HomeMy Public PortalAbout7_ReportPreparation.pdf7 REPORT PREPARATION
7-1
This report was prepared by the following consultants and individuals:
A. Lead Consultant
The Planning Center | DC&E
1625 Shattuck Avenue, Suite 300
Berkeley, CA 94709
(510) 848-3815 (ph)
(510) 848-4315 (fax)
www.dceplanning.com
The project team included:
David Early, Principal
Terri McCracken, Associate
Alexis Mena, Associate
Seung Hong, Planner
Melissa McDonough, Planner
B. Subconsultants
Air Quality, Greenhouse Gas Emissions, Noise
LSA Associates, Inc.
5084 N. Fruit Avenue, Suite 103
Fresno, CA 93711
Biological Resources
LSA Associates, Inc.
4200 Rocklin Road, Suite 11B
Rocklin, CA 95677
Foothill Associates, Inc.
140 Yellowstone Drive, Suite 100
Chico, CA 95973
TOWN OF TRUCKEE
CANYON SPRINGS DRAFT EIR
REPORT PREPARATION
7-2
Cultural Resources
LSA Associates, Inc.
157 Park Place
Pt. Richmond, CA 94801
Hydrology
Integrated Environmental Restoration Services, Inc. (IERS)
2780 Lake Forest Road
Tahoe City, CA 96145
Transportation and Circulation
LSC Transportation Consultants, Inc.
2690 Lake Forest Road, Suite C (PO Box 5875)
Tahoe City, CA 96145