Loading...
HomeMy Public PortalAbout08-0203 City of Tybee Island te ' . 4 +EbortrO CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 04 -25 -2008 PERMIT #: 080203 WORK DESCRIPTION STUCCO MEM'L PARK BATHROOM BLD WORK LOCATION 402 JONES AVE OWNER NAME CITY OF TYBEE ISLAND ADDRESS P 0 BOX 2749 CITY, ST, ZIP TYBEE ISLAND GA 31328 PHONE NUMBER CONTRACTOR NAME CLEVE WALKER CONSTRUCTION LLC ADDRESS 205 HILLARY RD CITY STATE ZIP SAVANNAH GA 31410 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE U TOTAL FEES CHARGED $ 0.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $6,269.00 TOTAL BALANCE DUE: $ 0.00 it is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within sbi months of the date of issuance. Signature of Building Inspector or Authorized Agent: _AI sp. P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org I IIVCir I GUIUOI) VI LVVV d..lV I"'IYI AJI•rV, a•vI S, .., P. •Ur pc og- ) l0 RECEIVED Cleve Walker Construction, LLC 205 Hillary Rd. Proposal # 286 Savannah Ga. 31410 s+ acce Phone; 912- 398 -0101 Fax 912 - 898.1 715 Job: City Of Tybee Island -- Park -- Restrooms Address: 403 Butler Ave. Date 02/01/08 JAYCEE PAID -A 5 Year warranty on "Sto Power Wall System", with a 3/8 in. brown and scratch coat. Sto Power Wall finish coat 1/8 in. Both materials are flexible elastomeric. Color chart will be provided. Metal Lath, plastic components and sand are provided by a different manufacturer. Four sheets of 5/8 in Plywood to be replaced.1799 Sir; FL Total labor and materials 12 485.0 �N 6 . ,t� Ct -A 3 Year warran y on "Sto Classic System ". Metal Lath, Plastic components and 3/8 in. scratch - -n -brown coat followed by finish coat. 1200 Sq. Ft. Total labor and materials MEMORIAL PARK - - -A 3 Year warran y on -0203 "Sto Classic System" Metal Lath, Plastic Components and 3/8 in. scratch -n -brown coat 4 A„ followed by finish coat. 1019 Sq. Ft. Total Labor and materials 6 269. A sand tan finish with a 1 year arranty on workmanship. Total on all 3--'49 /( _ FEB -01 - 2808 21 :40 912 898 1715 9E% P.02