HomeMy Public PortalAboutBR PK DESCRIPTION AB02-9DESCRIPTON UNITS QUANTITY UNIT PRICE CONTRACTTOTAL CHANGE ORDER  Excavation of Material CU. YDS. 564 $12.00 $6,768.00*   Actual  403  $4,836.00 $4,836.00  Silt Fence LIN. FEET 250 $7.00 $1,750.00*   Actual  0  0   Asphalt Removal CU. YDS. 9 $12.00 $108.00* $108.00  Actual  9  $108.00   Basalt Rock CU. YDS. 168 $18.00 $3,024.00*   Actu al  960  $17,280.00 $20,304.00  Filter Fabric SQ. FT. 5,140 $0.78 $925.20* $925.20  Actual  9,000  $925.00   Large Boulders CU. YDS. 396 $22.00 $8,712.00*   Actual  336  $7,392.00 $7,392.00  Deck Removal SQ. FT. 3,463 $2.05 $7,099.15* $7,099.15  Actual  3,463  $7,099.15   Cut Pilings Ea. 30 $30.00 $900.00* 0  Actual  30  0   Deck Replacement SQ. FT. 3,036  0 0  Actual    0   Asphalt Path – Plant Mix Tons 25 $150.00 $3,750.00* 0  Actual    0   Base Preparation - Path CU. YDS. 81 $20.00 $1,620.00 * 0  Actual    0   Deck Sub-Structure Removal EA 1 $2,000 0 $2,000.00  Actual       Total    $34,656.35* $42,664.35  TOTAL AMOUNT OF BID IN FIGURES: $34,656.35 TOTAL AMOUNT OF CHANGE ORDERS: $ 8,007.80 TOTAL AMOUNT DUE: $42,664.15 TOTAL AMOUNT OF BID IN WORDS: Forty Two Thousand Six Hundred Sixty Four and 15/100 DOLLARS Change Order Items: Basalt Rock – an additional 960 cu yds were needed to build a road to the site and to reinforce the foundation for the large boulders. A large area where the deck was removed needed to be filled. Deck Sub-Structure removal – the deck sub-structure was completely rotten and had to be removed. The original plan was to build a new deck over the existing sub-structure.