Loading...
HomeMy Public PortalAbout2006.018 - LUARESOLUTION NO. 2006-O1R A RESOLUTION OF THE LYNWOOD UTILITY AUTHORITY APPROVING A CONTRACT CHANGE ORDER IN THE AMOUNT OF $77,673.29 TO WANG MILESTONE CONSTRUCTION, INC. FOR THE LYNWOOD SENIOR CITIZEN CENTER BUILDING CONSTRUCTION PROJECT, PROJECT NUMBER 05-5297 AND AUTHORIZING THE PRESIDENT TO EXECUTE THE CONTRACT CHANGE ORDER WHEREAS, the Lynwood Senior Citizen Center Construction Project, Project Number 05-5297, is funded by the Lynwood Utility Authority (LUA) funds; and WHEREAS, the Lynwood Senior Citizen Center Construction Project is scheduled for completion in fiscal year 2006-2007; and WHEREAS, in order to continue the construction of the Lynwood Senior Citizen Center Building without delay, additional Improvements were necessary; and WHEREAS, Staff has identified and authorized the completion of several improvements that were necessary to complete the project in a timely manner are as follows: DESCRIPTION WMC, Inc. TOTAL FILE NO: STRUCTURAL ADDITIONS & ALTERATIONS FOR RFI 35, GLUE-LAM 35Ha BEAMS, LUMBER, ROUGH HARDWARE AND ROOF MODIFICATIONS (REVISED) $28,162.29 AT GRIDLINE K - J FROM 1-31-06 TO 2-24-06 STRUCTURAL ADDITIONS & ALTERATIONS FOR RFI 35 GLUE-LAM 35Ha BEAMS, LUMBER, ROUGH HARDWARE AND ROOF MODIFICATIONS (REVISED) $16,861.00 AT GRIDLINE K - J FROM 2-25-06 TO 5-25-06 BUILD UP ROOF DECK AT MECHANICAL WELL TO CREATE SLOPE 55D $2 661.00 PER SK 25 (REVISED) WOOD FRAMING AND DRYWALL FOR RETURN AIR PLENUM 57B $3 860.00 REVISION (REVISED) , (1) RELOCATE FOUR CEILING LIGHTS AT THE KITCHEN (2) ADD 61C KITCHEN AND PANTRY SOFFITS REVISION (REVISED) $3,216.00 ADD SAFETY DEVICE TO FOLDING PARTITIONS 307.00 $2 (REVISED) , CONSTRUCT CRICKET BUILT UP ROOF 059.00 $1 (REVISED) , PRICE INFLATION OF COILING SHUTTERS DUE TO DELAYS FROM 66B DESIGN ERRORS AND OMISSIONS (REVISED) $1 836.00 DESCRIPTION WMC, Inc. TOTAL FILE NO: PERFORM STRUCTURAL MODIFICATION MEMO REQUESTED BY 68B JCE DATED 06/12!06 (REVISED) $7,814.00 REORDER THE NEW 84" X 48" STORM LOUVER 6g (REVISED $1,442.00 INSTALL SIX VENTS ON NORTH AND EAST WALLS 71B $1 081.00 _ (REVISED) , ___ PROVIDE AND INSTALL KITCHEN OUTLET, PARTITION SWITCH ICE 72B , MAKER AND REWORK ELECTRICAL AT LOW WALL (REVISED) $2,312.00 INCREASE ELECTRICAL BREAKER AND WIRE SIZE FOR RFI 120 , RTHP-1 AND RTHP-2 73 $3,363.00 RELOCATE ELECTRIC & DATA OUTLETS IN THE LIBRARY 786 $545.00 (REVISED) PROVIDE AND INSTALL A KNOCK BOX 81 $1,054 00 TOTAL $77,673.29 NOW THEREFORE, the Lynwood Utility Authority does hereby find, proclaim, order and resolve as follows: Section 1. That the Lynwood Utility Authority approve the contract change order for Wang Milestone Construction, Inc. in the amount of $77,673.29 for the Lynwood Senior Citizen Center Improvement Project, Project Number 05-5297. Section 2. That the President is authorized to execute the. contract change order. Section 3. That this resolution shall take effect immediately upon its adoption. PASSED, APPROVED and ADOPTED this 7th day of November, 2006. ATTEST: ~~~ Andrea L. Hooper, Secretary APPROVED AS TO FORM: Au hority~e L ticia Vasquez, resident LOUIS BYRD PRESIDENT N. Enriq arti ez, Executive Director APPROVED AS TO CONTENT: 5--~. , ~' G. Daniel Ojeda, P.E. Director of Public Works/City Engineer STATE OF CALIFORNIA ) )SS. COUNTY OF LOS ANGELES ) I, the undersigned, Secretary of the Lyhwood Utility Authority, do hereby certify that the foregoing Resolution was passed and adopted by the Agency at its regular meeting held on the 77H day of NOVEMBER , 2006. AYES: MEMBERS, BYRD, JOHNSON, PEDROZA, SANTILLAN, AND VASQUEZ NOES: .NONE ABSENT: NONE ABSTAIN: NONE C7~ :~- ~~ Andrea L. Hooper; Secretary STATE OF CALIFORNIA ) )SS. COUNTY OF LOS ANGELES ) I, the undersigned, Secretary of the Lynwood Utility Authority, dd hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2006.018 on file in my office. and that said Resolution was adopted on the date and by the vote therein stated. Dated this 7TH day of NOVEMBER , 2006. C~~a~ G~ .~~~~ Andrea L. Hooper, Secretary