HomeMy Public PortalAboutPresentation AB 1600 TIFWG Meeting #1 AB 1600 Traffic Impact Fee
WorkingGroup
Meeting # 1
•rte-��-+� `' � ���-►.�
• Introductions
• Purpose of Working Group
• Traffic Impact Fee Program Overview
— History
— Current Program
— Program Update
• Review of Traffic Count Data
• Schedule Next Meeting
Proposed TIFWG Members
• Patrick Flora, Truckee Town Council
• Bruce Cornell, Planning Commission
• Pat Davison, Contractors Association of Truckee Tahoe
• Ted Owens, Tahoe Forest Health System
• Annie Rosenfeld, Tahoe Donner Association
• Jennifer Jennings, Truckee Trails Foundation
• Alexis 011ar, Mountain Area Preservation
• Todd Rivera, Tahoe Truckee Unified School District
• John R. Falk, Tahoe Sierra Board of Realtors
• Dale Creighton, SCO
• Alex Heyman, Member at Large
Traffic Impact Fee Program
• Provides equitable basis to mitigate
development's traffic impacts .
— New development mitigates traffic impact
through the payment of fees .
— Fees are proportionate to traffic impact of
project.
Traffic Impact Fee Program
• Study Components
— Evaluates future traffic conditions.
— Identifies necessary capacity improvement projects.
— Provides method for developing equitable fee.
• Truckee General Plan calls for updates every 5
years.
• Last update in 2007.
Program History
• March , 1993 — Town incorporates and adopts
Nevada County Impact Fee Program .
• June, 1999 — Town of Truckee adopts Traffic
Mitigation Fee Program based upon 1996 Town
General Plan .
• March , 2007 — Town adopts updated Traffic
Impact Fee Program based upon 2006 Town
general plan .
• June, 2007 — Town and Placer County execute
Cross-Jurisdictional Traffic Impact Fees
Agreement
Figure 1
1993-1998 TRUCKEE TRAFFIC IMPACT FEE PROJECT LOCATIONS
Total AB 1600 Cost Allocation = $3,813,000 '
Price per DUE _ $1,703
i
,_,._r,_.._.._.., :
•' e.R�� r i
------------------
i
0
, r
Donner Lake
!_.._.•_ •W___w_.. _ti . r_.•r.._.r_.._.r_r.w.._.._rsr�r.wr_r_-_ ��� .. - •�•
Legend ,s
Traffic Signal
Guardrail Installation N
Roadway Widening wE
--- New Roadways
0 3,250 6,500 13,000
�..I-r-..i n..,Urn;ni nui u!inrrri rtk Nr L'"_ I }11 InFeel
Figure 2
s 1999-2006 TRUCKEE TRAFFIC IMPACT FEE PROJECT LOCATIONS
Total AB 1600 Cost Allocation = $19,021,250
Price per DUE _ $1,887 - $2,381
_.._.L...\ I
l
-_.._.._.._.._-----
i l
i J i
i
...; ....., -
dL
pornnerLake v v7 <
.Or
Legend
Traffic Signal Installation/Improvement
Intersection Improvements N
- - - - New Roadways W E
- Roadway Widening
0 3,250 6,500 13,000 S'
1'.`.h'neincerine Uc;�,nim:n ,`i��bnLnx.nnp'Pi Iii.'. ',SAH 16X)Summary Feet
Figure 3
" �..y 2007-CURRENT TRUCKEE TRAFFIC IMPACT FEE PROJECT LOCATIONS
Total AB 1600 Cost Allocation = $73,339,830 •� i
3 i
Price per DUE _ $5,169 - $5,659
j
� I
1
; _.._.._.._.._.._i
r
s.
d � '
" Donner Lake
Legend
Roundabouts
Intersection Improvements
- New Roadways N
-` Roadway Widening
New Pedestrian Corridor W E
0 3,250 6,500 13.000
S1EngineeringDepartment10740En9inccrinu14 j u:'_n1I An h,OFeet
�a, Figure 4
M: ,.0 TRUCKEE TRAFIC IMPACT FEE PROGRAM PROJECT LOCATIONS, 1993-2013
Total AB 1600 Project Expenditures = $12,464,492 ;% L
Total Project Expenditures = $49,000,000s'Alder Geek Rd f
I
/
R
Mier Rd 5e
Fo
Vno k MtR er
��4 so oe° ear� ror
oMn�ep a g
dU rl
atin�ne OW te'�
u
w n
kl•✓ >° ?alhwa A„ eemerd Dr
aWC cDr Ma- 3 ^okstcae jl
sa�om NaY �m � la"b u
yS° rorR � vckU.oMp° G9 Gr .ksM1�,¢ ,
h� o a Cho
G
mUChelor Bi �45�4 h n _ rLn 'h/eG
M^u Ip W�
vaulne a nosy^oe Wa 9 ' Al.er in Rd 0 "'Ro
la 6 to Q Kani�
ria y mea hec T
a �s/ma<I Dr xa nnns � ove
dai:k o° p�h °rvoc Or A ROr h �� I s
I mRll aa, N 8
Melon YVe Co enhfl Bw�r WlssM1om v ese Le �� � Caleb �evo> F,spo
haMn bone N/e 4`
a9
Pd neuTd dA�e
Y MMValle
a /
L o
' E
80 Vies gal 9 Jce.e-0e ��
a'Trl
I`\ 6r100t V9et 5
soh ane �.i� ezRa
Donner Lake
.�d
a
' C
poi SOut^sore 2i
i'
Legend
- Roadway Widening
F �M1petM1em�ca
- New Roadway 26,
Intersection Improvements " Fy,e N
• Roundabout Construction W E
Feet
0 2,250 4,500 9,000 13,500 18,000 _� S
Figure 5:
AB 1600 Traffic Impact Fee Historical
Revenue Summary
Fees Collected Interest Earnec
2,500,000
N
2,000,000
n
0
o
--� N
� N �
m
0
00 p N
1,500,000
� a
Ln
rN
rN rn ui
Ln o r
1,000,000 �- 6 ° rc O
r
� N n N ^ � �
kD
00 ^ Lfl �} t/} c-i c l0
N N lfl N V} -i m
1 m Ln
—4m
m uj -C�
500,000 LCI
LnN
r, CO W
m I m o^ O
m ^ Lri (n 00 N O O O 0 CO 00 N n
n 00 0 M N m
N Lf1� N � n Lfl Ln Ln � kD L6 Lfl
Lfl � N lD 0
m
0
1���\�3 �� �O
1°���\ L°� \�y��Ay\�H 1���\�1 1��^\��1���\������`�O�O�\�'y�OOy\�'L��ry\p"� 3`� P\�h�OO�\�0� \�'1���`0�� \�1�O�\,O'e,O\,y1�O�y\,y'L
Figure 7:
$9,000,000 AB 1600 Traffic Impact Fee Historical Revenue,
Expenditure, and Fund Balance Summary
$8,000,000
Revenue Expenditures —*--Balance
$7,000,000
$6,000,000
$5,000,000
$4,000,000
Ln
N
$3,000,000 Ln
00 10 m
Q 00 ,n It
06 c-I 'n
0)
00
$2,000,000 .. ... ......._ _. _� O U) � I
LM LMr 1 00
10
00 00 �.. �..... V�j epl l.-IO 00 '�' c-V 07 00
$1,000,000 o
00 r,o 0 0) <n +h C 0 m m ui
00 f
$0 ii.
ti�C�" 1C��\��o ti"O)Co� -'c5o � "'C05 "� NO' ti��`oy �oo��oti ��o�\fl� �oo�\a� �Qo�\o� �ooh\o� �oQ��o� ����\�� 'od�o� ')oe o 11 X111` .
Table 3:
Projects Funded Using AB1600 Traffic Impact Fees
1993-2013
Project Name Expenditure
West River Street $61 ,186.00
Glenshire Bridge $1 ,098,394.04
Western Undercrossin $1 ,715,912.00
SR267/Palisades Signal $116,315.00
SR267 Bypass Rams $1 ,426,604.06
SR267/Glenshire Drive $49,770.00
SR267/UPRR Intersection $2,109.44
DPR Bike Ln Erosion Control 60-03-18 $864,334.00
1-80/SR89 Roundabout $3,188,126.00
Pioneer Trail / Bridge St. T.D. Connector $67,568.00
Pioneer Trail/DPR Roundabout 60-08-10 $1 ,989,242.00
Glen Dr. Widen/Guardrails $40,812.00
Martis Vly/Brockway Int. Roundabout $1 ,438,352.00
Downtown Circulation Analy. $30,000.00
SR 89S/UPRR Undercrossin 60-03-38 $126,052.00
Tahoe Donner Connector $165,490.48
SR89 Corridor Study $0.00
AB1600 Analysis and Administration $114,225.00
Total Ex enditures $1214941492.02
TIF Projects
Description of
Street / Intersection Improvement Total Cost (1 )
Donner Pass Road / Cold Stream Road / 1-80 Construct 2-Lane $3,157,281
EB Ramps Roundabout
Donner Pass Road / 1-80 WB Ramps (West Construct Roundabout or $3,157,281
Interchange) Equivalent Improvements
Donner Pass Road / SR 89 South Construct 2-Lane $4,735,922
Roundabout
West River Street / McIver Crossing Construct 1 -Lane $3,157,282
Roundabout
Construct 1 -Lane
Donner Pass Road / Bridge Street Roundabout or Equivalent $3,157,281
Improvements
Construct 1 -Lane
Bridge Street / West River Street Roundabout or Equivalent $37157,282
Improvements
TIF Projects
Description of
Street / Intersection Improvement Total Cost (1 )
Donner Pass Road / 1-80 EB Off Ramp Construct 1 -Lane $3,157,282
(Eastern Interchange) Roundabout
Donner Pass Road / Pioneer Trail (2) Construct 1 -Lane $2,278,466
Roundabout
SR 267 / 1-80 WB Ramps Construct 2-Lane $3,946,602
Roundabout
SR 267 / 1-80 EB Ramps Construct 2-Lane $3,473,010
Roundabout
Construct Roundabout
SR 267 / Brockway Road or Equivalent $4,735,922
Improvements
Extend DPR from Bridge
Donner Pass Road / Glenshire Drive Street to Glenshire Dr. $4,735,922
East of DPR
TIF Projects
Description of
Street / Intersection Segment Improvement Total Cost 1
Glenshire Dr. / Dorchester Road (West) Intersection $473,592
Improvements
Glenshire Dr./ Olympic Boulevard Intersection $473,592
Improvements
SR 89 North / Rainbow Road Intersection $473,592
Improvements
SR 89 North /Alder Creek Road Intersection $789,320
Improvements
Brockway Road / Reynolds Way Intersection $473,592
Improvements
TIF Projects
Street/Intersection Description of Improvement Total Cost
SR 89 / UPRR Undercrossing Provide 2 additional travel $12,633,601
(Mousehole) lanes, bike lanes, sidewalks
2 Travel Lanes from Pioneer
Pioneer Trail & Bridge Street Extensions Commerce Center to $23,679,612
Northwoods Blvd. and from
Jibboom St. to Pioneer Trail
Provide Improvements to
Downtown Rail Crossing Improvements Bridge Street Crossing or $6,000,000
(3) Eastern Underpass between
Rail Yard and East River St.
SR 267 Brockway to Placer Widen to 4 Lanes $3,946,602
County Line
Glenshire Drive Donner Pass Road to Add Shoulders $6,470,000
Sommerset Dr.
est River Street All Add Shoulders $3,157,282
Donner Pass Road Along Donner Lake Add Shoulders $4,673,337
OTAL $ 106,093,657
Total Project Cost $ 106,093,657
Cost of Improvements that $79,284,044
are Responsibility of AB
1600
Funds Not Yet Collected $77,235, 139
(adjusted for fees collected
and other funding sources)
Growth in Dwelling Unit 137384
Equivalents
Fee per DUE $5,771 �
Program Update = LSC
• Model Update
— Land Uses
• Project List
— General Plan Policies
General Plan
• Charge a traffic impact fee that is set in direct proportion to
the level of impact identified in a traffic impact analysis, so
as to ensure that the actual cost of improvements
demanded individually or cumulatively by a project can be
met. Such fees shall be applied to improvements needed
to increase the capacity of the roadway network including :
— Improvements listed in Table CIR-5.
— State Transportation Improvement Projects (STIP) projects
identified in Caltrans' Regional Transportation Plan.
— Improvements such as widening of travel lanes to meet Town
engineering standards, and to add Class II and III bike facilities.
— Other improvements identified by the Town needed to increase the
capacity of the roadway system, including those determined to be
needed through development of the Downtown Traffic Study, and to
reduce delays and improve safety at railroad crossings.
General Plan
• Establish and maintain a Level of Service D or better on
road segments and for total intersection movements in
portions of the Town outside of the Downtown Specific
Plan Area.
• Establish and maintain a Level of Service E or better on
arterial and collector road segments and for total
intersection movements within the Downtown Specific
Plan Area.
• Throughout the Town, individual turning movements at
unsignalized intersections shall not be allowed to reach
LOS F and to exceed a cumulative vehicle delay of four
vehicle hours. Both of these conditions shall be met for
traffic operations to be considered unacceptable.
General Plan Policies ( Road Cross Section
• P6. 3 Maintain Donner Pass Road at a three-lane cross-
section (two lanes of traffic with a left-turn lane). New
projects that could add significant traffic to Donner Pass
Road must demonstrate that cumulative traffic impacts
will not result in the need to widen Donner Pass Road.
• P6. 4 Maintain Highway 267 between Interstate 80 and
the Brockway Road/Soaring Way intersection at two
lanes.
• P6. 5 Maintain roadways in Truckee at a maximum of two
travel lanes. Exceptions to this policy include Interstate
80, Highway 89 South, Highway 267 from Truckee
Airport Road/Shaffer Mill Road to Brockway
Road/Soaring Way, and Coldstream Road.
General Plan Policy P7 . 2 ( Roundabouts)
• P7. 2 Install roundabouts instead of new
traffic signals or capacity enhancing
improvements to existing signalized
intersections, when roundabouts will
achieve the same or better Level of
Service as a traffic signal, where it is
physically feasible to do so, and when
installation of the roundabout will not be
substantially costlier than a signal.
Program Update = LSC
• Project Costs
• Other Funds Available
• Fee Methodology
Tentative Schedule
October 2014 — Updated Traffic Counts
— TIFWG Meeting #1
December 2014 Develop and Calibrate New
Model
January 2014 Pioneer Trail Extension Analysis
— TIFWG Meeting #2
March 2015 Update Project List
— TIFWG Meeting #3
• Update DUE
April 2015 Draft Report
— TIFWG Meeting #4
May 2015 Final Report
m.,
v
a e
Traffic Count Data LSC
r
yr -j x
A,, r
!'�• y��= .sem .�Z„� y P ., �?�:n.�� e a._ .r..
Set Next Meetings
• January 2015
• March 2015
• April 2015