RESOLUTION 2016 -60
A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF TRUCKEE
WHEREAS, California government code section 66001, article 4 requires specific
findings be made in order to retain development impact fees which have been on deposit in a
municipality in excess of five years; and
WHEREAS, at the conclusion of the 2015/2016 fiscal year the AB 1600 (traffic impact)
fee program account contained $3,697,676 in funds respectively which had been deposited in
excess of five years prior to the end of the fiscal year; and
WHEREAS, the source of the $3,697,676 deposited but unspent in the AB 1600
(traffic impact) fee program fund in excess of five years prior to the end of the 2015/2016 fiscal
year was the unexpended portion of the $16,449,512 in revenues which were deposited into the
fund prior to fiscal year 2011/2012.
NOW THEREFORE BE IT RESOLVED that the council hereby make the following
findings;
1. Funds which were deposited in the Town of Truckee AB 1600 (traffic impact) fee program
fund in excess of five years prior to the end of the 2015/2016 fiscal year are intended for
expenditure on elements of current projects such as the West River Street Bike Lane and on
elements of future projects such as the Pioneer Trail extension/Bridge Street extension
project, which is included in the capital improvement project list approved at the February 9,
2016 Town Council meeting in the Truckee Area AB 1600 Traffic Impact Fee Study (LSC,
February 1, 2016).
2. A reasonable relationship between the fee and the purpose for which it is charged is shown
in the Truckee Area AB 1600 Traffic Impact Fee Study (LSC, February 1, 2016) approved by
the Town Council through Ordinance No. 2016-03 on February 23, 2016. Town Council
adopted Resolution 2016-07 on April 12, 2016 revising implementation procedures for the
- collection of traffic impact fees under Ordinance No. 2016-03.
3. The sources and amounts of funding anticipated to complete financing of any incomplete
improvements, the approximate dates when funding is expected to be deposited, and the
approximate dates of completion of those projects are shown on Exhibit A, incorporated by
reference herein.
4. The funds which are on deposit in the AB 1600 (traffic impact) fee program fund, which were
collected in excess of 5 years prior to the end of the 2015/2016 fiscal year, or are on deposit
in excess of the prescribed five year limit established by government code section 66001,
article 4 for the following reasons:
a. Implementation of certain projects in the current and previous AB 1600 (traffic impact)
fee program capital improvement project list is dictated by schedules of other agencies
which preclude expenditure of these funds within the prescribed five year time frame.
b. Interest which is earned on AB 1600 (traffic impact) fee program fund balances will be
I
used to offset increases in construction cost inflation.
c. Certain projects within the AB 1600 (traffic impact) fee program will require funds in
excess of those which could be collected within a five year time frame.
d. Certain projects within the current and previous AB 1600 (traffic impact) fee program
capital improvement project lists require in excess of five years of project development
time due to the complexity of engineering, permitting, and environmental requirements
necessary for project implementation.
•
5. Given the information in the Findings, no funds deposited in the AB 1600 (traffic impact) fee
program funds in excess of five years prior to the end of the 2015/2016 fiscal year shall be
due or refundable to the sources from which they were collected.
The foregoing Resolution was introduced by Vice Mayor Wallace Dee, seconded
by Council Member Tirman, at a Regular Meeting of the Truckee Town Council, held on
the 13th day of December, 2016 and adopted by the following vote:
AYES: Vice Mayor Wallace Dee, Council Member Tirman, Council Member
Flora, Council Member Abrams, and Mayor Goodwin.
NOES: none.
i
ABSENT: none.
// _. '
Morgan Goodwin, Mayor
ATTEST:
4.
Judy P ice, M t", Town Clerk
111
I
EXHIBIT A
Status-Estimated
Estimated Total Traffic Impact Fee Construction
Street/Intersection Segment Description of Improvement Cost($) Funding Commencement
Truckee Intersections
Donner Pass Road/Cold Stream Road/1-80 ES Ramps Construct 1-Lane Roundabout $3,619,350 $2,569,700 Sole
Donner Pass Road/1-80 WE Ramps(West Interchange) Construct 1-Lane Roundabout $3,519,350 $2,859,300 2010
West River Street/McIver Crossing Construct 1-Lane Roundabout $2,585,250 $2,481,800 .2020
Donner Pass Road/Bridge Street
Construct 1-Lane Roundabout or Equivalent $2,585,250 $2,145,800 >2020
Improvements
Bridge Street/West River Street Construct 1-Lane Roundabout or Equivalent $2,585,250 $2,145,800 >2020
Impmvements
Donner Pass Road/1-80 EB Off Ramp(East Interchange) Connect 1-Lane Roundabout $3,619,350 $3,583,200 .2020
Donner Pass Road/Pioneer Trail Convert to 2-Lane Roundabout $775,575 $767,800 >2020
SR 267/1-80 WE Ramps Conshect 2-Lane Roundabout $4,136,400 $3,846,900 >2020
SR 267/180 EB Ramps Construct 2-Lane Roundabout $4,136,400 $3,681,400 >2020
SR 267/Brockway Road Construct 3-Lane Roundabout $4,136,400 $3,764,100 >2020
Glenshire Drive/Dorchester Road(Wen) Eastbound Left Tum Lane $517,050 $268,900 2017
SR 89 North/Rainbow Road Southbound Left Tum Lane $517,060 $470,500 >2020
1 Brookwsy Road/Reynolds Way Eastbound Leff Tum Lane $517.050 $501,500 2517
Donner Pass Road/Scuta Shore Drive Westbound Loft Tum Lens $517,050 $434,300 >2020
Truckee Roadways
2 Travel Lanes from Pioneer Commerce Center to
Pioneer Trail 8 Bridge Street Extensions Nortawoods Blvd.and from Jibboom SL to Pioneer Trail $20,682,000 $20,682,000 .2020
(I)
Church StreetExtend from DPR to Glenshire Drive to Address
Extension Donner Pass Road to Glenshire Drive GlenshirelDPR Deficiency Extend $5,687,600 .2020
SR 267 Brockway to Placer County Line Widen to 4 Lanes $4,239,810 $3,391,800 >2020
Glenshire Drive Berkshire Circle to Wiltshire Lane Add Shoulders $2,740,365 $1,085,200 2017
Donner Pass Road South Shore Drive to Town Limits Add Shoulders $1,344,330 $435,600 >2020
West River Street Alt Add Shoulders $2,350,000 $902,400 2018
Nevada County Roadway
Glenshire Drive/
Hirshchdale Rd. Truckee Tom Limits to 1-80 WE Ramps Add Shoulders $3,102,300 $2,574,900 >2020
Improvements
SUBTOTAL:Truckee and Eastern Nevada County(Current Fee Program) $74,013,130 $64,200,500
Estimated Expenditures on Mousehole Project Subsequent to June 30,2015 $800,069
Truckee Area Fair Share Contributions to Eastern Placer Improvements $9,59.5,291
Total:Truckee+Eastern Placer Projects $74,675,791
Credit for Placer County Traffic Impacts Already Included in Truckee TE Program 48,004,391
Cumulative AB 1600 Funds In Account as of July 1,2016 46,803,491
Additional Funds Not Yet Collected $61,887,909