HomeMy Public PortalAboutSheet 10AN.A.P.O.T.S.
N.A.P.O.T.S.
N.A.P.O.T.S.
5A
2A
2B
3 4 5B
4
1
5A
4
CLASS 1 LEGACY TRAIL
(PHASE 5B)
EXISTING TRAIL
EXISTING
TRAIL
10' MULTI-USE PATH
AT COMMERCIAL CENTER
(PHASE 5B)
CLASS 1 LEGACY TRAIL
(PHASE 1)
ROUNDABOUT AND
GATEWAY IMPROVEMENTS
(PHASE 1)
CLASS 1 LEGACY TRAIL
(PHASE 5B)
CLASS 1 LEGACY TRAIL
(PHASE 3)
CLASS 1 LEGACY TRAIL
AND STREAM ENHANCEMENT
(PHASE 4)
COMBINATION - CLASS 1 TRAIL
AND SOFT SURFACE TRAIL
¤
O
C
S
O
C
S
ANTICIPATED PHASING EXHIBIT
COLDSTREAM
OPTION A
TRAIL PHASING
1 CLASS 1 TRAIL AT COLDSTREAM RD AND DONNER PASS ROAD
2A COMBINED CLASS 1 AND SOFT SURFACE TRAIL FROM COLD CREEK BRIDGE TO WEST
PROPERTY LINE
2B TRAIL CONNECTIONS
3 CLASS 1 TRAIL FROM BRIDGE TO COLDSTREAM ROAD PROJECT ENTRY
4 CLASS 1 TRAIL ALONG COLD CREEK AND DONNER CREEK
5A SOFT SURFACE TRAIL ALONG LAKE EDGE (FROM LOT 57 TO COLD CREEK BRIDGE)
5B CLASS 1 TRAIL FROM DONNER CREEK TO EAST PROPERTY LINE AND OFFSITE ALONG
DEERFIELD DRIVE TO STATE ROUTE 89.
LEGEND
NOTES:
1.THIS IS A PHASED TENTATIVE MAP. THE ORDER OF PHASING MAY BE
MODIFIED AND/OR COMBINED WITH OTHER PHASES.
2.LEGACY TRAIL AND SOFT SURFACE TRAILS WILL BE CONSTRUCTED
OVER SEVERAL PHASES. REFER TO TRAIL PHASING NOTES.
3.RESTORATION OF COLD CREEK AND PONDS MAY OCCUR IN
EARLIER PHASES.
4.DEERFIELD DRIVE CONNECTION WILL BE PROVIDED UPON
COMPLETION OF PHASE 5B.
SHEET INDEX
SHEET 1
SHEET 2
SHEET 4
SHEET 5
SCHEMATIC DEVELOPMENT PLAN
LARGE LOT TENTATIVE MAP
OFFSITE TRAILS DEVELOPMENT PLAN - GATEWAY AREA
OFFSITE TRAILS DEVELOPMENT PLAN -DEERFIELD DRIVE AREA
SHEET 6
GATEWAY AREA DEVELOPMENT PLAN
VILLAGE MIXED USE TENTATIVE MAP
SHEET 7 VILLAGE GREEN TENTATIVE MAP
SHEET 8 LAKESIDE RESIDENTIAL TENTATIVE MAP
SHEET 9 INFRASTRUCTURE EXHIBIT
SHEET 10 PHASING EXHIBIT
SHEET 11 PRELIMINARY GRADING PLAN - VILLAGE GREEN
SHEET 12 PRELIMINARY GRADING PLAN - LAKESIDE RESIDENTIAL
SHEET 13 PRELIMINARY GRADING PLAN - LAKESIDE RESIDENTIAL
SHEET 14 PRELIMINARY GRADING PLAN - VILLAGE MIXED USE COMMERCIAL
SHEET 15
GATEWAY AREA LANDSCAPE PLANSHEET L1
SHEET 3
SNOW STORAGE EXHIBIT
PHASE 1 - OFF-SITE LEGACY TRAIL TO WEST AND CLASS 1 WITHIN GATEWAY IMPROVEMENT AREA FROM PROJECT
ENTRY TO DONNER MEMORIAL STATE PARK ENTRANCE
PHASE 2A - INCLUDES COMBINED TRAIL FROM BRIDGE TO WEST PROPERTY LINE AT COLDSTREAM ROAD
PHASE 2B - INCLUDES TRAIL CONNECTIONS
PHASE 3 - INCLUDES LEGACY TRAIL IN MIXED USE COMMERCIAL AREA FROM BRIDGE TO PROJECT ENTRY
PHASE 4 - STREAM RESTORATION - INCLUDES ON SITE LEGACY TRAIL FROM PEDESTRIAN BRIDGE TO EAST
PROPERTY LINE AND DEERFIELD CONNECTION
PHASE 5A - INCLUDES SOFT SURFACE TRAILS ALONG POND EDGE
PHASE 5B - OFF-SITE LEGACY TRAIL EAST TO STATE ROUTE 89 AND LEGACY TRAIL FROM DONNER CREEK TO EAST
PROP. LINE
EXISTING OFF-SITE LEGACY TRAIL
October 30, 2013
S:
\
J
o
b
_
P
r
o
j
e
c
t
s
\
0
1
1
5
C
O
L
D
S
T
R
E
A
M
\
d
w
g
\
0
1
1
5
_
T
E
N
T
6
3
-
P
h
a
s
i
n
g
E
x
h
i
b
i
t
.
d
w
g
,
1
0
/
2
9
/
2
0
1
3
5
:
1
0
:
4
1
P
M