Loading...
HomeMy Public PortalAboutCanyon Springs EIR Scoping - 22.pdf                                                                                                                                                    Neil Pankler                                                                                                                                                      17073 Glenshire Drive                                                                                                                                                      Truckee, CA 96161  Denyelle Nishimori  Town of Truckee  Planning Department    May 20, 2011      I am writing with concerns that I have regarding the Canyon Springs development that I would like to be  addressed in the upcoming EIR.    Density   It is my understanding that there could be two residences at each of the 185 lots that will be  offered for sale if the project is approved.  What mitigation is planned for the future increase in density?”      Traffic   The traffic impact report should take into account the maximum number of allowed residences.  It should include not only the commuter/service traffic but also the noise/visual pollution of off  highway vehicles ( dirt bikes, quads, etc) that have become so popular in this area.    Glenshire Drive is a hazardous road during the winter commute hours. An EIR traffic study done  on dry road conditions would indicate that the road could safely handle more traffic than the  same road could during winter conditions.   What mitigation is planned for these seasonal variations?     Cost to existing residents   Once the roads go into Canyon Springs they need to be maintained.   Who will be paying for the  winter road plowing, road & other infrastructure maintenance until the development is sold‐ out?   What mitigation is planned to defray the cost to existing homeowners?      Thank you for your help.      Neil Pankler      05‐20‐2011