Town of Truckee
Priority "A+" for FY 2000/01
PriorityStatusFuture Action/Timeline
Housing Needs Analysis, Affordable Grants received for needs and analysis. Study underway; completion
(Lashbrook)
Housing Styles; General Plan Update expected Nov/Dec 2001
Historic Resources Work program being prepared; RFP for Consultant contract - Sept 01,
Inventory/Preservation Standards & consultant selection underway. Awaiting one-year project.
. available staff time to proceed.
Policies/Design Guidelines
Mandatory Housing Element Update May require GP update process to begin July
December 2003 2002
(Lashbrook).
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 1
Town of Truckee
Priority "A" for FY 2000/01
PriorityStatusFuture Action/Timeline
Future Town Hall / Site RFP distributed. Proposals due 10-26-Council award November 2001.
Acquisition/Preliminary 01.
Layout/Design (Wright)
Economic Development Study completedStudy Session Summer 2001. Riverfront
(Tony).
Strategy, Including Initial RDA Revitalization Plan budgeted. Chamber enhanced
and Affordable Housing funding approved. New industrial space under
Projects, Industrial Site / construction. Additional discussion during October
Improvement Opportunities 2001 Growth Workshop.
Trout Creek Restoration In process of obtaining right-of-entry Hire engineering team for project design - Spring
with Railroad/developing MOU with 2001.
Lahonton/negotiating 319(H) grant
contract with Lahonton.
(Wilkins)
*Bikeway(s)/Trails Plan development FY 1998 thru 2000. 100% owner/resident mailer on EIR
Development Plan Prepared draft EIR and design released for public review.
(Lashbrook)
guidelines underway.
*Improvement Standards Drafts being circulated for staff review. Council action anticipated trailing the Development
(Wilkins)Code – March 2002.
Gann Limit Analysis of settlement effects and new Analyze results of recalculation following
census being evaluated. settlement to determine if it’s still a priority.
(Olsen)
Snow Dump Engineering in 2000/01 FY budget; now Anticipated grading in 2002 with bypass
50% complete completion. Paving in 2003.
(Wilkins)
rd
*Tahoe Donner 3 Access Preliminary design and engineering Report to Council – December 2001.
Align/Preliminary underway. (Wilkins)
Design
Police Department Facilities – Bid awarded, demolition underway. Bids for electrical/mechanical 10/01; completion
Design/Remodel 1/02.
(Boon/Terrazas)
PUD Telecommunications Discussions/negotiations anticipated. Spring 2001. When triggered.
Franchise
(Wright)
AB1600 Facilities Fee. Recommendation to Council. Late Fall 2001
(Olsen/Wright)
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 2
PriorityStatusFuture Action/Timeline
Hwy 267 Ramp Issues Cooperative & funding agreements in Construction -Summer 2002
place; right of way acquired.
(Wright/Wilkins)
Glenshire Guardrails/Widening Project complete.
(Wilkins
)
Peoria Sunnyside Litigation Settlement initiated. Revised application Development Agreement and hotel use permit
approved. ( pending.
Crabb/Wright/Lashbrook)
Truckee Lodging Center
SR 89 Corridor Study and PSR received from Caltrans September Need to discuss future actions with Caltrans &
"Mouse Hole" 2001. (Wilkins)NCTC.
Non-Certified wood stoves Draft ordinance for "point of sale" Approved by Council; effective date January 1,
removal ordinance. submitted to the committee. 2002.
Air Quality Financial Consolidate Program with Placer Staff has agreed on a concept program developed
Assistance Program County. by mid-2001.
TOT Use Consideration & Staff to return to Council with options. Council direction.
Visitor Center Agreement Does Council still want options? 3-yr
contracts renewed w/Chamber,
documents being finalized.
(Wright/Olsen/Terrazas)
Grossman Building Issues Demolition review completed. New project under construction.
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 3
PriorityStatusFuture Action/Timeline
Glenshire Bridge Claim. Town hired specialty counsel and expert Spring 2002.
witness for claim defense assistance.
(Wilkins)
Legislative policy oriented Applications submitted, early public Each of these will come before the Council at the
development applications. process underway. conclusion of early public process.
Hippy Hill (McIver), PC-3,
Meeting scheduled October/November 2001.
Hilltop Master Plan, Deerfield
General Plan Amendment.
Truckee River Legacy Trail Phase I complete. TDR&PD assuming Ribbon cutting 9-29-01.
acceptance. liability
.
SR 267 Design Configuration Grant request denied for design of “Old Investigate alternative funding sources.
& Gateway entrance signSR 267” corridor.
(Wilkins)
Housing Element Programs - Inventory to be complete by - January 1,
Annual review of development 2000.
and inventory of residential
sites; inventory of substandard
housing and housing at risk of
conversion with report on
removing unsafe, substandard
housing; report on housing
needs and program for
seasonal workers.
Street sanding guidelines for Work program being prepared. Pending available staff.
air quality purposes per
General Plan.
Donner Lake Water On-going inspection of construction Continued inspection & construction coordination
Distribution System project under way.(Wilkins) through Fall 2002.
Replacement Project.
Nevada County/Placer County Concept discussed with Placer County Development of methodology and work plan with
relationship re: Traffic Impact staff. Placer County. Pending staff availability.
Fee sharing.
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 4
PriorityStatusFuture Action/Timeline
10-yr Town-wide fleet Need identified. Public Works to draft 10-yr fleet plan with input
replacement plan from all Town departments during Winter 2001-
02.
West Reed Avenue District Consultant selection under way. Create assessment district during
Formation Winter/Spring/Summer 2002.
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 5
Town of Truckee
May Become "A" Priorities
Depending on Circumstances
PriorityStatusFuture Action/Timeline
Lighting guidelines and Work program being prepared. Pending available staff.
specifications per General
Plan.
Waste Franchise Agreement. Current agreement expires Summer Renegotiation of franchise with hauler, and separation
2002.of franchise agreement from Nevada County.
(Terrazas)
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 6
Town of Truckee
On-Going Priorities for FY 2000/01
PriorityStatusFuture Action/Timeline
Nevada/Placer Counties On-Going Housing meeting held May Commitment to future discussion - no
Relationships Monitor 2000 timeline.
(All)
Development/Special Projects
Nevada/Placer Counties Placer County update underway.Action Monitoring of Martis Valley Plan on going -
Relationships * Martis Valley taken to rescind adopted Airport Master coordination with Airport District. District
Plan re: Air/Traffic IssuesPlan. may initiate CLUP revision.
(Lashbrook/Wilkins)
Redevelopment Litigation Settlement negotiations underwayCompleted/resolved.
.
(Nevada County)
(Wright/Lashbrook)
Property Tax Litigation (Nevada Settlement obtained.
(Wright)
County)
Speeding Solutions Grant for additional officer received. Pending PD analysis.
Speed trailer acquired.
(Wright/Boon)
*Relocate “Bug Station” Working with State Dept. of Agriculture
- State funding approved for design/land
acquisition. Meetings underway for
design. Environmental document
reviewed.
(Lashbrook/Wright)
Sharing Information & Promoting On-going.
(All)
Town Projects (Marketing)
Dedicated River Trail Phase I River Trail complete. Request Determine trail alignment, begin
Development Plan for TEA 21 funding approved. environmental work pending staff availability.
($300,000). Planning for subsequent Progress reports to Council.
phases. Consultant hired.
(Wright/Lashbrook/Wilkins)
Grant Applications
Corporation Yard Needs assessment consultant report Pending Caltrans action. (Not expected for 4
Site Acquisition/Preliminary complete. Caltrans option now being to 5 years). Proposed upgrades to existing site
Layout/Design considered. May 2002.
(Wright/Wilkins/Terrazas)
Southwest Gas Construction On-going. Continue monitoring construction activity.
(Wilkins)
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 7
PriorityStatusFuture Action/Timeline
st
Pavement Management Program 1 three years of Five Year Plan Update 5-year plan Winter 2001/02.
implementation. implemented. (Wilkins)
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 8
Town of Truckee
B” Priorities for FY 2000/01
“
(Not a Top Priority for FY 2000/01)
PriorityStatusFuture Action/Timeline
Written Pre-Employment Exams Review in process. Exams available Spring 2001.
(Olsen)
Undergrounding Utilities Mello Roos District may trigger this need.
(Wilkins)
Satellite Maintenance Yards (Wilkins) Brought back with 5-year CIP
budget.
Strategy for Addressing Issues Faced by Preliminary contact underway – focus is on $2,500 added to the FY
the Hispanic Community. communication with local government. 2000/01 budget for
(Schneider/McCormack)translating/printing newsletter.
Mello-Roos/PBID Downtown Staff working with consultant and Downtown Updated design presented to
Preparation of Information for committee. Mello Roos being pursued for $10 property owners - Fall 2000.
Downtown Merchants million in projects. Additional design work being Further work subject to
completed. indication of 2/3 support.
(Lashbrook/Wilkins)
* Implementation of Open Space In conjunction with habitat management plan and No work yet. Completion 1-2
Policies Open Space Acquisition Report trails plan. Will follow completion of Development years off.
Enhancing Access to Historic/Rec Sites Code.
(Lashbrook)
* Habitat Management/Protection
Plan delayed FY 98/99 - will follow completion of
Development Code. Biological data collection.
(Lashbrook)
*Sphere of Influence/General Plan General Plan amendment approved. Mitigated Staff preparing additional
Amendment (pending action by Negative Declaration approved by Council and information requested from
LAFCO) accepted by LAFCO. LAFCO. On hold awaiting staff
(Lashbrook)
resources.
*Wood stove “7 year” phase out Needs to be prepared and presented to Council. Awaiting staff resources.
ordinance
SR 267/Downtown Pedestrian Crossing Pursue funding/assistance from Caltrans and UPRR. Still have drainage issue with
Design work contract underway. (Caltrans. Pedestrian sidewalk in
Wilkins)
future CIP. Needs Council
Discussions.
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 9
Priority Status Future Action/Timeline
Animal Control Fines Draft Policy for administrative process - higher fee Policy to Council - Fall 2001
consideration.
(Lashbrook/Olsen)
Lighting Guidelines & Specs per
General Plan
Patch Paving Contract Bid documents prepared. Discussions with Special Advertise – February 2001.
Districts ongoing.
(Wilkins)
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 10
Town of Truckee
"C" Priorities
(Deferred for Future Years)
PriorityStatusFuture Action/Timeline
Water Franchises PUD may absorb both systems, eliminating Discuss with Council.
issue.
(Wright)
Business License Proposition 218 vote required. No action anticipated.
Tax Sharing Agreement Pending sphere adoption.
Town Doing Business with Businesses Tow company issue needs discussion. Monitor Revisit current status of tow
in Violation of Codes with industrial opportunities. contracts.
(Wright/Lashbrook)
*Truck Route Ordinance Will require an ordinance and signing. May not be
necessary.
(Wilkins)
Potential Development of McIver
Dairy.
Donner Lake MTBE Policies Policies and permit format adopted. Grant funded Lake testing complete, report
study underway. pending.
(Wright)
Cable Licensing Ordinance
Sierra Pacific Franchise Direction to table this issue.
Bolded Items have been completed.
*
Related to General Plan Implementation
Italicized items are new since April 2001
September, 2001Page 11