HomeMy Public PortalAbout08-0202 City of Tybee Island CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 04 -25 -2008 PERMIT #: 080202
WORK DESCRIPTION STUCCO BLDG AT NORTH BEACH
WORK LOCATION NORTH BEACH BATHROOM
OWNER NAME CITY OF TYBEE ISLAND
ADDRESS P 0 BOX 2749
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME CLEVE WALKER CONSTRUCTION LLC
ADDRESS 205 HILLARY RD
CITY STATE ZIP SAVANNAH GA 31410
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $8,117.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
i
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 _ 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
•• -r .. .... , ,�. t!
p 0E-0(67 R
Cleve Walker Construction, LLC
205 Hillary Rd. Proposal # 286
Savannah Ga. 31410 % tete
Phone; 912- 398 -0101
Fax 912-8984715
Job: City Of Tybee Island- Park -- Restrooms
Address: 403 Butler Ave.
Date 02/01108
JAYCEE PAID, --A 5 Year warranty on
"Sto Power Wall System" with a 3/8 in_
brown and scratch coat. Sto Power Wall finish
coat 1/8 in. Both materials are flexible
elastomeric. Color chart will be provided.
Metal Lath, plastic components and sand are
provided by a different manufacturer, Four
sheets of 5/8 in Plywood to be replaced.1 799
SQ. FL Total labor and materials 12 485.0
_
02 0 a N -A 3 Year warran on
"Sto Classic System". Metal Lath, Plastic
components and 3/8 in. scratch -n-brown
coat followed by finish coat. 1200 Sq. Ft.
Total labor and material
MEMORIAL PARK ---A 3 Year warran on
"Sio Classic System". Metal Lath, Plastic
Components and 3/S in. scratch -n -brown coat
followed by finish coat. 1019 Sq. Ft.
Total Labor and materials 6 269.
A sand tan finish with a 1 year arranty on
workmanship. Total on all 3--$ papj
t
FEB- 81-2808 21 =40 912 898 1715 9/ aD