Loading...
HomeMy Public PortalAboutGardiner temp easement with DEQ letterWhen Recorded Mail to: City of Moab 217 East Center Street Moab, UT 84532 Ent 533263 Bk. 878 P 687. " bCti Date: 14--JAN--2019 3"s 57 s 09PITi Fee: NoneFiled Dyt GKW JOHN ALAN CORTES Recorder GRAND COUNTY CORPORATION For: CITY OF 110AB TEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT THIS TEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT (the "Agree- ment") is made and entered into as of the date(s) set forth below by and between Gardiner Properties Moab, LLC, a Utah limited liability company, the owner of record, ("Grantor"), and the City of Moab, a municipal corporation ("Grantee"). In consideration of the mutual promises and obligations contained herein, the receipt of which is hereby acknowledged, Grantor and Grantee agree as follows: 1. Grant of Easement. A 30 foot wide Easement, 15 feet on either side of the following de- scribed center line located in the Southeast Quarter of the Southwest Quarter of Section 26 and the Northeast Quarter of the Northwest Quarter of Section 35, Township 25 South, Range 21 East, Salt Lake Base and Meridian, Moab City, Grand County, Utah; and running adjacent to a perpetual sewer easement; more particularly described as follows: BEGINNING at a point on the Southerly line of the Grantor's property, said point being 118.68 feet South 89°55'28" West along the South line of said Section 26 and 56.73 feet South 00°04'32" East from the South Quarter corner of said Section 26; and ramming thence North 51 ° 16'28" West 211.91 feet; thence North 16°04'26" West 183.00 feet and thence North 45°02'41" West 312.83 feet to a point on the Northerly line of the Grantor's property and the termination of this easement center line. Note: The sidelines of this ease- ment should be extended to or terminated at said property lines. Contains 21,233 sq. ft. or 0.48 acres, more or less 2. Purpose. This Agreement is granted for the purpose of establishing, installing, construct- ing, repairing, replacing, and/or enlarging sanitary sewer lines, along with associated surface struc- tures including manholes, control boxes, cables, and such other surface and subsurface appurte- nances as may be deemed necessary for the intended use. This includes but is not limited to, the transport and storage of construction material, soil, equipment, and vehicles. Grantee shall have reasonable access to the Easement Area as necessary to carry out the purposes of this Agreement. Grantee shall be solely responsible for the maintenance of any improvements, structures, or equip- ment it constructs within the Easement Area. 3. Temporary Easement. This Agreement shall be temporary in duration, commencing upon the date of execution of this Agreement and continuing for the duration of the construction project, but not to exceed January 1, 2020, at which time the easement granted herein shall automatically 4821-9850-2018.v1 terminate without the recording of any notice of such termination. After construction and restora- tion is complete, Grantee covenants and agrees that it shall have no further right or interest as to the real property comprising the same. 4. Non-exclusive Use; Removal of Encroachments. Grantor expressly reserves and shall have the right to use the Easement Area in a manner that does not impair or harm the grant or use by Grantee. 5. Restoration. Upon completion of any constriction work contemplated by this Agreement, Grantee agrees to promptly restore the surface to a condition equal or superior to that existing prior to any disturbance. All restoration work within or upon the Easement Area shall be undertaken at the sole cost of Grantee. Upon completion of the restoration, the Grantee shall remove all equip- ment and materials from the Easement Area. 6. Condition of the Easement Area. Grantee accepts the Easement Area and all aspects thereof in "AS IS", "WHERE IS" condition, without warranties, either express or implied, "with all faults", including but not limited to both latent and patent defects, and the existence of hazardous materials, if any. Grantee hereby waives all warranties, express or implied, regarding the condition and use of the Easement Area, including, but not limited to any warranty of merchantability or fitness for a particular purpose. Subject to matters of record or reasonably discoverable by an inspection of the Easement Area, Grantor warrants that it has merchantable title to the Easement Area and that it will defend same against claims from persons claiming by or through Grantor. 7. Sole Agreement; Modifications. This Agreement constitutes the sole and complete agree- ment between the parties and no additional or different oral representation, promise or agreement shall be binding on any of the parties with respect to the subject matter of this instrument. No modification to this Agreement shall be binding unless it is in writing and duly executed by both parties. 8. Governing Law and Venue. This Agreement is governed by Utah law; the sole venue for any dispute arising from this Agreement shall be the courts of Grand County, Utah. 9. Remedies. In the event of any breach of the provisions of this Agreement, the non- breach- ing party rnay enforce same in an action for damages, specific performance, or both. In any such proceeding arising under this Agreement the prevailing party shall be entitled to recover its reason- able attorney fees and court costs, in addition to any other remedies or relief. 10. Liens. Grantee shall keep the Grantor real property located in Grand County, Utah ("Gran- tor Property") free from any liens arising out of any work performed, materials furnished, or obli- gations incurred by, through, for or under Grantee, and shall indemnify, hold harmless and agree to defend Grantor from any liens that may be placed on the Grantor Property pertaining to any work performed, materials furnished or obligations incurred by, through, for, or under Grantee and its agents, servants, employees, consultants, contractors and subcontractors (collectively, "Grantee's Agents"). 11. Compliance with Laws. Grantee will comply with all present or future laws, statutes, codes, acts, ordinances, rules, regulations, orders, judgments, decrees, injunctions, rules, regulations, per- mits, licenses, authorizations, directions and requirements of and agreements with all governments, ViE090 6d L £9at Eg lu3 4821-9850-2018.v1 departments, commissions, boards, courts, authorities, agencies, officials and officers, foreseen or unforeseen, ordinary or extraordinary, including, without limitation, any building, zoning, land use, and hazardous waste laws. 12. Release. Grantee, as a material part of the consideration of this Agreement, waives all claims or demands against Grantor and its employees, officers, members and affiliated entities and its and their employees, officers, members, agents, and professional consultants and its and their respective successors and assigns (collectively, the "Releasees") for any such loss, damage or in- jury of Grantee or Grantee's property. The terms and conditions of this provision shall remain effective, notwithstanding the expiration or termination of this Agreement. 13. Notices. Any notice shall be sent by first class mail, postage prepaid, or delivered by cou- rier, to the addresses for the parties as specified below: Grantee: Grantor: City of Moab Gardiner Properties Moab, LLC Attn: City Manager Attn: John Gardiner 217 East Center St. 1075 East 1200 South Moab, UT 84532 Salt Lake City, UT 84106 [Signatures Page Follows] Ent 533263 Bk. 0B78 Pg 0689 4821-9850-2018.v1 This Agreement is binding and effective as of the date(s) of execution by the parties, below. GRANTOR: Gardiner Properties Moab, LLC, a Utah limited liability company ohn Gardiner, STATE OF UTAH )ss. COUNTY OF S 4.1 k L— k_ ) On this 21-lik4lay of t)e c.e A., 6-sr— , 2018, before me, G 4 s .e j l.-\\Aa notary public, personally appeared before me, , j G IA", C-i tirc . ; A4. r— , whose identity is personally known to me or personally proven on the basis of satisfactory evidence and who affirmed, to be the Pr e 5 i a a n-E- of Gardiner Properties Moab, LLC, whose name is subscribed to this instrument, and acknowledged and executed the same. Witness my hand and official seal. Notary Public NOTARY PUBLIC CASEY JAMES HILL 697066 COMMISSION EXPIRES SEPTEMBER 25, 2021 STATE OF UTAH i [Signature Page Continued Next Page] Ent 533263 Bk 0878 1g C)69O 4821-9850-2018.v1 GRANTEE: CITY OF MOAB, a municipal corporation By: Emily Niehaus, Mayor \1, lV,I,, YYY\\_y ketiel Stenta, Recorder STATE OF UTAH }ss. COUNTY OF GRAND On this g111 day of -Sa yt {,ta-ir c./ , 20 a, before me, 4, � a` a notary public, personally appeared before rrie, Evil i 1 Aii�i/lcu,LS , whose identity is personally known to me or personally proven on the basis of satisfactory evidence and who affirmed, to be the oY of City of Moab, whose name is subscribed to this instrument, and acknowledged and executed the same. Witness my hand and official seal. RACHE1. E. STENTA Notary Public State of Utah Comm. No. 703637 My Commission Expires on Dec 15, 2022 Notary Public Ent 533�'E63 Ak 0878 Pg 0691 4821-9850-2018.vt C IMON,6 ` 532 AFC fj a� free."' Ser7t !' ` v;l' i=3t State of Utah Joiv M. itf_ NTSMN.IR Cn.rrnnr GARY HERBERT Lrewer:unr al eiwpr February 19. 2009 Department of En-vironmental Quality itiahJ. Sinclair Arthig Er etai;-r Direeror DWISION O w:�7'ER QUAl.t'rr Walter 'Striver, P �. Director MAR 0 2 2009 Environment DepartMeni Water -Quality Suarti Er ; Joe Pie coto. CJiarr �Dougluy, "vice C Isair `"° 13aviti r Echols Nterriltl£ Frey Darrci3l1. Mtnset Leland.i. My'crs WfIllaul J. Srtrclair lay Ivan t/lscn Girt gory t„ Rowley Steven Y. SimpsOa D2 niet Smarr Phi[ wilght Waittr t_ Baker. FdrevereSarreran vas. I.v1ary E. Hebert Director, Field Compliance P.O. Box 4324 Houston. TX 77210.4324 Subject: Appr€?vat of Facility Closure. Report, Enterprise Products Operating t Terminations of Class V Underground Injection Control Perrnit UTU-191 I112 71 anStorage facility: Termination of Ground Water Quality Discharge Permit UGtrirl9ObU19I P-i x21~77i and Dear ills_ Hebert: This letter is to notify you that, effective immediately, the Utah .Division of Water Quasi€Y (DIV hasterminated the following permits that were issued to Enterprise. .Products Operatin (Enterprise): I_ y_ Class V Underground Injection Control Permit UTU_191P-i i? Grotilld Water Quality Discharge Permit UOW19%101_ 1~771. and activities summarized below. The above -references perrth terminations are based on the approved decommissioning and closure Class V Underground injection Centro! Permit U' U-1.y1P-I%2F7i1 di r•roval o Plums• inz and Abandonment Plans for Backe re #1 and 42 C:avern/Inicction Weil Systems. On july 12, 2CM D�V issued an approval letter to Fetter rise of 4 abandonment plants t`nr €ffe Buckeye,�1 and .�? TP after r,.viewtng zi1e revised Plo��itt� end confirming that the cointnews Etneons iris articulat ed b yD�WQ in its otter dated ivlarch 27. � o a (LPG) -storage wells after adequately addressed. T007 were Submittal of C'.srE,ificatialts anti -tn_r�in and Abandonment Re ar;:s for the Fr.a LPG Storage Wells_ 1n 'sate Ocro� 7 d Aba tx>v CampmenttRe of the r th :t..rorise Buckeye 41 and #2 Section; was on site Ei� witness s the plugging- Q Ground Water Protection bging and abandonment of the Buckeye #1 'and -Buckeye 42 LPG storage wells_ On January I1. 2008,1]).-VQ received a letter of transmittal from Wally Swartz. Project Manager of PH Energy .Storage Services. inc., with the piuga' i .tnti �2 T•-.PG s€ora�c.:v,? _• -�'ng •�='ud abar�daamel;!i _reports for the Buckeye �' is Each report included a Certification sisnecl b Ebner L. Brown, Field Suuervisor of PB Energy Storage Services_ lac_ dated .tanuury 3, 'fiti&. ?A North 1,160 ilr.em -Sah take City. ZIT MJ33•.r fF resc• PO 804 J 44ifll• Sak Like ity, 7' &.11.442s10 rclephonc ".s (a ss 3'f }•`)-•�'Fax ($iiYlG•T.3J) i$OI;5=6-0.w14 Pruned 111i lOfre4, recycled i=Lft'r . Ms. Mary E_ Hebert February, 19. 2009 Page 2 Ground 'Water Quality D1,sebar;e Permit tiGW190001 Submittal of Draft Facility Closure, Plan_ fri accordance with Ground Water Quality Discharge Permit UGW191001. Enterprise submitted a facility closure play[ to DWQ on F'ebnlaty $, 2oos. after reviewing the Draft Facility Closure Plan, Woodrow Campbell of the DWQ Ground. Water Protection Section issued a DWQ Conditional Approval letter to Ives. Mary E. Hebert of Enterprise on February 28., 2008, inclicating that the asphalt liner in pond 1 had to be removed and properly disposed oft -site_ Pluming. and Abandonment of Ground Water IvIonitorinR Wells. On 7utte 13, 2€ 08, Woodrow Carnnbell of the DWQ Ground Water Protection Section was on site to witness the plugging and abandonment of the three four -inch PVC: ground water compliance monitoring wells used to monitor the bride ponds_ wells were plugged and abandoned by a Utah Licensed Wati:r Weil 'Driller (License No. 807) in accordance with 17AC R655-4-12. Abandon rsenr of grclls. The well -abandonment reports are provided in Facility Closure Report described below. Facility Decommissioning Activities During the same week of the monitoring weli abandonments, Woodrow Campbell of tlt w DWQ Ground Water Protection Section also witnessed the following facility decom issi€ nina activities: • removal and disposal of par of the asphalt liner from brine pond 2; a• stockpiles of piping and outer materials that would be transported. cuff site for recycling or disposal; • back -filling and vadrng of the site. Submittal of Facility Closure Report. On November 18. 2008 DWQ received the Facility Closure Report for the Enterprise. Products Moab Storage Facility_ Ground Water Discharge Permit No. 1.30W190001. under cover'letter from Mary E, Hebert, Diructor of Field C:ompIiance,. The Facility - Closure Report included the decommissioning scope of work, a description of the decommissioning process and activities, and appendices including well_abandon vent reports. waste recycling and disposal documentation. and photogt'aphs of Facility decommissioning activities. Final Inspection and Approval of'Facility Closter: Han. On January 23, 2Cf09_ Woodrow Campbell of the - DWQ Ground Water Protection Section conducted a final inspection of the facility_ Based on the results of the final inspection, the Facility Closure Report is hereby approved. Request for Termination of Permits in a letter datRri February 2, 2009 from Mary E_ S ieberr_ Enterprise re Atwsted that Cltxss Utldcrgro: uci injection Control Permit b1Tl T 191P-iI2F 71 and Ground Water Quality DischargePettnit UGWIg0f,10.1 by terminated. Based on the final facility inspection and approval. of the Facility Closure Report. DWQ has terminated. Class 4' Underarou nd Injection. Coutrof Permit r117;-191P-i 17F1?1: and Ground Water Quality Discharge Permit UG ,./f9 it3fli, effective immediately, We appreciate the diligent efforts and cooperation.of Enterprise dining the decommissioning aid s:.losme of are subject facilities_ If we can of further assistance_ please contact Mr_ `vinocirow C amipbe€? at rwcar pbellOutatti.?ov or (5013 538-6067. /tab\ E. lieberz February !% 209 s Sincerely; Utah Wal.er921iI Boar} Wa1+ L. Baker.yE Exe.cutive CO£ m2 W£S:RFI wwe : CI A BiorkSoutheastern Utah Disirict Health Department David mi0 &la, -eastern Uah District Engincer Dan J G Division of Oil,Gas and Mining . Mark W HgIi, Grand Cam !€ Enaintr.,cn- WLBIRE-1:we _phdl/ ad _ate m approvaims pgtmitm law.r.ctuc m November if), 2008 SNTcggitrSE::ii3d--YCTS PARTA ewe "INITZ1,7xSE),FLY::1C'r5-6?� zesa:�c ' 41 muLtJcztr. .LLC a ct:Er2.7F PAR746z lIRSIS_c f•—+,X�.�1fC?5� . 'far 2680 0002 34$8 $524 Return Rx.eipt R,gaested Woodrow Carapbeil, F.& Environmcntal Engineer Utah DEQ O x 14� 0 an of Water Quality, Grain d'tJarer Protection Section SaltLak;, City, (Hall 841 i4-4870 RR: Ground Water Discharge i'erroifNo. liGW190001 Enierprise.Praducts Moab Storage Facility Facliity Closure Report Dear Mr. Campbell, ts n a e mtrssionomuc theOp Moab Storage (El -Iran -Arise) has completed the demolition and torage Facility. Enclosed pI�se find a copy of the closure report for yourrcview. [f;col have questions or aacd addidonai infatr_tatian_ please do not hesimte r 880-8. Dan art ald, Area Environmental Scientist at (505) 595-2141 or me directly at 013) Yours truly, ;tom Mary a lieireit Director, Field Compliance IsJn cc Graham Bacon l Howson*, A Dennis Andrews LTIobbs-Gaincs, TX Mike WAsziril Farmington. NM Mike Todd f Rock Springs, WY r73 hCi'df:i:lYM •.ti�'�" traW._'C,�y_ena� Mo63tetagaFad14Decornmissinoingllei n Noven her 2408 retrloved fnr disposal Egad myelin& The mechanicavpump r�taved, Piping anA 00P41.1it on the west side ofthe � was removed_ and brine pump was 3tmB I L29292a Additional pondsediment was transported to the Gaud County Landfill for disposal, Add Tonal piping and corxlnit was removed. Removal of some of the concrete street= was conducted- Ranaval of the clay base from. Pone ;.1P that contained some brine material was initiated- Removal and tisposal of the clay liner from. pond #i one was completed. Conte material was buried on the western portion of The site it a trench. Asphalt was =laved from the site for disposal. The baeitElli g of Pond #2 was initialed using existingsot( The monitoring welis for Pried #I and pond #2 werr la from tkteguttd sod hank from Pend 02 were removed from the site for recycling.gSeai and abandoned Salvaged ripen Wore included completion ofhselcriilicg ofPoiad ii? The scale Itotsse build" ng was drsposa2. Scrap metals were transported to Provo, Utah for knal piping i ping fox everts were leruoved front ffie eastern portion of � site. Additional coacxete was tetra Wired to the burial pit on the western portion &idle seta. Completed demolition of existing buildings and transported to the landfill for disposal. Initiated b s rfilliyig of Perm #3 sith the existing soil la�nir matPsl3l. Iu4e—2i.2t}li8 the wesbeen The e si t1ng scales were removed from the sites. Additional coAc`zte was pieced is burial pit on graded>porti n of the fs die site. Haektlling of Pond #1 eras completed. The melte site v es amending typography Site decommission completed_ Wrge.7 sup)* }peg There is one oxtsite water supply well located on fte southeastern portion of the sac within a sTe41 cinderblock building.tiEntc.tplise has maintained this well ns infrastructure to be conveyed with the Phu' at di .Facility Fencing The existing facility fertelPg lass becc 1eit in place and convo yed with the property at disg¢sidon. 6 Moab 5tarage Neil; tyiieconinissionizrzReport Nownt er2008 2_0 Facility Deconuilis,sio ntiag Prior to demolition of the facility, Enterprise removed the shove grotmd pressure vessel.s aad other equipment for use at other facilities. Remaining piping, buildings ail ancillary equipment was ieft for the demolition contactor to selvage or dispose. Decommissioning of the Moab Storage 'Facility was initiated on May 19 2008. g & S Enterprises, of Moab, Inc. was contracted enmplete the decommissioning of the Moab Storage Facility. Eagle Environmental, Inc. was contracted to removeofashestos containing materials found to exist within the office building. The decommissioning scope of work included the following: ❑ Transfer remitting brine (3,4S5 barrels) to the Danish Plats Environmental services evaporation facility. o Transfer dried residue in ponds (salt and wind—blown sediment and clay liner -salt) to the Brand County LZ1:12C l (12.209 cubic YEm s). o Removal of asbestos containing materials from the office hirget ng (900 square feet). a Remove bike pond liners. Reuse, if possible, at another location, recycle it poss ble, ©r if rrrr.essary, dispose of eYi eppro vtx1 site. • o Rename piping for salvage and recycling. o Remove buildings, materials end ardfam of LPG storage and reverse or dispose of properly in amtove l sites- o Bulldoze mitten berms, r*-gtade site to vproximate predevelopment contours. a Earyinex< concrete material in a t cncn located at the western portion of the site with. a misirrutt of three feet of earthen Craver (500 cubic yards) a Removal and diapabal of asphalt (405 cable yards) at Elie Grand County EandSil- o Becornmicsioning activities were monitored for fugitive dust. A -water tuck was utilized e.s waaanted to control dust emissions dming decommissioning activities. o Removal and dispose?faeoyclmgofother waste materials ineiudingmiscellaneous contai = of paint, arlEt lives, used oil-, transformers end a mercaptan stuioge vessel. Copiesofroaui£e9t arc included is Attachincut d. Mt. following is a descriptirm of licrommiviamirtzProcems May I9 — 24. 70Q Asbestos materials were; pernoved from the af5ce building end transpo led. to a facility for proper disposal_ Asbestos abatement was compieted by s Utah Licensed contractor,, Eagle Environmental, Inc. of Forth gait 15fre City, Ma Asbestos closure dart meets are lacat*E1 in 4tt,ebmeat 2 Rernovai of brine water front the storage Penns was iuMated_ Mav?5, 31 2008 Work was inifisted on removing the two brine storage parkas Located at. -the site. Residual water located is the ponds was .ar,.tovcd and dssposed of z♦ Banish Flats Em'uonmentel Services evaporation facility loo ter+ near Cisco, Utah. Pond sed meat Was removed and uansported to the Gmrai County T stedfill for disposal. The liners €3r born Pond g1 and Pond #2 were also 5 Moab Sttarage i aet�ity Decominissiodutg Repo "November 20CIS 1.0 liltroC action Entri:rrise admitted a facility closure plan to the iJr`eh Ilepar*Mment of Environmental Quality (OEDE),DivisionofWaterQuality-inaccords/lee with CKouralWa :I -Discharge Permit Nuni er 1.10W19a001, for approval wa peEr usrg &, 2003, t}n .February 23, 200S, the 13 EQ pm ndcd =�in�pptrval of the plan and indicated that the aspha[t liner in pond 1 also. had to he disposed, A copy of the coalitional approval letter is included is Attachment I. The former site fatitititg are shown on Figs 2 and include buildings and fbundadons, storage ponds, moniivitig wilts, -water supply weEi, and piping and oandult. Buildzngy; Pozn lotions aru€Strmatires The primary l.ldings, struct , and foundations formerly located at the faaiiityinclude; o Hain office building O 4rale buttldirtg anti 5 1 o Truck reading , ty o Pipeline injccaion building o aine pump building a Wakv supply well -Willing (rig) a LPG above ginnod storage fonrtda%ions C Lfght sud electric palm and transformers a Facility Fencing 0:maining Staraga Pam* Two man made synthetic lined ponds were ussd to store brine =junction with the operation of the LPG storage terrain'al. Pond Size (neces) Pond Pond 2 i 5 Mairitoristg Weal" There v.f -e tlt , four inch diameter poly vinyl chloride (p vc) ground warQ- monitoring wells at the facility. The wells ware completed with submersible pmnps for sampling and monitoring the brine stet -appends. Monitor Reif Tot d Depth Depth to Water 54 FCs-I FG_7 33 65 FG-3 15 35 15 4 i Moab Storage PhcilityDarommissioninZ RIDatt Novernber20138 3,0 Monitoring Well Decommissioning As regarded by the facility discharge pert, the thin four inch PVC ground ;rater monitoring was were decommissioned accord to Ground Dater Wells, ratios Zan .�xitori Devi Borandard aho�ide ' anDecommissioning ��vise of Ezvircrmwttai ilctivifte D5299-92. This work was completed by a Utah .Licensed � for [driller Pima Frill Sc Vices, TIC, Utah License Number $ s Weil Ad�isnative Code, liule c^.64 .�. -12, Abandonment o Wells. ue accordance included c with lltah the cvell in a mane± to 1 aG w scans lese/I as prevent vertaq] mcr�+enQsxrt of water v+iiixin the boxr�eok as tgeIf as preventing theannul= spacecontamination of ssmding the well =,sing from becoming a conduit for possible the groundwater suppIy. The well driller obtained appruval froze the Stabe Engineer prior to execution of this work. The naoniborirg walls wem car oftaminhum oftd� feet beneath. the elevation of final gee aft= plugging with a bentonite mat^�i.al. abandarn ent reports z-e i le3ade& in Attnchrncat 3. 7 Itfosb Storage Facility Decommissioning Novemhz 2Ug8 b Report Background The former Moab Sim -age Facility was located in the of Section 35, Township 25 go South h a. Section 26 and North h of Figure I. The facility was a� Patel 2ange 21 �, acres and y, Ugh as depicted on the a�ke& 1954, the solution mined salt cas�rn y aci�s i$d #itiIy fenced. C.oristr�{� 6y others in Enierptise Pralunts Wig, L.IZ (Enteritis' was � for liquab.� gility i tu; g= 1 discontinued stnragG operations in 2p06. ant a) purchased ille facility in 21ki5 aad discanlintred o e 2�7. 1 � plugged, and abandoned injection wells, Buckeye I and Buckeye Enterprise =moved the retaining faoiiiiies aici completed decommissioning of the site during the summer of2n0S. The property ;s vacant with the exception of water well houses in a small cindsr binck bonding and a sit foot perimeter fence sunvunhmg the property- 3