500 STATE MANDATED INSURANCE I 5.450 ! 3,775 I 0 I 6,400 ------------------------------------- I ------------ ; ------------ I ------------ I ------------ I ------------------------ 01 Worker's Compensation ( 5,450 3,775 I 0 I 6,400 ( I ------------------------------------ I ------------ ! ------------ I ------------ I ------------ I ----------------------- I I I I I I ------------------------------------- I ------------ ! -- ------- I - --------- I ---- -- ---- I ------------------------ TOTAL SALARIES & BENEFITS I 453,300 432,775 I 0 ( 507,550 I I - - ----- ------ ------- ------- I ------------ ------------ ------------ I ------------ I ------------------------ PLANNING - PROGRAM 30 P.2 BLDGET 99/00 rrx++++++++rxrxxxxx+++xxrxxxxxxrxxrrx x xrr++rx+xxrr r ++rrrrrxrxxr x xxxxxxxxxxxx x rxxxx+xxxrxx r sxxr++++x++++x++xx+++++r r 99/2000 99/2000 99/2000 2000/01 Adopted Projected Actual Proposed SERVICES & SUPPLIES Budget Expenses Expenses Budget ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 4900 LEGAL FEES 0 0 0 0 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 01 Special Legal Fees 0 0 0 j 0 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 5000 REGULAR OUTSIDE SERVICES S00 0 0 500 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 04 Temporary Office Help 500 0 0 500 99 Miscellaneous 0 0 0 0 ------------------------------------ ------------ ------------ ------------ ------------ ------------------------ 5200 CONTRACT SERVICES 472,500 167,815 0 222,300 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 02 Graphics Design(Display 7,500 1,900 0 2,500 04 Architect/Engineer 0 0 0 ( 0 06 Planning Consultant 456,000 160,425 0 212,200 99 Other Professional Services 9,000 5,490 0 7,600 18 Intern 0 0 0 0 ------------------------------------- ----------- ------------ ------------ ------------ ------------------------ 5400 LIBRARY AND SUBSCRIPTIONS 800 250 0 400 ---------------------------------- ------------ ------------ ------------ ------------ ------------------------ 01 Photographs and Films 100 0 0 1 100 02 Books and Subscriptions 700 250 0 300 99 Miscellaneous 0 0 0 0 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 5501 FILM AND DEVELOPING 600 400 0 600 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 5600 RENTS AND LEASES 0 0 0 0 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 01 Structures 0 0. 0 0 02 Office Equipment 0 0 0 0 99 Miscellaneous 0 0 0 0 j ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ -------------------- ----------- ------------ ------------ ------------ ------------ ------------------------ 5705 TELEPHONE 0 0 0 1,500 ----------- ------------------------ ------------ ------------ ------------ ------------ --;--------------------- ------------------------------------- ------------ ------------ ------------ ------------ ----------------------- 5801 POSTAGE 200 120 0 200 ------------------------------------ ------------ ------------ ------------ ------------ ------------------------ ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 5900 PRINTING AND DUPLICATING 4,500 2,800 0 4,700 ------------------------------------- ------------ ----------- ------------ ------------ ------------------------ 01 Printing 0 0 0 0 02 Duplicating/Xeroxing 0 300 0 1,200 03 Brochure Printing 0 0 0 0 04 Photo Reproduction 4,500 2,500 0 3,500 99 Miscellaneous 0 0 0 0 ------------------------------------- ( ------------ ------------ ------------ ------------ ------------------------ I PLANNING - PROGRAM 30 P.3 BUDGET 99/00 99/2000 I 99/2000 I 99/2000 I 2000/01 Adopted I Projected I Actual I Proposed SERVICES & SUPPLIES I Budget I Expenses I Expenses I Budget ------------------------------------- I ------------ I ------------ I ----------- I ------------ I ------------------------ 6100 ADVERTISING I 2,000 I 3,500 I 0 1 2,000 ------------------------------------- I ------------ I ------------ I ------------ I ------------ I ------------------------ 01 Legal/Classified I 2,000 I 3,500 I 0 1 2,000 I 02 Display Ads I 0 1 0 1 0 1 0 1 ------ ------------------------- I ------------ I ------------ I ------------ I ------------ I ------------------------ 6200 MAPS AND AERIALS I 0 1 0 1 0 1 0 1 ------------------------------------- I --:--------- I ------------ I ------------ I ------------ I ------------------------ 01 Maps I 0 1 0 1 0 1 0 1 02 Aerials I 0 0 1 0 I 0 1 I ------------------------------------- I ------------ ------------ I ------------ I ------------ I ------------------------ I 6301 PRIVATE VEHICLE EXPENSE I 6,500 I 6,000 I 0 1 7,000 ------------------------------------- I ------------ I ----------- I ------------ I ------------ I ------------------------ i ------------------------------------- I ------------ I ------------ I ------------ I ------------ I ------------------------ I 6500 BUSINESS MEETING EXPENSES I 150 250 I 0 I 250 --------------------------- ---- I ------------ I ------------ I ------------ I ------------ I ------------------------ I O1 Local Business Meetings I 100 I 150 I 0 150 02 Out-of-Town Business Meetings I 50 ( 100 0 I 100 99 Miscellaneous I 0 1 0 0 0 1 I I I I I I ------------------------------------- I ------------ I ------------ I ------------ I ------------ I ------------------------ I 6600 PERSONNEL DEVELOPMENT I 9,150 I 2,600 I 0 1 9,065 I I ------------------------------------- I ------------ I ------------ I ------------ I ------------ I ------------------------ t 01 Training and Seminars 2,650 I 1,000 I 0 7,140 02 Tuition Reimbursement I 300 I 300 I 0 1 300 I I 03 Membership and Dues I 400 I 0 1 0 1 400 04 Professional Conferences I 5,800 I 1,300 I 0 1 1,225 I I I I I ------------------------------------- I ------------ I ------------ I ------------ I ------------ ------------------------ I 6700 MAINTENANCE AND REPAIR/EQUIPT. I 200 I 0 1 0 1 0 I ------------------------------------- I ------------ I ------------ I ------------ I ------------ ------------------------ 01 Field I 0 1 0 1 0 1 0 02 Office I 200 I 0 1 0 . I 0 1 I ------------------------------------- I ------------ ------------ I ------------ I ------------ I ------------------------ I 6800 COMPUTER EXPENSES I 400 2,700 I 0 1 2,375 I j ------------------------------------- I ------------ I ------------ I ------------ I ------------ I ------------------------ I O1 Software & Data I 0 0 1 0 1 575 02 Graphics Software I 400 I 400 0 1 1,500 03 Laser & Printers I 0 1 0 0 1 0 1 04 Repair & Replacement 0 1 2,300 0 300 ------------------------------------- ------------ I ------------ I ------------ ------------ I ------------------------ I 6900 OFFICE SUPPLIES/SMALL EQUIPT. 1,000 I 1,000 I 0 1,400 I I ------------------------------------- I ------------ I ------------ I ------------ I --- ------ I ------------------------ ! O1 Office Equipment (under $200) I 0 1 0 1 0 1 0 1 02 Office Supplies I 1,000 I 1,000 0 ( 1,400 7301 Miscellaneous I 0 1 0 1 0 .I 0 1 ------------------------------------- I ------------ I ------------ I ------------ I ------------ I ----------------- ------------------------------------- I ------------ I ------------ I ------------ i ------------ ------------------------ TOTAL SERVICES AND SUPPLIES I 498,500 187,435 I 0 I 252,290 ------------------------------------- I ------------ ------------ ------------ I ------------ I ------------------------ PLANNING - PROGRAM 30 P.4 BUDGET 99/00 xx++rrrrrrr+xxxx++r++rrrx+++rxwxxx+++ + +rrr:rrex►xr a rrxxxxxxxx+x + +++++++r+xrr r rrrrr+rrr+r+ + +r+++rxr+++r+x+++r+rxxx+ r 139/2000 99/2000 99/2000 2000/01 Adopted Projected Actual Proposed j FIXED ASSETS Budget Expenses Expenses Budget ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 8100 LAND EXPENDITURES 5,000 1,000 0 0 ------------------------------------- ------------ ----------- ------------ ------------ ------------------------ 09 Misc.Site Acquisition Exp. 0 0 0 0 10 Site Preparation Expenses 5,000 1,000 0 0 J ------------------------------------- ------------ ------------ ----------- ------------ ------------------------ 8200 STRUCTURES AND IMPROVEMENT 751,450 ( 563,650 0 595,150 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 01 Structures--Exterior/Interior 136,500 37,140 0 130,000 03 Electrical 0 0 I 0 0 04 Water 0 0 0 ( 15,000 05 Sewer/Septic 140,000 1.34,635 0 8,000 06 Heating 0 0 0 0 07 Parking Area 87,000 83,080 0 50,000 09 Trails and Roads 342,650 243,540 0 282,150 10 Signs 21,000 14,500 0 19,500 11 Protective Barriers 3,000 29,500 0 11,500 12 Resource Management 0 0 0 0 13 Demolition 10,000 j 13,335 0 79,000 99 Miscellaneous 11,300 1 7,920 0 O ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ 8300 EQUIPT.EXP./OFFICE (OVER $200) 4,250 15,700 0 I 5,600 ------------------------------------- ------------ ------------ ---------`-- ------------ ------------------------ 01 Furniture 0 0 0 3,200 02 Machines 3,950 15,700 0 2,400 03 Other 300 0 0 ( 0 ------------------------------------- ------------ ------------ . ------------ ------------ ------------------------ TOTAL FIXED ASSETS 760,700 580,350 0 600,750 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ TOTAL BUDGET-ALL CATEGORIES ,712,500 1,200,560 0 1,360,590 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ PLANNING - PROGRAM 30 P,1 BUDGET 99/00 99/2000 99/2000 99/2000 2000/01 Adopted Projected Actual Proposed SALARIES & BENEFITS Budget Expenses Expenses Budget ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ TOTAL SALARIES & BENEFITS 453,300 432,775 0 507,550 ------------------------------- ------------ ------------ ------------ ------------ ------------------------ Legal Fees 0 0 0 Consulting Services 472,500 167,815 0 I 222,300 Business Meeting Expense 150 250 0 250 Personnel Development 9,150 2,600 0 9,065 Other Services & Supplies 16,700 16,770 0 19,175 ------------------------------------- ------------ ------------ ------------ ------------ ----------------------- TOTAL SERVICES & SUPPLIES 498,500 187,435 0 250,790 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ Land Expenditures 5,000 1,000 0 0 Structures and Improvements 751,450 563,650 0 595,150 Office and Field Equipment 4,250 15,700 0 5,600 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ TOTAL FIXED ASSETS 760,700 580,350 0 600,750 ---------------- -------------------- ------------ ------------ ------------ ------------ ------------------------ ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ TOTAL BUDGET - ALL CATEGORIES 1,712,500 1,200,560 0 1,359,090 ------------------------------------- ------------ ------------ ------------ ------------ ------------------------ �to 28-Feb-00 PUBLIC AFFAIRS - PROGRAM 40 P.1/5 ADOPTED BUDGET 99/00 99/00 99/00 99/00 00/01 Adopted Projected Actual Proposed SALARIES & BENEFITS Budget Expenses Expenses Budget 4100 GENERAL MANAGER APPOINTEES 256,775 247, 525 0 232, 850 -------------------------------- -------- --------- -------- -------- ----------------------- 01 Group Leaders 71, 150 59, 900 56,200 PA Manager 02 Supervisor/Professional 56,600 57, 000 42,450 Visitor Services Sup. 03 Temporary Help 8,325 8,300 9,600 Interp./Special Events 04 Secretarial/Clerical (Perm) 38,000 38, 850 40, 000 PA Assistant 12 Overtime 13 Volunteer & Docent Coordina 82,700 83,475 84, 600 Vol/Doc Coordinators (2 14 Summer/Fall Intern -------------------------------- -------- --------- -------- -------- ----------------------- 4300 RETIREMENT PLANS 33, 900 33,425 0 25, 550 -------------------------------- -------- --------- -------- -------- ----------------------- 01 Pers 27, 550 26, 950 19, 100 03 G.M.Appointees/Def.Comp. 2, 100 2,350 2, 150 04 SS Medical 4,250 4, 125 4,300 1.45% - All 4400 GROUP INSURANCE 27, 150 25, 675 0 26, 900 -------------------------------- -------- --------- -------- -------- ----------------------- 01 Health 20,700 19, 725 19, 700 02 Dental 2,600 2,600 3, 250 03 Life 600 575 600 04 Long Term Disability 1,700 1, 525 1, 700 06 EAP 900 660 900 07 Vision 550 500 650 08 Cafeteria/Plan Section 125 100 90 100 4500 STATE MANDATED INSURANCE 7, 500 2, 150 0 6, 000 --01-Worker' s-Compensation 7, 500 2, 150 6, 000 -------------------------------- -------- --------- -------- -------- ----------------------- TOTAL SALARIES & BENEFITS 325, 325 308,775 0 291, 300 -------------------------------- -------- --------- -------- -------- ----------------------- PUBLIC AFFAIRS - PROGRAM 40 P.2/5 ADOPTED BUDGET 99/00 99/00 99/00 99/00 00/01 Adopted Projected Actual Proposed SERVICES & SUPPLIES Budget Expenses Expenses Budget -------------------------------- -------- --------- -------- -------- ----------------------- 5000 REGULAR OUTSIDE SERVICES 500 0 0 0 -------------------------------- -------- --------- -------- -------- ----------------------- 09 Internet Provider 500 5200 CONTRACT SERVICES 17,000 14, 000 0 13,500 05 Legislative Consultant 13,500 13, 500 13, 500 Avg. $1125/month 13 Photography 0 0 99 Other Professignal Services 3,500 500 0 5400 LIBRARY AND SUBSCRIPTIONS 1, 100 1,300 0 1,400 - ------------------------------- -------- --------- -------- -------- ----------------------- 01 Photographs & Films 0 02 Books and Subscriptions 1, 100 1,300 1,400 Incr. In Subscription -------------------------------- -------- --------- -------- -------- ----------------------- 5600 RENTS & LEASES 250 150 0 450 -------------------------------- -------- --------- -------- -------- ----------------------- 04 Vehicles 250 150 250 FOOSP House Tours/Vans 99 Miscellaneous 200 Portable Toilet ' -------------------------------- -------- --------- -------- -------- ----------------------- 5800 POSTAGE 27,200 25, 000 0 29, 000 01 Postage 21, 200 25, 000 26, 000 02 Special Distribution 6,000 0 3, 000 Mail annual Report/Coas 5900 PRINTING AND DUPLICATING 1,200 1, 300 0 2, 300 - - - --- ------ -------- --- ----------- ------ --------- -------- -------- ----------------------- 01 Printing 1, 000 1, 000 2, 000 02 Duplicating/Xeroxing 04 Photo Processing 200 300 300 6100 ADVERTISING 0 1, 500 0 1, 500 01 Legal/Classified 0 1, 500 1, 000 over=Pamgr;need for VSS 02 Display 0 0 500 coastal workshops ads -------------------------------- -------- --------- -------- -------- ----------------------- 6301 PRIVATE VEHICLE EXPENSE 1,200 1,200 1,200 -------------------------------- -------- --------- -------- -------- ----------------------- PUBLIC AFFAIRS - PROGRAM 40 ADOPTED BUDGET 99/00 P.3/5 99/00 99/00 99/00 00/01 Adopted Projected Actual Proposed SERVICES & SUPPLIES Budget Expenses Expenses Budget -------------------------------- -------- --------- -------- -------- ----------------------- 6500 BUSINESS MEETING EXPENSES 3, 575 3, 850 0 3, 975 01 Local Meeting Expense 300 350 300 02 Out-of-Town Business Meetin 75 0 75 03 Organizational Membership 3,200 3, 500 3, 600 Baosc,abag,ridge,2 sda' 6600 PERSONNEL DEVELOPMENT 2, 950 2,850 0 2, 650 -------------------------------- -------- --------- -------- -------- ----------------------- 01 Training and Seminars 750 750 750 03 Membership and .Dues 200 100 100 04 Professional Conferences 2, 000 2, 000 1, 800 -------------------------------- -------- --------- -------- -------- ----------------------- 6700 MAINTENANCE AND REPAIR/EQUI 0 0 0 0 -------------------------------- -------- --------- -------- -------- ----------------------- 02 Office 0 0 0 -------------------------------- -------- --------- -------- -------- ----------------------- 6800 COMPUTER EXPENSES 400 400 0 1, 100 01 Software 400 400 250 02 Computer Supplies 700 Monitor/ergonomic suppl 03 Laser Printers 04 Repair & Replacement 150 related to ergonomics -------------------------------- -------- --------- -------- -------- ----------------------- 6900 OFFICE SUPPLIES/SMALL EQUIP 275 300 0 325 01 Office Equipment (under $20 75 50 75 02 Office Supplies 150 200 200 04 Photographic Supplies 50 50 50 7301 MISCELLANEOUS 75 200 150 -------------------------------- -------- --------- -------- -------- ----------------------- PUBLIC AFFAIRS - PROGRAM 40 P.4/5 ADOPTED BUDGET 99/00 99/00 99/00 99/00 00/01 Adopted Projected Actual Proposed SERVICES & SUPPLIES Budget Expenses Expenses Budget -------------------------------- -------- --------- -------- -------- ----------------------- 7400 COMMUNICATIONS PUBLICATIONS 129,425 136, 650 0 150, 375 -------------------------------- -------- --------- -------- -------- ----------------------- 01 Professional Services 18,275 20, 550 22, 025 02 Production & Distribution 111, 150 116, 100 128, 350 -------------------------------- -------- --------- -------- -------- ----------------------- 7500 COMMUNICATIONS/SPECIAL PROJ 6, 900 3,250 0 8,250 O1 Professional Services 4, 150 1, 800 2, 100 02 Production & Distribution 2, 750 1,450 6, 150 7600 VISITOR SERVICES 11,450 11, 300 0 15,400 -------------------------------- -------- --------- -------- -------- ----------------------- 01 Volunteer News 1, 500 950 900 changed from bi to 1/4r 02 Docent Connections 1,400 1, 000 1, 150 chng to mnthly cal/l/4 03 Volunteer Supplies 700 700 800 04 Docent Supplies 400 350 400 05 Volunteer Docent Training 1, 000 700 750 no trng for reg doc in 06 Resource Materials 500 300 350 07 Recognition Events/Items 2, 800 2, 800 4, 000 more vol 's; unchanged 08 Trail Patrol/Docent Uniform 500 500 1, 600 09 Nature Center-Supplies & Eq 2, 000 3,400 4, 800 over: binocs from donat 10 Environmental Supplies 650 600 650 TOTAL SERVICES AND SUPPLIES 203, 500 203,250 0 231, 575 -------------------------------- -------- --------- -------- -------- ----------------------- FIXED ASSETS -------------------------------- -------- --------- -------- -------- ----------------------- 8300 EQUIPT.EXP./OFFICE (OVER $2 3, 000 4, 100 0 8,400 O1 Furniture 02 Machines 3, 000 4, 100 8,400 1)New comp-paul;new co -------------------------------- -------- --------- -------- -------- ----------------------- TOTAL FIXED ASSETS 3, 000 4, 100 0 8,400 2) laptop to run project -------------------------------- -------- --------- -------- 3)PC Projector for pcwe -------------------------------- -------- --------- -------- -------- ----------------------- TOTAL BUDGET-ALL CATEGORIES 531, 825 516, 125 0 531,275 PUBLIC AFFAIRS - PROGRAM 40 P.5/5 ADOPTED BUDGET 99/00 99/00 99/00 99/00 00/01 1999/2000 BUDGET Adopted Projected Actual Proposed PUBLIC AFFAIRS PROGRAM Budget Expenses Expenses Budget -------------------------------- -------- --------- -------- -------- ----------------------- TOTAL SALARIES & BENEFITS 325,325 308, 775 0 291, 300 -------------------------------- -------- --------- -------- -------- ----------------------- Legislative Consultant 13,500 13, 500 0 13,500 Communication Publications 129,425 136,650 0 150,375 Communications/Special Project 6, 900 3,250 0 8,250 Professional Conferences 2,000 2,000 0 1,800 Other Services & Supplies 51,675 47, 850 0 57, 650 TOTAL SERVICES & SUPPLIES 203,500 203,250 0 231,575 -------------------------------- -------- --------- -------- -------- ----------------------- -------------------------------- -------- --------- -------- -------- ----------------------- TOTAL FIXED ASSETS 3,000 4, 100 0 8,400 -------------------------------- -------- --------- -------- -------- ----------------------- -------------------------------- -------- --------- -------- -------- ----------------------- TOTAL BUDGET - ALL CATEGORIES 531,825 516,125 0 531, 275 ------- -------- -------- ----------------------- Y�ro rQn� 50 28-Feb-00 ADMINISTRATION - PROGRAM 50 P.1/5 BUDGET 99/00 ++s++++++r++rrrrrr++r+++rsr++r+r+aa +++++a+as++ +xxxxr+♦+s+ raxa+a+xr++ axxxr x++rr+ +xx+ss+xxxxarsrs++r+++a++ 99/2000 99/2000 99/2000 00/01 SALARIES & BENEFITS Adopted Projected Actual Proposed Budget Expenses Expenses Budget ------------------- ------ ----------- ----------- ----------- ----------- ------------------------- 4000 BOARD APPOINTEES 183,250 205,100 0 192,200 51 General Manager 104,600 116,800 110,350 52 Controller 15,000 18,100 15,000 53 Legal Counsel 63,650 70,200 66,850 4100 GENERAL MANAGER APPOINTEES 338,150 334,875 0 366,850 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Group Leaders 67,100 67,500 69,900 02 Supervisory/Professional(Perm) 114,600 116,000 121,050 03 Temporary Employees 2,000 1,950 2,500 04 Secretarial/Technical (Perm) 95,350 88,325 108,600 05 Administrative/Technical (Perm 59,100 61,100 64,800 12 Overtime 16 Vacation Accruals ----------------------------------- ----------- ----------- ----------- ----------- ------------------------ 4201 SALARY INCENTIVE AWARD 25,000 22,000 0 4300 RETIREMENT PLANS 64,950 69,150 0 54,800 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Pers 54,500 58,100 42,000 03 G.M.Appointees Def.Comp. 2,600 3,675 5,400 04 Social Security/Medicare 7,850 7,375 7,400 0.0145 + 6.2% Mike + Temp 4400 GROUP INSURANCE 41,400 44,475 0 43,600 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Health 27,950 30,600 27,950 02 Dental 6,000 6,550 7,600 03 Life 1,150 1,425 1,350 04 Long Term Disability 3,450 3,600 3,750 06 EAP 1,600 1,200 1,500 07 Vision 1,000 925 1,200 08 Cafeteria/Plan Section 125 250 175 250 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 4500 STATE MANDATED INSURANCE 10,200 3,250 0 4,500 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Worker's Compensation 4,200 3,250 4,500 02 Unemployment Insurance 6,000 0 0 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 4701 DIRECTORS FEES 30,000 26,900 30,000 38 MTGS.EACH PER YEAR TOTAL SALARIES & BENEFITS 692,950 705,750 0 691,950 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- ADMINISTRATION - PROGRAM 50 P.2/5 BUDGET 99/00 +++xxrtrss++++++++++++rr+rt+s+ss++s rr++++t++++ +++s++++rtt ++rtrr+++++ +++a+++++++ ++++++x+xs++xtttxs+++++++ 99/2000 99/2000 99/2000 00/01 SERVICES & SUPPLIES Adopted Projected Actual Proposed Budget Expenses Expenses Budget ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 4900 LEGAL FEES 10,000 6,000 0 10,000 01 Special Legal Fees 10,000 61000 10,000 Unanticipated legal fees 5000 REGULAR OUTSIDE SERVICES 7,000 8,200 0 7,500 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Microfilming 600 600 600 Board Records 04 Temporary Office Help 0 05 Payroll Services 3,700 4,200 4,200 09 Internet Provider 2,700 3,400 2,700 Internet Provider-Main Off 5200 CONTRACT SERVICES 72,800 60,650 0 63,200 01 Auditor 9,600 10,100 14,000 Annual Audit 03 Recording Services 7,200 6,000 7,200 $300 Per Meeting 07 Personnel Consultant 36,000 36,000 18,000 Assessment 08 Mapping 15 Computer Consultant 12,500 6,500 19,000 3000 Hal/8K database/Net/U 99 Other Professional Services 7,500 2,050 5,000 Facilitators, Acctg. Asst. ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 5300 ELECTION/ANNEXATION EXPENSES 0 0 0 28,000 01 Santa Clara County Expenses 0 0 0 02 San Mateo County Expenses 0 28,000 03 Annexation Expenses 5400 LIBRARY AND SUBSCRIPTIONS 4,400 6,500 0 6,500 02 Books and Subscriptions 700 1,000 1,000 03 Legal Books & Subscriptions 3,700 51500 5,500 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 5500 FILM AND DEVELOPING ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- ----------------------------------- ----- ----- ----------- ----------- ----------- ------------------------- 5600 RENTS AND LEASES 25,000 24,600 0 27,900 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Structures 1,500 200 500 Meeting Facilities 02 Office Equipment 17,500 19,000 22,000 Postage Meter/Copier Upgra 05 Telephone Lease 6,000 5,400 5,400 Lease Infinity ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 5700 UTILITIES 50,950 47,600 0 56,500 01 Electrical 22,000 18,000 24,000 02 Water 1,050 1,200 1,500 03 Propane & Gas 7,000 5,000 6,400 04 Garbage 900 900 1,100 05 Telephone 20,000 22,500 23,500 Modems,Maintenance Agreeme Cell Phones --------------------------------- ---------- ----------- ---------- ---------- ------------------------- 5801 POSTAGE 13,500 13,400 16,000 General/Board Postage Inc./Sub. Decrease ADMINISTRATION - PROGRAM 50 P.3/5 BUDGET 99/00 +++a+rr++ta+ra+taat••rrwwwwawtawwa+ +ata+aarrr+ ++a+a+t+aar aaat+ww+a+w twatwwww+aw rww+tta+ar+t++r+arr++rta+ 99/2000 99/2000 99/2000 00/01 SERVICES & SUPPLIES Adopted Projected Actual Proposed Budget Expenses Expenses Budget ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 5900 PRINTING AND DUPLICATING 15,300 11,500 0 15,800 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Printing 8,500 7,000 9,000 Letterhead, Business Cards 02 Duplicating/Photccopying 6,800 4,500 6,800 Paper/Toner 6000 INSURANCE 29,750 28,350 0 41,250 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 General 29,750 28,350 41,250 Add Employmnt Prost Ins. ----------------------------------- ----------- ----------- ----------= ----------- ------------------------- 6100 ADVERTISING 5,000 51000 0 5,000 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Legal/Classified 5,000 5,000 5,000 Public Notices, HMB 6301 PRIVATE VEHICLE EXPENSE 4,700 4,550 4,700 7 Staff/Rate ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- ----------------------------------- ---------- --------- ----------- ----------- ------------------------- 6500 BUSINESS MEETING EXPENSES 3,500 3,000 0 3,500 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Local Business Meetings 3,000 2,850 3,000 Evening Meetings 02 Out-of-Town Meetings 500 150 500 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 6600 PERSONNEL DEVELOPMENT 23,400 20,400 0 34,000 01 :raining and Seminars 9,500 8,000 9,500 Art O'Neal/10 Staff 02 Educational Assistance 300 300 600 03 Membership and moues 1,600 1,100 2,000 Park orgs/bar 04 Professional Conferences 6,400 6,100 12,300 Special District,BOD Insti 05 Safety Program 1,000 400 1,000 Safety Fair 06 Recognition Activities by Boar 4,000 3,900 8,000 07 Staff Activities 600 600 600 Staff Events ----------------------------------- ----------- ----------- ----------- ----------- -------------- ----- 6700 MAINTENANCE AND RE.PAIR/EQUIPT. 500 300 0 500 ----------------------------------- ----------- ----------- ----------- ----------- ------- ---------------- 02 Office Soo 300 500 Misc. Equip. ADMINISTRATION - PROGRAM 50 P.4/5 BUDGET 99/00 99/2000 99/2000 99/2000 00/01 SERVICES & SUPPLIES Adopted Projected Actual Proposed Budget Expenses Expenses Budget 6800 COMPUTER EXPENSES 8,050 6,600 0 10,700 01 Software 3,600 2,400 6,100 H.R. & Network 02 Supplies 550 300 1,400 Misc. Componets, ergonomic 03 Laser Printers 2,500 2,500 2,700 Printer, Clean Cartridges 04 Repair & Repair/Maintenance 1,400 1,400 500 Monitor, Maint. ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 6900 OFFICE SUPPLIES/SMALL EQUIPT. 7,200 7,000 0 7,800 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Office Equipment (under $500) 1,000 1,000 1,200 Misc. 02 Office Supplies 6,200 6,000 6,600 Office & Kitchen 7100 OUTSIDE MAINTENANCE AND REPAIR 20,000 -- 18,900 - -- --- 0 29,100 ----------------------------------- ------------------------- 01 Structures--Exterior/Interior 2,000 2,000 5,000 02 Janitorial and Cleaning 8,000 8,000 12,000 03 Electrical 1,000 800 1,000 04 Water 500 0 1,200 05 Sewer 500 700 1,200 06 Heating 5,000 5,000 5,000 12 Landscape Maintenance 2,500 2,100 2,800 13 Pest Control 0 0 400 99 Miscellaneous 500 300 500 7301 MISCELLANEOUS 100 100 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- TOTAL SERVICES AND SUPPLIES 301,150 272,550 0 368,050 FIXED ASSETS ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 8200 STRUCTURES & IMPROVEMENTS 60,000 35,000 0 90,000 8202 Structures--DC 60,000 35,000 90,000 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 8300 EQUIPT.EXP./OFFICE (OVER $500) 13,600 8,850 0 19,800 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- 01 Furniture 10,600 4,000 13,500 Expansion 02 Machines 3,000 4,850 6,300 1 Computer, 1 Printer & Se ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- TOTAL FIXED ASSETS 73,600 43,850 0 -09,800 TOTAL BUDGET-ALL CATEGORIES 1,067,700 1,022,150 0 1,169,800 ADMINISTRATION - PROGRAM 50 P.5/5 BUDGET 99/00 . x++x+a+a+aaaaaaaxaaxxa+++x++xxxx+a+ ++++++++a+a a+xx+a++++a aaa+a+xxxx+ +aa+++aaxxx as+++a++axaa+x++a+aaxxxxx 1999/2000 ADOPTED BUDGET 99/2000 99/2000 99/2000 00/01 GENERAL MANAGEMENT Adapted Projected Actual Proposed AND PROGRAM SUPPORT Budget Expenses Expenses Budget TOTAL SALARIES & BENEFITS 692,950 705,750 0 691,950 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- TOTAL SERVICES & SUPPLIES 301,150 272,550 0 368,050 ----------------------------------- ----------- ----------- ----------- ----------- ------ ------------------ TOTAL FIXED ASSETS 73,600 43,850 0 109,800 ----------------------------------- ----------- ----------- ----------- ----------- ------------------------- TOTAL BUDGET-ALL CATEGORIES 1,067,700 1,022,150 0 1,169,800 2/15/2000 2:25 PM OPERATIONS-PROGRAM 60 P_1 ADOPTED BUDGET 99/00 .................................................... ..................... . ..................... . ..................... . .................. . ................................... . I I 99/00 II 99/00 II 99100 II 00/01 II II II Adopted 11 Projected 11 Actual II Proposed II II SALARIES&BENEFITS II Budget p Expenses p Expenses p Budget II II •----- ------�-- - -_ _ II - -----II - - --- -------- 4100 GENERAL MANAGER it II II II II II APPOINTEES II 1,840,850 11 1,795,200 II 0 II 1,908,900 II II --------------- - - ___ - I I -- - ___ - II --------------------II -__- - --II -------- 01 Group Leaders 11 129,650 II 90,400 II 0 II 134,850 II MANAGER/ASST.GM II 02 Supervisory/Professional(Perm) II 161,050 II 161,975 II 0 II 165,900 II SUPP.STAFF/R.MNGMT II 03 Temporary Employees II 0 II 0 )I 0 II II / 04 Secretarial/Clerical(Perm) 39,150 39,000 0 � 9,"5011 SECRETARY 07 Ranger(Perm) 590,300 595,150 0 RANGERS (1 4) ,80008 Area Superintendent 121,600 114,400 0 5 IIII II AREA SUPERINTENDENTS(2 !I 09 Supervising Ranger II 209,000 II 208,700 II 0 II SUPERVISING RANGERS(4+ II 10 Open Space Tech/Leads(Perm) it 369,150 II 369,575 II 0 II 44.700 OS IDS (2+2) U 11 Open Space Tech(Temp) 119,100 110,125 ��0121,000 EHO 12 Overtime 5,000 7,250 o II � IIIII 14Interns 6.500 5,050 0 4.000 RESO MGMT.INTERNS 15 Mechanic/Equipt.Operator 90,350 93,575 III QUIP.OPERATOR(2) II 03 Temporary Employees II 0 II 0 II 0 II 0 II II -------------------- - ------------------------I I - -- - -I I --- ---- I I --�----I I ----- --I I -- 11 4300 RETIREMENT PLANS II 220,100 II 214,325 I! 0 II 174,650 II II --------------------------------------------------------I -----------------------il -------------- --II -__- - - I --------- 01 Pers I 189,650 II 182,200 II 0 II 140,250 II 11.088 X Reg.Employees II 03 G.M.Appointees/Def.Comp. II 4,950 II 7,125 II 0 II 8,050 II II 04 SS&SSMedical II 25,500 II 25,000 II 0 II 26,350 II 1,45% II --------------------- _-_- -- I I - - - --I I -- - - -I I -- -------___11 --------- --I I --- - - --11 4400 GROUP INSURANCE II 207.200 I 197.190 it 0 II 243.200 II II ---------------------------------------------------II ------------------------II ------------------------II -----------------___II ---------- ---II ---------------- 01 Health II 151,150 II 143,100 11 0 II 173,400 II 11 02 Dental II 29,250 II 29,750 II 0 II 40,950 II II 03 Life II 4,100 II 4,200 II 0 II 4,350 II I 04 Long Term Disability II 11.800 II 11,075 II 0 II 12,500 II II 05 Pre-Employment Physical II 0 II 0 II 0 II 0 II II O6 EAP II 6,000 II 4,690 II 0 II 6,000 II II 07 Vision I 4,100 II 3,725 II 0 II 5.200 I II O8 Cafeteria Plan/Section 125 II 800 11 650 II 0 II 800 II II -----------------------------------------------------------II -------------------------II -------------------------II -----------------------11 ------------- - II ------------------------- - !I 4500 STATE MANDATED INSURANCE II 92,100 II 67,350 II 0 II 97.800 II I! ------------------------------------------- --------------I I -------------------------I I --------------------------!I --------------------------i l -------------- - I I ----------------------------------!I 01 Worker's Compensation II 92,100 II 67,350 II 0 11 97,800 II H II o 11 II II 0 ii II ----------------------------------------------------------II --------------------------II ----------------------II - - - - II ----------- - II - --------------------------II II II II II it II - --------------- II - II - - II TOTAL SALARIES&BENEFITS 11 2,360,250 11 2,274,065 II 0 II 2.424,550 II II --------------------------------- -------------------------- -II --------------------------II --------------------------II ---------------------II ------------ - il -----------------------------------it 2/2 512 0 0 0 2:25 PM OPERATIONS-PROGRAM 60 P.2 ADOPTED BUDGET 99/00 II ssroo II 99100 p 99/00 II 00/01 p II II Adopted II Projected II Actual II Proposed !! II SERVICES&SUPPLIES 11 Budget Il Expenses II Expenses II Budget II II ------------- 4900 LEGAL SERVICES II 30,000 !1 40,000 Il 0 11 40,000 II 11 01 Special Legal Fees it 30,000 II 40.000 II 0 II 40,000 !! EST.FROM SUE SCHECTMA II II 0 II II 0 II 0 II II II 5000 REGULAR OUTSIDE SERVICES !! 34,200 II 34,600 11 0 II 33,800 II II --- II II II — II II II 06 Burglar Alarm 11 2.500 II 2,500 !! 0 II 2,700 II II 07 Sanitary Disposal Services II 8,700 II 10.300 II 0 II 8,700 II II 08 Dispatching Services !! 23.000 II 21.000 II 0 II 21,000 II YEAR 2 OF 5 YEAR AGRMT II 09 Internet Service II 0 II 800 II 0 If 1,400 11 II 99 Miscellaneous II 0 II 0 II 0 II 0 11 II II 0 II 0 II 0 II 0 II II ---______— —__ ___ _ ._II —--— II ------ 5200 CONTRACT SERVICES it 97,300 11 100.300 !I 0 11 103,900 II II ----------- — -- — — -- II -------------— ——II --------— II II 02 Graphics II 0 II 0 II 0 II 0 II II 04 Architect II 0 II 0 II 0 II 0 II II 06 Planning Consultant II 0 II 0 II 0 II 0 II II 07 Personnel Consultant II 2,000 II 1,000 II 0 Il 2,000 II II 14 Patrol Services II 0 II 2,400 II 0 II 2,400 11 WOODSIDE PATROL WINDY II 17 Medical Services II 2,800 !! 4,000 p 0 II 3.500 II II 18 Interns II 0 II 0 II 0 II 0 II it 99 Other Professional Services 11 92,500 II 92,900 II 0 II 96,000 II RES.MGMT.CONSULTANTS !! 5400 LIBRARY AND SUBSCRIPTIONS II 700 11 700 II 0 II 700 II 11 ------------------------------------ --- I I -----—------——— I ---------- I I --— I I — — —I I ----- 01 Photographs and Films I 200 II 300 II 0 II 300 II II 02 Books and Subscriptions Il 500 II 400 II 0 !! 400 II II 99 Miscellaneous II 0 II 0 II 0 II 0 11 II II 0 II 0 II 0 II 0 II II -----------------------------— — --—I I --— I I ---- if ----------- I I — — I I ----------------------- 5501 FILM AND DEVELOPING II 700 II 500 it 0 II 500 II II --------------------------------------------------------II --------------------------II --------—----------—II ----------------- !I — -------II -------------------------- II II I ii II --------------------------------------------------—— II ------------------ —II ---------—____it ----------------- --------------------II ---------—--------------- ------ iI 5600 RENTS AND LEASES II 16,100 I1 22.700 11 0 II 00 11 ----------—----------------------- — -- II ------------ ---- Ii!I 01 Structures 9,000 15,600 0 3000 AZUL RENT REIMB/SLAGH 11 03 Field Equipment&Machinery vI ! / �04 Vehicles 0 0 ! 0 if 0 II 30099 Miscellaneous 300 300 11 II ----—--------------—--------------------------II --------------------—II --------_-- it — II -------- -- II ------- -----------------------_--I! 2/25/2000 2:25 PM OPERATIONS-PROGRAM 60 P.3 ADOPTED BUDGET 99/00 .................................................... ..................... . ..................... . ..................... . ..................... . ............................ ...«.. , 11 99100 II 99/00 II 99/00 p 00/01 II II II Adopted II Projected 11 Actual 11 Proposed II II SERVICES&SUPPLIES 11 Budget II Expenses it Expenses II Budget II II ----------- —------ — — --—---I I — — --I I ------------- I I ---------------------11 ---—---—-------------I I —------------------------- 5700 UTILITIES II 27,600 II 25,160 11 0 II 26.950 II 11 ------------------------- ----— -------11 —-----— it --- ---II ---------—— —II -- ---- II ---------------—----- II 01 Electrical 11 14,000 it 10,700 II 0 II 11,300 Il II 02 Water 11 3,200 it 3,570 11 0 II 3,600 II II 03 Propane and Gas p 300 II 40 11 0 II 50 II II 04 Garbage 11 5,300 it 4,850 11 0 II 5,300 II II O5 4hone Telephone II 800II 6,000 II o II 6,700 II II 99 Miscellaneous II 0 II 0 II 0 II 0 II II II 0 If 0 II 0 11 0 II II 5801 POSTAGE II 200 II 0 II 0 II 0 II II -------------- ---- — I I — — --------------------II — -- ___ II --------------------—------ I II it II II II II —-------— -- — — ——II -- — !I -----------II —--- —---11 -----— ----II —-------------------------- II 5900 PRINTING AND DUPLICATING 11 6,500 II 2,500 II 0 II 4,500 11 II 11 -------------------- 01 Printing II 6,00C !1 2.000 11 0 11 4,000 11 WALL MAPS&MAP BOOKS II 02 Duplicating/Xeroxing 11 500 !1 500 11 0 it 500 I II 03 Brochure Printing !i 0 !I o II 0 II 0 II II 04 Photo Reproduction II 0 it 0 II 0 it 0 II II 99 Miscellaneous it 0 !1 0 II 0 II 0 II II II 0 .I 0 II 0 II 0 II II 6000INSURANCE Ii 106,500 ;I 110,400 II 0 II 117,500 II 11 --------------—II —----il ------- -----II —------—— — —II ----------------------Il —---—--------------------------- I 01 General ;i 101,000 I! 110.000 11 0 Il 117.000 11 ASSUMES 6%INCREASE I1 02 MROSD Sites ;! 5,500 ;I 400 11 0 11 500 II 1( !I 0 ;I 0 II 0 II 0 II II -----—------ _—_ -------- 6100 ADVERTISING II 2.000 11 5,000 it 0 II 6,000 II 11 -----------—— — -- —— — II — — --!I —— 11 —---------------------------II 01 Legal/Classified p 2,000 it 5,000 II 0 it 6,000 II I! 0 it 0 II 0 II II ----------—----------- —---------- ---------------- ! —-------------- I --------------------if -----------------------!I -----------------------I I ----------------------------------I I 6301 PRIVATE VEHICLE EXPENSE 1,6C. 2.100 11 0 'I 2,500 11 I! itli ------------------•---------------------II 2/25/2000 2:25 PM OPERATIONS-PROGRAM 60 PA ADOPTED BUDGET 99/00 . .... .......................... ..................... . ..................... . ..................... . .................... . ................................... . II 99/00 II 99/00 p 99/00 it 00/01 II II II Adopted II Projected II Actual jj Proposed II II SERVICES&SUPPLIES 11 Budget II Expenses II Expenses I{ Budget II II ---------------------- - - - - I I -------- -_-- I I -- ------------- ---I I 6400 DISTRICT VEHICLE EXPENSES II 143,400 II 166,400 Il 0 ;1 17 II 01 Consumables lj 47,000 II 62,000 II 0 it 7 CVO 6 II FUEL P ICES REMAIN HIGH II 02 Insurance II 26,000 Ij 23,000 p 0 jl 26,000 II II 03 Maintenance and Repairs II 68,000 II 79,000 II 79,000 II I! 04 Supplemental Equipt(under 500) jl 2,400 II 2,400 II 0 II 400 II II 99 Miscellaneous Ij 0 II 0 jl 0 (I 0 II II 6500 BUSINESS MEETING EXPENSES II 900 jl 1,100 Ij 0 Ij 1,100 I{ II ------------------------_- -__ -II - -- _..._ --------- 01 Local Meal Conferences 11 600 II 500 jl 0 Ij 500 II II 02 Out-of-Town Business Meetings II 300 Ij 600 jl 0 !! 600 II II 99 Miscellaneous II 0 II 0 II 0 it 0 II II - - --------------------------------- 6600 PERSONNEL DEVELOPMENT II 24.000 II 23,100 Ij 0 i1 29,600 II II ----------------------------------------------------I I -------------------- 01 Training and Seminars II 18,000 II 18,000 II 0 ;I 21,000 jj NEW EMPLOYEE TRAINING Il 02 Educational Assistance jl 1,000 11 300 jj 0 ;I 2.000 jl UNION TENT.AGREEMENT II 03 Membership and Dues II 500 jl 500 II 0 ;I 600 II II 04 Professional Conferences II 4,500 II 4,300 jj 0 6,000 II SPEC DIST.NRPA,PRAC TRA 05 Safety Program II 0 II 0 II 0 ii 0 II II -------------------------_-- _-- -II -- -- _ _II - II - !I --- II ----------- 6700 MAINTENANCE AND REPAIR/EQUIPT II 18,600 jl 18,870 II 0 ;j 19.700 II II 01 Outside Equipt.Repairs jj 1,500 II 1,500 II 0 jj 1,500 Ij jj 02 office jj 1,900 II 1,970 II 0 "t 2.200 II II 03 Parts and Consumables II 7,200 II 6,400 Il 0 7,000 jl II 04 Fire p 2,000 II 2,000 II 0 I 2,000 II 11 05 Radio II 5,500 II 6.500 jl 0 'I 6,500 II II 99 Miscellaneous II 500 II 500 II 0 500 jj II ------------------- ----------- ------------------ -- -------------------- ---- II ---------- ------- 6800 -II COMPUTER EXPENSES II 1,600 II 600 II 0 2.000 II BUDGET PER SYSTEM MGR !j ---------------------------------------- -------------------II -------------------------I I --------- ------------II ------------------ --------------11 -------------------------------- 01 Software II 600 j! 500 Il 0 0 Ij 02 Supplies II 500 0 I 0 1.700 I 03 Computer Maintenance II 500 II 0 II 0 0 Ij 04 Computer Repair&Maintenance II 0 II 100 Il 0 300 jj y -------------------------------------------------------------II --------------------------I I --------- - -1I - --- ------------- ---11 ------------------------------------- 6900 OFFICE SUPPLIES/SMALL EQUIPT. jj 1,200 II 2,200 Ij 0 2.200 11 p --------------------------------------------------------------I --------------------------I I ------ _ - - I I ------------------ ___------------- I I -------------------------------- 0 1 Office Equipment(under$500) jj 600 II 600 II 0 600 II it 02 Office Supplies jl 600 II 1,600 lj 0 1,600 p SUPPLEMENT ADMIN BUDGE 11 II 0 II 0 II 0 0 II ------------------------------------------------------------I I -----------------------I I ----------------------- I I - -- --------------I I ----------------------------- I J 2/25/2000 2:25 PM OPERATIONS-PROGRAM 60 P 5 ADOPTED BUDGET 99/00 .................................................... ..................... . ..................... . .................... . .........,,....,..... . ,.,.......................... ...... . I I 99/00 I I 99100 I I 99/00 I I 00/01 I I I II Adopted Il Projected II Actual II Proposed 11 II SERVICES&SUPPLIES 11 Budget II Expenses II Expenses Il Budget II II -------------------------------------------------------II --------------------- I I ---------------------I I -------- I I - - --- II - ---------------------- it 7000 FIELD SUPPLIES/SMALL EQUIPMENT II 49,000 II 49,000 11 0 II 70,450 II II ------------ -- -_-_ - - II ------------ - II --- - -II -----------II ---------------- 01 Field Equip/Shop Supp(under$500) II 6,000 11 6,500 II 0 II 10,500 II II 02 Field Supplies(Consumables) II 5,400 II 5.600 II 0 II 5,400 11 II 03 Uniform Allowance II 9,000 11 8,000 II 0 II 11.550.11 II 04 Uniforms District Provided II 16,500 II 18,000 II 0 II 21,000 II II 05 First Aid Consumables II 2,500 II 2,200 II 0 11 2,000 II I! 06 Restroom Supplies 11 4,700 II 3,700 II 0 11 4,000 II II 07 Public Safety Equipment II 2,300 II 2,400 II 0 II 13,000 Il REPLACE BODY ARMOR 11 10 Radio II 2,600 II 2,600 II 0 11 3.000 II II II o II 0 p 0 p 0 II II 7I00 OUTSIDE MAINTENANCE SERVICES II 148,100 11 150,940 II 0 Il 168,450 II II - ---- - -------------------II -----------------------II ---------------- -II -- II ----------------------- 01 Structures--interior/Exterior II 18.000 11 18,000 II 0 II 20,000 II it 02 Janitorial and Cleaning II 6,700 II 7,600 11 0 II 7,700 II II 03 Electrical II 400 II 400 II 0 II 400 p it 04 Water II 800 II 1,350 II 0 II 1,250 II II 05 Sewer/Septic II 1,000 II 1,160 II 0 II 1,000 II I O6 Heating II 200 II 2,500 II 0 II 200 II II 07 Parking Area II o II 0 II 0 II 0 II II 09 Trails and Roads II 70,000 11 72,000 II 0 II 84,000 11 STORM DAMAGE,PGE II 10 Signs II 2,500 II 2,180 II 0 11 2.500 II II 11 Protective Barriers II 6,400 II 5,500 11 0 II 8,900 II II 12 Resource Management II 32,900 II 31,000 Q 0 II 33,000 11 FIRE DISCING,OPS PROJEC II 13 Deer Hollow Farm 11 5,000 11 5.000 II 0 II 5,000 II ANTICIPATED TO CONTINUE II 99 Miscellaneous 11 4,200 II 4,250 II 0 II 4,500 II -----------------------------------------------------------II -------------------------- I ------------------------ I ----------------------II ------------------------II - - ------------------- li 7200 PROPERTY TAXES& LICENSES I 2,500 11 4,092 II 0 II 4,600 II II ----------------II - __---II -___--- II -- ---- II 02 Permits&Licenses II 2,500 II 4,092 II 0 II 4,600 II II II o II II II a II I ------------------------------------------------------------II -------------------------II -------------------------I I ---------- - it -------------------------- I -- --------------------- 7300 MISCELLANEOUS II 0 II 0 II 0 II 0 II -----------------------------------------------------------I I --------------------------II --------------------------I I ---------------------II -----------------------II -------------------------------- ----------------------------------------------------II -------------------------II --------------------------II -------------------------II -------------------------II ----------------------------------------- II oll 011 011 0 ;1 -------------------------------------------------------------I I -------------------------II -------------------------I I ------------------------I I -------------------------- I ------------------------------ ----------------------------------------------------------I I --------------------------I I --------------------------II ----------------------II ------------------------H --------- -------------------------- , TOTAL SERVICES AND SUPPLIES 11 712,900 II 760,262 II 0 II 820.450 II 1; -------------------------------------------------------------II ------------------------II ------------------------- II - --- - II -----------------------11 -------------------------------t! 2/25/2000 2:25 PM OPERATIONS-PROGRAM 60 P.6 ADOPTED BUDGET 99/00 ......................... ..................... . ..................... . ..................... . ...............I..... . ................................... . II 99/00 p 99/00 II 99/00 II 00/01 II II II Adopted II Projected II Actual II Proposed II II FIXED ASSETS II Budget II Expenses II Expenses II Budget II II ---------- _- ----- -- 11 8300 EQUIPT.EXP./OFFICE(OVER$200) II 5,200 II 6,717 II 0 II 7,500 II II ---------------------------- - - -- ---------- II ------II --------------------- 01 Furniture II 1,200 II 1,217 II 0 II 3,900 II OPS MGR,COMP TABLE FIEL II 02 Machines II 4,000 II 5,500 II 0 II 3.600 II (2)COMP FIELD (1)OFFICE II 03 Other II 0 II 0 II 0 II 0 II II II 0 II 0 II 0 II 0 II II 8400 EQUIPT.EXP./FIELD(OVER$200) II 69.500 II 78,500 II 0 II 15,500 II II 01 Field Equipment II 7.000 II 7,000 II 0 II 7.000 II II 02 Fire Equipment II 31.000 II 36,500 II 0 II 0 II II 03 First Aid/SAR Equipment II 0 II 0 II 0 II 0 II II 04 Supplemental Vehicle Equipment II 0 it 0 II 0 II 0 II II 05 Shop II 0 II 0 II 0 II 0 II !I 06 L.E.Equipment II 1,300 II 1,200 II 0 II 0 II II 07 Radio Base Station II 0 II 0 II 0 II 0 II II 08 Radio Mobile Vehicle II 6,000 II 4,600 II 0 II 2,500 II NEW TRUCKS ;I 09 Radio Mobile Personal II 4.200 it 4,900 II 0 II 6,000 II COMPLETE RANGER UPGRA ;I 10 Machinery p 20,000 300 24 II II 0 II 0 99 Miscellaneous it 0 II 0 II 0 II 0 II „ --------------------------------- -- --I I ----- I I ---------- -11 - -----------I I -----------------I I --- -----------II 8500 VEHICLES II 120.000 II 111.230 II 0 II 188,500 II II -------------—-------------— — ——---------I I — — — ----------------— 01 Cars it 0 II 0 II 0 II 0 II I 02 Trucks II 102.000 II 101.230 II 0 II 80,000 II 2 REPLACE,2 NEW PATROL II 03 Trailersi7ractors Il 0 II 0 II 0 II 73,000 II REPLACE BRUSHIN TRACTO ! 04 Supplemental Vehicle Equipemnt II 18,000 II 10.000 II 0 II 35,500 II ----------—-- — —— —---—------------ I - - - I I -------- _-- I I ------------------I I --------------------- -- TOTAL FIXED ASSETS II 194,700 II 196,447 II 0 it 211,500 II !I -------------------------------- ——--------— II -----tl ---------- II --II ---- ---II — — ------- ---it II II II II II ;; ---------------------------------------------------------il ------------ II - ___-- II --------------------II ----------------------- I --------------------------------------- TOTAL BUDGET II 3,267,850 ;! 3.230.774 II 0 II 3,456,500 !1 u - - --- I - - I I --------------------------I -------------------------- l ------------------------------------------- 2/25/2000 2:25 PM OPERATIONS-PROGRAM 60 P.1 ADOPTED BUDGET 99/00 ................. . ..................„............... . I I 99/00 II 99/00 I I 99100 I I 00/01 I I 2000/2001 BUDGET II Adopted II Projected II Actual II II Proposed II II OPEN SPACE OPERATIONS II Budget II Expenses II Expenses II Budget II II ---------------- -------------_- I I - ------ TOTAL SALARIES&BENEFITS II 2,360,250 ;I 2,274.065 II 0 II 2.424,550 II II ------II --------- ---11 -- ------------- -------- ---- - II Regular Outside Services II 34,200 II 34,600 II 0 II 33,800 II II Non-Vehicle Insurance II 106,500 II 110,400 II 0 II 117,500 II II District Vehicle Expense II 143,400 11 166.400 II 0 II 172,400 II II Personnel Development II 24.000 II 23,100 II 0 II 29,600 II II Field Supplies II 49,000 II 49.0 II 0 II 70,450 II II Outside Maintenance Services II 148,100 II 150,940 II 0 II 168.450 II II Other Services&Supplies II 207,700 II 225,822 II 0 II 228,250 II II TOTAL SERVICES&SUPPLIES II 712,900 Ij 760.262 II 0 II 820,450 ----------------------------- -- II II ----------- Field Equipment II 69,500 II 78,500 II 0 II 15,500 Vehicles II 120,000 II 111,230 II 0 II 188,500 II II Office Equipment II 5,200 I) 6,717 II 0 II 7,500 II II --------------- ---------- ---II - --�II ----- II ------- --- TOTAL FIXED ASSETS II 194,700 II 196,447 II 0 II 211,500 II II - ------- --- - --- -- - ----------------------------I I TOTAL BUDGET-ALL CATEGORIES II 3.267,850 II 3,230,774 II 0 �I 3.456,500 II II ------------------ ----------------- ------ ------- ------II ---------- - II Regional Open ace J MIDPENINSULA REGIONAL OPEN SPACE DISTRICT R-00-33 Meeting 00-05 March 8, 2000 AGENDA ITEM 3 AGENDA ITEM Authorization to Change District's Designation of Authorized Signatories for Entering District Safe Deposit Boxes ASSISTANT GENERAL MANAGER'S RECOMMENDATION Adopt the attached Resolution of the Board of Directors of the peninsula Regional Open Space District Establishing Signatories for Entering Safe Deposit Boxes(Mid-Peninsula Bank). DISCUSSION Section 2.50, "Safe Deposit Box",of your Rules of Procedure states that"The authorized signature for entrance into the District's safe deposit box are any of the following: President, Treasurer, General Manager, and the District Clerk." In light of the resignation of Peggy Coats and the re-appointment of Deirdre Dolan to District Clerk, it is necessary to change the District's designation of authorized signatories for the District safe deposit boxes to include Deirdre Dolan as Administration and Human Resources Manager and District Clerk. Prepared by: Deirdre Dolan,Administration&Human Resources Manager Contact person: Same as Above 330 Distel Circle e Los Altos,CA 94022-1404 • Phone:650-691-1200 FAX:650-691-0485 . E-mail:mrosd@openspace.org . Web site:www.openspace.org Board of Directors:Pete Siemens,Mary C.Davey,led Cyr,Deane Little,Nonette Hanko,Betsy Crowder,Kenneth C.Nitz •General Manager:L.Craig Britton w MID - PENINSLA BANK SAFE DEPOSIT SIGNATURE CUARD - NON PERSONAL Renter: MIDPENINSULA REGIONAL OPEN SPACE Financial Mid-Peninsula Same DISTRICT institution: 42o Cowper Street 330 DISTEL CIRCLE Palo Alto,CA 94301 LOS ALTOS,CA 94022 _ ~ RENTAL AGREEMENT M[OPENINSULA REGIONAL OPEN SPACE DISTRICT, hereinafter 'Renter', 'lessee-, hereby applies to Mid-Peninsula Bank. hereinafter "you ` eut","lessor',to rent the sale deposit box in accordance with the terms and Conditions contained on both sides of the card and,in consideration of the rental and the delivery of the two keys to the box,the receipt of which is hereby acknowledged,agrees t0 pay the rental fees and to comply in all respects with and be bound by all the terms,conditions,rules and regulatlons referred to or included in this Agreement. CORPORATE r ASSOCIATION RESOLUTION i hereby certify that I am the duty qualified Secretary of MIDPENINSULA REGIONAL OPEN SPACE DISTRICT, that at a meeting regularly convened pursuant to its Bylaws on March 8,2000,or by Special action without a meeting,its Board of Directors adopted a resolution which has not since been modified or revoked,of which the following is a true copy: -Resolved that any one(1)of the Authorized Signers below be and they hereby are authorized to enter into such safe deposit rental agresment(s) with Mid-Peninsula Bank,as they shalt deem proper,to haV9 access to and to surrender the box or boxes,to receive and receipt for any contOnts of the box or boxes or other properly in your possession for storing or safekeeping and to execute releases of liability with respect to any such transactions, until you receive at the location at which the sate deposit box or boxes may be rented a certified copy of a resolution revoking or modifying this resolution: I further certify that the signatures below are genuine signatures of the persons designated in the resolution CERTIFIED TO AND ATTESTED BY: X •Secretary or ASsistan( ecretary Renter. MIDPENINSULAWNWIbPEN SPACE DISTRICT Box Number: 2704 , 2 7 Q 5 , 2 7 0 6 Number of Signers Require*Eky one(1)of the Authorized Signer(s)shown 0610. t D SIGN AN TC 0ENTt ICA71 certifying offruw isby the resolutions as one of the signing office s,this resolution must afSa be MW signed by a second Director of the Corporation X _ SSN: 560-54-90a3 Phone:(H): (W); L CRAIG BRITTON,GENERAL MANAGER Date Street.Job: DOB: 02-0b-1941 ID: MMN: SHRADER X _ _ SSN: Phone:(Hy tW): KENNETH C NIT2,PRESIDENT Date Street: Job: ID: X _ SSN: Phone:(H): (W): MARY'DAYEY.TREASURER Date Street: Job: 10: X _ _ SSN: Phone:(H)-. tW) DEIRDRE DOLAN,ADMIN&HR MGR Dine Street; ID:ADDITIONAL TERMS AND CONDITIONS CONTINUED ON REVERSE SIDE Claims No. 00-05 Meeting 00-05 Date: March 08, 2000 Revised MIDPENINSULA REGIONAL OPEN SPACE DISTRICT # Amount Name Description 1433 225.00 Aaron's Septic Tank Service Sanitation Services 1434 134.41 ADT Security Services Alarm Service 1435 246.27 All Laser Service Printer Maintenance Service 1436 47.74 Randy Anderson Vehicle Expense 1437 2,000.00 Appraisal Research Corporation Appraisal Services 1438 238.24 Artech Laminating Lamination Supplies 1439 163.31 Barron Park Supply Co. Field Supplies 1440 45.00 Craig Beckman Reimbursement--Field Supplies 1441 1,103.58 Bishop Company Road Maintenance Supplies 1442 398.59 L. Craig Britton Reimbursement--AHR Conference Expense 1443 1,954.75 Dana Bland&Associates Consulting Biologists--Sierra Azul 1444 881.97 Bowerman Electric Electrical Repairs--Distel Building 1445 62.70 Cabela's Uniforms 1446 231.26 John Cahill Vehicle Expense 1447 73.03 *1 California Chamber of Commerce Resource Documents 1448 120.00 California Park&Recreation Society Dues--General Manager 1449 56.05 California Water Company Water Services 1450 80.00 Camino Medical Group Medical Services 1451 236.80 Cellular One Cellular Phone Service 1452 47.54 CSK Auto, Inc. Checker, Schuck's Kragen Vehicle Supplies 1453 250.00 California Specialized Training Institute Training--G. Baillie 1454 448.05 D & M Consulting Engineers, Inc. Permit Certification--Purisima Creek 1455 63.86 Dennis Dart Vehicle Expense 1456 320.00 Done Right Roofing and Gutters Enterprise Rental Repair 1457 4,830.00 Kevin Emery Builder Enterprise Rental Repair 1458 215.63 Ergonomic Sciences Corporation Office Equipment 1459 65.67 Federal Express Express Mail Service 1460 1,198.20 Forestry Suppliers Road Maintenance Supplies 1461 50.99 Foster Brothers Key Duplication 1462 131.13 Matt Freeman Vehicle Expense 1463 243.75 Robert E. Friday Acquisition Services 1464 772.07 Gardenland Power Equipment Field Supplies 1465 3161 G &K Services Shop Towel Service 1466 2,538.65 Sandra Gimbal Sommer, Landscape Architecture Contract Planner Services 1467 2,297.75 Gavin Hoban Mapping/GIS Development/Area Plan 1468 205.00 IRWA Training--M. Williams 1469 1,080.00 International Training Resources, Ltd. Defensive Tactics Training 1470 76.50 Kaiser-Santa Clara Medical Services 1471 33.73 Keeble&Shuchat Photography Photo Processing Services 1472 128.82 John Kowaleski Reimbursement--Uniforms 1473 76.00 Kwik Key Lock&Safe Co., Inc. Service Repair--Distel Building 1474 40.03 Life Assist, Inc. First Aid Supplies 1475 1,187.97 Lucent Technologies Telephones 1476 111.28 Paul McKowan Reimbursement--Resource Documents 1477 859.49 MetroMobileCommunications Radio Maintenance & Repairs 1478 346.55 MCI Telephone Service 1479 145.40 Minton's Lumber&Supply Field Supplies Page 1 Claims No. 00-05 Meeting 00-05 Date: March 08, 2000 Revised MIDPENINSULA REGIONAL OPEN SPACE DISTRICT # Amount Name Description 1480 263.91 Moffett Supply Company Janitorial Supplies 1481 157.46 Office Helper Office Supplies 1482 196.11 Overhead Door Company of Santa Clara Valley Shop Door Repairs 1483 196.31 Pacific Bell Telephone Service 1484 557.79 Palo Alto Upholstery Vehicle Upholstery 1485 25.00 City of Palo Alto Utilities Utilities 1486 9.53 Pearson Pontiac GMC OLDS Vehicle Repair Part 1487 1,625.14 Pip Printing Printing Services 1488 20.57 Pitney Bowes Postage Meter Maintenance 1489 152.24 Powerland Equipment, Inc. Field Supplies 1490 38.50 Precision Engravers, Inc. Name Tag Engraving 1491 526.60 Eric Remington Wildlife Assessment Services 1492 1,000.00 Rentco Fence Fence Rental-Bear Creek Redwoods 1493 9.06 Roberts Hardware Field Supplies 1494 892.12 Roy's Repair Service Vehicle Maintenance &Repair Services 1495 890.06 Russ Enterprises Signs 1496 126.66 San Mateo County Times Subscription Renewal 1497 126.11 Safety-Kleen Solvent Tank Service 1498 311.22 Second Cup Local Business Meeting Expense 1499 62.00 Sequoia Analytical Water Testing 1500 292.29 Shell Oil Fuel 1501 51.33 Skywood Trading Post Fuel 1502 124.50 Soma Ergonomics, Inc. Office Equipment 1503 320.42 Summit Uniforms Uniforms 1504 386.14 Therma Corp. HVAC Maintenance 1505 146.08 Turf&Industrial Equipment Co. Tractor Battery 1506 4,401.90 2 M Associates District Annexation Study Consultants 1507 1,538.45 United Rental Equipment Rental 1508 36.75 *2 United Parcel Service Parcel Service 1509 157.79 Michael Williams Vehicle Expense 1510 200.00 Woodside&Portola Private Patrol Windy Hill-Patrol Services 1511 337.39 Wedge-Loc Co. Inc. Field Supplies 1512 255.82 West Group Payment Center Legal On-Line Services 1513 73.06 Wolf Camera Photo Processing 1514 171.85 The Workingman's Emporium Uniforms 1514 456.27 Petty Cash Nature Center Supplies, Local Business Meeting Expense, Vehicle Expense and Field Supplies *1 Urgent Check Issued March 2, 2000 *2 Urgent Check Issued March 2, 2000 42,232.80 DUE TO ERRORS AND ADJUSTMENTS THE ORIGINAL CLAIMS LIST WAS VOIDED AND REDONE. Page 2 i Claims No. 00-05 Meeting 00-05 Date: March 8,2000 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT # Amount Name Description 1384 47.62 AT&T Telephone Service 1385 1,541.52 Acme&Sons Sanitation Sanitation Services 1386 47.74 Randy Anderson Vehicle Expense 1387 238.24 Artech Laminating Laminating Materials 1388 2,368.73 Big Creek Field Supplies 1389 231.26 John Cahill Vehicle Expense 1390 73.03 *1 California Chamber of Commerce Notices Kit 1391 47.54 CSK Auto,Inc. Checker, Schuck's,Kragen Vehicle Supplies 1392 250.00 California Specialized Training Institute Training Course 1393 4,975.17 Carpenter Printing Trail Brochure Printing 1394 4,830.00 Kevin Emery Builder Rental Deck Replacement 1395 1,954.75 Dana Bland&Associates Natural Resource Inventory 1396 29.95 Emergency Vehicle Systems Vehicle Maintenance 1397 69.26 Forestry Suppliers, Inc. Field Supplies 1398 27.19 Foster Brothers Security Systems,Inc. Field Supplies 1399 243.75 Robert E. Friday Acquisition Services 1400 772.07 Gardenland Power Equipment Field Supplies 1401 2,538.65 Sandra Gimbal Sommer,Landscape Architect Architect Services 1402 205.00 IRWA Training Course 1403 38.95 Jodi Isaacs Reimbursement-Books 1404 40.03 Life Assist Field Supplies 1405 246.08 Los Altos Garbage Company Dumpster Service 1406 346.55 MCI WorldCom,Inc. Cellular Phone Service 1407 46.52 Madco Welding Supply Company Welding Supplies 1408 111.28 Paul McKowan Reimbursement-Books 1409 12.99 MetroMobileCommunications Radio Supplies 1410 145.40 Minton's Lumber&Supply Field Supplies 1411 263.91 Moffett Supply Company Janitorial Supplies 1412 275.50 National Safety Council Magazine Subscription 1413 497.19 Navarone Mailing Services Mailing Service 1414 193.99 Pacific Bell Telephone Service 1415 305.06 Pacific Gas&Electric Company Gas&Electric Service 1416 557.79 Palo Alto Upholstery Vehicle Maintenance 1417 9.53 Pearson Oldsmobile Vehicle Maintenance 1418 196.19 PIP Printing Map Printing 1419 526.60 Eric Remington Consulting Services Page 1 Claims No. 00-05 Meeting 00-05 Date: March 8, 2000 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT # Amount Name Description 1420 892.12 Roys Repair Service Vehicle Maintenance&Repair 1421 890.06 Russ Enterprises,Inc. Signs 1422 674.16 San Francisco Newspaper Agency Recruitment Advertisement 1423 613.64 San Jose Mercury News Recruitment Advertisement 1424 311.22 Second Cup Caf6 Office Meeting 1425 86.40 Skyline County Water District Water Service 1426 331.81 Speedy Auto&Window Glass Vehicle Maintenance&Repair 1427 45.50 Swift Attorney Service Delivery Service 1428 396.14 Tberma Corp. HVAC Maintenance 1429 36.75 *2 United Parcel Service Delivery Service 1430 97.46 Wildfire Pacific,Inc. Field Supplies 1431 157.79 Michael Williams Vehicle Expense 1432 99.00 ZD Journals Magazine Subscription *1 Urgent Check Issued March 2,2000 *2 Urgent Check Issued March 2,2000 Total 28,927.08 Page 2 Regional Open Space —....,'---iwv.....................v ..v..wn. w ....�/`^^rv'^w.�' '�.. .. -•.wM/�.reNrwwwE--f .n'-=••� A��T�W.rv4 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT To Board of Directors From: C. Britton,General Manager Date: March 8,2000 Re: FYIs 330 Distel Circle • Los Altos,CA 94022-1404 • Phone:650-691-1200 Fax:650-691-0485 • E-mail: mrosd@openspace.org • Web site: www.openspace.org 1 INTEROFFICE MEMORANDUM February 23, 2000 I TO: C. Britton, General Manger FROM: G. Baillie, Operations Analyst SUBJECT: MONTHLY FIELD ACTIVITY SUMMARY Month January Year 2000 I VIOLATIONS TOTALS CITES CRIMES TOTALS Bicycles Arson/suicide 1 Closed area 8 8 Poss. controlled substance 1 Speed 2 2 Auto burglary 1 I Helmet 1 0 Night-riding 1 0 Unsafe operation 0 0 ACCIDENTS/INCIDENTS Dogs Vehicle accident 1 Prohibited area 5 1 Search & Rescue 1 Off-leash 5 0 Other first-aid 1 Off-road vehicles 1 0 Closed area 0 0 After hours 2 1 ENFORCEMENT Fishing 0 0 Citations 26 Vandalism 7 0 Written warnings 23 Parking 4 4 Arrests 2 Parking after hours 18 9 Police assistance 3 Dumping/littering 4 0 Campfires 0 0 Camping 0 0 MUTUAL AID Weapons Accidents 1 Actual contact 0 0 Law Enforcement 1 Report only 1 0 P y _ — Evidence of 2 0 Unauthorized trail construction 2 0 Unpermitted event I 1 Trespassing 2 0 SUMMARIES OF SIGNIFICANT INCIDENTS Jan. 1 A hiker reported off-road motorcycle riders in the Bald Knob/Irish Ridge area of Purisima Creek OSP. On Jan. 2 an e-mail report with photos was sent to the District regarding a second sighting. Off-road motorcycles were also reported in the preserve on Feb. 3. Jan 2 A Portola Heights resident reported hearing firearms discharged in Long Ridge OSP near Peters Creek and Portola Heights Road. A San Mateo Sheriff's deputy and three rangers checked the area but were unable to locate any suspects. B. Downing, D. Danielson. Jan. 2 Two hikers called on a cell phone to report that they had become lost in Monte Bello OSP at nightfall. Their exact location was not given and phone contact was lost. A search was conducted and the hikers were eventually located at a private residence on Montebello Road. L. Paterson, B. Downing, D. Danielson. I Jan. 4 T. Randall responded to a report of a vehicle fire on Mt. Umunhum Road in Sierra Azul OSP. CDF extinguished the fire and determined that a body was present. T. Randall provided crime scene security and traffic control until Santa Clara County Sheriff's deputies responded. The case is being investigated as a suicide. Jan. 5 A man believed to be responsible for illegal trail construction was contacted by a ranger at the site of the construction in La Honda Creek OSP. He initially denied constructing the trail. The next day he e-mailed the office, stating he was responsible. The person was written a letter of admonishment and issued a written warning. W. Phillips, B. Malone, D. Sanguinetti. Jan. 8 Staff has received several reports of subjects using paintball guns while playing war games in the drainage below the dam at Thornewood OSP. Rangers have increased patrol of this area. Jan. 9 K. Carlson discovered unlawful trail construction and maintenance in the Cathedral Oaks area of Sierra Azul OSP. A tractor had been used to open approximately 200 yards of an abandoned road. Jan. 12 While investigating recent acts of vandalism in St. Joseph's Hill OSP, T. Randall and K. Carlson discovered a methamphetamine drug lab on adjacent private property. Los Gatos Police were summoned and led to the scene. Jan. 12 A PG&E worker found ten .45-caliber shells near the Smith barn at Russian Ridge OSP. He showed the shells to an open space technician. S. Hooper. Jan. 20 Materials thought to belong to a former resident were found dumped in Sierra Azul OSP. The debris included auto parts, tires, engines, and a variety of junk. On Jan. 22 two separate reports of dumping were received from a local resident. He reported again on Jan. 30. Although rangers responded to the area no dumping in progress was observed. T. Randall, P. Hearin, T. Lausten. K. Carlson, C. Sparks-Hart. Jan. 23 K. Miller requested assistance from East Palo Alto Police for contacting two men in a parked car at Ravenswood OSP. The police arrested one occupant for smoking rock cocaine and the other for a probation violation. Jan. 25 Two dogs chased deer through M. Newburn's yard at RSA OSP. He attempted to catch them but they fled. Jan. 29 An organized group of about seventy people participated in an unauthorized running event that staged in Huddart County Park and entered Teague Hill OSP. The event combined running with the consumption of alcoholic beverages. The group's motto is "a drinking club with a running problem." The primary organizer was issued a citation for littering (with flour) and failure to obtain a permit. D. Danielson, L. Paterson. Jan. 29 A man was observed working on his car near a District gate in Sierra Azul OSP, who said the car broke down right after buying it from the neighbor. He said he needed to find his girlfriend, and then left District property and entered private property. Santa Clara Sheriff's Office was called to investigate suspicious circumstances. K. Carlson and Sparks-Hart assisted in attempting to find the suspicious person. The vehicle belonged to a felon wanted for parole violations with a 'no bail' warrant. Vandalism Incidents: Jan. I: Three after-hours signs near the Windy Hill picnic tables were found knocked down. Jan. 2: A chain with multiple locks was found missing from a gate at Bear Creek. Jan. 5: Two chains cut, and cyclone fence cut at St. Joseph's Hill gate. Jan. 11: Fence cut in two places and sign cut off gate at St. Joseph's Hill. Jan. 15: A 4WD pushed over a steel pipe in Sierra Azul. Jan. 15: Split rail and post cut 1/2 trough with axat Sierra Azul. Jan. 15: Rocks were pulled out of the way to allow for motorcycle access in Sierra Azul. Jan. 16: No parking sign broken off at base at Foothills parking area. Jan. 20: A steel post was found at Sierra Azul that appeared to be bent by use of a vehicle. Jan. 29: Area closed sign and post were taken from Saratoga Gap. Regional Open ace s MIDPENINSULA REGIONAL OPEN SPACE DISTRICT Mr. Don Pugh 231 Glenwood Ave., Woodside, CA 94062 February 24, 2000 Dear Mr. Pugh: This letter is in response to your request to Board member Betsy Crowder for an after-hours permit ride on Windy Hill Open Space Preserve. Ms. Crowder asked that I respond to your request. As you may recall, you were granted a one-time permit for your event last year. In a letter dated June 25, 1999 (attached) you were notified of this, and informed that you would need to plan future equestrian events to ensure that your event finishes by the regular closing time for the preserves, in compliance with District regulations. Official sunset on Friday June 16, 2000 is at 8:30 PM. If you wish to plan an event that would end by 9:00 PM, then please complete the attached permit request form, and return it to my attention. Sincerely, Gordon C. Baillie Operations Analyst/Court Liaison cc: MROSD Board of Directors L. Craig Britton - General Manager 330 Distel Circle • Los Altos,CA 94022-1404 • Phone:650-691-1200 FAX:650-691-0485 • E-mail:mrosd o ens ace.or • Web site:www.op enspace.org p g penspace.org Board of Directors:Pete Siemens,Mary C.Davey,led Cyr,Deane Little,Nonette Hanko,Betsy Crowder,Kenneth C.Nitz •Genera!Manager:L.Craig Britton 231 Glenwood Ave Woodside, Calif. 94062 650-851-2052 February 21, 2000 Ms. Betsy Crowder Member, Board of Directors Midpeninsula Regional Open Space District 330 Distel Circle Los Altos, Calif. 94022-1404 Dear Betsy, Thank you for your assistance last year with getting a permit for our Moonlight Ride on Windy Hill. We had 19 riders that represented a variety of equestrian organizations including San Mateo County Volunteer Horse Patrol, Los Viajeros, Los Altos Hounds, Menlo Polo and San Mateo County Horseman's Association. The trip to the top was easy. Behind us the last rays of sunlight shone on Silicon Valley below. We watched as the fog slowly crept up from the ocean as we ate dinner. The sun set, the fog enveloped us, and a chill wind started blowing. A few minutes after leaving the top, we emerged from the fog bank, and the moon shone bright in the starlit sky. Before us was a beautiful vista of the Bay area below with thousands of twinkling lights. Everyone had a great time and appreciated the opportunity to enjoy the district property. I would like to arrange a permit for a Moonlight ride on Windy Hill, this year on Friday, June 16'. Moonrise is at 8:31 PM and it will be a 99.9% full moon. We will ride out of Portola Valley at 6: 15, have a cate red dinn er in the parking lot, return to Portola Valley, and be off the Preserve by 10:00 PM. We agree to the Permit conditions of last year. Please let me know who to contact for this. Thank you for your assistance. Sincerely, � � 1 � . C-;o Don Pugh i FOLEY & LARDNER CHICAGO ONE MARITIME PLAZA,SIXTH FLOOR SACRAMENTO DENVER SAN FRANCISCO,CALIFORNIA 94111-3404 SAN DIEGO JACKSONVILLE TELEPHONE:(415)434-4484 SAN FRANCISCO LOS ANGELES FACSIMILE:(415)434-4507 TALLAHASSEE MADISON TAMPA MILWAUKEE WASHINGTON,D.C. ORLANDO WEST PALM BEACH WRITER'S DIRECT LINE 415.984,9891 EMAIL ADDRESS CLIENT/MATTER NUMBER ceady@foleylaw.com 57360-0107 February 29, 2000 Mr. L. Craig Britton Midpeninsula Regional Open Space District 330 Distel Circle Los Altos, California 94022-1404 Re: Plain English Marketing Award Dear Craig: As you know, we were privileged to serve as Stone & Youngberg's counsel in preparing the first cover-to-cover plain English official statement for the District's financing last August. Because it was so well received, we reprinted it at our expense in order to satisfy the unexpected nationwide de- mand for copies. We also decided to publish a full-color brochure about how it was done. .We have distributed the brochure at industry gatherings, including the California Public Finance Conference held in San Francisco last September and the Health Care Finance Conference held in New York last November. As mementos of each conference, we also designed and distributed cocoa mugs and private-label cocoa mix using a phonetic "plain English disclosure" logo which we have registered with the U.S. Patent and Trademark Office and are distributing this week at the Florida Public Finance Conference. The brochure, sadly, is now out of print, but we are working on a new brochure for national distribution. Together with the cocoa mugs and mix, these comprised our campaign to spread the word about plain English disclosure. On March 16, 2000, at a ceremony in Palm Springs, the national Legal Marketing Association (see www.legalmarketing.m g) will present us with an award for best law firm marketing campaign of 1999! We are gratified that it all started here with the District, and we are amazed at the impact of plain English disclosure, coast-to-coast. Thank you again for the opportunity to serve on the District's financings. Very truly yours, Edsell M. Eady, Jr. cc: Wm. Thomas Lockard Summary of the Conservation and Reinvestment Act (CARA), H.R. 701 (See Reverse Side for State Funding Estimates) This year, Congress has a unique opportunity to invest more than $2.8 billion from offshore oil and gas revenues for parks, wildlife, coastal impact and restoration programs, as well as a variety of other conservation programs. The bipartisan Conservation and Reinvestment Act (CARA, H.R. 701), which passed the House Resources Committee in 1999, represents the best opportunity to achieve significant and permanent conservation funding in this Congress. Like most legislation, this bill could be strengthened, and conservation leaders will be working to ensure that the bill is environmentally sound. CARA funds the following programs: Title I Impact Assistance and Coastal Conservation 1 billion P $ Title II land and Water Conservation Fund $900 million Title III Wildlife Conservation and Restoration Fund $350 million Title IV Urban Park and Recreation Recovery Program $125 million Title V Historic Preservation Fund $100 million Title VI Federal and Indian lands Restoration $200 million Title VII Conservation Easements and Species Recovery $150 million Title VIII Payment-in lieu-of-Taxes $200 million Impact Assistance and Coastal Conservation: This provision provides funding to states and territories, including Great Lake states, for coastal/marine conservation efforts: states that have OCS development would also receive "impact assistance" funding to mitigate the harmful impacts of drilling activities. Land and Water Conservation Fund (LWCF): Since its enactment in 1964, LWCF has been responsible for the acquisition of nearly seven million acres of protected land and open space, and the development of more than 37, 000 state and local parks and recreation areas. CARA equally apportions the LWCF fund. with $450 million distributed to federal lands and $450 million distributed to states in matching grants. �. Wildlife Conservation and Restoration Fund: Sometimes referred to as "Teaming with Wildlife,'' the Wildlife ,. Conservation and Restoration Fund gives state fish and wildlife agencies funding for game and non-game species, but without the excise tax. Interest generated under this provision will provide funding to the North American Wetlands Conservation Act (NAWCA). .� Urban Park and Recreation Recovery Program (UPARR): UPARR authorizes matching grants for recreation ' I !: projects in economically distressed urban communities. Whether it's funding a new big city park. ' revitalizing a 19th Century landmark, or creating an urban soccer or baseball field, UPARR has been integral to a healthy and safe urban community life. From 1978-1995, UPARR awarded almost $228 million `'' for 1,300 grants to 400 local jurisdictions in 42 states Historic Preservation Fund (HPF): The HPF provides matching grants to encourage private and non-federal investment in historic preservation efforts nationwide, and assists state and local governments. Indian tribes, among others, expanding and accelerating their historic preservation activities nationwide. HPF grants serve as a catalyst and "seed money" for preserving and protecting our nation's irreplaceable heritage for this and future generations. Since 1968, more than $800 million in grant funds has been awarded. Federal and Indian lands Restoration: This provision provides for a coordinated program on federal and Indian lands to restore degraded lands, protect resources threatened with degradation, and protect public health. Conservation Easements and Species Recovery: This provision provides annual and dedicated funding for conservation easements and funding for landowner incentives to aid in the recovery of endangered and threatened species. Payment In Lieu of Taxes: Interest generated from CARA would match the annual congressional appropriations for the Payment in Lieu of Taxes (PILT) Program, with a $200 million limit, PILT helps communities offset the loss of revenue when open space is placed in community stewardship. Funding Estimates : e in The Conservation and Reinvestmer of 1999 (CARA)* state T ar � ills I 'Title II "!'It1e�ll � Tidrill � 'fiNs�f T, T1tleVt ?tUa YII TWO Vol TOTAL Impact I WGF ;` A Wye kIP�" t et4rlo .; Federela:_ � Conservation PtI,T Assistance Conservation Preservation 41 and.ands Easements Aiaoama 32,138.707 8,410.416 5,765,950 1.467,732 1,881,336 441,830 2,440,264 597,959 314 Alaska 86,949,949 38,585.825 17.500,000 0 1,384,636 9,000.000 152,517 9 855 407 163 423:534 Arizona 0 13.353,530 7,928,512 765,223 1.738,450 14,668 7991 1,296 390 2 028 005 Arkansas 0 5,991,170 4,127.663 155,346 1,558,141 1,969,113 660,905 6 952 517 s1414N;o California 67,330.569 184,890,853 17,500,000 12,782.097 2,881,540 17,501.093 6,380,275 15 030 259 324 296 6-- Colorado 0 15,887,918 7,138,455 746.236 1,908,553 7,751,433 762,583 9.880,249 44 075 427 Connecticut 6,097,853 7,299,132 3,210,781 4,210.451 1,911.955 7,622 254,194 702540 23.694529 Delaware 5,000,000 4,048.014 1,750,000 303,788 1,381,234 81,604 228,775 938,685 13.732100 Honda 68,653,076 39,114,274 15.341,863 6.037,780 2,167,109 5,069.516 2.516.523 2,381.173 141,281.31 Georgia 6,734.237 15,978,804 8.833.765 1,937,797 2,415,459 1.779.087 1,398.068 1.297097 40.374.315 t,awa 5.139,239 15,274.435 1.750.000 15,535 1,037,627 1,038,405 7,549,568 663.683 32468 4cv cano 0 12,952,977 3,927,686 0 1,592,162 10,391,209 432130 10 016 744 39.3129, tu,no,s 12.795,673 16.354,885 13,170,669 8.156.239 1,993,604 508,666 635.486 2 46C 234 56.0754_1 no,ana 5,000,000 14,394,772 6,723,198 2,388.300 1.864,326 105,005 610,066 ' 217 826 3<303 4y4 1018 0 5,820,872 4,593.537 0 1,690,821 309.702 330.452 2,234167 '4979.`_ Kansas 0 5,618,134 5,242,991 291,70 1,b6&245 219,523 355.872 741,464 3537934 Keniucra 0 8,174,143 4,997 448 988,461 2,469,892 298,676 1,067,616 3 164,826 21 161 051 .u. s.ana 285,028,728 10,766,428 5,641,747 3701,837 2,282,779 1,801,875 533,808 1.902915 311660 ' hta�ne 15.154,284 14,770,371 2,186.203 296,308 1,459,482 221.611 177,936 2.069.659 36.335.853 ^.1ar,�anc 15.537.358 10.414,953 5,072,463 2.400,958 2,422,263 176,145 406 711 560.823 366 991 614 assaulusens 13 881.691 16 936 505 5.987.224 7,947,385 2,418,861 77,557 330,452 759 996 48 339 672 V;cn,gan 18,692.346 15.718,524 11,031.290 4,716.189 2.235.150 1.806,937 533,808 5 164 867 59 899 ' P,1innesola 5.000.000 15,543,655 7.123,639 1.989.579 1.945,975 2,773.235 279.614 1.542.959 36 ".tss.ss�po 60.677.682 6,218,715 4 145.662 827,361 1,517.316 1,148406 838,841 2.999 359 '8 373.>4' ht,ssou' 0 15,680,789 7,423,443 3,208,182 2.357.624 758.718 559.227 2.047.871 3:�5 Montana 0 16,253,748 5,861,942 474.668 1,581.956 12,451,403 355.872 11 348035 48 327 6j4 Neuraso,a 0 8,867.029 4 166.042 330,254 1,262,162 650,068 305 033 532841 16 113 429 Nevaca 0 12.682,289 5,229.278 6,904 1,041,029 22.314,479 864 260 8,505.594 50,643,83' Newnanipsnfre 5.000.000 5.413,360 1"750.000 154195 1,221,338 271,756 254,194 2,292,282 16,35712" Nee. verse. 20,121 116 17,889471 7,761,253 11,272,364 1,905,151 234,444 330,452 370,694 59,884.94 New Mexico 0 8,239.868 5.789.007 405.050 1 891.542 7,983.368 965.938 13.934 366 39.209 139 New Yorh 40 196 483 28,106.360 17.500.000 1 027 26 2.959,788 150,967 381,291 406,799 100.728951 Nora Caroiina 10.139,220 17 193,264 8,504.596 847,499 2.262,366 1,950,511 1,245.552 4.502125 46.645 13" NGn,n Dakota 0 3.386,963 2963855 0 1.085.255 4,679,492 254.194 1 953.085 14.322 844 O„c 6 809.852 24 835,215 11 997 018 6.277 703 2,554,943 120,573 559.227 1 51 7 527 54 672 058 0..anoma 0 6 796,962 5 461.323 167 428 1 796 285 601.309 432.130 1 444 218 16 699 05' �regor 5 997.264 19 442585 6,291 635 2014 895 1,690,821 11,547,011 686,324 4.758.699 52 429 2 3,: Pem,s.,,ama 6.745.399 19.593 582 13.017,997 5 742 623 2.806.695 275.263 406 711 1.382 769 49 971 039 aoe S anc 5.000 000 3.944,952 1 750.000 1 974 04 1 718,038 6.048 203,355 2,412,519 !7,069�,16 v+Caro;,na 9.149,393 7 965.230 4.482,034 673 741 1.881,336 692.352 762,583 1,391 014 26.997 88 a,^,u Dakota 0 4 931 2501 3.290.956 0 1 534,327 4,000.023 254,194 2 798,092 16,808 84 `ennessee 0 9.757,424 6 396 873 2894 613 2.024.223 803,114 2,236.909 3,091,162 27,204 317 axam 131.661 726 73 498 441 17.500.000 4.422 757 2.493,706 2,471,669 1,830,198 2 331.028 236 209 526 a„ 0 8.992.068 4 666.969 446 476 1.881,336 10,595,177 991.357 10 958.532 38 531 91E ermon! 0 3267 605 1.750 000 0 1,350,616 154.682 177.936 2276.050 8 976 889 17.019.441 15.923.657 7,629.588 1955026 2.099,068 1 161,400 1,321.810 3 024 437 51 13,4_'7 a nngt c 15.233 420 1 7.634,537 7 440247 3 030.397 1,629,584 5,076,681 482.969 4 196 931 54 724 767 es!'vrgm.a 0 10.655.036 2.503 075 1 197 315 1 371,028 415,394 508.388 3 400 702 20 050 93, sccns, 6 337 342 9800049 6.724 573 L368 195 1.894,945 1_346,224 381,291 529.710 28.382 330 oR,rrc 0 5,338.327 3 792 111 0 1,581,956 9,907,583 305,033 9.155,894 30.080 903 ^oR,cc 8488.981 6,981,895 1.750.000 717,468 1,041.029 21,552 1,804,779 25,373 20.831078 3-ar, 575.647 948 635 58 333 0 704,225 70,834 330,452 160,789 2,848.916 s,an(7s 671 145 6 514 675 58,333 0 918,555 12,429 279,614 21.653 8 476 404 Sar ca 424 198 108.169 58 333 0 639,586 123.810 50,839 0 1 404 936 ananas 617.981 0 58 333 0 625,978 0 228.775 0 53! 067 CO3umo,a 0 3 145 989 1 750 000 1 264.631 1,068,245 4,618 76,258 5.766 7 315 509 rapes Corps 0 3.691.270 3 757 107 0 0 20,000.000 0 0 27 448 37 7 r,licrones,a 0 0 58,333 0 877,730 0 0 0 936 06 t,?arsnao Isiands 0 0 58 333 0 510,308 0 0 0 568 64" Papa_ 0 0 58 333 0 510,308 0 0 0 568,64 Fu,Cs Avaoa0le ror 0 0 0 0 0 0 100,000,000 0 100,000 00 Concert-at�en Easements 'ota 1 000.000 0001 900,00M001 350 000,0001 125,000,000 100.000,000 200,000.000 150,000,000 196,000,000 7 02.0OT 000 Source House Resources Committee I What You Can Do Now: When you visit your Congressional Delegation, urge them to keep up the momentum to bring CARA to the House Floor for a VOTE by calling upon them to: • Urge House Leadership for a Vote Now • Deliver "One Minute" floor statements calling for a CARA vote • Join you for LWCF press conferences and site visits • Talk to editorial boards in their Congressional Districts • Write Opinion Editorials • Seek improvements in the legislation And, don't forget to thank those Members of Congress who cosponsored H.R. 701! What You Can Do When You Get Home - 4 Easy Things! a, 1. Utilize Your Friends and Allies w j The most important method for strengthening the LWCF campaign at the local level is to organize champions to serve as ambassadors. Whether working with elected officials, newspaper editors, or the public-at-large, a well-organized network of community leaders creates a power base that effectively can be used to carry out the goals of the campaign. A Few Tips: * Use your connections with community VIPs who can make a difference in advocating for LWCF * Create a diverse network of allies * Communicate with VIPs on a regular basis. 2. Get Your Member of Congress to Deliver "One Minute Floor Statements" Call your Member of Congress (U.S. Capitol Switchboard: 202-224-3121) and ask them to deliver "One Minute Floor Statements" in support of getting a floor vote for the Conservation and _ Reinvestment Act (CARA, H.R. 701). The more Members who stand up on the House floor asking for a vote on CARA, the more momentum we will have in revitalizing LWCF. A Few Tips: * When you call your Member's office, ask for the aide working on LWCF (or the environmental aide.) * Explain your purpose and whom you represent. 3. Organize a Site Tour Our greatest asset in the campaign to revitalize the Land and Water Conservation Fund is the legacy of successful projects and partnerships that LWCF has made possible. One of the best ways to further the cause is to get your representative or senator out of the office and into a park, playground, wildlife refuge, trail or other place that has benefited from LWCF. A Few Tips: * Use the opportunity as a media hook. * Include a diverse group of local activists and site users in the event. * Pick a rain date. 4. Set an Editorial Board Meeting with Your Local Newspaper Editorials educate the newspaper's readers on important topics of the day, shape public attitudes, make or break electoral candidates, and affect key policy decisions at the local, state, and national levels. Meeting with your local editorial board is an important strategy in any campaign. Providing your editorial writers with information on the Land and Water Conservation tt Fund will help those in your community learn about this important program. A Few Tips: # Write a letter asking for an appointment and always make a follow-up call. # Always organize a group of LWCF activists, but keep your group small. * Meet with your group before hand to decide who will say what. * Remember the purpose of the meeting is to provide the editorial writer with information about your issue. * Take fact sheets and other supporting documents. Land and Water Conservation Fund: Keep the Promise Now! Why the Promise Must be Kept: In 1964, Congress made a promise to the American people by creating the land and Water Conservation Fund, a visionary program, that reinvests offshore oil and gas revenues to create parks and protect America's natural heritage. LWCF has been an American success story, responsible for the acquisition of nearly seven million acres of parkland and open space and the development of more than 37,000 state parks and recreation projects. But, over the years, the LWCF promised was broken with LWCF funds diverted for non-conservation and recreation purposes. Now, its time for Congress to keep its promise and make LWCF a permanent part of the American landscape. Here's why: I • Combined estimates from the U.S. Fish and Wildlife Service, National Park Service, U.S. Forest Service, and Bureau of Land Management total a $10-12 billion backlog. • Sprawl and the loss of open space have become a primary concern for our communities. • Outdoor recreation represents one of the most vigorous growth areas in the U.S. * , economy, with public lands supporting much of this recreation. • The enormous popularity of soccer and other youth sports has created an unprecedented-and unmet --demand for new playing fields. I Why NOW? This year Congress has a unique opportunity to invest more than $2.8 billion from offshore oil and gas revenues for parks, wildlife, coastal impact and restoration programs, as well as a variety of other conservation programs, through the bipartisan Conservation and Reinvestment Act (CARA, H.R. 701), which passed the House Resources Committee in 1999, and now enjoys the support of 302 cosponsors - or two-thirds of the House of Representatives. In addition, President Clinton has proposed a similar permanent investment in conservation funding through his Lands Legacy Initiative. Americans for Our Heritage and Recreation (AHR) is a national organization of conservation and civic leaders, park and recreation directors, outdoor recreation enthusiasts, and the sporting goods industry committed to full and permanent funding for LWCF. Along with our nation's governors, mayors, and grassroots organizations nationwide. AHR believes that CARA represents the best vehicle to achieving a revitalized LWCF. What's In CARA? House Resources Committee Chairman Don Young (R-AK), the committee's ranking member, Representative George Miller (D-CA), and the bipartisan group of 302 Members of Congress who cosponsored H.R 701 are to be commended for their leadership. In addition to the unprecedented funding for wildlife, conservation easements, historic preservation, coastal assistance, and other conservation programs. CARA incorporates the tradition of LWCF by providing on an annual basis: • Full funding for LWCF at its authorized $900 million level . • Equitable allocation of funds between the federal and state programs, with $450 million for 0g"�, =, . x xa• z..��; federal LWCF and $450 for state matching grants ' • Traditional use of stateside funds for recreation enhancement • Revived Urban Park and Recreation Recovery Program (UPARR) funded at$125 million What's Not? In advancing this bill, CARA can be improved by: Providing that the full$450 million in federal LWCF funding will be spent each year i0 Recognizing the need to protect regional lands of national significance • Recognizing that LWCF matching grants should not supplant state general funds, if states can adequately match the LWCF grant, they should not be penalized by fluctuating annual budgets • Ensuring that the Department of the Interior has adequate funding to manage LWCF The clock is ticking . . . Right now, we have a unique opportunity to make the Land and Water Conservation Fund the true and permanent fund that its makers intended. But time is of the essence. If H.R. 701 is to advance this year, it must be voted on by the full House of Representatives this spring. It's up to you. For More Information on the LWCF Campaign: www.ahrinfo.org 1V i Summary of the Conservation and Reinvestment Act (CARA), H.R. 701 (See Reverse Side for State Funding Estimates) This year, Congress has a unique opportunity to invest more than $2.8 billion from offshore oil and gas revenues for parks, wildlife, coastal impact and restoration programs, as well as a variety of other conservation programs. The bipartisan Conservation and Reinvestment Act (CARA, H.R. 701), which passed the House Resources Committee in 1999, represents the best opportunity to achieve significant and permanent conservation funding in this Congress. Like most legislation, this bill could be strengthened, and conservation leaders will be working to ensure that the bill is environmentally sound. CARA funds the following programs: Title I Impact Assistance and Coastal Conservation $1 billion Title II land and Water Conservation Fund $900 million Title III Wildlife Conservation and Restoration Fund $350 million Title IV Urban Park and Recreation Recovery Program $125 million Title V Historic Preservation Fund $100 million Title VI Federal and Indian Lands Restoration $200 million Title VII Conservation Easements and Species Recovery $150 million Title VIII Payment-in lieu-of-Taxes $200 million Impact Assistance and Coastal Conservation: This provision provides funding to states and territories, including Great Lake states, for coastal/marine conservation efforts; states that have OCS development would also receive "impact assistance" funding to mitigate the harmful impacts of drilling activities. Land and Water Conservation Fund (LWCF): Since its enactment in 1964, LWCF has been responsible for the acquisition of nearly seven million acres of protected land and open space, and the development of more than 37, 000 state and local parks and recreation areas. CARA equally apportions the LWCF fund, with $450 million distributed to federal lands and $450 million distributed to states in matching grants. 5,_ , . Wildlife Conservation and Restoration Fund: Sometimes referred to as "Teaming with Wildlife," the Wildlife Conservation and Restoration Fund gives state fish and wildlife agencies funding for game and non-game ;., species, but without the excise tax. Interest generated under this provision will provide funding to the North American Wetlands Conservation Act (NAWCA). Urban Park and Recreation Recovery Program (UPARR): UPARR authorizes matching grants for recreation projects in economically distressed urban communities. Whether it's funding a new big city park, revitalizing a 19th Century landmark, or creating on urban soccer or baseball field, UPARR has been 4 integral to a healthy and safe urban community life. From 1978-1995, UPARR awarded almost $228 million for 1,300 grants to 400 local jurisdictions in 42 states Historic Preservation • T F - e rvation Fund (HPF). he HP provides matching grants to encourage private and non-federal investment in historic preservation efforts nationwide, and assists state and local governments, Indian tribes, among others, expanding and accelerating their historic preservation activities nationwide. HPF grants serve as a catalyst and ''seed money"for preserving and protecting our nation's irreplaceable heritage for this and future generations. Since 1968, more than $800 million in grant funds has been awarded. Federal and Indian lands Restoration: This provision provides for a coordinated program on federal and Indian lands to restore degraded lands, protect resources threatened with degradation, and protect public health. Conservation Easements and Species Recovery: This provision provides annual and dedicated funding for conservation easements and funding for landowner incentives to aid in the recovery of endangered and threatened species. I Payment In lieu of Taxes: Interest generated from CARA would match the annual congressional appropriations for the Payment in Lieu of Taxes (PILT) Program, with a $200 million limit. PILT helps 1 '< _; communities offset the loss of revenue when open space is placed in community stewardship. Funding Estimates by%in The Conservation and Reinvestment 1999 (CARA)- taw 011 AM, .... Y,:. ...... .. 3. .., Alabama 32,138,707 8,410,416 5,765,95q 1,467,732 1,881,3361 441,830 2,440,264 597,959 53,144,194 Alaska 86,949,949 38,585,825 17,500,G001 0 1,384,636 9,000,000 152,517 9,855,407 163,428,334 Arizona 0 13,353,530 7,928,512 765,223 1,738,450 14,668,799 1,296,390 12,028.005 51,778,91 Arkansas 0 5,991,170 4,127,663 155,346 1,558,141 1,969,113 660,905 6,952,517 21,414,856 California 67,330,569 184,890,853 17,500,000 12,782,097 2,881,540 17,501,093 6,380,275 15,030,259 324.296,68 Colorado 0 15,887,918 7,138,455 746,236 1.908.553 7,751,433 762,58 9,880,249 44,075,42 Connecticut 6,097,853 7,299,132 3,210,781 4,210,451 1,911,955 7,622 254,194 702,540 23.694,52 Delaware 5,000,000 7048,01 1,750.000 303,788 1,381,234 81,60 228,775 938,685 13,732,10 Florida 68.653.076 39,114,274 15,341,863 6,037,780 2,167,109 5,069,516 2,516,523 2,381.173 141,281,31 Georgia 6,734.237 15,978,804 8,833,765 1,937,797 2,415,459 1,779,087 1,398,068 1,297,097 40,374,31 Hawaii 5,139,239 15,274,431 1,750,000 15,535 1,037,627 1,038,405 7,549,568 663,683 32,468,49 Idaho 0 12.952,977 3,927.68E 0 1,592,162, 10,391,209 432,130 10,016,744 39,312,90 Illinois 12,795,67 16,354,885 13,170,669 8,156,239 1,993,604 508,666 635,486 2,460,204 56,075,42 Indiana 5,000,000 114,394,772 6,723,198 2,388,300 1,864,326 105.005 610,066 1,217,826 32.303,49 Iowa 0 5,820,872 4,593,537 0 1,690,821 309,702 330,452 2,234,167 14,979,55 f Kansas 0 5,618,134 5,242.991 291,705 1,068,245 219,523 355,872 741,464 13,537,934 Kentucky 0 8,174,143 4,997,448 988,461 2,469,892 298,67 I.D67,616 3.164,826 21,161,061 Louisiana 285,028.728 10,766,428 5,641,747 3,701,837 2,282,779 1,801,875 533,808 1,902,915 311,660,11 Maine 15,154,284 14,770,371 2,186,203 296,308 1,459,482 221,611 177,936 2,069,659 36.335,85 Maryland 15,537,358 10,414.953 5,072,463 2,400,958 2,422,263 176,145 406,711 560,823 36,991,67 Massachusetts 13,881,691 16,936.505 5,987,224 7,947,38 2,418,861 77,557 330,452 759,996 48.339,67 Michigan 18,692,346 15,718,524 11.031,290 4,716,189 2,235,1 50 1,806,937 533.808 5,164,867 59,899,11 Minnesota 5,000,000 15,543,655 7,123.639 1,989.579 1,945.975 2.773,235 279,614 1.542,959 36,198,65 Mississippi 60,677.682 6,218,715 4.145,662 827,361 1,517,316 1.148,406 838,841 2,999,359 78,373,341 Missouri 0 15.680,789 7,423,443 3,208.182 2,357,624 758,718 559.227 2,047,871 32,035,85 Montana 0 16,253,748 5,861,942 474,668 1,581,956 12,451,403 355.87 11,34&035 48,327,6241 Nebraska 0 8,867,029 4.166,042 330.254 1,262.162 650,0681 305,033 532.841 16,113,4291 Nevada 0 12,682.28 5,229.278 6,904 1,041.029 22,314,479 864,260 8,505,594 50,643,83 New Hampshire 5,000.000 5,413,360 1,750,000 154.195 1,221,33 271,756 254.194 2,292,282 16,357,12 New Jersey 20,121,116 17,889,471 7,761.253 11,272,364 1,905,151 234,444 330,452 370,694 59,884,94 New Mexico 0 8,239,868 5,789.007 405.050 1,891.542 7,983,368 965.938 13.934,366 39,209,13 New York 40.196,483 28,106,360 17,500,000 11.027,263 2.959,788 150,967 381.291 406.799 100,728,951 North Carolina 10,139.220 17193,264 8,504.596 847,499 2.262.366 1,950,511 1.245,552 4,502,125 46.645,13 North Dakota 0 3,386,963 2.963,855 0 1.085.255 4,679,492 254,194 1,953.085 14,322, Ohio 6.809.852 24,835.215 11.997,018 6.277.703 2.554,943 120,573 559,227 1.517,527 54.672,05 Oklahoma 0 6,796,962 5,461,323 167.428 1,796.285 601,309 432.130 1,444,218 16,699,65 Oregon 5,997,264 19,442,585 6.291,635 2,014,895 1,690,821 11,547,011 686.324 4,758,699 52,429,23 Pennsylvania 6,745.399 19,593,582 13,017,997 5,742,623 2,806,695 275,263 406,711 1,382,769 49,971,03 Rhode island 5,000.000 3.944,952 1,750.000 1.974,045 1,718.038 6,048 203.355 2472,579 17,069,01 South Carolina 9,149,393 7,965,230 4,T82,034 673,741 1,881336 692,352 762,5831 1.391.014 26,997,68 South Dakota 0 4.931,250 3290,95 1,534,327 4,000,023 254,19 2,798,092 16,8W84 Tennessee 0 9.757,424 6,396,873 2.894,613 2,024,223 803.114 2,236,909 3,091,162 27,204,31 Texas 131,661,726 73,498,441 17,500,000 4.422,757 2,493,706 2,471,669 1.830,198 2.331.028 236„209,5 Utah 0 8.992,068 4,666,969 446,476 1,881,336 10,595.177 991,357 10,958,53 38.531„91 Vermont 0 3,267,605 1,750,000 0 1,350,616 154,682 177.936 2,276.050 8,976,88 Virginia 17,019,441 15,923,657 7.629,588 2.955.026 2,099,068 1.161.400 1,321,810 3,024.43 7 51,134,42 Vvashington 15,233.420 17.634,537 7,440.247 3.030,397 1,629,584 5,076,681 482,969 4,196.931 54.724,76 West Virginia 0 10,655.036 2.503.075 1,197,315 1,371,028 415,394 508,388 3,400,702 20,050,93 Wisconsin 6,337.342 9,800,049 6,724,573 1,368.195 1.894,945 1,346,224 381,291 529,710, 28,382,33 Wyoming 0 5.338,327 3,792,111 0 1,581.956 9,907,583 305,033 9,155,894 30,080,90 Puerto Rico 8,488.981 6,981,895 1,750.000 717,468 1,041,029 21.55 1,804,779 25,373 20,831,07 Guam 575.647 948,635 58,333 0 704,225 70,834 330,452 160,789 2,848,91 Virgin Islands 671,145 6.514.675 58,333 0 918,555 12,429 279.614 21,653 8,476,40 Samoa 424,198 108,169 58,333 0 639,586 123.810 50,839 0 1,404,936 Marianas 617,981 0 58,333 0 625,978 0 228,77 1,531.06 Dist of Columbia 0 3,145,989 1.750,000 1,264,631 1,068.245 4,618 76.259 5,766 7,315,50 Tribes/Corps 0 3.691,270 3,757,107 0 0 20.000,000 0 0 27,448,37 Micronesia 0 0 58.333 0 877,730 0 0 0 936,06 Marshall islands 0 0 58.333 0 510,308 0 0 0 568,64 Palau 0 0 58,333 0 510,308 0 0 0 568,64 Funds Available for 0 0 0 0 0 0 100.000.000 0 100,000,00 Conservation Easements Total 1,000.000,00q 900,000.000 350,000,000 125,000.000 100,000,001 200,000,054150,000,000 196.000,0 3,021,000,00 'Source: House Resources Committee Land and Water Conservation Fund: Keep the Promise Now! Why the Promise Must be Kept: In 1964, Congress made a promise to the American people by creating the land and Water Conservation Fund, a visionary program, that reinvests offshore oil and gas revenues to create parks and protect America's natural heritage. LWCF has been an American success story, responsible for the acquisition of nearly seven million acres of parkland and open space and the development of more than 37,000 state parks and recreation projects. But, over the years, the LWCF promised was broken with LWCF funds diverted for non-conservation and recreation purposes. Now, its time for Congress to keep its promise and make LWCF a permanent part of the American landscape. Here's why: • Combined estimates from the U.S. Fish and Wildlife Service, National Park Service, U.S. Forest Service, and Bureau of Land Management total a $10-12 billion backlog. • Sprawl and the loss of open space have become a primary concern for our communities. • Outdoor recreation represents one of the most vigorous growth areas in the U.S. * ; economy, with public lands supporting much of this recreation. • The enormous popularity of soccer and other youth sports has created an unprecedented-and unmet -- demand for new playing fields. Why NOW? This year Congress has a unique opportunity to invest more than $2.8 billion from offshore oil and gas revenues for parks, wildlife, coastal impact and restoration programs, as well as a variety of other conservation programs, through the bipartisan Conservation and Reinvestment Act (CARA, H.R. 701), which passed the House Resources Committee in 1999, and now enjoys the support of 302 cosponsors - or two-thirds of the House of Representatives. In addition, President Clinton has proposed a similar permanent investment in conservation funding through his Lands Legacy Initiative. Americans for Our Heritage and Recreation (AHR) is a national organization of conservation and civic leaders, park and recreation directors, outdoor recreation enthusiasts, and the sporting goods industry committed to full and permanent funding for LWCF. Along with our nation's governors, mayors, and grassroots organizations nationwide, AHR believes that CARA represents the best vehicle to achieving a revitalized LWCF. What's In CARA? House Resources Committee Chairman Don Young (R-AK), the committee's ranking member. Representative George Miller (D-CA), and the bipartisan group of 302 Members of Congress who cosponsored H.R 701 are to be commended for their leadership. In addition to the unprecedented funding for wildlife, conservation easements, historic preservation, coastal assistance, and other conservation programs, CARA incorporates the tradition of LWCF by providing on an annual basis: • Full funding for LWCF at its authorized $900 million level • Equitable allocation of funds between the federal and state programs, with $450 million for '= federal LWCF and $450 for state matching grants • Traditional use of stateside funds for recreation enhancement • Revived Urban Park and Recreation Recovery Program (UPARR) funded at $125 million ; What's Not? In advancing this bill, CARA can be improved by: • Providing that the full $450 million in federal LWCF funding will be spent each year Recognizing the need to protect regional lands of national significance • Recognizing that LWCF matching grants should not supplant state general funds, if states can adequately match the LWCF grant, they should not be penalized by fluctuating annual budgets • Ensuring that the Department of the Interior has adequate funding to manage LWCF The clock is ticking . . . Right now, we have a unique opportunity to make the Land and Water Conservation Fund the true and permanent fund that its makers intended. But time is of the essence. If H.R. 701 is to advance this year, it must be voted on by the full House of Representatives this spring. It's up to you. I For More Information on the LWCF Campaign: www.ahrinfo.org i What You Can Do Now: When you visit your Congressional Delegation, urge them to keep up the momentum to bring CARA to the House Floor for a VOTE by calling upon them to: • Urge House Leadership for a Vote Now • Deliver "One Minute" floor statements calling for a CARA vote • Join you for LWCF press conferences and site visits • Talk to editorial boards in their Congressional Districts ! Write Opinion Editorials Seek improvements in the legislation And, don't forget to thank those Members of Congress who cosponsored H.R. 701! What You Can Do When You Get Home - 4 Easy Things! I. Utilize Your Friends and Allies The most important method for strengthening the LWCF campaign at the local level is to organize champions to serve as ambassadors. Whether working with elected officials, newspaper editors, or the public-at-large, a well-organized network of community leaders creates a power base that effectively can be used to carry out the goals of the campaign. A Few Tips: * Use your connections with community VIPs who can make a difference in advocating for LWCF * Create a diverse network of allies * Communicate with VIPs on a regular basis. 2. Get Your Member of Congress to Deliver "One Minute Floor Statements" Call your Member of Congress (U.S. Capitol Switchboard: 202-224-3121) and ask them to deliver ''One Minute Floor Statements" in support of getting a floor vote for the Conservation and Reinvestment Act (CARA, H.R. 701). The more Members who stand up on the House floor asking for a vote on CARA, the more momentum we will have in revitalizing LWCF. A Few Tips: * When you call your Member's office, ask for the aide working on LWCF (or the environmental aide.) * Explain your purpose and whom you represent. 3. Organize a Site Tour Our greatest asset in the campaign to revitalize the Land and Water Conservation Fund is the legacy of successful projects and partnerships that LWCF has made possible. One of the best ways to further the cause is to get your representative or senator out of the office and into a park, playground, wildlife refuge, trail or other place that has benefited from LWCF. A Few Tips: * Use the opportunity as a media hook. * Include a diverse group of local activists and site users in the event. * Pick a rain date. 4. Set an Editorial Board Meeting with Your Local Newspaper Editorials educate the newspaper's readers on important topics of the day, shape public attitudes, make or break electoral candidates, and affect key policy decisions at the local, state, f and national levels. Meeting with your local editorial board is an important strategy in any campaign. Providing your editorial writers with information on the Land and Water Conservation ' 14 ( Fund will help those in your community learn about this important program. \ � A Few Tips: * Write a letter asking for an appointment and always make afollow-up call. * Always organize a group of LWCF activists, but keep your group small. * Meet with your group Y before hand to decide who will say what. * Remember the purpose of the meeting is to provide the editorial writer with information about your issue. * Take fact sheets and other supporting documents. 9:30 a.m. to 12:30 p.m. 1:30 a.m. to 3:30 p.m. Canada College -4200 Farm Hill Edgeood Park Return to Blvd, Redwood City. Exit Farm Hill Blvd from Hwy. 280 and head north, exit at Edgewood Hwy.280, head east. From 101, exit Woodside Road. Road and head west until you reach H . .280 and y wy . head north,next exit is Farm Hill Blvd. At first Maps will be distributed at the morning session. light,turn left into college. Parking and room location TBA. Cafiada College is wheelchair accessible. For more information please contact: Karen Cotter 650-329-8544 or email to kcotter@sprynet.com Please bring your own lunch. Help reduce waste by bringing your own coffee cup. Bring water and sunscreen. Wear comfortable walking shoes and weather resistant clothing for our afternoon field trip. Posters, flyers, handouts, and give-aways to share with others are-welcome. Let us know if you need a table or an electrical outlet and please arrive early to set up your display. Restoration Workshop Sponsored by: Bay Area Action www.arastradero.org, California Native Plant Society, Santa Clara Valley Chapter www-leland.stanford.edu/rawlings/blazcon.htm, Midpeninsula Regional Open Space District www.openspace.org, and Native Habitats www.nativehabitats.org Please share this flyer with others. San Francisco.Peninsula-South Bay Restoration Workshop c/o Bay Area Action 265 Moffett Blvd. Mountain View, CA 94043 xA)dedr00%mvmp4erm&da . ,100%parr romune.a+xru 2000 San Francisco Peninsula SouthBa y Restoration Workshop Canada College and Edgewood Park Friday, April 7, 2000 9:30 a.m. to 3:30 p.m. Fee: $10 Since we are assured that the all-wise Creator has observed the most exact proportions of number,weight and measure in the make of all things, the most likely way therefore to get any insight into the nature of those parts of the Creation which carte within our t must in all reason be to number,weigh h and measure.g Stephen Hales t 1677-1761 >E English scientist. Veget able Staticks Introduction, 1727. How do we measure our success? How do we setup a monitoring program to monitor for our goals ' workshop brings together four was of looking at monitoring: and objectives. This year's wo sop g g y g g volunteer firm and a o emi privat e consulting representatives from a governmental agency, academia, p , monitoring program tell us how they chose their methods and standards. Two hands-on afternoon sessions provide a real world experience from setting up plots to counting caterpillars. Morning Session g at Canada College: , Jodi•Issacs, Biologist with the Mid-peninsula Regional Open Space District and Tim Hyland, California State Parks: Habitat Restoration -Which Method Works? ' r nervation Biology: Designing a Checkers of Stuart Weiss, Stanford University's Center for Cos gy g g p Butterfly Monitoring Program. Patrick Kobernus Thomas Reid Associates: Monitoring Habitat and Population Status for Rare Grassland Butterflies. Cynthia Gilbert, lecturer at San Francisco State University: Using Volunteers to Monitor and Getting Great Results. Afternoon Session at Edgewood Park(choose two): Volunteer monitoring Measuring differences between grassland management-techniques *Monitoring habitat and population status for rare grassland butterflies The Second San Francisco Peninsula- South Bay Restoration Workshop once again invites land managers, stewards and restorationists in the Santa Cruz Mountains Bioregion to share, network and collaborate on the challenges of managing our natural resources. Sign-ups limited to first 60 registrants. Please enclose a check for ten dollars made out to: CLAPS(for California Native Plant Society)and mail it and this form to return address on back by April 1: Name Agency Address City and Zip Phone Email Your ten dollars will defray the cost of the room rental, coffee, refreshments, and snacks. Page 1 of 1 I John Escobar From: mrosd <mrosd@openspace.org> To: Craig <cbritton@openspace.org>; JohnE <jescobar@openspace.org>; Mary <mdebeauvieres@openspace.org> Sent: Monday, March 06, 2000 8:44 AM Attach: CRAddendum2.doc Subject: Fw: Castle Rock General Plan Addendum#2 I ----- Original Message ----- From: Dave Keck<DKECK(�),parks.ca.gov> To: <MSchaller(ii),co.sanmateo.ca.us.2>; <mrosd(�z open space.org> Sent: Friday, March 03, 2000 4:39 PM Subject: Castle Rock General Plan Addendum#2 NOTICE OF ADDENDUM #2 Castle Rock State Park General Plan March 3, 2000 In response to the public's comments on the Castle Rock General Plan, our Department is making a continued effort to seek common ground on the appropriate management strategies, and provide further clarification of the vision for the park. We have revised the general plan to remove the walk-in campsites proposed at Partridge Farm, and added a statement in the Declaration of Purpose that the Natural Preserve will be managed with a goal of achieving wilderness protection. Attached, is the second Addendum to the Preliminary General Plan, which supersedes Addendum#l. Previous changes and revisions from Addendum#1 are included. The vertical lines in the margin indicate the location of text revisions being added by Addendum#2. Rusty Areias, Director NOTICE OF TOUR ON MARCH 7, 2000 CALIFORNIA STATE PARK AND RECREATION COMMISSION The State Park and Recreation Commission plans to tour Castle Rock State Park in Santa Cruz and Santa Clara counties on March 7, 2000. No public testimony and no action will be taken by the Commission during this tour. The tour will begin at approximately 1:45 PM at the Sempervirens Point parking lot, located on State Highway 9 near Saratoga Gap. 3/6/00 i Castle Rock State Par,. . reliminary General Plan Addendum March 2000 Castle Rock State Park Preliminary General Plan March 1, 2000 I This document was prepared by the California Department of Parks and Recreation as to the Castle Rock State Park Preliminary General Plan (February 1999). This -,,su ;`d January 24, 2000) and retlects changes and revisions being —4 - csEirY i Ef 4 iWnF? r'� t t! r! !3(f �t,4 iC?nc c fll ,,/ �f(i Yrnrr, Arlf -nrtl�. The underlined words indicate new or inserted text, and the strikethrough words are deleted. ,a ddendum #1 is replaced by Addendorr, Terence to the changes occurring in each step of this process. rage 53, DECLARATION OF PURPOSE purpose of Castle Rocl( x,tstandir7g natural rsources, ecosystems of the upper watershed or me :-)ar) L:./eti�zo Hiver. ;,vt?w providing opportunities for the visitinc; pudic 41,1; r-}rtrov and Fnspir'ed by the i.inique and (iivc rse topogr1,114 r,ommunities, and scenic views. .) accomplish this purpose, the ;alifornia 5(ate Par' tri anage the park resources for the continuing scene: scientific. and recreational henefits of present and future ienercat-ions. Park management :=hal; ()vide the `^ .„ f ,r --• �a{ processes and features in the naal< } �)xisted prior to the arrival o, �:urE���,rrc:ric��ans hF �°z?��trar_ will be 177a?'?aged with the goal '`}t� t)t;17ia 'li.i wdtjet � --- r estoralion, preservation, and eclucati -;,1t}GtCc�l processes 1 ill �e i.?n i'icgrb Page 53, UNIT VISION eisepseF), iptFHsiens The pork remains an i tegFai nr mepnnanf ..f fhh-P Sanfa Gr-az Meiinks eees)Lste-pq ai4ei its eyelu4epary Fe SON Ge � all4e& Page 1 of 11 Castle Rock State Pat,— reliminary General Plan Addendum #,- March 2000 Castle Rock State Park is a place of outstanding scenic beauty possessing the vestigial wilderness dualities of the Santa Cruz Mountains, linked through biocorridors with other remnant natural ecosystems of the region. A management philosophy of protecting wildness guides visitors through the scenic vistas, interesting vegetation, and unique landforms. The park lands and adj acent open space appear as interconnected wildlands recovering from previous human use. The visitor's quest for open space and solitude are met through an integrated system of trails and protected natural areas. Encounters with the most significant park values intensity as visitors penetrate deeper into these forested canyons. An environmental ethic guides responsible behavior and minimizes visitor impacts on the natural systems. There is a heightened awareness of the significance and sensitivity of park resources and the effect recreation may have on the health of the ecosystem, with recognition to preserve this area for future .generations. Page 59, Par. 1: Resource management program development and implementation is contingent upon the availability of funding. The Department should continue efforts to secure funding necessary for the success of this and other unitwide management programs. Page 59, Guideline: The Department should cooperate with other landowners and regulatory agencies to address watershed issues affecting Castle Rock State Park. A plaR *6 Reeded fGF 6peGifiG maRagemeRt aGt*9R6 iRteRded te aGhieVe wate%hed FAaRagemeRt goals. The Department will develop a Watershed Management Program to remedy unnatural soil erosion and stream sedimentation problems within Castle Rock State Park. Page 60, Guideline 1: The primary objective should be is to manacle vegetation toward a natural condition with a minimum of disruption to natural processes. Page 61, Guideline 2: California Black oak woodlands occurring at Castle Rock State Park 6hould shall be considered as Special Plant Communities and their preservation 6heuld shall be a high priority in vegetation management. Page 62, Guideline: The use of prescribed fire shel-ld shall be considered for ecosystem management in the park. Page 63, Guideline 1: Suppression methods sheuld shall cause the least resource damage commensurate with effective control. Page 2 of 11 Castle Rock State Pai. reliminary General Plan Addendum #. March 2000 Page 64, Guideline 1: Prior to any site development, heavy use activity, or prescribed burn, surveys for sensitive wildlife sheuld will be conducted during the appropriate season for detection in areas that will be affected. Page 64, Guideline 1: The Department will work with surrounding property owners and *urisdictions to reduce the numbers of non-native animals such as feral pigs, feral cats, cowbirds, bullfrogs, and starlings in the park. Page 66, Par. 1: These differentially weathered features, including caves, spheroidal masses referred to as "cannonballs," and lattice-like structures on rock faces and walls termed "fretworks," are often very fragile to the tOUG14 and can be easily damaged. Page 66, Goal: Protect and preserve tafoni features, including caves, spheroid masses called "cannonballs", and lattice-work rock walls and faces. The fossil and mineral record and specimens of Castle Rock State Park 6hould will also be preserved. Page 66, Guideline 1: Geological investigations should will be performed on sandstone outcrops where significant tafoni features are present in order to recommend and implement appropriate measures for their preservation. Page 66, Guideline 3: In order to protect natural resource values, only low- impact recreational climbing (defined below) sheuld will be allowed. A climbing management plan should will be developed that protects natural and cultural features, especially tafoni, and includes mitigation for impacts resulting from climbing. Page 67, Guideline 1: Measures sheuld will be taken to identify, record, and protect all significant prehistoric sites from adverse effects resulting from park use, development, resource management programs or natural processes such as erosion. Page 68, Guideline 1: Measures sheuld will be taken to identify and protect all significant historic sites and features. Page 72, New Section: MANAGING RESOURCES AND VISITOR IMPACTS It is recognized that any recreational use produces at least some impact, and that the Department needs to manage visitor impacts. Also recognized is the importance of providing and maintaining diversity in resource features and conditions of the park. Goal: Apply processes and methods of visitor impact analysis to minimize resource impacts and maintain appropriate types and levels of visitor use within this unit. Page 3 of 11 Castle Rock State Pai— reliminary General Plan Addendum #- March 2000 Guidelines: In accordance with the California Environmental Quality Act(CEQA), prior to site specific development or preparation of management plans, the area of potential impact will be surveyed and reviewed by appropriate personnel and responsible agencies. Resource conditions will be periodically assessed and appropriate actions taken to maintain acceptable conditions and manage use accordingly. Page 74, Par. 4: Castle Rock State Park has opportunities to provide a trail experience where access and low impact use remains a priority in future park management, and complements the preservation of wildlands and diverse resource values. The aFnGURt ef additieRal tFaiI6 pFejeGted fGF the paFk is abeut 19 miles- Page 79, New Guideline: Guidelines for Magnetometer Site: It is recommended that the Magnetometer Site, near Castle Rock Trail Camp, be interpreted for its own value as well as the role Russell Varian, early proponent of the park, played in developing it. Page 81, Guideline 1: Mobile feed URitS 6hould be GGRGideFed fqF pFeyidipq GE)RtFaGt SeFV*Ge6 tO Yi6it9F6 of Garstle RE)Gk State PaFk, wheR epeFated appFepFiate paFkiRg 19t !GGatiGns. Page 81, Last Par: SiRGe it It is not possible to predict all potential and compatible activities for Castle Rock State Park at this time. T-heFefeFe, 6peGifiG Specific proposals f9F Rew 69RGeE;s*E)RG to contract for services will be considered on a case-by-case basis. Each proposal will be weighed against the purpose, vision, values, and spirit of the park as discussed in other sections of this plan. Page 84, Natural Preserve Classification Goal: Establish special protection and designation for sensitive plant and wildlife habitats and geologic features. PFGYmde a NatUFal PFeseFye GIa66ifiGatiqR----f appF ximately 1,890 aGFe6 Gf in the upper San Lorenzo River and Kings Creek drainages, including the area known as Lion Caves. The management intent is to establish approximately 1,800 acres in a Natural Preserve Classification, with a primary management philosophy to protect, preserve, and interpret significant resources, and promote natural processes. Sensitive plant communities, wildlife habitats, and geologic features will receive special protection. Visitor use will be carefully monitored and managed on a few trails through the natural preserve. These selective trails will be designed for access with the least impacts, allowing visitors an opportunity to experience the wildness and serenity of the park, without disturbing critical habitats. Page 4 of 11 Castle Rock State Par,. . reliminary General Plan Addendum March 2000 Page 84, Guideline 2: The natural preserve 6heuld will be managed as a wildlands area where natural processes can occur without interference and which provides opportunities for scientific study of interpretive and educational values, where appropriate. Page 84, Guideline 4: HeweyeF, w eFe they present eTE)GieR and—other pFeblems, the The old road alignments, where they present erosion ane-etheF problems, s#e"d will be surveyed -nmrl f;e Page 85, Par. 2: TRAVERTINE SPRINGS AREA Travertine Springs is a small, unique area of the park that exhibits travertine mineral deposits issued from natural springs. The wetlands associated with the springs are equally fragile, supporting a tall grass meadow and stands of willow, bay, and hazelnut. This is the only place of occurrence of this rare and fragile feature in Santa Cruz County. Goal: Maintain, protect and perpetuate the Travertine Springs area of Castle Rock State Park. Guideline: The Department should develop and implement a specific area plan that provides for the protection and preservation of the Travertine Springs features occurring in the park. Page 86, Insert after Goal: Partridge Farm Area Land Use Management and Development The management intent is that the Partridge Farm Area provide the primary access contact and orientation for visitors to Castle Rock State Park. For most visitors, this entrance area will serve as the main trailhead parking and transitional zone between the park's wildland areas and the urbanized setting from which they come. Management will establish a new park headquarters area on this site that provides basic visitor services and information, with programs stressing park values and recreational opportunities. The open-air interpretive shelter will exhibit known natural and cultural features, and occasionally serve as an outdoor classroom. _ New facilities will be esthetically designed to blend with their surroundings and respect the environment and its preservation. The entry experience for visitors to Castle Rock State Park, through Partridge Farm, will prepare visitors for a wildlands experience they will get when entering the trail system beyond. Page 5 of 11 Castle Rock State Pai,. . reliminary General Plan Addendum March 2000 Future management and use of the Partridge Farm Area will be guided through proper site planning and on-going evaluation of resource conditions, as well as understanding visitor and operational needs. The introduction of public access and use to this site will transform some of the current open space to developed parking, buildings, and outdoor use areas. However, the predominance of open space will be preserved and native vegetation reestablished to provide wildlife habitat and serve as a buffer between facilities and surrounding natural areas. Visitors can be oriented to the appropriate use areas and informed about the resource values and park rules and regulations. The Department will focus on mitigating visitor impacts in sensitive resource areas, establishing the initial public contact and operating functions, and improving access for people with disabilities. An overall site plan will be prepared for the Partridge Farm Area, reflecting a phased approach to future development (see guidelines). This proposed change in land use will involve the design and construction of parking lots and entrance road in areas previously developed before the land became a state park. The design process will integrate facilities and vehicle and pedestrian circulation into the site with the least impacts on resources and surrounding activities. This site transformation and changes in the patterns of use will occur incrementally. The first phase of new parking at Partridge Farm will be managed for the primary visitor access and use of the Castle Rock Ridge area. Initially, any spaces retained in the -main parking lot could serve as a secondary access for trail use. Roadside parking will be removed along the highway outside both of these parking areas. The Partridge area parking will serve first time visitors and others coming to the park headquarters office, as well as for special events. Visitors will be directed to trailheads and designated perimeter parking areas, depending on their interests and need for visitor services. Ultimately, the goal is for Partridge to become the primary entrance and day use parking area, where visitor use can be effectively managed and resources protected. Page 86, Guideline 1, fourth sentence: Day use parking, including overnight parking for trail camps, and visitor facilities should be provided to support program needs. These facilities will be located away from sensitive areas. Page 86, Guideline 2: Establishment of day use parking and other facilities at Partridge Farm 6heuld will include an assessment of the ecological and social conditions for the adjacent areas of the Black Oak Woodland, Lion Caves, and Castle Rock Ridge Resource Management Zones. It is the goal to apply processes; wheFe fea&4Ae-, and methods of visitor management to minimize resource impacts. Page 6 of 11 Castle Rock State Par,— reliminary General Plan Addendum #'- March 2000 Page 86 , Guideline 3, first sentence: With the guidance of resource inventories, studies, and review, an overall site plan sold will be prepared for Partridge Farm... Page 86 , Guideline 3: With the guidance of resource inventories, studies, and review, an overall site plan sheuld will be prepared for Partridge Farm. This site plan should include components for vehicle access, visitor contact, park office, parking and circulation, day use areas, interpretive and operations facilities, cultural protection, buffer zones, and native plant restoration. Site planning should establish a significant buffer between facilities and sensitive resources, and consider the separation of day use, , and administrative areas, and include reforestation (with native species) of open space areas surrounding public use facilities. Page 87, Guideline 1: Day use parking should be provided (estimated at 50 te i 0o , including support facilities, such as restrooms, potable water, and appropriate trails (Refer to Parking and Access Guidelines),. An outdoor visitor program area and scenic overlook should may be considered for development. Development projects shall include restoration and protection of native vegetation and protection of cultural features. Page 93 (move to page 87) All reference to camping will be deleted i Goal: Expand access opportunities for visitors, Page 7 of 11 Castle Rock State Pai,, , reliminary General Plan Addendum March 2000 eliminate physical barriers, and provide equal accessibility to all programs and facilities. Support facilities will be designed for accessibility in accordance with ADA guidelines, and sited with minimal impact on resource values. Prior to facility development, a resource assessment will be implemented in order to direct management on development, use limitations, and public access to the Partridge Farm Area and its surroundings. The restoration and protection of the natural communities in the area will offset unavoidable impacts associated with any development. As well, there is a commitment to provide quality interpretation of the natural and cultural values therein. Such interpretation is intended to stimulate an awareness and appreciation by all park visitors to share in the protection and preservation of these resource values. Guidelines: i I Automobile parking should be screened with native plants • Restroom facilities should be small in scale and blended into the existing terrain and landscaped with native vegetation. • Pathways connecting to park trails shall guide users through the least sensitive resource areas. • provisions should be made for people with disabilities. Page 8 of 11 Castle Rock State Pai.. . reliminary General Plan Addendum #. March 2000 • Programs and development in the State Park System are currently guided by the ACCESS TO PARKS GUIDELINES document, dated May 1999, on file in the Human Rights Office of our Department. These guidelines are subject to continuous review and periodically updated as new information becomes available. Additional State and Federal guidelines may also apply. Page 88, Par. 1: GUIDELINES FOR MULTIPLE AREAS The management intent for wildland areas surrounding the Partridge Farm and proposed natural preserve is to preserve natural resource values, protect cultural sites and features and to provide access opportunities. Recreational activities will be managed and regulated to minimize visitor impacts on resources. Designated trailheads along State Highways 9 and 35 will be improved with upgrades in safety, services, and visitor orientation. The following goals and guidelines pertain to the management and use of areas outside the natural preserve and the Partridge Farm Area: including rock climbing, parking and access, trail camps, and the protection of historic sites and features. Page 89, Guideline 1: A Climbing Management Plan Ghould will be prepared in coordination with the climbing community to establish appropriate guidelines for climbing that protect geologic features and significant natural and cultural resources. Page 89, Guideline 4: The resources and recreational activities outside the natural preserve sheuld will be managed with methods that ensure protection of significant resource values and that maintain compatibility with adjacent parkland uses. Page 90, Goal: Relocate the park entrance and main parking area to Partridge Farm. Phasing will allow for monitoring resource impacts and changes in visitor use and determining appropriate g rminin the a ro riate management actions to minimize resource impacts. tome-taken- Page 91, Guideline 2: The Department Ghould will perform spesifis site investigations and resource assessments to determine appropriate g ro riate management actions and recommended mitigation. Page 9of11 i Castle Rock State Pat,. . reliminary General Plan Addendum March 2000 Page 91, Overnight Parking: Existing trail camps require parking spaces for overnight use. Backpackers, or campers who hike into the existing trail camps use the main parking lot. Currently, spaces in the main parking lot are allocated at nighttime for this purpose. The general plan guides the development and management of visitor parking_and potential trail camp locations. Goal: Provide E)YeMight parking for overnight use areas. Guidelines: Day use parking spaces in the existing or proposed parking lots may be allocated for overnight use of trail camps. The needs of resource management, trail camp users, and day use visitors should be considered in determining future parkin_ lot of capacities. The location and estimated number of parking spaces required by trail camp users depends on the total number of campsites and the use they receive. pFegFams. Page 93, Guideline 1: Considerations for the amount and disbursement of visitor parking made available along both highways s#hetild will be included in establishing a basis for managing visitor use of the park. Page 93, The OVERNIGHT USE FACILITIES section is deleted from this page and moved to page 87 with revisions as previously indicated. Page 101, Par. 2: The general plan proposes facility development and changes, operational changes, resource management proposals and classification recommendations. The initial impetus for this general plan was the mitigation of impacts arising from existing activities and conditions. Nearly half of the park is proposed for a natural preserve classification. Prescribed burning is proposed to reintroduce fire into the ecosystems, which will maintain and possibly expand native plant communities. The creation of a centralized visitor p Y L contact point at Partridge Farm will permit better visitor control and allow the provision of better public sanitation facilities. Revegetation with native plant species of the undeveloped portion of Partridge Farm will expand native plant communities improve esthetics, and provide additional wildlife habitat. These actions will also provide mitigation for the impacts from the relocation of day use parking The park administrative function will be relocated to one of three possible locations... Page 10 of 11 I Castle Rock State Pai,. . reliminary General Plan Addendum #'_ March 2000 Page 107 SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT 1. There is a potential for significant traffic impacts. The entrance to Partridge Farm may require a new alignment and channelization to provide safe access and egress when it is developed for public use. Assuming that each day use parking site generates 4 trips per day, 2- - trips per day total could be generated by Partridge Farm development. Although the volume... 2. The potential for significant visual impacts from development at the Partridge Farm does exist. The landscape has been considerably altered over the years by farm operations; however, a natural-appearing landscape is slowly reestablishing itself. The development of day-use parking could create an adverse visual impact to users. A parking area... Page 112, last Par. Maximum daily use for the proposed project, assuming 428 day use parking sites, 2 turnovers per parking site and 2.3 visitors per vehicle, 40 people per bus (1 site at Sempervirens Point), 428 x 2 x 2.3 + 40 visitors/day ( ) _ /d y i The theoretical maximum daily use for the proposed project is visitors/day. Page 119, Item number 3: 3. ... (every day use parking site used twice a day, each vehicle carries 2.3 people and each person uses 5 gallons of water) the maximum total demand for Partridge Farm would be approximately gallons per day or a flow of cubic feet per second. Page 11 of 11 Regional Open Space MIDPENINSULA REGIONAL OPEN SPACE DISTRICT To Board of Directors From: J. Escobar,Assistant General Manager Date: March 3,2000 Re: FYIs 330 Distel Circle • Los Altos, CA 94022-1404 • Phone: 650-691-1200 Fax: 650-691-0485 • E-mail: mrosd@openspace.org • Web site: www.openspace.org Regional Ope ropace 1 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT For Immediate Release Contact: Malcolm Smith January 14. 2000 Public Affairs Manager (650)691-1200 Open Space District Board Endorses Proposition 12 on March 7 Ballot Los Altos, CA—At its regular meeting of January 12, 2000 the Board of Directors of the Midpeninsula Regional Open Space District adopted a resolution in support of State Proposition 12 on the March 7, 2000 ballot. Proposition 12, known as the Safe Neighborhood Parks, Clean Water, Clean Air, and Coastal Protection Bond Act of 2000, is a$2.1 billion State bond measure which, if passed by the voters,will be the first such measure put into place since 1988. In addition to funds allocated to parks and open space agencies throughout the State on a per-capita basis, there will be millions of dollars available in competitive grant funds. The District estimates it will receive between $5 million and $6 million in per- capita funds, and intends to apply for the maximum practicable number of grants for meritorious projects. An added benefit of this bond measure is that it will provide $55 million to the San Francisco Bay Area Program of the State Coastal Conservancy. This is the same program from which the District recently secured a $3 million grant toward acquisition of the Bear Creek Redwoods Open Space Preserve. Funds in this program are earmarked for use in the nine-county Bay Area only, and will provide grants for many long-overdue recreation, acquisition, facilities, and other projects. The Midpeninsula Regional Open Space District,extending from the City of San Carlos to the Town of Los Gatos, is a public agency which has preserved over 45,000 acres of diverse open space and manages 24 open space preserves. Funding is provided by a small share of the annual total property tax revenues collected within District boundaries. The District permanently protects wildlife habitat, watershed, and a variety of ecosystems, restores damaged natural resources, and provides trail improvements for passive recreational use by the public. The District's goals are to acquire a continuous greenbelt of protected open space lands for public use and enjoyment, and to preserve open space for future generations to enjoy. There are approximately 20.000 - 30,000 acres of land still at risk of being lost to development within the District's planning area. The District is divided into seven geographic Nvards, each represented for a four-year term by an elected Board member. The Board holds public meeting_s on the sec ond and ��'fourth edn p � esdays of each month at 7:30 p.m., at the Dis trict office s. '10 Diste C i-de C.A o-io, '-1-1t�-1 . pr,O,x: {>x� e,�t`-1 r(Y F\V 67 0-091-048F . E-nmd: mrr�al�soper t,2c .orb . 4�ely ,�tc�.�� .�. r>or.i ,),xre.ar, „ , -, ' r.-t'•. r .,,,..,..., V,,in C. I),t.,=. '..,!C r 7 i tt i I Regional Open ~)ace MIDPENINSULA REGIONAL OPEN SPACE DISTRICT RESOLUTION No. 00-01 RESOLUTION OF THE BOARD OF DIRECTORS OF THE MIDPENINSULA REGIONAL OPEN SPACE DISTRICT SUPPORTING PROPOSITION 12, THE SAFE NEIGHBORHOOD PARKS, CLEAN WATER, CLEAN AIR, AND COASTAL PROTECTION BOND ACT OF 2000, ON THE MARCH 7, 2000 BALLOT WHEREAS, the Board of Directors of the Midpeninsula Regional Open Space District finds that providing public open space, park lands, and outdoor recreational opportunities is of vital environmental, social, and economic importance to the people of our region, of the State of California, and of the entire United States; and WHEREAS, the Legislature of the State of California has placed Proposition 12 on the March 7, 2000 ballot,which is a measure entitled The Safe Neighborhood Parks, Clean Water, Clean Air, and Coastal Protection Bond Act of 2000, in an amount of$2.1 billion; and WHEREAS, Proposition 12 is supported by a wide coalition of community and conservation groups, business, labor, and historic preservation organizations, and many other diverse grassroots groups; and WHEREAS, this bond act will provide significant funds for much-needed park and open space land acquisitions and development of public park facilities for the enhancement of our community, region, and state including urban forestry, parks, open space, recreation facilities, historic preservation, and a wide variety of other programs; and WHEREAS, if approved by the voters, funding from Proposition 12 will be allocated to the State Parks Department, State conservancies, local parks agencies, wildlife habitat conservation and land acquisition agencies, the State Resources Agency, and park acquisition and development for low-income and at-risk youth, thus meeting the very deep need for parks funding in a wide variety of sectors across the State; and WHEREAS, it is estimated that the Midpeninsula Regional Open Space District may directly receive up to S6 million, or more, from the "Roberti-Z'Berg-Harris" and "Per Capita"program areas of Proposition 12, and in addition will be eligible for significant funds which will be available on a competitive grant basis; and WHEREAS, the District will receive funding for open space acquisition and other projects in the Sierra Azul E1 Sereno, Monte Bella, Russian Ridge, Skyline Ridge, El Corte de ?Madera Creek, and Purisima Creek Redwoods Open Space Preserves if this bond act is approved by the voters. '0«", THEREFORE, BE IT RESOLVED that the Board of Directors of the Midpeninsula Regional Open Space District endorses Proposition 12, the Safe Neighborhood Parks, Clean Water, Clean Air, and Coastal Protection Bond Act of 2000 on the March 7, 2000 ballot. Regional Oper mace MIDPENINSULA REGIONAL OPEN SPACE DISTRICT For Immediate Release Contact: Malcolm Smith January 14,2000 Public Affairs Manager (650)691-1200 Open Space District Board Urges Long Term Preservation of Stanford Open Space Los Altos, CA—The Board of Directors of the Midpeninsula Regional Open Space District has adopted a resolution urging Stanford University to provide clear and significant long-term or permanent protection for open space areas of the campus as part of its long-range Community Plan. The resolution, discussed and adopted at the Board's regular meeting on January 12, 2000, recognizes the vast economic and cultural benefits that Stanford provides to this area, and the correspondingly significant environmental impacts. The Board members agreed that the draft Community Plan produced by Stanford does not provide the level of detail needed to clarify the university's future plans. It particularly fails in providing for any permanent or even long-term definition of the use of open space areas to the south and west of Junipero Serra Boulevard and Foothill Expressway,and straddling Interstate 280. The Community Plan is intended to cover the 4,017-acre portion of the campus in unincorporated Santa Clara County. "The use and development of the Stanford campus,particularly regarding open space, are issues of critical importance to the District and to all the communities and jurisdictions of the San Francisco Peninsula,"said Board member Nonette Hanko. "The future development of the campus is unquestionably the most significant project remaining to be under-taken on the Peninsula." Board member Mary Davey, who is also a member of the advisory Community Resource Group examining the plan,added, "Stanford has a vast level of development and impact, and is requesting entitlements for an additional two million square feet of buildings and 3000 housing units. It is entirely appropriate that the plan provide permanent protection for these open space holdings as a mitigation of the cumulative development impact. The current draft plan does not provide that detail." The Midpeninsula Regional Open Space District,extending from the City of San Carlos to the Town of Los Gatos,is a public agency which has preserved over 45,000 acres of diverse open space and manages 24 open space preserves. Funding is provided by a small share of the annual total property tax revenues collected within District boundaries.The District permanently protects wildlife habitat,watershed,and a variety of ecosystems, restores damaged natural resources.and provides trail improvements for passive recreational use by the public. The District's goals are to acquire a continuous greenbel- of protected open space lands for public use and enjoyment,and to preserve open space for future generations to enjoy.There are approximately 20,000- 30,000 acres of land still at risk of being lost to development within the District's planning area. The District is divided into seven geographic wards,each represented for a four year term by an elected Board member.The Board holds public meetings on the second and fourth Wednesdays of each month at 7:330 p.m.,at the District C, otr'ices. W Di,tel Circle * Los Altos, CA 9-4022-1404 Phone: 050-f),)1-12()o 1:NV OW-091-0485 & E-mail: niro,;(I!—soi)en,;i),l(-e.or,,, 1Veb,;ite: Regional Open 1-)ace 1 1 MIDPENINSULA REGIONAL OPEN SPACE DISTRICT Resolution No. 00-02 Resolution of the Board of Directors of the Midpeninsula Regional Open Space District Urging Stanford University to Offer,and Santa Clara County to Require,Permanent Protection of Significant Open Space Areas in the Stanford University Community Plan Whereas,Stanford University provides vast economic and cultural benefits to the communities of the San Francisco Peninsula,and has correspondingly significant environmental impacts;and Whereas, Stanford University is subject to the same General Plan,zoning,and other land use controls and standards as any other private institution;and Whereas,Stanford University is currently requesting renewal of its General Use Permit from Santa Clara County,which addresses development in the 4,000-acre portion of the 8,000-acre campus which lies within unincorporated Santa Clara County;and Whereas,Stanford University is proposing approximately 2 million additional square feet of educational,institutional,and commercial buildings,and over 3,000 additional housing units,which will have a significant cumulative impact on the community and the environment on the Peninsula;and Whereas,Stanford lands include open space lands south and west of Junipero Serra Boulevard and Foothill Expressway that provide vital recreational opportunities,an open space buffer between burgeoning urban areas,and wildlife corridors extending through adjacent parks and preserves and riparian corridors to the Santa Cruz Mountains and to San Francisco Bay; and Whereas,The Midpeninsula Regional Open Space District manages six open space preserves in the same critical watershed as the Stanford open space lands,and has as its Mission and Basic Objectives the preservation of a regional greenbelt,linking District and other key resource lands;and Whereas,Santa Clara County has required that Stanford University prepare a Community Plan,addressing the seven required elements of a General Plan under California law; and Whereas, Stanford University is internationally renowned as a leader in scientific,cultural, and technical fields,and through this Plan has the opportunity to demonstrate leadership in the field of environmental and community planning;and Whereas, Stanford University submitted a draft Community Plan to Santa Clara County on November 15, 1999,that failed to provide clear definition of future use or protection of critical open space areas, and respond to other vital community concerns. Now,Therefore, Be It Resolved that the Board of Directors of the Midpeninsula Regional Open Space District urges Stanford University to offer,and Santa Clara County to require,a Community Plan that: Provides permanent protection of open space areas in sufficient proportion to mitigate the significant cumulative impact of the requested development entitlements,and reflecting the community value and environmental sensitivity of the open space lands: Responds to conununity input and provides a level of detail adequate for review of future plans and policies; Reflects the General Plans and zoning of the adjacent communities and San Mateo County in the Community Plan, including the Urban Growth Boundary of the City of Palo Alto; Requires the discretionary review of current and future projects under 5.000 square feet in areas outside the core campus: Provides a more specific and higher standard of environmental management and monitoring of current and future use, to protect resources such as creeks,unstable slopes,and archeological sites. Regional Open - lace MIDPENINSULA REGIONAL OPEN SPACE DISTRICT PULL after February 25 Contact: Lori Raymaker January 21, 2000 Docent Coordinator (650) 691-1200 Open Space District Seeks Nature Center Volunteers Los Altos, CA -- Are you interested in spending an occasional day in a beautiful forest setting overlooking a peaceful pond and an abundance of wildlife? How about if you could also help people to understand and appreciate our environment and its inhabitants? If this sounds like fun, you may want to join Midpeninsula Regional Open Space District's team of nature center docents. Working in pairs, nature center docents staff the David Daniels Nature Center at Skyline Ridge Open Space Preserve on weekends and holidays. As a nature center volunteer, you'll greet the public, answer questions, and help visitors explore the hands-on exhibits in the nature center. Nature center docents must be available at least one Saturday or Sunday every 4 to 6 weeks. Volunteers are asked to attend three fun and informative training sessions before volunteering. Training sessions will be held from 7-9 p.m. on Tuesday, February 29 and from 9:30 a.m.- 12:30 p.m. on Saturday, March 4 and March 11. For more information, please call Lori Raymaker, docent coordinator, at (650) 691-1200. It's your chance to do something wild! Sign up today! The Midpeninsula Regional Open Space District, extending from the City of San Carlos to the Town of Los Gatos, is a public agency which has preserved over 45,000 acres of diverse open space and manages 24 open space preserves. Funding is provided by a small share of the annual total property tax revenues collected within District boundaries. The District permanently protects wildlife habitat, watershed, and a variety of ecosystems, restores damaged natural resources, and provides trail improvements for passive recreational use by the public. The District's goals are to acquire a continuous greenbelt of protected open space lands for public use and enjoyment, and to preserve open space for future generations to enjoy. There are approximately 20,000 - 30,000 acres of land still at risk of being lost to development within the District's planning area. The District is divided into seven geographic wards, each represented for a four year term by an elected Board member. The Board holds public meetings on the second and fourth Wednesdays of each month at 7:30 p.m., at the District offices. 130 Distel Circle * Los Altos, CA 94022-1404 o Phone:()S0-691-1200 FAO �)50-091-0485 o E-mail: mro,;dr+Dopenspa(e.or,', o Wei)site: ww\,v,(.)l)eni)ace.org V R(ur,l %I.ir% C. [),i%e , led Ct r [)eanc[ittie, \()nette Hanko Bei'v Crawler Kenneth C. \t,, - Generd I.Craig Britton Regional Open )ace ---------- MIDPENINSULA REGIONAL OPEN SPACE DISTRICT For Immediate Release Contact: Craig Britton February 23, 2000 General Manager (650)691-1200 Mike Potter Office of Byron Sher (408) 226-2992 Senator Byron Sher Wins State Funds for Midpeninsula Regional Open Space District's Bear Creek Redwoods Open Space Purchase Los Altos, CA—In response to a year-long lobbying effort by Senator Byron Sher(D-Stanford), the California Wildlife Conservation Board last week approved a$2 million grant to help fund the public acquisition and preservation of the Bear Creek Redwoods Open Space Preserve above the Town of Los Gatos. The District will use this grant to help acquire the upper 805 acres of the 1,065-acre Preserve, currently owned by Peninsula Open Space Trust (POST). Last year, the District acquired the lower 260 acres of this preserve for S 15 million. At that time, POST agreed to borrow commercially and contribute $10 million to purchase the upper 805 acres. Since last December, the District, with the help of Senator Sher, successfully obtained a total of S5 million in grant funds toward the purchase of this property from POST, which is working to raise $5 million in private funds toward the purchase. With the new $2 million Wildlife Conservation Board grant, the previous $3 million Coastal Conservancy grant, which Senator Sher helped obtain from the Bay Conservancy account established by Sher's legislation in 1999, and the private funds being, raised by POST, this property will be permanently protected and preserved as open space on behalf of the public, for today and for all future generations. "The Bear Creek Redwoods Open Space Preserve truly is a unique open space treasure in our area," Sher said. "We've worked hard this past year to ensure that this acquisition took place and I'm very pleased at the Wildlife Conservation Board's action." Senator Sher's and the District's efforts will help to preserve critical habitat for a number of species, including the threatened red-legged frog, the Southwestern pond turtle, the California tiger salamander, and at least 7 other species listed either by the State of Federal government as requiring special protection. Overall, 90 species of birds, _3)2 species of mammals and 22 species of reptiles and amphibians are known to occur on this site. (more) 330 Distel Circle * Los Altos, CA 94022-1404 * Phone: 650-691-1 2CV FAX: 650-691-0485 * E-mail: mroscl@openspace.org - Web site: www.oper>pace.org B(o,ml w Pirectors:Pete Siernenz loary C. Dave%, led(%,r,Deane htfle. ,Nonette Hanko, Betsv Croy% !- Kenneth C Genera/ t,Crx,_, Britton In his capacity as a chair of the Senate Budget Sub-committee, which oversees state natural resource programs, Sher led efforts in this year's state budget to provide $18.5 million in unallocated funds for the Wildlife Conservation Board, for use in just this sort of project. Senator Sher and State and regional officials went on a walking tour of the property last fall in order to see for themselves the rugged terrain, sensitive wildlife habitats, and natural beauty of the Bear Creek Redwoods property. "We are one big step closer to seeing the permanent protection of this entire property as public open space," said Craig Britton, District General Manager. "Thanks to Senator Sher's efforts and the Wildlife Conservation Board members, the Bear Creek Redwoods acquisition is nearly complete." Located at the base of the Santa Cruz Mountains, north of Lexington Reservoir and State Route 17, Bear Creek Redwoods Open Space Preserve has long been a high priority for the preservation because of its natural resources, wildlife habitats, and public recreational opportunities, and is also a top priority in the Santa Clara County 2020 plan. It is an approximately 20-minute drive from downtown San Jose, and within just 30 minutes of several million people living in the greater Southern San Francisco Bay area. The site's level grassland hilltops, which offer vistas of the entire Santa Clara Valley, and its rugged canyons and forested hills are well-suited for low-intensity public recreational use. Its direct access to Lexington Reservoir County Park and proximity to State Route 17 give it even more potential as a recreational destination from throughout the Bay Area. Trail connections in the region, including to the Bay Area Ridge Trail and the Los Gatos Creek Trail, would be greatly enhanced and would provide new access to thousands of acres of existing open space lands. Mature redwood and Douglas fir forests, which are very unusual to find on the bay side of the Santa Cruz Mountains, give the new Bear Creek Redwoods Open Space Preserve a unique environmental value. Successful preservation efforts will ensure that these natural resources are permanently protected, thus providing future generations with the opportunity to enjoy unspoiled open space. The Midpeninsula Regional Open Space District, extending from the City of San Carlos to the Town of Los Gatos, is a public agency which has preserved over 45,000 acres of diverse open space and manages 24 open space preserves. (more) Funding is provided by a small share of the annual total property tax revenues collected within District boundaries. The District permanently protects wildlife habitat, watershed, and a variety of ecosystems, restores damaged natural resources, and provides trail improvements for passive recreational use by the public. The District's goals are to acquire a continuous greenbelt of protected open space lands for public use and enjoyment, and to preserve open space for future generations to enjoy. There are approximately 20,000- 30,000 acres of land still at risk of being lost to development within the District's planning area. Regional Open )ace MIDPENINSULA REGIONAL OPEN SPACE DISTRICT For Immediate Release Contact: Randy Anderson February 24,2000 Planning Manager (650)691-1200 Open Space District Schedules Meetings to Review Trail Access Policv Los Altos, CA-- The Midpeninsula Regional Open Space District,extending from the City of San Carlos south to near Loma Prieta Mountain, is a public agency which has preserved over 45,000 acres of diverse open space and manages 24 open space preserves. The District manages a public trail system featuring 219 miles of unpaved "wildland" trails,mostly in steep, rugged terrain. Seventy eight percent of these trails are open to multiple use, including mountain bicycles, In recent years, the District's Board of Directors has become aware of a growing concern from the public over the limited opportunities available to hikers and equestrians for a tranquil nature experience on the District's open space preserves. The Board has also been concerned about the difficulty and cost of managing mountain bike use compared to hiking and equestrian use. A three-member ad hoc committee of the Board was directed by the full Board to revisit the Trail Use Policy, adopted in 1990, and to return to the full Board with recommendations on methods to address this issue. Recently a proposal was developed for review and discussion at a public meeting of the Trail Policy Committee. In order to immediately improve tranquil nature study opportunities in the District's open space preserves, a total of 13.6 miles of existing trails are proposed to be closed to bicycle use. No changes are proposed for hiking or equestrian access. To minimize the impact on bicycle users, the 13.6 miles of trail closures are proposed in preserves which have very limited existing bicycle access: Foothills, La Honda Creek, Los Trancos, Picchetti Ranch,Pulgas Ridge, Teague Hill, and Thornewood. A proposed change in the District's Trail Use Policy is to introduce a long range goal to create a trail use ratio of 35 -40% hiking or hiking/equestrian trail use, to 60% - 65% multiple use (including bicycles). The initial trail use changes would bring the ratio to 30% - 70%. The long range target ratio would be achieved in the future as new lands and trails are added to the system, through individual trail use designations, or by designating entire new preserves for hiking and equestrian use only. more 330 Distel Circle • Los Altos, CA 94022-1404 • Phone: 650-691-1200 FAX: 650-691-0485 • E-mail: mrosd@openspace.org • Web site:www.openspace.org L oxd of Directors:Pete Siemens,,Mary C. Davey,Jed Cyr,Deane Little, Nonette Hanko, Betsy Crowder, Kenneth C.Nitz •General,titana,;er:L.Craig Brtto n A public meeting of the Board's Trail Policy Committee is scheduled for Thursday, March 9 at 7:00 p.m. in the Los Altos Youth Center, 1 North San Antonio Road(behind Los Altos City Hall). This meeting is an opportunity for the public to learn about and provide input on the proposal. Written comments are also welcome. Based on public input and discussion, the Trail Policy Committee is expected to forward a recommendation to the Board of Directors for action at a public meeting in April or May. Funding for the Open Space District is provided by a small share of the annual total property tax revenues collected within District boundaries.The District permanently protects wildlife habitat,watershed, and a variety of ecosystems,restores damaged natural resources,and provides trail improvements for passive recreational use by the public.The District's adopted mission statement is: "To acquire and preserve a regional greenbelt of open space land in perpetuity;protect and restore the natural environment; and provide opportunities for ecologically sensitive public enjoyment and education." There are approximately 20,000-30,000 acres of land still at risk of being lost to development within the District's planning area. The District is divided into seven geographic wards,each represented for a four year term by an elected Board member. The Board holds public meetings on the second and fourth Wednesdays of each month at 7:30 p.m., at the District offices. Regional Open race -------------------- MIDPENLNSULA REGIONAL OPEN SPACE DISTRICT For Immediate Release Contact: Craig Britton February 25,2000 General Manager (650)691-1200 Open Space District Board Endorses Proposition 13 on March 7 Ballot Los Altos, CA—At its regular meeting of January 26, 2000 the Board of Directors of the Midpeninsula Regional Open Space District adopted a resolution in support of State Proposition 13 on the March 7, 2000 ballot. Proposition 13, known as the Safe Drinking Water, Clean Water, Watershed Protection,and Flood Protection Act of 2000, is a $1.9 billion State bond measure. Proposition 13 is designed to help meet safe drinking water standards to protect the public health,help reduce pollution in lakes and rivers and along the coast, and provide protection for wetlands,riparian corridors,watershed lands,and other natural habitats. If approved by the voters, Proposition 13 will provide competitive grant funds for which the District will be eligible in a number of categories, primarily in the riparian corridor and watershed protection sections. In endorsing this measure, the Board found that providing for the protection of water resources in the State of California, including conservation of watershed and riparian lands, is of crucial and immediate importance to the constituents of the District and the people of the State. The Midpeninsula Regional Open Space District, extending from the City of San Carlos to the Town of Los Gatos, is a public agency which has preserved over 45,000 acres of diverse open space and manages 24 open space preserves. Funding is provided by a small share of the annual total property tax revenues collected within District boundaries. The District permanently protects wildlife habitat,watershed;and a variety of ecosystems,restores damaged natural resources, and provides trail improvements for passive recreational use by the public. The District' i s goals are to acquire a continuous ttnuous greenbelt of protected open space lands for public use and enjoyment,and to preserve open space for future generations to enjoy. There are approximately 20,000 - 30,000 acres of land still at risk of being lost to development within the District's planning area. The District is divided into seven geographic wards, each represented for a four-year term by an elected Board member. The Board holds public meetings on the second and fourth Wednesdays of each month at 7:30 p.m., at the District offices. 330 Distel Circle - Los Altos, CA 94022-1404 - Phone: 650-691-1 200 �. FAX: 650-691-0485 • E-mail: mrosd«openspace.org - Web site:www.ol)erlspace.org Hwrd w Dire(tors:tors:Pete siemens, vlary C. Da4ev,Jed Cvr, Dune htde, Aocette Hanko,Rt-t,% ( o%%der,Kenneth( I\itz -Gerter.d htana,;er:L.Craig Britian Regional Open ace MIDPENINSULA REGIONAL OPEN SPACE DISTRICT R_ESOLT_'TION No. 00-09 RESOLUTION OF THE BOARD OF DIRECTORS OF THE MIDPEMNSULA REGIONAL OPEN SPACE DISTRICT SUPPORTING PROPOSITION 131, THE SAFE DRINKING WATER, CLEAN WATER, WATERSHED PROTECTION, AND FLOOD PROTECTION ACT OF 2000, ON THE MARCH 7, 2000 BALLOT WHEREAS, the Board of Directors of the Midpeninsula Regional Open Space District finds that providing for the protection of water resources in the State of California, including conservation of watershed and riparian lands, is of crucial and immediate importance to the constituents of the District and the people of the State; and WHEREAS, the Legislature of the State of C aliffornia has placed Proposition 13 on the March 7. 2000 ballot, which is a measure entitled The Safe Drinking Water. Clean Water, Watershed Protection, and Flood Protection Act of 2000, in an amount of S 1 .9 billion, and WHEREAS, Proposition I ) will provide funds to help meet safe drinking water standards to protect the public health, will help reduce pollution in lakes and rivers and along the coast, and will provide protection for wetlands, riparian corridors, watershed lands, and other natural habitats• and WHEREAS, if approved by the voters, Proposition 13 will provide for competitive grant funds for which the District will be eligible in a number of categories, primarily in the river protection and watershed protection sections. Now, THEREFORE, BE IT RESOLVED that the Board of Directors of the Midpeninsula Regional Open Space District endorses Proposition 13, The Safe Drinking Water, Clean Water. Watershed Protection, and Flood Protection Act of 2000. Regional Open )ace -------------- MIDPENINSULA REGIONAL OPEN SPACE DISTRICT March 9, 2000 Ms. Marilyn Walter 20 Coyote Hill Portola Valley, CA 94028 Subject: Trail Use Policy Review Dear Ms. Walter: Thank you for your recent letter regarding review of the District's Trail Use Policy. Your letter will be forwarded to the Board ad hoc committee who will be considering this issue at a public meeting on March 9. A copy of the letter will also be given to the Board of Directors for their information. If you would like to attend the public meeting regarding the proposal to revise the District's Trail Use Policy, the meeting will be held on Thursday, March 9, 2000 at the Los Altos Youth Center(behind City Hall), I North San Antonio Road,Los Altos, CA. The meeting is scheduled to begin at 7:00 p.m. Sincerely, Mary Beauvieres Senior Planner cc: Board of Directors 330 Distel Circle Los Altos, CA 94022-1404 Phone: 6,30-691-1200 FAX: 650-691-0485 o E-mail:m ros(l((—,)of)e n space org • Web site:www.openspace.org, Bo.ird(it Oire(tors Poe Siemens, ',Ury C. Davey, led Cyr, Deane Little, %onette Hanko, Bets% Crowder,Kenneth C. Nttz o Gener,il klana,fwr:L.CrIfg, Brimm 20 Coyote Hill Portola Vly., CA 94028 February 27 , 2000 MRC►SD 330 Distel Circle Los Altos, CA 94022-1404 Dear Board of Directors: l Thank you for giving new consideration to the use of Mid-Pen's land 1 iv gi`v'i 1g oppor*lanities for tranquil nati_ire experiences, and not thrill- seeking recreationists. The great gift your district gives us is the opportunity to escape from the fast pace of the Bay Area lifestyle into the peace of nature. And that peace is often interrupted by a couple of speeding bicyclists rushing by. I will never be convinced they are out for the enjoyment of nature; not at the speed they prefer. I would amend your Current Trail Use Designations by removing both Purisima Creek Redwoods and Windy Hill and moving them into the preserves proposed to be closed to all bicycle use. For these reasons: 1. Upper Alpine Road provides a very adequate parallel bicycle route from the valley floor to Skyline. In addition, Coal Creek Preserve increases the available bicycle use in that area. Therefore, Windy Hill woulu be better left to those 1r shing a tranquil experience, without speeding bicycles. 2. Purisima Creek Redwoods is another area which duplicates the bicycle experience of Corte Madera, and Bear Gulch West, and Tunitas Creek Road. This area is difficult to manage, is a very popular hiking area, and deserves to be left to those wishing a tranquil experience in nature. Best Wishes and Good Luck in pursuing your go D ECEOMC M n J. Walt r r i MIDPENINSULA REGIONAL OPEN SPACE DISTRICT i Regional Open *ace .............. 11............................ MIDPENINSULA REGIONAL OPEN SPACE DISTRICT March 9, 2000 James A. Lamb 463 Jeter Street Redwood City, CA 94062 Subject: Trail Use Policy Review Dear Ms. Walter: Thank you for your recent letter regarding review of the District's Trail Use Policy. Your letter will be forwarded to the Board ad hoc committee who will be considering this issue at a public meeting on March 9. A copy of the letter will also be given to the Board of Directors for their information. If you would like to attend the public meeting regarding the proposal to revise the District's Trail Use Policy, the meeting will be held on Thursday,March 9, 2000 at the Los Altos Youth Center(behind City Hall), I North San Antonio Road,Los Altos, CA- The meeting is scheduled to begin at 7:00 p.m. Sincerely, Mary Beauvieres Senior Planner . cc: Board of Directors 330 Distel Circle • Los Altos, CA 94022-1404 Phone: W)0-691-1200 FAX: 650-691-0485 o E-mail:nirosd@openspa(-e.org • Web site::%ww.openspace.org 84wr(iw Oireoor,:fete Siemens, %Aar\ C. Davev,led Cyr,Deane Little, \onette Kinko, Betsy Crovtider Kenneth C. %itz - Generrd ki,mater:L.Criig Britton 1 James A. Lamb �p 463 Jeter Street M 0Redwood City,CA 94062Board of Directors i F E 8 2 8 2400 Midpeninsula Regional Open Space District 330 Distel Circle MIDPENINS SPACE REGIONAL OPEN Los Altos, CA 94022-I404 RI To the Board of Directors: This letter is regarding the District's Trail Use Policy and Trail Use Guidelines and Mitigation Measures. I believe that several concepts should be considered in trail use policy. • The vast majority of users are intelligent and considerate, and rules created for the l unintelligent and inconsiderate minority should not interfere with the experience of the majority of users. • Excessive rules and their necessary enforcement expenses(or flagrant disregard) detract from the primary mission of the district. Special-interest users should bear the costs and perform the mitigation necessary for the pursuit of those special interests. • Rules should be as simple and straightforward as possible, and minimize conflicts between various interest groups. With these concepts in mind, I propose a radical notion for debate(bear in mind that I am primarily a hiker, rarely a mountain-biker and never an equestrian). • As many trails as possible should be designated multiple use. • Formally recognized equestrian and cyclist organizations should be responsible for monitoring their respective users. • Hikers should be encouraged to report inconsiderate behavior,trail destruction (including muddy zones made impassable), equestrian feces left on the trail or refusal to safely share right-of-way. • The district will tally complaints and designate specific preserves off-limits to special interest users if a certain number of complaints for that specific preserve are filed. • Preserves may be re-opened if the number of complaints(arbitrary cut-off values pre-determined)for all preserves declines. This gives the special-interest organizations incentive to monitor their users and enforce codes of conduct. Rather than hiker vs. equestrian vs. cyclist vs. MROSD,the special-interest groups should be motivated towards internal enforcement of appropriate conduct within their own groups. Rules cannot substitute for common sense nor can they substitute for special-interest groups instilling appropriate behavior among their peers. Though the concept of opening all trails to all non-motorized users may seem frightening, common sense among special-interest users would dictate that their use of some trails would not be appropriate. Equestrians who used narrow trails which would not allow a hiker to pass safely should generate a hiker complaint and potential loss of preserve rights. Similarly, a cyclist might use that narrow trail,but dismount and carry the bike to the side allowing passage--not doing so would generate a complaint and potential loss of usage rights. Special-interest organizations, with feedback from the District's complaint log, would have the role of advising their members on inadvisable routes. This would reduce the district's role to an open or closed policy at the preserve level (based on complaints)rather than trail-by-trail monitoring and seasonal micromanagement. The intelligent individual should be allowed to use common sense rather than having arbitrary rules dictated. These ideas would require the development of formal relationships with special-interest groups and a more formal method of registering complaints or infractions. The end result,however, should be one of increased cooperation rather than antagonism. Sincerely, es A. Lamb MROSD Docent