HomeMy Public PortalAboutFinal Mitigated Negative Declaration Church Street Extension/Trout Creek Restoration Project
CHURCH STREET EXTENSION/TROUT CREEK
RESTORATION PROJECT
Initial Study/Mitigated Negative Declaration
Prepared for June 2019
Town of Truckee
CHURCH STREET EXTENSION/TROUT CREEK
RESTORATION PROJECT
Initial Study/Mitigated Negative Declaration
Prepared for June 2019
Town of Truckee
2600 Capitol Avenue
Suite 200
Sacramento, CA 95816
916.564.4500
www.esassoc.com
Bend
Camarillo
Delray Beach
Destin
Irvine
Los Angeles
Oakland
Orlando
Pasadena
Petaluma
Portland
Sacramento
San Diego
San Francisco
Santa Monica
Sarasota
Seattle
Tampa
180971
OUR COMMITMENT TO SUSTAINABILITY | ESA helps a variety of
public and private sector clients plan and prepare for climate change and
emerging regulations that limit GHG emissions. ESA is a registered
assessor with the California Climate Action Registry, a Climate Leader,
and founding reporter for the Climate Registry. ESA is also a corporate
member of the U.S. Green Building Council and the Business Council on
Climate Change (BC3). Internally, ESA has adopted a Sustainability Vision
and Policy Statement and a plan to reduce waste and energy within our
operations. This document was produced using recycled paper.
Church Street Extension/Trout Creek Restoration Project i ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE OF CONTENTS
Church Street Extension/Trout Creek
Restoration Project Initial Study/Mitigated
Negative Declaration
Page
Chapter 1, Project Description .......................................................................................... 1-1
1.1 Introduction ........................................................................................................ 1-1
1.2 Project Location ................................................................................................. 1-1
1.3 Purpose and Objectives of the Proposed Project .............................................. 1-4
Church Street Extension .................................................................................... 1-4
Trout Creek Restoration .................................................................................... 1-4
1.4 Background ....................................................................................................... 1-5
Church Street Extension .................................................................................... 1-5
Trout Creek Restoration .................................................................................... 1-5
1.5 Proposed Project ............................................................................................... 1-6
Proposed Church Street Extension Component ................................................ 1-6
Proposed Trout Creek Restoration Component ................................................. 1-9
Construction Methods ...................................................................................... 1-11
Schedule and Equipment ................................................................................ 1-12
Traffic Control .................................................................................................. 1-13
1.6 Project Approvals and Permits ........................................................................ 1-13
Chapter 2, Initial Study ...................................................................................................... 2-1
2.1 Environmental Factors Potentially Affected ....................................................... 2-2
2.2 Environmental Checklist .................................................................................... 2-3
Aesthetics .......................................................................................................... 2-3
Agricultural and Forest Resources .................................................................... 2-5
Air Quality .......................................................................................................... 2-7
Biological Resources ....................................................................................... 2-11
Cultural Resources .......................................................................................... 2-36
Energy ............................................................................................................. 2-41
Geology, Soils, and Seismicity ........................................................................ 2-44
Greenhouse Gas Emissions ............................................................................ 2-48
Hazards and Hazardous Materials .................................................................. 2-51
Hydrology and Water Quality ........................................................................... 2-55
Land Use and Planning ................................................................................... 2-63
Mineral Resources ........................................................................................... 2-65
Noise ............................................................................................................... 2-66
Population and Housing .................................................................................. 2-72
Public Services ................................................................................................ 2-73
Recreation ....................................................................................................... 2-75
Transportation ................................................................................................. 2-76
Table of Contents
Page
Church Street Extension/Trout Creek Restoration Project ii ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Chapter 2, Initial Study (continued)
2.2 Environmental Checklist (continued)
Tribal Cultural Resources ................................................................................ 2-82
Utilities and Service Systems .......................................................................... 2-84
Wildfire............................................................................................................. 2-86
Mandatory Findings of Significance ................................................................. 2-87
Appendices
A. Design Plans
B. Air Quality
List of Figures
Figure 1 Project Location .............................................................................................. 1-2
Figure 2 Project Site ..................................................................................................... 1-3
Figure 3a Project Components (Phase 1) ....................................................................... 1-7
Figure 3b Project Components (Phase 2) ....................................................................... 1-8
Figure BIO-1 Wildlife Habitats ............................................................................................ 2-14
List of Tables
Table 1 Permits and Approvals Needed .................................................................... 1-13
Table AQ-1 NSAQMD Criteria Pollutant Attainment Status ............................................... 2-8
Table AQ-2 Proposed Project Construction Emissions in Pounds Per Day ....................... 2-9
Table AQ-3 Proposed Project Operational Emissions in Pounds Per Day ......................... 2-9
Table BIO-1 Habitat Types within the Project Site ............................................................ 2-13
Table BIO-2 Special-Status Species with the Potential to Occur in the Project Site ......... 2-22
Table NOI-1 Traffic Noise Levels Along Streets Under Existing and Existing Plus
Project Conditions ..................................................................................... 2-68
Table NOI-2 Typical Construction Equipment Noise Levels .............................................. 2-69
Table NOI-3 Summary of Estimate Noise Levels at Sensitive Receptors During
Proposed Project Construction .................................................................. 2-70
Church Street Extension/Trout Creek Restoration Project 1-1 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
CHAPTER 1
Project Description
1.1 Introduction
Truckee Development Associates (TDA) is currently developing the Truckee Railyard, a 34-acre
parcel adjacent to the Union Pacific Railroad (UPRR) east of Downtown Truckee. The parcel is
bounded on the north and east by Trout Creek, the south by the UPRR, and is accessed from the
west by means of Church Street and Truckee Way (formerly known as Donner Pass Road). As
part of their work in the Truckee Railyard, TDA has recently extended Church Street through the
UPRR balloon track. A second access from Glenshire Drive to the east will be necessary to fully
develop the parcel. This second access from Glenshire Drive will require a new crossing of Trout
Creek and will connect to Church Street east of the UPRR balloon track. In addition, the Town
has been restoring portions of Trout Creek upstream of the Truckee Railyard parcel over the last
14 years and has plans to restore the remaining portion of Trout Creek downstream to the UPRR
right-of-way.
For this project, the Town is proposing two components: the Church Street Extension component
and the Trout Creek Restoration component. The Church Street Extension component will extend
Church Street to Glenshire Drive, including a new crossing of Trout Creek. The crossing over
Trout Creek will consist of a precast concrete arch bridge with a natural streambed. The Trout
Creek Restoration component will restore Reaches 4 and 5 of Trout Creek through the project
area. This project component will restore Trout Creek from the western side of the balloon track
downstream to the UPRR right-of-way. Depending on funding sources, the restoration of the
creek may be completed in one or two construction phases. Preference is for the restoration of the
creek to be completed during one construction phase. However, if two phases are required, Phase
1 will include restoration of a segment of Reach 5 immediately upstream and downstream of the
new Church Street crossing to accommodate the roadway extension component of the project;
Phase 2 of the Trout Creek Restoration will include the remainder of Reach 5 and all of Reach 4.
1.2 Project Location
The project site is located at the eastern end of historic Downtown Truckee in the Railyard Master
Plan Area. The project site is comprised primarily of a site historically occupied by the railyard
and lumber mill, and is generally bounded by Glenshire Drive to the north, commercial uses and
undeveloped land to the east, UPRR right-of-way to the south, and the existing Church Street and
UPRR balloon track to the west (Figures 1 and 2). This location corresponds to Section 11 of
Township 17 North, Range 16 East of the Truckee, California U.S. Geological Survey (USGS)
7.5-minute series quadrangle. The proposed project site is located within the Town of Truckee, in
Lake Taho e NEVADACALIFORNIA395
80
Projec t Loc atio n
80
5089
267
89
28
28
Tr u c k e eTruckee
Ta h o e C i tyTahoe C i ty
S o d a S p r i n g sSoda S p r i n g s
In c li n e V il la g eIncline V il la g e
P l a c e rPlacer
C o u n t yCounty
S i e r r aSierra
C o u n t yCounty
N e v a d aNevada
C o u n t yCounty
W a s h o eWashoe
C o u n t yCounty
E l D o r a d oEl D o r a d o
C o u n t yCounty
D o u g l a sDouglas
C o u n t yCounty
C a r s o n C i t yCarson C i t y
C o u n t yCounty
Path: U:\GIS\GIS\Projects\18xxxx\D180971_ChurchStreetExtensionProject_CEQA\Fig1_RegionalLocator20190404.mxd, bja 4/4/2019SO UR CE : NA IP , 2016; ES R I, 2012; ESA, 2 019
0 5
Miles
Figure 1
Church Stree t Extens io n / Trout Creek Re stora tion Project
Project Location
N
Neva da Coun ty
Ser vice Layer C redits: Esri , U SDA Farm Servi ce Agency
TruckeeWayG l e n s h i r e D r i v e
T r o u tC r e e k
E a stR ive rS tre e tU n io n P a c ific R a ilro a dReach 4Reach 5C h u rch S tre e t(e xte n sio n co m p le te d 2 0 1 8 )Path: U:\GIS\GIS\Projects\18xxxx\D180971_ChurchStreetExtensionProject_CEQA\Fig2_ProjectArea_20190325.mxd, bja 3/25/2019SO URCE : D igital Globe , 2016; E S E, 2019; W aterW ays Cons ulting , 2019; ESA, 2019
Pro je ct Si te
Ch ur ch St re et Ex te ns ion A rea
Tr ou t C re ek R es to rat ion A re a (Ph as e 1)
Tr ou t C re ek R es to rat ion A re a (Ph as e 2)0 200
Fe et
Figure 2
Church Stre et Ex ten sion / Trout Cre ek Res toration Proje ct
Pro je c t S ite
N
Service Layer Credits: Source: Esri, DigitalG lobe, GeoEye, Ear ths tar Geogr aphic s,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the G IS U ser C omm unity
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-4 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Nevada County, totaling approximately 11.35 acres (this acreage includes the construction
footprint for both project components as well as staging areas, access routes, and buffers). Access
to the site is currently provided by Church Street on the west as well as a 64-inch corrugated
metal pipe (CMP) culvert crossing of Trout Creek at Rock & Rose, Inc. on the north. The
majority of the site, outside of the Trout Creek corridor, consists of disturbed or developed land
and was previously used for UPRR operations and other industrial purposes including lumber
mills. In the recent past, the majority of the project site was occupied by a material and equipment
storage yard for the Rock & Rose, Inc. landscaping company. Adjacent land uses include an
electrical substation, civic, residential, and commercial uses to the east, west, and northwest;
Glenshire Drive and U.S. Forest Service land to the north; and the UPRR and Truckee River to
the south. Elevation in the project site ranges from 5,780 feet above mean sea level along Trout
Creek to 5,820 feet above mean sea level along Glenshire Drive.
1.3 Purpose and Objectives of the Proposed Project
Church Street Extension
The primary objectives of the Church Street Extension include the following:
• Provide a connected community with places that are easily accessible to pedestrians,
bicyclists, and drivers;
• Create a street and sidewalk network that is physically connected to the existing Downtown,
surrounding neighborhoods, and Trout Creek and visually connected to the natural features
including the Truckee River and surrounding mountains;
• Advance the Town’s vision for the Railyard Area by creating an easterly extension of the
existing Downtown;
• Create a strong connection between the Railyard and the historic core; and
• Guide development of the Railyard Master Plan Area in a manner consistent with Town
planning and policy documents, including the General Plan and the Downtown Specific Plan.
Trout Creek Restoration
The primary objectives of the Trout Creek Restoration include the following:
• Develop a restoration design that will restore natural geomorphic function to lower Trout
Creek, improve bed mobility, and reduce fine sediment loads into the channel;
• Improve ecological value through creation of a functioning riparian corridor and
enhancement of aquatic habitat;
• Improve water quality by managing local runoff from existing and proposed urban
developments and, where feasible, treating urban runoff before it enters Trout Creek;
• Provide 100-year flood protection through the project reach and reduce peak runoff, where
feasible, from adjacent new developments through a stormwater management program; and
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-5 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
• Improve the recreational and aesthetic value of lower Trout Creek by integrating the stream
and riparian restoration project with the recreational opportunities provided as part of the
Railyard Master Plan.
1.4 Background
Church Street Extension
The Church Street Extension component of the proposed project was originally conceived of in
the Railyard Master Plan. The Master Plan is a tool to guide development of the Railyard Master
Plan Area, including the project site, in a manner that is consistent with Town planning and
policy documents, including the General Plan and the Downtown Truckee Specific Plan. The
purpose of the Truckee Railyard Mixed-Use Development Master Plan is to capture and describe
the Town’s vision for the Railyard Area and to guide its future redevelopment. The Master Plan
describes the scale and character of development envisioned for the Railyard Area and includes
development standards and design guidelines to help ensure that future development is consistent
with the Town’s vision for the area. An Environmental Impact Report (EIR) was prepared to
evaluate any potentially significant environmental effects that may result from implementation of
this Master Plan. The Draft EIR was completed and released for the community’s review and
comment in November 2008 and the Final EIR was published in May 2009. The Truckee
Railyard Master Plan was adopted by the Town Council on July 2, 2009, and became effective on
August 2, 2009. The Railyard Master Plan Final EIR, including the Mitigation Monitoring and
Reporting Program (MMRP), was also certified by the Town Council on July 2, 2009, through
Town Council Resolution No. 2009-32. Both became effective August 2, 2009. The Railyard
Master Plan was updated in 2016 and was subsequently adopted by the Town Council in
November 2016.
Trout Creek Restoration
Over the past 14 years, the Town of Truckee has led an effort to restore habitat conditions,
improve water quality, and reduce flood risk along approximately one mile of Trout Creek
through Downtown Truckee. Given the complexities of restoration in an urban environment and
the associated cost of replacing undersized culverts with bridges, replacing concrete with natural
channel material, coordinating project elements and easements with private property owners, and
addressing utility conflicts, the project is being implemented in phases as funding becomes
available. In 2006, Reach 2 was constructed. In 2011 and 2012, Reach 3 of the Trout Creek
Restoration Project was constructed, which included a portion of Trout Creek from Truckee Way
at the upstream end to the UPRR balloon track at the downstream end. In 2013, Reach 1 Phase 1
of the Trout Creek Restoration Project was constructed, which included a portion of Reach 1 from
approximately 50 feet downstream of the School Street crossing to Truckee Way.
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-6 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
1.5 Proposed Project
Proposed Church Street Extension Component
The Church Street Extension component of the proposed project, also referred to in planning
documents as Town CIP C1804, will construct a new roadway (an extension of existing Church
Street) connecting Church Street with Glenshire Drive (Figure 3a and 3b). The western end of
the extension will connect with the existing Church Street where it currently terminates near the
eastern side of the balloon track, and the eastern end of the extension will intersect with Glenshire
Drive just west of Rock & Rose, Inc. The extension of Church Street will consist of an
approximately 700-foot segment of two-lane roadway, with roadside swales along the roadway
and associated stormwater detention basins located immediately south of the proposed bridge
over Trout Creek. The extension will also include Class II bike lanes on each side of the roadway.
The project includes a complete drainage system and utilities installation.
In addition to constructing a new roadway section, the Church Street Extension component of the
proposed project will include a new roadway crossing over Trout Creek. The proposed bridge
will span approximately 40 feet and consist of a precast concrete arch bridge with a natural
bottom. The bridge will accommodate two lanes of traffic, and will include Class II bike lanes on
each side of the roadway. In order to ensure the new bridge structure will have the proper
hydrology and capacity to contain the 100-year storm event plus any required freeboard, the
restoration of Trout Creek immediately upstream and downstream of the bridge structure has
been designed to minimize sediment load and bridge scour, to improve riparian and aquatic
habitat, and to provide flood protection.
A third element of the Church Street Extension component of the proposed project will be the
construction of a roundabout at the new Church Street/Glenshire Drive intersection. A
roundabout was determined to be the preferred intersection configuration after an alternatives
analysis was conducted during the Phase 1 design process. The roundabout will support two lanes
of traffic, and will include splitter islands at the western, southern, and eastern approaches. A
stormwater detention basin will be located northeast of the roundabout, and an additional
stormwater detention basin will be located southeast of the roundabout. To accommodate the
roundabout, Glenshire Drive will be widened east and west of the intersection for a total of
approximately 640 feet. Installation of the roundabout will require the existing driveway to the
Rock & Rose, Inc. landscaping company to be reconfigured and relocated to the west by
approximately 60 feet of the existing connection to Glenshire Drive.
The Phase 1 (30% design level) project layout in Appendix A shows the conceptual design of the
extension, bridge, roundabout, and driveway. The Church Street Extension construction footprint
is approximately 2.68 acres.
Trout Cree k Limits of Work
Church Steet E xtension
Prec ast Conc rete Arch Brid ge
Enginee re d S treambe d Mate rial
Sta cke d Ro ck Wall
Commerc ial Driv eway Re -a lignme nt
Sid e Chann el
Low Flow Chann el Log Stru cture
Round abou t at Glen shire Drive an dChurch Stre et Inters ectionTruckeeWay G l e n s h i r e D r i v e
E a stR ive rS tre e tU n io n P a c ific R a ilro a d
C h u rch S tre e t(e xte n sio n co m p le te d 2 0 1 8 )Reach 4Reach 5Path: U:\GIS\GIS\Projects\18xxxx\D180971_ChurchStreetExtensionProject_CEQA\Fig3a_ProjectComponents_20190325.mxd, bja 4/5/2019SO URCE : D igital Globe , 2016; E S E, 2019; W aterW ays Cons ulting , 2019; ESA, 2019
Pro jec t Site
Chu rch Stre et Exte ns io n Are a
Tro u t Cre ek Res to ra tio n Area (Pha se 1)0 200
Fe et
Figure 3 a
Church Stre et Ex ten sion / Trout Cre ek Res toration Proje ct
Pro je c t C o mponent s (P has e 1)
N
Service Layer Credits: Source: Esri, DigitalG lobe, GeoEye, Ear ths tar Geogr aphic s,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the G IS U ser C omm unity
Trout Cree k Limits of W or k
Church Steet E xtension
Prec ast Conc rete Arch Brid ge
Enginee re d S treambe d Mate rial
Sta cke d Ro ck Wall
Commerc ial Driv eway Re -a lignme nt
Sid e Chann el
Low Flow Chann el
Log Stru cture
Round abou t at Glen shire Drive an dChurch Stre et Inters ectionTruckeeWay G l e n s h i r e D r i v e
E a stR ive rS tre e tU n io n P a c ific R a ilro a d
C h u rch S tre e t(e xte n sio n co m p le te d 2 0 1 8 )Reach 4Reach 5Sta cke d Ro ck Wall
Reinfo rc ed Conc re te Wa ll
Path: U:\GIS\GIS\Projects\18xxxx\D180971_ChurchStreetExtensionProject_CEQA\Fig3b_ProjectComponents2_20190325.mxd, bja 4/5/2019SO URCE : D igital Globe , 2016; E S E, 2019; W aterW ays Cons ulting , 2019; ESA, 2019
Pro jec t Site
Chu rch Stre et Exte ns io n Are a
Tro u t Cre ek Res to ra tio n Area (Pha se 2)0 200
Fe et
Figure 3 b
Church Stre et Ex ten sion / Trout Cre ek Res toration Proje ct
Pro je c t C o mponent s (P has e 2)
N
Service Layer Credits: Source: Esri, DigitalG lobe, GeoEye, Ear ths tar Geogr aphic s,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the G IS U ser C omm unity
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-9 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Proposed Trout Creek Restoration Component
Due to the cumulative loss of aquatic habitat, diminished riparian habitat values, and reduced ability
to improve water quality through the removal of sediments and pollutants, the Town has led an effort
to restore portions of Trout Creek over the last 14 years. The Trout Creek Restoration component of
the proposed project will include restoration of approximately 5.29 acres of habitat along Reaches 4
and 5, completing implementation of the downstream portion of the Trout Creek Restoration
Project. Depending on funding sources, the restoration of the creek may be completed in one or
two construction phases. Preference is for the restoration of the creek to be completed during one
construction phase. However, if two phases are required, Phase 1 will include restoration of a
segment of Reach 5 from the downstream extent of Reach 5 to immediately upstream of the new
Church Street crossing to accommodate the roadway extension project (see Figure 3a); Phase 2 of
the Trout Creek Restoration will include the remainder of Reach 5 and all of Reach 4 (see Figure 3b).
Reaches 4 and 5 are located completely within the proposed Railyard Master Plan Development.
The preliminary restoration design for Reaches 4 and 5 of Trout Creek identifies a comprehensive
approach to restore channel form and function, enhance riparian vegetation, and improve aquatic
habitat conditions within the constraints imposed upon the project. The proposed restoration of
Reaches 4 and 5 encompasses approximately 2,600 linear feet of Trout Creek and will begin at
the downstream end of the previously restored Reach 3, adjacent to the balloon track, ending
several hundred feet downstream of the existing Rock & Rose, Inc. 64-inch CMP culvert crossing
at Trout Creek. Restoration includes removal of this undersized 64-inch CMP culvert, which
currently constrains the creek channel. Within Reach 4 a portion of the stream channel is confined
on the south side by the balloon track and the hillslope on the north side.
Currently, the profile, planform, and bankfull geometry of the Trout Creek channel generally lack
variability in planform and is constrained to a channel geometry that is larger than a natural
channel would have been, limiting more frequent interaction of flow with the floodplain. This is
likely due to the fact that the existing channel was constructed along the margin of the valley to
accommodate industrial activities on the adjacent terrace and to maximize conveyance. There is
also evidence that an informal levee/berm was constructed and maintained along much of
Reach 5 to limit flooding. The material used to construct the levee appears to have been scraped
from the adjacent terrace/historic floodplain.
Reach 4
Reach 4 extends for approximately 600 feet from the downstream end of Reach 3, which was
constructed in 2012, to the downstream limit of the UPRR balloon track. Reach 4 is currently
confined to a narrow corridor that abuts the Glenshire Drive fill slope on the north side and a
metal sheet pile wall made of old railroad box cars that retain the rail line ballast material on the
south side. At the downstream end of Reach 4 a historic road crossing and fill associated with the
old lumber mill juts out from the north side. Previous efforts to relocate the balloon track, reduce
its size, or propose a different approach to turning around the trains that utilize the balloon track
were unsuccessful. Consequently, the balloon track exists as a constraint to widening the
floodplain through this reach. Despite the inability to widen the floodplain, there is still a desire to
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-10 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
protect adjacent areas from flooding during the 100-year event and to maximize floodplain area
and habitat in less constrained reaches.
To accommodate the 100-year flood event, achieve the desired profile through the project reach
that maximizes lower gradient meadow habitat in less confined reaches, and maximize channel
width through Reach 4, the channel gradient will be steepened in Reach 4 relative to other
reaches. The proposed channel gradient through this reach is 1.75% with a proposed typical
active channel dimension of 12 feet for the top width and 1.5 feet of depth. Narrow floodplain
benches totaling 8 feet of width will occur on either side of the active channel, creating a valley
bottom width of 20 feet. To accommodate the channel and floodplain benches and the desired
profile, a reinforced concrete wall will be constructed to support the UPRR balloon track and a
stacked rock wall will be constructed along the hillslope leading up to Glenshire Drive. The
stacked rock wall will resemble the rock walls implemented in Reach 1.
Natural stream substrate, salvaged from channel excavation within the project area, will be
incorporated into the active channel area. To protect against lateral movement of the channel and
erosion of the floodplain benches and the hill side stacked rock wall, large diameter rock will be
buried in a trench along the toe of the channel. Rock weirs will likely be installed through this
reach, similar to those constructed in Reaches 1 and 3, to act as riffle control, and randomly
placed boulders and large woody debris will be randomly incorporated into the creek bed to
provide for local scour and deposition and to enhance aquatic habitat.
Reach 5
The upstream end of Reach 5 begins at the eastern extent of the balloon track, flowing east for
approximately 2,000 feet to the downstream end of the reach, several hundred feet east of the
existing Rock & Rose, Inc. 64-inch CMP culvert crossing at Trout Creek. The upstream end of
the reach is relatively flat and confined on the north side by Glenshire Drive and on the south side
by an un-engineered levee that has been rebuilt following levee breaching events during high
flow conditions. A small ditch parallels the main channel to the south of the levee. This feature is
a historic ditch that diverted water from Trout Creek to a log pond to the east that was associated
with the milling operation. Towards the downstream end of Reach 5 Trout Creek crosses the
Rock & Rose, Inc. material yard access road through an undersized 64-inch CMP culvert that is
perched at the downstream end. Downstream of the crossing the channel is more confined and
incised into the terrace.
Under the proposed project, Reach 5 will be characterized by a large, relatively unconfined
meadow and associated meandering channel, extending from the downstream end of Reach 4 for
approximately 700 feet to the proposed Church Street Extension crossing. The proposed meadow
will have a valley slope of 0.75% and a meandering active channel with localized channel
gradients that range from 0.75% to less than 0.5%, depending on location. This reach will include
a variable-width floodplain that ranges from 95 to 150 feet in width and will include irregular
topography consisting of swales (mimicking cut-off historic channels), secondary channels
(connecting to the mainstem channel), and alcoves. The active channel dimensions will vary
between a top width of 9 to 12 feet and a depth of 1.5 feet. Floodplain roughness will include
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-11 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
embedded boulders, large woody debris, and hummock features. The large floodplain area will
provide an opportunity to create a variety of off-channel habitats that could include segments of
cut-off channels that would support a diversity of wetland types.
A steeper gradient channel is proposed through the Church Street Extension crossing that consists
of an armored streambed and floodplain (roughened channel consisting of Engineered Streambed
Material). This design will maximize wet meadow/floodplain habitat in areas outside the crossing
by creating lower gradient reaches and eliminating the grade through the crossing.
Downstream of the constrained Church Street Extension crossing, the gradient will flatten and the
floodplain will widen. The 64-inch CMP culvert at the Rock & Rose, Inc. material yard will be
removed as a constraint, and a precast concrete arch bridge with a natural bottom will be
installed, allowing a wider floodplain and associated meandering channel. To accommodate the
reconfigured and relocated driveway for Rock & Rose, Inc. landscaping company, a stacked rock
wall will be constructed along the hillslope north of Trout Creek. The stacked rock wall will
resemble the rock walls implemented in Reach 1. The approach to this portion of Reach 5 will be
similar to the segment upstream of Church Street with a variable-width floodplain that will
include irregular topography consisting of swales (mimicking cut-off historic channels),
secondary channels (connecting to the mainstem channel), and alcoves. The active channel
dimensions will vary between a top width of 9 to 12 feet and a depth of 1.5 feet. Floodplain
roughness will include embedded boulders, large woody debris, and hummock features. The large
floodplain area will provide an opportunity to create a variety of off-channel habitats that could
include segments of cut-off channels that would support a diversity of wetland types. The
downstream end of the Trout Creek Restoration component of the project will tie into the existing
Trout Creek channel near a historic beaver dam.
The engineering plans for the Trout Creek Restoration component of the project have been
developed to the 30% design level (Appendix A).
Construction Methods
Construction of the Church Street Extension/Trout Creek Restoration Project will employ
currently accepted typical construction methods. Construction staging will be located within the
project site in existing developed or disturbed areas.
Church Street Extension
The contractor will establish access routes and staging areas for travel within the site and storage
of materials and equipment in areas that are currently developed or disturbed. Trucks and
equipment will access the site using the existing Church Street which currently terminates east of
the UPRR balloon track. First, vegetation removal and a rough grading of the road alignment will
occur. Rubber-tired trucks will be used to off-haul cut and vegetation, and to import fill and
aggregate base. Rollers will be used to compact both the aggregate base and the pavement.
Standard paving equipment will be used to pave the roadway extension. Installation of the precast
concrete arch bridge over Trout Creek will require the use of a crane. The contractor(s) will
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-12 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
prepare and implement a dust control plan for constructions activities consistent with Northern
Sierra Air Quality Management District (NSAQMD) Rule 226.
Trout Creek Restoration
The contractor will establish access routes and staging areas for travel within the site and storage
of materials and equipment in areas that are currently developed or disturbed. Prior to grading
within the Trout Creek channel, the low flow channel, floodplain swale, and floodplain bench
will be cleared and grubbed. Woody vegetation removed during clearing and grubbing will be re-
used as part of the proposed project to construct the identified channel and floodplain wood
structures. Unused woody vegetation may be shredded/chipped for re-use on site for mulch.
Materials (e.g., soils, rocks, gravels, etc.) will be transported on site with a rubber wheeled dump
truck, tracked dump truck, front end loader, and/or tracked skid-steer loader. In-channel work will
likely utilize either a small scale excavator or a wheeled backhoe. Smaller equipment is preferred
for in-channel work in order to minimize impacts to existing riparian vegetation. In order to
protect creek resources and protect aquatic organisms, in-channel work may require limited
dewatering. Channel dewatering is not anticipated to be continuous over the entire restoration
area; it is anticipated that the contractor will dewater select portions of the channel during
installation of specific features. Floodplain and channel grading will likely utilize a tracked
bulldozer and medium size excavator. The contractor(s) will prepare and implement a dust
control plan for constructions activities consistent with NSAQMD Rule 226.
Dewatering Plan
In accordance with federal Clean Water Act Section 402, the selected contractor(s) will develop,
implement, and maintain a Stormwater Pollution Prevention Plan (SWPPP). The SWPPP will be
submitted to and approved by the Lahontan Regional Water Quality Control Board (LRWQCB)
and the State Water Resources Control Board (SWRCB). The plan will describe the proposed
methods of erosion and sediment controls for construction activities. Additionally, the contractor
shall ensure environmental and worker protection; operate temporary facilities and conduct
construction in ways and by methods that comply with environmental regulations; and minimize
air, waterway, and subsoil contamination or pollution and other undesirable effects. A component
of the SWPPP is a dewatering plan for in-channel activities.
Dewatering operations are practices that manage the discharge of water and sediment when stream
flow and subsurface flow must be removed from a work location so that construction tasks may
be accomplished. Stream flow diversion and dewatering is undertaken in order to protect creek
resources (i.e., reduce turbidity and nuisance sediment transport) and to protect aquatic organisms.
Schedule and Equipment
Construction of the project is anticipated to take approximately 4 to 5 months and is scheduled for
2021. If the Trout Creek Restoration component of the proposed project is constructed in phases
(due to funding constraints), Phase 1 will be constructed in 2021 and Phase 2 will be constructed
at a later date when funding is secured. Construction hours will be set in coordination with the
Truckee Community Development Director and the Public Works Director. Excavators,
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-13 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
compactors, dump trucks, backhoes, bulldozers, bobcats, graders, rollers, and scrapers are
potential large equipment to be used on the project. Project construction could occur either at
once (continuous) or in stages, depending on timing and scheduling constraints. Utility
relocations and installation will be coordinated with the corresponding utility companies and
construction sequencing. Creek restoration work will likely occur in late summer or early fall
when creek flows are at their lowest. Per NSAQMD. requirements, the contractor(s) will use grid
power for job site power needs as feasible.
Traffic Control
Construction activities associated with the proposed roundabout at the intersection of Glenshire
Drive and the Church Street Extension may require partial roadway closures on Glenshire Drive
over the course of several days. During this period, one lane of traffic will be available to through
traffic and flaggers will be used to manage traffic flow through the construction zone. The
contractor will prepare and implement a traffic control plan as part of the construction documents
required by the Town of Truckee Engineering Division for any roadway closures (full or partial)
needed to construct the project. The traffic control plan will designate how vehicular traffic,
bicyclists, and pedestrians will be routed around any lane closures. Unimpeded emergency
vehicle access will be provided at all times.
1.6 Project Approvals and Permits
The Town of Truckee would adopt the initial study/mitigated negative declaration (IS/MND) as
the lead agency. Additionally, the following permits, reviews, consultations, and approvals (see
Table 1, below) would also be required to be completed or approved prior to the commencement
of project construction.
TABLE 1
PERMITS AND APPROVALS NEEDED
Agency Permit/Approval Status
Federal
United States Army Corps
of Engineers (USACE)
Clean Water Act, Section 404 Nationwide Permit
(NWP) 14/ NWP 27 Permit for discharge of dredged
or fill material in waters of the United States
Not yet applied.
Anticipated application
date of 2020.
State
California Department of
Fish and Wildlife (CDFW)
California Fish and Game Code Section 1600-1602
Streambed Alteration Agreement
Not yet applied.
Anticipated application
date of 2020.
Lahontan Regional Water
Quality Control Board
(LRWQCB)
Clean Water Act, Section 401 Water Quality
Certification
Not yet applied.
Anticipated application
date of 2020.
California State Water
Resources Control Board
(SWRCB)
• General Order for Dewatering and other Low
Threat Discharge to Surface Waters Permit
• National Pollutant Discharge Elimination System
(NPDES) Construction Stormwater Permit
• General Waste Discharge Requirements for
Dredge and Fill Discharges
Not yet applied.
Anticipated application
date of 2020.
1. Project Description
Church Street Extension/Trout Creek Restoration Project 1-14 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
This page intentionally left blank
Church Street Extension/Trout Creek Restoration Project 2-1 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
CHAPTER 2
Initial Study
1. Project Title: Church Street Extension/Trout Creek
Restoration Project
2. Lead Agency Name and Address: Town of Truckee
Truckee Town Council
10183 Truckee Airport Road
Truckee, CA 96161
(530) 582-2932
3. Contact Person and Phone Number: Todd Landry
Senior Engineer
(530) 582-2904
4. Project Location: Town of Truckee
5. Project Sponsor’s Name and
Address:
Town of Truckee
6. General Plan Designation(s): Railyard Master Plan Area
Downtown Study Area
7. Zoning: Trout Creek (TC), Industrial Heritage (IH),
Downtown Master Plan (DMP), and Open
Space (OS)
8. Description of Project: (Describe the whole action involved, including but not limited to
later phases of the project, and any secondary, support, or off-site features necessary for its
implementation. Attach additional sheets if necessary.)
See Chapter 1, Project Description above.
9. Surrounding Land Uses and Setting. (Briefly describe the project’s surroundings.)
See Chapter 1, Project Description above.
10. Other public agencies whose approval is required (e.g., permits, financing approval, or
participation agreement.)
See Section 1.6, Project Approvals and Permits (Table 1) above.
11. Have California Native American tribes traditionally and culturally affiliated with
the project area requested consultation pursuant to Public Resources Code
section 21080.3.1? If so, has consultation begun?
See Tribal Cultural Resources section below.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-2 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
2.1 Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by this project, involving
at least one impact that is a “Potentially Significant Impact” as indicated by the checklist on the
following pages.
☐ Aesthetics ☐ Agriculture and Forestry Resources ☐ Air Quality
☒ Biological Resources ☒ Cultural Resources ☐ Energy
☐ Geology/Soils ☐ Greenhouse Gas Emissions ☐ Hazards & Hazardous Materials
☐ Hydrology/Water Quality ☐ Land Use/Planning ☐ Mineral Resources
☒ Noise ☐ Population/Housing ☐ Public Services
☐ Recreation ☐ Transportation ☐ Tribal Cultural Resources
☐ Utilities/Service Systems ☐ Mandatory Findings of Significance
DETERMINATION: (To be completed by the Lead Agency)
On the basis of this initial study:
☐ I find that the proposed project COULD NOT have a significant effect on the environment,
and a NEGATIVE DECLARATION will be prepared.
☒ I find that although the proposed project could have a significant effect on the
environment, there will not be a significant effect in this case because revisions in the
project have been made by or agreed to by the project proponent. A MITIGATED
NEGATIVE DECLARATION will be prepared.
☐ I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
☐ I find that the proposed project MAY have a “potentially significant impact” or
“potentially significant unless mitigated” impact on the environment, but at least one effect
1) has been adequately analyzed in an earlier document pursuant to applicable legal
standards, and 2) has been addressed by mitigation measures based on the earlier analysis
as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required,
but it must analyze only the effects that remain to be addressed.
☐ I find that although the proposed project could have a significant effect on the
environment, because all potentially significant effects (a) have been analyzed adequately
in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and
(b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE
DECLARATION, including revisions or mitigation measures that are imposed upon the
proposed project, nothing further is required.
Signature Date
Signature Date
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-3 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
2.2 Environmental Checklist
Aesthetics
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact No Impact
1. AESTHETICS — Except as provided in Public
Resources Code Section 21099, would the project:
a) Have a substantial adverse effect on a scenic vista? ☐ ☐ ☐ ☒
b) Substantially damage scenic resources, including,
but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
☐ ☐ ☐ ☒
c) In non-urbanized areas, substantially degrade the
existing visual character or quality of public views of
the site and its surroundings? (Public views are
those that are experienced from publicly accessible
vantage point). If the project is in an urbanized area,
would the project conflict with applicable zoning and
other regulations governing scenic quality?
☐ ☐ ☒ ☐
d) Create a new source of substantial light or glare
which would adversely affect daytime or nighttime
views in the area?
☐ ☐ ☐ ☒
Environmental Setting
Aesthetic or visual resources include the “scenic character” of a particular region and site. Scenic
features can include both natural features, such as vegetation and topography, and manmade
features (e.g. historic structures). Areas that are more sensitive to potential effects are usually
readily observable, such as land found adjacent to major roadways and hilltops.
Visual Environment
The project site is located east of historic Downtown Truckee, comprised primarily of a site
historically occupied by the railyard and lumber mill. The project site is generally bounded by
Glenshire Drive to the north, commercial uses and undeveloped land to the east, Union Pacific
Railroad (UPRR) right-of-way to the south, and the existing Church Street and UPRR balloon
track to the west (Figure 2). Topography of the project area is relatively flat with minor sloping
near Trout Creek, and the majority of the site, outside of the Trout Creek corridor, is disturbed or
developed. The project site is partially obscured by trees to the north and east. Adjacent land uses
include an electrical substation, civic, residential, and commercial uses to the east, west, and
northwest; Glenshire Drive and U.S. Forest Service land to the north; and the UPRR and Truckee
River to the south. The nearest residences are located approximately 300 feet west of the project
site on Trout Creek Road and 575 feet south of the project site on East River Street. Potential
viewer groups include vehicle occupants on adjacent roadways, including Glenshire Drive,
Truckee Way, and East River Street, as well as residents on East River Street and Trout Creek
Road.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-4 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Discussion
a) No Impact. There are no designated scenic vistas or notable geographic features
identified in the vicinity of the project site in the Master Plan; as a result, the proposed
project would have no impact on a scenic vista (Town of Truckee, 2016).
b) No Impact. A review of the current California Department of Transportation (Caltrans)
Map of Designated Scenic Routes indicates that there are no officially designated state
scenic highways within the Town of Truckee. Although Interstate 80 runs through
Truckee and is an Eligible State Scenic Highway (approximately 1,200 feet north of the
project site), it is not officially designated (Caltrans, 2011). Therefore, the proposed
project would result in no impact.
c) Less than Significant. Construction of the proposed project would result in temporary
changes to local visual conditions, such as grading, clearing of vegetation, and the
presence of equipment in the project area. These impacts would be temporary in nature
and would not extend beyond the anticipated approximation of 4-5 months of
construction activity. Given the relatively short-term nature of these construction-related
activities, construction-related visual impacts are considered less than significant.
Completion of the proposed project would result in some permanent visual changes to the
project area, including a new extension of Church Street and restoration of a section of
Trout Creek. However, these changes are consistent with the objectives of the Town’s
Railyard Master Plan, General Plan, and Downtown Specific Plan and are in part
intended to improve the aesthetic value of the Railyard Master Plan Area. For these
reasons, visual impacts from the proposed project are considered a less-than-significant
impact.
d) No Impact. The proposed project does not propose any new light sources or reflective
surfaces that would represent potential sources of glare. Therefore, the proposed project
would have no impact to aesthetics due to new sources of light and glare.
References
California Department of Transportation (Caltrans), 2011. California Scenic Highway Mapping
System, Tuolumne County. Available: http://www.dot.ca.gov/hq/LandArch/16_livability/
scenic_highways/. Accessed December 6, 2018.
Town of Truckee, 2016. Truckee Railyard Mixed-Use Development Master Plan. November 2016.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-5 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Agricultural and Forest Resources
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact No Impact
2. AGRICULTURE AND FORESTRY RESOURCES —
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may
refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California
Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining
whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may
refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s
inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment
project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air
Resources Board. Would the project:
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural
use?
☐ ☐ ☐ ☒
b) Conflict with existing zoning for agricultural use, or a
Williamson Act contract? ☐ ☐ ☐ ☒
c) Conflict with existing zoning for, or cause rezoning
of, forest land (as defined in Public Resources Code
section 12220(g)), timberland (as defined by Public
Resources Code section 4526), or timberland zoned
Timberland Production (as defined by Government
Code section 51104(g))?
☐ ☐ ☐ ☒
d) Result in the loss of forest land or conversion of
forest land to non-forest use? ☐ ☐ ☐ ☒
e) Involve other changes in the existing environment
which, due to their location or nature, could result in
conversion of Farmland, to non-agricultural use or
conversion of forest land to non-forest use?
☐ ☐ ☐ ☒
Environmental Setting
According to the Nevada County Important Farmland 2016 Map (CDC, 2017a), areas of Prime
Farmland, Unique Farmland, or Farmland of Statewide Importance do not occur within eastern
Nevada County, including within the Town of Truckee and the entire project area. The project
site is not zoned as forestland, timberland, or Timberland Production (Town of Truckee, 2016).
Discussion
a) No Impact. The project site is not listed as Prime Farmland, Unique Farmland, or
Farmland of Statewide importance pursuant to the Farmland Mapping and Monitoring
Program. Therefore, there would be no impact.
b) No Impact. The project site is not currently used for agricultural purposes and is not
designated for agricultural use by the Truckee Railyard Master Plan. Additionally, the
project site and surrounding parcels are not currently under a Williamson Act contract
(CDC, 2017b). Therefore, the proposed project would have no impact relating to existing
zoning for agricultural use or a Williamson Act contract.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-6 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
c-e) No Impact. There are no areas within the boundary of the project site that are zoned as
Farmland, forest land, timberland, or timberland zoned Timberland Production.
Accordingly, there would be no changes to the existing environment resulting in
conversion of Farmland to non-agricultural use or conversion of forest land to non-forest
use. Therefore, there would be no impact.
References
California Department of Conservation (CDC), 2017a. Nevada County Important Farmland 2016.
Available: ftp://ftp.consrv.ca.gov/pub/dlrp/FMMP/pdf/2016/nev16.pdf. Accessed
December 7, 2018.
CDC, 2017b. State of California Williamson Act Contract Land Available:
ftp://ftp.consrv.ca.gov/pub/dlrp/wa/2016%20Statewide%20Map/WA_2016_11X17.pdf.
Accessed December 7, 2018.
Town of Truckee, 2016. Truckee Railyard Mixed-Use Development Master Plan. November
2016.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-7 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Air Quality
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
3. AIR QUALITY —
Where available, the significance criteria established by the applicable air quality management district or air pollution
control district may be relied upon to make the following determinations. Would the project:
a) Conflict with or obstruct implementation of the
applicable air quality plan? ☐ ☐ ☒ ☐
b) Result in a cumulatively considerable net increase of
any criteria pollutant for which the project region is
non-attainment under an applicable federal or state
ambient air quality standard?
☐ ☐ ☒ ☐
c) Expose sensitive receptors to substantial pollutant
concentrations? ☐ ☐ ☒ ☐
d) Result in other emissions (such as those leading to
odors) adversely affecting a substantial number of
people?
☐ ☐ ☒ ☐
Environmental Setting
The project site is located at the eastern end of historic Downtown Truckee, Nevada County in
the Railyard Master Plan Area. The area maintains good ventilation and atmospheric mixing, with
moderate temperatures, which results in generally good air quality conditions. The terrain of the
region is mountainous, which limits mixing of air near the surface. Summer temperatures average
at a low of 40°F and a high of 80°F, while winter temperatures average at a low of 17°F and a
high of 41°F.
The project site is within the Northern Sierra Air Quality Management District (NSAQMD), and
is located in a mountain-type air basin near the California-Nevada border. The NSAQMD’s
attainment status for criteria air pollutants, according to state and federal standards, are
summarized in Table AQ-1.
Discussion
a) Less than Significant. The Town of Truckee adopted the Particulate Matter Air Quality
Management Plan (Plan) in 1999 in response to their designation of nonattainment for
Particulate Matter less than ten microns in diameter (PM10). The Plan contains nine
objectives and 13 control strategies, all aimed towards the goal of achieving compliance
with State Ambient Air Quality Standards (AAQS) and National Ambient Air Quality
Standards (NAAQS). The goal of the Plan aligns with the goals of the NSAQMD, thus
compliance with the NSAQMD California Environmental Quality Act (CEQA) guidance
(Guidance; NSAQMD 2016) would demonstrate consistency with the Plan. NSAQMD
CEQA guidance has three main requirements when addressing project-related potential
impacts to air quality: (1) preparation of a dust control plan pursuant to District Rule 226,
(2) analysis of associated emissions under the provided thresholds of significance, and
(3) inclusion of appropriate mitigation and commitments.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-8 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE AQ-1
NSAQMD CRITERIA POLLUTANT ATTAINMENT STATUS
Pollutant and Averaging Time
Designation
State Standards Federal Standards
Ozone (1-hour) Nonattainment No Federal Standard
Ozone (8-hour) Nonattainment Nonattainment
Carbon Monoxide Unclassified Unclassified/Attainment
Nitrogen Dioxide Attainment Unclassified/Attainment
Sulfur Dioxide Attainment Unclassified/Attainment
Respirable Particulate Matter (PM10) Nonattainment Unclassified
Fine Particulate Matter (PM2.5) Unclassified Unclassified/Attainment
Lead Attainment Unclassified/Attainment
Visibility Reducing Particles Unclassified No Federal Standard
Sulfates Attainment No Federal Standard
Hydrogen Sulfide Unclassified No Federal Standard
Vinyl Chloride Unclassified No Federal Standard
NOTE: CARB makes area designations for ten criteria pollutants (O3, CO, NO2, SO2, PM10, PM2.5, lead, visibility reducing particles,
sulfates, and hydrogen sulfide). CARB does not designate areas according to the vinyl chloride standard.
SOURCE: California Air Resources Board, 2017. Area Designation Maps. Available: www.arb.ca.gov/desig/adm/adm.htm. Accessed
April 3, 2019.
As required by the Guidance, the proposed project would prepare and implement a dust
control plan for constructions activities consistent with District Rule 226. Emissions
associated with the proposed project are analyzed and compared to the NSAQMD
significance thresholds in section b), below, and associated impacts are determined to fall
under NSAQMD’s Significance Level A, i.e., less-than-significant. The applicable
project commitment associated with Level A, use of grid power for job site power needs
as feasible, will be implemented.
In summary, the proposed project would meet all three requirements of the NSAQMD
guidance listed above, and thus, would remain consistent with the goals identified in the
Town of Truckee’s Particulate Matter Air Quality Management Plan, namely to support
achievement of attainment status for AAQS and NAAQS. Additionally, the proposed
project would follow all applicable criteria under NSAQMD guidance. This impact
would be less than significant.
b) Less than Significant. The proposed project would result in both construction-related
and operational emissions, which were modeled for this analysis using the California
Emissions Estimator Model (CalEEMod), version 2016.3.2. Project-specific information
was used for modeling when possible. Where project-specific data is unavailable,
CalEEMod defaults were used as inputs, which capture assumed values consistent with
standard practice. CalEEMod assumptions and detailed output can be found in
Appendix B.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-9 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
The proposed project includes two components: (1) the Church Street Extension, and
(2) the Trout Creek Restoration. The restoration component could occur in one or two
phases. If two phases are required, the second would occur at an undetermined later date
once funding is available. However, the most conservative scenario was used to model
emissions; it was assumed that all construction would occur in one phase, from June 2021
to October 2021. Operational emissions from the proposed project would come from
mobile sources through use of the Church Street extension.
As shown in Table AQ-2 and Table AQ-3, both construction and operational estimated
emissions fall below the NSAQMD thresholds. Because the proposed project would
result in less-than-significant impacts associated with both construction emissions and
operational emissions of criteria air pollutants, it would not result in a cumulative
considerable net increase in any of the criteria pollutants for which the NSAQMD is in
nonattainment.
TABLE AQ-2
PROPOSED PROJECT CONSTRUCTION EMISSIONS IN POUNDS PER DAY
Construction Year ROG (ppd) NOX (ppd) PM10 (ppd)
2021 9.02 22.00 1.05
NSAQMD Thresholds 24 24 79
Exceeds Threshold? No No No
NOTE: Project construction emissions estimates were made using CalEEMod version 2016.3.2.
SOURCE: ESA, 2019.
TABLE AQ-3
PROPOSED PROJECT OPERATIONAL EMISSIONS IN POUNDS PER DAY
Source Category ROG (ppd) NOX (ppd) PM10 (ppd)
Area <1 0 <1
Energy 0 0 0
Mobile <1 <1 1.14
NSAQMD Thresholds 24 24 79
Exceeds Threshold? No No No
NOTE: Project construction emissions estimates were made using CalEEMod version 2016.3.2.
SOURCE: ESA, 2019.
Therefore, potential impacts related to the construction and operation of the proposed
project, according to NSAQMD’s CEQA Guidance, would be less than significant and
no mitigation is required.
c) Less than Significant. Constructions emissions are short term and temporary by nature
and are all well below significance thresholds. Operational emissions are negligible. Any
impacts on sensitive receptors would be temporary and short term in duration and
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-10 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
minimized by both the preparation of a dust control plan pursuant to District Rule 226
and utilizing grid power for the job site to the greatest extent possible. This impact would
be less than significant.
d) Less than Significant. The proposed project includes only roadway extension and creek
restoration and thus, would not add any new odor sources to the surrounding area.
Potential impacts of the proposed project related to odor-generating emissions would
negligible. This impact would be less than significant.
References
Northern Sierra Air Quality Management District (NSAQMD), 2016. Guidelines for Assessing
and Mitigating Air Quality Impacts of Land Use Projects, May 2016.
Town of Truckee, 1999. Particulate Matter Air Quality Management Plan, adopted July 15, 1999.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-11 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Biological Resources
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
4. BIOLOGICAL RESOURCES — Would the project:
a) Have a substantial adverse effect, either directly or
through habitat modifications, on any species identified
as a candidate, sensitive, or special-status species in
local or regional plans, policies, or regulations, or by the
California Department of Fish and Wildlife or U.S. Fish
and Wildlife Service?
☐ ☒ ☐ ☐
b) Have a substantial adverse effect on any riparian habitat
or other sensitive natural community identified in local or
regional plans, policies, regulations, or by the California
Department of Fish and Wildlife or U.S. Fish and Wildlife
Service?
☐ ☒ ☐ ☐
c) Have a substantial adverse effect on state or federally
protected wetlands (including, but not limited to, marsh,
vernal pool, coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
☐ ☒ ☐ ☐
d) Interfere substantially with the movement of any native
resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors,
or impede the use of native wildlife nursery sites?
☐ ☒ ☐ ☐
e) Conflict with any local policies or ordinances protecting
biological resources, such as a tree preservation policy
or ordinance?
☐ ☐ ☐ ☒
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat
conservation plan?
☐ ☐ ☐ ☒
Environmental Setting
Data Sources/Methodology
Biological resources within the project site were identified by Environmental Science Associates
(ESA) biologist Joshua Boldt through field reconnaissance surveys and an aquatic resource
delineation conducted on November 14, 2017 and November 9, 2018. Prior to the surveys, a
review of pertinent literature and database queries was conducted for the project site and
surrounding area. The surveys were conducted on foot and existing habitat types, plants, and
wildlife species within and adjacent to the project site were recorded. The biological surveys
focused on identifying and delineating habitat for special-status plant and wildlife species,
although general habitat conditions were noted and incidental species observations were recorded.
An aquatic resource delineation was also conducted (ESA, 2019).
During the biological surveys, the biologist walked meandering transects through the entire
project site, spaced closely to obtain maximum visual coverage of the habitats present. Habitats
present at the project site were compared to the habitat requirements of the regionally occurring
special-status species and used to determine which of these species had the potential to occur at or
adjacent to the project site. Aquatic resources were delineated according to methods outlined in
the Corps of Engineers Wetland Delineation Manual (Environmental Laboratory, 1987) and the
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Western
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-12 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Mountains, Valleys, and Coast Region (Version 2.0) (USACE, 2010). Botanical taxonomy and
nomenclature conforms to The Jepson Manual: Vascular Plants of California (Second Edition)
(Baldwin et al., 2012) as revised by the Jepson eFlora (Jepson Flora Project, 2019). Common
names of plant species are derived from the Jepson Manual or Calflora (2019).
The primary sources of data referenced for this section include the following:
• U.S. Fish and Wildlife Service (USFWS) list of federal endangered and threatened species
that may occur in the proposed project location, and/or may be affected by the proposed
project (USFWS, 2019a);
• USFWS Critical Habitat for Threatened and Endangered Species (online mapping program)
(USFWS, 2019b);
• National Wetlands Inventory (USFWS, 2019c);
• California Natural Diversity Database (CNDDB) list of special-status species occurrences
within the Truckee, CA and eight surrounding USFS 7.5-minute topographic quadrangles
(Independence Lake, Hobart Mills, Boca, Norden, Martis Peak, Granite Chief, Tahoe City,
Kings Beach) (California Department of Fish and Wildlife [CDFW], 2019a);
• California Native Plant Society (CNPS) Inventory of Rare and Endangered Plants within the
Truckee and eight surrounding USGS 7.5-minute topographic quadrangles (CNPS, 2019);
• Special Vascular Plants, Bryophytes, and Lichens List (CDFW, 2019b);
• Special Animals List (CDFW, 2019c); and
• Church Street Extension/Trout Creek Restoration Project Aquatic Resources Delineation
Report (ESA, 2019).
Regional Setting
Regionally, the project site is located within the northern High Sierra Nevada subregion of the
California Floristic Province (Baldwin et al., 2012). Regional natural plant communities
surrounding the project site include those that are common to the Sierra Nevada such as coniferous
forests, sagebrush and bitterbrush scrub, montane chaparral, montane riparian, perennial grassland,
and meadow. The project site is predominantly situated on the flood plain of the Truckee River, and
terrain is generally flat, with minor sloping near Trout Creek. The climate is typically temperate to
very cold and dry. Data from the Western Regional Climate Center for the Truckee Ranger Station
weather station indicates that average annual precipitation is 30.15 inches and average annual
snowfall is 201.8 inches. The average maximum annual temperature is 59.1 degrees Fahrenheit and
average minimum annual temperature is 27.8 degrees Fahrenheit (Western Regional Climate
Center, 2019).
Project Site Setting
Plant Communities and Wildlife Habitats
Wildlife habitats are generally described in terms of dominant plant species and plant communities
along with landform, disturbance regime, and other unique environmental characteristics. The
wildlife habitats described in this section are based on the CDFW’s A Guide to Wildlife Habitats
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-13 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
(Mayer and Laudenslayer, 1988) that is used in CDFW’s California Wildlife Habitat
Relationships System. The California Wildlife Habitat Relationships (CWHR) habitat classification
scheme has been developed to support the CWHR System, a wildlife information system and
predictive model for California's regularly occurring birds, mammals, reptiles, and amphibians.
Wildlife habitats generally correspond to plant communities. Plant communities are assemblages of
plant species that occur together in the same area and are repeated across landscapes. Both species
composition and relative abundance define them. Plant communities within the project site were
identified using field reconnaissance and aerial photography. Within CDFW’s current vegetation
classification system, vegetation alliances are the scientifically derived hierarchical class that
corresponds best with plant communities and are designed to be the unit for conservation of rare
or threatened plant communities (Sawyer et al., 2009). Vegetation alliances typically represent a
much finer scale of vegetation description than wildlife habitats but correspond appropriately
with one or several wildlife habitat types. CDFW provides crosswalks to help correlate vegetation
alliances with wildlife habitats and the descriptions below make use of the crosswalk.
A description of each habitat type is presented below. Related vegetation alliances are listed
following the wildlife habitat description and are based on the alliance descriptions presented by
Sawyer et al. (2009) (vegetation alliances are not listed for some wildlife habitats).
Habitats present in the project site are characterized by developed land associated with the Union
Pacific Railroad (UPRR) and other development, ruderal/disturbed areas, perennial grassland,
Jeffrey pine forest, montane riparian scrub (upland), montane riparian scrub (wetland),
seasonal wetland, wet meadow, and riverine habitat. Because native habitats have been altered
by changes in land use throughout much of the project site, native plant communities are limited
within the project site to those areas adjacent to Trout Creek. Table BIO-1 and Figure BIO-1
summarize the extent of wildlife habitats in the project site.
TABLE BIO-1
HABITAT TYPES WITHIN THE PROJECT SITE
Habitat Type Area (acres)
Perennial Grassland 2.054
Montane Riparian Scrub (upland)2 0.417
Montane Riparian Scrub (wetland)1,2 0.780
Jeffrey Pine Forest 1.086
Ruderal/Disturbed 0.541
Developed 5.077
Wet Meadow1,2 0.485
Seasonal Wetland1,2 0.046
Riverine-Perennial1,2 0.715
Riverine-Intermittent1,2 0.148
Riverine-Ephemeral1,2 0.001
Total for the Project site 11.349
NOTES: 1 Clean Water Act jurisdiction; 2 1600 jurisdiction
SOURCE: ESA, 2019
TruckeeWayG l e n s h i r e D r i v e
T r o u tC r e e k
E a stR ive rS tre e tU n io n P a c ific R a ilro a d
C h u rch S tre e t(e xte n sio n co m p le te d 2 0 1 8 )Path: U:\GIS\GIS\Projects\18xxxx\D180971_ChurchStreetExtensionProject_CEQA\Fig4_Habitat_20190404.mxd, bja 4/4/2019SO URCE : D igital Globe , 2016; E S E, 2019; W aterW ays Cons ulting , 2019; ESA, 2019
Pro je ct Si te
Jeff re y P in e
Pe ren n ial Gr as sl an d
Mo nt an e R ip ar ian S cr ub (u pl an d)
Mo nt an e R ip ar ian S cr ub (w et la nd )
Pe ren n ial Ch an n el
Int erm it te nt Ch an ne l
Ep he me ra l C ha nn e l
Se as on al We tla nd
Wet M ea do w
Ru de ra l/D ist ur be d
De ve lop ed0200
Fe et
Figure B IO -1
Church Stre et Ex ten sion / Trout Cre ek Res toration Proje ct
Wild lif e Ha b ita ts
N
Service Layer Credits: Source: Esri, DigitalG lobe, GeoEye, Ear ths tar Geogr aphic s,CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the G IS U ser C omm unity
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-15 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Perennial Grassland
Perennial grasslands occur as dry meadows or open grasslands on drier sites adjacent to and in
association with wet meadows in the project site. Perennial grassland soils are usually saturated
for a short period after snowmelt but drain fairly rapidly in most years, becoming completely dry
by mid-summer. As a result, most plants in perennial grasslands grow rapidly throughout the
summer until soil aridity forces them into dormancy. In the project site, this habitat type is
dominated by perennial bunchgrasses and other perennial grasses such as bromes (Bromus spp.),
blue wild rye (Elymus glaucus), beardless wild rye (Elymus triticoides), fescues (Festuca spp.),
Kentucky bluegrass (Poa pratensis), squirreltail (Elymus elymoides), and spike false oat
(Trisetum spicatum). Dry tolerant sedges (i.e. threadleaf sedge [Carex filifolia]) and rushes as
well as a variety of forbs are less common associates of these grasses. This community forms a
dense sod adjacent to and upland of wetland meadows.
Vegetation Alliances
• Elymus glaucus (Blue wild rye meadows)
Montane Riparian Scrub
The vegetation of montane riparian zones is quite variable and often structurally diverse. This
habitat is typically associated with mountain lakes, ponds, rivers, streams as well as seeps, bogs
and meadows. Water may be permanent or ephemeral. In the project site, montane riparian scrub
occurs along Trout Creek and within an intermittent channel. This community supports several
willow species, but no single willow species is dominant. In the project site, the montane riparian
scrub community is characterized by Lemmon’s willow (Salix lemmonii), narrow-leaved willow
(Salix exigua), and Pacific willow (Salix lasiandra). The understory on the banks of Trout Creek
supports rushes (Juncus spp), sedges (Carex spp.), meadow barley (Hordeum brachyantherum),
and fringed willowherb (Epilobium ciliatum). Some areas of this habitat type meet the federal
definition of a water of the U.S. and are mapped as montane riparian scrub (wetland) (see
discussion under Aquatic Resources, below). Areas not meeting the federal definition of a water
of the U.S. are mapped as montane riparian scrub (upland).
Vegetation Alliances
• Salix exigua (Sandbar willow thickets)
• Salix lemmonii (Lemmon’s willow thickets)
Jeffrey Pine Forest
Jeffrey pine forest occurs as a narrow band along Glenshire Drive near the northern boundary of
the project site. It is likely this community was present throughout the project site prior to
development. Jeffrey pine (Pinus jeffreyi) is the dominant species found in varying densities in
the upper canopy layer of this habitat type. The dominant shrub layer species includes big
sagebrush (Artemisia tridentata), antelope bitterbrush (Purshia tridentata) and rubber rabbitbrush
(Ericameria nauseosa).
Vegetation Alliances
• Pinus jeffreyi (Jeffrey pine forest)
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-16 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Wet Meadow
Wet meadows are characterized by standing water or saturated soils and are composed of
moisture-loving members of the grass, rush, and sedge families, often to the exclusion of other
herbaceous perennials. Shrub or tree layers are usually absent or very sparse. They may, however,
be an important feature of the meadow edge or on higher ground where soils are somewhat drier.
Wet meadows occur where water is at or near the surface most of the growing season, following
spring runoff. As surface waters recede, plants tolerant of waterlogged soils begin to appear. The
shrub layer, when present, is dominated almost exclusively by willows. Within the project site,
wet meadow is found in close association with Trout Creek. These areas are dominated by Baltic
rush (Juncus balticus), woolly sedge (Carex pellita), or other wet meadow graminoids such as
small fruited bulrush (Scirpus microcarpus), creeping spikerush (Eleocharis macrostachya), and
Nebraska sedge (Carex nebrascensis).
Vegetation Alliances
• Carex nebrascensis (Nebraska sedge meadows)
• Juncus arcticus (var. balticus, mexicanus) (Baltic and Mexican rush marshes)
Seasonal Wetland
Seasonal wetlands are freshwater wetlands that support ponded or saturated soil conditions during
winter and spring and are mostly dry through the summer and fall. Vegetation is characterized by
both annual and perennial species including native and non-native grasses and forbs. Plant species
found within seasonal wetlands are adapted to withstand short periods of inundation. Seasonal
wetland plants typically initiate growth as aquatic or semi-aquatic plants and transition to a dry-
land environment as the wetland dries. Seasonal wetlands are colonized by low-growing, hardy
perennials that tolerate disturbance and annuals that tolerate seasonal soil saturation. Upland
grasses and forbs often establish after wetland species desiccate and features become dry. Within
the project site, one small seasonal wetland occurs in a topographic micro-depression adjacent to
the intermittent channel, surrounded by developed and ruderal lands. Associated wetland plant
species identified within this feature include creeping spike rush and purslane speedwell
(Veronica peregrina).
Vegetation Alliances
• Eleocharis macrostachya (Pale spike rush marshes)
Riverine
Riverine habitats are distinguished by ephemeral, intermittent, or perennial running water, and
occur in association with a variety of terrestrial habitats. Trout Creek, a perennially flowing
channel, is the dominant riverine habitat feature within the project site. Within the project site, the
north bank of Trout Creek is confined by Glenshire Drive and the south bank is confined by a man-
made berm which limits the width and lateral movement of Trout Creek. The montane riparian
scrub and wet meadow habitat types that border Trout Creek are hydrologically driven
communities that depend on hydrologic processes, including the frequency, duration, timing, and
magnitude of flooding. In addition to Trout Creek, two seasonal drainages occur in the project
site. A narrow intermittent overflow channel flows parallel to and is located south of Trout Creek,
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-17 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
eventually draining to Trout Creek within the project site. A small ephemeral channel flows from
a roadside ditch along Glenshire Drive south into Trout Creek.
Trout Creek originates approximately four miles northwest of Truckee in the Tahoe Donner
subdivision. The creek flows southwest through the subdivision and into Truckee. The creek exits
Downtown Truckee at the east end, where it flows under Truckee Way and into the project site.
After leaving the project site, Trout Creek flows along the north side of the railroad tracks for
approximately ¼-mile before crossing under the tracks and confluencing with the Truckee River.
Trout Creek provides habitat for native fish species include the Tahoe sucker (Catostomus
tahoensis) and the speckled dace (Rhinichthys osculus) and nonnative introduced salmonids
including brown trout (Salmo trutta), brook trout (Salvelinus fontinalis), and rainbow trout
(Oncorhynchus mykiss).
Ruderal/Disturbed
Areas defined as ruderal/disturbed have been altered by human actions such that the natural
communities no longer exist. Ruderal/disturbed areas are dominated by weedy forbs such as
prickly lettuce (Lactuca serriola), woolly mullein (Verbascum thapsus), white sweetclover
(Melilotus alba), common dandelion (Taraxacum officinale), and several grass species.
Developed
Developed areas include paved and unpaved roadways, parking lots, development, and
infrastructure. Vegetation associated with developed areas consists of ornamental shrubs and
trees.
Aquatic Resources
Wetlands and Other Waters of the U.S.
Wetlands are ecologically complex habitats that support a variety of both plant and animal life. In
a jurisdictional sense, the federal government defines wetlands in Section 404 of the Clean Water
Act (CWA) as “areas that are inundated or saturated by surface or ground water at a frequency
and duration sufficient to support (and do support, under normal circumstances) a prevalence of
vegetation typically adapted for life in saturated soil conditions” (33 CFR 328.3[b] and
40 CFR 230.3). Under normal circumstances, the federal definition of wetlands requires three
wetland identification parameters be present: wetland hydrology, hydric soils, and hydrophytic
vegetation. Examples of wetlands include freshwater marsh, seasonal wetlands, and vernal pool
complexes that have a hydrologic link to other waters of the U.S (see definition below for “other
waters of the U.S.”). The U.S. Army Corps of Engineers (USACE) is the responsible agency for
regulating wetlands under Section 404 of the CWA, while the U.S. Environmental Protection
Agency (EPA) has overall responsibility for the CWA. The CDFW does not normally have direct
jurisdiction over wetlands unless they are subject to regulation under Streambed Alteration
Agreements or they support state-listed endangered species; however, CDFW has trust
responsibility for wildlife and habitats pursuant to California law.
“Other waters of the U.S.” refers to those hydric features that are regulated by the CWA but are
not wetlands (33 CFR 328.4). To be considered jurisdictional, these features must exhibit a
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-18 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
defined bed and bank and an ordinary high-water mark. Examples of other waters of the
U.S. include rivers, creeks, intermittent and ephemeral channels, ponds, and lakes.
An aquatic resources delineation was conducted for the project site by ESA in November 2017
and November 2018 (ESA, 2019). The aquatic resources delineation identified 2.175 acres of
aquatic resources within the project site that are expected to be subject to regulation under
Section 404 of the CWA (see Figure BIO-1 and Table BIO-1). Aquatic resources within the
project site consist of wet meadow, seasonal wetland, montane riparian scrub (wetland), perennial
channel, intermittent channel, and ephemeral channel. Aquatic community and habitat were
classified using the Classification of Wetlands and Deepwater Habitats of the United States
(Cowardin Classification) (Federal Geographic Data Committee, 2013). The aquatic resources
delineation has not yet been verified by the USACE and should be considered preliminary until
verification in writing is received from the USACE.
Seasonal Wetland (Palustrine Emergent Wetland – Seasonally Flooded)
Seasonal wetlands are ephemeral wetlands that pond water or remain saturated for extended
periods during a portion of the year, often throughout the wet season, then dry up in spring or
early summer. Based upon observations or inferences of wetland hydrology, soils, and vegetation,
one seasonal wetland was noted in the project site in the central portion of the project site totaling
approximately 0.046 acre. This feature is adjacent to the intermittent channel and receives surface
water from the channel. The seasonal wetland within the project site is classified as “palustrine
emergent wetland (seasonally flooded)” using the Classification of Wetlands and Deepwater
Habitats of the United States (Federal Geographic Data Committee, 2013).
Wet Meadow (Palustrine Emergent Wetland – Seasonally Flooded)
Typically, wet meadows occur where water is at or near the surface most of the growing season
following spring runoff. Wet meadows at all elevations generally have a simple structure
consisting of a layer of herbaceous plants. Shrub or tree layers are usually absent or very sparse:
they may, however, be an important feature of the meadow edge. Based upon observations or
inferences of wetland hydrology, soils, and vegetation, 16 wet meadow wetlands were noted in
the project site totaling approximately 0.485 acre. All of these features are adjacent to Trout
Creek and receive surface and/or groundwater from the creek. The wet meadow wetlands within
the project site are classified as “palustrine emergent wetland (seasonally flooded)” using the
Classification of Wetlands and Deepwater Habitats of the United States (Federal Geographic
Data Committee, 2013).
Montane Riparian Scrub (Wetland) (Palustrine Scrub-Shrub Wetland – Seasonally Flooded)
At the project site, montane riparian scrub habitat occurs as a narrow, dense grove of broad-
leaved, winter deciduous trees and shrubs as well as occasional evergreen trees with a grassy
understory along the banks and adjacent floodplain of Trout Creek. This habitat forms a mosaic
of with wet meadow habitat (on wetter sites) and montane riparian scrub (upland) (on drier sites).
Based upon observations or inferences of wetland hydrology, soils, and vegetation, nine montane
riparian scrub wetlands were noted in the project site totaling approximately 0.780 acre. All of
these features are adjacent to Trout Creek and receive surface and/or groundwater from the creek.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-19 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
The montane riparian scrub wetlands within the project site are classified as “palustrine scrub-
shrub wetland (seasonally flooded)” using the Classification of Wetlands and Deepwater Habitats
of the United States (Federal Geographic Data Committee, 2013).
Perennial Channel/Riverine Perennial
Perennial channels are classified as “riverine perennial” using the Classification of Wetlands and
Deepwater Habitats of the United States (Federal Geographic Data Committee, 2013). A
perennial channel is a stream, or stream portion, that flows continuously during the calendar year.
Riverine perennial habitat within the project site occurs in the form of Trout Creek, comprising
approximately 0.715 acre.
Intermittent Channel/Riverine Intermittent
Intermittent channels are classified as “riverine intermittent” using the Classification of Wetlands
and Deepwater Habitats of the United States (Federal Geographic Data Committee, 2013). An
intermittent channel has flowing water during certain times of the year, when groundwater
provides water for stream flow. During dry periods, intermittent streams may not have flowing
water. Runoff from rainfall is a supplemental source of water for stream flow. The project site
contains one intermittent channel, comprising approximately 0.148 acre. The linear nature of
this channel suggests that it was excavated, likely for the purposes of draining the adjacent area.
Ephemeral Channel/Riverine Intermittent
Ephemeral drainages are classified as “riverine intermittent” using the Classification of Wetlands
and Deepwater Habitats of the United States (Federal Geographic Data Committee, 2013). An
ephemeral channel has flowing water only during, and for a short duration after, precipitation
events in a typical year. Ephemeral stream beds are located above the water table year-round.
Groundwater is not a source of water for the stream. Runoff from rainfall is the primary source
of water for stream flow. A single ephemeral channel, totaling approximately 0.001 acre, receives
flows from a roadside ditch adjacent to Glenshire Drive then flows south into Trout Creek.
1600 Jurisdictional Waters (Fish and Game Code)
The extent of 1600 jurisdiction includes waters of the U.S., as well as additional waters and
adjacent riparian habitat which may not be federally jurisdictional, including all portions of the
bed, banks, and channel of any stream, including intermittent and ephemeral streams. This is
typically extended laterally to the upland edge (and outer dripline) of any associated riparian
vegetation. The lateral extent of 1600 jurisdiction within a stream is therefore delineated to the
top of the physical bank of the channel, or the upland edge (outer dripline) of riparian vegetation,
whichever is broader. Based on field investigations, montane riparian scrub (upland) habitat
would extend 1600 jurisdictional limits beyond the federal Section 404 CWA limits in some
areas. A total of approximately 2.592 acres of 1600 jurisdictional habitat occurs within the project
site (see Figure BIO-1 and Table BIO-1).
Sensitive Natural Community
A sensitive natural community is a biological community that is regionally rare, provides
important habitat opportunities for wildlife, is structurally complex, or is in other ways of special
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-20 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
concern to local, state, or federal agencies. Most sensitive natural communities are given special
consideration because they perform important ecological functions, such as maintaining water
quality and providing essential habitat for plants and wildlife. Some plant communities support a
unique or diverse assemblage of plant species and therefore are considered sensitive from a
botanical standpoint. CEQA may identify the elimination of such communities as a significant
impact.
Sensitive natural communities include: a) areas of special concern to federal, state, or local
resource agencies; b) areas regulated under Section 404 of the CWA; c) areas protected under
Section 402 of the CWA; and d) areas protected under state and local regulations and policies.
Habitat types on the project site that would be considered sensitive by regulatory agencies include
wetlands and other waters of the U.S., which are regulated under Section 404 of the CWA.
The CDFW’s California Natural Community List (CDFW, 2019d) ranks vegetation alliances in
California according to their degree of rarity imperilment (as measured by rarity, trends, and
threats). All alliances are listed with a G (global) and S (state) rank. Alliances with State ranks of
S1-S3 are considered of special concern by the CDFW, and all associations within them are also
considered to be highly imperiled. CDFW guidance recommends all alliances with State ranks of
S1-S3 be considered and analyzed under CEQA.
The following vegetation alliances are considered of special concern by CDFW and should
therefore be considered a sensitive natural community under CEQA regulations:
Vegetation Alliances
• Salix lemmonii (61.113.00) Lemmon’s willow thickets (S3)
Wildlife Movement Corridors
Wildlife movement corridors are considered an important ecological resource by various agencies
(CDFW and USFWS) and under CEQA. Movement corridors may provide favorable locations
for wildlife to travel between different habitat areas such as foraging sites, breeding sites, cover
areas, and preferred summer and winter range locations. They may also function as dispersal
corridors allowing animals to move between various locations within their range. Topography
and other natural factors, in combination with urbanization, can fragment or separate large open-
space areas. Areas of human disturbance or urban development can fragment wildlife habitats and
impede wildlife movement between areas of suitable habitat. This fragmentation creates isolated
“islands” of vegetation that may not provide sufficient area to accommodate sustainable
populations, and can adversely affect genetic and species diversity. Movement corridors mitigate
the effects of this fragmentation by allowing animals to move between remaining habitats, which
in turn allows depleted populations to be replenished and promotes genetic exchange between
separate populations.
Trout Creek and its associated riparian corridor provide a movement corridor for areas between
its headwaters and the Truckee River. The creek corridor allows common aquatic and terrestrial
wildlife species to safely disperse back and forth between suitable habitats upstream and
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-21 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
downstream. Waterways such as Trout Creek (along with its associated riparian corridor) provide
important movement corridors, which allow dispersal and subsequent gene flow between wildlife
populations separated by roads and populated areas.
Special-Status Species
Special-status species are legally protected under the state and federal Endangered Species Acts
or other regulations or are species that are considered sufficiently rare by the scientific
community to qualify for such listing. These species are classified under the following categories:
1. Species listed or proposed for listing as threatened or endangered under the federal Endangered
Species Act (50 Code of Federal Regulations [CFR] 17.12 [listed plants], 17.11 [listed animals]
and various notices in the Federal Register [FR] [proposed species]);
2. Species that are candidates for possible future listing as threatened or endangered under the
federal Endangered Species Act (61 FR 40, February 28, 1996);
3. Species listed or proposed for listing by the State of California as threatened or endangered under
the California Endangered Species Act (14 California Code of Regulations [CCR] 670.5);
4. Plants listed as rare or endangered under the California Native Plant Protection Act (California
Fish and Game Code, Section 1900 et seq.);
5. Animal species of special concern to CDFW;
6. Animals fully protected under Fish and Game Code (California Fish and Game Code, Sections
3511 [birds], 4700 [mammals], and 5050 [reptiles and amphibians]);
7. Species that meet the definitions of rare and endangered under CEQA. CEQA Section 15380
provides that a plant or animal species may be treated as “rare or endangered” even if not on
one of the official lists (State CEQA Guidelines, Section 15380); and
8. Plants considered under the CDFW and CNPS to be “rare, threatened or endangered in
California” (California Rare Plant Rank [CRPR] 1A, 1B, and 2) as well as CRPR Rank 3 and
4 1 plant species.
A list of special-status species that have the potential to occur within the vicinity of the project
site was compiled based on data contained in the CNDDB (CDFW, 2019a), the USFWS list of
Federal Endangered and Threatened Species that Occur in or may be Affected by the proposed
project (USFWS, 2019a), and the CNPS Inventory of Rare and Endangered Plants (CNPS, 2019).
A list of special-status species, their general habitat requirements, and an assessment of their
potential to occur within and adjacent to the project site is provided below in Table BIO-2.
1 CRPR 3 and 4 plants may be analyzed under CEQA §15380 if sufficient information is available to assess potential
impacts to such plants. Factors such as regional rarity vs. statewide rarity should be considered in determining
whether cumulative impacts to a CRPR 3 or 4 plant are significant even if individual project impacts are not. CRPR
3 and 4 plants may be considered regionally significant if, for example, the occurrence is located at the periphery of
the species’ range, or exhibits unusual morphology, or occurs in an unusual habitat/substrate. For these reasons,
CRPR 3 and 4 plants should be included in the special-status species analysis. CRPR 3 and 4 plants are also
included in the California Natural Diversity Database Special Plants, Bryophytes, and Lichens List. [Refer to the
current online published list available at: http://www.dfg.ca.gov/biogeodata.].
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-22 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE BIO-2
SPECIAL-STATUS SPECIES WITH THE POTENTIAL TO OCCUR IN THE PROJECT SITE
Species
Status
Federal/State/CNPS Habitat Description Potential for Occurrence within the Project Site
Amphibians
Ambystoma macrodactylum
sigillatum
southern long-toed salamander
--/CSC/-- High elevation meadows and lakes in the Sierra Nevada, Cascade, and Klamath Mountains. Aquatic larvae occur in ponds and lakes. Outside of breeding season adults are terrestrial and associated with underground burrows of mammals and moist areas under logs and rocks.
Unlikely. No suitable habitat within the project site.
Lithobates pipiens
northern leopard frog
--/CSC/-- Native range is east of the Sierra Nevada-Cascade crest. Near permanent or semi-permanent water in a variety of habitats. Highly aquatic species. Shoreline cover, submerged and emergent aquatic vegetation are important habitat characteristics.
Low. The project site provides limited and low quality habitat for this species. Limited aquatic vegetation in Trout Creek.
Rana sierrae
Sierra Nevada yellow-legged frog
FE/ST/-- Always encountered within a few feet of water. Tadpoles may require 2 - 4 years to complete their aquatic development.
Low. Limited and low quality habitat in the project site. Little available backwater or off-channel refugia. Swift water in creek limits habitat suitability. Lack of nearby ponds or lakes that support breeding SNYLF populations. Introduced predatory salmonids occur within the stream channels in the project site.
Birds
Accipiter cooperii
Cooper’s hawk
--/SWL/-- Nests in riparian areas and oak woodlands, forages at woodland edges. Unlikely. No suitable habitat within the project site.
Accipiter gentilis
Northern goshawk
--/CSC/-- Within and in vicinity of coniferous forest. Uses old nests and maintains alternate sites. Usually nests on north slopes, near water. Red fir, lodgepole pine, Jeffrey pine, and aspens are typical nest trees.
Unlikely. No suitable habitat within the project site. The Jeffrey pine forest in the project site is not suitable habitat due to a lack of dense, mature trees.
Antigone canadensis tabida
Greater sandhill crane
--/ST,CFP/-- Nests in open areas of wet meadows. These areas are often interspersed with emergent marsh. Unlikely. No suitable habitat within the project site. The wet meadows in the project site are small and disconnected from similar habitats. The project site does not support emergent marsh.
Cypseloides niger
Black swift
--/CSC/-- Breeds very locally in the Sierra Nevada and Cascade
Range, the San Gabriel, San Bernardino, and San
Jacinto Mts., and in coastal bluffs and mountains from
San Mateo Co. south probably to San Luis Obispo Co.
Nests in moist crevice or cave on sea cliffs above the
surf, or on cliffs behind, or adjacent to, waterfalls in deep
canyons. Forages widely over many habitats.
Unlikely. No suitable habitat within the project site.
Empidonax traillii
Sierra Nevada willow flycatcher
--/SE/-- Inhabits extensive thickets of low, dense willows on edge of wet meadows, ponds, or backwaters. Requires dense willow thickets for nesting/roosting. Low, exposed branches are used for singing posts/hunting perches.
Medium. The montane riparian scrub habitat in the project site is not suitable nesting habitat, but this species could potentially migrate through the area.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-23 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE BIO-2 (CONTINUED)
SPECIAL-STATUS SPECIES WITH THE POTENTIAL TO OCCUR IN THE PROJECT SITE
Species
Status
Federal/State/CNPS Habitat Description Potential for Occurrence within the Project Site
Birds (cont.)
Haliaetus leucocephalus
Bald eagle
FDL/SE,CFP/-- Found in large trees along lake margins and rivers for both nesting and wintering. Roosts communally in winter.
Unlikely. No suitable habitat within the project site.
Pandion haliaetus
Osprey
--/SWL/-- Breeds in northern California from Cascade Ranges
south to Lake Tahoe, and along the coast south to Marin
Co. Nests near ocean shores, bays, freshwater lakes,
and larger streams. Large nests built in large trees,
snags, and dead-topped trees within 15 miles of a good
fish-producing body or water.
Unlikely. No suitable habitat within the project site.
Picoides arcticus
Black-backed woodpecker
--/--/-- Coniferous forests in the Sierra Nevada and Cascades to the Siskiyou Mountains. Recently burned coniferous forest, areas with dense standing dead trees, and less commonly in unburned forests.
Unlikely. No suitable habitat within the project site.
Setophaga petechia
Yellow warbler
--/CSC/-- Riparian plant associations. Prefers willows,
cottonwoods, aspens, sycamores, and alders for nesting
and foraging. Also nests in montane shrubbery in open
conifer forests.
Medium. Suitable nesting habitat is available in the project site and this species is known from the vicinity.
Fish
Oncorhynchus clarkii henshawi
Lahontan cutthroat trout
FT/--/-- Historically in all accessible cold waters of the Lahontan Basin in a wide variety of water temps and conditions. Cannot tolerate presence of other salmonids. Requires gravel riffles in streams for spawning.
Low. Low quality habitat within the project site. Trout Creek is not suitable habitat for this species due to the high level of disturbance and narrow channel width. In addition, LCT are currently not known to occur in the project area, though they are found in the Truckee River downstream of the Town.
Mammals
Aplodontia rufa californica
Sierra Nevada mountain beaver
--/CSC/-- Dense growth of small deciduous trees and shrubs, wet soil, and abundance of forbs in the Sierra Nevada and east slope. Needs dense understory for food and cover. Burrows into soft soil. Needs abundant supply of water.
Unlikely. The narrow riparian corridor along the reach of Trout Creek in the project site is not suitable habitat for this species.
Gulo gulo
California wolverine
FPT/ST,CFP/-- Typically found in very remote areas of the northern North America and high elevation areas of the Sierra Nevada and Rocky Mountains.
Unlikely. The presence of a populated area in and near the project site precludes the use of the area by wolverine.
Lasionycteris nocivagans
Silver-haired bat
--/--/-- Found primarily in coastal and montane forests, with streams, ponds, and open brushy areas for foraging habitat. Roosts in hollow trees, beneath exfoliating bark, abandoned woodpecker holes, and under rocks.
Low. Maternity and roosting colonies unlikely to occur on-site because of lack of suitable habitat. Could occur during migration or for foraging.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-24 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE BIO-2 (CONTINUED)
SPECIAL-STATUS SPECIES WITH THE POTENTIAL TO OCCUR IN THE PROJECT SITE
Species
Status
Federal/State/CNPS Habitat Description Potential for Occurrence within the Project Site
Mammals (cont.)
Lepus americanus tahoensis
Sierra Nevada snowshoe hare
--/CSC/-- Boreal riparian areas in the Sierra Nevada. Thickets of deciduous trees in riparian areas and thickets of young conifers.
Low. Limited and low quality habitat within the project site.
Lepus townsendii townsendii
Western white-tailed jackrabbit
--/CSC/-- Sagebrush, subalpine conifer, juniper, alpine dwarf-shrub, and perennial grassland east of the Sierra Crest. Low. Limited and low quality habitat within the project site.
Martes caurina sierrae
Sierra marten
--/--/-- Preferred habitat is characterized by dense, multi-storied coniferous forest that includes a high percentage of snags and downed logs in proximity to riparian corridors.
Unlikely. No suitable habitat within the project site.
Myotis volans
Long-legged myotis
--/--/-- Usually occur in woodland and forest habitat, but occupy drier areas. Roost in hollow trees, under tree bark and in caves and abandoned mines.
Unlikely. No suitable habitat within the project site.
Ochotona princeps schisticeps
Gray-headed pika
--/--/-- Mountainous areas, generally at higher elevations, often
above the treeline up to the limit of vegetation. At lower
elevations found in rocky areas within forests or near
lakes. Talus slopes, occasionally on mine tailings.
Prefers talus-meadow interface.
Unlikely. No suitable habitat within the project site.
Pekania pennanti
Fisher – West Coast DPS
--/CSC/-- Extensive forested areas with continuous canopy in higher elevations. Avoids entering open areas that have no overstory or shrub cover.
Unlikely. No suitable habitat within the project site.
Taxidea taxus
American badger
--/SC,CSC/-- Occurs in a wide variety of open forest, shrub, and grassland habitats that have friable soils for digging. Low. Limited and low quality habitat within the project site. Site is isolated from associated habitat.
Vulpes vulpes necato
Sierra Nevada red fox
FC/ST/-- Found from the Cascades down to the Sierra Nevada. Found in a variety of habitats from wet meadows to forested areas. Use dense vegetation & rocky areas for cover & den sites. Prefer forests interspersed with meadows or alpine fell-fields.
Low. Limited and low quality habitat within the project site.
Plants
Arabis rigidissima var. demota
Galena Creek rockcress
--/--/1B.2 Perennial herb found on well-drained, stony soil underlain
by basic volcanic rock in upper montane coniferous forests.
2255 – 2560 meters. Blooms July – August.
Unlikely. No suitable habitat within the project site.
Artemisia tripartita subsp. tripartita
Threetip sagebrush
--/--/2B.3 Shrub found in openings on rocky, volcanic soils in
upper montane coniferous forests. 2200 – 2600 meters.
Blooms in August.
Unlikely. No suitable habitat within the project site.
Astragalus austiniae
Austin’s astragalus
--/--/1B.3 Perennial herb found in rocky soils in alpine boulder and
rock fields and subalpine coniferous forests. 2440 –
2970 meters. Blooms July – September.
Unlikely. No suitable habitat within the project site.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-25 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE BIO-2 (CONTINUED)
SPECIAL-STATUS SPECIES WITH THE POTENTIAL TO OCCUR IN THE PROJECT SITE
Species
Status
Federal/State/CNPS Habitat Description Potential for Occurrence within the Project Site
Plants (cont.)
Astragalus whitneyi var. lenophyllus
Woolly-leaved milk-vetch
--/--/4.3 Perennial herb found in rocky soils in alpine boulder and
rock fields and subalpine coniferous forests.2135 – 3050
meters. Blooms July – August.
Unlikely. No suitable habitat within the project site.
Botrychium ascendens
Upswept moonwort
--/--/2B.3 Perennial rhizomatous herb found in moist habitats in
meadows and near springs and streams. 1115 – 2700
meters. Blooms July and August.
Medium. Suitable habitat is present in the project site.
Botrychium crenulatum
Scalloped moonwort
--/--/2B.2 Perennial rhizomatous herb found in habitats with wet or
moist soils such as marshes, meadows, and along the
edges of lakes and streams. 1268 – 3280 meters. Blooms
June – September.
Medium. Suitable habitat is present in the project site.
Botrychium lunaria
Common moonwort
--/--/2B.3 Perennial rhizomatous herb found in habitats with wet or
moist soils such as marshes, meadows, and along the
edges of lakes and streams. 1980 – 3400 meters. Blooms
August.
Medium. Suitable habitat is present in the project site.
Botrychium minganense
Mingan moonwort
--/--/2B.2 Perennial rhizomatous herb found in habitats with wet or
moist soils such as marshes, meadows, and along the
edges of lakes and streams. 1455 – 2180 meters. Blooms
July – September.
Medium. Suitable habitat is present in the project site.
Bruchia bolanderi
Bolander’s bruchia
--/--/4.2 Moss species which grows on damp clay soils. This
species is ephemeral in nature and takes advantage of
disturbed sites. 1700 – 2800 meters.
Medium. Suitable habitat is present in the project site.
Carex davyi
Davy’s sedge
--/--/1B.3 Perennial herb found in dry, sparse meadows in
subalpine and upper montane coniferous forests. 1500 –
3200 meters. Blooms May – August.
Medium. Suitable habitat is present in the project site.
Carex lasiocarpa
Woolly-fruited sedge
--/--/2B.3 Perennial rhizomatous herb; generally found in standing
water in sphagnum bogs, freshwater marsh, lakes, and
ponds. 1700 – 2100 meters. Blooms June – July.
Unlikely. No suitable habitat within the project site.
Carex limosa
Mud sedge
--/--/2B.2 Perennial rhizomatous herb found in sphagnum bogs
and edges of lakes. 1200 – 2700 meters. Blooms June –
August.
Unlikely. No suitable habitat within the project site.
Ceanothus fresnensis
Fresno ceanothus
--/--/4.3 Perennial evergreen shrub found on rocky slopes and in
openings in cismontane woodlands and lower montane
coniferous forests. 900 – 2103 meters. Blooms May –
July.
Unlikely. No suitable habitat within the project site.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-26 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE BIO-2 (CONTINUED)
SPECIAL-STATUS SPECIES WITH THE POTENTIAL TO OCCUR IN THE PROJECT SITE
Species
Status
Federal/State/CNPS Habitat Description Potential for Occurrence within the Project Site
Plants (cont.)
Claytonia megarhiza
Fell-fields claytonia
--/--/2B.3 Perennial herb found in crevices between rocks or in
rocky or gravelly soils in alpine fell fields and subalpine
coniferous forest. 2600 – 3532 meters. Blooms July –
September.
Unlikely. No suitable habitat within the project site.
Cryptantha glomeriflora
Clustered-flower cryptantha
--/--/4.3 Annual herb found on sandy granitic or volcanic soils on
open slopes and in dry meadows and creek beds. 1800
– 3750 meters. Blooms June – September.
Medium. Suitable habitat is present in the project site.
Drosera anglica
English sundew
--/--/2B.3 Carnivorous perennial herb found in swamps, bogs, fens
and peatlands. 1300 – 2255 meters. Blooms June –
September.
Unlikely. No suitable habitat within the project site.
Epilobium howellii
Subalpine fireweed
--/--/4.3 Perennial stoloniferous herb found in wet meadows and
mossy seeps. 2000 – 3150 meters. Blooms July –
August.
Medium. Suitable habitat is present in the project site.
Epilobium oreganum
Oregon fireweed
--/--/1B.2 Perennial herb found in and near springs, bogs, and
small streams. Associated with serpentine soils. 500 –
2240 meters. Blooms June – September.
Medium. Suitable habitat is present in the project site.
Erigeron eatonii var. nevadincola
Nevada daisy
--/--/2B.3 Perennial herb found on rocky soils in Great Basin
scrub, lower montane coniferous forest, and pinyon-
juniper woodland. 1400 – 2900 meters. Blooms May –
July.
Unlikely. No suitable habitat within the project site.
Erigeron miser
Starved daisy
--/--/1B.3 Perennial herb found on rocky, granitic outcrops in upper
montane coniferous forest. 1840 – 2620 meters. Blooms
June – October.
Unlikely. No suitable habitat within the project site.
Eriogonum umbellatum var.
torreyanum
Donner Pass buckwheat
--/--/1B.2 Perennial herb found on steep slopes and ridgetops; rocky,
volcanic soils; usually in bare or sparsely vegetated areas in
upper montane coniferous forest, chaparral, meadows.
1855 – 2620 meters. Blooms July – September.
Unlikely. No suitable habitat within the project site.
Eriophorum gracile
Slender cottongrass
--/--/4.3 Perennial rhizomatous herb found on acidic soils in
bogs, fens, wet meadows, and seeps. 1280 – 2900
meters. Blooms May – September.
Medium. Suitable habitat is present in the project site.
Glyceria grandis
American managrass
--/--/2B.3 Perennial rhizomatous aquatic plant found in streams,
ditches, ponds, and wet meadows. 15 – 1980 meters.
Blooms June – August.
Medium. Suitable habitat is present in the project site.
Hackelia amethystina
Amethyst stickseed
--/--/4.3 Perennial herb found in openings and disturbed areas
within coniferous forest and meadows. 1500 – 2315
meters. Blooms June – August.
Medium. Suitable habitat is present in the project site.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-27 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE BIO-2 (CONTINUED)
SPECIAL-STATUS SPECIES WITH THE POTENTIAL TO OCCUR IN THE PROJECT SITE
Species
Status
Federal/State/CNPS Habitat Description Potential for Occurrence within the Project Site
Plants (cont.)
Ivesia sericoleuca
Plumas ivesia
--/--/1B.2 Perennial herb found in vernally mesic areas; usually
volcanic substrates in great basin scrub, lower montane
coniferous forest, meadows, vernal pools. 1310 – 2200
meters. Blooms May – October.
Medium. Suitable habitat is present in the project site.
Juncus luciensis
Santa Lucia rush
--/--/1B.2 Annual herb found in vernal pools, ephemeral drainages,
wet meadows, and stream banks. 300 – 2040 meters.
Blooms April – July.
Medium. Suitable habitat is present in the project site.
Lewisia longipetala
Long-petaled lewisia
--/--/1B.2 Perennial herb found on mesic, rocky sites in cracks of
granite or gravelly volcanic soils within alpine boulder
and rock fields and subalpine coniferous forests. 2500 –
2925 meters. Blooms July – September.
Unlikely. No suitable habitat within the project site.
Meesia triquetra
Three-ranked hump moss
--/--/4.2 Moss growing on mesic soils in bogs, fens, wet
meadows and seeps. 1300 – 2925 meters.
Medium. Suitable habitat is present in the project site.
Meesia uliginosa
Broad-nerved hump moss
--/--/2B.2 Moss growing on damp soil in bogs, fens, wet meadows
and seeps. 1210 – 2804 meters.
Medium. Suitable habitat is present in the project site.
Mertensia oblongifolia var.
oblongifolia
Sagebrush bluebells
--/--/2B.2 Perennial herb found on mesic sites in Great Basin
scrub, coniferous forests, meadows, and seeps. 1000 –
3000 meters. Blooms April – July.
Medium. Suitable habitat is present in the project site.
Nardia hiroshii
Hiroshi’s flapwort
--/--/2B.3 Liverwort found on damp soils with granitic bedrock in
meadows and seeps.
Medium. Suitable habitat is present in the project site.
Potamogeton epihydrus
Nuttall’s ribbon-leaved pondweed
--/--/2B.3 Aquatic perennial rhizomatous herb found in assorted
shallow freshwater sites such as marshes and swamps.
369 – 2172 meters. Blooms June – September.
Unlikely. No suitable habitat within the project site.
Potamogeton robbinsii
Robbins’ pondweed
--/--/2B.3 Aquatic perennial rhizomatous herb found deep water in
lakes. 1530 – 3300 meters. Blooms July – August.
Unlikely. No suitable habitat within the project site.
Pseudostellaria sierrae
Sierra starwort
--/--/4.2 Perennial rhizomatous herb found in the dry understory
of meadows, chaparral, mixed oak, and coniferous
forests. 1225 – 2194 meters. Blooms May – August.
Medium. Suitable habitat is present in the project site.
Rhamnus alnifolia
Alder buckthorn
--/--/2B.2 Perennial deciduous herb found on mesic sites in meadows
and seeps, lower montane coniferous forest, upper
montane coniferous forest, montane riparian scrub. 1370 –
2130 meters. Blooms May – July.
Medium. Suitable habitat is present in the project site.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-28 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
TABLE BIO-2 (CONTINUED)
SPECIAL-STATUS SPECIES WITH THE POTENTIAL TO OCCUR IN THE PROJECT SITE
Species
Status
Federal/State/CNPS Habitat Description Potential for Occurrence within the Project Site
Plants (cont.)
Rorippa subumbellata
Tahoe yellowcress
--/SE/1B.1 Perennial rhizomatous herb found on sandy beaches on
decomposed granite sand on the shores of Lake Tahoe.
1890 – 1905 meters. Blooms May – September.
Unlikely. No suitable habitat within the project site.
Scutellaria galericulata
Marsh skullcap
--/--/2B.2 Perennial rhizomatous herb found mesic sites in swamps,
meadows, stream banks and wet places in coniferous
forests. 0 -2100 meters. Blooms June – September.
Medium. Suitable habitat is present in the project site.
Sphaeralcea munroana
Munro’s desert mallow
--/--/2B.2 Perennial herb that occurs in deserts, valleys and foothills in
association with rabbitbrush and sagebrush. In California it
is known only from the Squaw Creek area. 2000 meters.
Blooms May – June.
Unlikely. No suitable habitat within the project site.
Stuckenia filiformis subsp. alpina
Slender-leaved pondweed
--/--/2B.2 Aquatic rhizomatous herb that occurs in shallow, clear water
of lakes, drainage channels, marshes and swamps. 300 –
2150 meters. Blooms May – July.
Unlikely. No suitable habitat within the project site.
Subularia aquatica subsp.
americana
water awlwort
--/--/4.3 Aquatic annual herb found on lake margins in upper
montane coniferous forests. 1900 – 3100 meters.
Blooms July – September.
Unlikely. No suitable habitat within the project site.
STATUS CODES:
FEDERAL (U.S. Fish and Wildlife Service):
FE = Listed as Endangered by the Federal Government
FT = Listed as Threatened by the Federal Government
FPE = Proposed for Listing as Endangered
FPT = Proposed for Listing as Threatened
FC = Candidate for Federal listing
FDL = Federally delisted species
STATE (California Department of Fish and Wildlife):
SE = Listed as Endangered by the State of California
ST = Listed as Threatened by the State of California
SC = Candidate for State listing
SDL = State delisted species
CSC = California species of special concern
CFP = California fully protected species
SWL = Listed on CDFW’s species watch list
California Native Plant Society (CNPS):
Rank 1A = Plants presumed extirpated in California and either rare or extinct elsewhere
Rank 1B = Plants rare, threatened, or endangered in California and elsewhere
Rank 2A = Plants presumed extirpated in California, but more common elsewhere
Rank 2B = Plants rare, threatened, or endangered in California but more common elsewhere
Rank 3 = Plants about which more information is needed – a review list
Rank 4 = Plants of limited distribution – a watch list
CNPS Code Extensions:
.1 = Seriously endangered in California (over 80% of occurrences threatened/high degree and immediacy of threat)
.2 = Fairly endangered in California (20-80% occurrences threatened)
.3 = Not very endangered in California (less than 20% of occurrences threatened or no current threats known)
SOURCE: CDFW, 2019a; USFWS, 2019a, CNPS, 2019
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-29 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
The “Potential to Occur” categories are defined as follows:
• Unlikely: The project site does not support suitable habitat for a particular species and/or the
project site is outside of the species known range.
• Low Potential: The project site only provides limited and low quality habitat for a particular
species. In addition, the known range for a particular species may be outside of the immediate
project area.
• Medium Potential: The project site and/or immediate project area provides suitable habitat for
a particular species.
• High Potential: The project site and/or immediate project area provide ideal habitat conditions
for a particular species and/or known populations occur in the immediate project area or within
the project site.
Critical Habitat
Critical habitat is defined in Section 3(5)A of the federal Endangered Species Act as the specific
portions of the geographic area occupied by the species in which physical or biological features
essential to the conservation of the species are found and that may require special management
considerations or protection. Specific areas outside of the geographic area occupied by the species
may also be included in critical habitat designations upon a determination that such areas are
essential for the conservation of the species.
There is no critical habitat designated within or adjacent to the project site (USFWS, 2019b).
Discussion
a) Less than Significant with Mitigation. Special-status species and their habitats that may
be affected either directly or indirectly through implementation of the proposed project
include special-status birds, nesting raptors and migratory birds, and special-status plant
species. Each of these potentially affected species is described below.
Special-Status Bird Species
Yellow Warbler
Yellow warbler (Setophaga petechia) nests in riparian areas dominated with deciduous
species, usually in small trees and shrubs such as willows, cottonwoods, and alder. The
project site provides suitable nesting and foraging habitat for yellow warbler within the
montane riparian scrub community. Yellow warbler is known to occur within the
Truckee area. Direct or indirect impacts to the montane riparian scrub habitat may result
in impacts to this species. The impact would be less than significant if construction
activities occur during the non-breeding season (i.e., from September 1st through
January 31st). However, construction activities conducted during the breeding season
between February 1st and August 31st could affect the species adversely and result in a
potentially significant impact. Implementation of Mitigation Measure BIO-1 would
mitigate the impact to less than significant.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-30 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Sierra Nevada Willow Flycatcher
Sierra Nevada willow flycatcher (Empidonax traillii) is a rare to uncommon summer
resident in wet meadows and montane riparian habitats in the Sierra Nevada and
Cascade Range. Willow flycatchers are usually found in broad, open river valleys or
large mountain meadows with a dense growth of willow shrubs. The montane riparian
scrub habitat in the project site is not suitable nesting habitat for willow flycatcher
because it is not dense or extensive enough, but this species could potentially migrate
through the area or forage in the area. However, because nesting habitat is not present,
any migrating or foraging willow flycatcher found in the project site during
construction would be able relocate in order to avoid construction impacts. Therefore,
this impact is less than significant.
Nesting Raptors and Migratory Birds
Under the Migratory Bird Treaty Act (MBTA), migratory bird species and their nests and
eggs are protected from injury or death. California Fish and Game Code Subsections 3503,
3503.5, and 3800 prohibit the possession, incidental take, or needless destruction of birds,
their nests, and eggs.
The project site and the immediate vicinity have the potential to support nesting raptors as
well as migratory birds on suitable nest trees and shrubs. Direct impacts on nesting raptors
or migratory birds or their habitat such as removal of trees or shrubs could result in
substantial lowered reproductive success or habitat loss, thereby potentially adversely
affecting local population levels. The raptor or bird species could be adversely affected if
active nesting, roosting, or foraging sites are either removed or exposed to a substantial
increase in noise or human presence during project activities. The impact would be less
than significant if construction activities occur during the non-breeding season (i.e., from
September 1st through January 31st). However, construction activities conducted during the
breeding season between February 1st and August 31st could affect species adversely and
result in a potentially significant impact. Implementation of Mitigation Measure BIO-1
would mitigate the impact to less than significant.
Special-Status Plants
Suitable habitat for a number of special-status plants occurs on the project site. Based on
reconnaissance-level surveys conducted on the project site, a review of available
databases and literature, and an on-site habitat suitability assessment, 23 special-status
plant species were determined to have the potential to occur on the project site (see Table
BIO-2). The reconnaissance-level surveys conducted for this project did not record the
presence of any special-status plant species; however, these surveys do not constitute a
full botanical inventory of the site and do not meet the requirements outlined in the
Protocols for Surveying and Evaluating Impacts to Special Status Native Plant
Populations and Sensitive Natural Communities (CDFW, 2018). Therefore, it is not
known whether the project site supports any special-status plant species. Implementation
of the proposed project could potentially result in direct or indirect impacts to special-
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-31 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
status plant populations if they are located on the project site. Mitigation Measure BIO-
2 will reduce potential impacts to special-status plants to less than significant.
b, c) Less than Significant with Mitigation. The project site supports sensitive habitats,
including protected waters of the U.S. as defined in Section 404 of the Clean Water Act,
riparian vegetation, and state jurisdictional waters.
Church Street Extension
Sensitive habitats, including protected wetland habitat and riparian vegetation, as defined
in Section 404 of the Clean Water Act and Section 1602 of the California Fish and Game
Code, could be affected by project construction through direct removal, filling, hydrological
interruption, alteration of bed and bank, and other construction-related activities. Based on the
30% design level engineering plans for the Church Street Extension component of the
project, implementation of the street extension component of the project would result in the
permanent removal of approximately 0.463 acre of federally protected waters of the U.S. and
an additional 0.367 acre of habitat protected under Section 1602 of the California Fish and
Game Code. This is a potentially significant impact. Implementation of Mitigation
Measure BIO-3 would mitigate the impact to less than significant.
Trout Creek Restoration
Based on the 30% design level engineering plans for the Trout Creek Restoration
component of the project, implementation of the restoration component of the project would
result in the temporary removal of approximately 1.141 acres of federally protected waters
of the U.S. and an additional 0.010 acre of habitat protected under Section 1602 of the
California Fish and Game Code. Overall, implementation of the Trout Creek component of
the project is not expected to result in any net loss of sensitive natural communities,
including waters of the U.S., and instead is expected to result in a net increase in
functions and services of wetland and riparian habitat at the project site. Based on the
nature of the proposed restoration activities, and the long-term aquatic ecosystem benefits
that would result from implementation of restoration of Reaches 4 and 5 of Trout Creek,
impacts to sensitive natural communities, including waters of the U.S., are considered
less than significant.
d) Less than Significant with Mitigation. Trout Creek, along with its associated riparian
corridor, provides a movement corridor for fish and wildlife to areas upstream and
downstream of the project site. Trout Creek provides habitat for native fish species
including the Tahoe sucker and the speckled dace, and nonnative introduced salmonids
including brown trout, brook trout, and rainbow trout. Construction activities may
temporarily disrupt fish and wildlife movement within the project site. The disturbance
would only occur during project construction and the disruption of fish and wildlife
movement would be temporary in nature. Implementation of the proposed project would
not interfere substantially with the movement of terrestrial wildlife species or with
established native resident or migratory wildlife corridors, or impede the use of native
wildlife nursery sites. In addition, the proposed project would have a long-term beneficial
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-32 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
impact on aquatic habitat in Trout Creek and downstream in the Truckee River. The long-
term effects of the proposed Trout Creek Restoration component of the project would be
beneficial to native and nonnative fish species by improving fish passage and habitat
quality within the project reaches, and improving habitat quality downstream of the
project reaches by decreasing sedimentation and increasing water quality in the Truckee
River due to the habitat degradation that currently exists in the project reaches.
Nevertheless, direct or indirect impacts to the riverine habitat in Trout Creek may result in
impacts to migratory or resident fish in the project site. Mitigation Measures BIO-4 and
BIO-5 will reduce potential impacts to migratory or resident fish to less than significant.
e) No Impact. The Town recognizes the importance of trees and regulates the removal of
trees through Section 18.30.155 of the Town of Truckee Development Code. However,
no trees are expected to be removed during construction of the Church Street Extension
component of the proposed project, and no trees over 24-inches diameter at breast height
will be removed during construction of the Trout Creek Restoration component of the
project; therefore, a permit for tree removal pursuant to Section 18.30.155 of the Town of
Truckee Development Code is not required. The project would not conflict with any local
policies or ordinances protecting biological resources. Therefore, there is no impact.
f) No Impact. The proposed project is not located within an adopted Habitat Conservation
Plan, Natural Community Conservation Plan, or other approved local, regional, or state
habitat conservation plan. Therefore, there would be no impact.
Mitigation Measures
Mitigation Measure BIO-1: Perform Pre-Construction Surveys for Nesting Raptors
and Migratory Birds. For construction activities expected to occur during the nesting
season of raptors (February 1 to August 31) and migratory birds, a pre-construction
survey shall be conducted to determine if active nests are present on or within 500 feet of
the project site where feasible. Areas that are inaccessible due to private property
restrictions shall be surveyed using binoculars from the nearest vantage point. The survey
shall be conducted by a qualified biologist no more than seven days prior to the onset of
construction. If no active nests are identified during the pre-construction survey, no
further mitigation is necessary. If construction activities begin prior to February 1, it is
assumed that no birds will nest in the project site during active construction activities and
no pre-construction surveys are required. If at any time during the nesting season
construction stops for a period of two weeks or longer, pre-construction surveys shall be
conducted prior to construction resuming.
If active nests are found on or within 500 feet of the project site, then the Town shall
notify CDFW and explain any additional measures that a qualified biologist plans to
implement to prevent or minimize disturbance to the nest while it is still active.
Depending on the conditions specific to each nest, and the relative location and rate of
construction activities, it may be feasible for construction to occur as planned within the
500-foot buffer without impacting the breeding effort. Appropriate measures may include
restricting construction activities within 500 feet of active raptor nests, and having a
qualified biologist with stop work authority monitor the nest for evidence that the
behavior of the parents have changed during construction. Appropriate measures would
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-33 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
be implemented until the young have fledged or until a qualified biologist determines that
the nest is no longer active. Construction activities may be halted at any time if, in the
professional opinion of the biologist, construction activities are affecting the breeding
effort.
Mitigation Measure BIO-2: Perform Pre-Construction Surveys for Special-Status
Plants. A qualified plant biologist shall conduct a pre-construction survey(s) in the
appropriate season(s) for the plant species identified as having a medium to high potential
to occur within the construction disturbance area (see Table BIO-2). Surveys will
conform to the procedures in CDFW’s Protocols for Surveying and Evaluating Impacts
to Special Status Native Plant Populations and Sensitive Natural Communities (CDFW,
2018). If special-status plant species are found, the Town shall consult with CDFW to
provide preservation and avoidance measures commensurate with the standards provided
in applicable CDFW protocols for the affected species. The preservation and avoidance
measures may include appropriate buffer areas clearly marked during project activities,
monitoring by a qualified plant biologist, the evaluation of relocating project facilities
that would impact special-status plant species populations, and the development and
implementation of a replanting plan (collection of seeds, revegetation, and management
and monitoring of the habitat to ensure success) for any individuals of the species that
cannot be avoided.
Mitigation Measure BIO-3: Wetland and Riparian Mitigation Plan. The Town shall
prepare a wetland and riparian mitigation plan that ensures no net loss of waters of the
U.S. and riparian vegetation. The wetland and riparian mitigation plan shall be based on a
wetland delineation verified by USACE. This measure may be implemented through the
CWA Section 404 permit and Streambed Alteration Agreement process. The Town shall
compensate for the loss of wetland and riparian habitat through a combination of
restoration/enhancement and/or the purchase of mitigation credits at an approved
mitigation bank. The ratio of compensation shall be determined in consultation with
USACE and CDFW, as part of the CWA Section 404 permit and Streambed Alteration
Agreement process, but shall not be less than 1:1.
Mitigation Measure BIO-4: Fish Rescue. Before construction activities commence
within Trout Creek (i.e., prior to creek diversion and dewatering), a qualified biologist
shall develop and implement a fish capture and translocation plan within the construction
dewatering area. The plan will specify that all captured native fish species shall be
captured and immediately released to suitable habitat near the project site. The plan will
also include measures for the placement of nets with 1/8-inch mesh at the up and
downstream extent of the area to be dewatered to keep fish out of the area during fish
removal activities. After removal activities have been completed, the work area would
then be cleared for dewatering. Fish rescue and relocation would continue until the area is
completely dewatered or until it is determined that no fishes remain in the dewatering
area. These activities would take place in consultation with CDFW and in accordance
with the dewatering plan.
Mitigation Measure BIO-5: Prepare a Dewatering Plan. A dewatering plan will be
developed and designed so that any potential discharges to surface water will meet the
water quality objectives provided in the Water Quality Control Plan for the Lahontan
Region (Basin Plan) (LRWQCB, 2016). The Dewatering Plan will describe the
procedures necessary to satisfy the requirements of the State of California’s General
Permit for Discharges of Storm Water Runoff Associated with Construction Activity
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-34 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
(General Storm Water Permit) and the RWQCB 401 water quality certification. The
dewatering plan is required to include details on the proposed use of fish screens,
intended to prevent entrainment or impingement of small fish (on the suction end of
intake pipes), and measures to prevent erosion of sediments downstream.
References
Baldwin, B.G., D.H. Goldman, D.J. Keil, R. Patterson, T.J. Rosatti, and D.H. Wilken, editors.
2012. The Jepson manual: Vascular plants of California, second edition. University of
California Press, Berkeley, CA.
Calflora, 2019. Information on California plants for education, research and conservation [web
application]. Berkeley, California: The Calflora Database [a non-profit organization].
Available: http://www.calflora.org/. Accessed March 25, 2019
California Department of Fish and Wildlife (CDFW), 2018. Protocols for Surveying and
Evaluating Impacts to Special Status Native Plant Populations and Sensitive Natural
Communities. Sacramento, CA.
CDFW, 2019a. California Natural Diversity Database (CNDDB) Rarefind 5 computer program
(v5.2.14). California Department of Fish and Wildlife Biogeographic Data Branch.
Sacramento, CA.
CDFW, 2019b. Special Vascular Plants, Bryophytes, and Lichens List. California Department of
Fish and Wildlife, Natural Diversity Database. Sacramento, CA. Quarterly publication.
127 pp. Data dated March 2019.
CDFW, 2019c. Special Animals List. California Department of Fish and Wildlife, Natural
Diversity Database. Sacramento, CA. Periodic publication. 66 pp. Data dated November
2018.
CDFW, 2019d. California Natural Community List. Vegetation Classification and Mapping
Program. Sacramento, CA. Available:
https://www.wildlife.ca.gov/Data/VegCAMP/Natural-Communities/List. Accessed March
25, 2019
California Native Plant Society (CNPS), 2019. Inventory of Rare and Endangered Plants (online
edition, v8.03 0.39). California Native Plant Society. Sacramento, CA. Accessed April 2,
2019
Environmental Laboratory. 1987. Corps of Engineers Wetland Delineation Manual (Technical
Report Y-87-1). U.S. Army Corps of Engineers Waterways Experimental Station.
Vicksburg, Mississippi.
Environmental Science Associates (ESA), 2019. Church Street Extension/Trout Creek
Restoration Project Aquatic Resources Delineation Report. April 2019.
Federal Geographic Data Committee, 2013. Classification of Wetlands and Deepwater Habitats
of the United States. FGDC-STD-004-2013. Second Edition. Wetlands Subcommittee,
Federal Geographic Data Committee and U.S. Fish and Wildlife Service, Washington, DC.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-35 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Jepson Flora Project (eds.), 2019. Jepson eFlora. http://ucjeps.berkeley.edu/eflora/. Accessed
March 25, 2019.
Mayer, K. E., and W.F. Laudenslayer, Jr., 1988. A Guide to Wildlife Habitats of California. State
of California Resources Agency, California Department of Fish and Game. Sacramento, CA.
Sawyer, J. O., T. Keeler-Wolf, and J. M. Evens, 2009. A Manual of California Vegetation.
California. 2nd Edition. Native Plant Society Press. Sacramento, CA.
U.S. Army Corps of Engineers (USACE). 2010. Regional Supplement to the Corps of Engineers
Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region (Version 2.0)
ed. J.S. Wakeley, R.W. Lichvar, and C.V. Noble. ERDC/EL TR-10-3. Vicksburg, MS: U.S.
Army Engineer Research and Development Center.
U.S. Fish and Wildlife Service (USFWS), 2019a. List of Federal Endangered and Threatened
Species that may occur in the Project Area. Sacramento Fish and Wildlife Office,
Endangered Species Division.
USFWS, 2019b. Critical Habitat for Threatened and Endangered Species. Critical Habitat Portal
Online Mapper. Available: http://ecos.fws.gov/crithab/. Accessed March 25, 2019.
USFWS. 2019c. National Wetlands Inventory. Available: www.fws.gov/wetlands/Data/
Mapper.html. Accessed November 13, 2017; November 8, 2018; and March 25, 2019.
Western Regional Climate Center. 2019. Period of Record General Climate Summary for Truckee
RS, California, 1904 –2016. Accessed March 25, 2019.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-36 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Cultural Resources
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
5. CULTURAL RESOURCES — Would the project:
a) Cause a substantial adverse change in the
significance of a historical resource pursuant to
§15064.5?
☐ ☐ ☐ ☒
b) Cause a substantial adverse change in the
significance of an archaeological resource pursuant to
§15064.5?
☐ ☒ ☐ ☐
c) Disturb any human remains, including those interred
outside of formal cemeteries? ☐ ☒ ☐ ☐
Discussion
a) No Impact. CEQA Guidelines Section 15064.5 requires the lead agency to consider the
effects of a project on historical resources. A historical resource is defined as a building,
structure, site, or object listed in or determined to be eligible for listing in the California
Register of Historical Resources (California Register), or determined by a lead agency to
be significant in the architectural, engineering, scientific, economic, agricultural,
educational, social, political, or cultural annals of California. The following discussion
focuses on architectural and structural resources. Archaeological resources, including
those that are potentially historical resources according to CEQA Guidelines Section
15064.5, are addressed under impact b).
As a result of a records search, background research, and a site survey, it was confirmed
that no historical resources are present in the project area (ESA, 2018). As such, there are
no architectural or structural resources on the project site that qualify as historical
resources as defined in CEQA Guidelines Section 15064.5; therefore, the project would
have no impact on historical resources, as defined in CEQA Guidelines Section 15064.5.
b) Less than Significant with Mitigation. This section discusses archaeological resources,
both as historical resources according to CEQA Guidelines Section 15064.5, as well as
unique archaeological resources as defined in Public Resources Code Section 21083.2(g).
A significant impact would occur if the project would cause a substantial adverse change
to an archaeological resource through physical demolition, destruction, relocation, or
alteration of the resource.
ESA completed a record search at the North Central Information Center (NCIC) of the
California Historical Resources Information System on November 1, 2017. The record
search indicated that nine cultural resources studies had previously been completed which
partially overlapped or encompassed the project site. One study, Cultural and
Paleontological Resources Study and Historical Evaluation for the Truckee Railyard
Master Plan Project (Pulcheon and Marvin 2008), completely encompassed the current
project site. This report also evaluated the CEQA-level significance of the cultural
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-37 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
resources within the project area. In addition to these reports, an additional 65 studies
were conducted within a ½-mile of the project site.
The record search also indicated that five cultural resources had been recorded within the
project site and 65 additional resources had been recorded within a ½-mile of the project
site. On November 7, 2017, ESA archaeologist R. Scott Baxter surveyed the project area
in 10-meter transects. Ground surface visibility was excellent, the only limitations being
sparse riparian habitat along Trout Creek. On November 9 and 16, 2018, ESA
archaeologist Ben Curry conducted a survey of two additional sections of Trout Creek.
Five cultural resources were identified within the project area: P-29-000823 (CA-NEV-
695H), P-29-000950 (CA-NEV-714H), P-29-001199/P-29-001204, P-29-001200, and
P-29-004376.
• P-29-000823 (CA-NEV-695H), the Sierra Nevada Wood and Lumber
Company/Hobart Southern Railway, is a short segment of a much longer historic
railway system dating to ca. 1896-1955. All that remains of the railway within the
project site is a level, earthen railroad grade. Snyder (1998) and subsequently
Pulcheon and Marvin (2008:33) recommended that this is not a historical resource
under CEQA.
• P-29-000950 (CA-NEV-714H), Lincoln Highway, is a segment of the old Lincoln
Highway. This segment coincides with the alignment of Glenshire Drive along the
northern edge of the project site. In its current form it is a two-lane asphalt paved
roadway. Pulcheon and Marvin (2008:22, 34) as well as Lindström (2002:2) noted
that the Lincoln Highway “likely possesses historical significance” and is considered
a historical resource under CEQA. However, Lindström and Bennet (2013:1) later
indicated that “The Glenshire Drive segment of the Lincoln/Victory highways/Old
U.S. 40 has been fully inventoried and evaluated as part of prior studies and found
ineligible to the National Register of Historic Places and California Register of
Historic Resources.” This segment of the highway is, therefore, not a historical
resource under CEQA.
• P-29-001199/P-29-001204 is a series of water control ditches and gates, partially
integrated into Trout Creek. The creek has been channelized and is linked to a
parallel ditch via a pair of sluice gates and shallow ditches. These resources were
previously recorded as two separate sites. P-29-001199 was recorded by Lindström
and Bennet (2002) as a ditch. P-29-001204 was recorded by Lindström (2002) as a
stone retaining wall on the south bank of Trout Creek. While most of this wall is
outside the project site, much of the length of the creek in the project site has been
channelized. The creek, and the ditch recorded as P-29-001199, are connected by a
pair of sluice gates and shallow ditches, creating one integrated water control system.
Lindström (2002) and subsequently Pulcheon and Marvin (2008:33) recommended
that the two primary components of this resource (P-29-001199 and P-29-001204)
are not a historical resource under CEQA.
• P-29-001200 is a fence line recorded as Kearney’s Chick Ranch Fence by Lindström
(2002). In 2018, four standing fence posts and three fallen fence posts were identified
in the project site along Trout Creek. The fence line, when standing, would have
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-38 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
crossed Trout Creek, and would have paralleled the railroad bed on its northern side.
The posts are reused railroad ties, with round wire cut nails. Some deer mesh fencing
is still present near the northern post next to Trout Creek. Lindström (2002)
recommended that the fence line is not a historical resource under CEQA.
• P-29-004376 is a fence line between Trout Creek and Glenshire Drive previously
recorded by Mitchell (2012). It is composed of a mix of railroad tie and rail fence
posts, strung with a combination of barbed wire, hog wire, and random scraps of
bailing wire. The fence has fallen into state of disrepair, with most of the fencing
material having fallen down. Only random posts remain standing. P-29-004376 does
not meet any of the criteria for listing in the National or California Registers. In
addition, the resource lacks physical integrity. As the resource is not eligible for the
California Register, it is not considered a historical resource under CEQA.
In summary, none of the cultural resources identified within the project area are historical
resources or unique archaeological resources under CEQA.
Through a records search and background research, a surface survey, and an evaluation
of cultural resources in the project area, it has been determined that no archaeological
resources that qualify as historical resources or unique archaeological resources are in the
project site. In addition, based on the environmental context and previous disturbance,
there is a low potential that unknown archaeological resources could be discovered
during project implementation (ESA, 2018).
If a previously unrecorded archaeological resource were identified during project ground
disturbing activities, and was found to qualify as an historical resource per CEQA
Guidelines Section 15064.5 or a unique archaeological resource as defined in PRC
Section 21083.2(g), any impacts to the resource resulting from the project could be
potentially significant. Mitigation Measure CUL-1, which will be implemented in the
event of inadvertent discovery of unidentified archaeological cultural resources, requires
work to halt and the resources to be thoroughly documented and treated appropriately.
Implementation of this mitigation measure would ensure that impacts on archaeological
resources remain at a less-than-significant level.
c) Less than Significant with Mitigation. The records search and background research
confirmed that no human remains are known to exist in the project area. Therefore, the
proposed project is not anticipated to impact human remains, including those interred
outside of formal cemeteries.
While unlikely, if any previously unknown human remains were encountered during
ground disturbing activities, any impacts to the human remains resulting from the project
could be potentially significant. Implementation of Mitigation Measure CUL-2 would
reduce this potential impact to a less-than-significant level by ensuring that if human
remains are encountered, the find will be reported to the County Coroner. If the remains
are determined to be Native American in origin, the Native American Heritage
Commission would be contacted and the remains would be treated appropriately.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-39 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Mitigation Measures
Mitigation Measure CUL-1: Inadvertent Discovery of Archaeological Resources or
Tribal Cultural Resources. If prehistoric or historic-era cultural resources are
encountered, all construction activities within 100 feet shall be halted and the Town of
Truckee shall be notified. Prehistoric archaeological materials might include obsidian and
chert flaked-stone tools (e.g., projectile points, knives, scrapers) or toolmaking debris;
culturally darkened soil (“midden”) containing heat-affected rocks, artifacts, or shellfish
remains; stone milling equipment (e.g., mortars, pestles, handstones, or milling slabs);
and battered stone tools, such as hammerstones and pitted stones. Historic-era materials
might include stone, concrete, or adobe footings and walls; filled wells or privies; and
deposits of metal, glass, and/or ceramic refuse. An archaeologist meeting the Secretary of
the Interior’s Professional Qualifications Standards for Archeology, hereafter “qualified
archaeologist,” will inspect the findings within 24 hours of discovery.
If it is determined that the project could damage a significant cultural resource, mitigation
will be implemented with a preference for preservation in place, consistent with the
priorities set forth in CEQA Guidelines Section 15126.4(b)(3). If avoidance is not
feasible, a qualified archaeologist will prepare and implement a detailed treatment plan in
consultation with the Town of Truckee and, for prehistoric resources, the
ethnographically associated Native American tribe. If the resource is determined to be a
tribal cultural resource, as defined by Public Resources Code 21074, the Town of
Truckee, in consultation with the ethnographically associated Native American tribe,
will, if feasible, minimize significant adverse impacts by avoiding the resource or treating
the resource with culturally appropriate dignity, which includes protecting the cultural
character and integrity of the resource, protecting the traditional use of the resource, and
protecting the confidentiality of the resource.
Mitigation Measure CUL-2: Inadvertent Discovery of Human Remains. In the event
of discovery or recognition of any human remains during construction activities the
provisions of CEQA Guidelines § 15064.5(e) will be followed and such activities will
cease within 100 feet of the find until the County Coroner has been contacted to
determine that no investigation of the cause of death is required. If it is determined that
the remains are Native American in origin, the Native American Heritage Commission
(NAHC) will be contacted within 24 hours. The NAHC will then identify the person or
persons it believes to be the most likely descendant from the deceased Native American.
The most likely descendant would, in turn, make recommendations to the Town of
Truckee for the appropriate means of treating the human remains and any grave goods.
References
ESA, Church Street Extension Project Cultural Resources Inventory (D170799), Prepared for
Todd Landry, Senior Civil Engineer, Town of Truckee, November 2018.
Lindström, Susan, Trout Creek Restoration Project, Heritage Resource Inventory, Truckee,
California, Nevada County. Prepared for by Susan Lindström for PWA, 2002.
Lindström, Susan and Lizzie Bennet, P-29-001199. Site record on file at NCIC, 2002.
Lindström, Susan and Lizzie Bennet, P-29-001199. Site record update on file at NCIC, 2013.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-40 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Mitchel, Kelly, P-29-004376. Site record on file at the NCIC, 2012.
North Central Information Center (NCIC), File No. NEV-17-75 California Historical Resources
Information System at California State University, Sacramento. On file at ESA,
November 1, 2017.
Pulcheon, Andrew and Judith Marvin, Cultural and Paleontological Resources Study and
Historical Evaluation for the Truckee Railyard Master Plan Project. Prepared by LSA for
the Truckee Community Development Department, 2008.
Snyder, R.A., P-29-000823/CA-NEV-000695H. Site Record on file at NCIC, 1998.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-41 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Energy
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
6. ENERGY — Would the project:
a) Result in potentially significant environmental impact
due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
☐ ☐ ☒ ☐
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency? ☐ ☐ ☒ ☐
Discussion
Consistent with Public Resources Code Section 21100(b)(3), this impact analysis evaluates the
potential for the project to result in a substantial increase in energy demand and wasteful use of
energy during project construction, operation and maintenance. The impact analysis is informed
by Appendix G of the CEQA Guidelines. The potential impacts are analyzed based on an
evaluation of whether construction energy use estimates for the project would be considered
excessive, wasteful, or inefficient.
a) Less than Significant. The analysis in this section utilizes the energy input assumptions
used to complete the analyses from the Air Quality and Greenhous Gas Emissions
sections respectively. Because the California Emissions Estimator Model (CalEEMod)
program used for those analyses does not quantify in the output file the fuel volume or
type for construction-related sources; additional calculations were completed and are
summarized below.
Project Construction
Construction of the project would result in fuel consumption from the use of construction
tools and equipment, truck trips to haul material, and vehicle trips generated from
construction workers commuting to and from the site. Project construction is expected to
consume a total of approximately 19,178 gallons of diesel fuel and 1,140 gallons of
gasoline from construction equipment and vendors, hauling, truck trips, and construction
worker commute.
Construction activities and corresponding fuel energy consumption would be temporary
and localized, as the use of diesel fuel and heavy-duty equipment would not be a long-
term condition of the project. In addition, there are no unusual project characteristics that
would cause the use of construction equipment or haul vehicles that would be less energy
efficient compared with other similar construction sites in other parts of the State. In
conclusion, construction-related fuel consumption by the project would not result in
inefficient, wasteful, or unnecessary energy use compared with other construction sites in
the region. This impact is considered less than significant.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-42 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Project Operation
Once construction is complete, the source of operational emissions will be minimal and
related to maintenance activities. Because the project’s operational impacts on energy
resources are primarily driven by limited maintenance activities, energy use would be
negligible. This impact is considered less than significant.
b) Less than Significant. The transportation sector is a major end-user of energy in
California, accounting for approximately 39 percent of total statewide energy
consumption in 2014 (U.S. Energy Information Administration, 2016). In addition,
energy is consumed in connection with construction and maintenance of transportation
infrastructure, such as streets, highways, freeways, rail lines, and airport runways.
California’s 30 million vehicles consume more than 16 billion gallons of gasoline and
more than 3 billion gallons of diesel each year, making California the second largest
consumer of gasoline in the world (CEC, 2016).
With respect to transportation energy, existing energy standards are promulgated through
the regulation of fuel refineries and products, such as the Low Carbon Fuel Standard
(LCFS), which mandates a 10 percent reduction in the non-biogenic carbon content of
vehicle fuels by 2020. Additionally, there are other regulatory programs with emissions
and fuel efficiency standards established by USEPA and the California Air Resources
Board (CARB) such as Pavley II/LEV III from California’s Advanced Clean Cars
Program and the Heavy-Duty (Tractor-Trailer) GHG Regulation. CARB has set a goal of
4.2 million Zero Emissions Vehicles (ZEV) on the road by the year 2030 (CARB, 2016).
Further, construction sites will need to comply with State requirements designed to
minimize idling and associated emissions, which also minimizes use of fuel. Specifically,
idling of commercial vehicles and off-road equipment would be limited to five minutes in
accordance with the Commercial Motor Vehicle Idling Regulation and the Off-Road
Regulation 2.
In terms of local energy planning Nevada County is in the process of developing an
Energy Action Plan (Nevada County, 2019). The Draft Plan includes goals related to
energy efficiency and fuel efficient transportation practices. The proposed project is
consistent with the goals of the draft plan and would not impede progress towards
achieving these local goals.
In conclusion, the proposed project would not conflict with or obstruct a state or local
plan for renewable energy or energy efficiency or impede progress towards achieving
goals and targets. This impact is considered less than significant.
2 California Code of Regulations (CCR), 2005. Title 13, Chapter 10, 2485, updated through 2014.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-43 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
References
California Air Resources Board (CARB). 2016. Mobile Source Strategy, May 2016. Available:
https://www.arb.ca.gov/planning/sip/2016sip/2016mobsrc.htm. Accessed March 2019.
California Energy Commission (CEC). 2016. Summary of California Vehicle and Transportation
Energy. Available: http://www.energy.ca.gov/almanac/transportation_data/summary.
html#vehicles. Accessed March 2019.
Nevada County. 2019. Draft Energy Action Plan.
U.S. Energy Information Administration. 2016. California State Profile and Energy Estimates:
Consumption by Sector. Available: http://www.eia.gov/state/?sid=CA#tabs-2. Accessed:
March 2019.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-44 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Geology, Soils, and Seismicity
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
7. GEOLOGY and Soils — Would the project:
a) Directly or indirectly cause potential substantial
adverse effects, including the risk of loss, injury, or
death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on other
substantial evidence of a known fault? Refer to
Division of Mines and Geology Special
Publication 42.
☐ ☐ ☐ ☒
ii) Strong seismic ground shaking? ☐ ☐ ☒ ☐
iii) Seismic-related ground failure, including
liquefaction? ☐ ☐ ☒ ☐
iv) Landslides? ☐ ☐ ☒ ☐
b) Result in substantial soil erosion or the loss of topsoil? ☐ ☐ ☒ ☐
c) Be located on a geologic unit or soil that is unstable,
or that would become unstable as a result of the
project, and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction,
or collapse?
☐ ☐ ☒ ☐
d) Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code (1994),
creating substantial direct or indirect risks to life or
property?
☐ ☐ ☒ ☐
e) Have soils incapable of adequately supporting the use
of septic tanks or alternative waste water disposal
systems where sewers are not available for the
disposal of waste water?
☐ ☐ ☐ ☒
f) Directly or indirectly destroy a unique paleontological
resource or site or unique geologic feature? ☐ ☐ ☐ ☒
Discussion
a.i) No Impact. A geotechnical engineering report was conducted for the proposed project
that evaluated geotechnical issues related to the proposed bridge over and restoration
actions to Trout Creek (Holdrege and Kull, 2017). The project site is not located within
an Alquist-Priolo earthquake fault zone. Therefore, relative to being located on an active
fault, there would be no impact.
a.ii) Less than Significant. The geotechnical engineering report identified the following
active faults in the region (Holdrege and Kull, 2017):
• Dog Valley Fault, approximately five miles northwest;
• A group of unnamed faults southeast of Truckee approximately one mile and two
miles southwest;
• Polaris Fault, approximately two miles northeast;
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-45 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
• West Tahoe Fault, approximately 16 miles south-southeast;
• North Tahoe Fault, approximately 15 miles southeast.
Earthquakes associated with these faults may cause strong ground shaking at the project
site. Movement on the Dog Valley Fault could result in a maximum credible earthquake
of 6.75 (Town of Truckee, 2008a). There has been seismic activity felt in Truckee in
recent history, including a magnitude 6+ earthquake in 1966, a magnitude 3.6 earthquake
in 1998, and a magnitude 4.5 earthquake centered six miles south of Truckee in June of
2004. A seismic event could subject the precast concrete arch bridge to be constructed
over Trout Creek to seismic shaking. The estimated peak acceleration with a 10 percent
chance of being exceeded over the next 50 years is estimated by the California
Geological Survey at 0.33 g (33 percent of gravity) (Town of Truckee, 2008b). The
geotechnical engineering investigation estimated 0.480 g (Holdrege and Kull, 2017). The
proposed road and bridge would be required to be constructed to Caltrans standards,
which would consider the level of seismic shaking the bridge could be subjected to. The
geotechnical engineering report included seismic design criteria based on their site-
specific investigation, and recommendations to address the estimated level of seismic
shaking and the effects of seismic shaking and secondary seismic failures such as
liquefaction on the bridge. Note that compliance with Caltrans standards and the
implementation of the geotechnical investigation recommendations is a condition of the
grading and construction permit. With compliance with Caltrans standards and
implementation of the geotechnical recommendations, the impact relative to seismic
shaking would be less than significant.
a.iii) Less than Significant. The soils in the project area are glacial moraine deposits with
limited amounts of organic materials and clays and sands (Town of Truckee, 2008b). The
geotechnical engineering investigation indicated that the susceptibility of the site to
liquefaction is low (Holdrege and Kull, 2017). Therefore, the impact relative to
liquefaction would be less than significant.
a.iv) Less than Significant. Topography of the project area is relatively flat with a relatively
gradual slope near Trout Creek. Therefore, the project area would not be susceptible to
landslides and the impact would be less than significant.
b) Less than Significant. The proposed earthmoving construction activities would
temporarily disturb soils and alter existing drainage patterns. Disturbed soils are
susceptible to high rates of erosion from wind and rain, resulting in sediment transport
from the site. As explained in further detail below in Hydrology and Water Quality,
impacts a) and f), the proposed project would be subject to the requirements of the Town
of Truckee Development Code, which requires adherence to Section 402 of the federal
Clean Water Act and the National Pollutant Discharge Elimination System (NPDES)
permitting process. All construction projects that disturb more than one acre of land are
required to acquire coverage under the state Construction General Permit, which would
require preparing and implementing a stormwater pollution prevention plan (SWPPP) to
minimize the potential erosion of soils and the release of sediment or other pollutants into
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-46 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Trout Creek and the Truckee River through the use of best management practices
(BMPs). Details regarding BMP designed to minimize erosion are discussed below in
Hydrology and Water Quality, impacts a) and f). With implementation of BMPs and
compliance with the state Construction General Permit, the impacts from erosion and loss
of topsoil would be less than significant.
c) Less than Significant. As discussed above in Impact a.iv), the project site has a gradual
slope and would not be susceptible to slope failures such as landslides or collapse. The
proposed project does not include the withdrawal of groundwater, oil, or natural gas, and
therefore would not cause subsidence. As discussed above in Impact a.iii), the project site
does not have soils susceptible to liquefaction or lateral spreading (Holdrege and Kull,
2017). Therefore, the impacts relative to unstable soils would be less than significant.
d) Less than Significant. As discussed above in Impact a.iii), the soils in the project area
are glacial moraine deposits with limited amounts of organic materials and clays and
sands. Expansive soils are soils with a high percentage of clays susceptible to expansion
(shrink-swell) when subjected to alternating wetting and drying. The geotechnical
engineering investigation did not encounter expansive soils (Holdrege and Kull, 2017).
With minimal amounts of clay, the project would not be susceptible to expansion and the
impact would be less than significant.
e) No Impact. The proposed project would not include the use of septic tanks or alternative
wastewater disposal systems, resulting in no impact.
f) No Impact. Paleontological resources are the fossilized evidence of past life found in the
geologic record. Despite the tremendous volume of sedimentary rock deposits preserved
worldwide, and the enormous number of organisms that have lived through time,
preservation of plant or animal remains as fossils is an extremely rare occurrence.
Because of the infrequency of fossil preservation, fossils—particularly vertebrate
fossils—are considered to be nonrenewable resources. Because of their rarity, and the
scientific information they can provide, fossils are highly significant records of ancient
life.
Rock formations that are considered of paleontological sensitivity are those rock units
that have yielded significant vertebrate or invertebrate fossil remains (SVP, 2010). This
includes, but is not limited to, sedimentary rock units that contain significant
paleontological resources anywhere within its geographic extent. As discussed above in
Impact a.iii), the soils in the project area are glacial moraine deposits with limited
amounts of organic materials and clays and sands. The deposits have been derived from
the surrounding igneous rocks of the Sierra Nevada Mountains. Igneous rocks would not
contain paleontological resources, resulting in no impact.
References
Holdrege & Kull, 2017, Geotechnical Engineering Report for Church Street to Glenshire Drive
Intersection Project. Truckee, California, December 4, 2017.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-47 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Society of Vertebrate Paleontology (SVP), 2010. Assessment and Mitigation of Adverse Impacts
to Nonrenewable Paleontologic Resources: Standard Guidelines, Society of Vertebrate
Paleontology News Bulletin, 2010.
Town of Truckee, 2008a. Town of Truckee Emergency Operations Plan, February.
Town of Truckee, 2008b. Truckee Railyard Draft Master Plan EIR, November.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-48 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Greenhouse Gas Emissions
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
8. GREENHOUSE GAS EMISSIONS —
Would the project:
a) Generate greenhouse gas emissions, either directly or
indirectly, that may have a significant impact on the
environment?
☐ ☐ ☒ ☐
b) Conflict with an applicable plan, policy or regulation
adopted for the purpose of reducing the emissions of
greenhouse gases?
☐ ☐ ☒ ☐
Discussion
a) Less than Significant. Greenhouse Gas Emissions (GHG) from both construction
activities and operations will be emitted from the proposed project. Construction
activities that are associated with the proposed project would include GHG emissions
from excavators, compactors, dump trucks, backhoes, bulldozers, bobcats, graders,
rollers, and scrapers. Project construction could occur either at once (continuous) or in
stages, depending on timing and scheduling constraints. GHG emissions from creek
restoration work will likely occur in late summer or early fall when creek flows are at
their lowest. Materials (e.g., soils, rocks, gravels, etc.) will be transported on site with a
rubber wheeled dump truck, tracked dump truck, front end loader, and tracked skid-steer
loader emitting additional GHGs.
Construction of the project is anticipated to take approximately 4 to 5 months and is
scheduled for 2021. If the Trout Creek Restoration component of the proposed project is
constructed in phases (due to funding constraints), Phase 1 will be constructed in 2021
and Phase 2 will be constructed at a later date when funding is secured. If two phases are
required, the second would occur at an undetermined later date once funding is available.
However, the most conservative scenario was used to model emissions; it was assumed
that all construction would occur in one phase, from June 2021 to October 2021.
Operational emissions from the proposed project would be minimal and generated from
the use of the Church Street Extension and maintenance activities.
The Northern Sierra Air Quality Management District (NSAQMD) does not currently
have GHG significance thresholds and defers to neighboring Districts. Placer County Air
Pollution Control District (PCAPCD) CEQA Guidelines recommend both a construction
and operational significance threshold of 10,000 metric tons per year of CO2e. These
alternate significance thresholds are appropriate for the proposed project.
GHG emissions from construction activities were estimated using the CalEEMod
emissions model with the same assumptions as discussed in the Air Quality analysis. The
results of the CalEEMod modeling indicate that the project would generate a total of
204.83 metric tons of CO2e over the construction period. The resulting operational
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-49 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
emissions would be 53.23 metric tons of CO2e per year for project. Please refer to
Appendix B for all assumptions used to estimate project-related GHG emissions.
Both construction and operational emissions for the proposed project would be well
below the 10,000 metric tons CO2e per year significance threshold. Therefore, the
proposed project would not generate GHG emissions that would have a significant impact
on the environment. This impact would be less than significant.
b) Less than Significant. In 2006, the California legislature passed Assembly Bill (AB32;
California Health and Safety Code Division 25.5, Sections 38500, et seq.), also known as
the Global Warming Solutions Act, which requires the California Air Resources Board
(CARB) to design and implement feasible and cost-effective emissions limits,
regulations, and other measures, such that statewide GHG emissions are reduced to 1990
levels by 2020 (representing a 25-percent reduction in emissions). Pursuant to AB 32, the
CARB adopted a Climate Change Scoping Plan in December 2008 outlining measures to
meet the 2020 GHG reduction goals, which was most recently updated in 2017.
In addition to policy directly guided by AB 32, the legislature in 2008 passed SB 375,
which provides for regional coordination in land use and transportation planning and
funding to help meet the AB 32 GHG reduction goals. SB 375 aligns regional
transportation planning efforts, regional GHG emissions reduction targets, and land use
and housing allocations. SB 375 requires Regional Transportation Plans (RTPs)
developed by the state’s 18 metropolitan planning organizations to incorporate a
“sustainable communities strategy” that will achieve GHG emission reduction targets set
by the CARB. SB 375 also includes provisions for streamlined CEQA review for some
infill projects, such as transit-oriented development. While the proposed project isn’t
specifically addressed within a RTP, it is consistent with the goals of SB 375 in terms of
transportation planning.
In terms of local climate planning, while the Town of Truckee has begun meetings
related to Climate Action Planning, no plan has been adopted or put into place to date.
Nevada County is in the process of adopting an energy plan for both the facilities it
controls and the county in general (Nevada County, 2019). One of the stated goals is to
reduce GHGs through energy efficiency measures. The proposed project will not impede
the pursuit of the stated County GHG goal as additional GHG emissions are anticipated
to be minimal.
With regard to consistency with the applicable state and local climate planning, both
construction and operational GHG emissions are well below the PCAPCD significance
thresholds, therefore the proposed project is consistent with applicable plans and policies.
This impact would be less than significant.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-50 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
References
Nevada County. Draft Energy Action Plan, 2019.
Northern Sierra Air Quality Management District (NSAQMD), 2016. Guidelines for Assessing
and Mitigating Air Quality Impacts of Land Use Projects, May 2016.
Placer County Air Pollution Control District (PCAPCD). CEQA Handbook, 2017.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-51 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Hazards and Hazardous Materials
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
9. HAZARDS AND HAZARDOUS MATERIALS —
Would the project:
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
☐ ☐ ☒ ☐
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and accident conditions involving the release of
hazardous materials into the environment?
☐ ☐ ☒ ☐
c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
☐ ☐ ☐ ☒
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result,
would it create a significant hazard to the public or the
environment?
☐ ☐ ☒ ☐
e) For a project located within an airport land use plan
or, where such a plan has not been adopted, within
two miles of a public airport or public use airport,
would the project result in a safety hazard or
excessive noise for people residing or working in the
project area?
☐ ☐ ☒ ☐
f) Impair implementation of or physically interfere with
an adopted emergency response plan or emergency
evacuation plan?
☐ ☐ ☒ ☐
g) Expose people or structures, either directly or indirectly,
to a significant risk of loss, injury, or death involving
wildland fires?
☐ ☐ ☒ ☐
Discussion
a, b) Less than Significant. During the construction phase, project construction equipment
and materials would include fuels, oils and lubricants, cement and concrete, and asphalt
mixtures, which are all commonly used in construction. The routine use or an accidental
spill of hazardous materials used in construction could result in inadvertent releases,
which could adversely affect construction workers, the public, and the environment.
Construction activities would be required to comply with numerous hazardous materials
regulations designed to ensure that hazardous materials are transported, used, stored, and
disposed of in a safe manner to protect worker safety, and to reduce the potential for a
release of construction-related fuels or other hazardous materials into the environment,
including stormwater and downstream receiving water bodies, including Trout Creek and
the Truckee River. Contractors would be required to prepare and implement Hazardous
Materials Business Plans (HMBPs) that would require that hazardous materials used for
construction be used properly and stored in appropriate containers with secondary
containment, as needed, to contain a potential release. Construction contractors would be
required to acquire coverage under the state Construction General Permit, which requires
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-52 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
the preparation and implementation of a Stormwater Pollution Prevention Plan (SWPPP)
for construction activities. The SWPPP would list the hazardous materials (including
petroleum products) proposed for use during construction; describe spill prevention
measures, equipment inspections, equipment and fuel storage; describe protocols for
responding immediately to spills; and describe Best Management Practices (BMPs) for
controlling site run-on and runoff. Details regarding BMPs designed to minimize erosion
are discussed below in Hydrology and Water Quality, impacts a) and f). In addition, the
transportation of hazardous materials would be regulated by the U.S. Department of
Transportation, Caltrans, and the California Highway Patrol. Together, federal and State
agencies determine driver-training requirements, load labeling procedures, and container
specifications designed to minimize the risk of an accidental release.
The required compliance with the numerous laws and regulations discussed above that
govern the transportation, use, handling, and disposal of hazardous materials would limit
the potential for creation of hazardous conditions due to the use or accidental release of
hazardous materials, and would render this impact less than significant. During
operations after the project construction has been completed, there would be no further
use of equipment that would use fuels, oils, and/or lubricants.
c) No Impact. There are no schools located within one-quarter mile of the project site.
Therefore, relative to schools, there would be no impact.
d) Less than Significant. The footprint of the proposed project site is currently
undeveloped land with Trout Creek flowing west to east across the site. Several
hazardous materials sites are located in the area (GeoSearch, 2019). However, only the
former rail yard and lumber mill on the south side of Trout Creek is close enough to
potentially affect the proposed project site. For investigation and site cleanup purposes,
the former railyard and lumber mill site is referred to as the Truckee Railyard Balloon
Track site on the State Water Resources Control Board (SWRCB) GeoTracker website,
one of the hazardous materials lists that comprise the Cortese List (Government Code
Section 65962.5). The locations of the various historical lumber yard and railyard
structures were all south of proposed project site within the circular rail loop shown on
Figure 2 or to the west of both the rail loop and the proposed project site (Regional Water
Quality Control Board [RWQCB], 2014; GrafCon, 2013).
To characterize the nature and extent of contamination of the former railyard and lumber
mill site, numerous soil samples were collected throughout the area, including just south
and west of the proposed project site (GrafCon, 2013). Soil contamination consisted of
total petroleum hydrocarbons (TPH) mostly in the heavy fuel oil range, polynuclear
aromatic hydrocarbons (PAHs), polychlorinated biphenyls (PCBs), and metals.
Investigations of the nature and extent of contamination revealed that most of the
contamination in soil was close to the main rail lines along the southern portion of the
former rail yards. The direction of groundwater is to the southeast and not toward the
project site.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-53 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
In 2012, approximately 5,066 tons of contaminated soil was excavated and removed from
the southern portion of the railyard site (GrafCon, 2013). Based on the extent of
contamination, a deed restriction was placed over an extended area along the main rail
line south of the rail loop, restricting the use of this area to commercial uses; no
residential uses would be permitted (RWQCB, 2014). This restricted area is about
600 feet south of the proposed project footprint. The rest of the former railyard and
lumber yard area, including the area adjacent to the footprint of the proposed project, has
been approved for unrestricted use, including residential. Soil within this area may have
residual levels of TPH in the diesel and oil range, and related PAHs, but at concentrations
below regulatory standards (GrafCon, 2013). The closest soil sample to the proposed
project site was collected in 2012 from surface soil just inside of the rail loop and
contained 30 milligrams per kilogram (mg/kg) of TPH in the diesel range, and 130 mg/kg
of TPH in the oil range. These concentrations are below the San Francisco RWQCB
residential Environmental Screening Levels (ESLs)3 of 230 mg/kg for TPH as diesel and
5,100 mg/kg for TPH as motor oil (RWQCB, 2016). ESLs are soil screening levels used
by regulatory agencies throughout California to assess whether further action is needed
for a given site. The soil contamination is not known to extend into the proposed project
footprint (GrafCon, 2013). Therefore, relative to being located on a listed hazardous
materials site, the impact would be less than significant.
e) Less than Significant. The proposed project site is about one mile northwest of the
Truckee-Tahoe Airport and is located within the airport’s Compatibility Land Use Plan
(CLUP) (Town of Truckee, 2008). The eastern portion of the site is within the CLUP
Compatibility Zone C and the western portion is within CLUP Compatibility Zone D.
The zones place various restrictions on development densities, building heights, and
types of uses. Zones C and D limit structure heights to 50 and 100 feet respectively. The
proposed project would not include the construction of any structures other than the
bridge over Trout Creek. The bridge height would be less than 50 feet and would not
conflict with any CLUP height restrictions. Therefore, relative to airports, the impact
would be less than significant.
f) Less than Significant. The construction activity and the staging of equipment and
materials for the proposed project would occur mostly within the undeveloped area south
of Trout Creek, which would not require road closures or lane restrictions. The proposed
project would include the construction of a roundabout at the new Church Street
Extension/Glenshire Drive intersection. This activity would result in temporary lane
restrictions and possibly short-term road closures. As discussed below in the section on
Transportation, the construction permit would require the preparation and implementation
of a traffic control plan to minimize traffic disruptions and facilitate the re-routing of
traffic during construction. With implementation of the traffic control plan, impacts to
emergency response and evacuation plans would be less than significant.
3 Although the ESLs are established and periodically updated by the San Francisco RWQCB, ESLs are used as
screening levels by regulatory agencies throughout the state.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-54 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
g) Less than Significant. The entire Truckee area is designated as within a high fire hazard
severity zone (Town of Truckee, 2008). However, the proposed project site does not have
dense vegetation and is not located on steep slopes, factors that contribute to increased
wildfire risk. In addition, Trout Creek runs through the project area, further reducing fire
risk. The proposed project would not change the site characteristics other than improving
aquatic and riparian habitat associated with the creek. The addition of the paved road and
bridge would not result in structures that could catch fire. Therefore, relative to wildland
fires, the impact would be less than significant.
References
GeoTracker, 2019, Radius Report, Church Street Extension, 10250 Church Street, Truckee,
Nevada County, California 96161, March.
GrafCon, 2013, Site Management Plan, Truckee Railyard, Balloon Track Parcels Truckee,
California, December.
Regional Water Quality Control Board (RWQCB), 2014, No Further Action Required for the
Truckee Railyard Balloon Track Parcels (APNs 19-420-68, -69, -70, and -72), Truckee,
Nevada County, Site Cleanup Program, Case No. T6S054, November 18.
Regional Water Quality Control Board (RWQCB), 2016, Environmental Screening Levels
(ESLs), February.
Town of Truckee, 2008, Truckee Railyard Draft Master Plan EIR, November.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-55 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Hydrology and Water Quality
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
10. HYDROLOGY AND WATER QUALITY —
Would the project:
a) Violate any water quality standards or waste
discharge requirements? ☐ ☐ ☒ ☐
b) Substantially deplete groundwater supplies or
interfere substantially with groundwater recharge such
that there would be a net deficit in aquifer volume or a
lowering of the local groundwater table level (e.g., the
production rate of pre-existing nearby wells would
drop to a level which would not support existing land
uses or planned uses for which permits have been
granted)?
☐ ☐ ☒ ☐
c) Substantially alter the existing drainage pattern of the
site or area, including through the alteration of the
course of a stream or river, in a manner which would
result in substantial erosion or siltation on- or off-site?
☐ ☐ ☒ ☐
d) Substantially alter the existing drainage pattern of the
site or area, including through the alteration of the
course of a stream or river, or substantially increase the
rate or amount of surface runoff in a manner that would
result in flooding on- or off-site?
☐ ☐ ☒ ☐
e) Create or contribute runoff water that would exceed
the capacity of existing or planned stormwater
drainage systems or provide substantial additional
sources of polluted runoff?
☐ ☐ ☒ ☐
f) Otherwise substantially degrade water quality? ☐ ☐ ☒ ☐
g) Place housing within a 100-year flood hazard area as
mapped on a federal Flood Hazard Boundary or Flood
Insurance Rate Map or other flood hazard delineation
map?
☐ ☐ ☐ ☒
h) Place within a 100-year flood hazard area structures
that would impede or redirect flood flows? ☐ ☐ ☒ ☐
i) Expose people or structures to a significant risk of
loss, injury or death involving flooding, including
flooding as a result of the failure of a levee or dam?
☐ ☐ ☐ ☒
j) Inundation by seiche, tsunami, or mudflow? ☐ ☐ ☐ ☒
Environmental Setting
Surface Water
The proposed project is located within the Martis Valley Region of the Truckee River Basin. The
Truckee River Basin is just over 3,000 square miles starting in the mountains above Lake Tahoe
California, flowing past Tahoe City and the Town of Truckee before merging with the Donner
Lake drainage, Martis Creek drainage, Prosser Creek, Trout Creek, and Little Truckee River
drainages before eventually ending at Pyramid Lake in Nevada. On average, the region receives
approximately 40 inches of precipitation with about 75 percent of that falling during the winter
months. Snow and ice removal is implemented by the Town of Truckee’s Public Works
Department. Plowing begins after accumulations reach three inches. Plowing and snow removal
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-56 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
operations may be ongoing 24-hour per day, and last several days after a major storm. Sand is
applied as an aide in snow removal (Town of Truckee, 2006).
Water Quality
Surface water within the Truckee River Basin primarily originates as mountain snowmelt of good
water quality. However, exposure to pollutants and sedimentation generated from human activity
and development has impaired reaches of the River within the vicinity of Truckee. According to
the Lahontan Regional Water Quality Control Board (LRWQCB), the Truckee River is on the
Clean Water Act Section 303(d) list of impaired water bodies for elevated levels of
sedimentation/siltation (SWRCB, 2011). “Impaired” refers to water bodies that do not or are not
expected to meet water quality standards despite compliance with NPDES permit requirements.
Water quality in Donner Lake has been found to be impaired due to elevated levels of arsenic,
chlordane, and polychlorinated biphenyls (PCBs). In addition, the California Department of
Water Resources (DWR) and the LRWQCB are currently operating and maintaining three water
quality monitoring stations along the Truckee River. The data obtained through monitoring
quantifies Total Maximum Daily Loads (TMDL), which help define the extent of sediment
delivery reduction that is necessary to bring the waterway into attainment with applicable water
quality standards.
Groundwater
The Town of Truckee obtains its water supply from the Martis Valley Groundwater Basin
(MVGB). The basin is a low lying area of approximately 57 square miles that is completely
contained within a larger watershed of approximately 167 square miles. The basin has a total
subsurface storage volume of 484,000 acre-feet and is made up of three aquifers composed of
sediments and volcanic deposits nearly 1,000 feet thick. Infiltration from surface water and
precipitation supplies the upper unconfined aquifer system, which in turns feeds adjacent wetland
areas (Town of Truckee, 2006).
Annual groundwater recharge depends heavily on snowmelt in the late spring and early summer,
from April through June. Estimates of annual groundwater recharge in the MVGB vary, with
more recent estimates showing higher recharge. The basin-wide annual recharge was estimated
by the Town of Truckee General Plan to be 29,165 acre-feet per year (AFY) (Town of Truckee,
2006). More recent estimates included in the 2013 Martis Valley Groundwater Management Plan
estimates 12,143 AFY (dry year) to 56,792 AFY (wet year), with an average annual recharge
estimate of 32,745 AFY (Brown and Caldwell, 2013).
The Truckee Donner Public Utility District (TDPUD), Placer County Water Agency (PCWA) and
the Northstar Community Services District (NCSD), which all depend on the Martis Valley Basin
for water supply, have conducted studies of the basin’s capacity. The 2013 Martis Valley
Groundwater Management Plan estimates buildout water demand for all users in the MVGB to be
approximately 21,000 AFY, which is below the average annual recharge estimates for the MVGB
AFY (Brown and Caldwell, 2013).
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-57 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
The Town of Truckee obtains its potable water supply from semi-confined to confined deep-
seated aquifers within the Martis Valley Groundwater Basin. According to the 2001 Water Master
Plan Update, groundwater quality met all current water quality standards in regards to allowable
levels of regulated pollutants. Data gathered by the TDPUD indicates that the current water
supply system and its contents are in compliance with existing State maximum contaminant
levels (MCLs).
According to the 2013 Martis Valley Groundwater Management Plan, groundwater quality in the
MVGB is generally of good quality. Most constituents showed concentration levels in samples
that were below drinking-water thresholds, with some exceptions: a) concentrations of arsenic
were above the MCL in 4 of the 14 wells sampled, and b) manganese concentrations were
elevated above the MCL in one well. TDPUD has also reported arsenic levels above the MCL
(Brown and Caldwell, 2013).
Drainage and Flooding
The Town of Truckee maintains a public storm drainage system that discharges into the Truckee
River. The Town enforces regulations to ensure that water quality of the municipal storm water
discharge is in compliance with the LRWQCB’s Truckee River Hydrologic Unit Project
Guidelines.
The Town of Truckee’s Municipal Code regulates activities influencing the quality of the
municipal storm water discharge such as land development projects. Currently, storm water
runoff from the Town of Truckee impacts the Truckee River by contributing to stream bank
erosion and the transport of contaminants such as automobile lubricants. The Town of Truckee
aims to reduce storm hydrographs and storm water runoff within in the Downtown area through
implementation of the Downtown River Revitalization Strategy Plan. Measures within this plan
include, but are not limited to, infiltration or retention of runoff and use of filter strips on
development parcels adjacent to the Truckee River to slow overland flow of runoff and trap
pollutants
The area adjacent to Trout Creek, approximately 200 feet in width, is zoned by the Federal
Emergency Management Agency (FEMA) as a 100-year flood zone and includes portions of the
proposed project (Town of Truckee, 2006).
A tsunami is a very large ocean wave caused by an underwater earthquake or volcanic eruption.
The proposed project is located over 190 miles from the Pacific Ocean and would not be affected
by tsunami. Seiche occurs within enclosed water bodies, such as lakes, bays, or contained
harbors. Seiche does not typically occur along rivers. The risk of a seiche occurring on Donner
Lake during a strong seismic event is considerable given the size of the lake and its location on
the southwestern edge of the Town. However, the Truckee General Plan notes there are relatively
low levels of seismic activity locally to induce such a seismic event (Town of Truckee, 2006).
Mudflow can occur as a result of volcanic activity, or denuding of large areas of vegetation from
highly erosive soils. The Truckee General Plan notes that some areas in Town have steep slopes
that could be susceptible to mudslide; however, the areas listed are not in the proposed project
area (Town of Truckee, 2006).
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-58 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
There are five dams in the area of the Town of Truckee. Although failure of any of the dams
would cause flooding, Truckee would not be significantly affected by potential inundation.
Modeling by the United States Bureau of Reclamation (Reclamation) shows failure by any of
these five dams would not result in inundation of Truckee (Town of Truckee, 2006).
Discussion
a, f) Less than Significant. Construction activities associated with the proposed project
would involve the delivery, handling, and storage of construction materials and wastes, as
well as the use of construction equipment, which could result in stormwater
contamination and degradation of water quality. The use of heavy equipment during
construction of the proposed project would include, but not be limited to, excavation,
grading, and earthmoving. Spills or leaks from heavy equipment and machinery could
result in oil and grease contamination of receiving waters. Staging areas or construction
sites could also be the source of pollution because of the use of paints, solvents, cleaning
agents, and metals during construction. Impacts associated with metals in stormwater
include toxicity to aquatic organisms, such as bioaccumulation, and the potential
contamination of drinking water supplies.
In addition, earthmoving construction activities would temporarily disturb soils and alter
existing drainage patterns. Disturbed soils are susceptible to high rates of erosion from
wind and rain, resulting in sediment transport from the site. Erosion and sedimentation
affects water quality through interference with photosynthesis, oxygen exchange, and the
respiration, growth, and reproduction of aquatic species. Additionally, the pollutants
mentioned previously can bind to sediment and be transported in runoff, leaving the
project site and affecting water quality.
The proposed project would be subject to requirements of the Town of Truckee
Development Code which requires adherence to Section 402 of the federal Clean Water
Act and the National Pollutant Discharge Elimination System (NPDES) permitting
process. Under the NPDES, all construction projects that disturb more than one acre of
land are required to prepare and implement a stormwater pollution prevention plan
(SWPPP) to minimize the potential erosion of soils and release of sediment and
hazardous materials into Trout Creek and the Truckee River. The goal of the NPDES
stormwater regulations is to improve the quality of stormwater discharged to receiving
waters to the “maximum extent practicable” through the use of BMPs. Construction
activities in California are regulated under the NPDES through compliance with the
Construction General Permit.
The SWPPP is incorporated into all project plans and specifications. The restoration and
road construction contractor(s) will be required to post a copy of the SWPPP at the
project location, file a notice of intent to discharge stormwater with the LRWQCB, and
implement all measures required by the SWPPP. A component of the SWPPP is a
dewatering plan for in-channel activities. A Qualified SWPPP Practitioner (QSP) will be
responsible for construction monitoring to ensure that the provisions of the SWPPP are
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-59 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
effectively enforced. In the event of noncompliance, the QSP will have the authority to
shut down the construction site or fine the responsible party or parties.
The SWPPP will include the following information and Best Management Practices
(BMPs):
• A description of site characteristics, including runoff and drainage characteristics and
soil erosion hazard;
• A description of proposed construction procedures and construction-site
housekeeping BMPs, including prohibitions on discharging or washing potentially
harmful materials into roads, drainages, or Trout Creek; and
• A description of BMPs that will be implemented for erosion and sediment control,
including requirements to:
− Conduct major construction activities involving excavation and spoils haulage
during the dry season, to the extent possible;
− Conduct all construction work in accordance with site-specific construction plans
that minimize the potential for increased sediment inputs to surface waters;
− Grade and stabilize spoils sites to minimize erosion and sediment input to surface
waters and generation of airborne particulate matter; and
− Implement erosion control measures as appropriate to prevent sediment from
entering surface waters to the extent feasible, including the use of silt fencing or
fiber rolls to trap sediments.
• A Spill Prevention and Response Plan that identifies any hazardous materials to be
used during construction; describes measures to prevent, control, and minimize
spillage of hazardous substances; describes transport, storage and disposal procedures
for these substances; and outlines procedures to be followed in case of a spill of a
hazardous material. The Spill Prevention and Response Plan will require that
hazardous and potentially hazardous substances stored onsite be kept in securely
closed containers located away from drainage courses and areas where stormwater is
allowed to infiltrate. Spill prevention kits will be required to be kept in close
proximity to construction areas and workers will be trained in their use. It will also
stipulate procedures, such as the use of spill containment pans, to minimize hazards
during onsite fueling and servicing of construction equipment. Finally, the Spill
Prevention and Response Plan will require that all agencies listed in the Spill
Prevention and Response Plan be notified immediately of any substantial spill or
release.
As described in the project description, channel dewatering is not anticipated to be
continuous over the entire restoration area; it is anticipated that the Contractor will
dewater select portions of the channel during installation of specific features. The
restoration contractor shall be responsible for generating a dewatering plan which
complies with the construction stormwater permit.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-60 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
The contractor would be responsible for selecting the appropriate range of groundwater
levels and equipment for the dewatering system used during construction, based on site
conditions. The dewatering system would: lower the water table during installation or
intercept seepage which would emerge from the sides or the bottom of the installation;
improve the stability of the installations and prevent disturbance of the bottom of the
installations; provide a reasonably dry working area in the bottom of the installations; and
provide for collection and removal of surface water and rainfall. Discharge of water from
dewatering activities associated with construction could impact the water quality of
receiving waters.
Water from channel dewatering activities would be discharged back into Trout Creek in
accordance with regulatory permits. The Town of Truckee would apply and receive
coverage under NPDES No. CAG995001 Waste Discharge Requirements (WDR)
General Order for Dewatering and Other Low Threat Discharges to Surface Waters prior
to construction. Management of dewatering activities in accordance with the conditions
of the WDRs would minimize the risk of impacting the water quality of receiving waters.
Following construction, the proposed project would result in increased vehicle use and
potential discharge of associated pollutants. Pollutants associated with the operational
phase of the proposed project include fuel, oil and grease, tire wear, heavy metals, salt or
deicing chemicals, sediment, and other debris. The urban runoff from development of the
proposed project would contain levels of pollutants that could adversely affect water
quality in Trout Creek and the Truckee River by increasing the aforementioned pollutants
in stormwater.
The proposed project is subject to the Town of Truckee Stormwater Quality Ordinance
which includes the compliance with the Phase II MS4 Permit through a stormwater
management program (SWMP), and any development would be required to implement
post-construction stormwater quality Low Impact Development (LID) BMPs, such as
streetscapes, bioswales, or vegetated swales along some of the streets, parks, parking lots,
and parkways. These would address water quality issues upstream before entering the
storm drain system.
The streetscapes, swales, and other LID BMPs mentioned above would be designed to
meet the Town of Truckee and state LID standards. As such, these LID BMPs would
provide the first line of pretreatment of runoff and would be capable of meeting the water
quality objectives of the Town of Truckee Stormwater Quality Ordinance to slow down,
filter, and infiltrate stormwater.
As required pursuant to LRWQCB standards, Construction General Permit requirements
during project construction would substantially reduce or prevent waterborne pollutants
from entering receiving waters and protect water quality during project construction.
Compliance with the Town of Truckee Stormwater Quality Ordinance requirements
would protect water quality during project operation. Implementation of BMPs would be
required as a condition of approval of the proposed project, and would substantially
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-61 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
reduce or prevent waterborne pollutants from entering receiving waters per LRWQCB
standards. Therefore, this impact is considered less than significant.
b) Less than Significant. The proposed project would not pump groundwater for water
supply during construction or operation. The proposed project would extend the existing
Church Street to Glenshire Drive and would restore Reaches 4 and 5 of Trout Creek. In
addition, the proposed Church Street extension would provide a new roadway crossing
over Trout Creek and a roundabout at the Church Street Extension intersection with
Glenshire Drive. The extension of Church Street and the roundabout would result in new
impervious surfaces. However, the extent of these impervious surfaces would be minor,
and would not interfere with groundwater recharge. Groundwater dewatering is not
anticipated to be required in support of construction of the proposed project. Therefore,
the proposed project would result in a less-than-significant impact related to the
depletion of groundwater supplies or interference with groundwater recharge.
c, d) Less than Significant. The proposed project would result in changes to the existing
drainage pattern of the project site. The extension of Church Street would add impervious
surfaces that could lead to increased erosion, siltation, or on- or off-site flooding. The
Town of Truckee General Plan includes policies that requires that storm water drainage
systems be incorporated into development projects to effectively control the rate and
amount of runoff, so as to prevent increases in downstream flooding potential.
The areas of Trout Creek immediately upstream and downstream of the bridge structure
would be reconstructed and restored to allow for proper hydrology of the bridge and to
contain 100-year storm events.
Given the relatively small amount of impervious surfaces added by the proposed project
in comparison to the Downtown area, the required compliance with General Plan policies
for storm drainage, and the restoration of Trout Creek in the project site, drainage would
be effectively controlled and erosion would be minimized. Therefore, this impact would
be less than significant.
e) Less than Significant. The proposed project would increase the amount of impervious
surfaces which would lead to an increase in runoff water; however, the proposed project
will be designed to improve water quality and control stormwater drainage rates by
managing local runoff from existing and proposed urban developments and, where
feasible, treating urban runoff before it enters Trout Creek. Roadside swales would be
constructed along the extension of Church Street and the revised Glenshire Drive, and
four stormwater detention basins would be constructed: two on the south side of the new
bridge, with one basin on either side of the roadway; and two just east of the roundabout,
with one basin on either side of Glenshire Drive. The roadside swales would attenuate
stormwater flows and prevent flooding by collecting runoff from the roadway and
allowing for infiltration. The stormwater detention basins would serve as larger features
where stormwater would be collected and where larger amounts of water could infiltrate
the soil. These features would help achieve adherence with the Town of Truckee General
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-62 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Plan policies and Town ordinances which require the proposed project to control
stormwater drainage rates. The roadside swales and stormwater detention basins features
would also provide water quality benefits by reducing the off-site transport of sediments,
pollutants, and trash through infiltration. Therefore, this impact would be less than
significant.
g) No Impact. The proposed project does not include the construction of housing, and as
such would not place houses within a 100-year flood plain that would redirect or impede
flood flows. Therefore, no impact would occur.
h) Less than Significant. As described in the project description, the proposed project
would include a new roadway crossing over Trout Creek. The area within 200 feet of
Trout Creek is zoned as a 100-year flood zone and includes the location of the proposed
roadway crossing. However, in order to ensure the new bridge structure would have the
proper hydrology and capacity to contain the 100-year storm event plus any required
freeboard, a limited section of Trout Creek immediately upstream and downstream of the
bridge structure would be reconstructed and restored and would result in improved flood
capacity. Therefore, this impact would be less than significant.
i) No Impact. As described in checklist items g) and h), the proposed project would not place
any new housing in a flood hazard zone and the roadway crossing would be designed to
contain a 100-year storm event in addition to restoration to Trout Creek in the area of the
crossing. In addition, the proposed project is not located within a dam inundation area.
Therefore, no persons or structures would be exposed to a significant risk associated with
flooding due to levee failure or dam inundation and no impact would occur.
j) No Impact. The proposed project is located far from the coast and therefore would not be
exposed to coastal flooding hazards such as tsunami. Although a seiche could potentially
form in Donner Lake, there are low levels of seismic activity locally and as such
inducement of a seiche is unlikely. The proposed project is located in a relatively flat area
and is not an area known to be susceptible to mudflow. Therefore, no impact would
occur.
References
Brown and Caldwell, 2013. Martis Valley Groundwater Management Plan. April, 2013.
SWRCB (State Water Resources Control Board), 2011. 2010 Integrated Report (Clean Water Act
Section 303(d) List / 305(b) Report). October 11, 2011.
Town of Truckee, 2006. Town of Truckee 2025 General Plan Draft EIR. May, 2006.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-63 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Land Use and Planning
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
11. LAND USE AND PLANNING — Would the project:
a) Physically divide an established community? ☐ ☐ ☐ ☒
b) Cause a significant environmental impact due to a
conflict with any land use plan, policy, or regulation
adopted for the purpose of avoiding or mitigating an
environmental effect?
☐ ☐ ☒ ☐
Environmental Setting
The project site is located east of historic Downtown Truckee, comprised primarily of a site
historically occupied by the railyard and lumber mill. The project site is generally bounded by
Glenshire Drive to the north, commercial uses and undeveloped land to the east, Union Pacific
Railroad right-of-way to the south, and Truckee Way to the west to the west (Figure 2). The
majority of the site, outside of the Trout Creek corridor, is disturbed or developed. Most recently,
the site has been used for material storage by the Rock & Rose, Inc. Adjacent land uses include
an electrical substation, civic, residential, and commercial uses to the east, west, and northwest;
Glenshire Drive and U.S. Forest Service land to the north; and the Union Pacific Railroad and
Truckee River to the south. The project site is within the Railyard Master Plan Area and is
designated by the Railyard Master Plan as Trout Creek (TC), Industrial Heritage (IH), Downtown
Master Plan (DMP), and Open Space (OS).
Discussion
a) No Impact. As described in Section 1.3, the purpose of the Church Street Extension
component of the proposed project is to provide a connected community with places that
are easily accessible to pedestrians, bicyclists, and drivers as well as create a street and
sidewalk network that is physically connected to the existing Downtown, surrounding
neighborhoods, and Trout Creek. The proposed project would connect the existing
Church Street to Glenshire Drive, providing access to the Truckee Railyard. In addition,
the proposed Church Street extension would provide a new roadway crossing over Trout
Creek with a new precast modular type bridge, further connecting the Town of Truckee.
The Trout Creek Restoration component of the project would consist of the restoration of
Reaches 4 and 5 of Trout Creek. Therefore, the proposed project would have no impact
related to physically dividing an established community.
b) Less than Significant. The project includes extending Church Street and restoring
Reaches 4 and 5 of Trout Creek, both of which are identified in the Railyard Master Plan.
The project is consistent with the goals and policies addressed in the Railyard Master
Plan including the following:
Goal 2: Provide a connected community with places that are easily accessible to
pedestrians, bicyclists, and drivers.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-64 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Policy 2.a: Create a street and sidewalk network that is physically connected to
the existing Downtown, surrounding neighborhoods, and Trout Creek and
visually connected to the natural features including the Truckee River and
surrounding mountains.
Policy 3.b: Facilitate a strong connection between the Railyard Master Plan Area
and the existing Downtown through well-designed street and sidewalk
improvements, building forms and uses.
Policy 3.c: Preserve and enhance public views of the mountains, Trout Creek,
and Truckee River through Railyard development.
Policy 3.m: Improvements to Church Street should also be considered as part of
Phase I of the Streetscape Plan.
Policy 4.e: Support restoration of Trout Creek and a greenway along the creek as
a prominent natural and recreational feature available to the public.
Further, the proposed project components are allowable land uses permitted by the
Railyard Master Plan. Therefore, the proposed project would not conflict with any plan,
policy, or regulation adopted for the purposes of avoiding or mitigating an environmental
effect. The impact would be less than significant.
References
Town of Truckee, 2018. Zoning Districts and Allowable Land Uses. Available:
https://www.townoftruckee.com/home/showdocument?id=8201. Accessed November 16,
2018.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-65 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Mineral Resources
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
12. MINERAL RESOURCES — Would the project:
a) Result in the loss of availability of a known mineral
resource that would be of value to the region and the
residents of the state?
☐ ☐ ☐ ☒
b) Result in the loss of availability of a locally-important
mineral resource recovery site delineated on a local
general plan, specific plan, or other land use plan?
☐ ☐ ☐ ☒
Environmental Setting
The Mineral Land Classification map for Eastern Nevada County classifies the project site as
Mineral Resource Zone -4 (MRZ-4) which is defined as an area of no known mineral
occurrences, where geologic information does not rule out either the presence or absence of
significant mineral resources (Town of Truckee, 1997). Additionally, no known mineral resource
recovery sites have been identified in the immediate project vicinity (USGS, 2017).
Discussion
a, b) No Impact. The proposed project will not result in the loss of availability of a known
mineral resource or affect a locally-important mineral resource recovery site
delineated on a local general plan, specific plan or other land use plan. There would
be no impact to mineral resources.
References
Town of Truckee, 1997. Downtown Truckee Specific Plan, Chapter 5. Available:
https://www.townoftruckee.com/home/showdocument?id=1091. Accessed November 13,
2018.
United States Geological Survey (USGS), 2017. Mineral Resources Online Spatial Data.
Available: http://mrdata.usgs.gov/mineral-resources/mrds-us.html. Accessed November 13,
2018.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-66 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Noise
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
13. NOISE — Would the project result in:
a) Exposure of persons to or generation of, noise levels
in excess of standards established in the local general
plan or noise ordinance, or applicable standards of
other agencies?
☐ ☒ ☐ ☐
b) Exposure of persons to or generation of excessive
groundborne vibration or groundborne noise levels? ☐ ☐ ☒ ☐
c) A substantial permanent increase in ambient noise
levels in the project vicinity above levels existing
without the project?
☐ ☐ ☒ ☐
d) A substantial temporary or periodic increase in
ambient noise levels in the project vicinity above
levels existing without the project?
☐ ☐ ☒ ☐
e) For a project located within an airport land use plan
or, where such a plan has not been adopted, within
two miles of a public airport or public use airport,
would the project expose people residing or working in
the project area to excessive noise levels?
☐ ☐ ☒ ☐
f) For a project located in the vicinity of a private airstrip,
would the project expose people residing or working in
the project area to excessive noise levels?
☐ ☐ ☒ ☐
Discussion
a) Less than Significant with Mitigation. The proposed project does not include the
development of residential or commercial land uses that would increase vehicular trips
along roadways in the vicinity of the proposed project. Since goals and policies found in
the Noise Element of the Town of Truckee 2025 General Plan are aimed at reducing
noise exposure on proposed residential developments and do not have any limitation on
traffic noise on existing sensitive receptors, the proposed project would not conflict with
the Town of Truckee 2025 General Plan (Town of Truckee, 2006).
Although the operation of the proposed project would not conflict with the goals and
policies found in the Town of Truckee 2025 General Plan, the construction of the
proposed project could expose nearby existing sensitive receptors to noise levels that
could conflict with the Town of Truckee’s Municipal Code and General Plan. According
to the Section 18.44.070 of the Town of Truckee Municipal Code, construction activities
are exempt from the noise standard found in the Town’s Municipal Code provided
activities occur from 7:00 a.m. to 9:00 p.m. on any day except Sunday, or from 9:00 a.m.
to 6:00 p.m. on Sunday. In addition, Policy P3.13 of the Town of Truckee 2025 General
Plan provides standard construction control measures (Town of Truckee, 2015).
Construction of the proposed project would occur during the construction exempt hours
found in the 18.44.070 of the Town of Truckee Municipal Code and would be consistent
with the Town’s Municipal Code. However, since the proposed project would not include
the standard construction control measures found in the Policy P3.13 of the Town of
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-67 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Truckee’s 2025 General Plan, construction of the proposed project would conflict with
the of the Town of Truckee’s 2025 General Plan and could result in a significant impact.
Implementation of Mitigation Measure Noise-1 would require the applicant to comply
with the Town of Truckee’s standard construction control measures. After
implementation of Mitigation Measure Noise-1 this impact would be reduced to a less-
than-significant level.
b) Less than Significant. Since the operation of the proposed project would not include any
activities that would generate significant levels of vibration, it is not anticipated that the
operation of the proposed project would expose the nearest sensitive receptor or structure
to vibration levels that would result in annoyance. Therefore, only vibration impacts from
onsite construction activities are evaluated.
For adverse human reaction, the analysis applies the “strongly perceptible” threshold of
0.9 inch/second peak particular velocity (PPV) for transient sources. For risk of
architectural damage to historic buildings and structures, the analysis applies a threshold
of 0.12 inch/second PPV (Caltrans, 2013b). A threshold of 0.3 inch/second PPV is used
to assess damage risk for all other buildings. There are no historic structures in the
vicinity of proposed project that could be adversely affected by project construction-
related vibration.
The potential use of a bulldozer during proposed project construction would be expected to
generate the highest vibration levels during construction. According to the Federal Transit
Administration’s (FTA) Transit Noise and Vibration Impact Assessment, bulldozers
typically generate vibration levels of 0.089 inch/second PPV at a distance of 25 feet (FTA,
2006). There are single-family residences located approximately 300 feet west of the
project site on Trout Creek Road and 575 feet south of the project site on East River Street.
These single-family residences would be exposed to a vibration level of 0.001 inch/second
PPV, below the applied human annoyance and building damage threshold. Consequently,
existing sensitive receptors and structures near the project site would not be affected by
substantial groundborne vibration during project construction and this impact would be
considered less than significant.
c) Less than Significant. Although the proposed project would not include facilities or land
uses that would contribute to vehicular traffic volumes along local roadway segments, the
proposed project would result in the construction of a new intersection and extension of
Church Street, which could expose nearby existing sensitive receptors to a substantial
increase in traffic noise.
In 2008, the Town of Truckee published the Truckee Railyard Master Plan Draft
Environmental Impact Report (DEIR) (Town of Truckee, 2008). The DEIR proposed the
development of a substantial number of new residential units, commercial buildings and
new roadways in the Town of Truckee. Since the traffic analysis prepared in the DEIR
included the proposed project (i.e., extension of Church Street), the traffic volumes under
the existing and existing conditions provided in the DEIR were used to evaluate whether
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-68 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
the proposed project could expose nearby sensitive receptors to traffic noise levels that
could be considered substantial.
The DEIR used a 2008 baseline year; however, due to natural traffic growth in the region,
the baseline traffic volumes in the year 2008 are expected to be less than those currently.
Since the DEIR’s baseline traffic volumes are less than expected under the proposed
project, using the traffic volumes presented in the DEIR is considered a conservative
approach to determining the proposed project’s incremental contribution to existing traffic
noise.
Using algorithms from the Federal Highway Administration’s (FHWA) Traffic Noise
Model Technical Manual and the traffic volumes provided in the Transportation,
Circulation and Parking Chapter of the DEIR (Town of Truckee, 2008), traffic noise
levels were estimated for roadways segments near the proposed project under existing
and existing plus project conditions. The segments analyzed and the associated results of
the modeling are shown in Table NOI-1. For the purposes of this analysis a 5 dB
increase in traffic noise exposure is considered a substantial increase. According to
Caltrans Traffic Noise Supplement, a 5 dB increase in traffic noise is considered a readily
perceptible increase in noise levels (Caltrans, 2013a). As shown in Table NOI-1, traffic
noise levels under the existing plus project conditions are estimated to be less than
existing conditions. The reason for this reduction in traffic noise could be due to the
addition of Church Street, which would divert a majority of traffic away from Glenshire
Drive. Since none of the roadway segments evaluated would result in a 5 dB increase in
traffic noise, the proposed project would not result in a substantial permanent increase in
ambient noise levels in the proposed project vicinity above levels existing without the
proposed project. This would be a less-than significant impact.
TABLE NOI-1
TRAFFIC NOISE LEVELS ALONG STREETS
UNDER EXISTING AND EXISTING PLUS PROJECT CONDITIONS
Roadway Segment
Traffic Noise Level 50 feet from Center of
Roadway, dBA, Ldn1 Existing Existing plus Project Incremental Increase Significant? (Yes or No)2 Glenshire, west of Church Street 68 66 -2 No
Glenshire, east of Church Street 68 68 0 No
Church Street, south of Glenshire N/A 65 N/A No
NOTES: 1 Noise levels were determine using methodology described in FHWA’s Traffic Noise Model Technical Manual and traffic
volumes provided in the Truckee Railyard Draft Master Plan EIR (Town of Truckee, 2008) 2 Traffic noise increases that exceed 5 dB are considered to result in a substantial permanent increase in ambient noise
levels.
SOURCE: ESA, 2019
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-69 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
d) Less than Significant. Although there would be no long-term operational noise
following construction, the construction of the proposed project could result in a
substantial temporary increase in ambient noise levels in the proposed project vicinity
above levels existing without the proposed project.
Construction noise levels at and near the proposed project would fluctuate depending on
the type, number, and duration of use of various pieces of construction equipment. Given
the low level of construction-related vehicle trips associated with hauling and commuting
workers, these trips would not be expected to raise ambient noise levels along haul
routes. Table NOI-2 shows typical noise levels produced by various types of
construction equipment that would operate during the construction of the proposed
project.
TABLE NOI-2
TYPICAL CONSTRUCTION EQUIPMENT NOISE LEVELS
Construction Phase
Average Noise Level
(dBA, Leq at 50 feet)
Average Noise Level
(dBA, Leq at 1,000 feet)
Backhoe 78 48
Dump Truck 84 54
Grader 85 55
Loader 79 49
Paver 77 48
Excavator 81 51
SOURCE: FHWA, 2006.
The operation of each piece of equipment within the proposed project would not be
constant throughout the day, as equipment would be turned off when not in use. Over a
typical workday, the equipment would be operating at different locations and all the
equipment would not operate concurrently at the same location of the proposed project.
To quantify construction-related noise exposure that would occur at the nearest sensitive
receptors, it was assumed that the two loudest pieces of construction equipment would
operate at the closest location of the proposed project to the nearest off-site sensitive
receptors. Table NOI-3 presents the highest Leq noise levels that sensitive receptors
could be exposed to at each of the construction sites.
The Town of Truckee does not contain noise level standards that are applicable to short-
term construction activities in their respective general plans and municipal codes.
Although there are no applicable local policies or standards available to judge the
significance of short-term daytime construction noise levels, the FTA’s Transit Noise and
Vibration Impact Assessment has identified a daytime 1-hour Leq level of 90 dBA as a
noise level where adverse community reaction could occur at residential land uses (FTA,
2006). This noise level is used here to assess whether construction-related noise levels
would cause a substantial temporary or periodic increase in ambient noise levels at
sensitive receptor locations. As shown in Table NOI-3, onsite construction activities at
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-70 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
each of the reaches would not expose the nearest sensitive receptor to noise levels that
would exceed the 90 dBA Leq threshold, and therefore would not result in a significant
impact. The temporary increase in ambient noise levels would cause a less-than-
significant impact.
TABLE NOI-3
SUMMARY OF ESTIMATE NOISE LEVELS AT SENSITIVE RECEPTORS DURING
PROPOSED PROJECT CONSTRUCTION
Project Component
Distance to
Nearest Sensitive
Receptor (feet)
Two Loudest Pieces
of Construction
Equipment
Combined Noise
level from 50 feet
(dBA Leq)1
Attenuated
Noise Level
(dBA Leq)
Exceed
90 dBA Leq
(yes or no)?
Trout Creek Restoration 300 Grader, Dump Truck 78 63 No
Church Street Extension 575 Grader, Excavator 82 60 No
NOTE:
1 Reference construction equipment noise levels were obtained from Caltrans’ Roadway Construction Noise Level (RCNM) (FHWA, 2006).
SOURCE: FHWA, 2006.
e, f) Less than Significant. The proposed project is located approximately one mile northwest
of the Truckee Tahoe Airport. According to the Truckee Tahoe Airport Land Use
Compatibility Plan, the proposed project is located approximately 0.2 mile west of the
airport’s 60 dBA CNEL noise contour (Town of Truckee, 2016). Therefore, the proposed
project would not expose people working in the proposed project area to excessive noise
levels. A less-than-significant impact would occur.
Mitigation Measures
Mitigation Measure Noise-1: Comply with Town of Truckee Noise Standards. The
construction contractor(s) shall comply with the standard construction control measures
found in P3.13 of the of the Town of Truckee’s 2025 General Plan, which includes the
following measures:
• Equip all internal combustion engine driven equipment with intake and exhaust
mufflers that are in good condition and appropriate for the equipment.
• Locate stationary noise generating equipment as far as possible from sensitive
receptors when sensitive receptors adjoin or are near a construction project area.
• Utilize “quiet” air compressors and other stationary noise-generating equipment
where appropriate technology exists.
• The project sponsor shall designate a “disturbance coordinator” who would be
responsible for responding to any local complaints about construction noise. The
disturbance coordinator will determine the cause of the noise complaint (e.g., starting
too early, bad muffler, etc.) and will require that reasonable measures warranted to
correct the problem be implemented. The project sponsor shall also post a telephone
number for excessive noise complaints in conspicuous locations in the vicinity of the
project site. Additionally, the project sponsor shall send a notice to neighbors in the
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-71 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
project vicinity with information on the construction schedule and the telephone
number for noise complaints.
References
Caltrans, 2013a. Technical Noise Supplement to the Traffic Noise Analysis Protocol. September
2013.
Caltrans, 2013b. Transportation and Construction Vibration Guidance Manual. September 2013.
Federal Highway Administration (FHWA), 2006. FHWA Roadway Construction Noise Model
User’s Guide. January 2006.
Federal Transit Administration (FTA), 2006. Transit Noise and Vibration Impact Assessment.
May 2006.
Town of Truckee, 2006. 2025 General Plan. November 16, 2006.
Town of Truckee, 2016. Truckee Tahoe Airport Land Use Compatibility Plan. June 2016.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-72 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Population and Housing
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
14. POPULATION AND HOUSING — Would the project:
a) Induce substantial unplanned population growth in an
area, either directly (for example, by proposing new
homes and businesses) or indirectly (for example,
through extension of roads or other infrastructure)?
☐ ☐ ☒ ☐
b) Displace substantial numbers of existing people or
housing, necessitating the construction of
replacement housing elsewhere?
☐ ☐ ☐ ☒
Environmental Setting
According to the US Census Bureau, there were 16,553 residents in the Town of Truckee in 2017.
The US Census Bureau counted 13,637 households in the Town’s census tracts, resulting in an
average household size of approximately 1.2 persons (U.S. Census Bureau, 2017).
Discussion
a) Less than Significant. The project proposes to construct a new roadway connecting the
existing Church Street to Glenshire Drive and restore Reaches 4 and 5 of Trout Creek and
does not include any new residential or commercial development. The proposed project
would provide temporary employment during construction; however, it would not result
in the creation of a significant number of new jobs that would induce substantial
population growth. Additionally, the Church Street Extension and Trout Creek
Restoration would not indirectly result in inducing substantial population growth. The
Church Street Extension component of the project will be an extension of the existing
Church Street and will provide a connection with Glenshire Drive. This will not lead to
indirect population growth. Growth inducement related to the Truckee Railyard Master
Plan was evaluated in the EIR for the Plan. The project would have a less-than-
significant impact on population growth.
b) No Impact. The proposed project would be constructed on undeveloped and UPRR land
and would not displace any housing or people. Accordingly, the proposed project would
have no impact relating to the displacement of housing or people and replacement
housing would not be necessary.
References
United States Census Bureau, 2017. Community Facts- Truckee Town. Available:
https://factfinder.census.gov/faces/nav/jsf/pages/community_facts.xhtml. Accessed
November 19, 2018.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-73 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Public Services
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
15. PUBLIC SERVICES —
a) Would the project result in substantial adverse
physical impacts associated with the provision of new
or physically altered governmental facilities, need for
new or physically altered governmental facilities, the
construction of which could cause significant
environmental impacts, in order to maintain
acceptable service ratios, response times or other
performance objectives for any of the following public
services:
i) Fire protection? ☐ ☐ ☒ ☐
ii) Police protection? ☐ ☐ ☒ ☐
iii) Schools? ☐ ☐ ☐ ☒
iv) Parks? ☐ ☐ ☐ ☒
v) Other public facilities? ☐ ☐ ☐ ☒
Environmental Setting
Fire protection and emergency medical services are provided to the Town of Truckee and the
project site by the Truckee Fire Protection District (TFPD). Station 91 is the nearest fire station,
located at 10049 Truckee Way in Truckee, approximately 0.25 mile southwest of the project site
(TFPD, 2018). The TFPD has a goal to respond to all emergency calls within eight minutes.
Additionally, the TFPD has mutual aid agreements with Northstar Fire Department, Squaw
Valley Fire department, and North Tahoe Fire Protection District (Town of Truckee, 2008)
The Town of Truckee Police Department provides law enforcement services in the Town of
Truckee, including the project site (Nevada County Sheriff’s Office, 2018). Currently the Truckee
Police Department employees 33 full time employees including the Police Chief, one lieutenant,
and one Support Service Manager. The Truckee Police Department oversees Operations, Support
Services, Animal Services, and Parking in the Town of Truckee (Town of Truckee, 2018). The
nearest station to the site is the Joseph Center located at 10075 Levon Avenue in Truckee,
approximately one mile west of the project site.
The project site is located within the Tahoe Truckee Unified School District (TTUSD, 2018).
Discussion
a.i) Less than Significant. No commercial or residential development is proposed as part of
the proposed project; therefore, the proposed project would not increase demands on fire
protection nor affect the response time of fire services. Fire hydrants will be installed in
accordance with the Town of Truckee and State requirements. Additionally, as addressed
in the Railyard Master Plan EIR, the proposed project would be subject to plan review by
the Truckee Fire District to ensure proper safety standards and emergency response
access. A less-than-significant impact would occur.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-74 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
a.ii) Less than Significant. Construction of the proposed project may result in accidents or
emergency incidents that would require police services; however, construction activities
would be short-term and limited in scope. Operation of the proposed project may result in
accidents or emergency incidents requiring police services as well as increased policing
of traffic; however, as addressed in the Railyard Master Plan EIR, additional police staff
are anticipated to serve the Master Plan buildout area. Therefore, the proposed project is
expected to have a less-than-significant impact on police protection.
a.iii-v) No Impact. The proposed project would not generate any additional residential
population that would increase demand for schools, parks, or other public facilities
because no permanent residential population would be created. There is no impact.
References
Nevada County Sheriff’s Office, 2018. Sheriff’s Office Locations. Available:
https://www.mynevadacounty.com/167/Sheriffs-Office-Locations. Accessed November 19,
2018.
Tahoe Truckee Unified School District (TTUSD), 2018. District Overview. Available:
https://www.ttusd.org/Domain/33. Accessed November 19.
Truckee Fire Protection District (TFPD), 2018. Fire Stations. Available:
https://www.truckeefire.org/fire-stations/. Accessed November 19, 2018.
Town of Truckee, 2008. Truckee Railyard Draft Master Plan Draft Environmental Impact Report.
Accessed November 19, 2018.
Town of Truckee, 2018. Police. Available: https://www.townoftruckee.com/government/police.
Accessed November 19.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-75 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Recreation
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
16. RECREATION —
a) Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of
the facility would occur or be accelerated?
☐ ☐ ☐ ☒
b) Does the project include recreational facilities or
require the construction or expansion of recreational
facilities which might have an adverse physical effect
on the environment?
☐ ☐ ☐ ☒
Environmental Setting
Existing recreation in the area includes the Donner Memorial State Park and the Truckee River
Regional Park as well as recreational facilities associated with Lake Tahoe.
Discussion
a, b) No Impact. The proposed project would not increase the demand for recreation facilities,
as the project proposes construction of a new roadway connecting the existing Church
Street to Glenshire Drive and restoration of Reaches 4 and 5 of Trout Creek. The
proposed project does not include recreational facilities or require the construction or
expansion of recreational facilities. Therefore, no impact would result from the proposed
project.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-76 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Transportation
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
17. TRANSPORTATION/TRAFFIC —
Would the project:
a) Conflict with an applicable plan, ordinance or policy
establishing measures of effectiveness for the
performance of the circulation system, taking into
account all modes of transportation including mass
transit and non-motorized travel and relevant
components of the circulation system, including but not
limited to intersections, streets, highways and freeways,
pedestrian and bicycle paths, and mass transit?
☐ ☐ ☒ ☐
b) Conflict with an applicable congestion management
program, including, but not limited to level of service
standards and travel demand measures, or other
standards established by the county congestion
management agency for designated roads or
highways?
☐ ☐ ☒ ☐
c) Result in a change in air traffic patterns, including
either an increase in traffic levels or a change in
location that results in substantial safety risks?
☐ ☐ ☐ ☒
d) Substantially increase hazards due to a design feature
(e.g., sharp curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
☐ ☐ ☒ ☐
e) Result in inadequate emergency access? ☐ ☐ ☒ ☐
f) Conflict with adopted policies, plans, or programs
regarding public transit, bicycle, or pedestrian facilities,
or otherwise decrease the performance or safety of
such facilities?
☐ ☐ ☒ ☐
The new CEQA Guidelines Section 15064.3, subdivision (b) was adopted in December 2018 by
the California Natural Resources Agency. These revisions to the CEQA Guidelines criteria for
determining the significance of transportation impacts are primarily focused on projects within
transit priority areas, and shifts the focus from driver delay to reduction of greenhouse gas
emissions, creation of multimodal networks, and promotion of a mix of land uses (which in turn
reduces vehicle trips). Vehicle miles traveled, or VMT, is a measure of the total number of miles
driven to or from a development and is sometimes expressed as an average per trip or per person.
The newly adopted guidance provides that a lead agency may elect to be governed by the
provisions of this section immediately. Beginning on July 1, 2020, the provisions of this section
shall apply statewide. The Town of Truckee is currently engaged in this process and has not yet
formally adopted its updated transportation significance thresholds or its updated transportation
impact analysis procedures. Since the regulations of SB 743 have not been finalized or adopted
by the Town, automobile delay remains the measure used to determine the significance of a
traffic impact.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-77 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Environmental Setting
Roadways
Regional access to the Town of Truckee is provided via Interstate 80 (I-80). In addition to I-80,
State Route (SR) 89 and SR 267 are major regional routes serving Truckee. As of 2017, the peak
summer average daily traffic (ADT) on I-80 in the vicinity of the project site is 47,000 vehicles
per day. The peak summer ADT on SR 89 to the south of I-80 (south of the project site) is 10,600
vehicles per day; north of I-80 (north of the project site), the peak summer ADT is 4,900 vehicles
per day. The peak summer ADT on SR 267 in the vicinity of the project site is 18,200 vehicles
per day (Caltrans, 2018).
Local access to the project site is provided via Truckee Way and Glenshire Drive. Based on the
latest data available (2004), the peak summer ADT on Truckee Way through Downtown Truckee
(west of the project site) is 9,870 vehicles per day. The peak summer ADT on Glenshire Drive
between Truckee Way and SR 267 is 7,830 vehicles per day (Town of Truckee, 2006).
Public Transportation
The Town of Truckee is served by Tahoe Truckee Area Regional Transit (TART), North Lake
Tahoe Express, Greyhound, and Amtrak. Most of the transit routes operated by these service
providers stop at the Truckee Train Depot, which is located approximately one-half mile west of
the project site. There are no public bus stops along Truckee Way or Glenshire Drive in the
vicinity of the project site.
Bicycle and Pedestrian Facilities
The Town of Truckee currently has approximately 31 miles of dirt and paved trails and 70 miles
of bikeways (38 miles of bike lanes and 32 miles of bike routes). Existing bicycle facilities
include bike lanes along Truckee Way and Glenshire Drive. There are no existing paved trails in
the vicinity of project site other than the sidewalks located along the main streets in Downtown
Truckee. It should be noted that as part of the Truckee Railyard Master Plan, new sidewalks will
be developed along the new roadways as well as new bike lanes (Town of Truckee, 2015).
Airports and Rail Facilities
The nearest public airport to the project site is the Tahoe-Truckee Airport, which is located
approximately two miles to the southeast. In 2016, the airport’s two runways served an average of
approximately 96 general aviation flights per day. The western end of the proposed Church Street
Extension would connect with Church Street near the access road to the Union Pacific Rail Road
(UPRR) operations facility.
Discussion
a, b) Less than significant. The project is not anticipated to result in a substantial impact to
existing traffic loads or street system capacity. No traffic study was required for the
project given that the project would not generate any operational vehicle trips and the
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-78 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
distribution/diversion of vehicle trips that would occur with implementation of the
Truckee Railyard Master Plan was already evaluated in the EIR for the Plan. As such, the
focus of the impact analysis is on construction traffic, while the operational analysis
conducted for the proposed roundabout at the intersection of Glenshire Drive and the
Church Street extension is summarized below.
Construction
Construction traffic would result in short-term increases in traffic volumes on I-80, SR
89, SR 267, Truckee Way, and Glenshire Drive. The addition of project-related
construction vehicle traffic to existing roadway volumes without a corresponding
increase in the capacity of the roadway could result in increased congestion and delay for
vehicles. The presence of construction truck traffic could temporarily reduce roadway
capacities due to the slower travel speeds and larger turning radii of trucks. The impacts
of construction traffic would be most noticeable in the immediate vicinity of the project
area. A maximum of 30 construction workers will be needed at the project site daily
during peak construction activities, which equates to 60 one-way vehicle trips (30
inbound, 30 outbound). In addition, a maximum of 20 daily truck trips would be needed
to transport material (e.g., cut and fill, vegetation, water) to/from the project site, which
equates to 40 one-way vehicle trips (20 inbound, 20 outbound). In total, the maximum
number of vehicle trips that would be generated by the period of peak construction
activity is 100 ADT.
Based on existing traffic volumes on regional and local roadways that would be used to
access the project site, the addition of up to 100 vehicle trips per day would represent an
increase of between 0.2 and 2.0 percent on regional roadways, and between 1.0 and
1.3 percent on local roadways. The magnitude of these increases is within the range of
typical daily variation in traffic levels (usually on the order of ± 5 percent) that might be
expected on the major roadways serving the project site, and roadway operating
conditions on these roadways would remain substantially similar to current conditions.
As such, construction traffic generated by the proposed project would not substantially
affect the performance of roadway operating conditions in the project vicinity, and
impacts related to short-term traffic increases on I-80, SR 89, SR 267, Truckee Way, and
Glenshire Drive during construction of the project would be less than significant.
The contractor will establish access routes and staging areas for travel within the site and
storage of materials and equipment. As such, construction activities would generally take
place outside of the public right-of-way and would not substantially conflict with traffic,
transit, bicycle, or pedestrian access or circulation along these facilities. However,
construction activities associated with the proposed roundabout at the intersection of
Glenshire Drive and the Church Street extension may require partial roadway closures on
Glenshire Drive over the course of several days. During this period, one lane of traffic
would be available to through traffic and flaggers would be used to manage traffic flow
through the construction zone. The contractor will prepare and implement a traffic
control plan as part of the construction documents required by the Town of Truckee
Engineering Division for any roadway closures (full or partial) needed to construct the
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-79 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
project. The traffic control plan would designate how vehicular traffic, bicyclists, and
pedestrians would be routed around any lane closures. Unimpeded emergency vehicle
access would be provided at all times. Implementation of the traffic control plan would
ensure traffic safety and minimize disruptions to vehicular traffic, bicycle, or pedestrian
access or circulation along Glenshire Drive.
Given these considerations, construction of the project would result in less-than-
significant impacts to transportation and circulation.
Operation
As stated above, the project would not generate any new operational vehicle trips.
However, a supplemental operational analysis was conducted for the proposed
roundabout at the intersection of Glenshire Drive and the Church Street extension
(Traffic Works LLC, 2018), which is summarized below. This analysis was conducted
because a roundabout was not evaluated at this location as part of the Truckee Railyard
Master Plan EIR, and a capacity analysis was necessary to determine whether the
roundabout would operate at an acceptable level of service.
Under Policy P2.1 of the General Plan, the Town strives to maintain LOS D or better at
intersections located outside of Downtown (Town of Truckee, 2006). The analysis results
indicated that a side-street stop control on the Church Street extension (no traffic control
on Glenshire Drive) would operate at poor levels of service (LOS “E”) in 2030 assuming
full build-out of the Truckee Railyard Master Plan. Alternatively, a single-lane
roundabout with a right-turn bypass from eastbound Glenshire Drive to southbound
Church Street would result in LOS “C” or better in 2030 assuming full-build-out of the
Truckee Railyard Master Plan. Since the proposed roundabout design would result in
levels of service that meet the Town’s standard during the operational phase, there would
be no impact to existing traffic loads or street system capacity.
c) No Impact. The project would not be located immediately adjacent to any public airports
or airstrips. In addition, there would be no permanent structures that would interfere with
air traffic operations (e.g., take-offs or landings). Neither construction nor operation of
the project components (i.e., Church Street extension, Trout Creek restoration) would
generate any aviation activity, result in a change in air traffic patterns at the Tahoe-
Truckee Airport, or result in substantial safety risks. There would be no impact to airport
transportation or air traffic patterns.
d) Less than Significant. Trucks accessing the project site would mostly use I-80 and
Truckee Way. The Town does not have any formally designated truck routes, but trucks
traveling on local roadways would need to adhere to truck weight limits (i.e., 7-tons on
Glenshire Drive) and truck prohibitions (i.e., Northwoods Boulevard north of Truckee
Way). Furthermore, based on the low number of anticipated construction trips in relation
to traffic volumes on regional and local roadways. and their limited duration, construction
activities would result in a less-than-significant impact with regard to hazards and
incompatible uses. The extension of Church Street, which includes the bridge over Trout
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-80 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Creek and a roundabout at the intersection of Church Street and Glenshire Drive, would
be designed and constructed to comply with all relevant Town standards to ensure that
facilities operate safely and efficiently. Detailed designs for the project are provided in
Appendix A of this Initial Study. The Town and the Truckee Fire Protection District
(TFPD) have adopted roadway standards that preclude the construction of any unsafe
design features. Compliance with these established design standards would ensure that
operation of the proposed project would result in a less-than-significant impact with regard
to hazards and incompatible uses.
e) Less than Significant. Temporary construction staging would not block or interfere with
emergency response vehicles. Increases in traffic volumes on local roadways providing
access to the project site could cause intermittent and temporary slowdowns in traffic
flow, although as concluded above under impact discussion a, b), operational conditions
are not expected to deteriorate on local roadways as a result of project-generated truck
trips. Furthermore, the Church Street extension component of the project would create
new vehicular access between Downtown Truckee and Glenshire Drive, which would be
accessible to large emergency vehicles such as fire engines. The design of the roadway
and the roundabout at Glenshire Drive would comply with California Fire Code and
TFPD requirements. For these reasons, the project would not result in inadequate
emergency access and the impact would be less than significant.
f) Less than Significant. As described in Section 2.3, the purpose of the proposed Church
Street Extension component of the project is to provide a connected community with
places that are easily accessible to pedestrians, bicyclists, and drivers as well as create a
street and sidewalk network that is physically connected to the existing Downtown,
surrounding neighborhoods, and Trout Creek. The proposed project would not propose
any activities that would conflict with policies, plans, or programs that support alternative
transportation.
Construction of the project may result in temporary lane closures on Glenshire Drive,
which would result in intermittent and temporary impedances to bicycle and pedestrian
access along that roadway. However, as noted above under impact discussion a, b), the
contractor will prepare and implement a traffic control plan as part of the construction
documents required by the Town of Truckee Engineering Division for any roadway
closures (full or partial) needed to construct the project. The traffic control plan(s) would
designate how vehicular traffic, bicyclists, and pedestrians would be routed around any
lane closures. Therefore, the project would result in a less-than-significant impact to the
performance or safety of bicycle, pedestrian, and transit facilities and operations.
Operation of the project would not affect existing or planned alternative transportation
facilities/operations on adjacent roadways. As stated previously, there are no public
transit stops on adjacent roadways. Existing and planned bicycle and pedestrian facilities
will not be removed or precluded by the project components. The existing bicycle lanes
on Glenshire Drive will be maintained (reconstructed) leading up to and away from to the
proposed roundabout. Within the roundabout, bicyclists would share the lane with low-
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-81 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
speed vehicular traffic because it is typical/best practice that bicycle lanes not be striped
in roundabouts. Travel speeds in single-lane roundabouts are low (25 mph or less). As
such, the roundabout design would accommodate safe and continuous bicycle traffic
along Glenshire Drive, and the proposed bicycle lanes on the Church Street extension
would provide bicyclists a new alternative route to and from Downtown Truckee.
References
AirNav.com, 2018. Truckee-Tahoe Airport – FAA Information Effective 06 December 2018.
Available: https://www.airnav.com/airport/KTRK. Accessed on December 7, 2018.
California Department of Transportation, 2018. 2017 Traffic Volumes on California State
Highways, published 2018. Available: http://www.dot.ca.gov/trafficops/census/
volumes2017/. Accessed on December 7, 2018.
Town of Truckee, 2015. Truckee Trails & Bikeways Master Plan, September 2015. Available:
https://www.townoftruckee.com/home/showdocument?id=13200. Accessed on
December 7, 2018.
Town of Truckee, 2006. 2025 General Plan – Circulation Element. Adopted November 15, 2006.
Available: https://www.townoftruckee.com/home/showdocument?id=1212. Accessed on
December 7, 2018.
Traffic Works LLC, 2018. Glenshire Drive/Church Street Intersection Control Evaluation.
January 29, 2018.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-82 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Tribal Cultural Resources
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
18. Tribal Cultural Resources —
a) Would the project cause a substantial adverse change
in the significance of a tribal cultural resource, defined
in Public Resources Code section 21074 as either a
site, feature, place, cultural landscape that is
geographically defined in terms of the size and scope
of the landscape, sacred place, or object with cultural
value to a California Native American tribe, and that
is:
☐ ☒ ☐ ☐
i) Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in Public
Resources. Code Section 5020.1(k), or
☐ ☒ ☐ ☐
ii) A resource determined by the lead agency, in its
discretion and supported by substantial evidence,
to be significant pursuant to criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1. In applying the criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1, the lead agency shall consider the
significance of the resource to a California Native
American tribe.
☐ ☒ ☐ ☐
Discussion
a.i, a.ii) Less than Significant with Mitigation. Tribal cultural resources are: 1) sites, features,
places, cultural landscapes, sacred places, and objects with cultural value to a California
Native American tribe that are listed, or determined to be eligible for listing in the
California Register of Historical Resources (California Register), or local register of
historical resources, as defined in PRC Section 5020.1(k); or, 2) a resource determined by
the lead CEQA agency, in its discretion and supported by substantial evidence, to be
significant pursuant to criteria set forth in PRC Section 5024.1(c). For a cultural
landscape to be considered a tribal cultural resource, it must be geographically defined in
terms of the size and scope of the landscape (PRC Section 21074[b]). Also, a historical
resource, as defined in PRC Section 21084.1, unique archaeological resource, as defined
in PRC Section 21083.2(g), or non-unique archaeological resource, as defined in PRC
Section 21083.2(h), may also be a tribal cultural resource.
The Truckee Development Associates sent a Sacred Lands Search request letter to the
Native American Heritage Commission (NAHC). On November 23, 2015, the United
Auburn Indian Community sent a letter to the Town of Truckee asking to be notified of
any projects within their traditional territory. The Town of Truckee sent a letter to the
UAIC on May 17, 2019. No responses were received.
Through a records search and background research at the North Central Information Center
of the California Historical Resources Information System and a surface survey, no known
archaeological resources that could be considered tribal cultural resources, listed or
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-83 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
determined eligible for listing in the California Register, or included in a local register of
historical resources as defined in PRC Section 5020.1(k), pursuant to PRC Section
21074(a)(1), would be impacted by the project (ESA, 2018). In addition, the Town did not
determine any resource that could potentially be affected by the project to be a tribal
cultural resource significant pursuant to criteria set forth in PRC Section 5024.1(c).
If any previously unrecorded archaeological resource were identified during ground-
disturbing construction activities and were found to qualify as a tribal cultural resource
pursuant to PRC Section 21074(a)(1) (determined to be eligible for listing in the
California Register or in a local register of historical resources), any impacts to the
resource resulting from the project could be potentially significant. Any such potential
significant impacts would be reduced to a less-than-significant level by implementing
Mitigation Measure CUL-1. This measure would ensure that work is halted in the
vicinity of a find until a qualified archaeologist can make an assessment and provide
additional recommendations if necessary, including contacting Native American tribes
(refer to Cultural Resources).
References
ESA, Church Street Extension Project Cultural Resources Inventory (D170799), Prepared for
Todd Landry, Senior Civil Engineer, Town of Truckee, November 2018.
North Central Information Center (NCIC), File No. NEV-17-75 California Historical Resources
Information System at California State University, Sacramento. On file at ESA, November
1, 2017.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-84 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Utilities and Service Systems
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
19. UTILITIES AND SERVICE SYSTEMS —
Would the project:
a) Exceed wastewater treatment requirements of the
applicable Regional Water Quality Control Board? ☐ ☐ ☐ ☒
b) Require or result in the construction of new water or
wastewater treatment facilities or expansion of
existing facilities, the construction of which could
cause significant environmental effects?
☐ ☐ ☐ ☒
c) Require or result in the construction of new storm
water drainage facilities or expansion of existing
facilities, the construction of which could cause
significant environmental effects?
☐ ☐ ☒ ☐
d) Have sufficient water supplies available to serve the
project from existing entitlements and resources, or
are new or expanded entitlements needed?
☐ ☐ ☐ ☒
e) Result in a determination by the wastewater treatment
provider which serves or may serve the project that it
has adequate capacity to serve the project’s projected
demand in addition to the provider’s existing
commitments?
☐ ☐ ☐ ☒
f) Be served by a landfill with sufficient permitted
capacity to accommodate the project’s solid waste
disposal needs?
☐ ☐ ☒ ☐
g) Comply with federal, state, and local statutes and
regulations related to solid waste? ☐ ☐ ☐ ☒
Environmental Setting
The setting information provided below is based on information provided in the Truckee Railyard
Draft Master Plan EIR.
Water services are provided to the project site by Truckee Donner Public Utility District
(TDPUD). The TDPUD acquires water from the Martis Valley Ground Water Basin, which has a
storage volume of 484,000 acre-feet.
Truckee Sanitary District provides wastewater collection services to the project site. The
District’s collection system includes storm sewers and associated pumping facilities.
Solid waste and recycling services are provided to the project site and surrounding area by Tahoe
Truckee Sierra Disposal (TTSD). The Eastern Regional Landfill Material Recovery Facility
(MRF) acts as a transfer station for construction material waste before it is transported to the
Lockwood Regional Landfill, a 1,535-acre site located in Storey, Nevada.
Truckee Donner Public Utility District provides electrical power services to the project area.
Natural gas is provided by Southwest Gas via a two-inch mainline on Church Street.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-85 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Discussion
a, b, No Impact. The project proposes to restore Reaches 4 and 5 of the Trout Creek as well as
d, e, g) construct a new roadway connecting the existing Church Street to Glenshire Drive and
does not include any new commercial or residential development. Accordingly, there
would not be an increased demand for water or wastewater treatment facilities or
additional water supplies as a result of the proposed project. Construction of the proposed
project will comply with all the wastewater requirements of the LRWQCB (refer to the
Hydrology and Water Quality section for more information), as well as all federal, state,
and local statutes and regulations related to solid waste. Therefore, there would be no
impact.
c) Less than Significant. The proposed project includes roadside swales and associated
stormwater detention basins located immediately south of the proposed bridge over Trout
Creek as well as east of the proposed roundabout, as described in the project description.
All construction activities would comply with requirements in the NPDES construction
General Permit and a SWPPP would be implemented to regulate water quality associated
with construction activities. Construction and operation of stormwater treatment areas
would result in impacts to the project site. However, these impacts are considered as part
of the proposed project and are evaluated throughout this Initial Study. In instances where
significant impacts have been identified for the project, mitigation measures are required
to reduce impacts to less than significant levels. Therefore, impacts related to storm water
drainage facilities would be less than significant.
f) Less than Significant. The proposed project would generate minimal waste from
temporary construction activities. All solid waste collected at the project site would be
brought to the transfer station at the Eastern Regional Landfill MRF before being
transferred to the Lockwood Regional Landfill. The landfills that serve the project area
have the capacity to accept waste generated by the proposed project. Therefore, the
proposed project would result in a less-than-significant impact.
References
Town of Truckee, 2008. Truckee Railyard Draft Master Plan Draft Environmental Impact Report.
Accessed November 19, 2018.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-86 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Wildfire
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
20. WILDFIRE —
If located in or near state responsibility areas or
lands classified as very high fire hazard severity,
would the project:
a) Substantially impair an adopted emergency response
plan or emergency evacuation plan? ☐ ☐ ☒ ☐
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to pollutant concentrations from a wildfire
or the uncontrolled spread of a wildfire?
☐ ☐ ☒ ☐
c) Require the installation or maintenance of associated
infrastructure (such as roads, fuel breaks, emergency
water sources, power lines or other utilities) that may
exacerbate fire risk or that may result in temporary or
ongoing impacts to the environment?
☐ ☐ ☒ ☐
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
☐ ☐ ☒ ☐
Discussion
a) Less than Significant. The construction activity and the staging of equipment and
materials for the proposed project would occur mostly within the undeveloped area south
of Glenshire Drive, which would not require road closures or lane restrictions. The
proposed project would include the construction of a roundabout at the new Church
Street Extension/Glenshire Drive intersection. This activity would result in temporary
lane restrictions and possibly short-term road closures. As discussed previously in the
section on Transportation, the construction permit would require the preparation and
implementation of a traffic control plan to minimize traffic disruptions and facilitate the
re-routing of traffic during construction. With implementation of the traffic control plan,
impacts to emergency response and evacuation plans would be less than significant.
b-d) Less than Significant. The entire Truckee area is designated as within a high fire hazard
severity zone (Town of Truckee, 2008). However, the proposed project site does not have
dense vegetation and is not located on steep slopes, factors that contribute to increased
wildfire risk. In addition, Trout Creek runs through the project area, further reducing fire
risk. The proposed project would not change the site characteristics other than improving
aquatic and riparian habitat associated with the creek. The addition of the paved road and
bridge would not result in structures that could catch fire. Therefore, relative to wildland
fires, the impact would be less than significant.
References
Town of Truckee, 2008, Truckee Railyard Draft Master Plan EIR, November.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-87 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Mandatory Findings of Significance
Issues (and Supporting Information Sources):
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact No Impact
20. MANDATORY FINDINGS OF SIGNIFICANCE —
a) Does the project have the potential to substantially
degrade the quality of the environment, substantially
reduce the habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below self-sustaining
levels, threaten to eliminate a plant or animal
community, substantially reduce the number or restrict
the range of a rare or endangered plant or animal or
eliminate important examples of the major periods of
California history or prehistory?
☐ ☒ ☐ ☐
b) Does the project have impacts that are individually
limited, but cumulatively considerable? (“Cumulatively
considerable” means that the incremental effects of a
project are considerable when viewed in connection with
the effects of past projects, the effects of other current
projects, and the effects of probable future projects)?
☐ ☒ ☐ ☐
c) Does the project have environmental effects which will
cause substantial adverse effects on human beings,
either directly or indirectly?
☐ ☒ ☐ ☐
Discussion
a) Less than Significant with Mitigation. Per the impact discussions above, the potential
of the proposed project to substantially degrade the environment is less than significant
with incorporated mitigation measures. As described in this Initial Study, the proposed
project has the potential for impacts related to biological resources, cultural resources, and
noise. However, these impacts would be avoided or reduced to a less-than-significant level
with the incorporation of avoidance and mitigation measures discussed in each section.
b) This section provides a description of other actions in the area and a discussion of the
cumulative impacts of those projects, in combination with the previously identified
effects of the proposed project. CEQA Guidelines Section 15355 states that “cumulative
impacts refer to two or more individual effects which, when considered together, are
considerable or which compound or increase other environmental impacts.”
a) The individual effects may be changes resulting from a single project or a number of
separate projects.
b) The cumulative impact from several projects is the change in the environment which
results from the incremental impact of the project when added to other closely related
past, present, and reasonably foreseeable probable future projects. Cumulative
impacts can result from individually minor but collectively significant projects taking
place over a period of time.
The past, present and reasonably foreseeable future conditions of the project site and
vicinity were considered for the cumulative analysis. This includes future development
within the Railyard Master Plan Area as well as past restoration of Reaches 1-3 of Trout
Creek.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-88 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
Aesthetics. Completion of the proposed project would result in some permanent visual
changes to the project area, including a new extension of Church Street and restoration of
a section of Trout Creek. Changing the existing vacant land into a new extension of
Church Street would not result in significant aesthetics impacts. Further, these changes
are consistent with the objectives of the Town’s Railyard Master Plan, General Plan, and
Downtown Specific Plan and are in part intended to improve the aesthetic value of the
Railyard Master Plan Area, and the Town of Truckee identifies the project site as an area
to be developed. As such, cumulative impacts to aesthetics would be less than significant.
Agricultural and Forest Resources. The project would have no impact to agricultural
and forest resources and thus does not contribute to cumulative impacts.
Air Quality and Greenhouse Gas Emissions. A number of individual projects in the
Town of Truckee may be under construction simultaneously with the proposed project.
Depending on construction schedules and actual implementation of projects in and
around Town, generation of fugitive dust and pollutant emissions during construction
may result in short-term air pollutants, which would contribute to short-term cumulative
air quality impacts. However, each individual project would be subject to Northern Sierra
Air Quality Management District (NSAQMD) rules, regulations, and other mitigation
requirements during construction. For cumulative impacts to air quality and greenhouse
gas emissions see the Air Quality and Greenhouse Gas Emissions sections above. The
thresholds used consider the contribution of other projects within the air basin.
Additionally, greenhouse gas emissions are considered cumulative in nature because it is
unlikely that a single project would contribute significantly to climate change.
Biological Resources, Cultural Resources, Tribal Cultural Resources,
Geology/Soils/Seismicity, Hazards and Hazardous Materials, and Wildfire. The
project’s impacts for these environmental issues would be limited to the project site, and
any significant impacts (biological resources, cultural resources) have been reduced to a
less-than-significant level by incorporating proposed mitigation measures. Thus, the
proposed project would not contribute to cumulative impacts for these topics.
Energy. Construction of the project would result in fuel consumption from the use of
construction tools and equipment, truck trips to haul material, and vehicle trips generated
from construction workers commuting to and from the site. This impact would be
temporary and localized. Operation impacts to energy are not anticipated. Construction-
related fuel consumption by the project would not result in inefficient, wasteful, or
unnecessary energy use compared with other construction sites in the region.
Hydrology and Water Quality. Implementation of the proposed project would result in
an increase in impervious coverage and an increase in the amount of stormwater
generated in the project site. Construction and operational impacts to water quality that
would result from implementation of the proposed project would be minimized through
implementation of the stormwater pollution prevention plan (SWPPP). In addition, the
project incorporates stormwater detention basins to attenuate stormwater flows and
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-89 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
prevent flooding by collecting runoff from the roadway and allowing for infiltration. The
Trout Creek Restoration component of the project is expected to result in a net benefit in
water quality at the project site and downstream. Both the proposed project and other
projects in the Railyard Master Plan Area project would be required to develop plans to
address stormwater during construction and operation. With this requirement, cumulative
impacts would be less than significant.
Land Use and Land Use Planning. The proposed project is an allowable use under the
existing zoning and is consistent with the goals and policies addressed in the Railyard
Master Plan; therefore, it would not contribute to cumulative land use issues.
Mineral Resources. The project would have no impact on mineral resources and thus
does not contribute to cumulative impacts.
Noise. The project’s noise impacts are anticipated to be minor and the project will
comply with the noise standards in the Noise Element of the General Plan. The impacts
from construction noise would be reduced to a less-than-significant level with
implementation of the mitigation measure included in the Noise section. Operation of the
proposed project would not result in a substantial permanent increase in ambient noise
levels in the proposed project vicinity above levels existing without the proposed project.
As such, cumulative noise impacts would be less than significant.
Population and Housing. The proposed project would not induce substantial population
growth in the area as the project does not include any new residential or commercial
development. The proposed project would provide temporary employment for several
people during construction. The proposed project would not result in the permanent
creation of a significant number of new jobs that would induce substantial population
growth. Therefore, cumulative population and housing impacts would be less than
significant.
Public Services. No commercial or residential development is proposed as part of the
proposed project; therefore, the proposed project would not increase demands on fire
protection or police services nor affect the response time of these services. Therefore,
cumulative public services impacts would be less than significant.
Recreation. The project would have no impact on recreation and thus does not contribute
to cumulative impacts.
Transportation and Traffic. For cumulative impacts see the Transportation and Traffic
section above.
Utilities and Service Systems. The project does not include wastewater or water supply
systems, and would generate a relatively small amount of solid waste per day only during
construction. Stormwater would be treated on-site. Therefore, cumulative impacts to
utilities and service systems would be less than significant.
2. Initial Study
Church Street Extension/Trout Creek Restoration Project 2-90 ESA / 180971
Initial Study/Mitigated Negative Declaration June 2019
This Draft Initial Study/Mitigated Negative Declaration found that the proposed project
and associated activities will potentially impact the environment in the areas of biological
resources, cultural resources, and noise. However, these potential impacts will be reduced
to a less-than-significant level with implementation of the mitigation measures included
in this report, and most impacts are temporary in nature (i.e. would only occur during
construction). Other future projects proposed in the region and vicinity may increase
impacts identified herein or this project may contribute to other impacts; however, this
project is not anticipated to contribute substantially to any one impact, and the proposed
project’s impacts are not anticipated to be cumulatively considerable when viewed in
connection with the effects of past projects, the effects of other current projects, and the
effects of future projects; resulting in a less-than-significant impact.
c) Less than Significant with Mitigation. The proposed project will not result in any
substantial adverse effects to human beings, either directly or indirectly, since each
potentially significant impact can be reduced to a less-than-significant level with the
implementation of the mitigation measures provided in this document. No other
substantial adverse effects to human beings are anticipated as a result of this project,
resulting in a less-than-significant impact.
Appendix A
Design Plans
NEVADA COUNTY, CALIFORNIA TOWN OF TRUCKEECIVIL ENGINEER:4515 TOWNE DRIVE, SUITE A, RENO, NV 89521TEL: (775) 828-7220, FAX: (775) 828-7221AGENCY:TOWN OF TRUCKEETOWN ADMINISTRATIVE CENTER10183 TRUCKEE AIRPORT RDTRUCKEE, CA 96161PH: (530) 582-7700FX: (530) 582-771030% DESIGN SUBMITTAL OFLOCATION MAPNOT TO SCALEPROJECTLOCATIONCHURCH STREET EXTENSION TOGLENSHIRE DRIVE & TROUTCREEK RESTORATION REACH 4 & 5PROJECTVICINITY MAPNOT TO SCALEREVISIONSDateNo.BY APPD
SHEET No. OFSTAMP
1
2
3
4
TITLE
PROJECT
5Designed:4515 TOWNE DRIVE MAIN: (775) 828-7220
RENO, NV 89521 FAX: (775) 828-7221Drawn By:Approved By:Job No:Scale:Date:CHURCH EXTENSION TO GLENSHIRE
TITLE SHEET
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC120CHURCH STREET EXTENSION TO GLENSHIRE DRIVE& TROUT CREEK RESTORATION REACH 4 & 5 PROJECTCIVIL ENGINEER:INDEX OF SHEETS:SHEET #DESCRIPTIONC1TITLE SHEETC2LEGEND & ABBREVIATIONSC3SHEET INDEXC4SITE PLAN & EASEMENTSC5PLAN & PROFILE STA "GSD" 19+00 - 21+00C6PLAN & PROFILE STA "GSD" 21+00 - 23+50C7PLAN & PROFILE STA "GSD" 23+50 - 26+00C8PLAN & PROFILE STA "GSD" 26+00 - 28+25C9PLAN & PROFILE STA "GSD" 28+25 - 29+50C10PLAN & PROFILE STA "CS" 32+50 - 24+75C11PLAN & PROFILE STA "CS" 34+75 - 37+25C12PLAN & PROFILE STA "CS" 37+25 - 39+60C13GLENSHIRE-CHURCH INTERSECTION GRADING PLANC14ROCK-N-ROSE DRIVEWAY GRADINGC15 NOTES AND LEGENDC16 REACH 4 AND 5 PLAN AND PROFILEC17 REACH 5 PLAN AND PROFILEC18 TYPICAL SECTIONSC19 TYPICAL SECTIONSC20 DETAILS509 Swift Street, Unit ASanta Cruz, California 95060Phone: (831) 421-9291, Fax: (888) 819-6847
REVISIONSDateNo.BY APPD
SHEET No. OFSTAMP
1
2
3
4
TITLE
PROJECT
5Designed:4515 TOWNE DRIVE MAIN: (775) 828-7220
RENO, NV 89521 FAX: (775) 828-7221Drawn By:Approved By:Job No:Scale:Date:CHURCH EXTENSION TO GLENSHIRE
LEGEND & ABBREVIATIONS
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC220////////////////////
SHEET INDEXC6C7C8C9C10C11C12C5REVISIONSDateNo.BY APPD
SHEET No. OFSTAMP
1
2
3
4
TITLE
PROJECT
5Designed:4515 TOWNE DRIVE MAIN: (775) 828-7220
RENO, NV 89521 FAX: (775) 828-7221Drawn By:Approved By:Job No:Scale:Date:CHURCH EXTENSION TO GLENSHIRE
SHEET INDEX
¬6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC320C13C14C16C17
EASEMENTS PLAN VIEWREVISIONSDateNo.BY APPD
SHEET No. OFSTAMP
1
2
3
4
TITLE
PROJECT
5Designed:4515 TOWNE DRIVE MAIN: (775) 828-7220
RENO, NV 89521 FAX: (775) 828-7221Drawn By:Approved By:Job No:Scale:Date:CHURCH EXTENSION TO GLENSHIRE
SITE PLAN & EASEMENTS
¬6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC420LEGEND
GLENSHIRE DRIVE PLAN VIEWMATCH LINE
SEE SHEET C6GLENSHIRE DRIVE PROFILE VIEW MATCH LINE
SEE SHEET C6
CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "GSD" 19+00 - 21+00
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC520
GLENSHIRE DRIVE PLAN VIEWMATCH LINE
SEE SHEET C7GLENSHIRE DRIVE PROFILE VIEW MATCH LINESEE SHEET C5
CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "GSD" 21+00 - 23+50
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC620MATCH LINESEE SHEET C5
MATCH LINE
SEE SHEET C7
GLENSHIRE DRIVE PLAN VIEWMATCH LINESEE SHEET C6
GLENSHIRE DRIVE PROFILE VIEW MATCH LINESEE SHEET C8MATCH LINE
SEE SHEET C8
CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "GSD" 23+50 - 26+00
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC720MATCH LINESEE SHEET C6
GLENSHIRE DRIVE PLAN VIEWGLENSHIRE DRIVE PROFILE VIEW MATCH LIN
E
SEE SHEET
C9 MATCH LINESEE SHEET C7CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "GSD" 26+00 - 28+25
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC820MATCH LINESEE SHEET C7
MATCH LINE
SEE SHEET C9
GLENSHIRE DRIVE PLAN VIEWGLENSHIRE DRIVE PROFILE VIEW MATCH LINESEE SHEET C8
CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "GSD" 28+25 - 29+50
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC920MATCH LINESEE SHEET C8
CHURCH ST. PLAN VIEWMATCH LINE
SEE SHEET C11CHURCH ST PROFILE VIEW CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "CS" 32+50 - 24+75
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC1020MATCH LINE
SEE SHEET C11
CHURCH ST. PLAN VIEWMATCH LINESEE SHEET C12CHURCH ST PROFILE VIEW MATCH LINESEE SHEET C10
MATCH LINE
SEE SHEET C12
CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "CS" 34+75 - 37+25
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC1120MATCH LINESEE SHEET C10
CHURCH ST. PLAN VIEWCHURCH ST PROFILE VIEW MATCH LINESEE SHEET C11
SEE SHEET C13 ORGLENSHIRE/CHURCHINTERSECTION 10 SCALEGRADING PLANMATCH LINESEE SHEET C11
CHURCH EXTENSION TO GLENSHIRE
PLAN & PROFILE
STA "CS" 37+25 - 39+60
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC1220
GLENSHIRE /CHURCH INTERSECTION GRADING PLANCHURCH EXTENSION TO GLENSHIRE
GLENSHIRE-CHURCH
¬,17(56(&7,21*5$',1*3/$1
6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC1320
GLENSHIRE DRIVE- CHURCH STREET INTERSECTION PLAN VIEWCHURCH EXTENSION TO GLENSHIRE
ROCK-N-ROSE DRIVEWAY GRADING
¬6-29-18AS SHOWN17.1.32TOWN OF TRUCKEE CALIFORNIA
TOWN OF TRUCKEE
10183 TRUCKEE AIRPORT ROAD
TRUCKEE, CA 96161MRCJSC, PSDDJC1420
Appendix B
Air Quality
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population
City Park 5.29 Acre 5.29 230,432.40 0
Other Asphalt Surfaces 2.68 Acre 2.68 116,740.80 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Rural
14
Wind Speed (m/s)Precipitation Freq (Days)2.2 72
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Pacific Gas & Electric Company
2021Operational Year
CO2 Intensity
(lb/MWhr)
641.35 0.029CH4 Intensity
(lb/MWhr)
0.006N2O Intensity
(lb/MWhr)
Church St. Extension-Trout Creek Restoration
Northern Sierra AQMD Air District, Annual
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 1 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
Project Characteristics - no utility required
Land Use - Asphalt surfaces = new road
City Park = creek restoration
Construction Phase - scrapping hours provided, otherwise assume full duration of project window for road work and full duration of late summer window for
restoration
Off-road Equipment - project specific
Off-road Equipment -
Off-road Equipment - defaults for grading
Off-road Equipment -
Off-road Equipment - default for grading
Off-road Equipment - hours provided for scrapers
Off-road Equipment -
Off-road Equipment - assume no crane, welders, gen sets for building a retaining wall
Off-road Equipment - assume no welders required for pre fab bridges
Grading - Restoration - Steambed mat + Retaining Wall material = 1150 CY + 617 CY
Trips and VMT - pre fab bridge requires flat bed truck = vendor trip
haul trip miles represent roundtrip distance
ROAD phases overlap w/ RESTORATION entire duration; max daily workers for project is 30 per day
assume one vendor trip per day for paving (asphalt truck etc)
Energy Use -
Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 10.00 1.00
tblConstructionPhase NumDays 10.00 18.00
tblConstructionPhase NumDays 20.00 19.00
tblConstructionPhase NumDays 230.00 18.00
tblConstructionPhase NumDays 230.00 18.00
tblConstructionPhase PhaseEndDate 8/22/2022 9/21/2021
tblConstructionPhase PhaseEndDate 6/27/2022 7/27/2021
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 2 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
tblConstructionPhase PhaseEndDate 8/9/2021 6/29/2021
tblConstructionPhase PhaseEndDate 7/25/2022 8/24/2021
tblConstructionPhase PhaseEndDate 7/12/2021 6/1/2021
tblConstructionPhase PhaseStartDate 7/26/2022 8/25/2021
tblConstructionPhase PhaseStartDate 8/10/2021 6/30/2021
tblConstructionPhase PhaseStartDate 7/13/2021 6/2/2021
tblConstructionPhase PhaseStartDate 6/28/2022 7/28/2021
tblConstructionPhase PhaseStartDate 6/29/2021 6/1/2021
tblGrading MaterialImported 0.00 6,750.00
tblGrading MaterialImported 0.00 170.00
tblGrading MaterialImported 0.00 35.00
tblGrading MaterialImported 0.00 1,767.00
tblOffRoadEquipment LoadFactor 0.48 0.48
tblOffRoadEquipment LoadFactor 0.48 0.48
tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Dozers Scrapers
tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Dozers Scrapers
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00
tblProjectCharacteristics UrbanizationLevel Urban Rural
tblTripsAndVMT HaulingTripLength 20.00 30.00
tblTripsAndVMT HaulingTripLength 20.00 60.00
tblTripsAndVMT HaulingTripLength 20.00 4.00
tblTripsAndVMT HaulingTripLength 20.00 30.00
tblTripsAndVMT HaulingTripLength 20.00 4.00
tblTripsAndVMT HaulingTripNumber 0.00 20.00
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 3 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
2.0 Emissions Summary
tblTripsAndVMT HaulingTripNumber 0.00 1.00
tblTripsAndVMT HaulingTripNumber 0.00 1.00
tblTripsAndVMT HaulingTripNumber 0.00 3.00
tblTripsAndVMT HaulingTripNumber 0.00 5.00
tblTripsAndVMT VendorTripNumber 0.00 1.00
tblTripsAndVMT VendorTripNumber 57.00 0.00
tblTripsAndVMT VendorTripNumber 57.00 1.00
tblTripsAndVMT WorkerTripNumber 3.00 60.00
tblTripsAndVMT WorkerTripNumber 15.00 60.00
tblTripsAndVMT WorkerTripNumber 15.00 60.00
tblTripsAndVMT WorkerTripNumber 15.00 60.00
tblTripsAndVMT WorkerTripNumber 15.00 60.00
tblTripsAndVMT WorkerTripNumber 146.00 0.00
tblTripsAndVMT WorkerTripNumber 146.00 60.00
tblTripsAndVMT WorkerTripNumber 15.00 0.00
tblTripsAndVMT WorkerTripNumber 3.00 0.00
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 4 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
2.1 Overall Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2021 0.1627 1.4795 1.2424 2.2900e-
003
1.2030 0.0707 1.2738 0.6039 0.0652 0.6691 0.0000 201.8560 201.8560 0.0544 0.0000 203.2169
Maximum 0.1627 1.4795 1.2424 2.2900e-
003
1.2030 0.0707 1.2738 0.6039 0.0652 0.6691 0.0000 201.8560 201.8560 0.0544 0.0000 203.2169
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2021 0.1627 1.4795 1.2424 2.2900e-
003
1.2030 0.0707 1.2738 0.6039 0.0652 0.6691 0.0000 201.8558 201.8558 0.0544 0.0000 203.2167
Maximum 0.1627 1.4795 1.2424 2.2900e-
003
1.2030 0.0707 1.2738 0.6039 0.0652 0.6691 0.0000 201.8558 201.8558 0.0544 0.0000 203.2167
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 5 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.0138 0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mobile 0.0185 0.1049 0.2083 5.1000e-
004
0.0339 5.7000e-
004
0.0345 9.1100e-
003
5.4000e-
004
9.6400e-
003
0.0000 46.4929 46.4929 2.8000e-
003
0.0000 46.5628
Waste 0.0000 0.0000 0.0000 0.0000 0.0914 0.0000 0.0914 5.4000e-
003
0.0000 0.2263
Water 0.0000 0.0000 0.0000 0.0000 0.0000 6.4176 6.4176 2.9000e-
004
6.0000e-
005
6.4427
Total 0.0323 0.1049 0.2084 5.1000e-
004
0.0339 5.7000e-
004
0.0345 9.1100e-
003
5.4000e-
004
9.6400e-
003
0.0914 52.9106 53.0020 8.4900e-
003
6.0000e-
005
53.2320
Unmitigated Operational
Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter)
1 6-1-2021 8-31-2021 0.9776 0.9776
2 9-1-2021 9-30-2021 0.5011 0.5011
Highest 0.9776 0.9776
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 6 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.0138 0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
Energy 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mobile 0.0185 0.1049 0.2083 5.1000e-
004
0.0339 5.7000e-
004
0.0345 9.1100e-
003
5.4000e-
004
9.6400e-
003
0.0000 46.4929 46.4929 2.8000e-
003
0.0000 46.5628
Waste 0.0000 0.0000 0.0000 0.0000 0.0914 0.0000 0.0914 5.4000e-
003
0.0000 0.2263
Water 0.0000 0.0000 0.0000 0.0000 0.0000 6.4176 6.4176 2.9000e-
004
6.0000e-
005
6.4427
Total 0.0323 0.1049 0.2084 5.1000e-
004
0.0339 5.7000e-
004
0.0345 9.1100e-
003
5.4000e-
004
9.6400e-
003
0.0914 52.9106 53.0020 8.4900e-
003
6.0000e-
005
53.2320
Mitigated Operational
3.0 Construction Detail
Construction Phase
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 7 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 ROAD - Earthwork Site Preparation 6/1/2021 6/1/2021 5 1 only 10hr scrapping required
2 ROAD - Borrow Grading 6/2/2021 6/29/2021 5 20
3 ROAD - Bio Soil Grading 6/30/2021 7/27/2021 5 20
4 ROAD - Paving Paving 7/28/2021 8/24/2021 5 20
5 RESTORATION - Earthwork Site Preparation 8/1/2021 8/25/2021 5 18 180hr at 10hr a day of scrapping
6 ROAD - RipRap Grading 8/25/2021 9/21/2021 5 20
7 RESTORATION - Steambed mat Grading 8/26/2021 9/21/2021 5 19
8 RESTORATION - Retaining wall Building Construction 9/22/2021 10/15/2021 5 18
9 ROAD - Pre fab bridge Building Construction 9/22/2021 10/15/2021 5 18
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor
RESTORATION - Retaining wall Cranes 0 7.00 231 0.29
ROAD - Pre fab bridge Cranes 1 7.00 231 0.29
ROAD - Borrow Excavators 1 8.00 158 0.38
ROAD - Paving Pavers 2 8.00 130 0.42
ROAD - Paving Rollers 2 8.00 80 0.38
ROAD - Bio Soil Excavators 1 8.00 158 0.38
ROAD - Borrow Rubber Tired Dozers 1 8.00 247 0.40
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural
Coating ±sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 2.68
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 8 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
ROAD - Bio Soil Tractors/Loaders/Backhoes 3 8.00 97 0.37
ROAD - Borrow Graders 1 8.00 187 0.41
ROAD - Borrow Tractors/Loaders/Backhoes 3 8.00 97 0.37
ROAD - Paving Paving Equipment 2 8.00 132 0.36
ROAD - Earthwork Scrapers 1 10.00 367 0.48
ROAD - RipRap Excavators 1 8.00 158 0.38
RESTORATION - Steambed mat Excavators 1 8.00 158 0.38
RESTORATION - Retaining wall Forklifts 3 8.00 89 0.20
ROAD - Pre fab bridge Forklifts 3 8.00 89 0.20
RESTORATION - Retaining wall Generator Sets 0 8.00 84 0.74
ROAD - Pre fab bridge Generator Sets 1 8.00 84 0.74
ROAD - Bio Soil Graders 1 8.00 187 0.41
ROAD - RipRap Graders 1 8.00 187 0.41
RESTORATION - Steambed mat Graders 1 8.00 187 0.41
ROAD - Bio Soil Rubber Tired Dozers 1 8.00 247 0.40
ROAD - RipRap Rubber Tired Dozers 1 8.00 247 0.40
RESTORATION - Steambed mat Rubber Tired Dozers 1 8.00 247 0.40
RESTORATION - Earthwork Scrapers 1 10.00 367 0.48
RESTORATION - Retaining wall Tractors/Loaders/Backhoes 3 7.00 97 0.37
ROAD - Pre fab bridge Tractors/Loaders/Backhoes 3 7.00 97 0.37
ROAD - RipRap Tractors/Loaders/Backhoes 3 8.00 97 0.37
RESTORATION - Steambed mat Tractors/Loaders/Backhoes 3 8.00 97 0.37
RESTORATION - Retaining wall Welders 0 8.00 46 0.45
ROAD - Pre fab bridge Welders 0 8.00 46 0.45
Trips and VMT
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 9 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.2 ROAD - Earthwork - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 6.6000e-
004
0.0000 6.6000e-
004
7.0000e-
005
0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 5.8000e-
004
6.7200e-
003
4.4000e-
003
1.0000e-
005
2.6000e-
004
2.6000e-
004
2.4000e-
004
2.4000e-
004
0.0000 0.8365 0.8365 2.7000e-
004
0.0000 0.8432
Total 5.8000e-
004
6.7200e-
003
4.4000e-
003
1.0000e-
005
6.6000e-
004
2.6000e-
004
9.2000e-
004
7.0000e-
005
2.4000e-
004
3.1000e-
004
0.0000 0.8365 0.8365 2.7000e-
004
0.0000 0.8432
Unmitigated Construction On-Site
3.1 Mitigation Measures Construction
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
RESTORATION -
Retaining wall
6 0.00 0.00 3.00 16.80 6.60 30.00 LD_Mix HDT_Mix HHDT
ROAD - Earthwork 1 60.00 0.00 0.00 16.80 6.60 20.00 LD_Mix HDT_Mix HHDT
ROAD - Borrow 6 60.00 0.00 20.00 16.80 6.60 30.00 LD_Mix HDT_Mix HHDT
ROAD - Bio Soil 6 60.00 0.00 1.00 16.80 6.60 60.00 LD_Mix HDT_Mix HHDT
ROAD - Paving 6 60.00 1.00 0.00 16.80 6.60 20.00 LD_Mix HDT_Mix HHDT
ROAD - RipRap 6 60.00 0.00 1.00 16.80 6.60 4.00 LD_Mix HDT_Mix HHDT
ROAD - Pre fab bridge 8 60.00 1.00 0.00 16.80 6.60 20.00 LD_Mix HDT_Mix HHDT
RESTORATION -
Steambed mat
6 0.00 0.00 5.00 16.80 6.60 4.00 LD_Mix HDT_Mix HHDT
RESTORATION -
Earthwork
1 0.00 0.00 0.00 16.80 6.60 20.00 LD_Mix HDT_Mix HHDT
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 10 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.2 ROAD - Earthwork - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.3000e-
004
1.9000e-
004
1.6800e-
003
0.0000 3.7000e-
004
0.0000 3.7000e-
004
1.0000e-
004
0.0000 1.0000e-
004
0.0000 0.3222 0.3222 1.0000e-
005
0.0000 0.3225
Total 2.3000e-
004
1.9000e-
004
1.6800e-
003
0.0000 3.7000e-
004
0.0000 3.7000e-
004
1.0000e-
004
0.0000 1.0000e-
004
0.0000 0.3222 0.3222 1.0000e-
005
0.0000 0.3225
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 6.6000e-
004
0.0000 6.6000e-
004
7.0000e-
005
0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 5.8000e-
004
6.7200e-
003
4.4000e-
003
1.0000e-
005
2.6000e-
004
2.6000e-
004
2.4000e-
004
2.4000e-
004
0.0000 0.8365 0.8365 2.7000e-
004
0.0000 0.8432
Total 5.8000e-
004
6.7200e-
003
4.4000e-
003
1.0000e-
005
6.6000e-
004
2.6000e-
004
9.2000e-
004
7.0000e-
005
2.4000e-
004
3.1000e-
004
0.0000 0.8365 0.8365 2.7000e-
004
0.0000 0.8432
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 11 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.2 ROAD - Earthwork - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 2.3000e-
004
1.9000e-
004
1.6800e-
003
0.0000 3.7000e-
004
0.0000 3.7000e-
004
1.0000e-
004
0.0000 1.0000e-
004
0.0000 0.3222 0.3222 1.0000e-
005
0.0000 0.3225
Total 2.3000e-
004
1.9000e-
004
1.6800e-
003
0.0000 3.7000e-
004
0.0000 3.7000e-
004
1.0000e-
004
0.0000 1.0000e-
004
0.0000 0.3222 0.3222 1.0000e-
005
0.0000 0.3225
Mitigated Construction Off-Site
3.3 ROAD - Borrow - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.3247 0.0000 0.3247 0.1668 0.0000 0.1668 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0229 0.2474 0.1586 3.0000e-
004
0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2644
Total 0.0229 0.2474 0.1586 3.0000e-
004
0.3247 0.0116 0.3363 0.1668 0.0107 0.1774 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2644
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 12 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.3 ROAD - Borrow - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 1.0000e-
004
3.4700e-
003
5.9000e-
004
1.0000e-
005
2.5000e-
004
1.0000e-
005
2.7000e-
004
7.0000e-
005
1.0000e-
005
8.0000e-
005
0.0000 1.0815 1.0815 3.0000e-
005
0.0000 1.0823
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.6500e-
003
7.2500e-
003
0.0341 8.0000e-
005
7.5900e-
003
7.0000e-
005
7.6600e-
003
2.0200e-
003
6.0000e-
005
2.0800e-
003
0.0000 7.5250 7.5250 3.1000e-
004
0.0000 7.5329
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.3247 0.0000 0.3247 0.1668 0.0000 0.1668 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0229 0.2474 0.1586 3.0000e-
004
0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2643
Total 0.0229 0.2474 0.1586 3.0000e-
004
0.3247 0.0116 0.3363 0.1668 0.0107 0.1774 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2643
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 13 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.3 ROAD - Borrow - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 1.0000e-
004
3.4700e-
003
5.9000e-
004
1.0000e-
005
2.5000e-
004
1.0000e-
005
2.7000e-
004
7.0000e-
005
1.0000e-
005
8.0000e-
005
0.0000 1.0815 1.0815 3.0000e-
005
0.0000 1.0823
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.6500e-
003
7.2500e-
003
0.0341 8.0000e-
005
7.5900e-
003
7.0000e-
005
7.6600e-
003
2.0200e-
003
6.0000e-
005
2.0800e-
003
0.0000 7.5250 7.5250 3.1000e-
004
0.0000 7.5329
Mitigated Construction Off-Site
3.4 ROAD - Bio Soil - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.3244 0.0000 0.3244 0.1667 0.0000 0.1667 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0229 0.2474 0.1586 3.0000e-
004
0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2644
Total 0.0229 0.2474 0.1586 3.0000e-
004
0.3244 0.0116 0.3360 0.1667 0.0107 0.1774 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2644
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 14 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.4 ROAD - Bio Soil - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 1.0000e-
005
2.9000e-
004
5.0000e-
005
0.0000 3.0000e-
005
0.0000 3.0000e-
005
1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.1017 0.1017 0.0000 0.0000 0.1017
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.5600e-
003
4.0700e-
003
0.0336 7.0000e-
005
7.3700e-
003
6.0000e-
005
7.4200e-
003
1.9600e-
003
5.0000e-
005
2.0100e-
003
0.0000 6.5452 6.5452 2.8000e-
004
0.0000 6.5523
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.3244 0.0000 0.3244 0.1667 0.0000 0.1667 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0229 0.2474 0.1586 3.0000e-
004
0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2643
Total 0.0229 0.2474 0.1586 3.0000e-
004
0.3244 0.0116 0.3360 0.1667 0.0107 0.1774 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2643
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 15 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.4 ROAD - Bio Soil - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 1.0000e-
005
2.9000e-
004
5.0000e-
005
0.0000 3.0000e-
005
0.0000 3.0000e-
005
1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.1017 0.1017 0.0000 0.0000 0.1017
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.5600e-
003
4.0700e-
003
0.0336 7.0000e-
005
7.3700e-
003
6.0000e-
005
7.4200e-
003
1.9600e-
003
5.0000e-
005
2.0100e-
003
0.0000 6.5452 6.5452 2.8000e-
004
0.0000 6.5523
Mitigated Construction Off-Site
3.5 ROAD - Paving - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0126 0.1292 0.1465 2.3000e-
004
6.7800e-
003
6.7800e-
003
6.2400e-
003
6.2400e-
003
0.0000 20.0235 20.0235 6.4800e-
003
0.0000 20.1854
Paving 3.5100e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0161 0.1292 0.1465 2.3000e-
004
6.7800e-
003
6.7800e-
003
6.2400e-
003
6.2400e-
003
0.0000 20.0235 20.0235 6.4800e-
003
0.0000 20.1854
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 16 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.5 ROAD - Paving - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 4.0000e-
005
1.1000e-
003
2.9000e-
004
0.0000 6.0000e-
005
0.0000 6.0000e-
005
2.0000e-
005
0.0000 2.0000e-
005
0.0000 0.2535 0.2535 2.0000e-
005
0.0000 0.2539
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.5900e-
003
4.8800e-
003
0.0338 7.0000e-
005
7.4000e-
003
6.0000e-
005
7.4500e-
003
1.9700e-
003
5.0000e-
005
2.0200e-
003
0.0000 6.6970 6.6970 3.0000e-
004
0.0000 6.7045
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0126 0.1292 0.1465 2.3000e-
004
6.7800e-
003
6.7800e-
003
6.2400e-
003
6.2400e-
003
0.0000 20.0235 20.0235 6.4800e-
003
0.0000 20.1854
Paving 3.5100e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0161 0.1292 0.1465 2.3000e-
004
6.7800e-
003
6.7800e-
003
6.2400e-
003
6.2400e-
003
0.0000 20.0235 20.0235 6.4800e-
003
0.0000 20.1854
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 17 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.5 ROAD - Paving - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 4.0000e-
005
1.1000e-
003
2.9000e-
004
0.0000 6.0000e-
005
0.0000 6.0000e-
005
2.0000e-
005
0.0000 2.0000e-
005
0.0000 0.2535 0.2535 2.0000e-
005
0.0000 0.2539
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.5900e-
003
4.8800e-
003
0.0338 7.0000e-
005
7.4000e-
003
6.0000e-
005
7.4500e-
003
1.9700e-
003
5.0000e-
005
2.0200e-
003
0.0000 6.6970 6.6970 3.0000e-
004
0.0000 6.7045
Mitigated Construction Off-Site
3.6 RESTORATION - Earthwork - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.0119 0.0000 0.0119 1.2900e-
003
0.0000 1.2900e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0105 0.1210 0.0792 1.7000e-
004
4.7100e-
003
4.7100e-
003
4.3300e-
003
4.3300e-
003
0.0000 15.0562 15.0562 4.8700e-
003
0.0000 15.1779
Total 0.0105 0.1210 0.0792 1.7000e-
004
0.0119 4.7100e-
003
0.0166 1.2900e-
003
4.3300e-
003
5.6200e-
003
0.0000 15.0562 15.0562 4.8700e-
003
0.0000 15.1779
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 18 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.6 RESTORATION - Earthwork - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.0119 0.0000 0.0119 1.2900e-
003
0.0000 1.2900e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0105 0.1210 0.0792 1.7000e-
004
4.7100e-
003
4.7100e-
003
4.3300e-
003
4.3300e-
003
0.0000 15.0561 15.0561 4.8700e-
003
0.0000 15.1779
Total 0.0105 0.1210 0.0792 1.7000e-
004
0.0119 4.7100e-
003
0.0166 1.2900e-
003
4.3300e-
003
5.6200e-
003
0.0000 15.0561 15.0561 4.8700e-
003
0.0000 15.1779
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 19 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.6 RESTORATION - Earthwork - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated Construction Off-Site
3.7 ROAD - RipRap - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.3243 0.0000 0.3243 0.1667 0.0000 0.1667 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0229 0.2474 0.1586 3.0000e-
004
0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2644
Total 0.0229 0.2474 0.1586 3.0000e-
004
0.3243 0.0116 0.3359 0.1667 0.0107 0.1774 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2644
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 20 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.7 ROAD - RipRap - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 7.0000e-
005
1.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0128 0.0128 0.0000 0.0000 0.0129
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.5500e-
003
3.8500e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4564 6.4564 2.8000e-
004
0.0000 6.4635
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.3243 0.0000 0.3243 0.1667 0.0000 0.1667 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0229 0.2474 0.1586 3.0000e-
004
0.0116 0.0116 0.0107 0.0107 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2643
Total 0.0229 0.2474 0.1586 3.0000e-
004
0.3243 0.0116 0.3359 0.1667 0.0107 0.1774 0.0000 26.0537 26.0537 8.4300e-
003
0.0000 26.2643
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 21 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.7 ROAD - RipRap - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 7.0000e-
005
1.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0128 0.0128 0.0000 0.0000 0.0129
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 4.5500e-
003
3.7800e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4436 6.4436 2.8000e-
004
0.0000 6.4506
Total 4.5500e-
003
3.8500e-
003
0.0335 7.0000e-
005
7.3400e-
003
6.0000e-
005
7.3900e-
003
1.9500e-
003
5.0000e-
005
2.0000e-
003
0.0000 6.4564 6.4564 2.8000e-
004
0.0000 6.4635
Mitigated Construction Off-Site
3.8 RESTORATION - Steambed mat - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.1803 0.0000 0.1803 0.0926 0.0000 0.0926 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0218 0.2350 0.1507 2.8000e-
004
0.0110 0.0110 0.0101 0.0101 0.0000 24.7510 24.7510 8.0000e-
003
0.0000 24.9511
Total 0.0218 0.2350 0.1507 2.8000e-
004
0.1803 0.0110 0.1913 0.0926 0.0101 0.1028 0.0000 24.7510 24.7510 8.0000e-
003
0.0000 24.9511
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 22 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.8 RESTORATION - Steambed mat - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 1.0000e-
005
3.4000e-
004
5.0000e-
005
0.0000 1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0642 0.0642 1.0000e-
005
0.0000 0.0644
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.0000e-
005
3.4000e-
004
5.0000e-
005
0.0000 1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0642 0.0642 1.0000e-
005
0.0000 0.0644
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 0.1803 0.0000 0.1803 0.0926 0.0000 0.0926 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Off-Road 0.0218 0.2350 0.1507 2.8000e-
004
0.0110 0.0110 0.0101 0.0101 0.0000 24.7510 24.7510 8.0000e-
003
0.0000 24.9511
Total 0.0218 0.2350 0.1507 2.8000e-
004
0.1803 0.0110 0.1913 0.0926 0.0101 0.1028 0.0000 24.7510 24.7510 8.0000e-
003
0.0000 24.9511
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 23 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.8 RESTORATION - Steambed mat - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 1.0000e-
005
3.4000e-
004
5.0000e-
005
0.0000 1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0642 0.0642 1.0000e-
005
0.0000 0.0644
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 1.0000e-
005
3.4000e-
004
5.0000e-
005
0.0000 1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0642 0.0642 1.0000e-
005
0.0000 0.0644
Mitigated Construction Off-Site
3.9 RESTORATION - Retaining wall - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 7.9200e-
003
0.0766 0.0849 1.1000e-
004
4.9000e-
003
4.9000e-
003
4.5100e-
003
4.5100e-
003
0.0000 10.0748 10.0748 3.2600e-
003
0.0000 10.1563
Total 7.9200e-
003
0.0766 0.0849 1.1000e-
004
4.9000e-
003
4.9000e-
003
4.5100e-
003
4.5100e-
003
0.0000 10.0748 10.0748 3.2600e-
003
0.0000 10.1563
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 24 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.9 RESTORATION - Retaining wall - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 2.0000e-
005
5.2000e-
004
9.0000e-
005
0.0000 4.0000e-
005
0.0000 4.0000e-
005
1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.1622 0.1622 0.0000 0.0000 0.1623
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.0000e-
005
5.2000e-
004
9.0000e-
005
0.0000 4.0000e-
005
0.0000 4.0000e-
005
1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.1622 0.1622 0.0000 0.0000 0.1623
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 7.9200e-
003
0.0766 0.0849 1.1000e-
004
4.9000e-
003
4.9000e-
003
4.5100e-
003
4.5100e-
003
0.0000 10.0748 10.0748 3.2600e-
003
0.0000 10.1563
Total 7.9200e-
003
0.0766 0.0849 1.1000e-
004
4.9000e-
003
4.9000e-
003
4.5100e-
003
4.5100e-
003
0.0000 10.0748 10.0748 3.2600e-
003
0.0000 10.1563
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 25 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.9 RESTORATION - Retaining wall - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 2.0000e-
005
5.2000e-
004
9.0000e-
005
0.0000 4.0000e-
005
0.0000 4.0000e-
005
1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.1622 0.1622 0.0000 0.0000 0.1623
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Worker 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 2.0000e-
005
5.2000e-
004
9.0000e-
005
0.0000 4.0000e-
005
0.0000 4.0000e-
005
1.0000e-
005
0.0000 1.0000e-
005
0.0000 0.1622 0.1622 0.0000 0.0000 0.1623
Mitigated Construction Off-Site
3.10 ROAD - Pre fab bridge - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0144 0.1433 0.1337 2.2000e-
004
7.9600e-
003
7.9600e-
003
7.4400e-
003
7.4400e-
003
0.0000 19.1534 19.1534 4.8100e-
003
0.0000 19.2736
Total 0.0144 0.1433 0.1337 2.2000e-
004
7.9600e-
003
7.9600e-
003
7.4400e-
003
7.4400e-
003
0.0000 19.1534 19.1534 4.8100e-
003
0.0000 19.2736
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 26 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
3.10 ROAD - Pre fab bridge - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 3.0000e-
005
9.9000e-
004
2.6000e-
004
0.0000 5.0000e-
005
0.0000 6.0000e-
005
2.0000e-
005
0.0000 2.0000e-
005
0.0000 0.2281 0.2281 1.0000e-
005
0.0000 0.2285
Worker 4.0900e-
003
3.4000e-
003
0.0302 6.0000e-
005
6.6000e-
003
5.0000e-
005
6.6500e-
003
1.7600e-
003
5.0000e-
005
1.8000e-
003
0.0000 5.7992 5.7992 2.5000e-
004
0.0000 5.8055
Total 4.1200e-
003
4.3900e-
003
0.0304 6.0000e-
005
6.6500e-
003
5.0000e-
005
6.7100e-
003
1.7800e-
003
5.0000e-
005
1.8200e-
003
0.0000 6.0273 6.0273 2.6000e-
004
0.0000 6.0340
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0144 0.1433 0.1337 2.2000e-
004
7.9600e-
003
7.9600e-
003
7.4400e-
003
7.4400e-
003
0.0000 19.1534 19.1534 4.8100e-
003
0.0000 19.2736
Total 0.0144 0.1433 0.1337 2.2000e-
004
7.9600e-
003
7.9600e-
003
7.4400e-
003
7.4400e-
003
0.0000 19.1534 19.1534 4.8100e-
003
0.0000 19.2736
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 27 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
3.10 ROAD - Pre fab bridge - 2021
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Vendor 3.0000e-
005
9.9000e-
004
2.6000e-
004
0.0000 5.0000e-
005
0.0000 6.0000e-
005
2.0000e-
005
0.0000 2.0000e-
005
0.0000 0.2281 0.2281 1.0000e-
005
0.0000 0.2285
Worker 4.0900e-
003
3.4000e-
003
0.0302 6.0000e-
005
6.6000e-
003
5.0000e-
005
6.6500e-
003
1.7600e-
003
5.0000e-
005
1.8000e-
003
0.0000 5.7992 5.7992 2.5000e-
004
0.0000 5.8055
Total 4.1200e-
003
4.3900e-
003
0.0304 6.0000e-
005
6.6500e-
003
5.0000e-
005
6.7100e-
003
1.7800e-
003
5.0000e-
005
1.8200e-
003
0.0000 6.0273 6.0273 2.6000e-
004
0.0000 6.0340
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 28 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.0185 0.1049 0.2083 5.1000e-
004
0.0339 5.7000e-
004
0.0345 9.1100e-
003
5.4000e-
004
9.6400e-
003
0.0000 46.4929 46.4929 2.8000e-
003
0.0000 46.5628
Unmitigated 0.0185 0.1049 0.2083 5.1000e-
004
0.0339 5.7000e-
004
0.0345 9.1100e-
003
5.4000e-
004
9.6400e-
003
0.0000 46.4929 46.4929 2.8000e-
003
0.0000 46.5628
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
City Park 10.00 120.35 88.55 91,212 91,212
Other Asphalt Surfaces 0.00 0.00 0.00
Total 10.00 120.35 88.55 91,212 91,212
Miles Trip %Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by
City Park 14.70 6.60 6.60 33.00 48.00 19.00 66 28 6
Other Asphalt Surfaces 14.70 6.60 6.60 0.00 0.00 0.00 0 0 0
4.4 Fleet Mix
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH
City Park 0.441745 0.043228 0.239449 0.147556 0.039687 0.007004 0.014545 0.055644 0.001831 0.001022 0.005999 0.000606 0.001684
Other Asphalt Surfaces 0.441745 0.043228 0.239449 0.147556 0.039687 0.007004 0.014545 0.055644 0.001831 0.001022 0.005999 0.000606 0.001684
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 29 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Electricity
Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Electricity
Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
NaturalGas
Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
NaturalGas
Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 30 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
City Park 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 31 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
6.1 Mitigation Measures Area
6.0 Area Detail
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
City Park 0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000
Unmitigated
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
City Park 0 0.0000 0.0000 0.0000 0.0000
Other Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000
Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 32 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.0138 0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
Unmitigated 0.0138 0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
4.0600e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
9.7100e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 1.0000e-
005
0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
Total 0.0138 0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 33 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
4.0600e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
9.7100e-
003
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 1.0000e-
005
0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
Total 0.0138 0.0000 7.0000e-
005
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.4000e-
004
1.4000e-
004
0.0000 0.0000 1.5000e-
004
Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 34 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
Total CO2 CH4 N2O CO2e
Category MT/yr
Mitigated 6.4176 2.9000e-
004
6.0000e-
005
6.4427
Unmitigated 6.4176 2.9000e-
004
6.0000e-
005
6.4427
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
City Park 0 /
6.30294
6.4176 2.9000e-
004
6.0000e-
005
6.4427
Other Asphalt
Surfaces
0 / 0 0.0000 0.0000 0.0000 0.0000
Total 6.4176 2.9000e-
004
6.0000e-
005
6.4427
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 35 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
8.1 Mitigation Measures Waste
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
City Park 0 /
6.30294
6.4176 2.9000e-
004
6.0000e-
005
6.4427
Other Asphalt
Surfaces
0 / 0 0.0000 0.0000 0.0000 0.0000
Total 6.4176 2.9000e-
004
6.0000e-
005
6.4427
Mitigated
8.0 Waste Detail
Total CO2 CH4 N2O CO2e
MT/yr
Mitigated 0.0914 5.4000e-
003
0.0000 0.2263
Unmitigated 0.0914 5.4000e-
003
0.0000 0.2263
Category/Year
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 36 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
City Park 0.45 0.0914 5.4000e-
003
0.0000 0.2263
Other Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Total 0.0914 5.4000e-
003
0.0000 0.2263
Unmitigated
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
City Park 0.45 0.0914 5.4000e-
003
0.0000 0.2263
Other Asphalt
Surfaces
0 0.0000 0.0000 0.0000 0.0000
Total 0.0914 5.4000e-
003
0.0000 0.2263
Mitigated
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 37 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
11.0 Vegetation
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type
Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type
User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2016.3.2 Date: 3/28/2019 2:27 PMPage 38 of 38
Church St. Extension-Trout Creek Restoration - Northern Sierra AQMD Air District, Annual
UPRR Engine Emissions
2021 Emission Factors1
NOX 94 g/gal
PM10 2.2 g/gal
HC 3.4 g/gal
ROG2 3.6 g/gal
CO2 10,217 g/gal
Train Emission Factors & Emissions Per Mile
Composit Train Emission Factors
ROG NOx PM10 CO2 CH4
lbs/gallon 7.89E-03 2.07E-01 4.85E-03 2.25E+01
MT/gallon ---1.02E-02
Criteria Pollutants
RESTORATION Streambed 1150 CY 150 pounds per cubic foot3
2329 ton
ROAD Rip Rap 35 CY 150 pounds per cubic foot2
71 ton
456 miles per gallon per ton4
30 miles traveled (longest distance provided in data request)
5 number of trips
Train Emissions: Per tonnage - Per mile
ROG NOx PM10 CO2
lbs/mile/ton 1.73E-05 4.54E-04 1.06E-05 -
MT/mile/ton ---2.24E-05
Train Emissions: Total and Average per Day or Year
ROG NOx PM10 CO2
lbs lbs lbs MT
RESTORATION 1.21E+00 3.17E+01 7.43E-01 1.57E+00
ROAD 3.68E-02 9.66E-01 2.26E-02 4.76E-02
total 1.25 32.72 0.77 1.61
lbs/day lbs/day lbs/day MT/yr
Average5 0.25 6.54 0.15 1.61
2 VOC emissions are assumed to be equal to 1.053 times the HC emissions2
1 USEPA 2009. Emission Factors for Locomotives EPA-420-F-09-025. April. Available:
www3.epa.gov/nonroad/locomotv/420f09025.pdf. Accessed May 2016
3 On average UPRR trains can move one ton of freight 456 miles on a single gallon of gas: Available:
http://www.up.com/aboutup/environment/operations/index.htm. Accessed: May 2016
5 Average Daily threshold except CO2e is annual (no averaging)
4Pete Lien & Sons, FAQ https://petelien.com/21-crushed-faqs/50-how-many-tons-of-riprap-are-in-one-cubic-yard. Accessed
4/1/2016