HomeMy Public PortalAbout25-C-B-3 EIR appeal period TDA - 1 -
Truckee Development Associates, LLC
1201 Pine Street, Suite 151
Oakland, California 94607
t: 510 547 2122 f: 510 547 2125
Exhibit C-B-3a: Environmental Review
RE: HCD Prop 1c IIG 2013
August 5, 2013
The Town of Truckee filed the Notice of Determination for the Truckee Railyard Master Plan
EIR on 7/7/2009. The appeal period closed 8/6/2009. An appeal was filed but had no merit and
was settled in favor of Truckee Development Associates and the Town of Truckee. There are no
active appeals and no means for further appeal of the project EIR.
SCH Number: 2007122092
Document Type: NOD - Notice of Determination
Alternate Title: Truckee Railyard Draft Master Plan Project
Project Lead Agency: Truckee, City of
Project Description
The Truckee Railyard Draft Master Plan provides for development of an eclectic mix of building types and uses within an attractive, pedestrian-
oriented neighborhood. The Draft Master Plan anticipates that development will entend easterly from the Downtown Core. The pattern of development
would include the highest development intensity occurring immediately adjacent to the Downtown Core and then decrease as development extends to
the north and east. The Draft Master Plan includes provisions of affordable housing and recognizes the importance of allowing development within the
Master Plan Area to "grow organically" to accommodated market demands and the community needs. The Draft Mast Plan includes a Maximum
Allowable Development (MAD) that provides development thresholds for each of the Districts created by the Draft Mast Plan. This EIR evaluates the
potential impacts of the development within the Master Plan Area based on the MAD. The MAD would allow up to: 570 residential units (including
work/live units); 70,000 sf of retail area; 15,000 of office space; A 60 room hotel; A 1,000 seat movie theater; 20,000 sf grocery store; 25,000 sf civic
building.
Contact Information
Primary Contact:
Denyelle Nishimori
City of Truckee
(530) 582-2934
10183 Truckee Airport Road
Truckee, CA 96161
Project Location
County: Placer
City: Truckee
Region:
Cross Streets: Donner Pass Road and Bridge Street, Church Street, Trout Creek Road
Latitude/Longitude: 39° 19' 48" / 120° 10' 43" Map
Parcel No: multiple
Township: 17N
Range: 16E
Section: multi
Base: MDB&M
Other Location Info:
Determinations
This is to advise that the Lead Agency Responsible Agency Town of Truckee has approved the project described above on 6/17/2009
and has made the following determinations regarding the project described above.
1. The project will will not have a significant effect on the environment.
2. An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA.
A Negative Declaration was prepared for this project pursuant to the provisions of CEQA.
3. Mitigation measures were were not made a condition of the approval of the project.
4. A Statement of Overriding Considerations was was not adopted for this project.
5. Findings were were not made pursuant to the provisions of CEQA.
California Home Monday, July 29, 2013
OPR Home > CEQAnet Home > CEQAnet Query > Search Results > Document Description
Truckee Railyard Master Plan
CEQAnet - Truckee Railyard Master Planhttp://www.ceqanet.ca.gov/NODdescription.asp?DocPK=635486
1 of 2 7/29/2013 2:17 PM
Final EIR Available at: Town of Truckee 10183 Truckee Airport Rd Truckee, CA 96161
Date Received: 8/19/2009
CEQAnet HOME | NEW SEARCH
CEQAnet - Truckee Railyard Master Planhttp://www.ceqanet.ca.gov/NODdescription.asp?DocPK=635486
2 of 2 7/29/2013 2:17 PM