HomeMy Public PortalAboutcont. 82.1~XHIBIi II
LYtdW00D
INDUSTRIAL DEVELOPMEIJT AUTHORITI'
PROCEDURES
The following statement outlines the basic steps prescribed by.the
state law to process an application through the Lynwood Industrial
Development Authority.
1. Applicant has an initial consultation with the staff of the Author-
ity. Zf indications seem positive, staff issues the application
form with procedures and fee schedules.
2. Subsequently, the staff will accept a completed application for
review and will make a preliminary determination of public benefit
criteria and other provisions of law and make recommendations to
the Authority. Acceptance of the application in no way obligates
the ,4uthority to approve the protect.
3. If, on the basis of review under step X12, an affirmative determi-
nation is made (a) the Authority must certify the application and
make a finding of public benefit, (b) a copy of the certified
application is then filed with the City Council, and (c) a
notice is published which indicates the acceptance of the appli-
cation, the filing with the City Council. The notice also names
the company, briefly summarizes the protect and states the
maximum estimated amount of the bond issue.
4. Upon completion of the steps indicated above, the City Council
must take an action to approve or disapprove the application
within 45 days.
5. Once the City Council approves the application, the City Clerk
. certifies the Council action and transmits all supportive materials,
studies, etc. tc the Authority's staff. At that time, payment of
a non-refundable fee of $1,250 will be required. The balance
of the processing fee and recovery of any additional costs will
be paid at the time of final Authority approval of the issue.
o. Upon certification and transmittal of the City of Lynwood's
approval to the Authority's staff, the proposed bond issue to-
gether with any required State fees and documentation is trans-
mitted to the California Industrial Development Financing ,4d-
visory Commission, which is chaired by the State Treasurer,
has sixty (60) days from the date of receipt of application to
make a determination of approval or disapproval. Such approval
or disapproval will be made on the basis of its findings on
the following criteria.
a. Public benefit of the protect
b. Determination of whether the protect er its operation will
result in the relocation or abandonment of other facilities
within the State.
Exhibit III
Office Use Only
Application No.
Date Received _
Data Approved
LYNWOOD
INDt~TRTAT, DLZ7EfAFMENT F.UT-iORITY
PRQTECP ELIGIBILITY REVIc^R
?'he information requested on this form is necessary to process a r~.iest for
financial assistance from the Lynwood Industrial 1~velcprent Authority.
Fill in all the blanks using "NONE" or "NOT APPLICABLE" where necessary. If
fig~.ire given is an estimate, put "EST." after the figure. If rare space is
needed for any specific answer to a question, use a separate sheet. All
insor:ration submitted in this fore will be kept confidential to the extent
:titled by law and drill not be made public without prior notice to the
applicant. Please enclose the last fiscal year-end financial statement plus
any interim statements if mailable. The information r~n,;red may be waived
at the discretion of the Executive Director of the Authority. Retu~-n t,~o
signed copies of this application to:
i;ynwoed Tsdustrial L~veloptrent Authority
Coc[m~u:ity Development repartnent
11330 Bullis Road
Lynwood, CA 90262
I. IDEN^tIFICATION AND DESCRIPTION OF TfiE APPL'1CAP.TT
A. Company Identification
1. Official Company Name:
Official Mailing Address:
Telephone: ( )
2. Business Organization: Corporation Partner-
ship , Sole Proprietorship , or Other
(describe)
Is the Company
owned by an individual
a subsidiary
affiliated directly or indirectly with any other
organization?
- 1 -
If a corporation, list state of incorporation
and date cualified to do business in California
If a partnership, list name of partnership
and date of agreement
If a subsidiary or affiliated with ar_other company give
name and brief state-
ment of affiliation of relationship
3. Officers
name and Home address Other Susiness Affiliaticr_s
President
vice President
Secretary
Treasurer
Controller
Directors
- 2 -
4. .List name and home address of ecuity owners of i0$ or
more, If partnership, list general and limited partners
and interest owned by each. If trust, list bere_:.-
ciaries.
NarA
Home Address
~ of Ecuity
Interest Gwned
S. For publicly-Held corporations, show stock exchange on
which listed. If traded over t::^.e counter, or on NASDAQ,
please list the market makers:
B. Company Description
1. Star_dard L^.dustrial Classification (SIC) Code :Io. of
['mm~a nv
2. Description of principal products and/or services:
3. List number of current full and part-time employees, and
payroll, by skill category.
Fu11-time Part-time
Annual annual
Payroll Payroll
?mount ~ Amount
Management
Skilled
Semi-skilled
Unskilled
- 3 -
4. Description of company's physical facilities:
S. Financial statements (attach as exhibits)
a. For publicly held companies:
Conies of the annual report to stockholders for
each of the last three years; conies of any
registration statements, prospectuses and 10-ms's
filed with the Securities and Exchange Cocrtission
wlthln edCP_ OL the last tI!ree VearS; dnd COpleS OL
the applicant's last 10-Q and r:,ost recent 8-~.
b. For all other companies:
1. History and brief description of tre
applicant, any guarantor, and any
subsidiaries, including type of prcducts
manufactured, present and future markets and
prospects.
2. Resume of management and owne__*ship, including
age, business experience, length o_
association with company, salary and other
compensation, and directors with outside
affiliations.
3. Description of any pending litigation.
4. Copies of audited fiscal year-end statements
for preceding three years.
- 5. Interim financial statements for periods
within sixty days of the aeplication.
II. COVTACT INFOR•±~TIG:I
~. Officer to whom all notices and communications concerning the
project should be sent:
Nase
Address:
Telephone:
- 4 -
B. Legal counsel to apaiicant:-
Name:
:,ddress:
Telephone:
C. Principal bank(s) with names and phone numbers o. contacts
there.
name: Contact:
~ddress: Phone:
Clare c Contact:
address: Phone:
D. Independent accountant for apniicant:
Firm name:
address:
Telephone:
III. DESCRIPTION OF TH% ?ROJEC^t
:~. Project location and site i.^.formation
1. address:
2. Size of Site:
3. Description of current improvements on the site,
including age, use and size; include pictures if
available.
- ~ -
5. Srief explanation why ?.ppiicant is undertaking project:
9. Ownership
1. Does applicant own site? ves no.
2. If no, describe lease arrangements, options or other
evidence of applicant's permission to use site, or plans
to acquire site.
3. Please attach copies of any credit agreement, debt
indenture or ether instruments w'r_ich in any way limits
~oolicant's indebtedness or affects the sale, 1e_sir.g,
acquisition or use of proeerty or applicant's prcposed
oaerations at the project.
C. Proposed Project
1. Type of project (new facility, expansion, renovation, or
accuisition) describe in detail:
2. Estimate time required for construction:
Starting date Completion date
- 6 -
3._ ?rinciaal products, uses and activities to be financed
(include SIC Code):
D. Eligibility of project uses - A statement e= eligibility of
the project for financing under Section 91503 0 the Act.
attach a letter from bond counsel attesting to the project's
eligibility:
1. Project is for industrial uses as described in
paragraph (a)(1) of Section 91503, and/or for energy
conservation uses as described in caragraph (a)(2) of
Section 91503.
2. A statement that the project is rot for the uses
described under paragraph (b) of Section 91503.
3. any covenants or bond ter-.,ts restricting the use of t'r.e
facilities or property
E. Public Approvals/Pe Waits
Have all required pe ~~its, licenses and other Dublic
approvals, (EIR, conditional use permit, general plan
COPD l].dnCe, pub l.iC i7O riC5, ZOn1ng, lOCal, State dad *ede_*dl
regulations) been obtained? yes ..^.o. If no, please
shOW StdtllS and eYpeCted reSG1llt1OR Oi 1nC CIRD fete dCt1V1tV
If yes, please describe
r^^. 3ond counsel on proaosed project:
Finn name:
Address:
Phone:
- 7 -
G, please~irdicate the estimated capital expenditures during the
last three VearS Which were made in the COl1t1C31
]llr15d1Ct10n (C1ty Or lln 1RCOrpOrated CCLP.tV), OL the DrODOS2d
project for facilities used by the ynolicant, or any otr.er
nrooosed occupant of the project
cF'ere any of these expenditures financed by issuance of
industrial development bonds? yes ro.
If yes, please describe
$, ~dVe dnV Of the i?PpllCdnt~ S faCi11t1eS Or equipment 1I1 Ot:'ler
political jurisdictions of the nation been financed by
industrial development bonds? yes no.
If yes, please describe
IV. COSTS Or T?-IE PROJECT
State the costs necessary for the acquisition of t:.e site and
construction of the proposed project together with any machinery
and equipment in connectior_ therewith, including utilities, access
roads, and appurtenant facilities.
a. EXISTING Lr~.ND A.`iD 3UILDI;LGS ....................... S
I. Contract price S
2. Legal, filing, misc. S
3. Taxes ar_d fees ~
Subtotal $
H. ?RCHITECTUR_~L P.ND ENGI:LEERING .....................5
- 8 -
C. CONSTRUCTION COSTS
i. architectural and engineering $
2. Site pr=_paration $
~. Labor $
5. Construction contracts $
6. Utilities connection $
7. Paving and landscaping $
D. ,H~CHI:IERY AND EQUIPMENT ...............
$
............
1. Invoice cost $
2. Installation $
E. INTEREST DURING CONSTRUCTION (FRGS TO )..$
e^. FI~1:-,VCIVG, LEG~I,, i~fISC:.LL?NEOUS (PLE~Sc SPECIFL) $
G. CGNTINGENCY (if appropriate) .................
$
.....
TOTAI .....................5
i9:~XIb1UM AiiOUPdT OF FUNDS REQGESTED
Note: Project costs may not include working capital; ~;:ovir!g
expenses; inventory financing; or assumption, reaayment, or
refinancing or existing indebtedness other than coastructior.
loans.
V. DESCR_TPTION OF THE PROPOSED ISSUANCE OF THE BONDS
a. Tyne of placement; Private
Public
Negotiated
3. Proposed tens of the bonds years.
9 -
C. Indicate method of financing:
1. Loan o= bond proceeds by LIDP, to Applicant
2. Lease of facilities by LIRA to Applicant
3. Installment sale of facilities by LPG to
Applicant
4. Other
D. Indicate the collateral for *_re bonds and the method of
payment; identify revenues to be used for debt service:
E. Identify the proposed purchaser of the bonds, underwriter or
placement agent for the Applicant:
Name of purchaser:
Officer or partner:
Address:
Telephone:
Attach a cony of tentative commitment letter from such
prospective purchaser of tentative agreement with such
underwriter or placement agent.
F. Wii1 the bonds be issued in exchange for one or more
outstanding bonds, or similar claims, or partly in such
exchange and partly for cash or property? yes no
If yes, describe exchance or refunding
V2. DESC4IPTZON OF PUBLIC BENEFITS
Benefits which would accrue from undertaking .the project, pursuant
to criteria contained in Section 91502.1. (If applicable,
information in this section is to be given for both the Applicant
and all other entities that will be principal users of the
facilities).
- 10 -
a. Employment benefits
1. Indicate full-tir:e employment
categories:
~t Project Upon Completion 1 Year
Site Tcdav of Project Comp1
i ~ 'a 5 t
?anacement
Skilled
Semi-skilled
Unskilled
Total
and payroll for various
After 2 Years after
_t10 P. CO rip le tl0n
2. If part-time wcrkers will be er,.ployed, attach
description as above.
3. Estimate, if applicable, increased employment and
payroll in related and service fields due to the
completion of the project.
4. Indicate, if applicable, anticipated impact of the
proposed new. jobs on problems of severe unemployment or
the hard core unemployed.
5. Document, if applicable, that the completion of the
project will retain jobs that would otherwise be lost.
H. Resource Conservation (if applicable)
1. Explain and document any estimated conservaticn of
energy, mineral or natural or cultivated resources
arising out of the project.
2. Explain and document any reduction of waste, improvement
of recovery or intensificaticn of utilization of
resources that otherwise would be less intensively
utilized, wasted or not recovered.
- 11 -
C. Cor.suser benefits (if applicable)
1. EXpl31n and d0 C'lment tale 1mpr0Vement OL qud l.L tV Cr
Qll3ntitV Of prCduCtS, energy Or related 3erViCeS bV
V1rtL'e OL CCmp 1et10n C: t.^.e pr0]eCt.
D. Other Benefits
1. 47111 project contribute to the improvement of
detrimental environment factors? ves no. If
yes, attach description.
2. 41111 project contribute to the revitalization of a
deteriorated area or wi11 it increase economic
usefulness of an area? yes no. T_f yes, attach
description.
3. Estimate any increased 1eca1 ar_d state taxes, f=_es and
other revenues due to the comnletion of the project.
4. Estimate any decreases of public service costs by virtue
of completion of the project (such as decreased welfare
or unemployment costs).
VII. A CESCRIPTICN OF Fu'VY PUBLIC DETRIMENT cROM ISSUANCE GF BOAIDS IN
THE. MAXI~IUbl ADiOUNT PROPOSED IN 'THE APPLICATIOY.
A. Employment displacement -- wi11 the comnletion of the project
contribute to job displacements (such as resulting from site
clearance or demise of competing firms? ves no. If
yes, attach description.
3. Energy, mineral or natural or cultivated resource i^pact --
will the comnletion of the project lead to increased
utilization of scarce resources? yes no. If yes,
attach description.
1. Estimate of increased utilization. of resources.
2. Estimate of increases in cost to the public due to
increased utilization.
C. Daes construction of the project, or completion of the
project have any adverse environmental impacts, including
additional waste disposal? yes no. 2f yes, attach
description.
1. Estimate of environmental impacts.
2. Include copies of any required environmental impact
reports.
- 12 -
D. Econcmic impact on the city, county ar_d/or state.
1. EStimdte types and COStS OL new Ol;b1iC SerViCeS reCUired
bV tLle prOjeCt, '
Z. And1VS1S OL t.:e COStS t0 the Ci t.7, COLntV 3Rd/Or State
LOr public l.<<p rOVementS 2.nCllldlrig 1:t111ty, Street
improvements, trafflC control enhancement, and the cost
Of Li ndnCing SllCLl imDrOVementS.
VIII-. A DESCRIPTION, IF APPLICABLE, OF THE STAT°F7IDE SIZE AD1D LOCATION OF
THE OPER_~TIONS OF THE APPLICA~lT (including related persons and
princiaal users).
A. A Listing of the current statewide operations of the Applicant
including size, location, rusher o employees and payroll.
B. A listing of the statewide operations of the Applicant upon
completion of the project, including size, location, number of
employees and aayroll.
C. A listing of the statewide operations of the Applicant two years
after COmpletiOn Of the DrO~eCt, 1nCluding S].Ze, 10C3tiOn,
number of employees and payroll.
D. RelOCatlOn - If financinc 15 required fOr relOCdtiCn Of 3
rdC111 ty Wlthln the State Of Cd1lrOrnid, docur„e ntdtion that the
relocation is due to one of tre following:
1. An iaadeeuacy of the existing facility.
2. A significant charge in the firm's operations t::at would
require a different location.
3. A building moratorium where tre existing facility is
located.
4. The existing lease is expiring and cannot be r=_newed under
economic conditions.
5. An econcmic need to move closer to the firm's customers or
suppliers.
6. Other.
- 13 -
~~_ _