HomeMy Public PortalAboutORD16102BILL NO. 2020-053 SPONSORED BY Councilmember Hussey ORDINANCE NO. It, 101 AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A UTILITY RELOCATION AGREEMENT WITH AMEREN MISSOURI AND TO ACCEPT A GRANT FROM THE PARKS FOUNDATION IN CONJUNCTION WITH THE BICENTENNIAL BRIDGE PROJECT. BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. The Mayor and City Clerk are hereby authorized to execute a Utility Relocation Agreement with Ameren Missouri. Section 2. The agreement shall be substantially the same in form and content as that agreement attached hereto as Exhibit A. Section 3. The grant from the Parks Foundation as indicated in the Memorandum attached hereto as Exhibit B is accepted. Section 4. This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed: ('W-lAtt Presi ing Officer ATTEST: W W-1 0=277". -F/Galfll I., Wr � N/ City el�rk I Approved: - 5 2D V l Mayor Carrie Tergin APPROVED AS TO FORM: CITY OF JEFFERSON UTILITY RELOCATION AGREEMENT THIS UTILITY RELOCATION AGREEMENT ("Agreement") is entered into by the City of Jefferson (hereinafter "City") and Union Electric Company d/b/a Ameren Missouri (hereinafter "Utility"). CITY IMPROVEMENT PROJECT: This Agreement covers the relocations necessary for the project entitled Bicentennial Bridge, Project Number 97621. This project will include the construction of a bicycle and pedestrian bridge from the Capitol grounds near the Veteran's Memorial to the area known as Adrian's Island (the "Improvement Project". WHEREAS, in order to complete said improvements in accordance with said plans, it will be necessary to adjust certain facilities now located on/in private and public easement(s) within the area of the proposed City Improvement Project. It is agreed that this will be the only Agreement executed to cover reimbursement of the Utility's costs to relocate, or adjust, their facilities as required by the City's Improvement Project (hereafter the "Utility Relocation"). This Agreement will remain in full force until both parties agree, in writing, that amendments are needed, or unless the Agreement is terminated by either party. THEREFORE, the parties agree as follows: 1. Information: The City agrees to furnish all necessary information to Ameren on the improvements in order to allow Ameren to properly carry out the Utility Relocation. 2. Relocation Plan: The Utility will furnish a plan of adjustment marked as Attachment A and a document marked as Attachment B indicating the City's financial obligations directly related to the Utility Relocation. 3. Payment: Upon final execution of this agreement the City agrees to pay to the Utility within 30 days the sum of $154,828.23 for the Utility Relocation. 4. Change Order: If any substantial change is made in the plan of adjustment and extent of the work (a "Change Order"), the Utility will be paid by the City for the work performed in accordance with the Change Order in accordance with a written supplemental agreement or change order approved by the City and agreed to by the Utility prior to the performance of the work. 5. Commencement and Completion of Work: After approval of the detail plan and estimate of cost and upon notification by the City and receipt of payment by the Utility from City, the Utility will commence with the Utility Relocation, as soon as practicable, but not prior to January 1, 2021. The Utility will actively pursue completion of the Utility Relocation so as to minimize interference with the City's Improvement Project. 6. Utility's Responsibility for Subcontractors: If the Utility utilizes subcontractors to perform any of the Utility Relocation, Utility shall be fully responsible for acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as the Utility is for acts and omissions of persons it directly employs. The Utility shall cause appropriate provisions to be inserted in any subcontracts relating to this work, to bind all subcontractors to the Utility by all terms herein set forth, insofar as applicable to the work of subcontractors and to give the Utility the same power regarding termination of any subcontract as the City may exercise over the Utility under any provisions of this Agreement. Nothing contained in this Agreement shall create any contractual relations between any subcontractor and the City. 7. Coordination with the Railroad: The Utility and its subcontractors shall meet all the terms and conditions set forth by Union Pacific Railroad associated with crossing and operating within railroad right of way in performing the Utility Relocation. 8. Utility shall Defend: The Utility shall defend, indemnify and save harmless the City, its officers, agents, employees and servants against all loss, damage or expense that it or they may sustain as a result of any suits, actions or claims of any character brought on account of property damage, injury to or death of any person or persons, including all persons performing any work on the Utility Relocation, which is due to the acts or omissions of the Utility or any contractor it may hire pursuant to this Agreement. The Utility shall not be obligated to defend, indemnify and save harmless the City from liability for damage, injury or death proximately caused by the negligence of an employee, agent or servant of the City, or any other third party not contracted by or acting on behalf of Utility. 9. Inspection: Each party shall be responsible for providing their own inspections as required to insure all construction is in accordance with the Plan of Adjustment, Attachment A. 10. Condition of Adjoining Property- After completion of the Utility Relocation, all leftover material and debris directly related to the Utility Relocation work shall be removed by the Utility from the area of the Utility Relocation and the adjoining property to the Utility Relocation. After completion of the Utility Relocation, Utility shall leave the area for the Utility Relocation and the adjoining property in a neat, workmanlike condition, free of holes, mounds of dirt, or other debris or construction material. 11. Jurisdiction: This Agreement shall be construed according to the laws of the State of Missouri. The Utility shall comply with all local, state and federal laws and regulations relating to the Utility Relocation related to this Agreement. In WITNESS WHEREOF, the parties have entered into this Agreement on this day of January, 2021. City of Jefferson Title: �-�ry� n'n►, ^ , ATTEST: / ///i ..ice ►rL' ► APPROVED AS TO FORM: Union Electric Company d/b/a Ameren Missouri fit,• ��i/ ATTEST: I itle: Attachment A I� %Ameren Summary Project Description Distribution Project: Jefferson_ City Walkway 69 kV Project Description: A section of the Jefferson City Plant — St. Louis Rd 69kV. sub -transmission line (Feeder #966044) will be rebuilt to account for the proposed new Bicentennial Bridge. Two (2) self-supporting tangent steel structures will be removed and three (3) new self-supporting tangent steel structures will be installed to provide adequate clearance from the 69kV line to the elevated walkway. Project Engineer: Ryan Jacobs (POWER Engineers, Inc.) Scott Vilbig (Ameren) Project Location: The project starts at structure 2547716 located approximately 350' northeast of Jefferson City Plant Substation. The line runs 1,715' southeast to structure 2547720 where the project ends. This section of the line travels along railroad. Summary Scope of Work: The work for this project shall include the following: o Install (3) single circuit self-supporting steel tangent structures. o Remove (2) single circuit self-supporting steel tangent structures. o Replacement of (3) conductor deadend clamps. o Replacement of'(1) shield wire deadend clamp. o Transfer existing 336.4 kcmil 18/1 "Merlin" ACSR conductor to new structures. o Transfer existing 3/8" 7 Strand EHS Steel shield wire to new structures. o Tension transferred conductor and shield wire to match existing tensions. ............. .............. ---------------- .. :mMa44� 4 - - --- ---- - --- �a + 3 r a m .._ n a°° l? �i b �� "a a m�- - -- : oe � Ea� E . Eno �µ cwuo.p ew rno4 ,W av a E. ..........:.........{._____..__y.___._..-+-__..__. �.._.._.__{__.-_____ . �_____..__;______.:_____.__ .y______.__y____.._._r_ ...._ _ ._.___ __-___ __ _ _.._.__ ______-___ _-. _ _______ _.___.-i-_.___--_;---__.__ _._ _ -__. _ ...__.y____--___� : i - i ....____......._ o ................ .............. .............. ......... ......... . _. _..................... ...... i r nL -NI-Y ' YiLc TJA'4 . - . : .............................. 3M.__.......'_...__......_._.__ .... ___. _ ... ... .V __ _ _ ___ _ _ _ ___ _ __ _ _ _ ___ _ _ ___ { __ _ __ _ _ _ _ __ _ _ . I _ ___ ..__ .__. ___ ... ___ ___ __._......_...... _ _. _ _ _ _ __ .__ _ _ _ _ ___ __ . _ _ .-.-. .1 'yk q R I 9 7--------- .--------------------- __-.-_-._1--__----..___-_._--:-______ ---------------------__._ .__ ___. ----------- ___ ---------- ---------- ____ ._. .__. ___--. --------- ------- ----------------- ...___ --------------- __._.......... ............... _ _-. -_ ___'_ __' -------------__. -------------------- ____.._.. _____ ___ _._...__. ..._._........__ .....-_._ ...... --. ...-._--......_.__ -...._.__.... _.--_. ___-.--_........... ___ ._..- ......... .--........__._... ...-.___-.._-____....__._- ................................. :...-._--__-_______._--__--___--___-__.--__--..__-____.__.-__--.---__._.-__----.--.__._..-......-_...-_....._.----_...---._.--_....--_._..._-_..-____-.._......_._______-____-..._____..._.____.._____.__...___.__....._____.___.____--__-_.___.---_.._._._..--.......................---._._._.--..._._._.-_-___.__.,..____.______..._..__........___.._....--.:...............___._.......__.... 1 2 6 3 j�I FOR JEFFERSON CITY FU - ST. LOUIS RD. POWER TION LINE 'MVAl".eve^ ENGINEERS PLAN S, PROFILE wwn.nono..+nvevwx.w wrw.Fenwwn0.mn 10/30/2019 SHEET OF 4 3 2 6 T B 5 TO MOREAU 1 gEMOVABLE CL IMB INC LADDER •2 NOTE 2 (FLAT TI TO MOREAU - RE MOVABLE CI IMBING ADOEZ •2 MOTE IFLAT 71 TO MOREAU REMDVABLE CLIMBING LADDER •2 D NOTE 2 (FLAT ]1 D I BE- ABLE CLIMBING I RAND ABLE IIWING I REMDLE CLIMBINGI LADDER IFLAT L DDII " LADIFLAT 1 NOTEE2BIF LPT 2 1 12 TO JEFFERSON CITY TO .1EFFERSON CITY TO JEFFERSON CITY FLAT DESIGNATION PLAN O LEVEL "A" PLAN Y LEVELS "B" 6 "D" PLAN O LEVEL "C" SUMBER SIGN BRACKETS E DETAIL 1 LEVEL "A m GSEETA(L 2 - TOP OF REMOVABLE II FLATSR. e T III YP.I NOTE 2 LEVEL "B" II - _ III L11DER BRACKET I ECE]iPITTNO P.I% ..E. II C HXH LEVEL "C' M' ITTP.1 1 YP.I TYP.1 L ANGLE r� i ARM DIMENSION `7 4'SEE �I =------------_ (TYP III �IDTYP.IL 3 m I", LEVEL 'D" �I I<_, sq, � __--- .� POLE CAP fes- _ _ __ - - --- a- 0 ------------ - - - �---� I B_ P 2°X2"K'/q"K2"/�• LG. ANGLE H LLL°°°+++111HOLE 6,: R it A, Ya CHAMFER'/ B.S. ITT.TC.1 ITTP1 • ! - y _- [MA%. WpI- q b.. Inl S Pd.E S POLE A. P01 GND. HOLE ITTPU // 111"0 CONNECTION 'WING POLE N LE CHAMFER B.S. ¢ III ��' SEEUOE141L LUG ITYP.1 II .. LATS 6 6 Iz FRONT VIEW 510E VIEM DETAIL 1 I Y POLE DETAIL 2 L%:— NKII SECTION DETAIL 3 SEE APPENDIX "D. EL -3i II �I NOTES 6 a II I I NUMBER SIGN B0.ALKETS SEE NON OTE 31 _ WORKING POLE Pjj,QAOUNDING LUG SEE APPENDIX "E" a NOTE HSEE EANPPEND IX B" OTE II II III li I B III m POLE TABLE I CONSTR. 0. TYPE 5X1 LINE ZNOL 1 CP TO I 100=0" 00.06'22"Li II II I I ox 1" CLIP CORNERS HOWN ITYP.1 m �IDLYT y" ] • A - qp CPTO 90'-0" DD'23'19"LT 90TEs, 1. DESIGN AND FABRICATION OF STEEL POLES SHALL BE IN ALCOgDANCE WITH AMEREw SPEC. ND. EC -3i WHICH INCLUDES APPEN01%ES "A" "B" "C" "O" "E" "F" AND DRAWING ]qJ]-A-2]986. 2. LADDERS SHALL BE REMOVABLE ENTIRE THE F w KF"0 HOLE /HOLEREQUIREMENTS.KA/. LENGTH OP FOLE.FOR REMOVABLE LADDER SSEgMBLOYY DETAIL SEE SPEC. EC-li APPENDIX SEE PURCHASE EMOVABLE LADDER QUANTITY LI BOTTOM STEP OF gEMOVABLE LdO0ER5 "2 21 WEO [IOVE FACE BASE [ .NGN BRACKETS TO BE ON AHEAD ANO BACK FACES OF POL E.SEE APPENDI%"D" SPEC.EC-1]. q. LPOUADINM LUGS AT TOP ANO VANGS AT BOTTOM OFPOLETOb I11 N PURCH AAEEDF AL ANOFINSHASREST OFPCLEAS SPECIFIE(NOTE DER. POLE FACE DETAIL 4 DETAIL 5 NROUNO INA 'AN F 1 NEAR I R FACE SEE APPEND I% SPETESC137.6g1 GROUNDING LUC SEE ELEVATION FOR LOCATIONS SEE NOTES 1 6 1 GROUNDING VANC BEE ELEVATION FOR LOCATIONS SEE NOTES 1 6 q REFERENCE OR .Wlxc. A HARDWARE AS SEMBI*OLOLAilONS_ ]OG 150 LOAD TREE TABLE__________________ 711 11 - SEE OE TA IL 5 I STAKING DE TAIOOI SS DAMPER b SPLICE ASSEMBLY DETAILS _----__ 00159 ..T FOUNDATION DETAILS________________ TBD y = BOTTOM OF BASE [ arT� ELEVATION raolWr�Jl LINE CONSTRUCTION - 69 KV STEELPOLE OUTLINE .n! POLE TYPE CPTO STRUCTURES 3,4 8 4A _ - LOOKING TOWARDS ST.LOU15 RD. SUBSTATION (AHEAD STAT I ONI T JEFFERSON CITY PLANT - ST.LOUIS RD. PNpJ& _ WWA4EfF�W 700153 0 pW a 2 E STRUCTURE PERPENDI TO LINE ANGLE BISECT SEE NOTE 2 TO ST. LOU I S RD. SUBSTAT I ON TYPE CPTD TANGENT LEFT LINE ANGLE SHOWN OF At G� RYANM. CONST. NO. OPER. NO. STRUCTURE TYPE ANGLE oc 3 3 CPTD 0° 0212" RT 4 4 CPTD 0'06'21" LT 4A 4A CPTD 0'23'19" LT —x— 1. STRUCTURE ALIGNMENT STAKE AT EACH LOCATION INDICATED BY AN "X" 2. POSITION ALIGNMENT NOTCHES ON TOP AND BOTTOM TEMPLATE WITH TRANSVERSE AXIS. 3. SURVEYOR WILL ADJUST,AS NECESSARY,THE DISTANCE OF OFFSET AND REFERENCE STAKES FROM THE CENTER HUB STAKE BASED ON LOCATION OF FENCES,CULTIVATION,AND OTHER LAND FEATURES OR OBSTACLES. REFERENCE DRAWINGS: STEEL POLE OUTLINE,TYPE "CPTD"___________ 700153 REV PROJ ID DATE I DRWN I RVW I APPD LINE CONSTRUCTION — 69 KV STAKING DATA DETAILS STRUCTURE TYPE CPTD STRUCTURES 3,4 & 4A ER ", i — I I kSIONALEo REV PROJ ID DATE D 0 1 18/31/201 REVD DATE OF SIGNING: ael7v2o2o ISSUED FOR CONSTRUCTION JEFFERSON CITY PLANT - ST.LOUIS RD. `fl REV WAmenen 700155 0 MISSOURI 1 SCALE RATIO =NTS 3 2 1 BILL OF MATERIAL ITEM OTY. UNIT DESCRIPTION MFR.* CAT. AMEREN SERVICES REMARKS NO.. STOCK NO. 92 REO'0 EA, ELECTRONICRIGN ITIONIZE 65, ERIGO 65PLDUSF20 22-22-993 MS LD:TAC9B98 STEEL POLE 101 242 AS " 0 H.S. 7-t8 STRAND FT' 27-59-007 5'-0" 5'-0" f0'-0" 10'-0° NOTE 5 149 �i 255 READ COPPERWELO 2 EA. GROUND ROD Y4°0K10'-0" LONG BLACKBURN 7510 23-13-104 ! 749 706 WIRE CLIP, 1' MAX. WIRE SIZE. MCMASTER C 2 EA. 886373 23-68-562 1'-0" IT11.1 J !i! 726 GALV. CARR 2 EA. NAIL,ZMAC ANCHOR RAWL 2820 21-51-077 !MAX. F AHEAD SPAN _� _ 7607 2 EA. CAOWELD CARTRI,GE,SIZE 115, CAOWELO MOL,: GTCI B9B ER[CO 22-22-994 i 02 92 92 BRACKET AT TOP OF POLE 2279 ELECTRONIC IGNITION 115PLUSF20 STOCK° 86-44-434 GROUND CLAMP,0.204"-0.630"DIA. 2 EA. RANGE LABLE TO FLAT FOR "BAfl AN,ERSON GC -141 A-OY-12 17-52-223 z 1047 REO'D EA. ZINC PLATE WASHER UNISTRUT HFLW025 21-75-187 2 PER SIGN PLAN SIGN MOUNTING DETAIL z 1494 RASEA' CbP SCPEWI LG. HX. HD. GALV. 21-53-053 2 PER SIGN TYPICAL STEEL POLE w 1495 RES EA. %p - 20 GALV.LDCKNUT 21-61-038 2 PER SIGN vU^i 1869 AS EA NUMBER SIGN,6'XW%FORMICA, SEE TABLE NOTE 5 REO'0 WHITE ON BLACK I GO FT':' C PEIiWfL0 e8. -S 265.:`;2,.:'YA.::`G.ROUNO POD;."hXiQ.:�O":COBCAGKB�•'�` i 21 tBbT% ISApTLD-:TC-18 g34 CAEWEYD.ICRIGIR CONI ZE'.1 t5.: alpp'iiSPOLWUE5F2D /2;:` BOTTOM OF -1 ;.'EA;`' BBAANNETOT ;22-21-.W94'' BASE R. j 706 726 :-..T'--.. .' 3279' :'2;'';.:'EA:'' GR dMPT�.20A 4]0?'OIBAR: '71NDERSON, 6L _NIA [-12 :Ti,52-223` GRADE i NOTE 2 h.., `.. ;' `":;': r..,` . L OF TRANSMISSION LINE �.§2;! AS' ;EA.: CADWE G`CARTRIOGE; S ih 6'S,Rk IDD .' CAOWELD; ,.22-22.'943' .'M©LgJ'TAE989B: LENON' 65PLUSF20 r, i ; f 160 62 160 i ';'247 .'tiEO'o:' .tl-EOTRONIC ;. °0'H,3'.7r°B:STkA'Qi;:27,.=59"009,:.. PPEAWELD - 292 92 Ifi0 +. .: 2 55 ; .4 .` 6A.:'G O'R00 "6f O'otl" 6UNG' 'aC 9URN•.'i RpUN I'4 n & 16 5 3 H-..._ ..........................:c., .-7 ......................... _ - 91RE C[IP..; MAX:WIAE,SIZE;MCMARTER %705:'..2E'A.f 2i' ;E961T3':z3_!ib 'n e'; GALV:' 'CARR: �; �' �.EA;% I 255 NOTE 3 � 242 � 160 - - - � W •' Z26,:' NA'14; 2MAC (7i,HBR :' RAWL' ` 2820' 2T-5�1-017:' j . ... NOTE4j_W!_<tfi02' 41 eA . . :::a _.:' :EAI' CONNECLOIiy SPL1T BEEOLL`� i iGROUND fi 8 7 4'-0" C WWE2 E . EIEtTBON BRIBNOI7•SONI J•15 %Ep [C(i:, 1 bP USF2D:•'Y2; 22-9941 •`M BL OYR fit BSB+ • ' STEEL POLE PLAN .2'2i$ CC NP.i .2D "-8:630" ,IA'. / 3.' ` Ep:: pANOE,.C;18LE TO'FLA? F➢A 1 BAR AN iRSIIN ELEVATION :24.l :` J•' .:' SA'. a INDICATION OF MANUFACTURER B CATALOG NUMBER IMPLIES "OR EQUAL" STEEL POLE GROUNDING DETA 1 LPOLE I: NUMBER SIGN TABLE I/4-1'-0"ri•ii FACE NUMERAL 0 STOCK NO. 16-02-117 1. 1 16-02-101 i3 2 16-02-112 [�a� { 27 8 3 16-02-113 4 16-02-114 5 16-02-115 SUPPLIED 1}:,�U-CLAMP 6,9 7 16-02-116 16-02-118 BY OTHERS 4:' B 16-02-119 ' A 16-02-196 NOTESs �'v� 8 C 16-02-145 16-02-144 1. GROUND RODS WHICH CANNOT BE DRIVEN TO FULL DEPTH SHALL _ SWITCH HANDLE GROUND STRAP NOTE 5 BE BENT OVER AN, BURIED NO LESS THAN i'-6" BELOW EARTH GRADE. i 2. FOR STEEL POLE GROUNDING, COUNTERPOISE CONNECTIONS (IN ITS SANDING OR WITHOUT IITEMS ' 255259EARET70SBE2A�RE,2AS REQUIREDH TOWER LEG 27 726 706 ....�„•, INDTALLATIONTOFCGROUND IRNGS ODSARE TAKEN AND RECORDED DURING 3. GROUND RODS TO HAVE 15 OHMS OR LESS COMBINED GROUND FIELD DRILL s/j5” 0 HOLE FOR N'+� MOUNTING BONDING ASSEMBLY N'•-•40:'�:��: •. •. 7B:+^..",<';+.':-::`::.;:;::% GRA,E -; RESISTANCE. q. GROUNDING ROTS TO HAVE 1 OHM OR LESS COMBINED GROUND ,.�•': �• z .. •.......\........ T.O.C. H-yL ••••••-•••'•• 'r'^>: v � is RESISTANCE AT SWITCH STRUCTURES. 160 : c 160 6U 6 i 2 - 5. NUMBER SIGNS TO BE MOUNTED ON BOTH AHEAD AND SPAN o :: :•: .i..:: 41 ...._.: 242 p R T W NUMBER G N FACES F TH STEEL POLES STEEL TOWERS N N R S SIGN OP OF ST ER BRACKETS AT FOR AILS OF TAPPENDIX RD"OFE ......,.,..:._,._..-._. BRACKETS SEE AMERENO SPECIFICATIONBNO. ........ ............. NOTE S. GROUND TO BE INSTALLED UNDER OPERATING HANDLE. I 7. BACKFILL AREA OVER GROUNDING MESH WITH CRUSHED ROCK. I60 - REFERENCE DRAWINGS: STEEL POLE OUTLINE,TYPE "CPTO"_------_--__.700153 NOTE 3 265 ELEVATION lOIY�FR LINE CONSTRUCTION - 69 KV GROUNDING DETAILS 8 SIGN ~ TOWER GROUNDING DETAIL 2 PER TOWER ON OPPOSITE LEGS STEEL POLE SWITCH GROUNDING DETAIL yR�R1'�2 MOUNTING DETAILS w `�. STEEL STRUCTURES _ JEFFERSON CITY PLANT — ST.LOUIS RD. 0i0NAL 7007 56 —7-0 I -'/."-: ASSEMBLY BB CONDUCTOR SUSPENSION ASSEMBLY FOR 336.4 KCMIL "MERLIN" ACSR --------------------------------------- _ __________.-. 987 VV i 8 UNITS 'yl ------------------------------------ NOTE 2 �5v ASSEMBLY DD Vv STRUCTURE 1 CONDUCTOR DEADEND i STRAIN 6 JUMPER MODIFICATION NOTE 2 ,,. FOR 336.4 KCMIL "MERLIN"ACSR 538 2 NOTE 2 J 1 971 275 222 551 BILL OF MATERIAL J ITEM OT Y. UNIT DESCRIPTION MFR.• CAT. NO.* AMER SERVICES STOCK N0. REMARKS ASSEMBLY PP VV AS FT WIRE,ELEC.,336 ACSR. 18/1 STR.. MERLIN 18-05-120 UL T.�,6g0 LBS - 53 53 7 1 EA. BALL EYE.30K ANDERSON BE -30 23-59-019 57 1 EA. ANCHOR SHACKLE.40K ANDERSON AS-35-ONK 23-68-316 HARDWARE ASSEMBLY DETAILS 528 1 EA, SUSPENSION CLAMP, AL UM W/ ANDERSON HAS -147-S SOCKET RANGE 1.00" TO 1.47" 25 23-68-694 C 1611 8 EA. ISULATOR, ON, SUSPENS SEOIVER NIDD/14B TONUGHENED GLASS 5 u1 D" 22K 25-05-120 ANSI CLASS 52-3 2584 1 EA, ARMOR ROD, 0.680"-0.703" PEP AR -0129 RANGE 0.204" 9 68" LG. AL 1T -i9-040 • WIRE, STATI C, "7 -STRAND, EHS STEEL, 10.F00 FT./REE 27-09-157 ULT. 19,700 L85. EA, ARMOR R00, 0.347"-0.373" RANGE, PLP AR -1130 0.100" DIA. 48" LG STEEL 27-09-092 EA. ANCHOR SHACKLE, LONG, 30K ANDERSON AS-25-L-6NK 23-68-368 PSFT EA, SUSPENSIGN CLAMP, 0.30°-0.70° ANDERSON MS-70-NMGF 23-18-225 EA. Y-CLEVIS EYE,`%",20K ANDERSON YCS-05 23-59-178 FT. WIRE, 556 K AA, 19 STR DAHLIA" 18-05-04T ULT. --9,750 LBS. VV AS RED, FT' WIPE. ELE C.. 336 ACSR, 18/1 STR. MERLIN 16-05-120 ULT.=8,600 LBS. - 538 1 EA. CLAM', PAARALLEL GROOVE. LINE PENN PCAA- 397.5-795 ACSR, TAP 3/0-397.5 ACSR UNION 30SBF 17-51-136 987 1 EA, CLAMP, STRAIN, 0.4 W-O.B6"0 RANGE, ANDERSON SO -86-S ALMM.,23K,SGCKET FITTING 23-18-392 J AS REO'D FT ' WIRE,STATIC, "i -STRAND, E STEEL 10 400 FT./REE 27-09-157 ULT. --19,100 LBS. JJ ASFT REO'D WIRE.1/0 AWG, AAAC 7 STR AZUSA" 12100 FT./REEL 16-05-060 ULT. -1,280 LBS. 222 1 EA. CHAIN LINK,30K ANDERSON LK -30 23-68-249 275 1 EA. ANCHOR SHACKLE,LONG,30K ANDERSON AS-25-L-BNK 23-68-368 < 551 1 EA. STRAIN CLAMP. 0.36"-0.84" 0 RANGE.NO FITTING ANDERSON SWOE-84-N 23-10-427 275 971 1 EA ,LAMP, PARALLEL," GROOVE, LINE ANDERSON LC51CXBUE 1i-51-032 B-1/0 AC,. TAP B-1/0 ACSR � 155 340 25 B ASSEMBLY CC -1 SHIELD WIRE SUSPENSION ASSEMBLY FOR %" ENS STEEL NOTE 2 J 971 275 222 551 J NOTES: 1. /" GALVANIZED STEEL U -BOLTS TO BE TORQUED TO 40 FT. -LBS. ASSEMBLY PP 0 UNTIL BELLEVILLE WASHER IS NEARLY FLAT. STRUCTURE 1 SHIELD WIRE STRAIN 2. DASHED LINES INDICATE EXISTING ITEMS. 6 JUMPER MODIFICATION FOR %" EMS STEEL REFERENCE DRAWINGS, STEEL POLE OUTLINE, TYPE "CPTD" 700153 HARDWARE ASSEMBLY LOCATIONS ___________700158 LINE CONSTRUCTION - 69 KV HARDWARE ASSEMBLY DETAILS sr pc Arm ASSEMBL IES "BB". "CC -1 ", "DD" 8 q „PP., JEFFERSON CITY PLANT - ST.LOUIS R0. s/orc"''"__ �►AmerBn 700157 0 3 2 C ASSY PP— ASS'Y CC -1 ` I TO ST.LOU IS R0�— " ASS 'Y DO """""' ..........� I ............. ASSY BB . ASSY BB I 1 B STRUCTURE 1 I I STRUCTURES 3,4 8 4A (LOOKING SOUTHWEST TOWARDS (LOOKING SOUTH TOWARDS JEFFERSON CITY PLANT SUBSTATION) ST.LOUIS RD.SUBSTATION) NOTES, 1. DOTTED LINES INDICATE EXISTING ITEMS. REFERENCE DRAWINGSe STRUCTURE TYPE "CPTD --- ______________700153 HARDWARE ASSEMBLY DETAILS 700157 LINE CONSTRUCTION — 69 KV HARDWARE ASSEMBLY LOCATIONS JEFFERSON CITY PLANT - ST.LOUIS RD. s�oxeLT�ARIPlL7/ 700158 0 _ w: 'E.: Fe�i�'A�i"iF.2.'�vasveas 1 SPLICE ONLY CONDUCTOR SUSPENSION SPANS SPLICE ONLY WIRE SUSPENSION SPANS SHIELD WIRE SPLICE %" EHS 7 -STRAND STEEL USE AS REQUIRED CONDUCTOR SPLICE 336.4 KCMIL 16/1 ACSR "MERLIN" USE AS REQUIRED NOTES 1. MINIMUM DISTANCE FROM SUSPENSION CLAMP,DEADEND CLAMP,OR DAMPER TO SPLICE IS 50'. 2. 0 L ONE SPLICE PERMITTED PER SPAN ON EACH WIRE IN ACCORDANCE WITH AMEREN SERVICES SPEC.NO.EC-25. REFERENCE DRAWINGS: STEEL POLE OUTLINE. TYPE "CPTD --- _ 700153 HARDWARE ASSEMBLY DETAILS -----------_ 700157 LINE CONSTRUCTION — 69 KV DAMPER AND SPLICE ASSEMBLY DETAILS CITY PLANT - ST.LOUIS RD. 700159 0 a Weo. 7 - Y.^-+•-a� BILL OF MATERIAL ITEM OTY. UNIT DESCRIPTION MFR.. CAT. NO.+K AM=REN SERVICES STOCK N0. REMARKS J AS ftEO'D FT WIRE, STATIC, "7 -STRAND, EHS STEEL, 10,900 fT./REEL 27-09-157 ULT: 19,700 LBS. VV AS REGO FT WIRE, ELEC., 336 ACSR, 18/1 STR. MERLIN 16-05-120 ULT.=8,680 LRS. AS 1039 AS EA. SPL ICE. COMPR�'SSIDN, ANDERSON 811425 ALUM.SLEEVE, EHS STL. 17-60-436 1357 AS RASACSR EA. SPLICE, CONDUCTOR,336 MACLEAN 7656 -AP 18/1 STR., AUTO 17-60-333 C 1537 RAST ED EA. FILLER COMPOUND,HT ANDERSON HTJC16 31-51-103 • INDICATION OF MANUFACTURER A CATALOG NUMBER IMPLIES "OR EQUAL". NOTES 1. MINIMUM DISTANCE FROM SUSPENSION CLAMP,DEADEND CLAMP,OR DAMPER TO SPLICE IS 50'. 2. 0 L ONE SPLICE PERMITTED PER SPAN ON EACH WIRE IN ACCORDANCE WITH AMEREN SERVICES SPEC.NO.EC-25. REFERENCE DRAWINGS: STEEL POLE OUTLINE. TYPE "CPTD --- _ 700153 HARDWARE ASSEMBLY DETAILS -----------_ 700157 LINE CONSTRUCTION — 69 KV DAMPER AND SPLICE ASSEMBLY DETAILS CITY PLANT - ST.LOUIS RD. 700159 0 a Weo. 7 - Y.^-+•-a� v2"Ameren MISSOURI Attachment B Bicentennial Bridge Ameren Relocation Cost Breakdown Total Cost for Project: Ameren Donation: Plocher Donation: BBC Donation: Additional Savings (tax, efficiencies gained, overhead reductions): Remaining Cost to be paid by Jefferson City: Jason Woodard, PE Supervising Engineer Ameren Missouri 1901 Chouteeu Avenue St. Louis, M0 63166-6149 PO Box 66149 $638,835 -$200,000 -$ 61,000 -$ 40,600 -$182,407 $154,828.23 AmerenMissouri.com Exhibit B Memorandum To: City Council From: City Administrator Re: Grant Acceptance Over $25,000 For: Council Agenda Pursuant to Section 2- 28 of the City Code, I request authority to accept the following Grant: The name of the grantor: Parks Foundation The amount of the grant: $100,000.00 The purpose of the grant: To fund the Union Pacific Railroad Company Pedestrian Underpass Agreement and other incidental expenses related to the construction of the Bicentennial Bridge, Project Number 97621 Any matching requirements or future Any additional funding necessary will come from Parks obligations tied to acceptance of the grant: funds. GL Acct where matching funds will come from (will be used for budget adjustment upon grant acceptance to make budget authority in expense acct shown below whole) CFDA#: n/a Grant Award # (if any): n/a City Department Responsible: Public Works Employee assigned as Grant David Bange Administrator: Revenue account # to be amended: 21-210-430040 Local Grant Expense account # to be amended: 21-990-574069 Bicentennial Bridge Reviewed by Finance: Please NOTE: Upon Approval of the Consent Agenda, the City Administrator may, on behalf of the city execute any documents necessary for accepting the grant and amend the budget to reflect the acceptance of such revenue, and amend the budget to reflect equivalent expenses so as to accomplish the purpose of such funds. For Finance Department Use only: Approved by Bill ; Ordinance on this day of , 20 Revised 8/2/16 by Ordinance 15545