Loading...
HomeMy Public PortalAbout7_ReportPreparation.pdf7 REPORT PREPARATION 7-1 This report was prepared by the following consultants and individuals: A. Lead Consultant The Planning Center | DC&E 1625 Shattuck Avenue, Suite 300 Berkeley, CA 94709 (510) 848-3815 (ph) (510) 848-4315 (fax) www.dceplanning.com The project team included: David Early, Principal Terri McCracken, Associate Alexis Mena, Associate Seung Hong, Planner Melissa McDonough, Planner B. Subconsultants Air Quality, Greenhouse Gas Emissions, Noise LSA Associates, Inc. 5084 N. Fruit Avenue, Suite 103 Fresno, CA 93711 Biological Resources LSA Associates, Inc. 4200 Rocklin Road, Suite 11B Rocklin, CA 95677 Foothill Associates, Inc. 140 Yellowstone Drive, Suite 100 Chico, CA 95973 TOWN OF TRUCKEE CANYON SPRINGS DRAFT EIR REPORT PREPARATION 7-2 Cultural Resources LSA Associates, Inc. 157 Park Place Pt. Richmond, CA 94801 Hydrology Integrated Environmental Restoration Services, Inc. (IERS) 2780 Lake Forest Road Tahoe City, CA 96145 Transportation and Circulation LSC Transportation Consultants, Inc. 2690 Lake Forest Road, Suite C (PO Box 5875) Tahoe City, CA 96145