Loading...
HomeMy Public PortalAboutCanyon Springs EIR Scoping - 33.pdfMARTIS PEA OCIATION  K HOMEOWNERS ASS TR 0   P. O. BOX 1431   UCKEE,CA 9616 (530) 587‐8647        May 20, 2011    Denyelle Nishimiori  ent Dept.  Associate Planner   Developm ort Road  Truckee Community 0183 Truckee Airp1 Truckee, CA  96161    Re:  Canyon Springs Development    The Martis Peak Homeowners Association “MPHOA” is a road association, and  therefore has concerns and questions related to our road, Martis Peak and the  roposed Canyon Springs development.  The MPHOA Board requests that the Town  nclude focus on the following areas in the Environmental Impact Study.  p i   Traffic  On July 25, 2010, the MPHOA sent a letter to the Town expressing our concerns over  traffic related to the proposed Canyon Springs development.  The only entrance to  our development, Martis Peak Road., would be shared as the only access to the new  development.  That concern is still a major one for us.  While there are currently  approximately 200 trips per day on Martis Peak Road off Glenshire Drive, depending  on the number of multi‐family dwellings and secondary dwellings on the proposed  185 lots, this number will increase dramatically.  We request that the Town study  the impact of the increased traffic at that intersection as well as along the section of  Glenshire Drive between Hirschdale and Martis Peak Road.  This is a section of road  that is already difficult in winter and has seen many issues related to drivers  travelling with excessive speed throughout the year.  Traffic studies should also  include potential additional development in the area, specifically in the adjacent  eel (Raley’s) property.  MPHOA requests an opportunity to review and comment  n all related raffic studies.   T o t   Public Safety  We ask that the Town consider the impact of the increasing density and limited  access/exit options for residents in Glenshire, The Meadows, Martis Peak, Canyon  Springs and adjacent areas in the case of an emergency such as a wildfire.  We ask  that careful study be given to the ability of residents to escape in the worst case  scenario, as well as the ability of emergency personal to gain access to the area.   When the last major wildfire hit the area, it forced the closure of I80.  How would a  similar scenario impact access/exit with an additional 185+ households using  M i artis Peak Road only?  We also request that due examination be given to any  ncreased danger of wildfire during and after construction.    On­Going Construction  The Canyon Springs plan has called for multiple phases (8) over a long period of  time (up to 20 years).  We are concerned about the long‐term impact on our road  from the constant use by heavy equipment and contractor trucks.   How will road  uality and our safety be addressed for those of us who will be neighbors to the q development?  e appreciate your consideration of these noted concerns.    W   The Martis Peak Homeowners Association Board of Directors  raig Wilson, Nicole Reitter, Michelle Jones, Al Hall, Neil Blumenfield C