Loading...
HomeMy Public PortalAboutDoc_tee grant exhibitItem No. Description Estimated Quantity Unit Price Total Price 1. Grading, complete, including all excavation/filling, finish grading of sidewalk area and shoulder, testing, bonds, etc. JOB LUMP SUM 10,000 2. 4" Concrete Sidewalk (4' wide) 160 SY 30.00 4,800 3. 4" Concrete Sidewalk (8' wide) 600 SY 30.00 18,000 4. Traffic Control JOB LUMP SUM 4,000 5. Erosion Control and Grassing JOB LUMP SUM 4,500 Subtotal $41,300 Engineering and Contingencies 10,000 Total $51,300 MULTI-USE SIDEWALK BYARS AVENUE TO NEW PATH TYBEE ISLAND, GEORGIA CONCEPTUAL COST ESTIMATE Hussey, Gay, Bell De Young, Inc. Consulting Engineers November 4, 2010 1 Item No. Description Estimated Quantity Unit Price Total Price 1. Grading, complete, including all excavation and filling, finish grading of path area and shoulders, all clearing and removals, testing, bonds, etc. JOB LUMP SUM 50,000 2. 6" Graded Aggregate Base Course 4,700 SY 16.00 75,200 3. 1 -1/2" Asphaltic Concrete Surface Course, including prime coat 4,700 SY 13.00 61,100 4. Traffic Control JOB LUMP SUM 7,500 5. Erosion Control and Grassing JOB LUMP SUM 22,000 Subtotal $215,800 Engineering and Contingencies 53,950 Total $269,750 TYBEE GREENWAY/BIKEWAY TRAIL U.S. HIGHWAY 80 CORRIDOR TYBEE ISLAND, GEORGIA CONCEPTUAL COST ESTIMATE Hussey, Gay, Bell DeYoung, Consulting Engineers November 4, 2010 1