HomeMy Public PortalAboutFW_ TIF 2016-02-09From:Becky Bucar
To:"Pat Davison"
Cc:Dan Wilkins; "Alex Heyman"; "Alexis Ollar (alexis@mapf.org)"; "arosenfeld@TahoeDonner.com"; Bonnie
Thompson ; "Dale Creighton"; Dan Wilkins; "Gordon Shaw"; "jfj@surewest.net"; John McLaughlin ;
"jrfintel@outlook.com"; Judy Price ; "leslie@lsctahoe.com"; "Owens, Ted (towens@TFHD.COM)"; "Pat Davison
(pat@ca-tt.com)"; Patrick Flora; "Todd Rivera (trivera@ttusd.org)"; Tony Lashbrook
Subject:FW: TIF
Date:Tuesday, February 09, 2016 10:46:26 AM
Attachments:Copy of 2015 Truckee TIF Analysis v6.xlsx
Pat,
Attached is the spreadsheet that shows how the Placer County credit was calculated. Look at column
S of Table 2 tab. It factors the total cost by the proportion that is the responsibility of future growth
times the proportion that is not growth generated in Truckee.
I hope this answers your question.
Thank you,
Becky
Becky Bucar, Engineering Manager
Town of Truckee
10183 Truckee Airport Road
Truckee, CA 96161
530-582-2932
Units Existing1 Build Out #%
Land Use
Housing Units DU 12,858 19,990 7,132 55%
Lodging Units Rooms 561 1,113 552 98%
Non-Residential Floor Area2 Square Ft 2,559,000 4,593,000 2,034,000 79%
PM Pk Hr Vehicle Miles of Travel in Truckee 36,985 55,507 18,522 50%
Note 1: Reflects 2014 conditions.
Note 2: Excludes golf courses, schools, parks, RV parks, and churches.2014 Truckee TIF.xlsx
Growth
TABLE 1: Land Use and Travel Conditions Summary for Existing and Future
Conditions
TABLE 2: TIF Projects, Cost Estimates and Percent Funding Responsibility
General Plan Build-out Roadway Improvement Needs
Relevant
Standard:
Existing
Conditions
Existing
Unmitigated
Build-out
Unmitigated
Build-out
Mitigated Capacity Measure
% of Project Cost
Associated with Road
Maintenance (Not AB
1600 Eligible)
Traffic Impact Fee
Funding Placer %PLACER AMOUNT
% of Project Costs
Eligible for AB
1600 Funding
Year Project
Entered TIF
Program(2)
Document, Source of
Requirement
Truckee Intersections
Construct 1-Lane Roundabout D F F D $3,500,000 PM Pk-Hr 71%-$2,485,000 9%$308,000 100%2007 2015 TIF Update Study
Construct 1-Lane Roundabout F + 4 hrs
delay
F with 3.1 hrs
delay F B $3,500,000 PM Pk-Hr 79%-$2,765,000 21%$735,000 100%2007 2015 TIF Update Study
Construct 1-Lane Roundabout F + 4 hrs
delay
F with 3.1 hrs
delay F C $2,500,000 PM Pk-Hr 96%-$2,400,000 4%$100,000 96%2007 2015 TIF Update Study
Construct 1-Lane Roundabout or Equivalent
Improvements E F F C $2,500,000 PM Pk-Hr 83%-$2,075,000 0%$0 100%2007 2015 TIF Update Study
Construct 1-Lane Roundabout or Equivalent
Improvements E F F E $2,500,000 PM Pk-Hr 83%-$2,075,000 2%$42,500 100%1999 or earlier 2015 TIF Update Study
Construct 1-Lane Roundabout D D F C $3,500,000 PM Pk-Hr 99%-$3,465,000 1%$35,000 99%2007 2015 TIF Update Study
Convert to 2-Lane Roundabout D A F D $750,000 PM Pk-Hr 99%-$742,500 1%$7,500 99%2007 2015 TIF Update Study
Construct 2-Lane Roundabout D C F E $4,000,000 PM Pk-Hr 93%-$3,720,000 7%$280,000 100%1999 or earlier 2015 TIF Update Study
Construct 2-Lane Roundabout D B E E $4,000,000 PM Pk-Hr 89%-$3,560,000 11%$440,000 100%1999 or earlier 2015 TIF Update Study
Construct 3-Lane Roundabout D B F F $4,000,000 PM Pk-Hr 91%-$3,640,000 9%$360,000 91%2007 2015 TIF Update Study
Eastbound Left Turn Lane ----$500,000 PM Pk-Hr Advancing
Volume 52%-$260,000 0%$0 52%2007 2015 TIF Update Study
Southbound Left Turn Lane ----$500,000 PM Pk-Hr Advancing
Volume 91%-$455,000 9%$45,000 91%2007 2015 TIF Update Study
Eastbound Left Turn Lane ----$500,000 PM Pk-Hr Advancing
Volume 97%-$485,000 3%$15,000 97%1999 or earlier 2015 TIF Update Study
Donner Pass Road / South Shore Drive Westbound Left Turn Lane ----$500,000 PM Pk-Hr Advancing
Volume 84%-$420,000 16%$80,000 100%2016 2015 TIF Update Study
Truckee Roadways
2 Travel Lanes from Pioneer Commerce Center to
Northwoods Blvd. and from Jibboom St. to Pioneer Trail
(1)
D D E D $20,000,000
PM Pk-Hr on Donner
Pass Road: SR 89S to
Northwoods
100%-$20,000,000 0%$0 100%1999 or earlier 2015 TIF Update Study
Church Street
Extension Donner Pass Road to Glenshire Drive Extend from DPR to Glenshire Drive to Address
Glenshire/DPR Deficiency
E + 4 hrs
delay E F E $5,500,000 PM Pk-Hr at Glenshire
Dr./ DPR 100%-$5,500,000 0%$0 100%1999 or earlier 2015 TIF Update Study
SR 267 Brockway to Placer County Line Widen to 4 Lanes E E F D $4,100,000 Average Daily Traffic 80%-$3,280,000 20%$820,000 80%2007 Truckee General Plan Traffic
Study
Glenshire Drive Berkshire Circle to Wiltshire Lane Add Shoulders ----$2,650,000 -66%40%$1,049,400 0%$0 40%1999 or earlier Truckee Public Improvement &
Engineering Standards, 2003
Donner Pass Road South Shore Drive to Town Limits Add Shoulders ----$1,300,000 Average Daily Traffic 54%40%$421,200 11%$143,700 32%2016 Truckee Public Improvement &
Engineering Standards, 2003
West River Street All Add Shoulders ----$3,250,000 -64%40%$1,248,000 3%$87,100 38%2007 Truckee Public Improvement &
Engineering Standards, 2003
Nevada County Roadway
Glenshire Drive/
Hirshchdale Rd.
Improvements
Truckee Town Limits to I-80 WB Ramps Add Shoulders ----$3,000,000 -83%-$2,490,000 0%$0 72%2016
SUBTOTAL: Truckee and Eastern Nevada County (Current Fee Program)$72,550,000 $62,536,100 $3,498,800
Estimated Expenditures on Mousehole Project Subsequent to June 30, 2015 $800,000
Truckee Area Fair Share Contributions to Eastern Placer Improvements $9,595,291
Total: Truckee + Eastern Placer Projects $72,931,391
Credit for Placer County Traffic Impacts Already Included in Truckee TIF Program -$6,096,491
Cumulative AB 1600 Funds in Account as of July 1, 2015 -$6,283,640
Additional Funds Not Yet Collected $60,551,260
Projects Removed From 2007 TIF Project List -- No Longer Required to Provide Adequate LOS at Buildout
Intersection Improvements ----$812,684 ----
Construct 2-Lane Roundabout D C C -$4,876,106 ----
Provide Improvement to Bridge Street Crossing or
Eastern Underpass ----$6,000,000 ----
Total $11,688,790
Projects Removed From 2007 TIF Project List -- Completed
Construct bike and pedestrian tunnel ----$13,925,000 ----
Roadway Construction & Construction of Single Lane
Roundabout at DPR/Pioneer Trail ----$6,500,000 ----
Intersection Improvements ----$500,000 ----
Glenshire Drive Donner Pass Road to Somerset Add Shoulders ----$7,440,000 ----
Donner Pass Road South Shore to Moraine Add Shoulders ----$4,719,942 ----
Total $33,084,942
Note 1: A portion of this project including Comstock Dr and part of Pioneer Trail have been completed.Note 2: Prior to 1999, impact fees were collected through a program implemented by Nevada County prior to Town incorporation.Note 3: See Table 3.2/9/2016
Source: LSC Transportation Consultants, Inc. 2014 Truckee TIF.xlsx
SR 267 / I-80 WB Ramps
SR 267 / I-80 EB Ramps
Donner Pass Road / Cold Stream Road / I-80 EB Ramps
Donner Pass Road / I-80 WB Ramps (West Interchange)
Pioneer Trail & Bridge Street Extensions
West River Street / McIver Crossing
Donner Pass Road / Bridge Street
SR 89 North / Rainbow Road
Brockway Road / Reynolds Way
Donner Pass Road / Pioneer Trail
Bridge Street / West River Street
Donner Pass Road / I-80 EB Off Ramp (East Interchange)
SR 267 / Brockway Road
Glenshire Drive / Dorchester Road (West)
SR 89 North / Alder Creek Road
Donner Pass Road / SR 89 South
Downtown Rail Crossing Improvements
SR 89 / UPRR Undercrossing (Mousehole)
Comstock Drive and Portion of Pioneer Trail Extension
Glenshire Drive / Olympic Boulevard
Street / Intersection Segment Description of Improvement
Level of Service
Estimated Total Cost
($)
% of Total Funding That is
The Responsibility of
Future Development in TIF
Area(3)
(Bold Indicates Exceedance of Standards)
TABLE 3: Percent Funding Responsibility
General Plan Build-out Roadway Improvement Needs
Existing
Volume
Future
Volume Capacity
Truckee Intersections
1,090 1,034 1,460 1,365 89%80%71%
1,010 970 1,129 1,064 79%100%79%
990 970 2,100 2,035 96%100%96%
1,411 1,389 2,091 2,091 100%83%83%
1,686 1,644 2,952 2,887 98%85%83%
1,096 1,068 1,981 1,946 99%100%99%
1,301 1,273 2,491 2,456 99%100%99%
1,431 1,118 2,962 2,546 93%100%93%
1,661 1,189 3,357 2,692 89%100%89%
2,169 1,676 4,517 3,817 91%100%91%
810 810 1,348 1,348 100%52%52%
661 541 814 680 91%100%91%
806 799 1,422 1,399 97%100%97%
Donner Pass Road / South Shore Drive 478 423 720 626 84%100%84%
Truckee Roadways
----100%100%100%
Church Street Extension Donner Pass Road to Glenshire Drive 1,334 1,334 1,789 1,789 100%100%100%
SR 267 Brockway to Placer County Line 1,797 1,336 2,809 2,143 80%21,234 34,036 25,000 100%80%
Glenshire Drive Berkshire Circle to Wiltshire Lane 369 369 716 716 100%3,889 7,547 2,000 66%66%
Donner Pass Road South Shore Drive to Town Limits 295 239 515 421 83%3,378 5,885 2,000 65%54%
West River Street All 715 695 1,834 1,769 96%8,187 20,999 2,000 67%64%
Nevada County Roadway
Glenshire Drive
Improvements Truckee Town Limits to Hirschdale Rd 255 255 476 476 100%2,475 4,760 2,000 83%83%
Note 1: Based on incremental LOS analysis rather than total intersection volume.
Note 2: As existing conditions achieve LOS standards, all future exceedance is the responsibility of future development.
Note 3: As existing conditions along Donner Pass Road between Northwoods Drive and 89 South meet LOS standards, all future exceedance is the responsibility of future development.
Note 4: As existing conditions at Donner Pass Road / Glenshire Drive achieve LOS standards, all future exceedance is the responsibility of future development.
Source: LSC Transportation Consultants, Inc. 2014 Truckee TIF.xlsx
% of Total Funding
That is The
Responsibility of
Future Development in
TIF Area
Average Daily Traffic Volumes
SegmentStreet / Intersection
Truckee Traffic Model PM Peak-Hour Generated Traffic Volumes
2014
SR 89 North / Rainbow Road
Pioneer Trail & Bridge Street Extensions
Brockway Road / Reynolds Way
Donner Pass Road / Bridge Street
Glenshire Drive / Dorchester Road (West)
SR 267 / Brockway Road
Bridge Street / West River Street
SR 267 / I-80 WB Ramps
SR 267 / I-80 EB Ramps
Donner Pass Road / I-80 EB Off Ramp (Eastern Interchange)
Donner Pass Road / Pioneer Trail
Donner Pass Road / Cold Stream Road / I-80 EB Ramps
Donner Pass Road / I-80 WB Ramps (West Interchange)
West River Street / McIver Crossing
% of Capacity
Exceedance
Generated by
Future
Development
Note 2
Note 2
Note 1
Total Traffic
Volumes
Study Area-Generated
Traffic Volumes (At Least
One Trip End in Study
Area)
Total PM
Traffic
Volumes
Study Area-Generated
Traffic Volumes (At Least
One Trip End in Study
Area)
Build-Out
% of Total
Traffic Growth
Generated by
Study Area
Note 1
Note 1
Note 1
Note 2
Note 2
Note 2
Note 2
Note 2
Note 3
Note 4
Note 2
Note 2
Note 2
TABLE 4: Dwelling Unit Equivalent and Fee Calculation
Land Use Category Unit
DUE per
Unit
Growth in
Land Use DUE
Single-family DU 1.00 4,705 4,705
Multi-family DU 0.62 2,264 1,404
Mobile Home DU 0.59 37 22
Retirement DU 0.25 126 32
Hotel/Motel Room 0.70 562 393
Office 1,000 s.f.1.49 557 830
Medical Office 1,000 s.f.3.57 9 32
General Retail 1,000 s.f.2.64 692 1,827
Multiplex Movie Theater 1,000 s.f.2.94 24 71
Restaurant - Quality or High-Turnover 1,000 s.f.3.23 30 97
Fast Food Restaurant / Coffee Shop 1,000 s.f.8.78 17 147
Supermarket 1,000 s.f.3.24 40 130
Convenience Market 1,000 s.f.12.53 17 210
Bank 1,000 s.f.6.56 5 33
Gas Station Fueling Position 1.79 12 21
Health Fitness Club 1,000 s.f.2.65 25 66
Light Industrial 1,000 s.f.0.97 658 639
Warehouse 1,000 s.f.0.32 7 2
Hospital 1,000 s.f.0.72 3 2
Public Park Acres 0.20 261 52
Total DUE 10,715
Total Funding Responsibility of Future Truckee Growth $60,551,260
Fee per DUE $5,651
Calculation of Traffic Impact Fee per DUE
TABLE 5: Dwelling Unit Equivalent Factors and Fee Calculations
Fee Formula:$5,651 x DUE per Unit x Units (from Project) = fee
Land Use Category Unit
ITE Land Use
Code
PM Peak Hour Trip
Rate Per Unit3
% New
Trips
New
Trips per
Unit
DUE per
Unit
Residential
Single-family1 DU 210 1.00 100%1.00 1.00
Multi-family2 DU 220 0.62 100%0.62 0.62
Mobile Home DU 240 0.59 100%0.59 0.59
Retirement DU 252 0.25 100%0.25 0.25
Hotel/Motel Room 310 0.7 100%0.70 0.70
Office
General Office 1,000 s.f.710 1.49 100%1.49 1.49
Medical Office 1,000 s.f.720 3.57 100%3.57 3.57
Commercial
General Retail 1,000 s.f.Note 4 6.08 43%2.64 2.64
Multiplex Movie Theater 1,000 s.f.445 2.94 100%2.94 2.94
Restaurant - Quality or High-Turnover 1,000 s.f.931, 932 8.67 37%3.23 3.23
Fast Food Restaurant / Coffee Shop 1,000 s.f.933, 934 29.4 30%8.78 8.78
Supermarket 1,000 s.f.850 9.48 34%3.24 3.24
Convenience Market 1,000 s.f.851 52.4 24%12.5 12.53
Bank 1,000 s.f.912 24.3 27%6.56 6.56
Gas Station Fueling Position 944 13.87 13%1.79 1.79
Health Fitness Club 1,000 s.f.492 3.53 75%2.65 2.65
Industrial
Light Industrial 1,000 s.f.110 0.97 100%0.97 0.97
Warehouse 1,000 s.f.150 0.32 100%0.32 0.32
Hospital 1,000 s.f.610 0.93 77%0.72 0.72
Public Park Acre 417 0.2 100%0.2 0.20
School
Elementary School 1,000 s.f.520 1.21 80%0.97 0.97
Middle School 1,000 s.f.522 1.19 80%0.95 0.95
High School 1,000 s.f.530 0.97 80%0.78 0.78
Community College 1,000 s.f.540 2.54 80%2.03 2.03
Note 3: PM peak-hour of adjacent street traffic.
Note 4: Trip generation rate based on calibrated Town of Truckee Model.
2014 Truckee TIF.xlsx
Note 1: A secondary dwelling with a floor area greater than 850 square feet shall be considered a single-family residence for the purpose of this Ordinance. Any single-
family residence in excess of three bedrooms will be assessed an additional 0.33 DUE per bedroom in excess of three bedrooms.
Note 2: Multifamily units are any attached units (including duplex). In addition, a secondary dwelling with a floor area of 850 square feet or less shall be considered a
multifamily residence for the purpose of this Ordinance.
TABLE x: Turn Lane Warrant Summary
Turn Lane
Warranted
Existing?
Warranted
Future?
Existing
Threshold
Existing
Traffic
Volume
Future
Traffic
Volume
% of Capacity
Exceedance Generated
by Future Development Notes
Glenshire Road / Dorchester Road (West)Eastbound Left Yes Yes 200 422 658 52%
SR 89 North / Rainbow Road Southbound Left No Yes ---100%
SR 89 North / Alder Creek Road Northbound Left Yes No ---0%
Pioneer and Bridge St. Extensions
eliminate need for turn lane
Brockway Road / Reynolds Way Eastbound Left No Yes ---100%
Donner Pass Road / South Shore Drive Westbound Left No Yes ---100%
Critical Warrent Volume
Table X: Average Daily Traffic (ADT) Volume
Roadway Existing Capacity Existing ADT Future ADT
Glenshire Drive 2,000 3,889 7,547
West River Street 2,000 8,187 20,999
Alder Creek without Ext 2000 2724
Alder Creek with Extensions 2000 1295
DPR South Shore to Wolfe Dr 2000 3378 5885
DPR Wolfe Dr to Town Limits 2000 3206 5439
Preliminary TIF Calc for Glenshire Drive between Hirshdale Rd and Martis Peak Rd
ADT
Existing Capacity 2,000
Existing 2014 Model Volume 2,475
Buildout 2014 Model Volume 4,760
83%
100%
83%
% of Capacity Exceedance Generated by Future
Development
% of Total Traffic Growth Generated by Town of
Truckee
% of Total Funding That is The Responsibility of
Future Growth in Truckee
66%10.54
67%11.45
8.99 Peak hour to Daily
11.45